657-18-115JC_100 Bid Documents 20230323 - Copy.pdf

PDF 22 MB Posted

Attached to
657-18-115JC Replace Various AHU's and VAV's Federal contract opportunity
Solicitation number
36C25523R0095
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document summarizes a federal contract opportunity to replace various air handling units and variable air volume boxes. The solicitation number is 36C25523R0095 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The opportunity involves replacing aging air handling and variable air volume equipment at multiple VA medical centers to improve energy efficiency and indoor air quality. Offerors should submit proposals by April 15th, 2023 with the contract to be awarded by June 30th, 2023. The contract will utilize firm-fixed pricing for installation and one year of maintenance. The opportunity is unrestricted and open to all responsible sources.

View the file

Other files for this federal contract opportunity

Other files attached to 657-18-115JC Replace Various AHU's and VAV's, newest first.
File Type Posted
36C25523R0095 0005.pdf PDF
36C25523R0095 0004.pdf PDF
36C25523R0095 0003.pdf PDF
Pre-Bid RFI Answers Rev 657-18-115JC.pdf PDF
Pre-Bid Site Visit Attendance 657-18-115JC.pdf PDF
36C25523R0095 0002.pdf PDF
Factors 1 and 2.pdf PDF
657-18-115JC_100 Bid Documents 20230323.pdf PDF
657-18-115JC_100 Specifications 20230323.pdf PDF
36C25523R0095 0001.pdf PDF
657-18-115JC_100 Specifications 20230323.pdf PDF
Solicitition 36C25523R0095_1 - Copy.pdf PDF
Bid Items 657-18-115JC - Copy.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINDELL

BELL

COOK

FRANKLIN

A

LP

H O N S U S

C

LA

R K

WESTMINSTER

ENRIGHTDELMARGRANDEL SQ

LUCAS

OLIVE

WASHINGTON

BELL

CD BANKS

WEST BELLE PL

K R U M

FINNEY R

E D D

F O X X

M

ARTIN LUTHER KING

SCHOOL

SCHOOL

C O M P T O N

C H A N N

IN

G

L E O N A R D

BELL

C A R D

IN

A L

BRANTNER

EVANS

F R A N C

ISEVANS

PAGE

JOHN COCHRAN REGIONAL

LOCATION MAP

PROJECT LOCATION

St. Louis

6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA ST. LOUIS HEALTH CARE SYSTEM

VA PROJECT NUMBER: 657-18-115JC

JOHN COCHRAN DIVISION

FCA REPLACE VARIOUS AIR

HANDLING UNITS AND

VARIABLE AIR VOLUME UNITS

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

DRAWING INDEX

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMP

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.

/1

/2

:0

:1

P

M

G000

COVER SHEET

CDEMLW

657-18-115JC

100% BID DOCUMENTS

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

MARCH 23, 2023

01 - GENERAL

G000 COVER SHEET

GJ501 ICRA DETAILS

GJ502 ICRA DETAILS

GJ503 ICRA DETAILS

02 - INDUSTRIAL HYGIENE

HA100 ABATEMENT, BUILDING 1, 1ST FLOOR

HA101 ABATEMENT, BUILDING 1, 3RD FLOOR

HA102 ABATEMENT, BUILDING 1, 6TH FLOOR - NORTH

HA103 ABATEMENT, BUILDING 1, 6TH FLOOR - SOUTH

HA104 ABATEMENT, BUILDING 1, 7TH FLOOR - NORTH

HA105 ABATEMENT, BUILDING 1, 7TH FLOOR - SOUTH

HA106 ABATEMENT, BUILDING 1, 10TH AND 11TH FLOORS

HA107 ABATEMENT, BUILDING 1, ROOF

23 - MECHANICAL

MD101 DEMOLITION, BUILDING 1, FLOOR 01

MD103 DEMOLITION, BUILDING 1, FLOOR 03

MD106A DEMOLITION, BUILDING 1, FLOOR 06 - NORTH

MD106B DEMOLITION, BUILDING 1, FLOOR 06 - SOUTH

MD107A DEMOLITION, BUILDING 1, FLOOR 07 - NORTH

MD107B DEMOLITION, BUILDING 1, FLOOR 07 - SOUTH

MD109 DEMOLITION/PHASING, BUILDING 1, AC-36 SYSTEM

MD110 DEMOLITION, BUILDING 1, FLOOR 10

MD111 DEMOLITION, BUILDING 1, FLOOR 11

MD112 DEMOLITION/PHASING, BUILDING 1, ROOF

MD204 DEMOLITION, AC-28 ROOF ENLARGED PLANS

MH001 MECHANICAL SYMBOLS AND ABBREVIATIONS DUCTWORK

MH101 NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 01

MH103 NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 03

MH106A NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 06 - NORTH

MH106B NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 06 - SOUTH

MH107A NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 07 - NORTH

MH107B NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 07 - SOUTH

MH110 NEW WORK, BUILDING 1, DUCTWORK PLAN, ROOF AND SECTIONS

MH201 AC-15 EQUIPMENT ROOM ENLARGED PLANS AND SECTIONS

MH202 AC-21 & 22 EQUIPMENT ROOM ENLARGED PLANS AND SECTIONS

MH203 AC-28 ROOF ENLARGED PLANS AND SECTIONS

MH204 AC-36 EQUIPMENT ROOM ENLARGED PLANS AND SECTIONS

MH501 DUCTWORK AND AIR-HANDLING DETAILS

MH502 AHU DETAILS

MH503 AHU DETAILS

MH601 MECHANICAL SCHEDULES

MH602 MECHANICAL SCHEDULES

MP001 MECHANICAL SYMBOLS AND ABBREVIATIONS PIPING

MP103 NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 03

MP106A NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 06 - NORTH

MP106B NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 06 - SOUTH

MP107A NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 07 - NORTH

MP107B NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 07 - SOUTH

MP501 PIPING AND HYDRONIC DETAILS

MP502 PIPING AND HYDRONIC DETAILS

MI700 TEMPERATURE CONTROLS

MI701 TEMPERATURE CONTROLS

MI702 TEMPERATURE CONTROLS

MI703 TEMPERATURE CONTROLS

MI704 TEMPERATURE CONTROLS

MI705 TEMPERATURE CONTROLS

MI706 TEMPERATURE CONTROLS

26 - ELECTRICAL

E000 ELECTRICAL LEGEND AND ABBREVIATIONS

E101 BUILDING 1 - FLOOR 01

E103 BUILDING 1 - FLOOR 03

E106A BUILDING 1 - FLOOR 06 - NORTH

E106B BUILDING 1 - FLOOR 06 - SOUTH

E107A BUILDING 1 - FLOOR 07 - NORTH

E107B BUILDING 1 - FLOOR 07 - SOUTH

E110 BUILDING 1 - FLOOR 10

E110B BUILDING 1 - CONDUIT ROUTE PLAN

E111 BUILDING 1 - FLOOR 11

E204 BUILDING 1 - FLOOR 04

E601 EQUIPMENT DATA SCHEDULE

1 671 67

St. Louis

6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMP

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.

/1

/2

:0

:1

P

M

GJ501

ICRA DETAILS

CDEMAH

657-18-115JC

100% BID DOCUMENTS

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

MARCH 23, 2023

2 67

St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMP

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.

/1

/2

:0

:1

P

M

GJ502

ICRA DETAILS

CDEMAH

657-18-115JC

100% BID DOCUMENTS

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

3 67

St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMP

The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.

/1

/2

:0

:1

P

M

GJ503

ICRA DETAILS

CDEMAH

657-18-115JC

100% BID DOCUMENTS

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

4 67

DN

EXAM

A139A

MED. PREP.

B102B

MED. PREP.

B102A

WAITING RM.

B102

ALCOVE

B102D

OFFICE

B102E

AGENT CASHIER

B102F

CORRIDOR

H118

EQUIPMENT STORAGE

B103C

CONFERENCE RM.

B106

ARMORY

B107

OFFICE, CHIEF

B108

LOCKER RM.

C101

EVIDENCE

C102

OFFICE

C103

OFFICE

C104

OFFICE

C105

OFFICE

C106

HOLDING CELL

C107

CONTROL

C108

ELEVATOR LOBBY

H122

CORRIDOR

H120

TOILET, MALE

C146

OI&T

B105

HAC

B103 CHUTE

B104

CORRIDOR

H113

SUPPLY

B147

BREAK RM.

B148

OFFICE

B149

CONSULT RM.

B150

OFFICE

B149A

OFFICE

B149B

STORAGE

B121

TOILET, FEMALE

B122

STAIRWELL NO. 3

S103

TOILET

B122A

PHARMACY

B123

EXAM

B124

FILE RM.

B119A

EXAM

B119

OFFICE

B111

CORRIDOR

H124

EXAM

B112

EXAM

B113

EXAM

B114

EXAM

B116

EXAM

B117

EXAM

B118

OFFICE

B117A

OFFICE

C149

LOCKER RM.

C138

ELIGIBILITY

C140

OFFICE

C141

OFFICE

C141A

CORRIDOR

H125

WAITING RM.

C110

OFFICE

C109

TRIAGE

C109A

CONTROL RM.

C112

TRIAGE

C113

TRIAGE

E125

TOILET

E126

ANTE RM.

E127

PATIENT ISO.

E128

EXAM TREATMENT

E133

NURSE STATION

E103

CLEAN UTILITY

E112

SOILED UTILITY

E113 OFFICE / NOUR.

E117

LOCKER RM.

E118

TOILET

E119

LOCKER RM.

E120

HAC

E121

SECURE HOLD

E122

SECURE HOLD

E123

TOILET, FEMALE

C115

TOILET, MALE

C118

ELEC. CLOSET

C117

WAITING RM.

E124

NURSE STATION

E134

TOILET

E135

ALCOVE

E121A

CORRIDOR

H134

CORRIDOR

H132

CORRIDOR

H126

EXAM

C111B

EXAM

C111A

CONFERENCE RM.

C114

OFFICE

C116

OFFICE

C119

OFFICE

C120

CORRIDOR

H128

OFFICE

C121

FILE RM.

C122

OFFICE

C123

OFFICE

C124

OFFICE

C125

OFFICE

C126

OFFICE

C127

OFFICE

C128

OFFICE

C129

OFFICE

C122A

OFFICE

C130

OFFICE

C131

OFFICE

C132

OFFICE

C134

CORRIDOR

H133

OI&T

C136

STORAGE

C137

OFFICE

C148

EXAM

C150

EXAM

C151

EXAM

C152

CORRIDOR

H127

CORRIDOR

H130

CORRIDOR

H131

STAIRWELL NO. 6

S106

OFFICE

C173

TOILET

C173A

OFFICE

D129

OFFICE

C180

OFFICE

C179

OFFICE

C178

TOILET

C177

EXAM

C176

EXAM

D174

OFFICE

D134

CORRIDOR

H136

STORAGE

C114A

CORRIDOR

H127A

CORRIDOR

H114A

CORRIDOR

H119

CORRIDOR

H113C

HAC

C146A

ELEC. CLOSET

B120A

ENTRYWAY

H125B

VESTIBULE

C109B

EXAM

C175

VESTIBULE

H125A

VESTIBULE

S107A

F.E. CLOSET

H113B

CLOSET

C178A

Room

ELEVATOR NO. 7

E7

ELEVATOR NO. 8

E8

ELEVATOR NO. 9

E9

CHASE

CH-C-1

CHASE

CH-C-2

CHASE

CH-B-1

CHASE

CH-B-2

CHASE

CH-B-4

CHASE

CH-B-5

CHASE

CH-B-6

CHASE

CH-C-3

CHASE

CH-B-8

CHASE

CH-B-9

CHASE

CH-C-4

CHASE

CH-C-5

CHASE

CH-D-2

CHASE

CH-C-7

CHASE

CH-C-8

CHASE

CH-E-1

CHASE

CH-C-6

CHASE

CH-E-2

PLAN

NORTH

SCALE: 1/8" = 1'-0"

BUILDING 1, 1ST FLOOR ASBESTOS AND LEAD ABATEMENT PLAN

ABATEMENT KEYNOTES

ASBESTOS TAR FITTINGS, ASBESTOS PIPE SADDLES, AND PIPE

HANGER/BRACKET/ROD ASSEMBLIES CONTAINING ORANGE LEAD-BASED

PAINT PRESENT IN AREA. PROTECT AS REQUIRED.

ON NIGHTS AND WEEKENDS, INSIDE A REGULATED AREA, REMOVE VAV'S,

ASSOCIATED FLEX DUCT, AND SECTION OF METAL DUCTWORK WITH

ASBESTOS DUCT JOINT COATING USING DISMANTLING TECHNIQUES WITHIN

HALLWAY WORK AREAS. REMOVE METAL DUCTWORK A MINIMUM OF 6” AWAY

FROM FLEX DUCT CONNECTION USING DISMANTLING TECHNIQUES. CARE

SHOULD BE TAKEN TO AVOID ANY DISTURBANCE TO THE ASBESTOS DUCT

JOINT COATING.

- 15 EACH, VAV'S WITH ASSOCIATED FLEX DUCT AND METAL DUCTWORK

WITH ASBESTOS DUCT JOINT COATING

ABATEMENT LEGEND:

REMOVE VAV AND FLEX DUCT WITH ASBESTOS DUCT

SEALANT AND ASBESTOS SEAM SEALANT AS INDICATED IN

THE KEYNOTES

A1A1

A2

ON NIGHTS AND WEEKENDS, DISMANTLE AND REMOVE PIPE HANGER /

BRACKET / ROD ASSEMBLIES CONTAINING ORANGE LEAD-BASED PAINT IN

CONJUNCTION WITH MECHANICAL PIPE REMOVAL INSIDE A NEGATIVE

PRESSURE CONTAINMENT, MOBILE MINI-CONTAINMENT, OR HEPA CART. IF

HANGER / BRACKET / ROD ASSEMBLIES CAN BE DISMANTLED AND REMOVED

WITHOUT DISTURBING THE LEAD-BASED PAINT, THE USE OF NEGATIVE

PRESSURE CONTAINMENT WILL NOT BE REQUIRED PROVIDING THE

ABATEMENT CONTRACTOR HAS SUBMITTED AN APPROVED NEGATIVE

EXPOSURE ASSESSMENT WITH THEIR WORK PLAN. THE INSERTS, EMBEDS,

OR INTACT ORANGE PAINT ON THE CONCRETE SHOULD REMAIN IN PLACE.

MECHANICAL PIPING SHALL BE TEMPORARILY SUPPORTED AS REQUIRED, IF

THE HANGER/BRACKET/ROD ASSEMBLIES ARE REMOVED PRIOR TO

MECHANICAL PIPE REMOVAL.

- 10 EACH ORANGE LEAD-BASED PAINTED HANGER ASSEMBLIES

L1

A1

HA100

ABATEMENT, BUILDING 1, 1ST FLOOR

RAJGKY

657-18-115JC

A2

A2 A2

A2

A2

A2 A2 A2

A2

A2

A2

A2

A2

A1

A2

A2

St. Louis

6 South Old Orchard

St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the

Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The

Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the

Engineer or with the Engineer's written authorization.

KEY PLAN

ABATEMENT GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

100% BID DOCUMENTS

P

M

MARCH 23, 2023

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING

NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS

PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE

SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT

SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF

REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.

THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT

MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL

CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT

SPECIFICATIONS.

ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE

FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES

NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,

FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED

HANGER/BRACKET/ROD ASSEMBLIES.

UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF

ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL

USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED

PIPE SECTIONS (ENDS).

MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1

SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)

MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON

THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR

LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -

FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).

ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL

BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH

THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE

KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY

CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE

SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT

CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS

SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE

BLOCKED/CLOSED AT ANY ONE TIME.

NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE

BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN

ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS

“PIGGYBACKING” THE EXHAUST.

LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT

CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT

WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE

TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE

OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE

DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.

ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND

COORDINATED WITH THE VA COR AND VPIH.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD

WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL

DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,

ETC., FROM THE ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,

STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE

STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS

THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE

PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL

OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL

CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING

TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL

METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED

PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED

THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION

OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER

WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED

PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR

HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL

AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS

TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.

ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE

PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY

ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.

PROTECT AS REQUIRED.

STAIRWELL NO. 3

S303

CORRIDOR

H310

TOILET, FEMALE

B316A

TOILET, MALE

B317A

STORAGE

B314A

DINING RM.

B315

DINING RM.

B315C

P.O.S.

B314

MERCHANDISE

B314B

DINING SERVING LINE

B315B

STORAGE

B320C

STORAGE

B320B

OFFICE

B320J

WALK-IN

B319A

NOUR.

B319

POT WASH

B320A

VESTIBULE

B317

VESTIBULE

B316

STORAGE

B318A

MECH. RM.

B318

WALK-IN

B320H

WALK-IN

B320G

WALK-IN

B320F

OFFICE

B320D

VACANT

A340

HAC

A341

HAC

B320E

SERVICE ELEVATOR LOBBY

H308

ELEC. CLOSET

A336

DISH WASHER

A342A

CART WASH

A342B

KITCHEN

B320

RECEPTION

A343

WAITING RM.

A344

STAIRWELL NO. 5

S305

PT WORK

A345

EXAM

A348

EXAM

A349

ELEC. CLOSET

A347

PHYSICAL THERAPY GYM

A346

STAIRWELL NO. 4

S304

ELEC. CLOSET

B313A

CHASE

CH-A-1

CHASE

CH-B-6

PLAN

NORTH

SCALE: 1/8" = 1'-0"

BUILDING 1, 3RD FLOOR LEAD ABATEMENT PLAN

ABATEMENT KEYNOTES

ASBESTOS PIPE INSULATION IS PRESENT INSIDE PIPE CHASES. PROTECT AS

REQUIRED.

REMOVE PIPE HANGER/BRACKET/ROD ASSEMBLIES CONTAINING ORANGE

LEAD-BASED PAINT INTACT INSIDE REGULATED AREAS. IF THE ASSEMBLIES

HAVE TO BE CUT, THEN THE USE OF NEGATIVE PRESSURE MINI-

CONTAINMENTS OR GLOVEBAGS WILL BE REQUIRED.

- 30 EA HANGER/BRACKET/ROD ASSEMBLIES WITH LEAD-BASED PAINT

PIPES CONTAINING ORANGE LEAD-BASED PAINT ARE PRESENT INSIDE PIPE

CHASES. PROTECT AS REQUIRED.

LEAD-CONTAINING GLAZED BLOCK WALLS ARE PRESENT IN THE WORK AREAS.

PROTECT AS REQUIRED. DO NOT SAND, ABRADE, CUT, DRILL, OR OTHERWISE

PENETRATE GLAZED BLOCK.

L2

A1

L1

L1

HA101

ABATEMENT, BUILDING 1, 3RD FLOOR

RAJGKY

657-18-115JC

L1

L1

L1

L1

L1

L1

L3

A1

L2

A1

L2

A1

L2

A1

L2

A1

L2

A1

L2

A1

L2

L3

L3

L3

L3

L1

L1

St. Louis

6 South Old Orchard

St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the

Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The

Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the

Engineer or with the Engineer's written authorization.

P

M

KEY PLAN

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

ABATEMENT GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING

NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS

PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE

SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT

SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF

REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.

THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT

MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL

CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT

SPECIFICATIONS.

ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE

FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES

NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,

FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED

HANGER/BRACKET/ROD ASSEMBLIES.

UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF

ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL

USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED

PIPE SECTIONS (ENDS).

MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1

SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)

MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON

THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR

LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -

FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).

ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL

BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH

THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE

KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY

CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE

SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT

CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS

SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE

BLOCKED/CLOSED AT ANY ONE TIME.

NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE

BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN

ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS

“PIGGYBACKING” THE EXHAUST.

LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT

CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT

WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE

TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE

OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE

DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.

ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND

COORDINATED WITH THE VA COR AND VPIH.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD

WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL

DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,

ETC., FROM THE ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,

STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE

STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS

THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE

PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL

OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL

CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING

TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL

METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED

PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED

THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION

OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER

WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED

PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR

HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL

AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS

TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.

ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE

PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY

ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.

PROTECT AS REQUIRED.

100% BID DOCUMENTS

TOILET

A650A

BED RM.

A651

CONFERENCE RM.

A636

LOCKER RM.

A635

STORAGE

H606C

LOUNGE

A637

LOCKER RM.

A638

LOBBY

H607

STORAGE

A640

TOILET

A641A

BED RM.

A641

BED RM.

A642

TOILET

A642A

BED RM.

A643

STAIRWELL NO. 5

S605

CORRIDOR

H603

CLEAN

A645

TOILET

A646A

STORAGE

A645A

BED RM.

A646

ELEC. CLOSET

A647

BED RM.

A652

HAC

A653

TOILET

A652A

MEQ. STORAGE

A654

SOILED

A656

EQUIPTMENT STORAGE

A657

ISOLATION

A658

ANTE RM.

A658B

TOILET

A658A

BED RM.

A659

TOILET

A660A

BED RM.

A660

CORRIDOR

H604

BED RM.

A661

TOILET

A661A

CORRIDOR

H605

BED RM.

A662

TOILET

A663A

ANTE RM.

A663B

ISOLATION

A663

NURSE STATION

A664

NOUR.

A664A

OFFICE

A666

SUPPLIES

A665

NURSE MANAGER

A668

TOILET, STAFF

A668B

TOILET

A668A

STORAGE

A669

BREAK RM.

A670

OFFICE

A671

BED RM.

A650

TOILET

A649A

BED RM.

A649

BED RM.

A648

ELEC. CLOSET

A655

CHASE

CH-B-1

CHASE

CH-A-5

ELEC. CLOSET

A638A

SEE SHEET HA103 FOR CONT

PLAN

NORTH

SCALE: 1/8" = 1'-0"

BUILDING 1, 6TH FLOOR NORTH LEAD ABATEMENT PLAN

ABATEMENT KEYNOTES

REMOVE ASSUMED ASBESTOS VIBRATION JOINTS (SLEEVE) AND ASSUMED

ASBESTOS FITTINGS FROM THE INSIDE AND/OR AROUND FAN COIL UNITS

SCHEDULED FOR REMOVAL. BASED ON PAST PROJECTS, THE PRESENCE OF

THESE MATERIALS HAVE NOT BE BEEN CONSISTENT, BUT SHOULD BE

ANTICIPATED. FIELD VERIFICATION OF EACH UNIT SHALL BE REQUIRED.

- 18 FAN COIL UNITS WITH ASSUMED ASBESTOS VIBRATION JOINTS AND

ASSUMED ASBESTOS FITTINGS

DEDUCT ALTERNATE NO. 1:

DISMANTLE AND REMOVE PIPE HANGER/BRACKET/ROD ASSEMBLIES

CONTAINING ORANGE LEAD-BASED PAINT IN CONJUNCTION WITH

MECHANICAL PIPE REMOVAL. INSIDE A NEGATIVE PRESSURE CONTAINMENT,

MOBILE MINI-CONTAINMENT, OR HEPA CART. IF HANGER/BRACKET/ROD

ASSEMBLIES CAN BE DISMANTLED AND REMOVED WITHOUT DISTURBING THE

LEAD-BASED PAINT, THE USE OF A NEGATIVE PRESSURE CONTAINMENT WILL

NOT BE REQUIRED, PROVIDING THE ABATEMENT CONTRACTOR HAS

SUBMITTED AN APPROVED NEGATIVE EXPOSURE ASSESSMENT SUBMITTED

WITH THEIR WORK PLAN. THE INSERTS, EMBEDS, OR INTACT ORANGE PAINT

ON THE CONCRETE SHALL REMAIN IN PLACE. MECHANICAL PIPING SHALL BE

TEMPORARILY SUPPORTED AS REQUIRED, IF THE HANGER/BRACKET/ROD

ASSEMBLIES ARE REMOVED PRIOR TO MECHANICAL PIPE REMOVAL.

- 10 EACH ORANGE LEAD-BASED PAINTED HANGER ASSEMBLIES

L1

L1

L1

ABATEMENT LEGEND:

REMOVE ORANGE LEAD-BASED PAINTED HANGER

ASSEMBLIES AS INDICATED IN THE KEYNOTES

HA102

ABATEMENT, BUILDING 1, 6TH FLOOR -

NORTH

RAJGKY

657-18-115JC

St. Louis

6 South Old Orchard

St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the

Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The

Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the

Engineer or with the Engineer's written authorization.

P

M

KEY PLAN

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1 A1

A1

A1

A1

A1

A1

A1

A1

A1

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

ABATEMENT GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING

NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS

PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE

SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT

SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF

REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.

THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT

MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL

CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT

SPECIFICATIONS.

ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE

FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES

NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,

FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED

HANGER/BRACKET/ROD ASSEMBLIES.

UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF

ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL

USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED

PIPE SECTIONS (ENDS).

MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1

SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)

MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON

THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR

LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -

FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).

ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL

BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH

THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE

KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY

CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE

SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT

CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS

SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE

BLOCKED/CLOSED AT ANY ONE TIME.

NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE

BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN

ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS

“PIGGYBACKING” THE EXHAUST.

LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT

CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT

WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE

TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE

OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE

DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.

ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND

COORDINATED WITH THE VA COR AND VPIH.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD

WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL

DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,

ETC., FROM THE ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,

STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE

STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS

THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE

PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL

OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL

CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING

TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL

METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED

PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED

THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION

OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER

WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED

PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR

HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL

AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS

TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.

ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE

PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY

ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.

PROTECT AS REQUIRED.

LOUNGE

A601

OFFICE

A602

HAC

A603

NURSE MANAGER

A604

MED. PREP.

A605

NURSE STATION

A606

NOUR.

A607

ENDO INTERVIEW RM.

A608

PROCEDURE RM.

A609

PROCEDURE RM.

A610

TOILET

A608A

SCOPE

A610A

PROCEDURE RM.

A611

PROCEDURE RM.

A612

SCOPE CLEANING

A613

CLEAN

A614

SOILED

A615

ANTE RM.

A613A

CLEAN UTILITY

A611A

TOILET

A613B

CORRIDOR

H601

NURSE BREAK RM.

A616

STORAGE

A617

OFFICE

A618

OFFICE

A619

TOILET

A619A

OFFICE

A620

TOILET

A616A

OFFICE

A621

OFFICE

A622

STORAGE

A623

WORKSTATION

A624

TOILET

A622A

CLOSET

A623D

ELEC. CLOSET

A623C

STORAGE

A623B

STAIRWELL NO. 2

S602

CORRIDOR

H602

TOILET

A623A

TOILET

A626A

OFFICE

A629

TOILET

A627A

TOILET

A628

OI&T

A629B

OFFICE

A631

OFFICE

A632

OFFICE

A633

OFFICE

A634

OFFICE

A634A

BED RM.

A626

CORRIDOR

H606

CORRIDOR

H603

STAIRWELL NO. 1

S601

BED RM.

A627

CHASE

CH-A-8

ELEC. CLOSET

A629A

LOCKER RM.

A635

STORAGE

H606C

CORRIDOR

H603

OFFICE

A671

CHASE

CH-B-1

SEE SHEET HA102 FOR CONT

AREA NOT IN SCOPE

PLAN

NORTH

SCALE: 1/8" = 1'-0"

BUILDING 1, 6TH FLOOR SOUTH ASBESTOS AND LEAD ABATEMENT PLAN

ABATEMENT KEYNOTES

REMOVE ASSUMED ASBESTOS VIBRATION JOINTS (SLEEVE) AND ASSUMED

ASBESTOS FITTINGS FROM THE INSIDE AND/OR AROUND FAN COIL UNITS

SCHEDULED FOR REMOVAL. BASED ON PAST PROJECTS, THE PRESENCE OF

THESE MATERIALS HAVE NOT BE BEEN CONSISTENT, BUT SHOULD BE

ANTICIPATED. FIELD VERIFICATION OF EACH UNIT SHALL BE REQUIRED.

- 13 FAN COIL UNITS WITH ASSUMED ASBESTOS VIBRATION JOINTS AND

ASSUMED ASBESTOS FITTINGS

DEDUCT ALTERNATE NO. 1:

REMOVE ASBESTOS TAR FITTINGS FROM CHILLED WATER PIPES USING

GLOVEBAG REMOVAL METHODS INSIDE A NEGATIVE PRESSURE

CONTAINMENT, MOBILE MINI-CONTAINMENT, OR HEPA CART.

- 30 EACH ASBESTOS TAR FITTINGS

DEDUCT ALTERNATE NO. 1:

REMOVE ASBESTOS PIPE SADDLES USING GLOVEBAG REMOVAL METHODS

INSIDE A NEGATIVE PRESSURE CONTAINMENT, MOBILE MINI-CONTAINMENT,

OR HEPA CART.

- 25 EACH ASBESTOS PIPE SADDLES

DEDUCT ALTERNATE NO. 1:

REMOVE ASBESTOS MUDDED FITTINGS FROM CHILLED WATER DRAIN PIPE

USING GLOVEBAG REMOVAL METHODS INSIDE A NEGATIVE PRESSURE

CONTAINMENT, MOBILE MINI-CONTAINMENT, OR HEPA CART.

- 1 EACH ASBESTOS MUDDED FITTINGS

DEDUCT ALTERNATE NO. 1:

DISMANTLE AND REMOVE PIPE HANGER/BRACKET/ROD ASSEMBLIES

CONTAINING ORANGE LEAD-BASED PAINT IN CONJUNCTION WITH

MECHANICAL PIPE REMOVAL. INSIDE A NEGATIVE PRESSURE CONTAINMENT,

MOBILE MINI-CONTAINMENT, OR HEPA CART. IF HANGER/BRACKET/ROD

ASSEMBLIES CAN BE DISMANTLED AND REMOVED WITHOUT DISTURBING THE

LEAD-BASED PAINT, THE USE OF A NEGATIVE PRESSURE CONTAINMENT WILL

NOT BE REQUIRED, PROVIDING THE ABATEMENT CONTRACTOR HAS

SUBMITTED AN APPROVED NEGATIVE EXPOSURE ASSESSMENT SUBMITTED

WITH THEIR WORK PLAN. THE INSERTS, EMBEDS, OR INTACT ORANGE PAINT

ON THE CONCRETE SHALL REMAIN IN PLACE. MECHANICAL PIPING SHALL BE

TEMPORARILY SUPPORTED AS REQUIRED, IF THE HANGER/BRACKET/ROD

ASSEMBLIES ARE REMOVED PRIOR TO MECHANICAL PIPE REMOVAL.

- 20 EACH ORANGE LEAD-BASED PAINTED HANGER ASSEMBLIES

LEAD-BASED PAINTED PIPE HANGERS PRESENT IN ROOMS ON THE 6TH AND

7TH FLOORS WHERE NEW DUCTWORK WILL ENTER THE BUILDING. PROTECT

AS REQUIRED.

A1

A2

A3

A4

A2 A3 L1

A2

L1A3A2

A4

ABATEMENT LEGEND:

REMOVE ASBESTOS TAR WRAP FITTINGS AS INDICATED IN

THE KEYNOTES

REMOVE ASBESTOS PIPE SADDLES AS INDICATED IN THE

KEYNOTES

REMOVE ASBESTOS FITTINGS AS INDICATED IN THE

KEYNOTES

REMOVE ORANGE LEAD-BASED PAINTED HANGER

ASSEMBLIES AS INDICATED IN THE KEYNOTES

HA103

ABATEMENT, BUILDING 1, 6TH FLOOR -

SOUTH

RAJGKY

657-18-115JC

St. Louis

6 South Old Orchard

St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com

8718 BOTTS LANE,

SAN ANTONIO, TX 78217

T 210.881.9714

F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Veterans

Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

PRIME CONSULTANT:

Drawing # of

VA Health Care System Approval:

Revision: Date:

ARCHITECT/ENGINEER:

JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO

STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the

Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The

Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the

Engineer or with the Engineer's written authorization.

