_657-23-115JB_100_Drawings_Book_2_Electrical.pdf
PDF 5 MB Posted
- Attached to
- Z1DA--657-23-115JB Correct Campus Steam System Failures, JB Federal contract opportunity
- Solicitation number
- 36C25524R0096
About this file
This document contains architectural, mechanical, and electrical drawings and specifications for a construction project titled "Correct Campus Steam System Failures" under Project Number 657-23-115JB at the Jefferson Barracks Division of the St. Louis VA Medical Center.
The project requires construction services to improve the steam and condensate system functionality, manhole access, safety, remote valve operation, and monitoring of manhole system components to address conditions of non-compliance with VA and industry standards. Key work includes replacing compensators, steam valves, condensate receiver pumps, condensate distribution loop, duplex sump pumps, and providing remote monitoring and controls for steam traps and valves. The period of performance is estimated to be 180 days from mobilization through final closeout. The federal agency involved is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 15.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:5 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
ABBREVIATIONS, GENERAL
NOTES, AND SHEET INDEX -
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
E-001
A B B R E V I A T I O N S
1PH SINGLE-PHASE
1P SINGLE POLE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3PH THREE-PHASE
4/C FOUR-CONDUCTOR
4W FOUR-WIRE
A/C AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT, ADJOINING
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC
FREQUENCY CONTROL, OR AVAILABLE
FAULT CURRENT
AFCI ARC-FAULT CURRENT INTERRUPTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BAT BATTERY
BD BOARD
BFF BELOW FINISH FLOOR
BLDG BUILDING
BRKR BREAKER
BYP BY PASS
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/
OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
C/B CIRCUIT BREAKER
CL CONNECTOR LIGHTING
CLF CURRENT LIMITING FUSE
CLG CEILING
CO CONDUIT ONLY
COAX COAX CABLE
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CUR CURRENT
DB DECIBEL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DDC DIRECT DIGITAL CONTROLS
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DP DISTRIBUTION PANEL
DMR SW DIMMER SWITCH
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EL ELEVATION OR EXISTING TO BE RELOCATED
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMER/EM EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
EN EXISTING IN NEW LOCATION
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
EPRF EXPLOSION PROOF
ER EXISTING TO REMAIN
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXIST(E) EXISTING
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FCIO FURNISHED BY CONTRACTOR,
INSTALLED BY OWNER
FOIC FURNISHED BY OWNER,
INSTALLED BY CONTRACTOR
FIXT FIXTURE
FLA FULL LOAD AMPS
FLUOR FLUORESCENT
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G ELECTRICAL GROUND
GEN GENERATOR
GFCI GROUND FAULT
CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTION
GND GROUND
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
IG ISOLATED GROUND
IESNA ILLUMINATION ENGINEERING
SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT AMPERE
KVAH KILOVOLT AMPERE PER HOUR
KVAR KILOVOLT AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
LCP LIGHTING CONTROL PANEL
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MS MOTOR STARTER
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
NA NOT APPLICABLE
NAC NOTIFICATION APPLIANCE CABINET
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURERS ASSOCIATION
NEUT, N NEUTRAL
NFC NOT FOR CONSTRUCTION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OL OVERLOAD
OS OCCUPANCY SENSOR
P POLE
PB PULL BOX
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PIV POST INDICATOR VALVE
PF POWER FACTOR
PH PHASE
PNL PANEL
PS POWER SUPPLY
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
R EXISTING TO BE REMOVED
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
RM ROOM
RMC RIGID METAL CONDUIT
RMS ROOT MEAN SQUARE
REQD REQUIRED
SAC SMALL APPLIANCE CIRCUIT
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SM SMART METER
SPD SURGE PROTECTIVE DEVICE
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD OR SB SWITCHBOARD
SWGR OR SG SWITCHGEAR
TEL TELEPHONE
TR TAMPER RESISTANT
TV TELEVISION
TYP TYPICAL
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER
POWER SUPPLY
UTIL UTILITY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT/WEATHERPROOF
(WHILE IN USE)
WH WATER HEATER
WP/W WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
1. THESE "GENERAL NOTES" SHALL APPLY TO ALL DRAWINGS WITHIN THIS DRAWING SET.
2. IF THE SPECIFICATIONS OR DRAWINGS CONFLICT WITH EACH OTHER THE MORE STRINGENT CRITERIA/SCOPE OF WORK SHALL BE REQUIRED.
3. BLACKENED OR BOLDED EQUIPMENT INDICATES THE EQUIPMENT SHALL BE PROVIDED AND INSTALLED BY THE CONTRACTOR. ITEMS NOT DIRECTLY FURNISHED BY THE CONTRACTOR SHALL HAVE A DESIGNATION SUCH AS OFCI (OWNER FURNISHED CONTRACTOR INSTALLED), OFOI (OWNER FURNISHED OWNER INSTALLED), OR NIC (NOT IN CONTRACT). GRAY OR GRAY-SCALED EQUIPMENT SHALL BE ASSUMED TO BE EXISTING OR SHOWN FOR EQUIPMENT LOCATION COORDINATION.
4. EXISTING CIRCUITS ASSOCIATED WITH THE PROJECT AREA OF WORK ARE TO BE DE-ENERGIZED DURING CONSTRUCTION.
5. ALL ELECTRICAL WORK SHALL BE COMPLETED WITH ALL PROXIMATE ELECTRICAL CIRCUITS DE-ENERGIZED (i.e. A NEW BREAKER OR CIRCUIT CANNOT BE ADDED TO A PANEL UNLESS THE PANEL IS COMPLETELY DE-ENERGIZED), OR THE CONTRACTOR MUST COMPLY WITH NFPA 70E FOR WORK ON ENERGIZED SERVICE. THE VA WILL DETERMINE IF THE ELECTRICAL SERVICE CAN BE SHUT DOWN OR IT WILL HAVE TO BE WORKED HOT DEPENDING ON THE CRITICALITY OF THE AREA BEING AFFECTED. IF THE WORK MUST BE DONE WITH THE SERVICE LIVE, THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL REQUIRED PROTECTIVE TOOLS, EQUIPMENT, AND CLOTHING, AND MUST FOLLOW THE JOB SPECIFIC WORK PLAN PREPARED BY THE CONTRACTOR AND APPROVED BY THE VA. WORK THAT REQUIRES SHUTTING DOWN ELECTRICAL SERVICE MAY HAVE TO BE
ACCOMPLISHED DURING OTHER THAN NORMAL DUTY HOURS.
6. WHERE NOT SPECIFICALLY INDICATED ON DRAWINGS, BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG MINIMUM FOR RUNS EQUAL TO OR LESS THAN 65 FEET AND 10 AWG MINIMUM FOR RUNS GREATER THAN 65 FEET. RACEWAYS AND CONDUCTORS SHALL BE SIZED AND QUANTIFIED TO SERVE AND CONTROL APPLICABLE EQUIPMENT WITH VOLTAGE DROP NO GREATER THAN THREE PERCENT. CONDUCTOR SIZE SHALL BE INCREASED TO COMPENSATE FOR DERATING REQUIRED PER NEC 310.15 WHERE MORE THAN THREE CURRENT CARRYING CONDUCTORS WITHIN ONE RACEWAY; CONDUCTOR AMPACITIES SHALL BE TAKEN FROM THE 75°C COLUMN. INDIVIDUAL CIRCUITS SHALL NOT SHARE
NEUTRAL CONDUCTORS.
7. MINIMUM CONDUIT SIZE SHALL BE 1” FOR EXTERIOR AND UNDERGROUND CONDUIT. MINIMUM CONDUIT SIZE SHALL BE 3/4” FOR INTERIOR CONDUIT. ADDITIONAL CONDUCTORS FOR UNSWITCHED HOT CONDUCTOR TO LUMINAIRES WITH EMERGENCY BATTERY POWERED BACKUP UNITS OR TRANSFER DEVICES SHALL BE PROVIDED. ALL CONDUIT SHALL BE CONCEALED. THE ABOVE COMMENTS SHALL BE ADHERED TO UNLESS OTHERWISE NOTED ON THE DRAWINGS.
8. EMERGENCY LIGHTING OR EQUIPMENT CIRCUITS SHALL BE ROUTED INDEPENDENT FROM OTHER CIRCUIT TYPES; ENSURE NEC 700.10 REQUIREMENTS ARE MET.
9. PROVIDE ALL CONDUIT AND WIRE FOR ALL CIRCUITS INDICATED AND/OR NOTED ON THE DRAWINGS AND/OR SPECIFICATIONS. ALL AUXILIARY OR REQUIRED APPURTENANCES
FOR PROVIDED EQUIPMENT SHALL BE PROVIDED WITH ALL CONNECTIONS AS REQUIRED.
10. ALL EQUIPMENT AND DEVICES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL DISTRIBUTION EQUIPMENT, RECEPTACLES, DATA OUTLETS, AND SPECIAL SYSTEM DEVICES, SHALL HAVE THEIR EXACT LOCATION COORDINATED WITH ARCHITECTURAL/ENGINEERED DRAWINGS, ALL TRADES, AND OWNER PRIOR TO COMMENCING WORK.
11. ALL CONDUIT/SLEEVE FLOOR AND WALL PENETRATIONS SHALL BE SEALED WITH FIRE RATED ASSEMBLIES, CAULKING, AND APPURTENANCES. ELECTRICAL BOXES LOCATED IN
FIRE RATED WALLS SHALL BE RATED FOR USE IN FIRE RATED WALLS.
12. ALL EQUIPMENT AND INSTALLATION METHODS SHALL BE LISTED AND LABELED PER NEC, UL LISTED, OR REVIEWED EQUAL.
13. FOR ALL EQUIPMENT, COORDINATE WITH ALL TRADES (ARCHITECTURAL, MECHANICAL, PLUMBING, ETC) FOR ELECTRICAL REQUIREMENTS AND INSTALLATION LOCATIONS PRIOR
TO INSTALLATION.
14. ALL LOW-VOLTAGE SYSTEM CABLING NOT RAN IN CONDUIT TO WALL MOUNTED DEVICE SHALL HAVE A MINIMUM 1"C ROUTED FROM DEVICE THROUGH WALL INTO THE ACCESSIBLE CEILING SPACE; CABLING SHALL NOT BE ROUTED IN WALLS OR IN AN INACCESSIBLE LOCATION WITHOUT CONDUIT.
15. GFCI RECEPTACLES SHALL BE PROVIDED WITHIN 6’ OF A SINK/OR WATER SOURCE, WITHIN DAMP ROOMS, OR WHEN MOUNTED OUTDOORS/EXTERIOR TO THE BUILDING.
16. NO STRUCTURAL MEMBERS SHALL BE CUT, DRILLED, OR NOTCHED WITHOUT PRIOR WRITTEN CONSENT FROM THE STRUCTURAL ENGINEER OR ARCHITECT.
17. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE NO MORE THAN THREE CIRCUITS. EACH BRANCH CIRCUIT HOMERUN SHALL HAVE A SEPARATE GREEN INSULATED EQUIPMENT GROUNDING CONDUCTOR SIZED PER NEC TABLE 250.122. ALL WIRING IS BASED ON Cu COPPER PER NEC TABLE 310.15(B)(16), USING 75°C AMPACITIES FOR FEEDERS.
18. MULTI-GANG BACKBOXES FOR DIFFERENT VOLTAGES AND TYPES OF EMERGENCY AND NORMAL BRANCH WIRING DEVICES SHALL HAVE DIVIDERS BETWEEN DEVICES.
19. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES, CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT WITHIN THE WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT PROTECTIVE DEVICE AND REMOVE WIRING COMPLETELY
FROM THE ABANDONED CONDUITS.
20. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND CONDUCTORS PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS.
G E N E R A L N O T E S S H E E T I N D E X
E-001 - ABBREVIATIONS, GENERAL NOTES, AND SHEET INDEX
E-002 - ELECTRICAL LEGENDS
ES101 - OVERALL ELECTRICAL SITE PLAN
18EP101 - BLDG 18 - LEVEL 00 - ELECTRICAL PLAN
23EP101 - BLDG 23 - LEVEL 00 - ELECTRICAL PLAN
55EP101 - BLDG 55 - LEVEL 01 - ELECTRICAL PLAN
75EP101 - BLDG 75 - LEVEL 01 - ELECTRICAL PLAN
EP401 - MANHOLE 'MH-2A' AND 'MH-2B' ENLARGED ELECTRICAL PLANS
EP402 - MANHOLE 'MH-3' ENLARGED ELECTRICAL PLANS
EP403 - MANHOLE 'MH-4' ENLARGED ELECTRICAL PLANS
EP404 - MANHOLE 'MH-5' ENLARGED ELECTRICAL PLANS
EP405 - MANHOLE 'MH-6A' AND 'MH-6B ENLARGED ELECTRICAL PLANS
EP406 - MANHOLE 'MH-7A' AND 'MH-7B' ENLARGED ELECTRICAL PLANS
EP407 - MANHOLE 'MH-8' ENLARGED ELECTRICAL PLANS
EP408 - MANHOLE 'MH-9' ENLARGED ELECTRICAL PLANS
EP409 - MANHOLE 'MH-10' ENLARGED ELECTRICAL PLANS
EP410 - MANHOLE 'MH-12A' AND 'MH-12B' ENLARGED ELECTRICAL PLANS
EP411 - MANHOLE 'MH-13A' AND 'MH-13B' ENLARGED ELECTRICAL PLANS
EP412 - MANHOLE 'MH-15' ENLARGED ELECTRICAL PLANS
EP413 - MANHOLE 'MH-16' ENLARGED ELECTRICAL PLANS
EP414 - MANHOLE 'MH-18A' ENLARGED ELECTRICAL PLANS
EP415 - MANHOLE 'MH-18B' ENLARGED ELECTRICAL PLANS
EP416 - MANHOLE 'MH-19' ENLARGED ELECTRICAL PLANS
EP417 - MANHOLE 'MH-20' ENLARGED ELECTRICAL PLANS
EP418 - MANHOLE 'OMH-5' ENLARGED ELECTRICAL PLANS
E-501 - MANHOLE ELECTRICAL BUTTERFLY DETAILS
E-502 - MANHOLE ELECTRICAL BUTTERFLY DETAILS
E-503 - MANHOLE ELECTRICAL BUTTERFLY DETAILS
E-504 - TYPICAL ELECTRICAL DETAILS
E-505 - TYPICAL SUMP PUMP CONTROL PANEL LAYOUT DETAILS
E-506 - TYPICAL SUMP PUMP CONTROL PANEL WIRING DIAGRAMS
18EP601 - BLDG 18 - ONE-LINE DIAGRAM
55EP601 - BLDG 55 - ONE-LINE DIAGRAM
75EP601 - BLDG 75 - ONE-LINE DIAGRAM
E-701 - GENERAL ELECTRICAL SCHEDULES
E-702 - ELECTRICAL PANELBOARD SCHEDULES
Revisions: Date:
SECTION A
XXX
SECTION LETTER
SHEET WHERE
SECTION IS TAKEN
FROM
A
XXX
SECTION LETTER
SHEET WHERE
SECTION IS TAKEN
FROM
XXX
DETAIL NUMBER
SHEET ON WHICH
DETAIL APPEARS
DETAIL AREA
SCALE
CONDUIT & WIRE TAG
(REFER TO CONDUIT
AND WIRE SCHEDULE)
XX FAULT CURRENT TAG
(3 PH, SYM AMPS)
1 KEY NOTE
XXX
FIGURE OR PHOTO
DETAIL NUMBER
IF PHOTO, ARROW
DENOTES DIRECTION
TAKEN
SHEET WHERE DETAIL
IS TAKEN FROM
DETAIL/PLAN
DETAIL/PLAN NUMBER
XXXX
SELECTOR SWITCH
NUMBERS INDICATE AMOUNT OF SECTIONS.
'X' DENOTES DESIGNATED SECTION ON RUNG.
I.E. 'XOO' INDICATES RUNG IS SELECTED FOR POSITION '1'
MOTOR OVERLOAD
FLOAT SWITCH, SHOWN N.O. OR N.C.
CR
CONTROL RELAY COIL + N.O. AND N.C. CONTACTS
X
CR-X CR-X
XOO
OOX
PUSHBUTTON, SHOWN AS N.O. OR N.C.
G
T
CONTROL PANEL PILOT LIGHT, PUSH-TO-TEST, LED.
LETTER INDICATES COLOR (I.E. 'R' = RED)
WIRED CONNECTION. DOT INDICATES TERMINAL
RTM RUNTIME METER
CONTROL PANEL FUSE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:0 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
ELECTRICAL LEGENDS
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
E-002
G E N E R A L S Y M B O L
D I V 2 6 - L E G E N D D I V 2 7 - L E G E N D D I V 2 8 - L E G E N D
G
SWITCH, MULTIPOSITION
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
CIRCUIT BREAKER
DRAWOUT AIR CIRCUIT BREAKER
GENERATOR, POWER
BATTERY
CAPACITOR
RELAY; NUMBER INDICATES RELAY TYPE
50 = INSTANTANEOUS OVER CURRENT OR RATE-OF-RISE
51 = AC-TIME OVER CURRENT
67 = AC-DIRECTIONAL OVER CURRENT
86 = LOCKING OUT
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED
STARTER, COMBINATION WITH DISCONNECT SWITCH
STARTER OR MOTOR CONTROLLER
METER
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
TRANSFORMER, PLAN
MOTOR
LADDER CABLE TRAY
PANELBOARD, FLUSH MOUNTED
PANELBOARD, SURFACE MOUNTED
RECEPTACLE, DUPLEX, 20A, 125V
RECEPTACLE, DUPLEX ON EMERGENCY POWER, 20A, 125V
RECEPTACLE, DUPLEX WITH GROUND FAULT CIRCUIT
INTERRUPTER, 20A, 125V
RECEPTACLE, QUADRUPLEX, 20A, 125V
RECEPTACLE, SINGLE, 20A, 125V
RECEPTACLE, SINGLE WITH SWITCH
RECEPTACLE, SPECIAL PURPOSE
A = 120V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 5-20R.
B = 208V, 20A, 1 PHASE, 2-POLE, 3W, NEMA 6-20R.
C = 120V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 5-30R.
D = 208V, 30A, 1 PHASE, 2-POLE, 3W, NEMA 6-30R.
E = 208V, 60A, 1 PHASE, 3-POLE, 4W, NEMA 14-60R.
F = 208V, 30A, 3 PHASE, 3-POLE 4W, NEMA 15-30R.
G = 208V, 50A, 3 PHASE, 3 POLE, 4W, NEMA 15-30R.
H = 208V, 60A, 3 PHASE, 3 POLE, 4W, NEMA 15-60R.
RECEPTACLE, SWITCHED DUPLEX
DROP CORD, SINGLE CONVENIENCE OUTLET, 3-WIRE,
GROUNDING TYPE, 20A, W/#12 CONDUCTORS IN FLEXIBLE
CORD (CENTER LINE OF OUTLET: 6'-6" [1981mm] AFF. MINIMUM).
ELECTRICAL STRIP MOLD (OUTLETS ON 2'-0" [610mm]
CENTERS OR AS DESIGNATED ON DRAWINGS), MTD
3'-6" [1067mm] AFF OR AS INDICATED.
F = FUSED SWITCH K = KEY OPERATED
L = LOCK LM= LOW VOLTAGE MASTER
M = MANUAL MOTOR STARTING MC= MOMENTARY CONTACT
MP= MOTOR SNAP WITH PILOT LIGHT P = WITH PILOT LIGHT
(THERMAL TYPE)
PB= PUSH BUTTON STATION RC= REMOTE CONTROL
WP= WEATHER PROOF X = EXPLOSION PROOF
SWITCH, CEILING MOUNTED PULL
SWITCH (# SUBSCRIPT AS INDICATED BELOW):
BLANK = SINGLE POLE 2 = DOUBLE POLE
3 = THREE-WAY 4 = FOUR-WAY
D = DIMMER K = KEY OPERATED
LV= LOW VOLTAGE P = WITH PILOT LIGHT
LM= LOW VOLTAGE MASTER RC= REMOTE CONTROL
PB= PUSH BUTTON STATION WP= WEATHER PROOF
T = TIMER OPERATED Mo= OCCUPANCY SENSOR
LIGHTING, ONE HEAD EMERGENCY BATTERY POWER
LIGHTING, TWO HEAD EMERGENCY BATTERY POWER
LIGHTING, THREE HEAD EMERGENCY BATTERY POWER
EXIT SIGN, WALL MOUNTED WITH DIRECTIONAL ARROWS AND
FACES AS SHOWN
EXIT SIGN, CEILING MOUNTED WITH DIRECTIONAL ARROWS AND
FACES AS SHOWN
POWER
LIGHTING
x = LUMINAIRE SWITCH ZONE (ANY LOWER CASE LETTER APPLIES)
AUDIO DEVICE; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
B-BELL C-CHIME H-HORN K-KLAXON
L-LISTEN-IN M-MICROPHONE S-SOUNDER S-SPEAKER Z-BUZZER
BI-STATIC BEAM SENSOR; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
I-INFRARED M-MICROWAVE
F=FUNCTION
RX-RECEIVE TX-TRANSMIT
BIOMETRICS ACCESS CONTROL DEVICE; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
F-FINGER PRINT H-HAND GEOMETRY I-EYE IRIS
R-EYE RETINA V-VOICE
CARD ACCESS READER; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
B-BARCODE F-ELEVATOR FLOOR CALL H-ELEVATOR HALLCALL
M-MAG STRIP P-PROXIMITY S-SMART CARD
T-TOKEN
CARD READER WITH KEYPAD; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
CARD READER WITH TIME AND ATTENDANCE; LETTER INDICATES ASFOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH
H-HIDDEN M-MULLIONP-PEDESTAL R-RACK
S-SURFACE W-WALLCENTRAL PROCESSING UNIT
CONTROL PANEL; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
B-BURGLAR D-DOOR F-FIRE P-PERIMETER
ELECTRONIC LOCK; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
D-DEADBOLT H-HYBRID L-LATCH SET M-MAGNETIC S-STRIKE
EXIT DEVICE; LETTER INDICATES AS FOLLOWS:
T=TECHNOLOGY/TYPE
D-DELAYED EGRESS E-ELECTRIFIED M-MECHANICAL X-HIGH SECURITY
FIBER OPTIC MODULE; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
R-RECEIVERT-TRANSCEIVER TX-TRANSMITTER
FIELD PANEL; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
A-ALARM C-CARD READER
GLASS BREAKAGE SENSOR; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
A-AUDIO S-SHOCK
INTERCOM; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
M-MASTER S-SUBSTATION
KEYBOARD
KEYPAD DEVICE; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
MONITOR; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
D-DATA G-GRAPHIC M-MULTISCREEN V-VIDEO
MOTION DETECTOR; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN
M-MULLIONP-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
D-DUAL TECHNOLOGY IR-INFRARED M-MICROWAVE U-ULTRASONIC
X-REQUEST-FOR-EXIT
RECORDER; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
A-AUDIO D-DIGITAL V-VIDEO
SECURITY ACCESS, ANNUNCIATOR PANEL
SECURITY ACCESS, BUZZER. MTD 1'-6" [457mm] AFF
UNLESS OTHERWISE NOTED
SECURITY ACCESS, CONTROL UNIT WITH
CLOSED CIRCUIT TELEVISION CAMERA
SECURITY ACCESS, GENERIC "X" INDICATES THE
TYPE, PROVIDE SCHEDULE OR LEGEND
SECURITY ACCESS, HORN OR SIREN
SECURITY ACCESS, OUTDOOR MICROWAVE TRANSMISSION UNIT
SECURITY ACCESS, PANIC ALARM
SECURITY ACCESS, VIDEO CAMERA WITH LENS
M = MOTION DETECTOR
PZ = MOTION DETECTOR WITH PAN AND ZOOM
PTZ= MOTION DETECTOR WITH PAN, TILT, AND ZOOM
SECURITY ACCESS, VOLUMETRIC SENSOR
SECURITY SCREEN WITH ALARM; LETTER INDICATES ASFOLLOWS:
T=TECHNOLOGY/TYPE
B-BLIND S-SHADE
SECURITY WINDOW SCREEN; LETTER INDICATES ASFOLLOWS:
T=TECHNOLOGY/TYPE
B-BLIND
VIDEO CONTROL KEYBOARD
VIDEO MOTION DETECTOR
SECURITY ACCESS, PANNING CAMERA TRAVERSE ANGLE
C = CEILING MOUNTED
SECURITY ACCESS, SENSOR, BURIED VEHICULAR
SECURITY ACCESS, SWITCH, BALANCED MAGNETIC CONTROL
SECURITY ACCESS, TELEPHONE HANDSET
SECURITY ACCESS, VIDEO CAMERA WITH LENS, ANGLE OF VIEW
ALARM, CHECK VALVE
ALARM, FIRE, COMMUNICATOR
ALARM, FIRE, PANEL; LETTERS INDICATE AS FOLLOWS:
FACC = CENTRAL CONSOLE FACP = CONTROL PANEL
MFACP= MASTER CONTROL PANEL FAAP = ANNUNCIATORPANEL
ALARM, FIRE, MANUAL PULL STATION
ALARM, GONG
ALARM, HORN/LIGHT, ONE ASSEMBLY WITH CHIME
ALARM, HORN/LIGHT, SEPARATE ASSEMBLY
ALARM, LAMP LIGHT, SIGNAL LIGHT, STROBE
ALARM, MANUAL CONTROL
ALARM,
MINI
HORNALARM, SPRINKLER SYSTEM WATER FLOW BELL
ALARM, TAMPER SWITCH
DETECTION, GAS
DETECTION, SMOKE CONTROL AND PRESSURE PANEL
DETECTION SWITCH, ABORT
DETECTION SWITCH, VALVE TAMPER
DETECTOR, FLAME FLICKER
DETECTOR, FLOW SWITCH
DETECTOR, HEAT
DETECTOR, HEAT; LETTER INDICATES AS FOLLOWS:
R/T = COMBINATION F = FIXED TEMPERATURERISE
R/C = RATE COMPENSATION R = RATE OF
DETECTOR; LETTER INDICATES AS FOLLOWS:
BLANK = SMOKE DETECTOR
H = HEAT SMOKE
I = IONIZATION SMOKE
P = PHOTOELECTRIC SMOKE
IH = IONIZATION AND HEAT SMOKE
IP = IONIZATION AND PHOTOELECTRIC SMOKE
PH = PHOTOELECTRIC AND HEAT SMOKE
IPH = IONIZATION, PHOTOELECTRIC, AND HEAT
DETECTOR, SMOKE, FOR DUCT
DETECTOR, SWITCH LEVEL
PUSH BUTTON; LETTER INDICATES AS FOLLOWS:
M=MOUNT
C-CEILING D-DESK F-FLUSH H-HIDDEN M-MULLION
P-PEDESTAL R-RACK S-SURFACE W-WALL
T=TECHNOLOGY/TYPE
B-BELL PUSH D-DURESS P-PANIC R-DOOR RELEASE
X-REQUEST-FOR-EXIT
CODE ONE CONTROL AND ALARM STATION. MTD 5'-0"
AFF UNLESS OTHERWISE NOTED.
CODE ONE TERMINAL CABINET.
CODE ONE ANNUNCIATOR PANEL.
CODE ONE BEDSIDE STATION.
CODE ONE DUTY STATION, MTD 5'-0" AFF UNLESS
OTHERWISE NOTED.
ALARM, FIRE; LETTERS INDICATE AS FOLLOWS:
BATT =BATTERIESCHR = CHARGER FAR = RECORDER
ALARM, FIRE, VALVE SUPERVISORY SWITCH.
ALARM, FIRE, TERMINAL CABINET.
ALARM, FIRE, POST INDICATOR VALVE.
ALARM, TRANSPONDER OR TRANSMITTER
ALARM, VOICE COMMUNICATION PANEL
FIRE ALARM STATION, MANUAL PULL
FIRE ALARM LINE = FA
ELECTROMAGNETIC TYPE DOOR HOLDER OUTLET
CITY FIRE ALARM MASTER STATION MTD 5'-6" [1676mm] AFF UNLESS
NOTED.
FIRE ALARM TRANSMITTER (BASE LOOP) NUMERALS DENOTE CODE.
FIRE ALARM TROUBLE TRANSMITTER (BASE LOOP) NUMERALS
DENOTE CODE.
ALARM, HORN/LIGHT, ONE ASSEMBLY C = WITH CHIME
360°
40°
X
M PTZ
FAT
2-4-6
FAT
2-4-6
AP
NIP
NIT
NIA
NI
NID
FAC
FACP
P
C
BATT
OSY
FATC
PIV
M
TS
FTR
SCCP
HD
R/T
HD
H
DH
PB
T
S
WB
C
S
M
T
M
F
T
M
T
T
M
M
M
M
T
T
M
T
M
T
M
T
M
T
M
M
T
M
T
M
T
M
T
T
T
CP
EPO
CONDUIT OR EQUIPMENT TO BE REMOVED
CONDUIT 3/4"C, 3#12 PHASE, 1#12 N, & 1#12 GND UNLESS
SHOWN OTHERWISE. (EXAMPLE SHOWN: TO PANEL P1,
CIRCUIT 1,3,5). LONG TICK FOR NEUTRAL WIRE; ONE SHORT
TICK FOR EACH PHASE WIRE; GROUND SIZED PER NEC. NOTE
THAT A SECOND SHORT TICK FOR LUMINAIRES IS FOR A
TRAVELER WIRE.
CONDUIT HOME RUN - SEE CONDUIT AND WIRE SCHEDULE
CONDUIT CONCEALED IN WALL, CEILING, UNDER FLOOR,
IN FLOOR SLAB, OR ROUTED UNDERGROUND
CONDUIT CONCEALED WHERE POSSIBLE, OTHERWISE
EXPOSED
EXTRA-HARD USAGE FLEXIBLE CORD
FLEXIBLE CONDUIT
CONDUIT TURNED UP OR TOWARD
CONDUIT TURNED DOWN OR AWAY
CONDUIT CAPPED
XXXX
P1-1,3,5
FA
J
M
A
V
W
WH
P
S
FS
RECEPTACLE, DUPLEX FLOOR MOUNTED
PE
DS
X
X
X
ALL INTERIOR AREAS TO HAVE MANUAL "ON"/AUTO OFF LIGHTING
CONTROL WITH THE USE OF DUAL TECHNOLOGY OCCUPANCY
SENSORS. EXCEPT WHERE A WALL SWITCH OCCUPANCY SENSOR
IS NOTED.
PHOTO ELECTRIC SENSOR
DAYLIGHT SENSOR FOR DAYLIGHT HARVESTING CONTROL. SENSOR
SHALL BE CEILING MOUNTED.
LIGHT TRACK WITH HEADS AS SHOWN
LIGHT FIXTURE, BOLLARD
OS
J
EXIT SIGN, ABOVE DOOR, CEILING MOUNTED
RECEPTACLE, DUPLEX CEILING MOUNTEDC
PP
X
POWER PACK FOR COMPLEX LIGHTING CONTROL. "X" DENOTES THE
LIGHTING ZONE.
METERING POINT##
OUTLET, COMBINATION TELEPHONE/DATA COMMUNICATION
CABLE TELEVISION LINE = CATV
CLOSED CIRCUIT TELEVISION LINE = CCTV. MINIMUM 1" [25mm] CONDUIT
FIBEROPTICS LINE = FO
SPEAKER, CEILING MOUNTED, "X" INDICATES THE TYPE, PROVIDE SCHEDULE ON
LEGEND.
SPEAKER, WALL MOUNTED, "X" INDICATES THE TYPE, PROVIDE SCHEDULE
ON LEGEND. MTD. 7'-6" [2286mm] AFF UNLESS OTHERWISE NOTED.
OUTLET DATA OR TELEPHONE, "X" INDICATES NUMBER OF OUTLET PORTS. BOX
AROUND SYMBOL INDICATES FLOOR MOUNTED.
P = POLE/PEDESTAL MOUNTED
TELEPHONE LINE = T
INTERCOM LINE = I. MINIMUM 3/4" [19mm] CONDUIT.
SOUND LINE = S
NURSE CALL LINE = NC. MINIMUM 3/4" [19mm] CONDUIT.
OUTLET; LETTER INDICATES AS FOLLOWS:
A = AUDIO V = VIDEO I = INTERCOM
RADIO CONDUIT RUN, MINIMUM 3/4" [19mm] CONDUIT.
RADIO CHANNEL SELECTOR FACILITIES, MTD. 4'-6" [1372mm] AFF UNLESS
OTHERWISE NOTED.
SPEAKER PROGRAM SELECTOR SWITCH & VOLUME
CONTROL MTD. 4'-6" [1372mm] AFF UNLESS OTHERWISE NOTED.
OUTLET, TELEVISION
BLANK = 4 11/16" [119mm] MASTER ANTENNA OUTLET BOX W/BLANK
COVER, MTD. 18" [457mm] AFF UNLESS OTHERWISE NOTED.
C = CAMERA (CCTV SYSTEM), MTD 18" [457mm] AFF
M = MONITOR (CTTV SYSTEM).
NURSE'S CALL MASTER STATION MTD ON
NURSE'S COUNTER TOP UNLESS OTHERWISE NOTED.
NURSE CALL TERMINAL CABINET.
NURSE CALL STATION.
2 = DUPLICATE FACILITIES FOR TWO BEDS (SEPARATE INDICATORS AT MASTER
STATION) MTD 5'-0" [1524mm] AFF UNLESS OTHERWISE NOTED.
D = DUTY STATION. MTD 5'-0" [1524mm] AFF UNLESS NOTED OTHERWISE.
E = MTD 6'-0" [1829mm] AFF FOR SHOWER LOCATION, MTD 4'-6" [1372mm] AFF FOR TUB LOCATION, & MTD 3'-0" [914mm] AFF FOR TOILET LOCATION.
P = PSYCHIATRIC CORRIDOR STATION WITH KEY SWITCH
S = AUDIO VISUAL MALL STATION (STAFF) MTD 5'-0" [1524mm] AFF UNLESS
OTHERWISE NOTED
U = UTILITY CALL STATION, MTD 5'-0" [1524mm] AFF UNLESS OTHERWISE NOTED.
NURSE CALL STATION.
2 = NURSE'S CALL DOME LIGHT (SUFFIX INDICATES No OF
LAMP) MTD 6" [152mm] ABOVE DOOR.
D = CORRIDOR DOME LIGHT.
I = AUXILIARY INTERSECTIONAL DOME LIGHT.
TELEPHONE TERMINAL CABINET
TELEPHONE BACKBOARD (WALLMOUNTED)
3-POLE TWIST-LOCK RECEPTACLE FOR MICROPHONE, MTD. 4'-6" 1372mm]
AFF.
REMOTE DICTATING OUTLET MTD 1'-6" [457mm] AFF. UNLESS OTHERWISE NOTED.
INTERCOM STATION (REFER TO SPECS. FOR FUNCTIONAL
OPERATION OF INSTRUMENT & TYPE REQUIRED).
INTERCOM STAFF STATION.
TELECOMMUNICATIONS MANHOLE
DATA/COMMUNICATION
N X
TTB
A
S X
S X
X
N X
R M
C
R
R M
NCS
NCT
S
CATV
CCTV
FO
T
I
S
NC
R
= 3 - FUNCTION EMERGENCY STATION; FUNCTIONS SHALL INCLUDE "STAFF
EMERGENCY", "CODE BLUE", AND "CANCEL". MTD 5'-0" AFF.
WIRELESS ACCESS POINT.
"S" = STAFF; "G" = GUEST. IF NOTED LIKE THIS "S,G", CONTRACTOR SHALL PROVIDE
(2) SEPARATE WAPs, (1) WAP FOR EACH SERVICE.
X X
XWAP
1 = SINGLE PATIENT STATION. MTD 4'-0" AFF UNLESS OTHERWISE NOTED.
P
WIRELESS TRACKING MODULE, IR TECHNOLOGY
VW - INDICATES VIRTUAL WALL TYPE.
WT
VW
OUTLET TELEPHONE; "X" INDICATES NUMBER OF OUTLET PORTS. "Y" INDICATES AS
FOLLOWS:
BLANK=EXISTING CONDUIT WITH NEW CAT6A CABLE
P=POLE/ PEDESTAL MOUNTED
F=FURNITURE MOUNTED
C=OUTLET WITH NEW CONDUIT INSTALLED, 3/4" MINIMUM UNLESS OTHERWISE
STATED "Z" INDICATES AS FOLLOWS:
J = JACK TYPE W = WALL TYPE A = ANALOG PORT
Z Y
X
P/D POWER/DATA POLE
HARDWIRED
H =HDMI
C
EMERGENCY NORMAL
X X
X X
X X
X X
X X
X X
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X = DENOTES LUMINAIRE TAG NAME
RECESSED DOWNLIGHT
FIXTURE
LIGHT FIXTURE, RECESSED, 2'x4'
LIGHT FIXTURE, RECESSED,1'x4'
LIGHT FIXTURE, RECESSED, 1'x8'
LIGHT FIXTURE, RECESSED, 2'x2'
LIGHT FIXTURE, SURFACE MOUNTED, 2'x4'
LIGHT FIXTURE, SURFACE MOUNTED, 1'x4'
LIGHT FIXTURE, SURFACE MOUNTED, 1'x8'
LIGHT FIXTURE, SURFACE MOUNTED, 2'x2'
STRIP LIGHTING, 4' LONG
LIGHT FIXTURE, WALL MOUNTED
STREET LIGHT WITH BRACKET
LIGHT POLE, ONE LUMINAIRE
LIGHT POLE, TWO LUMINAIRES
LIGHT POLE, POST TOP MOUNT LUMINAIRE
LIGHTING WALL PACK, EXTERIOR BUILDING
DELTA CONNECTION
MOTOR, SINGLE-PHASE
MOTOR, THREE-PHASE
TRANSFORMER
WYE CONNECTION
EARTH GROUND
JUNCTION BOX
PULL BOX
THESE ARE GENERAL LEGENDS. NOT ALL SYMBOLS MAY BE SHOWN.
REFERENCE PLANS FOR ALL UTILIZED SYMBOLS.
BLDG 18
BLDG 3T
BLDG 3
BLDG 56
BLDG 2
BLDG 24
BLDG 59
BLDG 25
BLDG 51
BOILER PLANT/VAULT
BLDG 52
BLDG 60
BLDG 75
BLDG 53
BLDG 54
MH-18B
MH-6 MH-19
MH-7
MH-8
MH-20
BLDG 1BLDG 23
MH-5
MH-4
MH-3
MH-2
MH-16
MH-15
MH-13
MH-12
MH-10
MH-9
EP416
EP405
EP405
EP406
EP406
EP417
EP404
EP404
EP403
EP403
EP407
EP407
EP402
EP402
EP401
75EP101
EP413
EP413
EP401
EP412
EP417
1 EP416
EP412
EP411
EP411
EP410
EP410
EP409
EP409
23EP101
23EP101
18EP101
EP408
EP408
BLDG 55
EP415
EP415
EP414
EP414
BLDG 57
MH-18A
EP418
EP418
OLD MH-5
P-1 (2)
P-2
C-1
C-2
C-3 (3)
23EP101
55EP101
(2)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:0 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
OVERALL ELECTRICAL SITE PLAN
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
ES101
- 1" = 100'-0"
1 OVERALL ELECTRICAL SITE PLAN
GENERAL NOTES
1. PLAN INCLUDED TO SHOW OVERALL SITE PLAN.
2. ALL EXISTING EQUIPMENT AND MANHOLES MAY NOT BE SHOWN. CONTRACTOR
SHALL FIELD VERIFY PRIOR TO BID TO FAMILIARIZE THEMSELVES WITH EXISTING SITE
CONDITIONS.
3. LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE
MANNER ONLY. CONTRACTOR SHALL REFERENCE CIVIL DRAWINGS FOR ADDITIONAL
INFORMATION.
4. ALL CONDUIT SHALL BE ROUTED TO AVOID ALL OTHER UNDERGROUND PIPING AND
ANY OTHER OBSTRUCTIONS. NOT ALL UNDERGROUND PIPING IS SHOWN FOR
CLARITY; COORDINATE WITH OTHER DISCIPLINES AND ENGINEERED DRAWINGS AS
REQUIRED.
5. NOT ALL CONDUIT AND WIRE MAY BE SHOWN. REFERENCE WIRING AND CONNECTION
DIAGRAMS FOR WIRING REQUIREMENTS.
TRUE
NORTH
0 100' 200'
KEY NOTES
ELEVATOR
CONDENSING UNIT
A
RF - 1
E1
SF - 1 LP1
DS2
ELEVATOR
E1
ELEVATOR
LOBBY
2 3 4 5 6 7 8 9 10 18 20 21 22 23 24 25 26
A
UP ELEVATOR
MACHINE RM.
CORRIDOR
H001
MECH. RM.
STAIRWELL NO. 2
S002
UP
TOILET, FEMALE
TOILET, UNISEX
PIPE CHASE
Z001
CHASE
CH-1-B
HAC
CORRIDOR
H002
CHASE
CH-4-B
MECH. RM.
MECH. RM.
003A
OI&T
003B
J
I
UP
OFFICE
VENDING
H003
OFFICE
H
CHASE
CH-3-B
BREAK RM.
OFFICE
010 OFFICE
CHASE
CH-2-B
C
B
TR
011A
OFFICE
D
E
F
G
11 12 13 14 15 16 17 19
I LQ UEFI D PT RO L EUM G AS
M ALF M AB LE G AS 2
P
U BR EIS LV DNG 1 23
L
UBI
DNG
V A P
O L
ICE
VO
LTS
C
DUS
TO
LECT
O
R
R
TAS
H C O
M P
ACT
O
R
A
PC
&SD
M
UN
TED
G
EAR
ATL
# 51 2-C3
DG
I
2P1V M
O
DEL
# PM
H-9
G S1
E329 -52
A
HV
C
UN
IT
A
HV
C
UN
IT
E L
EC
TRI
P
AN
R
TAN
SFO
RM
ER
R
TAN
SFO
RM
ER
R
TAN
SFO
RM
ER
E L
ECT
RI
AS
AREA SHOWN
TRANSFER
SWITCH
SPD
LTG JBOX
ELEVATOR DISCONNECT
PARKING LOT DISCONNECT
LP1
HOA
SWITCH
LTG CONTACTOR PARKING LOT
TRANSFORMER "A"
MH-18 DISCONNECT
MH-18 JBOX
BLDG 18
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:1 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
BLDG 18 - LEVEL 00 - ELECTRICAL
PLAN 18
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
18EP101
KEY NOTES
KEY PLAN
GENERAL NOTES
TRUE
NORTH
- 1/8" = 1'-0"
1 BLDG 18 - LEVEL 00 - ELECTRICAL PLAN
PROJECT
NORTH
4'0 8' 16'
EXISTING PANELBOARD "LP1" TO POWER SUMP PUMP CONTROL PANEL "CP-MH-18B".
REFERENCE ONE-LINE DIAGRAM ON SHEET 18EP601 FOR ADDITIONAL INFORMATION.
1. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH PROJECT PHASING.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES.
2. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
3. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
4. COORDINATE WITH VA FOR FINAL LOCATIONS OF ALL EQUIPMENT PRIOR TO
INSTALLATION.
UP
9' - 11"
/2
DOCK AREA
DN
6" STOOP
VCT
9x9
ELECTRIC
PANELS
ROLLING
BIPARTING
SHELVING
ROLLING
BIPARTING
SHELVING
ROLLING
BIPARTING
SHELVING
DN
FAP
FAP
FAPFAP
FAP
FE
FE
FE
FEC
FEC AP AP
Floor 3"
Floor 5"
REF.
2147 SF
BREAK RM. /
STORAGE
G23
979 SF
CARPENTER
SHOP
G26
277 SF
CARPENTER
SHOP OFFICE/
KEY PICK-UP
G25
101 SF
LOCKER, MALE
G15
64 SF
TOILET /
SHOWER
G16
27 SF
STORAGE
G14
59 SF
STAIRWELL NO.
S1
365 SF
CORRIDOR
H001
89 SF
TOILET, MEN
G12
34 SF
STORAGE
G13
94 SF
LOCKER, MALE
G11 195 SF
CARPENTER
STORAGE
G10
527 SF
CHARGING
STATION
G07
83 SF
STORAGE
G08
96 SF
KEY SHOP
G09A
402 SF
BREAK RM.
G04
168 SF
STORAGE
G05
162 SF
OFFICE
G01A
1212 SF
ELEC RM.
G01
187 SF
MECH. RM.
G02
173 SF
ELEC RM.
G03
523 SF
CORRIDOR
H002
682 SF
CORRIDOR
H003
41 SF
BATTERY
STORAGE
G13C
78 SF
TRASH RM.
G13B
113 SF
WASH RM.
G13A
186 SF
STAIRWELL NO.
S2
325 SF
MECH. RM.
G17
56 SF
ELEVATOR
E-1
UP
325 SF
MECH. RM.
G17
UP
325 SF
MECH. RM.
G17
AREA SHOWN
CP-4 1 CP-3 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:1 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
BLDG 23 - LEVEL 00 - ELECTRICAL
PLANS 23
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
23EP101
KEY NOTES
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
3/8" = 1'-0"ES101
1 B23 G17 - DEMOLITION ELECTRICAL PLAN
3/8" = 1'-0"ES101
2 B23 G17 - ELECTRICAL PLAN2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
EXISTING MECHANICAL EQUIPMENT TO BE DEMOLISHED AND REPLACED. PRESERVE
EXISTING CONDUIT AND WIRING FOR RETERMINATION.
UTILIZE EXISTING STARTER AND CIRCUIT TO FEED EQUIPMENT.
1. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH PROJECT PHASING.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES.
2. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
3. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
4. COORDINATE WITH VA FOR FINAL LOCATIONS OF ALL EQUIPMENT PRIOR TO
INSTALLATION.
Tectonic Copyright 2007
T ectonic Cop yright 2007
Tectonic Copyright 2007
DATA
SYSTEMS
1C132
DATA
TECH
1C133
CORRIDOR
C1-57
BREAKDOWN,VERIFICATION
INVENTORY
1C135
FEC
FEC
F E
C
UP
DN
Tectonic Copyright 2007
Tectonic Copyright 2007
F E
C F
E C
FEC
F E
C
F E
C
F E
C
F E
C
FEC
UP
UP
DP-551N3
55-DP-TRB
A R
E A
A
A R
E A
B S
E E
S H
E E
T
E
P b
LCP-2
TR-55-1C3
TR-55-EQ3
PANEL 55-1EQ3-1
PANEL 55-1C3P
PANEL 55-1N3-2
TR-55-1N3
PANEL 55-1L3
PANEL 55-1N3-1
PANEL 55-1C3
TR
1B104
AGENT CASHIER
WAITING
1B102
CORRIDOR
C1-4
TR
1B104
AGENT CASHIER
WAITING
1B102
TR
1C132
Staff Lounge 1A
Agent Cashier 1B
Eyeglass Fitting & Display
1A 100c
Storage, Wheelchair &
Stretcher 1B
House Keeping 1A
Office (Disposition)
1B
Office (Disposition)
1B 103b Office
(Disposition) 1B
DATA TECH
1C133
CORRIDOR
C1-57
BREAKDOWN,
VERIFICATION &
INVENTORY
1C135
Women's Toilet 1B
Elevator Lobby
C1-8
Cache 1C
Lockers 1C
130a
Lounge 1C
OP (Shared) Storage - Med
Supplies 1C
127a OP (Shared)
Storage Prepack.
Meds
1C
Vault Controlled Sub.
1C
124b
IP Storage, Active 1C
Aseptic Transfer, IV Admixture
1C 126a
Anteroom, IV Admixture
1C
Cubicle, Inventory Clerk
C1-45
Cubicle, Swing 1C
125h
IV Admix Freezer
C1-55
Dispensing, Controlled Sub
1C 124a
Cubicle, IP Process
1C 125d
Cubicle, IP Process
1C 125b
Cubicle, IP Process
1C 125c
Cubicle, IP Process
1C 125a
Cubicle, OP Spec.
1C
125f
Cubicle, OP Spec.
1C
125e
Invest. Drug Work Area & Stor.
1C
Pharm Teach Lab / Conf 1C
Storage, Sterile Fluids and Admixture
1C
IP Freezer
C1-54
Consult 1C
100a Consult
1C 100b
Consult 1C
100c
Consult 1C
100d
OP Waiting 1C
Dispensing
C1-40
Dispensing
C1-39
Drug Information Area
C1-47
OP Refrigerator
C1-52
Storage - Cart 1C
Mail Out 1C
P.C.
C1-53
Elec.
1C
Clinical Pharm Teaching
1C
Cubicle, Resident 1C
110a
Cubicle, Phone 1C
119e
Cubicle, Phone 1C
119b
Cubicle, Phone 1C
119a Cubicle, Pain
1C 118a
Cubicle, Phone & Telemed
1C 119f
Cubicle, Phone 1C
119c
Cubicle, Phone 1C
119d Office, Secretary /
Wait 1C
Office, Assistant Chief
1C
Cubicle, Resident 1C
110b
Office, Pharmacist 1C
Office, Pharmacist 1C
Office, Pharmacist 1C
Office, Pharmacist 1C
Office, Chief 1C
Office, Pharmacist 1C
Cubicle, Ancil.
1C
118e
Workstation, Tech- Lead
1C 125g
Workstation, Tech
C1-46
Mechanical 1M
Men's Toilet 1B
Electrical 1C
Staff Toilet 1C
Recycling 1B
Housekeeping Storage (Future Public Elev. #4)
1B
Stair #2-1 Stair #2
Service Elev. #3
S-1
Elevator Lobby
C1-3
Stair #3-1 Stair #3
Corridor
C1-7
Corridor
C1-9
Corridor
C1-5
Lobby
C1-2
Radiology Data Room
1B 109a
Corridor
C1-35
Corridor
C1-36
Corridor
C1-38
Corridor
C1-51 Corridor
C1-50
Corridor
C1-56
Stat. Counter
C1-43Med Assignment
C1-42
Repackaging, Extemp.
C1-44
Active Filling
C1-41
Prescription Filling and Assembly
C1-49
Gen Tech Work
C1-48
Staff Toilet 1C
H.K.
1C
Cubicle, Psych 1C
118d
Cubicle, LTC 1C
118c
Cubicle, LTC 1C
118b
Staff Toilet 1C
Corridor
C1-37
Reception 1B
Corridor
C1-6
Corridor
C1-58
COURTYARD-
LOW VISION
SITE
Lobby
2C153
8.3 8.5 8.7 8.9
J.1
H.4
C
F
H
B
E
G
J
K
L
1311109
8 8.2
8.8
L.9
AREA SHOWN
1PANEL 55-1N3-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:2 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
BLDG 55 - LEVEL 01 - ELECTRICAL
PLAN 55
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
55EP101
KEY NOTES
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
KEY NOTES
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
- 1" = 10'-0"
1 BLDG 55 - LEVEL 01 - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
1. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH PROJECT PHASING.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES.
2. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
3. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
4. COORDINATE WITH VA FOR FINAL LOCATIONS OF ALL EQUIPMENT PRIOR TO
INSTALLATION.
EXISTING PANELBOARD "55-1N3-2" TO POWER SUMP PUMP CONTROL PANELS "CP-
MH-7", "CP-MH-8", "CP-MH-9", AND "CP-MH-10". REFERENCE ONE-LINE DIAGRAM ON
SHEET 55EP601 FOR ADDITIONAL INFORMATION.
UP
Entry Room
1B 109
Office
1B 106
Corridor
C1-3
Control Room
1B 108
TERMINAL ROOM
A
1B 107
Men's Toilet 1B
103a
Switchgear
1C 100
Switchgear
1C 101
Switchgear
1C 102
1 2 3 4 4.5 5 6 7 8 9 10 11
J J
H
G Boiler Bay
1A 101
F
E
(MCC / 75-1)
K
D
PANEL '75L'
C.5
C
B
Chiller Bay
1A 100
Housekeeping
1B 104
Recyclable Storage
1B 102
Sound Lock
C1-4
(MCC / 75-3)
Corridor
C1-2
CORRIDOR
C1-6
TR
1B 105
Air Lock
C1-5
Entry
1B 103 Men's Lockers
1B 103b
Shower 1B
103c Shower 1B
101c Women's Lockers
1B 101b
Entry
1B 101 Break Room
1B 100
A
1 2 3 4 4.5 5 6 7 8 9 10 11
Vest.
C1-1
Women's Toilet 1B
101a
(MDP / 75-1)
BACK
BAY-12
BAY-11
BAY-10
BAY-9
BAY-8
BAY-7
BAY-6
BAY-5
BAY-4
PARALL. CONTROLS
FUTURE
FUTURE
FUTURE
(UNS / 75-1)
(PG / 75-1)
D.1
MAIN (EM)
FRONT
FRONT
BAY-1
BAY-2
BAY-3
BAY-4
BAY-5 BACK
(TR-UNS -
75-1)
FRONT
BAY-1
BAY-2
BAY-3
BAY-4
BAY-5
BAY-6
BAY-7
BAY-8
BAY-9
MAIN1
UTIL. METERING
GENCHP
BACK C
B
MAIN2
BAY-10
BAY-11
BAY-12
(PS / 75-1)
A
Substation
SITE
CAMPUS
MEDIUM
VOLTAGE
SWITCHGEAR
D
C.5
D.1
MAIN (NORMAL) K
F
E
Areaway
1C 104 Areaway
1C 105
Generator Bay
1C 103
H
G
I LQ UEFI D PT RO L EUM G AS
M ALF M AB LE G AS 2
P
U BR EIS LV DNG 1 23
L
UBI
DNG
V A P
O L
ICE
VO
LTS
DUS
TO
LECT
R
R
TAS
H C O
M P
ACT
O
R
A
PC
&SD
M
UN
TED
EAR
ATL
# 51 2-C3
DG
I
2P1V M
O
DEL
# PM
H-9
G S1
E329 -52
A
HV
C
UN
IT
A
HV
C
UN
IT
E L
EC
TRI
P
AN
R
TAN
SFO
RM
ER
R
TAN
SFO
RM
ER
R
TAN
SFO
RM
ER
E L
ECT
RI
AS
AREA SHOWN
PANEL '75N'
PANEL '75N2'
PANEL 'DP / 75-1'
75-DP-TRAB
TR - 75 - 112.5
(MCC / 75-2)
E-5043
TO MANHOLE "MH-2"
(SEE SHEET ES101)
P-1(2)
P-2
C-1
C-2(2)
C-3(3)
PANEL '75L'
BLDG 75
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:2 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
BLDG 75 - LEVEL 01 - ELECTRICAL
PLAN 75
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
75EP101
KEY NOTES
KEY PLAN
GENERAL NOTES
PROJECT
NORTH
- 1" = 10'-0"
1 BLDG 75 - LEVEL 01 - ELECTRICAL PLAN 0 10' 20'
PROJECT
NORTH
1. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH PROJECT PHASING.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES.
2. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
3. CONTRACTOR SHALL PROVIDE UPDATED CIRCUIT PANEL DIRECTORIES FOR ALL
PANELS THAT CONTAIN CIRCUITS IMPACTED BY THIS PROJECT.
4. COORDINATE WITH VA FOR FINAL LOCATIONS OF ALL EQUIPMENT PRIOR TO
INSTALLATION.
EXISTING EQUIPMENT TO BE MODIFIED. REFERENCE ONE-LINE DIAGRAM FOR
ADDITIONAL INFORMATION.
PROVIDE CONTROL PANEL "CP-MH-2" AND ASSOCIATED EQUIPMENT AS SHOWN IN
DETAIL '3', SHEET 'E-504'.
J
AREA SHOWN
(E) 14" COMPENSATOR
SP-2
MANHOLE
"MH-2B"
MANHOLE
"MH-2A"
(E) 14" COMPENSATOR
STEAM TRAP
SENSOR (TYP)
"MH-2B"
MANHOLE
SP-1A,B
LEVEL SWITCH (TYP)
"MH-2A"
MANHOLE
STS
LSHH
LSH
LSL
STS A
V
ACTUATED VALVE
(TYP)
A V
A V
C-2
P-2
P-1 P-1
C-1
C-3
C-3
C-3
C-2
MH-2A AND MH-2B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:3 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
MANHOLE 'MH-2A' AND 'MH-2B'
ENLARGED ELECTRICAL PLANS -
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
EP401
KEY PLAN
GENERAL NOTES
TRUE
NORTH
1/4" = 1'-0"ES101
1 MANHOLE 'MH-2A' AND 'MH-2B' ENLARGED DEMO ELECTRICAL PLANS
2'0 4' 8'
PROJECT
NORTH 1/4" = 1'-0"ES101
2 MANHOLE 'MH-2A' AND 'MH-2B' ENLARGED REVISED ELECTRICAL PLANS
2'0 4' 8'
PROJECT
NORTH
BASED ON FIELD INVESTIGATION
NO VOLTAGE/POWER WAS OBSERVED
IN EXISTING VAULT
KEY NOTES
1. ALL EXISTING EQUIPMENT WITHIN MANHOLES MAY NOT BE SHOWN. CONTRACTOR
SHALL FIELD VERIFY SITE PRIOR TO BID TO FAMILIARIZE THEMSELVES WITH
EXISTING SITE CONDITIONS.
2. LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE
MANNER.
3. ALL CONDUIT SHALL BE ROUTED TO AVOID ALL OTHER UNDERGROUND PIPING AND
ANY OTHER OBSTRUCTION. NOT ALL UNDERGROUND PIPING IS SHOWN FOR CLARITY;
COORDINATE WITH OTHER DISCIPLINES AND ENGINEERED DRAWINGS AS REQUIRED.
4. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH PROJECT PHASING.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES.
5. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
6. COORDINATE WITH VA FOR FINAL LOCATIONS OF ALL EQUIPMENT PRIOR TO
INSTALLATION.
7. NOT ALL CONDUIT AND WIRE MAY BE SHOWN. REFERENCE WIRING AND
CONNECTION DIAGRAMS FOR WIRING REQUIREMENTS.
8. EXISTING MANHOLE POWER FEEDER(S) FROM PANELBOARD SOURCE TO
MANHOLE(S) IS UNKNOWN. CONTRACTOR SHALL PROVIDE FIELD INVESTIGATION TO
FULLY AS-BUILD EXISTING FEEDERS [CONDUCTORS AND RACEWAYS (QUANTITY,
SIZE, AND CONDITION)] FROM PANELBOARD SOURCE TO EQUIPMENT LOADS WITHIN
MANHOLE(S).
9. ALL MANHOLE CONDUIT PENETRATIONS SHALL BE GROUTED AND SEALED TO
PROVIDE LEAK-PROOF INSTALLATION.
EXISTING SUMP PUMP AND ASSOCIATED CONDUIT AND WIRING WITHIN VAULT(S) TO
BE DEMOLISHED BACK TO POWER POINT OF ENTRY OF VAULT(S), UNLESS
OTHERWISE NOTED.
EXISTING RECEPTACLE TO BE DEMOLISHED AND REPLACED WITH JUNCTION BOX.
EXISTING CONDUCTORS TO BE PRESERVED AND PROTECTED FOR REUSE.
CONTINUE TO SUMP PUMP CONTROL PANEL "CP-MH-2". REFERENCE SHEETS ES101
AND 75EP101 FOR PANEL PLACEMENT AND RACEWAY ROUTING.
PROVIDE STAINLESS STEEL NEMA 4X JUNCTION BOX (6"Hx6"Wx4"D, MIN.) TO SPLICE
EXISTING CONDUCTORS AND PROVIDE POWER TO CONTROL PANEL. PROVIDE
RACEWAYS AND CONDUCTORS TO CONTROL PANEL "CP-MH-2" AS INDICATED.
JUNCTION BOX TO BE LOCATED HIGH WITHIN THE MANHOLE TO AVOID FLOODING.
CONTRACTOR SHALL PROVIDE CIRCUIT TRACING BACK TO PANELBOARD SOURCE TO
VERIFY EXISTING VAULT POWER FEEDER; CONTRACTOR SHALL DOCUMENT AND AS-
BUILD FINDINGS. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING
CONDUCTORS WHILE MAINTAINING EXISTING RACEWAY; CONDUCTORS SHALL BE
SIZED FOR VOLTAGE DROP PER NEC. COORDINATE WITH VA AS REQUIRED.
JJ
AREA SHOWN
(E)14" COMPENSATOR
E-504
E-504
SP-2A,B
MANHOLE
''MH-3''
LSHH
LSH
LSL
LEVEL SWITCH (TYP)
STEAM TRAP SENSOR
STS
P-1
C-1
C-2
P-1
P-2
(E)14" COMPENSATOR
MANHOLE
''MH-3''
SP-31
MH-3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:4 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
MANHOLE 'MH-3' ENLARGED
ELECTRICAL PLANS -
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
EP402
KEY NOTES
KEY PLAN
GENERAL NOTES
TRUE
NORTH
1/4" = 1'-0"ES101
2 MANHOLE 'MH-3' ENLARGED REVISED ELECTRICAL PLANS
BASED ON FIELD INVESTIGATION
NO VOLTAGE/POWER WAS OBSERVED
IN EXISTING VAULT
1/4" = 1'-0"ES101
1 MANHOLE 'MH-3' ENLARGED DEMO ELECTRICAL PLANS 2'0 4' 8'
PROJECT
NORTH
2'0 4' 8'
PROJECT
NORTH
EXISTING SUMP PUMP AND ASSOCIATED CONDUIT AND WIRING WITHIN THE VAULT(S)
TO BE DEMOLISHED BACK TO POWER POINT OF ENTRY OF VAULT(S), UNLESS
OTHERWISE NOTED.
EXISTING RECEPTACLE AND ASSOCIATED RACEWAYS AND CONDUCTORS TO BE
DEMOLISHED.
EXISTING JUNCTION BOX TO BE DEMOLISHED AND REPLACED. EXISTING
CONDUCTORS TO BE PRESERVED AND PROTECTED FOR REUSE.
PROVIDE STAINLESS-STEEL NEMA 4X JUNCTION BOX (6"Hx6"Wx4"D, MIN.) TO SPLICE
EXISTING CONDUCTORS AND PROVIDE POWER TO CONTROL PANEL. PROVIDE
RACEWAYS AND CONDUCTORS TO CONTROL PANEL "CP-MH-3" AS INDICATED.
JUNCTION BOX TO BE LOCATED HIGH WITHIN THE MANHOLE TO AVOID FLOODING.
PROVIDE CONTROL PANEL "CP-MH-3" AS INDICATED. FINAL LOCATION OF CONTROL
PANEL TO BE COORDINATED WITH VA.
CONTRACTOR SHALL PROVIDE CIRCUIT TRACING BACK TO PANELBOARD SOURCE TO
VERIFY EXISTING VAULT POWER FEEDER; CONTRACTOR SHALL DOCUMENT AND AS-
BUILD FINDINGS. CONTRACTOR SHALL REMOVE AND REPLACE EXISTING
CONDUCTORS WHILE MAINTAINING EXISTING RACEWAY; CONDUCTORS SHALL BE
SIZED FOR VOLTAGE DROP PER NEC. COORDINATE WITH VA AS REQUIRED.
Revisions: Date:
1. ALL EXISTING EQUIPMENT WITHIN MANHOLES MAY NOT BE SHOWN. CONTRACTOR
SHALL FIELD VERIFY SITE PRIOR TO BID TO FAMILIARIZE THEMSELVES WITH
EXISTING SITE CONDITIONS.
2. LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE
MANNER.
3. ALL CONDUIT SHALL BE ROUTED TO AVOID ALL OTHER UNDERGROUND PIPING AND
ANY OTHER OBSTRUCTION. NOT ALL UNDERGROUND PIPING IS SHOWN FOR CLARITY;
COORDINATE WITH OTHER DISCIPLINES AND ENGINEERED DRAWINGS AS REQUIRED.
4. ALL ELECTRICAL WORK SHALL BE CLOSELY COORDINATED WITH PROJECT PHASING.
COORDINATE ALL ELECTRICAL WORK WITH ALL OTHER TRADES.
5. MAKE ALL CONNECTIONS TO EQUIPMENT PER MANUFACTURER'S REQUIREMENTS.
6. COORDINATE WITH VA FOR FINAL LOCATIONS OF ALL EQUIPMENT PRIOR TO
INSTALLATION.
7. NOT ALL CONDUIT AND WIRE MAY BE SHOWN. REFERENCE WIRING AND
CONNECTION DIAGRAMS FOR WIRING REQUIREMENTS.
8. EXISTING MANHOLE POWER FEEDER(S) FROM PANELBOARD SOURCE TO
MANHOLE(S) IS UNKNOWN. CONTRACTOR SHALL PROVIDE FIELD INVESTIGATION TO
FULLY AS-BUILD EXISTING FEEDERS [CONDUCTORS AND RACEWAYS (QUANTITY,
SIZE, AND CONDITION)] FROM PANELBOARD SOURCE TO EQUIPMENT LOADS WITHIN
MANHOLE(S).
9. ALL MANHOLE CONDUIT PENETRATIONS SHALL BE GROUTED AND SEALED TO
PROVIDE LEAK-PROOF INSTALLATION.
J
SP-4
"MH-4"
MANHOLE
STEAM TRAP
SENSOR
SP-3A,B
"MH-4"
MANHOLE
E-504
E-504
STS
LEVEL SWITCH (TYP)
LSL
LSH
LSHH
P-1
C-1
C-2
P-1
MH-4
AREA SHOWN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ENGINEERING DISCIPLINE:
SPEES DESIGN BUILD
23830 PACIFIC HIGHWAY S. SUITE 203
KENT, WA 98032
(206) 590-2118
RAY SPEES
/0
/2
:4
:5 a m
B
IM
/6
-2
-1
J B
V A
M O
J B
S te a m
F a ilu re s /V
A J B
S
F E
L
S D
B .r v t
MANHOLE 'MH-4' ENLARGED
ELECTRICAL PLANS -
WM/MM JBB/JFO
100% CONSTRUCTION
DOCUMENTS
04/24/2024
657-23-115JBCorrect Campus Steam Failure - St.
Louis, MO (Jefferson Barracks
Division)
ST. LOUIS COUNTY, MISSOURI
EP403
KEY NOTES
KEY PLAN
GENERAL NOTES
3/8" = 1'-0"ES101
1 MANHOLE 'MH-4' ENLARGED DEMO ELECTRICAL PLANS
3/8" = 1'-0"ES101
2 MANHOLE 'MH-4' ENLARGED REVISED ELECTRICAL PLANS
TRUE
NORTH
2'0 4' 6'
PROJECT
NORTH
2'0 4' 6'
PROJECT
NORTH
BASED ON FIELD INVESTIGATION
NO VOLTAGE/POWER WAS OBSERVED
IN EXISTING VAULT
EXISTING SUMP PUMP AND ASSOCIATED CONDUIT AND WIRING WITHIN THE VAULT(S)
TO BE DEMOLISHED BACK TO POWER POINT OF ENTRY OF VAULT(S), UNLESS
OTHERWISE NOTED.
EXISTING RECEPTACLE AND ASSOCIATED RACEWAYS AND CONDUCTORS TO BE
DEMOLISHED.
EXISTING JUNCTION BOX TO BE DEMOLISHED AND REPLACED. EXISTING
CONDUCTORS TO BE PRESERVED AND PROTECTED FOR REUSE.
PROVIDE STAINLESS STEEL NEMA 4X JUNCTION BOX (6"Hx6"Wx4"D, MIN.) TO SPLICE
EXISTING CONDUCTORS AND PROVIDE POWER TO CONTROL PANEL. PROVIDE
RACEWAYS AND CONDUCTORS TO CONTROL PANEL "CP-MH-4" AS INDICATED.
JUNCTION BOX TO BE LOCATED HIGH WITHIN THE MANHOLE TO AVOID FLOODING.
PROVIDE CONTROL PANEL "CP-MH-4" AS INDICATED. FINAL LOCATION OF CONTROL
PANEL TO BE COORDINATED WITH VA.
CONTRACTOR SHALL PROVIDE CIRCUIT TRACING BACK TO PANELBOARD SOURCE TO
VERIFY EXISTING VAULT POWER FEEDER; CONTRACTOR SHALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .