659-20-100_01-11-22_ Plumbing Bid Documents - Revision 1.pdf

PDF 1 MB Posted

Attached to
Z1DA--Bldg. 5 Pharmacy Cleanroom
Solicitation number
36C24622B0004
Issued by

About this file

This document package includes bid documents and a federal contract opportunity notice for a plumbing project. The bid documents provide specifications for plumbing work required to install a clean room in Building 5 of the W.G. Hefner VA Medical Center in Salisbury, North Carolina. The scope of work involves demolishing an existing sink and associated piping and installing a new sink along with hot and cold water, vent, and waste piping. The contract opportunity notice is a solicitation for a service-disabled veteran-owned small business to provide all labor, materials, equipment, permits, and supervision to construct the clean room space in accordance with the specifications. The bid due date is March 4, 2022 and the virtual bid opening will be held on March 10, 2022. The estimated value of the construction project is between $500,000 and $1 million.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL PLUMBING NOTES

PLUMBING ABBREVIATIONS

DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.

Phone: (804) 726-9540 https//raymond.global

1601 Summit Avenue

Richmond, VA 23230

DATE DESCRIPTION

PROJECT NO.: RVA1033.003

OWNER:

WG HEFNER VAMC

BUILDING 5

PHARMACY CLEAN ROOM

1601 BRENNER AVE

SALISBURY, NC, 28144

SENSITIVE UNCLASSIFIED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUES / REVISIONS

09/15/20 15% SD SUBMISSION

10/29/20 35% SD SUBMISSION

DATE VA COR SIGN OFF

09/15/20 ANDRE L. NOBS

SUB

15% SD

11/18/20 ANDRE L. NOBS35% SD

12/19/20 65% DD SUBMISSION

02/25/21 95% DD SUBMISSION

2/2/21 ERIC STEWART65% DD

3/12/21 ERIC STEWART95% DD

03/26/21 100% DD SUBMISSION

05/09/21 FINAL BID DOCUMENTS

4/16/21 ANDRE HAYLES100% DD

09/29/21 DILANDRO COMMENTS

SHEET NAMING CONVENTION

1. ALL EXISTING EQUIPMENT IS SHOWN IN HALFTONE LINEWORK.

ALL DEMOLISHED EQUIPMENT IS SHOWN IN BOLD LINEWORK,

DASHED AND HATCHED. ALL NEW OR RELOCATED EQUIPMENT

IS SHOWN IN BOLD LINEWORK. BELOW IS AN EXAMPLE OF

EACH:

EXISTING EQUIPMENT

NEW OR RELOCATED EQUIPMENT

DASHED INDICATES EQUIPMENT TO BE DEMOLISHED

DEMOLITION NOTES

P-001

PLUMBING GENERAL NOTES, LEGENDS,

ABBREVIATIONS AND SCHEDULE

A/E

AFF

AG

AS

ASHRAE

ASME

ARCHITECT / ENGINEER

ABOVE FINISH FLOOR

AIR GAP

AUTOMATIC SPRINKLER

AMERICAN SOCIETY OF HEATING

AMERICAN SOCIETY OF MECHANICAL

REFRIGERATION, AND AIR CONDITIONING

ENGINEERS

ASPE

BFP

BSP

BTU

BTUH

C

DCW

DHW

DHWR

DHWS

DN

DOE

DWG

EL

EPA

EX

F

FD

FM

H&CW

HB

HYD

M

NIC

NTS

PG

PRV

TYP

WG

WH

WH

WL

WM

WSFU

YH

ENGINEERS

AMERICAN SOCIETY OF PLUMBING

ENGINEERS

REDUCED PRESSURE BACKFLOW

PREVENTER

BLACK STEEL PIPE

BRITISH THERMAL UNIT

CELSIUS

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

DOWN

DEPARTMENT OF ENERGY

DRAWINGS

ELEVATION

ENVIRONMENTAL PROTECTION

EXISTING

FAHRENHEIT

FLOOR DRAIN

FLOW METER

HOT AND COLD WATER

HOSE BIBB

HYDRANT

METER

NOT IN CONTRACT

NOT TO SCALE

PRESSURE GAUGE

PRESSURE REDUCING VALVE

TYPICAL

WATER GAUGE

WALL HYDRANT

WATER HEATER

WATER LINE

WATER METER

WATER SUPPLY FIXTURE UNITS

YARD HYDRANT

AGENCY

BRITISH THERMAL UNIT PER HOUR

DOMESTIC HOT WATER SUPPLY

PLUMBING PIPING SYMBOLS:

DOMESTIC COLD WATER, COLD WATER

DOMESTIC HOT WATER, HOT WATER

DOMESTIC HOT WATER RETURN, HOT WATER RETURN

GENERAL PLUMBING SYMBOLS:

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OR INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

LIMIT OF DEMOLITION

GATE VALVE

GLOBE VALVE

GATE VALVE WITH 3/4"

HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

PLUMBING VALVE SYMBOLS:

SP-1

SUMP PUMP (50 GPM)

SD SD

VENT PIPING

SANITARY WASTE PIPING

STORM WATER PIPING

1. PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE 2015 IBC, 2015 IPC, AND 2015

IFGC.

2. SLOPES AND INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS

INSTALLED IN ORDER TO MAINTAIN PROPER SLOPES. ANY DISCREPANCIES SHALL

BE REPORTED TO CONTRACTING OFFICER'S REPRESENTATIVE. ALL PIPING SHALL

BE LOCATED AND DETERMINED WHEN TO BE INSTALLED TO AVOID CONFLICT WITH

OTHER DISCIPLINES.

3. PIPING SHALL BE CONCEALED UNLESS OTHERWISE NOTED.

4. KEEP ALL BURIED PIPING CLEAR OF FOOTINGS.

5. ALL WALL CLEANOUTS SHALL BE PROVIDED WITH WALL COVERS AND MOUNTED IN

UNOBTRUSIVE LOCATIONS WHILE MAINTAINING ACCESSIBILITY. ALL FLOOR

CLEANOUTS SHOWN SHALL BE SET FLUSH WITH FLOOR AREAS OR FINISHED

GRADE.

6. COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL AND

ELECTRICAL EQUIPMENT. NO PIPING SHALL BE INSTALLED ABOVE ELECTRICAL,

COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH

ARCHITECTURAL PLANS FOR EXACT LOCATION OF PLUMBING FIXTURES,

COMPLIANCE TO ADA CLEARANCES, AND FINISHES.

7. PROVIDE REQUIRED WATER, WASTE, AND VENT PIPING, FITTINGS, AND INSULATION,

AND MAKE FINAL CONNECTIONS TO EQUIPMENT. THESE PLANS ARE SCHEMATIC

AND DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS,

VALVES, AND MISCELLANEOUS FITTINGS FOR A COMPLETE INSTALLATION. ALL

PIPING, EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE

WITH SPECIFICATIONS, LOCAL CODES AND ORDINANCES, AND MANUFACTURER'S

INSTRUCTIONS.

8. SANITARY SEWER PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF

1%. WASTE PIPING 3" AND SMALLER SHALL BE INSTALLED TO PROVIDE A MINIMUM

SLOPE OF 2%.

9. DO NOT SCALE DRAWINGS. REFER TO ARCHITECTURE DRAWINGS FOR EXACT

DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, AND NUMBERS.

10. EXTENSION OF EQUIPMENT DRAINS TO FLOOR DRAINS, FLOOR SINKS, AND OPEN

SITE DRAINS SHALL BE PROVIDED BY EQUIPMENT CONTRACTOR.

11. WHERE POSSIBLE, INSTALL SHUT-OFF VALVES AND EQUIPMENT REQUIRING

MAINTENANCE, CLEANING AND ADJUSTMENT ABOVE ACCESSIBLE CEILINGS OR IN

SERVICE AREAS SUCH AS JANITOR'S CLOSETS. IN OTHER LOCATIONS, PROVIDE

ACCESS PANELS IN INCONSPICUOUS LOCATIONS WITH FINISH TO MATCH

ARCHITECTURAL.

12. ALL HOSE BIBBS, WALL HYDRANTS, AND VALVES WITH THREADED HOSE

CONNECTIONS SHALL BE EQUIPPED WITH VACUUM BREAKER.

13. WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES,

MATERIALS, FLUID BEING HANDLED, AND INVERTS OF ALL EXISTING UTILITIES AND

CONFIRM THAT NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE

INSTALLED CONFORMING TO CODE AND AS SHOWN. NOTIFY CONTRACTING

OFFICER'S REPRESENTATIVE OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO

PURCHASING ANY MATERIALS OR PERFORMING ANY WORK OR EXTENSION OF

CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER WORK TO PROVIDE

ACCESS TO THE CONCEALED UTILITY.

14. PROVIDE INSULATION, PIPE IDENTIFICATION, AND OTHER REQUIREMENTS AS

LISTED IN SPECIFICATIONS.

15. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND ELEVATIONS

OF ALL PLUMBING FIXTURES.

16. ALL PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING

STRUCTURE AND SHALL NOT REST ON CEILING TILES OR BE SUPPORTED FROM

CEILING TILES.

17. WATER PIPING ROUTED ABOVE CEILINGS AND IN EXTERIOR WALLS SHALL BE

ROUTED ON HEATED SIDE (UNDERSIDE) OF CEILING INSULATION AND HEATED SIDE

(INSIDE) OF WALL INSULATION.

18. TOPS OF ALL FLOOR DRAINS AND CLEANOUTS SHALL BE SET FLUSH WITH FINISHED

FLOOR, UNLESS NOTED OTHERWISE.

19. LOCATE ALL SECTIONAL OR MAIN CONTROL VALVES WITHIN 1'-0" FROM ACCESS

PANELS, CEILING TILES, OR OTHER POINT OF ACCESS.

20. PROVIDE WATER HAMMER ARRESTORS SIZED PER PDI SPECIFICATIONS ON ALL

DOMESTIC WATER LINES SERVING FLUSH VALVE FIXTURES, WASHING MACHINES

SUPPLIES, PRV STATIONS, AND OTHER INSTALLATIONS WITH QUICK CLOSING

VALVES.

21. PROVIDE A MANUFACTURED EXPANSION DEVICE OR FABRICATED EXPANSION LOOP

ON ALL PIPING SYSTEMS CROSSING BUILDING EXPANSION JOINTS.

22. COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL

PLUMBING EQUIPMENT WITH THE ELECTRICAL DRAWINGS AND THE ELECTRICAL

CONTRACTOR, AND FURNISH EQUIPMENT WIRED FOR THE VOLTAGES SHOWN

THEREIN.

23. ALL PLUMBING EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED FOR A MINIMUM

PERIOD OF ONE YEAR AFTER OWNER'S FINAL ACCEPTANCE.

24. ALL PIPE PENETRATIONS OF FIRE AND/OR SMOKE-RATED ASSEMBLIES SHALL BE

FIRE-STOPPED AS REQUIRED TO RESTORE ASSEMBLY TO ORIGINAL INTEGRITY.

FIRE BARRIER PRODUCTS SHALL BE AS MANUFACTURED BY 3M COMPANY, CP25

CAULK, CS195 COMPOSITE PANEL, FS195 WRAP/STRIP, OR PSS 7900 SERIES

SYSTEMS AS RECOMMENDED BY MANUFACTURER FOR PARTICULAR APPLICATION,

OR EQUIVALENT SYSTEM AS APPROVED BY LOCAL CODE OFFICIALS.

25. ALL WATER CLOSET FLUSH VALVE LEVERS SHALL BE LOCATED ON THE APPROACH

SIDE OF THE WATER CLOSET.

26. ALL VENTS THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY

OUTSIDE AIR INTAKE.

27. ALL COLD WATER, HOT WATER, AND DRAIN PIPING AT HANDICAPPED FIXTURES

SHALL BE INSULATED WITH HANDI-LAV GUARD MODELS 102 AND 105 (OR APPROVED

EQUAL) INSULATION KITS.

28. NOT ALL PLUMBING ABBREVIATIONS SHOWN WILL BE USED FOR THIS PROJECT.

PRESSURE REDUCING VALVE

NA NOT APPLICABLE

PDI PRE-DELIVERY INSPECTION

IBC

INTERNATIONAL BUILDING CODE

IFGC

INTERNATIONAL FUEL GAS CODE

IPC

INTERNATIONAL PLUMBING CODE

WWW

CO CLEAN OUT

TP TRAP PRIMER

WCO WALL CLEAN OUT

W/ WITH

WASTE

MARK

DESCRIPTION VENT CW

WASTE

HW

FIXTURE

UNITS

WATER

FIXTURE

UNITS

WRIST

BLADE

HANDLES

ELECTRIC

SENSOR

REMARKS

PLUMBING FIXTURE SCHEDULE

LAVATORY SINKP-516 2"

3 2

CAH

CAH

VN

P-001A

2 DIGIT DISCIPLINE

DESIGNATOR

G GENERAL

A ARCHITECTURAL

S STRUCTURAL

FA FIRE ALARM

E ELECTRICAL

ED ELECTRICAL DEMOLITION

M MECHANICAL

MD MECHANICAL DEMOLITION

MH MECHANICAL HVAC

P PLUMBING

1 DIGIT SHEET TYPE

DESIGNATOR

0 - GENERAL

1 - PLANS

2 - ELEVATIONS

3 - SECTIONS

4 - ENLARGED PLANS

5 - DETAILS

6 - SCHEDULES AND DIAGRAMS

7 - VARIES

8 - VARIES

9 - 3D VIEWS (ISO, PERSPECTIVES)

2 DIGIT SEQUENTIAL # (01-99)

1 DIGIT AREA

DESIGNATOR

(AREA DESIGNATOR

ONLY USED WHEN

PLANS ARE SUBDIVIDED

INTO AREAS.)

W W

W W

W W

3" VTR (E)

1/2" CW (E)

1/2" HW (E)

1/2" CW (E)

1/2" HW (E)

3" VTR (E)

P-516, NEW SINK

EXISTING SINK

PIPES BELOW FLOOR LEVEL

PIPES BELOW FLOOR LEVEL

GENERAL NOTES

KEYED NOTES

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - DEMO

1. REMOVE SINK AND TRIM. REMOVE ASSOCIATED CW AND HW PIPING AS

SHOWN.

2. INSTALL SINK PROVIDED WITH THE CLEAN ROOM. PROVIDE ALL

NECESSARY TRIM PARTS FOR A COMPLETE INSTALLATION OF SINK.

EXTEND 2" WASTE, 1 1

2" VENT, 1

2 " HOT WATER, 1

2" COLD WATER PIPING TO

NEW SINK.

SCALE: 1/8" = 1'-0"

PLUMBING FLOOR PLAN - NEW

HAZARDOUS

COMPOUNDING

ROOM

HAZARDOUS

STORAGE

ROOM

PHARMACY

STAGING

NON-HAZARDOUS

COMPOUNDING

ROOM

ANTE

ROOM

DOCUMENTS ARE PROPERTY OF THE U.S. GOVERNMENT.

Phone: (804) 726-9540 https//raymond.global

1601 Summit Avenue

Richmond, VA 23230

DATE DESCRIPTION

PROJECT NO.: RVA1033.003

OWNER:

WG HEFNER VAMC

BUILDING 5

PHARMACY CLEAN ROOM

1601 BRENNER AVE

SALISBURY, NC, 28144

SENSITIVE UNCLASSIFIED

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUES / REVISIONS

09/15/20 15% SD SUBMISSION

10/29/20 35% SD SUBMISSION

DATE VA COR SIGN OFF

09/15/20 ANDRE L. NOBS

SUB

15% SD

11/18/20 ANDRE L. NOBS35% SD

12/19/20 65% DD SUBMISSION

02/25/21 95% DD SUBMISSION

2/2/21 ERIC STEWART65% DD

3/12/21 ERIC STEWART95% DD

03/26/21 100% DD SUBMISSION

05/09/21 FINAL BID DOCUMENTS

4/16/21 ANDRE HAYLES100% DD

09/29/21 DILANDRO COMMENTS

P-101

PLUMBING FLOOR PLAN DEMO AND

NEW

PROJECT

NORTH

PROJECT

NORTH

CAH

CAH

VN

Sheets and Views
RVA1033-003 Plmb Drawings - P-001
RVA1033-003 Plmb Drawings - P-101

File details come from the government source that posted it. Updated .