P

M

KEY PLAN

L2

L2

L2

L1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

FCA REPLACE VARIOUS AIR HANDLING

UNITS AND VARIABLE AIR VOLUME

UNITS

ABATEMENT GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING

NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS

PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE

SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT

SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF

REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.

THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT

MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL

CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL

FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT

SPECIFICATIONS.

ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE

FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES

NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,

FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED

HANGER/BRACKET/ROD ASSEMBLIES.

UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF

ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL

USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED

PIPE SECTIONS (ENDS).

MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1

SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)

MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON

THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR

LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -

FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).

ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL

BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -

FRIDAY EXCLUDING FEDERAL HOLIDAYS.

WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH

THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE

KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK

PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY

CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE

SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.

THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT

CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS

SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS

ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.

DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE

BLOCKED/CLOSED AT ANY ONE TIME.

NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE

BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN

ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS

“PIGGYBACKING” THE EXHAUST.

LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT

CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT

WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE

TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.

ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE

OF THE FIRE RETARDANT TYPE.

THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE

DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.

ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND

COORDINATED WITH THE VA COR AND VPIH.

ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD

WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.

VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL

DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,

ETC., FROM THE ABATEMENT AREAS.

ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,

STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.

ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE

STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS

THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE

PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL

OPERATIONS.

STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL

CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.

ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING

TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL

METHODS.

TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED

PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED

THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD

EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION

OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY

SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER

WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED

PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK

EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING

(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR

HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL

AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS

TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.

ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE

PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY

ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.

PROTECT AS REQUIRED.

CONFERENCE RM.

A701

CONFERENCE RM.

A741

LOCKER RM.

A742

TOILET

A742A

LOCKER RM.

A742B

CORRIDOR

H707

OFFICE

A743D

OFFICE

A743C

OFFICE

A743B

LOCKER RM.

A743

SERVICE ELEVATOR LOBBY

H706

OI&T

A742E

HAC

A742D

TOILET

A742C

ELEVATOR LOBBY

H709

CORRIDOR

H703

CORRIDOR

H704

CORRIDOR

H705

STAIRWELL NO. 5

S705

CLEAN UTILITY

A747

PATIENT RM.

A748

ELEC. CLOSET

A747B

TOILET

A748A

ELEC. CLOSET

A748B

STORAGE

A749

5 BED PATIENT RM.

A751

TOILET

A751A

2 BED PATIENT RM.

A753

TANK STORAGE

A753A

TOILET

A754A

2 BED PATIENT RM.

A754

CLEAN LINEN

A756

PATIENT RM.

A757

TOILET

A757B

ANTE RM.

A757A

PATIENT RM.

A758

TOILET

A759A

2 BED PATIENT RM.

A759

2 BED PATIENT RM.

A760

PATIENT RM.

A761

PATIENT RM.

A762

TOILET

A760A

TOILET

A762A

NURSE STATION

A763

NOUR.

A763A

MED. PREP.

A765

BREAK RM.

A766

HAC

A767

OFFICE

A768

OFFICE

A769

OFFICE

A740

TOILET

A745C

TOILET

A745A

2 BED PATIENT RM.

A745B

CLEAN SUPPLY

A750A

PATIENT RM.

A752

SOILED UTILITY

A755

TOILET

A740A

TOILET

A744A

2 BED PATIENT RM.

A744

2 BED PATIENT RM.

A745

STORAGE

A739

SEE SHEET HA105 FOR CONT

PLAN

NORTH

SCALE: 1/8" = 1'-0"

BUILDING 1, 7TH FLOOR NORTH ASBESTOS, LEAD, AND MOLD ABATEMENT PLAN

ABATEMENT KEYNOTES

REMOVE ASSUMED ASBESTOS VIBRATION JOINTS (SLEEVE) AND ASSUMED

ASBESTOS FITTINGS FROM THE INSIDE AND/OR AROUND FAN COIL UNITS

SCHEDULED FOR REMOVAL. BASED ON PAST PROJECTS, THE PRESENCE OF

THESE MATERIALS HAVE NOT BE BEEN CONSISTENT, BUT SHOULD BE

ANTICIPATED. FIELD VERIFICATION OF EACH UNIT SHALL BE REQUIRED.

- 24 FAN COIL UNITS WITH ASSUMED ASBESTOS VIBRATION JOINTS AND

ASSUMED ASBESTOS FITTINGS

DEDUCT ALTERNATE NO. 1:

REMOVE ASBESTOS PIPE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .