This document is a 100% Construction Document submittal for the Correct Campus Steam System Failures project (VA Project 657-23-115JB) at the Jefferson Barracks VA Medical Center in St. Louis, Missouri.

The overall intent of this project is to analyze and correct deficiencies in the campus steam system, including dangerous conditions in the steam manholes, issues with the steam supply and condensate return systems, and non-compliance with VA specifications and industry standards. The architectural scope focuses on upgrading manhole access and installing new manhole lids. The mechanical scope includes replacing compensators, steam valves, condensate pumps, and adding remote monitoring and moisture detection capabilities. The electrical scope provides power and controls for the remote monitoring and sump pump systems.

The period of performance is estimated at 180 days and includes all construction, inspections, closeout documents, and warranties. This project is under VA Project Number 657-23-115JB.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--657-23-115JB Correct Campus Steam System Failures, JB, newest first.
File Type Posted
RFI 021 Response - Manhole Concrete Repairs.pdf PDF
_657-23-115JB_ADD1_Drawings_Book_2_Electrical.pdf PDF
_657-23-115JB_ADD1_Drawings_Book_1_General_and_Mechanical.pdf PDF
Follow Up Responses REV1 20240802.xlsx XLSX spreadsheet
ADD1_-_BOD_COMBINED_-_657-23-115JB_UPDATED_8.1.24.pdf PDF
_657-23-115JB_ADD1_Drawings_Book_3_Electrical-reduced.pdf PDF
36C25524R0096 0002.docx DOCX document
_657-23-115JB_ADD1_Drawings_Book_4_Electrical.pdf PDF
36C25524R0096 0001.docx DOCX document
Pre-Construction Conference Sign-in Sheet 657-23-115.doc DOC document
Contractor Pre-Bid RFI Log - 657-23-115JB - REV1.3.xlsx XLSX spreadsheet
PreProposal Conference Site Visit Agenda 657-23-115JB.pdf PDF
_657-23-115JB_100_Drawings_Book_3_Electrical.pdf PDF
Project_Work_Overview.pdf PDF
_657-23-115JB_100_Drawings_Book_4_Electrical.pdf PDF
_657-23-115JB_100 _Drawings_Book_1_General_and_Mechanical.pdf PDF
S02 ATTACMENT 3 Past Performance Questionnaire 36C25524R0096 Project 657-23-115JB.pdf PDF
36C25524R0096.docx DOCX document
_657-23-115JB_100Percent _Specs_Conformed 20240612.pdf PDF
_657-23-115JB_100_Drawings_Book_2_Electrical.pdf PDF
Directions to Prebid Meeting --- Bldg 1-1st Flr-FLOOR PLAN.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24 April 2024

CORRECT CAMPUS

STEAM SYSTEM

FAILURES

PROJECT #: 657-23-115 JB

JEFFERSON BARRACKS VA MEDICAL CENTER

ST. LOUIS, MISSOURI

BASIS OF DESIGN

100% SUBMITTAL

CONSTRUCTION DOCUMENTS

Correct Campus Steam System Failures

Jefferson Barracks VA Medical Center – St. Louis, MO Project #: 657-23-115JB

TABLE OF CONTENTS PAGE 02

TABLE OF CONTENTS

TABLE OF CONTENTS

EXECUTIVE SUMMARY

ARCHITECTURAL NARRATIVE

MECHANICAL NARRATIVE

ELECTRICAL NARRATIVE

APPENDIX A – ENVIRONMENTAL INVESTIGATION

APPENDIX B – PREVENTIVE MAINTENANCE PLAN

EXECUTIVE SUMMARY PAGE 03

EXECUTIVE SUMMARY

The overall intent of this project is to analyze the current design of the campus steam system. This analysis will culminate in the production of a full set of construction documents to correct deficiencies within the system at the St. Louis VA, Jefferson Barracks (JB). The corrections will address dangerous conditions within the steam manholes and improve the steam supply and condensate return systems.

The corrections will also address steam and condensate system functionality, manhole access, safety considerations, remote valve operation, monitoring of manhole system components, and conditions of non-compliance with VA specifications and industry standards.

This narrative will detail the initial findings and recommendations from the A/E for consideration by the

VA. The A/E will submit a technical report on the condition of the existing campus steam system and provide recommendations to the VA for next steps and possible design solutions in following submittals.

Design Parameters U.S. Department of Veterans Affairs, Office of Construction & Facilities Management Design and Construction Standards, latest version.

Master Construction Specifications (PG-18-1) Design & Construction Procedures (PG 18-3) Standard Details & CAD Standards (PG-18-4) International Building Code (IBC) National Fire Protection Agency (NFPA) OSHA Standards National Electric Code Equipment Guide List (PG-18-5) Design Manuals (by discipline) (PG-18-10) Design Guides (graphical, by function) (PG-18-12) Minimum Requirements for A/E Submissions (PG-18-15, vol. C&F) Environmental Planning Guide (PG-18-17) Physical Security Design Manual for VA Mission Critical Facilities VA PACT (Patient Aligned Care Team) Design Manual VA Handbook 0730/4 Security and Law Enforcement VA Interior Design Manual for New Construction & Renovations of Hospitals/Clinics VA Signage Design Guide VA Sustainable Design Manual TIL Alerts: A/E Quality, Design, & Standards Alerts Federal Information Processing Standards Pub. (FIPS-201-1) Federal Information Processing Standards Pub. (FIPS-140-2) Government Smart Card Interoperability (GSC-IS) (IR 6887 V2.1) Electronic Authentication Guideline (Special Pub 800-63) Security Controls for Federal Information Systems (NIST Sp Pub 800-53) Sustainable Design & Energy Reduction Manual Equipment Guide List (H-7610) Hardware (Equipment Symbols) (H-08-6) VAMC Approved Hardware Locking Standards (H-08-6) Seismic Design Requirements (H-18-8)

ARCHITECTURAL NARRATIVE PAGE 05

ARCHITECTURAL NARRATIVE

GENERAL

This project will upgrade the existing campus steam distribution system at the Jefferson Barracks VA

Medical Center.

Architectural scope for this project is expected to be limited and will focus on the following elements:

1) Updated manhole access using ladder systems that can extend beyond the manhole opening.

The new ladders will meet all current code requirements.

2) Hydraulic assisted manhole lids to reduce force required to open.

EXISTING CONDITIONS

The existing access to manholes is provided by ladder systems that do not extend beyond the manhole opening creating possible dangerous conditions when entering and exiting the manhole, and lids are heavy steel doors and are very difficult to operate and pose a slamming danger to anyone inside the manhole.

ARCHITECTURAL NARRATIVE PAGE 06

PROJECT UPGRADES

A new ladder system will be provided that will meet all code requirements and improve safety at the manholes. This system will include retractable handrails that will lock in the upright position and will extend above the manhole opening to allow for safe manhole entry and exit for maintenance personnel.

See cut sheet on the next page for ladder basis of design.

A new manhole lid system will also be installed to provide ease of operation and will provide a gas shock system that will assist the operator in opening and closing the door to prevent overexertion when opening and slamming of the lid closing. The new system will also include a “hold-open” arm to lock the door open and prevent the door from slamming closed while the manhole is occupied.

MECHANICAL NARRATIVE PAGE 08

MECHANICAL NARRATIVE

GENERAL

The scope of this project and the objectives of the VA are as follows:

1) Investigate and assess current compensators, thrust blocks, and any other relevant accessory within the steam manholes.

2) Investigate and access current steam condensate return system including tanks, pumps and overall system installation.

3) Design and provide construction plan drawings for the repair and installation of any components in the campus steam and condensate distribution loop (between the building condensate return tank and the Energy Plant) that are identified to be non-compliant with VA specifications, VA design guides, manufacturer recommendations, or that are identified as anything less than industry best practice.

4) Investigate, design, and install components to allow remote steam trap monitoring, and valve operation from outside the manholes.

5) Moisture monitoring in the steam vaults using visual indicators (like a light on the outside of the manhole) if water is detected

6) Investigate pipe scaling conditions

7) Preventative maintenance plan for steam vaults

8) Duplex sump pumps as needed in manholes

*Note – This narrative does not include previous design document updates. Initial intent and/or final solutions are presented per scope objective

CODES AND REGULATIONS

• VA Steam, Heating Hot Water, and Outside Distribution Systems Design Manual Sept 1, 2022 Vol.3

• ASME B31.1 Standards

MECHANICAL NARRATIVE PAGE 09

ITEM 1: Investigate and assess current compensators, thrust blocks, and any other relevant accessory within the steam manholes.

Summary: The campus steam distribution system has had several equipment failures over the years despite repairs, reports, and analysis being performed. Per the IMEG report and the observations made, it appears to be the consensus that the failures are due to the thrust block, or mount plate. This may be a contributing factor however it would appear water hammer is also a likely factor for compensator failure.

Items to consider:

1) Per the IMEG report “Expansion joint review update” conclusions, ADSCO concluded a water hammer event may have damaged the MH-16 compensator and compromised its integrity

2) The trap in MH-16 per the IMEG report had likely failed and allowed condensate to build in within the system near the corresponding compensator.

3) It was recommended that 2 traps be installed in parallel at MH-16. Per the site visit this addition was made with disk traps. It’s also worth noting that per 5.4.2 of the design manual inverted bucket traps are recommended.

4) Per the design manual the steam lines should slope at 2” per 40 ft in the direction of flow.

5) Other manholes are problematic, and these should also be investigated further for proper equipment, thrust block condition etc.

100% Solution: Based on design analysis and site investigation completed by the design team, 3 compensators will be replaced. At manholes 12 and 15, they will receive slip style compensators.

Manhole 16 will receive a bellows style compensator which addresses lateral load concerns. New slip style compensators will be ordered to withstand higher pressures if water hammer does persist, and leaks can be fixed by adding packing which will allow maintenance staff to complete repairs without shutting down the steam system. The Bellows style compensator per the schedule is designed to accept lateral forces. Manholes 8, 13, and 16 will receive a pressure powered condensate receiver pumps to assist with removing condensate from the HPS lines.

MECHANICAL NARRATIVE PAGE 10

ITEM 2: Investigate and assess current steam condensate return system including tanks, pumps and overall system installation.

Summary: A condensate system per the design manual should return most if not all condensate to the boiler plant except where deemed not economical. The piping infrastructure is present however the maintenance staff have expressed some concerns including some buildings not returning condensate at all.

Items to consider:

• Condensate comes in surges according to staff. Sometimes there is little to no flow.

• Buildings 1, 3, 18, 23, 24, 53, and 54 either do not have condensate return or the pumps are inoperable.

• Low condensate return means the boiler plant is making up all the water that is lost and decreased overall system efficiency.

100% Solution: It has been determined that Buildings 18, 24, 53 and 54 already have condensate receiver pump replacements in process or are already completed. Buildings 23 have been identified as needing condensate receiver pumps.

ITEM 3: Design and provide construction plan drawings for the repair and installation of any components in the campus steam and condensate distribution loop (between the building condensate return tank and the Energy Plant) that are identified to be non-compliant with VA specifications, VA design guides, manufacturer recommendations, or that are identified as anything less than industry best practice.

100% Response: Drawings have been completed. Where possible equipment has been repaired and/or brought into compliance.

ITEM 4: Investigate, design, and install components to allow remote steam trap monitoring, and valve operation from outside the manholes.

100% Solution: Remote valve actuation and steam trap monitoring have been built into the design.

Valves will have an operating time of approximately 60 seconds. All steam traps will have a steam blow-by sensor and a water logged sensor. These sensors will be wired for long term reliability and simplicity. Failures will be reported to a Sprirax Sarco monitoring panel within the controls cabinet.

Note – Manhole 1 will not have new motorized valves or trap monitoring. This manhole is under building 75 and can be easily accessed without a confined space permit. For this reason the A/E recommends not installing remote/monitoring devices in this location.

ITEM 5: Moisture monitoring in the steam vaults using visual indicators (like a light on the outside of the manhole) if water is detected.

100% Solution: Each manhole will be equipped with a high level alarm switch on the sump pump controls which will activate an alarm state on the control panel and provide a visual indicator alarm to maintenance personnel.

ITEM 6: Investigate pipe scaling conditions.

100% Response: Pipe scaling occurs when continuous water total hardness and high levels of minerals, such as calcium and magnesium, are present in a piping system at above tolerance limits.

Based on the station provided water condition reports, it is unlikely any major scaling is occurring in the high-pressure steam lines. Some recent water condition reports indicated out of tolerance total hardness in the condensate return lines. Multiple possible situations can contribute to water condition that can cause pipe scaling. Recent construction affecting piping, breaks in lines, maintenance issues with condensate collection equipment, old piping, etc. can all be potential causes of pipe scaling. To identify where the hard water source is coming from, water testing should be done at the condensate receiver tank of each building before it enters the site return system. Other items to consider include evaluation of any condensate return systems that were repaired or site work around the same time as the out of tolerance hardness was detected. These events could potentially introduce impurities into the system, causing unfavorable water conditions that can lead to pipe scaling.

ITEM 7: Preventative maintenance plan for steam vaults

100% Solution: A checklist style plan has been created. This includes checking steam traps, pumps, ITEM 8: Duplex sump pumps as needed in manholes.

Intent: Any sump that does not have a duplex, or sump that is not pumped shall be fitted with a duplex style sump pump.

100% Solution: Duplex sump pumps are shown in the design.

100% Final updates

The primary intent of this project and investigation included determining why compensators have failed and what can be done to prevent this from happening in the future. After the investigation was completed it was determined that water hammer was the cause of the failures. The engineering team has implemented two solutions to mitigate the water hammer issues. The first being pressure powered condensate receiver pumps in manholes 8, 13, and 16. These manholes specifically have positive slopes on either side meaning these areas are prone for condensate to building up in the high pressure steam line. These pressure pumps will allow for more condensate to be removed compared to steam traps alone. At manholes 12 and 15, they will receive slip style compensators. Manhole 16 will receive a bellows style compensator which addresses lateral load concerns. These manholes specifically are on the lowest side of the loop and have the greatest potential for water hammer events. The new slip style compensators will withstand higher pressures if water hammer does persist, and leaks can be fixed by adding packing without shutting down the steam system. The manhole 16 compensator has been designed to accept lateral loads due to the existing pipe conditions. Replacing low spot compensators will add safety value and durability. In conclusion, these two solutions will greatly reduce the risk of compensator failures and water hammer in general.

ELECTRICAL NARRATIVE PAGE 12

ELECTRICAL NARRATIVE

Scope of work consists of electrical design to support the rehabilitation/upgrading of the existing campus steam system. The electrical design shall include the following:

1) Provide electrical to support remote steam trap monitoring and valve operation from outside of the manholes.

2) Provide electrical and controls to support manhole duplex sump pump stations.

3) Voltage drop and short-circuit calculations will be incorporated in the design and will adhere to

NEC and IEEE requirements.

EXISTING CONDITIONS

Based on field investigation to verify existing conditions, we observed that not all manholes have power available. For manholes that do not have power available, we do not know where to circuit power from to get power to the manhole. The circuits in the following manholes do not have power:

• MH-2

• MH-3

• MH-4

• MH-5

• MH-6

• MH-12

• MH-13

• MH-15

The rest of the manholes within the project scope were observed to have circuits with power available.

Based on conversations with VA electricians as well as site investigation of electrical panels, it is our understanding that the manholes are fed from buildings 18, 55, and 75. Building 18 feeds Manhole MH-

18. Building 55 appears to feed manholes MH-7, MH-8, MH-9, and MH-10. The remaining manholes under our project scope appear to be fed from building 75. VA electricians also advised that multiple manholes are fed from a panel located in manhole MH-5, however the underground circuit from building

75 to manhole MH-5 was severed during a construction project and it isn’t known if the circuit has been repaired.

Currently, remote operation of manhole valves and remote monitoring of manholes/piping does not exist.

ELECTRICAL NARRATIVE PAGE 13

PROJECT UPGRADES

Power – AE will confirm where existing power is available nearby the subject manholes and provide electrical feeders as required to support the installation of duplex sump pump stations. AE will also coordinate with the VA where power is required and available for the sump pumps, monitoring equipment, and remote valve actuation.

In order to verify power capacity of existing electrical distribution equipment, 30-day peak demand power metering may be required; per NEC 220.87, a peak demand power study is required anytime load is being added to an electrical system unless viable electrical load calculations or existing meter data within the last 12 months is available. Due to unknown power sources currently feeding the vault and design time for the subject project, the construction contractor will be responsible for verifying existing circuiting and providing 30-day demand power metering.

Panel Equipment – The possible panel requirements and installation details are as follows:

1. Upsize Building 75 Panels “75N2(SEC1)” and “75N2(SEC2)” and associated upstream feeder and feeder circuit breaker.

a. Replacement Panels “75N2(SEC1)” and “75N2(SEC2)” shall be rated 400A, with 400A main circuit breaker.

b. Replace the associated upstream feeder and feeder circuit breaker with new feeder and circuit breaker rated for 400A.

2. Upsize Building 55 Panel “55-1N3-2” and refeed the panel directly from Distribution Panel

“DP/55-1N3”.

a. Replacement Panel “55-1N3-2” shall be rated 400A, with 400A main circuit breaker.

b. New feeder from Distribution Panel “DP/55-1N3” to Panel “55-1N3-2” shall be rated

400A and shall be fed from new 400A circuit breaker.

Duplex Pump Control Panel and Associated Rack Equipment – The duplex sump pump control panel requirements and installation details are as follows:

1. Control panel shall be mounted to a stainless steel Unistrut rack.

2. Control panel enclosure shall be stainless steel, NEMA 4x.

3. Control panel enclosure shall house the following equipment:

ELECTRICAL NARRATIVE PAGE 14

a. Swing door mounted pilot devices including open-off-close dials for motorized valves, lead-lag selector switch, available power light, pump running, pump fault, high-level alarm. All pilot devices shall be 30mm type; pilot lights shall be LED push-to-test.

b. One (1) motor starter for each pump. Starter shall be Across-The-Line (ATL), Full-

Voltage Non-Reversible (FVNR), NEMA rated with electronic overloads. Each starter shall be protected by a circuit breaker.

c. Hardwired, relay-based controls: All controls shall be provided by readily available off-the-self components including pilot devices, control relays, control circuit breakers, control power transformer, seal fail/moisture sensor controller, float switches, pump runtime meter, terminals, and fuse blocks.

d. Enclosure auxiliary devices shall include motion activated panel light, thermostatically controlled panel heater, GFCI duplex receptacle (120v), externally mounted audio-visual alarm, remote steam trap monitoring, and remote valve operation.

e. Please note that the control panel wiring diagram has not been completed as final instrumentation selections are still being coordinated with vendor.

4. All control panel locations are mounted in the field outside of the vault, with the only exception being Manhole “MH-2”. Manhole “MH-2” is located in an asphalt/driveway area and is unable to safely and practically place a control panel directly adjacent to the manhole. AE has provided an

RFI to the VA for possible control panel locations; AE awaits VA direction for proposed control panel location.

Lighting – Exterior and/or interior manhole lighting may be desirable; AE will coordinate with VA as required.

Conduits - Conduits shall be rigid where used in damp or exposed locations, or where specifically required by the NEC. PVC conduits shall be used where routed underground. Electrical metallic tubing shall be used in dry concealed locations and in furred, ceiling spaces. Flexible conduits shall be used for final connections to motor driven equipment and vibrating equipment. Conduit shall not be used as a ground path; all electrical circuits shall contain a ground wire. All IT/special system conduit minimum size shall be 1”; all other minimum conduit size shall be 3/4-inches. Conduit seal-off fittings will be provided if required due to classification of manholes.

Conductors – We will provide copper conductors with 600-volt insulation for low voltage distribution.

ELECTRICAL NARRATIVE PAGE 15

Conductors No. 8 and larger shall be stranded, type THWN. Smaller conductors shall be a solid type

THHN/THWN. Aluminum conductors will not be permitted. Conductors for use in high temperature locations shall be insulated as required by the NEC. The minimum size of power conductors shall be

No. 12 AWG.

Codes and Standards

1. National Electrical Code (NEC), NFPA 70

2. Veterans Affairs Electrical Design Manual for Hospitals

3. Veterans Affairs Design Guide, Office and Information Technology

APPENDIX A – ENVIRONMENTAL INVESTIGATION PAGE 16

APPENDIX A – ENVIRONMENTAL INVESTIGATION

Project Overview and Background

Riverfront Safety & Health, LC (Riverfront), a Service-Disabled Veteran Owned Small Business, has provided the required limited asbestos & lead identification field surveys and historical records review in support of the 100% Construction Documents phase of the Correct Campus Steam System Failures (VA Project 657-23-115JB) located at the Jefferson Barracks VA Medical Center, St. Louis, MO (The Project).

The only site features included in the scope of this project are steam manhole/vault locations. No tunnel inspections are currently in the scope of work. Principal contacts for this project are Kimberly Rumpsa of the VA Medical Center and Steve Butros from Spees DB. Currently, RSH understands the scope of work may impact the following related systems:

Steam manhole/vault locations only

The following generalized analysis is provided for your review and future design considerations related to potential asbestos, lead, and mold issues associated with The Project:

Mold impacted building materials are not anticipated and where present are a highly localized condition. Areas will be visually inspected for suspect mold growth on materials located within or near the projected pathways of work.

As a general course of action, reuse of existing wall penetrations and pathways is recommended.

The steam manhole/vaults were operational at the time of the site visits and, due to safety concerns, observations and samples were taken from above. RSH’s inspection was also limited to manholes 12, 15, and 16. Because access was not possible, the inspection was limited only to the visible aluminum-jacketed mineral wool thermal system insulation system over an unpainted steel steam line. The potential for concealed asbestos (TSI, caulks, sealants, and associated fittings) exists. Should additional suspect materials (i.e. caulking, sealants, gaskets, non-mineral wool insulation, or other) be encountered within manholes and within scope of work, stop work immediately and contact VA COR for direction.

Asbestos Inspection Summary

RSH performed limited asbestos and lead surveys on 12/04/2023 – 12/05/2023, to identify the presence, location, quantity, and condition of all asbestos containing materials and lead bearing building components present within the pathways of The Project which may be impacted during the execution of work. The site survey was completed by Justin Rhyneer (CIH) and Charles Davis. Mr. Rhyneer and Mr.

Davis are Missouri licensed Asbestos Building Inspectors and Missouri licensed Lead Risk Assessors.

The surveys were performed in accordance with all applicable local, State and Federal regulations pertaining to asbestos and lead building inspections.

Based on the age of the facility and potential methodology of contract work, anticipated suspect materials included asbestos pipe insulation.

A total of nine (9) samples were collected which included Manhole 12, 15, and 16. A total of zero (0) samples were found to be greater than 1% asbestos.

APPENDIX A – ENVIRONMENTAL INVESTIGATION PAGE 17

Please see attached Appendix A for representative photographs of the aluminum-jacketed duct system and associated mineral wool insulation.

Additional Asbestos and Lead Paint Observations

Although mechanical room G17 was not included in the environmental scope, RSH has performed an inspection in this room during another previous project and is able to provide historical environmental information. Additionally, RSH was able to perform a brief visual inspection of room G17 on 12/12/2023.

Please see attached Appendix A photo log for pipe insulation photographs from room G17.

Building 23, Room G17

• All steam lines are insulated with fiberglass with the exception of one medium pressure steam line. Work requiring disturbance of steam lines labeled with asbestos warning signage is subject to VA asbestos specification 02.82.11.

• All steam lines are presumed to be painted with lead-containing orange paint unless otherwise tested. All work likely to disturb steam lines must be performed in accordance with VA lead specifications 02.83.33.13.

Please see the included Table 1 for the full RSH asbestos bulk sampling. A photo log is included as Appendix A. Laboratory analytical reports, sample chains of custody, and certifications are contained in Appendices B and C.

Riverfront appreciates the opportunity to assist with this project. It is our intent that this information will assist with project development at this phase. Please feel free to contact us with any questions or concerns.

Sincerely, February 16, 2024 Justin R. Rhyneer, CIH Date Principal

Table 1: RSH Field Sampling Summary Table Appendix A: Photo Log Appendix B: Asbestos Laboratory Results Appendix C: Professional Certifications

APPENDIX A – ENVIRONMENTAL INVESTIGATION PAGE 18

TABLE 1: RSH ASBESTOS SAMPLING SUMMARY

Field Sampling December 5, 2023

Sample No.

Material Description

Sample Location

Homogenous Area

Category Condition Quantity Asbestos Content

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 12 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 12 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 12 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 15 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 15 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 15 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 16 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 16 Non-

Friable Good

None Detected

SH1899-

120523-

Insulation Package

Steam line Main

Manhole 16 Non-

Friable Good

None Detected

Notes:

1) Positive ACM samples are noted in bold type.

2) An asbestos-containing material is defined as a material that contains greater than 1% asbestos.

3) A friable asbestos-containing material is a material that can be pulverized, crumbled, or reduced to powder by hand pressure. Likewise, a non-friable asbestos-containing material is a material than cannot be pulverized, crumbled, or reduced to powder by hand pressure.

APPENDIX A – ENVIRONMENTAL INVESTIGATION PAGE 19

Appendix A: Photo log

VA PROJECT NUMBER

PROJECT NAME

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC 100% Construction Documents

SUBJECT Environmental Design Narrative – Appendix A

Manhole Photographs

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC 100% Construction Documents

Building 3, Room B014 Photographs

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

Building 23, Room G17 Photographs

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

SUBMITTAL

657-23-115JB

Correct Campus Steam System Failures – STLVAMC

APPENDIX A – ENVIRONMENTAL INVESTIGATION PAGE 34

Appendix B: Asbestos Laboratory Results

EMSL Analytical, Inc.

100 Green Park Industrial Court Saint Louis, MO 63123

Tel/Fax: (314) 577-0150 / (314) 776-3313 http://www.EMSL.com / saintlouislab@emsl.com

392312369EMSL Order:

Customer ID: RIVF72

Customer PO:

Project ID:

Attention: Phone:Charles Davis (314) 436-9492

Fax:Riverfront Safety & Health, LLC (314) 436-9733

Received Date:11140 South Towne Square, Suite 100 12/05/2023 10:25 AM

Analysis Date:Saint Louis, MO 63123 12/05/2023

Collected Date:

Project: SH1899 Spees JB STL Steam

Test Report: Asbestos Analysis of Bulk Materials via AHERA Method 40CFR 763 Subpart E

Appendix E supplemented with EPA 600/R-93/116 using Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

SH1899-120523-1

392312369-0001

None DetectedNon-fibrous (Other)7%Min. Wool93%Various

Fibrous

Homogeneous

SH1899-120523-2

392312369-0002

None DetectedNon-fibrous (Other)6%Min. Wool94%Various

Fibrous

Homogeneous

SH1899-120523-3

392312369-0003

None DetectedNon-fibrous (Other)5%Min. Wool95%Various

Fibrous

Homogeneous

SH1899-120523-4

392312369-0004

None DetectedNon-fibrous (Other)5%Min. Wool95%Various

Fibrous

Homogeneous

SH1899-120523-5

392312369-0005

None DetectedNon-fibrous (Other)4%Min. Wool96%Various

Fibrous

Homogeneous

SH1899-120523-6

392312369-0006

None DetectedNon-fibrous (Other)100%Various

Non-Fibrous

Homogeneous

SH1899-120523-7

392312369-0007

None DetectedNon-fibrous (Other)7%Min. Wool93%Various

Fibrous

Homogeneous

SH1899-120523-8

392312369-0008

None DetectedNon-fibrous (Other)6%Min. Wool94%Various

Fibrous

Homogeneous

SH1899-120523-9

392312369-0009

None DetectedNon-fibrous (Other)5%Min. Wool95%Various

Fibrous

Homogeneous

Analyst(s)

Clayton Summers (3)

Sue Ferrario (6)

Jeff Siria, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Saint Louis, MO NVLAP Lab Code 200742-0

Initial report from: 12/05/2023 17:29:19

Page 1 of 1ASB_PLM_0008_0001 - 1.78 Printed: 12/5/2023 4:29 PM Page 35

OrderID: 392312369

OrderID: 392312369

APPENDIX A – ENVIRONMENTAL INVESTIGATION PAGE 38

Appendix C: Professional Certifications

Justin Rhyneer

CIH-CP 8594

July 03, 2003

December 01, 2028

Powered by TCPDF (www.tcpdf.org) http://www.tcpdf.org

STATE OF MISSOURI

DEPARTMENT OF HEALTH AND SENIOR SERVICES

LEAD OCCUPATION LICENSE REGISTRATION

Issued to:

Charles N. Davis

The person, firm or corporation whose name appears on this certificate has fulfilled the requirements for licensure as set forth in the Missouri Revised Statutes

701.300-701.338, as long as not suspended or revoked, and is hereby authorized to engage in the activity listed below.

Lead Risk Assessor

Category of License

Issuance Date: 7/7/2023

Expiration Date: 7/22/2025

License Number: 190722-300005842

Paula F. Nickelson

Acting Director

Department of Health and Senior Services

Lead Licensing Program, PO Box 570, Jefferson City, MO 65102

AIHA Laboratory Accreditation Programs, LLC acknowledges that

EMSL Analytical, Inc.

100 Green Park Industrial Ct Saint Louis, MO 63123-7260

Laboratory ID: LAP-102636 along with all premises from which key activities are performed, as listed above, has fulfilled the requirements of the AIHA Laboratory Accreditation Programs (AIHA LAP), LLC accreditation to the ISO/IEC 17025:2017 international standard, General Requirements for the Competence of Testing and Calibration Laboratories in the following:

LABORATORY ACCREDITATION PROGRAMS

INDUSTRIAL HYGIENE Accreditation Expires: January 01, 2025

ENVIRONMENTAL LEAD Accreditation Expires: January 01, 2025

ENVIRONMENTAL MICROBIOLOGY Accreditation Expires:

FOOD Accreditation Expires:

UNIQUE SCOPES Accreditation Expires:

Specific Field(s) of Testing (FoT)/Method(s) within each Accreditation Program for which the above named laboratory maintains accreditation is outlined on the attached Scope of Accreditation. Continued accreditation is contingent upon successful on-going compliance with ISO/IEC 17025:2017 and AIHA LAP, LLC requirements. This certificate is not valid without the attached Scope of Accreditation. Please review the AIHA LAP, LLC website (www.aihaaccreditedlabs.org) for the most current Scope.

Revision20: 06/07/2022

Cheryl O Morton Managing Director, AIHA Laboratory Accreditation Programs, LLC

Date Issued: 01/01/2023

Effective: 06/07/2022 Revision: 9.2

AIHA Laboratory Accreditation Programs, LLC

SCOPE OF ACCREDITATION

EMSL Analytical, Inc. Laboratory ID: LAP-102636 100 Green Park Industrial Ct Saint Louis, MO 63123-7260

Issue Date: 01/01/2023

The laboratory is approved for those specific field(s) of testing/methods listed in the table below. Clients are urged to verify the laboratory's current accreditation status for the particular field(s) of testing/Methods, since these can change due to proficiency status, suspension and/or withdrawal of accreditation.

Industrial Hygiene Laboratory Accreditation Program (IHLAP)

Initial Accreditation Date: 04/15/1999

IHLAP Scope Category Field of Testing (FOT) Technology sub-type/Detector

Published Reference Method/Title of

In-house Method

Component, parameter or characteristic tested

Asbestos/Fiber Microscopy Core

Phase Contrast Microscopy (PCM) - NIOSH 7400 Asbestos/Fibers

Spectrometry Core Inductively- Coupled Plasma ICP/OES NIOSH 7303 Modified Metals in Air

Spectrometry Core Inductively- Coupled Plasma ICP/OES NIOSH 9102 Modified Metals Bulks

A complete listing of currently accredited IHLAP laboratories is available on the AIHA LAP, LLC website at:

http://www.aihaaccreditedlabs.org

APPENDIX B – PREVENTIVE MAINTENANCE PLAN PAGE 45

APPENDIX B – PREVENTIVE MAINTENANCE PLAN

Preventive maintenance is crucial for ensuring the reliability and efficiency of a steam distribution system. Regular checks and maintenance activities can help identify potential issues before they become major problems. See below for a list of items that should be done internally and see next page for the manhole preventive maintenance checklist.

Documentation and Record Keeping:

- Maintain a comprehensive maintenance log.

- Document all inspections, tests, and repairs.

- Keep manufacturer's manuals and documentation up-to-date.

Spare Parts Inventory:

- Maintain an inventory of critical spare parts.

- Replace gaskets, seals, and other consumables regularly.

Emergency Response Plan:

- Develop and review an emergency response plan.

- Train personnel on emergency procedures.

APPENDIX B – PREVENTIVE MAINTENANCE PLAN PAGE 46

Date: _______________________

Personnel: ___________________

Preventive Maintenance Checklist for Manholes

All maintenance should be done quarterly unless otherwise indicated.

Steam Pipes and Fittings:

Inspect insulation for damage and repair as necessary.

Check for signs of steam leaks, such as water stains.

Inspect hangers and supports for stability and integrity.

Inspect and note any changes in alignment of compensators.

Steam Traps:

Inspect valves for steam trap isolation and bypass line.

Inspect and clean strainers.

Controls and Instrumentation:

Cycle control valves for proper function NOTE: this should be done annually and coordinated with the buildings that are affected by the momentary shutdown.

Cycle sump pump by dumping water into the pit.

END OF NARRATIVE