This document is a set of construction drawings and specifications for a federal contract opportunity to Correct Campus Steam System Failures at the Jefferson Barracks Division of the St. Louis VA Medical Center in St. Louis, MO.
The scope of work includes architectural, mechanical, and electrical construction to improve steam and condensate system functionality, manhole access, safety, remote valve operation, monitoring of manhole system components, and compliance with VA and industry standards. Key elements include replacing compensators, steam valves, condensate receiver pumps, condensate distribution loop, sump pumps, and installing remote steam trap and valve monitoring, as well as moisture monitoring in the steam vaults. The period of performance is estimated at 180 days. This project is under number 657-23-115JB, and the solicitation number is 36C25524R0096.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSB/55-1
3000A, 480/277V, 3PH, 4W,
100kAIC
2000kVA 4160-480Y/277V 3P,4W
MVSG
ATS/'55-LS1'
ISC=31,552A
ATS/'55-C1'
ISC=31,784A
ATS/'55-EQ1'
ISC=30,218A
ATS/'55-EQ2'
ISC=28,941A
DP/55-EQ2
ISC=25,062A
DP/'55-EQ1'
1200A, 480/277V, 3PH, 4W,
42kAIC, ISC=25,062A
MCC-'55-2E'
ISC=8,345A
MCC-'55-E'
ISC=24,214A
TR-55-EQ1
45kVA
TR-55-EQ4
30kVA
TR-55-EQ3
45kVA
TR-55-EQ2
30kVA
PANEL
'55-1EQ2-1'
ISC=2,170A
PANEL
'55-1EQ2-2'
ISC=1,996A
PANEL
'55-2EQ1-1'
ISC=1,699A
PANEL
'55-3EQ1-1'
ISC=1,374A
PANEL
'55-1EQ3-1'
ISC=1,843A
PANEL
'55-2EQ3-1'
ISC=1,268A
PANEL
'55-3EQ3-1'
ISC=1,007A
PANEL
'55-1EQ4-1'
ISC=1,858A
PANEL
'55-1EQ4-2'
ISC=1,724A
PANEL
'55-2EQ4-1'
ISC=1,519A
PANEL
'55-1EQ4-1'
ISC=1,247A
PANEL
'55-1EQ1-1'
ISC=2,540A
PANEL
'55-1EQ1-2'
ISC=2,511A
PANEL
'55-2EQ1-1'
ISC=1,699A
PANEL
'55-3EQ1-1'
ISC=1,374A
TR-55-1C3
30kVA
PANEL
'55-1C3'
ISC=4,192A
PANEL
'55-1C3P'
ISC=1,016A
PANEL
'55-2EQ1-1'
ISC=1,699A
PANEL
'55-3EQ1-1'
ISC=1,374A
TR-55-1C4
30kVA
TR-55-2C1
30kVA
PANEL
'55-2C1'
ISC=7,726A
PANEL
'55-2C1P'
ISC=1,085A
PANEL
'55-2C1P-1'
PANEL
'55-2C2P'
ISC=892A
TR-55-2C2
15kVA
TR-55-2C3
15kVA
PANEL
'55-2C3'
ISC=4,098A
PANEL
'55-2C3P'
ISC=1,017A
PANEL
'55-2C4P'
ISC=854A
PANEL
'55-2C4P-1'
TR-55-2C4
30kVA
TR-55-3C1
30kVA
PANEL
'55-3C1'
ISC=7,159A
PANEL
'55-3C1P'
ISC=1,077A
PANEL
'55-3C1P-1'
PANEL
'55-3C2P'
ISC=902A
TR-55-2C2
15kVA
TR-55-3C3
15kVA
PANEL
'55-3C3'
ISC=3,899A
PANEL
'55-3C3P'
ISC=988A
PANEL
'55-3C4P'
ISC=853A
PANEL
'55-3C4P-1'
TR-55-3C4
30kVA
DP/'55-C1'
400A, 480/277V, 3PH, 4W
42kAIC, ISC=25,062
TO 5kV PAD
MOUNTED SWITCH
1000A
GSB/'55-1'
1200A, 480/277V, 3PH, 4W,
10kAIC, ISC=4,859A
E N
L
E N
L
E N
L
E N
L
DP/'55-LS1'
225A, 480/277V, 3PH, 4W
42kAIC, ISC=25,622
PANEL
'55-3LS3P'
ISC=1,017A
TR-55-3LS3
15kVA
PANEL
'55-3LS3'
ISC=4,015A
PANEL
'55-3LS1P'
ISC=2,227A
TR-55-3LS1
30kVA
PANEL
'55-3LS1'
ISC=7,689A
PANEL
'55-3LS1P2'
ISC=1,074A
PANEL
'55-2LS3P'
ISC=1,036A
TR-55-2LS3
15kVA
PANEL
'55-2LS3'
ISC=7,988A
PANEL
'55-2LS1P'
ISC=1,032A
TR-55-2LS1
15kVA
PANEL
'55-2LS1'
ISC=7,718A
PANEL
'55-LSP-1'
ISC=1,077A
TR-55-LS1
15kVA
PANEL
'55-LS1'
ISC=7,806A
PANEL
'55-1LS3P'
ISC=1,006A
TR-55-1LS3
15kVA
PANEL
'55-1LS3'
ISC=4,208A
PANEL
'55-1LS1P'
ISC=1,078A
TR-55-1LS31
15kVA
PANEL
'55-1LS1'
ISC=9,320A
DP/'55-M'
1200A, 480/277V, 3PH, 4W,
42kAIC, ISC=31,933A
MCC-'55-1'
ISC=30,090A
MCC-'55-2'
ISC=4,183A
DP/'55-L'
400A, 480/277V, 3PH, 4W,
42kAIC, ISC=30,442A
PANEL
55-'1L3'
ISC=4,352A
PANEL
55-'2L3'
ISC=4,000A
PANEL
55-'3L3'
ISC=3,860A
PANEL
55-'1L1'
ISC=8,609A
PANEL
55-'2L1'
ISC=6,248A
PANEL
55-'3L1'
ISC=6,382A
DP/'55-R'
1200A, 480/277V, 3PH, 4W,
42kAIC, ISC=31,357A
TR-55-1N4
150kVA
DP/'55-1N4'
500A, 480/277V, 3PH, 42
22kAIC, ISC=7,325A
PANEL
'55-3N4-1'
ISC=5,568A
PANEL
'55-3N4-2'
ISC=5,660A
PANEL
'55-2N4-1'
ISC=6,303A
PANEL
'55-2N4-2'
ISC=6,092A
PANEL
'55-1N4-1'
ISC=7,105A
TR-55-1N3
150kVA
DP/'55-1N3'
500A, 208/120V, 3PH, 4W,
22kAIC, ISC=8,636A
PANEL
'55-3N3-1'
ISC=5,910A
PANEL
'55-3N3-2'
ISC=5,717A
PANEL
'55-2N3-1'
ISC=6,373A
PANEL
'55-2N3-2'
ISC=5,993A
PANEL
'55-1N3-1'
ISC=7,137A
PANEL
'55-1N3-2'
ISC=5,923A
TR-55-1N2
150kVA
DP/'55-1N2'
500A, 2080/120V, 3PH, 4W,
42kAIC, ISC=8,636A
PANEL
'55-3N2-1'
ISC=7,063A
PANEL
'55-3N2-2'
ISC=6,842A
PANEL
'55-2N2-1'
ISC=7,265A
PANEL
'55-2N2-2'
ISC=6,986A
PANEL
'55-1N2-2'
ISC=8,112A
PANEL
'55-1N2-1'
ISC=8,399A
DP/'55-1N1'
500A, 208/120V, 3PH, 4W,
42kAIC, ISC=8,694A
PANEL
'55-3N1-1'
ISC=6,795A
PANEL
'55-3N1-2'
ISC=6,552A
PANEL
'55-2N1-1'
ISC=7,306A
PANEL
'55-2N1-2'
ISC=7,024A
PANEL
'55-1N1-2'
ISC=8,001A
PANEL
'55-1N1-1'
ISC=8,333A
TR-55-1N1
150kVA
GEN-'55-1'
500kW/625kVA
480Y/277V, 3P,4W
G
225A/3P
400A/3P
2 SETS, 2"C-4#3/0, #3G
55-1A129A
208V, 3PH
100A
55-1B104A
208V, 3PH
100A
55-1C132A
208V, 3PH
100A
55-2A136A
208V, 3PH
100A
55-2C144A
208V, 3PH
100A
55-3A120A
208V, 3PH
100A
55-3C149A
208V, 3PH
100A
DISTRIBUTION PANEL
55-DP-TRA
400A, 208V, 3PH
100A/3P 100A/3P 100A/3P 100A/3P 100A/3P 100A/3P 100A/3P 20A/3P 20A/3P
1-1/4"C-4#3, #8G
SPD DPM
4"C-4#600 KCM, 1#3 GND
3"C-4#250, 1#4 GND
3"C-4#250, 1#4 GND
400A/3P 800A/3P 400A/3P 400A/3P 400A/3P 800A/3P 400A/3P 1000A/3P 1000A/3P 400A/3P
600A/3P 225A/3P 150A/3P 150A/3P
50A/3P50A/3P70A/3P50A/3P225A/3P225A/3P
100A/3P 100A/3P100A/3P 100A/3P 100A/3P
175A/3P 250A/3P 250A/3P 250A/3P
500A/3P
150A/3P 150A/3P 150A/3P 400A/3P
400A/3P
DISTRIBUTION PANEL
55-DP-TRB
400A, 208V, 3PH
100A/3P 100A/3P 100A/3P 100A/3P 100A/3P 100A/3P 100A/3P
55-1A129B
208V, 3PH
100A
55-1B104B
208V, 3PH
100A
55-1C132B
208V, 3PH
100A
55-2A136B
208V, 3PH
100A
55-2C144B
208V, 3PH
100A
55-3A120B
208V, 3PH
100A
55-3C149B
208V, 3PH
100A
20A/3P 20A/3P
SPD DPM
2 SETS, 2"C-4#3/0, #3G
1-1/4"C-4#3, #8G
200A/3P 150A/3P 200A/3P
200A/3P
500A/3P
150A/3P 200A/3P
200A/3P 200A/3P 200A/3P
500A/3P
125A/3P 125A/3P 125A/3P 125A/3P 125A/3P 125A/3P 125A/3P
2"C-3#4/0,#4G
TR-55-DP-TRA
150kVA 480-208/120V
SUMP
PUMP
CONTROL
PANEL
"CP-MH-7"
208V, 1PH
MANHOLE
"MH-7"
MANHOLE
"MH-8"
MANHOLE
"MH-9"
MANHOLE
"MH-10"
J
1/31/3
SUMP PUMP
"SP-6B"
SUMP PUMP
"SP-6A"
TYP.
P-2
P-1
SUMP
PUMP
CONTROL
PANEL
"CP-MH-8"
208V, 1PH
J
1/31/3
SUMP PUMP
"SP-7B"
SUMP PUMP
"SP-7A"
P-2
P-1
SUMP
PUMP
CONTROL
PANEL
"CP-MH-9"
208V, 1PH
J
1/31/3
SUMP PUMP
"SP-8B"
SUMP PUMP
"SP-8A"
P-2
P-1
SUMP
PUMP
CONTROL
PANEL
"CP-MH-10"
208V, 1PH
J
1/31/3
SUMP PUMP
"SP-9B"
SUMP PUMP
"SP-9A"
P-2
P-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:4 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
BLDG 55 - ONE-LINE DIAGRAM
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
55EP601
KEY NOTES
GENERAL NOTES
NTS
1 BLDG 55 - ONE-LINE DIAGRAM
Revisions: Date:
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLAN,
AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR
TO IMPLEMENTATION.
3. ONE-LINE TOPOLOGY DOWNSTREAM FROM PANELBOARD "55-1N3-2" IS
DIAGRAMATICAL IN NATURE AND UNVERIFIED. CONTRACTOR SHALL PROVIDE FIELD
INVESTIGATION TO FULLY AS-BUILD EXISTING FEEDERS [CONDUCTORS AND
RACEWAYS (QUANTITY, SIZE, AND CONDITION)] FROM PANELBOARD SOURCE TO
EQUIPMENT LOADS WITHIN MANHOLE(S). COORDINATE WITH VA AS REQUIRED FOR
ALL INVESTIGATIONS.
EXISTING PANELBOARD PROVIDING POWER TO MANHOLES. PROVIDE UPDATE TO
CIRCUIT DIRECTORIES AS REQUIRED. PRIOR TO CIRCUITING NEW LOADS,
CONTRACTOR SHALL PROVIDE 30-DAY POWER DEMAND LOAD STUDY PER NEC
220.87 TO VERIFY PANELBOARD CAPACITY.
PROVIDE JUNCTION BOX TO SPLICE EXISTING CONDUCTORS AND PROVIDE POWER
TO LOCAL SUMP PUMP CONTROL PANEL. REFERENCE ASSOCIATED ENLARGED
MANHOLE PLAN FOR ADDITIONAL INFORMATION.
75-DP-TRAB
208V, 3PH
200A 200A/3P
20A/3P20A/3P100A/3P100A/3P
DPMSPD
1/4"C-4#3, #8G
75-1B105A
208V, 3PH
100A
75-1B105B
208V, 3PH
100A
2"C-4#3/0, #6G
PANEL
75N(SEC1)
250A, 208V, 3PH
4W
PANEL
75N(SEC2)
250A, 208V, 3PH
4W
600A/3P
250A/3P60A/3P
SPD
TO UNIT SUBSTATION UNS 75
CBL-TR-MDP75-1-4160V
Cable Size 600 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation Non-Segregated
TR-MDP75-1-4160V
System Nominal Voltage 4160.0 V
13464 Amps 3P
X/R Pos 10.91
12459 Amps SLG
X/R SLG 10.5532
S
P
TR-MDP75-1
Nominal kVA 2500.0 kVA
Z% 5.7500 %
X/R 10.4739
Pri RatedVoltage 4160 V
Pri FLA 347.0 A
Sec RatedVoltage 480 V
Sec FLA 3007.0 A
TR-MDP75-1-480V
System Nominal Voltage 480.0 V
50311 Amps 3P
X/R Pos 9.55
50686 Amps SLG
X/R SLG 9.8386
CBL-0030
Cable Size 3000 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation
(MDP/75- 1)
Frame/Rating 3000.0 A
Frame/Model KTU
(MDP/75-1)
System Nominal Voltage 480.0 V
50211 Amps 3P
X/R Pos 9.29
50097 Amps SLG
X/R SLG 8.3585
(MDP/75-1)-1 (MDP/75-1)-3
Frame/Rating 1600.0 A
Frame/Model PA
Settings
Thermal Curve
INST LO (4960A)
(MDP/75-1)-2
Frame/Rating 800.0 A
Frame/Model PA
Settings
Thermal Curve
INST LO (3200A)
CBL-0036
Cable Size 500 AWG/kcmil
Length 145.0 ft
QtyPerPhase 5
Installation
CBL-0037
Cable Size 300 AWG/kcmil
Length 87.0 ft
QtyPerPhase 3
Installation
(MCC/75-2)
PD-0184
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0185
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0186
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0187
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0188
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0189
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0190
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0191
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0192
Frame/Rating 0.0 A
Frame/Model
Settings
System Nominal Voltage 480.0 V
39128 Amps 3P
X/R Pos 3.71
34080 Amps SLG
X/R SLG 2.5903
Frame/Rating 1000.0 A
Frame/Model PA
Settings
Thermal Curve
INST LO (3500A)
(MDP/75-1)-4
Frame/Rating 225.0 A
Frame/Model KC
Settings
Thermal Curve
INST LO (1125A)
(MDP/75-1)-5
Frame/Rating 250.0 A
Frame/Model KA
Settings
Thermal Curve
INST LO (875A)
CBL-0038 CBL-0039
Cable Size 300 AWG/kcmil
Length 134.0 ft
Qty Per Phase 3
Installation
Cable Size 2 AWG/kcmil
Length 113.0 ft
Qty Per Phase 1
Installation
PANEL '75L'
System Nominal Voltage 480.0 V
10364 Amps 3P
X/R Pos 0.51
6392 Amps SLG
X/R SLG 0.3824
S
P
CBL-0040
Cable Size 2/0 AWG/kcmil
Length 12.0 ft
Qty Per Phase 1
Installation
(TR/75N)
Nominal kVA 112.5 kVA
Z% 5.0000 %
X/R 3.1562
Pri Rated Voltage 480 V
Pri FLA 135.3 A
CBL-BLR-1
Cable Size 4 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation
BUS-BLR-1
System Nominal Voltage 480.0 V
31209 Amps 3P
X/R Pos 1.48
25862 Amps SLG
X/R SLG 1.2513
MTRI-BLR-1
Init Sym RMS 3P 279.13 A
Init Sym RMS SLG 154.20 A
Rated HP 40.0 hp
Rated Voltage 480 V
Rated Amps 48.2 A
CBL-BLR-2
Cable Size 4 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation
BUS-BLR-2
System Nominal Voltage 480.0 V
31209 Amps 3P
X/R Pos 1.48
25862 Amps SLG
X/R SLG 1.2513
MTRI-BLR-2
Init Sym RMS 3P 279.13 A
Init Sym RMS SLG 154.20 A
Rated HP 40.0 hp
Rated Voltage 480 V
Rated Amps 48.2 A
CBL-BLR-3
Cable Size 4 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation
BUS-BLR-3
System Nominal Voltage 480.0 V
31209 Amps 3P
X/R Pos 1.48
25862 Amps SLG
X/R SLG 1.2513
MTRI-BLR-3
Init Sym RMS 3P 279.13 A
Init Sym RMS SLG 154.20 A
Rated HP 40.0 hp
Rated Voltage 480 V
Rated Amps 48.2 A
CBL-AC-1
Cable Size 8 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-AC-1
System Nominal Voltage 480.0 V
22154 Amps 3P
X/R Pos 0.75
18062 Amps SLG
X/R SLG 0.6699
MTRI-AC-1
Init Sym RMS 3P 139.57 A
Init Sym RMS SLG 75.86 A
Rated HP 20.0 hp
Rated Voltage 480 V
Rated Amps 24.1 A
CBL-ROP-1 & 2
CableSize 12 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-ROP-1 & 2
System Nominal Voltage 480.0 V
12475 Amps 3P
X/R Pos 0.38
10200 Amps SLG
X/R SLG 0.3510
MTRI-ROP-1 & 2
Init Sym RMS 3P 41.87 A
Init Sym RMS SLG 22.82 A
Rated HP 6.0 hp
Rated Voltage 480 V
Rated Amps 7.2 A
CBL-FOP-1 & 2
Cable Size 12 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-FOP-1 & 2
System Nominal Voltage 480.0 V
12470 Amps 3P
X/R Pos 0.37
10197 Amps SLG
X/R SLG 0.3503
MTRI-FOP-1 & 2
Init Sym RMS 3P 27.91 A
Init Sym RMS SLG 15.22 A
Rated HP 4.0 hp
Rated Voltage 480 V
Rated Amps 4.8 A
CBL-BFP-1 & 2
Cable Size 4 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-BFP-1 & 2
System Nominal Voltage 480.0 V
31209 Amps 3P
X/R Pos 1.48
25862 Amps SLG
X/R SLG 1.2513
MTRI-BFP-1 & 2
InitSymRMS 3P 279.13 A
InitSymRMS SLG 154.20 A
Rated HP 40.0 hp
RatedVoltage 480 V
RatedAmps 48.2 A
CBL-BFP-3 & 4
Cable Size 4 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation
BUS-BFP-3 & 4
System Nominal Voltage 480.0 V
31209 Amps 3P
X/R Pos 1.48
25862 Amps SLG
X/R SLG 1.2513
MTRI-BFP-3 & 4
Init Sym RMS 3P 279.13 A
Init Sym RMS SLG 154.20 A
Rated HP 40.0 hp
Rated Voltage 480 V
Rated Amps 48.2 A
CBL-TP-1 & 2
Cable Size 10 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-TP-1 & 2
System Nominal Voltage 480.0 V
17558 Amps 3P
X/R Pos 0.56
14294 Amps SLG
X/R SLG 0.5161
MTRI-TP-1 & 2
Init Sym RMS 3P 104.67 A
Init Sym RMS SLG 56.81 A
Rated HP 15.0 hp
Rated Voltage 480 V
Rated Amps 18.1 A
Sec Rated Voltage 208 V
Sec FLA 312.3 A
CBL-0041
Cable Size 600 AWG/kcmil
Length 5.0 ft
QtyPerPhase 1
Installation
(MCC/75-3)
PD-0193
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0194
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0195
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0196
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0197
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0198
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0199
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0200
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0201
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0202
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0203
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0204
System Nominal Voltage 480.0 V
35897 Amps 3P
X/R Pos 3.23
29255 Amps SLG
X/R SLG 2.1473
Frame/Rating 0.0 A
Frame/Model
Settings
CBL-CT/1A CBL-CT/1B
Cable Size 2 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation
BUS-CT/1A
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/1A
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CT/1B
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/1B
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CT/2A
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CT/2A
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/2A
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CT/2B
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CT/2B
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/2B
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CT/3A
CableSize 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CT/3A
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/3A
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CT/3B
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CT/3B
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/3B
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CT/4A
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CT/4A
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/4A
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CT/4B
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CT/4B
System Nominal Voltage 480.0 V
30965 Amps 3P
X/R Pos 1.83
24500 Amps SLG
X/R SLG 1.4485
MTRI-CT/4B
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 184.05 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-MUA-1 & 2 &3
Cable Size 6 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-MUA-1 & 2 & 3
System Nominal Voltage 480.0 V
25487 Amps 3P
X/R Pos 1.07
19966 Amps SLG
X/R SLG 0.9291
MTRI-MUA-1 & 2 & 3
Init Sym RMS 3P 209.35 A
Init Sym RMS SLG 109.33 A
Rated HP 30.0 hp
Rated Voltage 480 V
Rated Amps 36.2 A
CBL-AHU-1 & 2 & 3
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-AHU-1 & 2 & 3
System Nominal Voltage 480.0 V
30953 Amps 3P
X/R Pos 1.82
24494 Amps SLG
X/R SLG 1.4472
MTRI-AHU-1 & 2 & 3
Init Sym RMS 3P 282.62 A
Init Sym RMS SLG 149.10 A
Rated HP 40.5 hp
Rated Voltage 480 V
Rated Amps 48.8 A
CBL-SF-1 & 2, EF-1 & 2 & 3
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-SF-1 & 2, EF-1 & 2 & 3
System Nominal Voltage 480.0 V
30958 Amps 3P
X/R Pos 1.83
24497 Amps SLG
X/R SLG 1.4478
MTRI-SF-1 & 2, EF-1 & 2 & 3
Init Sym RMS 3P 314.02 A
Init Sym RMS SLG 165.65 A
Rated HP 45.0 hp
Rated Voltage 480 V
Rated Amps 54.3 A
CBL-SF-3, EF-4 & 5, FCU-1 & 2
Cable Size 8 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-SF-3, EF-4 & 5, FCU-1 & 2
System Nominal Voltage 480.0 V
21033 Amps 3P
X/R Pos 0.77
16511 Amps SLG
X/R SLG 0.6917
MTRI-SF-3, EF-4 & 5, FCU-1 & 2
Init Sym RMS 3P 167.48 A
Init Sym RMS SLG 87.64 A
Rated HP 24.0 hp
Rated Voltage 480 V
Rated Amps 28.9 A
(MCC/75-1)
PD-0174
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0175
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0176
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0177
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0178
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0179
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0180
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0181
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0182
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0183
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0205
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0206
Frame/Rating 0.0 A
Frame/Model
Settings
PD-0207
Frame/Rating 0.0 A
Frame/Model
Settings
System Nominal Voltage 480.0 V
43845 Amps 3P
X/R Pos 5.99
37663 Amps SLG
X/R SLG 3.8134
CBL-SCWP-1 CBL-SCWP-2
Cable Size 3/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 2
Installation
BUS-SCWP-1
System Nominal Voltage 480.0 V
42110 Amps 3P
X/R Pos 4.60
35628 Amps SLG
X/R SLG 3.2151
MTRI-SCWP-1
Init Sym RMS 3P 1744.58 A
Init Sym RMS SLG 984.03 A
Rated HP 250.0 hp
Rated Voltage 480 V
Rated Amps 301.5 A
Cable Size 3/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 2
Installation
BUS-SCWP-2
System Nominal Voltage 480.0 V
42110 Amps 3P
X/R Pos 4.60
35628 Amps SLG
X/R SLG 3.2151
MTRI-SCWP-2
Init Sym RMS 3P 1744.58 A
Init Sym RMS SLG 984.03 A
Rated HP 250.0 hp
Rated Voltage 480 V
Rated Amps 301.5 A
CBL-SCWP-3
Cable Size 3/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 2
Installation
BUS-SCWP-3
System Nominal Voltage 480.0 V
42110 Amps 3P
X/R Pos 4.60
35628 Amps SLG
X/R SLG 3.2151
MTRI-SCWP-3
Init Sym RMS 3P 1744.58 A
Init Sym RMS SLG 984.03 A
Rated HP 250.0 hp
Rated Voltage 480 V
Rated Amps 301.5 A
CBL-CWP-1
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CWP-1
System Nominal Voltage 480.0 V
37591 Amps 3P
X/R Pos 2.19
31007 Amps SLG
X/R SLG 1.8227
MTRI-CWP-1
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 191.87 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CWP-2
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CWP-2
System Nominal Voltage 480.0 V
37591 Amps 3P
X/R Pos 2.19
31007 Amps SLG
X/R SLG 1.8227
MTRI-CWP-2
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 191.87 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CWP-3
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CWP-3
System Nominal Voltage 480.0 V
37591 Amps 3P
X/R Pos 2.19
31007 Amps SLG
X/R SLG 1.8227
MTRI-CWP-3
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 191.87 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CWP-4
Cable Size 2 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CWP-4
System Nominal Voltage 480.0 V
37591 Amps 3P
X/R Pos 2.19
31007 Amps SLG
X/R SLG 1.8227
MTRI-CWP-4
Init Sym RMS 3P 348.92 A
Init Sym RMS SLG 191.87 A
Rated HP 50.0 hp
Rated Voltage 480 V
Rated Amps 60.3 A
CBL-CWP-5
Cable Size 3/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CWP-5
System Nominal Voltage 480.0 V
40291 Amps 3P
X/R Pos 3.72
33677 Amps SLG
X/R SLG 2.7917
MTRI-CWP-5
Init Sym RMS 3P 872.29 A
Init Sym RMS SLG 486.06 A
Rated HP 125.0 hp
Rated Voltage 480 V
Rated Amps 150.8 A
CBL-CWP-6
Cable Size 3/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CWP-6
System Nominal Voltage 480.0 V
40291 Amps 3P
X/R Pos 3.72
33677 Amps SLG
X/R SLG 2.7917
MTRI-CWP-6
Init Sym RMS 3P 872.29 A
Init Sym RMS SLG 486.06 A
Rated HP 125.0 hp
Rated Voltage 480 V
Rated Amps 150.8 A
CBL-CP-1
CableSize 2/0 AWG/kcmil
Length 10.0 ft
QtyPerPhase 1
Installation
BUS-CP-1
SystemNominalVoltage 480.0 V
39814 Amps 3P
X/R Pos 3.28
33183 Amps SLG
X/R SLG 2.5293
MTRI-CP-1
Init Sym RMS 3P 697.83 A
Init Sym RMS SLG 387.74 A
Rated HP 100.0 hp
Rated Voltage 480 V
Rated Amps 120.6 A
CBL-CP-2
Cable Size 2/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CP-2
System Nominal Voltage 480.0 V
39814 Amps 3P
X/R Pos 3.28
33183 Amps SLG
X/R SLG 2.5293
MTRI-CP-2
Init Sym RMS 3P 697.83 A
Init Sym RMS SLG 387.74 A
Rated HP 100.0 hp
Rated Voltage 480 V
Rated Amps 120.6 A
CBL-CP-3
Cable Size 2/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CP-3
System Nominal Voltage 480.0 V
39814 Amps 3P
X/R Pos 3.28
33183 Amps SLG
X/R SLG 2.5293
MTRI-CP-3
Init Sym RMS 3P 697.83 A
Init Sym RMS SLG 387.74 A
Rated HP 100.0 hp
Rated Voltage 480 V
Rated Amps 120.6 A
CBL-CP-4
Cable Size 2/0 AWG/kcmil
Length 10.0 ft
Qty Per Phase 1
Installation
BUS-CP-4
System Nominal Voltage 480.0 V
39814 Amps 3P
X/R Pos 3.28
33183 Amps SLG
X/R SLG 2.5293
MTRI-CP-4
Init Sym RMS 3P 697.83 A
Init Sym RMS SLG 387.74 A
Rated HP 100.0 hp
Rated Voltage 480 V
Rated Amps 120.6 A
DISTRIBUTION PANEL "DP75-1"
600A, 208V, 3PH, 4W
PANEL
75N2(SEC1)
225A, 208V, 3PH
4W
PANEL
75N2(SEC2)
225A, 208V, 3PH
4W
250A/3P 250A/3P 250A/3P
TO
EXISTING
LOAD
TO
EXISTING
LOAD
SUMP
PUMP
CONTROL
PANEL
"CP-MH-13"
208V, 1PH
1/3
J
J J
J J
J
J
J
J
MANHOLE "MH-13"
SUMP PUMP
"SP-11B"
1/3
SUMP PUMP
"SP-11A"
P-2
SUMP
PUMP
CONTROL
PANEL
"CP-MH-12"
208V, 1PH
1/3
MANHOLE "MH-12"
SUMP PUMP
"SP-10B"
1/3
SUMP PUMP
"SP-10A"
P-2
SUMP
PUMP
CONTROL
PANEL
"CP-MH-15"
208V, 1PH
1/3
MANHOLE "MH-15"
SUMP PUMP
"SP-12B"
1/3
SUMP PUMP
"SP-12A"
P-2
SUMP
PUMP
CONTROL
PANEL
"CP-MH-4"
208V, 1PH
1/3
MANHOLE "MH-4"
SUMP PUMP
"SP-3B"
1/3
SUMP PUMP
"SP-3A"
P-2
SUMP
PUMP
CONTROL
PANEL
"CP-MH-6"
208V, 1PH
1/3
MANHOLE "MH-6"
SUMP PUMP
"SP-5B"
1/3
SUMP PUMP
"SP-5A"
P-2
SUMP
PUMP
CONTROL
PANEL
"CP-MH-5"
208V, 1PH
1/3
MANHOLE "MH-5"
SUMP PUMP
"SP-4B"
1/3
SUMP PUMP
"SP-4A"
P-2
SUMP
PUMP
CONTROL
PANEL
"CP-MH-16"
208V, 1PH
1/3
MANHOLE "MH-16"
SUMP PUMP
"SP-13B"
1/3
SUMP PUMP
"SP-13A"
P-2
SUMP
PUMP
CONTROL
PANEL
"CP-MH-3"
208V, 1PH
1/3
MANHOLE "MH-3"
SUMP PUMP
"SP-2B"
1/3
SUMP PUMP
"SP-2A"
P-2
P-1
SUMP
PUMP
CONTROL
PANEL
"CP-MH-19"
208V, 1PH
1/3
MANHOLE "MH-19"
SUMP PUMP
"SP-16B"
1/3
SUMP PUMP
"SP-16A"
P-2
J
SUMP
PUMP
CONTROL
PANEL
"CP-MH-2"
208V, 1PH
1/3
MANHOLE "MH-2"
SUMP PUMP
"SP-1B"
1/3
SUMP PUMP
"SP-1A"
P-2
P-1
TYP.
J
SUMP
PUMP
CONTROL
PANEL
"CP-MH-18A"
208V, 1PH
1/3
MANHOLE "MH-18A"
SUMP PUMP
"SP-14B"
1/3
SUMP PUMP
"SP-14A"
P-2
J
SUMP
PUMP
CONTROL
PANEL
"CP-OMH-5"
208V, 1PH
1/3
MANHOLE "OMH-5"
SUMP PUMP
"SP-18B"
1/3
SUMP PUMP
"SP-18A"
P-2
P-1P-1P-1
P-1
P-1 P-1 P-1 P-1
P-1 P-1
J
SUMP
PUMP
CONTROL
PANEL
"CP-MH-20"
208V, 1PH
1/3
MANHOLE "MH-20"
SUMP PUMP
"SP-17B"
1/3
SUMP PUMP
"SP-17A"
P-2
P-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:5 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
BLDG 75 - ONE-LINE DIAGRAM
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
75EP601
KEY NOTES
GENERAL NOTES
NTS
1 BLDG 75 - ONE-LINE DIAGRAM
Revisions: Date:
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS. ANY DISCREPANCIES
FOUND SHALL BE REPORTED TO THE ENGINEER.
2. CONTRACTOR SHALL PROVIDE ALL SHUTDOWN PLANS, TEMPORARY POWER PLAN,
AND PHASING PLANS FOR VA AND ENGINEER REVIEW AND APPROVAL PRIOR TO
COMMENCING WORK. ALL PLANS SHALL BE SUBMITTED FOR REVIEW 30 DAYS PRIOR
TO IMPLEMENTATION.
3. ONE-LINE TOPOLOGY DOWNSTREAM FROM PANELBOARD "75N2 (SEC 1 & 2)" IS
DIAGRAMATICAL IN NATURE AND UNVERIFIED. CONTRACTOR SHALL PROVIDE FIELD
INVESTIGATION TO FULLY AS-BUILD EXISTING FEEDERS [CONDUCTORS AND
RACEWAYS (QUANTITY, SIZE, AND CONDITION)] FROM PANELBOARD SOURCE TO
EQUIPMENT LOADS WITHIN MANHOLE(S). COORDINATE WITH VA AS REQUIRED FOR
ALL INVESTIGATIONS.
EXISTING PANELBOARD PROVIDING POWER TO MANHOLES. PROVIDE UPDATE TO
CIRCUIT DIRECTORIES AS REQUIRED. PRIOR TO CIRCUITING NEW LOADS,
CONTRACTOR SHALL PROVIDE 30-DAY POWER DEMAND LOAD STUDY PER NEC
220.87 TO VERIFY PANELBOARD CAPACITY.
PROVIDE JUNCTION BOX TO SPLICE EXISTING CONDUCTORS AND PROVIDE POWER
TO LOCAL SUMP PUMP CONTROL PANEL. REFERENCE ASSOCIATED ENLARGED
MANHOLE PLAN FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:0 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
GENERAL ELECTRICAL
SCHEDULES -
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
E-701 Revisions: Date:
NAME CALLOUT TYPE VOLTAGE PHASE RATING MANUFACTURER/MODEL NOTES
LEVEL SWITCH LOW LSL FLOAT SWITCH 120 1 5A SJE RHOMBUS SENSOR FLOAT (NORMALLY CLOSED MODEL), OR APPROVED EQUAL 2
LEVEL SWITCH HIGH LSH FLOAT SWITCH 120 1 5A SJE RHOMBUS SENSOR FLOAT(NORMALLY OPEN MODEL), OR APPROVED EQUAL 2
LEVEL SWITCH HIGH-HIGH LSHH FLOAT SWITCH 120 1 5A SJE RHOMBUS SENSOR FLOAT(NORMALLY OPEN MODEL), OR APPROVED EQUAL 2
ACTUATED VALVE AV ACTUATED VALVE 208 1 1500W - 1
STEAM TRAP SENSOR STS STEAM TRAP SENSOR NA 1 100W - 1
AUDIO-VISUAL ALARM AVA ALARM 120 1 0.115A EDWARDS SIGNALING BEACONS MULTI-STATUS LED 108 SERIES, OR APPROVED EQUAL 2
VISUAL-ONLY ALARM VOA ALARM 120 1 0.045A EDWARDS SIGNALING BEACONS MULTI-STATUS LED 108 SERIES, OR APPROVED EQUAL 2
NOTES
2. PROVIDE MANUFACTURER CABLE LENGTH AS REQUIRED.
INSTRUMENTATION EQUIPMENT SCHEDULE
1. REFERENCE MECHANICAL PLANS FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:0 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
ELECTRICAL PANELBOARD
SCHEDULES -
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
E-702
KEY NOTES
GENERAL NOTES
Revisions: Date:
PANEL SCHEDULE PROVIDED TO SHOW BRANCH CIRCUITING AND LOADING
ONLY.
REMOVE EXISTING CIRCUIT BREAKER AND PROVIDE CIRCUIT BREAKER TO
SUPPLY LOAD AS SHOWN.
UTILIZE EXISTING CIRCUIT BREAKER TO SUPPLY LOAD.
1 1
1. THE CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES
FOR ALL PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
2. PRIOR TO COMMENCING ANY WORK, CONTRACTOR SHALL CONDUCT 30-DAY
DEMAND POWER METERING PER NEC 220.87 FOR ALL PANELBOARDS WITH
LOAD ADDED UNDER THIS PROJECT. ALL METERING DATA SHALL BE PROVIDED
VIA SUBMITTAL PROCESS TO ENGINEER FOR REVIEW; ENGINEER SHALL HAVE
APPROXIMATELY 7-DAYS TO REVIEW DATA AND PROVIDE ADDITIONAL
DIRECTION AND/OR APPROVE WORK TO COMMENCE AS INDICATED ON
DRAWINGS.
| 657-23-115JB 100% Ar Sheets |
| G-001|COVER |
| A500|ARCHITECTURAL DETAILS |
| MS001|MECHANICAL SYMBOLS, LEGEND AND ABBREVIATIONS |
| MS100|OVERALL SITE PLAN |
| MS101|BUILDING 1 CONDENSATE PUMP ROOM |
| MS102|BUILDING 3 CONDENSATE PUMP ROOM |
| MS103|BUILDING 18 CONDENSATE PUMP ROOM |
| MS104|BUILDING 23 CONDENSATE PUMP ROOM |
| MS105|BUILDING 24 CONDENSATE PUMP ROOM |
| MS106|BUILDING 53 CONDENSATE PUMP ROOM |
| MS400|NORTHEAST SIDE ENLARGED PLAN |
| MS401|MAN HOLE ENLARGED VIEWS |
| MS402|MAN HOLE ENLARGED VIEWS |
| MS403|MAN HOLE ENLARGED VIEWS |
| MS404|MAN HOLE ENLARGED VIEWS |
| MS405|MAN HOLE ENLARGED VIEWS |
| MS406|MAN HOLE ENLARGED VIEWS |
| MS500|MECHANICAL DETAILS |
| MS501|MECHANICAL DETAILS |
| MS502|MECHANICAL DETAILS |
| MS600|MECHANICAL SCHEDULES |
| E-001|ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX |
| E-002|ELECTRICAL LEGENDS |
| ES101|OVERALL ELECTRICAL SITE PLAN |
| 01EP101|BLDG 01 -LEVEL 01 -ELECTRICAL PLANS |
| 03EP101|BLDG 03 -LEVEL 01 -ELECTRICAL PLANS |
| 18EP101|BLDG 18 -LEVEL 00 -ELECTRICAL PLAN |
| 18EP102|BLDG 18 -LEVEL 00 -ELECTRICAL PLANS |
| 23EP101|BLDG 23 -LEVEL 00 -ELECTRICAL PLANS |
| 24EP101|BLDG 24 -LEVEL 00 -ELECTRICAL PLANS |
| 53EP101|BLDG 53 -LEVEL 00 -ELECTRICAL PLANS |
| 55EP101|BLDG 55 -LEVEL 01 -ELECTRICAL PLAN |
| 75EP101|BLDG 75 -LEVEL 01 -ELECTRICAL PLAN |
| EP401|MANHOLE 'MH-2' ENLARGED ELECTRICAL PLANS |
| EP402|MANHOLE 'MH-3' ENLARGED ELECTRICAL PLANS |
| EP403|MANHOLE 'MH-4' ENLARGED ELECTRICAL PLANS |
| EP404|MANHOLE 'MH-5' ENLARGED ELECTRICAL PLANS |
| EP405|MANHOLE 'MH-6' ENLARGED ELECTRICAL PLANS |
| EP406|MANHOLE 'MH-7' ENLARGED ELECTRICAL PLANS |
| EP407|MANHOLE 'MH-8' ENLARGED ELECTRICAL PLANS |
| EP408|MANHOLE 'MH-9' ENLARGED ELECTRICAL PLANS |
| EP409|MANHOLE 'M-10' ENLARGED ELECTRICAL PLANS |
| EP410|MANHOLE 'MH-12' ENLARGED ELECTRICAL PLANS |
| EP411|MANHOLE 'MH-13' ENLARGED ELECTRICAL PLANS |
| EP412|MANHOLE 'MH-12' ENLARGED ELECTRICAL PLANS |
| EP413|MANHOLE 'M-16' ENLARGED ELECTRICAL PLANS |
| EP414|MANHOLE 'MH-18' ENLARGED ELECTRICAL PLANS |
| EP415|MANHOLE 'MH-19' ENLARGED ELECTRICAL PLANS |
| EP416|MANHOLE 'MH-20' ENLARGED ELECTRICAL PLANS |
| E-501|ELECTRICAL DETAILS |
| E-502|ELECTRICAL DETAILS |
| E-503|ELECTRICAL DETAILS |
| E-504|ELECTRICAL DETAILS |
| 18EP601|BLDG 18 -ONE-LINE DIAGRAM |
| 55EP601|BLDG 55 -ONE-LINE DIAGRAM |
| 75EP601|BLDG 75 -ONE-LINE DIAGRAM |
| E-701|ELECTRICAL SCHEDULES |
| E-702|ELECTRICAL SCHEDULES |
| RSH-CombinedDraw |
| HA000 |
| Sheets and Views |
| Model |
| HA001 |
| Sheets and Views |
| Model |
| HA003 |
| Sheets and Views |
| Model |
| HA023 |
| Sheets and Views |
| Model |
| VAJB_SF_ME_SDB |
| MS001 - MECHANICAL SYMBOLS, LEGEND AND ABBREVIATIONS |
| MS100 - OVERALL SITE PLAN |
| MS101 - BUILDING 23 CONDENSATE PUMP ROOM |
| MS400 - NORTHEAST SIDE ENLARGED PLAN |
| MS401 - MAN HOLE ENLARGED VIEWS 1 |
| MS402 - MAN HOLE ENLARGED VIEWS 2 |
| MS403 - MAN HOLE ENLARGED VIEWS 3 |
| MS404 - MAN HOLE ENLARGED VIEWS 4 |
| MS405 - MAN HOLE ENLARGED VIEWS 5 |
| MS406 - MAN HOLE ENLARGED VIEWS 6 |
| MS500 - MECHANICAL DETAILS |
| MS501 - MECHANICAL DETAILS |
| MS502 - MECHANICAL DETAILS |
| MS503 - MECHANICAL DETAILS |
| MS600 - MECHANICAL SCHEDULES |
| 100% CD JB STEAM FAIL_2024.04.24_Signed-LRL |
| E-001 |
| E-002 |
| ES101 |
| 18EP101 |
| 23EP101 |
| 55EP101 |
| 75EP101 |
| EP401 |
| EP402 |
| EP403 |
| EP404 |
| EP405 |
| EP406 |
| EP407 |
| EP408 |
| EP409 |
| EP410 |
| EP411 |
| EP412 |
| EP413 |
| EP414 |
| EP415 |
| EP416 |
| EP417 |
| EP418 |
| E-501 |
| E-502 |
| E-503 |
| E-504 |
| E-505 |
| E-506 |
| 18EP601 |
| 55EP601 |
| 75EP601 |
| E-701 |
| E-702 |