This federal contract opportunity solicitation seeks to replace various air handling units and variable air volume boxes. The solicitation number is 36C25523R0095 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The opportunity aims to replace equipment at multiple locations to improve HVAC systems. Offerors should submit bids by the response date of March 23, 2023 for consideration. The agency intends to award a firm fixed-price contract to the responsible bidder whose offer follows the solicitation instructions and is most advantageous to the government regarding technical approach and pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25523R0095 0005.pdf | ||
| 36C25523R0095 0004.pdf | ||
| Pre-Bid RFI Answers Rev 657-18-115JC.pdf | ||
| 36C25523R0095 0003.pdf | ||
| Pre-Bid Site Visit Attendance 657-18-115JC.pdf | ||
| 36C25523R0095 0002.pdf | ||
| Factors 1 and 2.pdf | ||
| 657-18-115JC_100 Specifications 20230323.pdf | ||
| 36C25523R0095 0001.pdf | ||
| 657-18-115JC_100 Bid Documents 20230323 - Copy.pdf | ||
| Solicitition 36C25523R0095_1 - Copy.pdf | ||
| Bid Items 657-18-115JC - Copy.pdf | ||
| 657-18-115JC_100 Specifications 20230323.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINDELL
BELL
COOK
FRANKLIN
A
LP
H O N S U S
C
LA
R K
WESTMINSTER
ENRIGHTDELMARGRANDEL SQ
LUCAS
OLIVE
WASHINGTON
BELL
CD BANKS
WEST BELLE PL
K R U M
FINNEY R
E D D
F O X X
M
ARTIN LUTHER KING
SCHOOL
SCHOOL
C O M P T O N
C H A N N
IN
G
L E O N A R D
BELL
C A R D
IN
A L
BRANTNER
EVANS
F R A N C
ISEVANS
PAGE
JOHN COCHRAN REGIONAL
LOCATION MAP
PROJECT LOCATION
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
VA PROJECT NUMBER: 657-18-115JC
JOHN COCHRAN DIVISION
FCA REPLACE VARIOUS AIR
HANDLING UNITS AND
VARIABLE AIR VOLUME UNITS
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
DRAWING INDEX
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMP
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.
/1
/2
:0
:1
P
M
G000
COVER SHEET
CDEMLW
657-18-115JC
100% BID DOCUMENTS
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
MARCH 23, 2023
01 - GENERAL
G000 COVER SHEET
GJ501 ICRA DETAILS
GJ502 ICRA DETAILS
GJ503 ICRA DETAILS
02 - INDUSTRIAL HYGIENE
HA100 ABATEMENT, BUILDING 1, 1ST FLOOR
HA101 ABATEMENT, BUILDING 1, 3RD FLOOR
HA102 ABATEMENT, BUILDING 1, 6TH FLOOR - NORTH
HA103 ABATEMENT, BUILDING 1, 6TH FLOOR - SOUTH
HA104 ABATEMENT, BUILDING 1, 7TH FLOOR - NORTH
HA105 ABATEMENT, BUILDING 1, 7TH FLOOR - SOUTH
HA106 ABATEMENT, BUILDING 1, 10TH AND 11TH FLOORS
HA107 ABATEMENT, BUILDING 1, ROOF
23 - MECHANICAL
MD101 DEMOLITION, BUILDING 1, FLOOR 01
MD103 DEMOLITION, BUILDING 1, FLOOR 03
MD106A DEMOLITION, BUILDING 1, FLOOR 06 - NORTH
MD106B DEMOLITION, BUILDING 1, FLOOR 06 - SOUTH
MD107A DEMOLITION, BUILDING 1, FLOOR 07 - NORTH
MD107B DEMOLITION, BUILDING 1, FLOOR 07 - SOUTH
MD109 DEMOLITION/PHASING, BUILDING 1, AC-36 SYSTEM
MD110 DEMOLITION, BUILDING 1, FLOOR 10
MD111 DEMOLITION, BUILDING 1, FLOOR 11
MD112 DEMOLITION/PHASING, BUILDING 1, ROOF
MD204 DEMOLITION, AC-28 ROOF ENLARGED PLANS
MH001 MECHANICAL SYMBOLS AND ABBREVIATIONS DUCTWORK
MH101 NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 01
MH103 NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 03
MH106A NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 06 - NORTH
MH106B NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 06 - SOUTH
MH107A NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 07 - NORTH
MH107B NEW WORK, BUILDING 1, DUCTWORK PLAN, FLOOR 07 - SOUTH
MH110 NEW WORK, BUILDING 1, DUCTWORK PLAN, ROOF AND SECTIONS
MH201 AC-15 EQUIPMENT ROOM ENLARGED PLANS AND SECTIONS
MH202 AC-21 & 22 EQUIPMENT ROOM ENLARGED PLANS AND SECTIONS
MH203 AC-28 ROOF ENLARGED PLANS AND SECTIONS
MH204 AC-36 EQUIPMENT ROOM ENLARGED PLANS AND SECTIONS
MH501 DUCTWORK AND AIR-HANDLING DETAILS
MH502 AHU DETAILS
MH503 AHU DETAILS
MH601 MECHANICAL SCHEDULES
MH602 MECHANICAL SCHEDULES
MP001 MECHANICAL SYMBOLS AND ABBREVIATIONS PIPING
MP103 NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 03
MP106A NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 06 - NORTH
MP106B NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 06 - SOUTH
MP107A NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 07 - NORTH
MP107B NEW WORK, BUILDING 1, PIPING PLAN, FLOOR 07 - SOUTH
MP501 PIPING AND HYDRONIC DETAILS
MP502 PIPING AND HYDRONIC DETAILS
MI700 TEMPERATURE CONTROLS
MI701 TEMPERATURE CONTROLS
MI702 TEMPERATURE CONTROLS
MI703 TEMPERATURE CONTROLS
MI704 TEMPERATURE CONTROLS
MI705 TEMPERATURE CONTROLS
MI706 TEMPERATURE CONTROLS
26 - ELECTRICAL
E000 ELECTRICAL LEGEND AND ABBREVIATIONS
E101 BUILDING 1 - FLOOR 01
E103 BUILDING 1 - FLOOR 03
E106A BUILDING 1 - FLOOR 06 - NORTH
E106B BUILDING 1 - FLOOR 06 - SOUTH
E107A BUILDING 1 - FLOOR 07 - NORTH
E107B BUILDING 1 - FLOOR 07 - SOUTH
E110 BUILDING 1 - FLOOR 10
E110B BUILDING 1 - CONDUIT ROUTE PLAN
E111 BUILDING 1 - FLOOR 11
E204 BUILDING 1 - FLOOR 04
E601 EQUIPMENT DATA SCHEDULE
1 671 67
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMP
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.
/1
/2
:0
:1
P
M
GJ501
ICRA DETAILS
CDEMAH
657-18-115JC
100% BID DOCUMENTS
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
MARCH 23, 2023
2 67
St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMP
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.
/1
/2
:0
:1
P
M
GJ502
ICRA DETAILS
CDEMAH
657-18-115JC
100% BID DOCUMENTS
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
3 67
St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714 F 210.881.6808 www.hfscompany.com th re e i n c h e s o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t o n e e ig h th i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMP
The Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the Engineer or with the Engineer's written authorization.
/1
/2
:0
:1
P
M
GJ503
ICRA DETAILS
CDEMAH
657-18-115JC
100% BID DOCUMENTS
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
4 67
DN
EXAM
A139A
MED. PREP.
B102B
MED. PREP.
B102A
WAITING RM.
B102
ALCOVE
B102D
OFFICE
B102E
AGENT CASHIER
B102F
CORRIDOR
H118
EQUIPMENT STORAGE
B103C
CONFERENCE RM.
B106
ARMORY
B107
OFFICE, CHIEF
B108
LOCKER RM.
C101
EVIDENCE
C102
OFFICE
C103
OFFICE
C104
OFFICE
C105
OFFICE
C106
HOLDING CELL
C107
CONTROL
C108
ELEVATOR LOBBY
H122
CORRIDOR
H120
TOILET, MALE
C146
OI&T
B105
HAC
B103 CHUTE
B104
CORRIDOR
H113
SUPPLY
B147
BREAK RM.
B148
OFFICE
B149
CONSULT RM.
B150
OFFICE
B149A
OFFICE
B149B
STORAGE
B121
TOILET, FEMALE
B122
STAIRWELL NO. 3
S103
TOILET
B122A
PHARMACY
B123
EXAM
B124
FILE RM.
B119A
EXAM
B119
OFFICE
B111
CORRIDOR
H124
EXAM
B112
EXAM
B113
EXAM
B114
EXAM
B116
EXAM
B117
EXAM
B118
OFFICE
B117A
OFFICE
C149
LOCKER RM.
C138
ELIGIBILITY
C140
OFFICE
C141
OFFICE
C141A
CORRIDOR
H125
WAITING RM.
C110
OFFICE
C109
TRIAGE
C109A
CONTROL RM.
C112
TRIAGE
C113
TRIAGE
E125
TOILET
E126
ANTE RM.
E127
PATIENT ISO.
E128
EXAM TREATMENT
E133
NURSE STATION
E103
CLEAN UTILITY
E112
SOILED UTILITY
E113 OFFICE / NOUR.
E117
LOCKER RM.
E118
TOILET
E119
LOCKER RM.
E120
HAC
E121
SECURE HOLD
E122
SECURE HOLD
E123
TOILET, FEMALE
C115
TOILET, MALE
C118
ELEC. CLOSET
C117
WAITING RM.
E124
NURSE STATION
E134
TOILET
E135
ALCOVE
E121A
CORRIDOR
H134
CORRIDOR
H132
CORRIDOR
H126
EXAM
C111B
EXAM
C111A
CONFERENCE RM.
C114
OFFICE
C116
OFFICE
C119
OFFICE
C120
CORRIDOR
H128
OFFICE
C121
FILE RM.
C122
OFFICE
C123
OFFICE
C124
OFFICE
C125
OFFICE
C126
OFFICE
C127
OFFICE
C128
OFFICE
C129
OFFICE
C122A
OFFICE
C130
OFFICE
C131
OFFICE
C132
OFFICE
C134
CORRIDOR
H133
OI&T
C136
STORAGE
C137
OFFICE
C148
EXAM
C150
EXAM
C151
EXAM
C152
CORRIDOR
H127
CORRIDOR
H130
CORRIDOR
H131
STAIRWELL NO. 6
S106
OFFICE
C173
TOILET
C173A
OFFICE
D129
OFFICE
C180
OFFICE
C179
OFFICE
C178
TOILET
C177
EXAM
C176
EXAM
D174
OFFICE
D134
CORRIDOR
H136
STORAGE
C114A
CORRIDOR
H127A
CORRIDOR
H114A
CORRIDOR
H119
CORRIDOR
H113C
HAC
C146A
ELEC. CLOSET
B120A
ENTRYWAY
H125B
VESTIBULE
C109B
EXAM
C175
VESTIBULE
H125A
VESTIBULE
S107A
F.E. CLOSET
H113B
CLOSET
C178A
Room
ELEVATOR NO. 7
E7
ELEVATOR NO. 8
E8
ELEVATOR NO. 9
E9
CHASE
CH-C-1
CHASE
CH-C-2
CHASE
CH-B-1
CHASE
CH-B-2
CHASE
CH-B-4
CHASE
CH-B-5
CHASE
CH-B-6
CHASE
CH-C-3
CHASE
CH-B-8
CHASE
CH-B-9
CHASE
CH-C-4
CHASE
CH-C-5
CHASE
CH-D-2
CHASE
CH-C-7
CHASE
CH-C-8
CHASE
CH-E-1
CHASE
CH-C-6
CHASE
CH-E-2
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BUILDING 1, 1ST FLOOR ASBESTOS AND LEAD ABATEMENT PLAN
ABATEMENT KEYNOTES
ASBESTOS TAR FITTINGS, ASBESTOS PIPE SADDLES, AND PIPE
HANGER/BRACKET/ROD ASSEMBLIES CONTAINING ORANGE LEAD-BASED
PAINT PRESENT IN AREA. PROTECT AS REQUIRED.
ON NIGHTS AND WEEKENDS, INSIDE A REGULATED AREA, REMOVE VAV'S,
ASSOCIATED FLEX DUCT, AND SECTION OF METAL DUCTWORK WITH
ASBESTOS DUCT JOINT COATING USING DISMANTLING TECHNIQUES WITHIN
HALLWAY WORK AREAS. REMOVE METAL DUCTWORK A MINIMUM OF 6” AWAY
FROM FLEX DUCT CONNECTION USING DISMANTLING TECHNIQUES. CARE
SHOULD BE TAKEN TO AVOID ANY DISTURBANCE TO THE ASBESTOS DUCT
JOINT COATING.
- 15 EACH, VAV'S WITH ASSOCIATED FLEX DUCT AND METAL DUCTWORK
WITH ASBESTOS DUCT JOINT COATING
ABATEMENT LEGEND:
REMOVE VAV AND FLEX DUCT WITH ASBESTOS DUCT
SEALANT AND ASBESTOS SEAM SEALANT AS INDICATED IN
THE KEYNOTES
A1A1
A2
ON NIGHTS AND WEEKENDS, DISMANTLE AND REMOVE PIPE HANGER /
BRACKET / ROD ASSEMBLIES CONTAINING ORANGE LEAD-BASED PAINT IN
CONJUNCTION WITH MECHANICAL PIPE REMOVAL INSIDE A NEGATIVE
PRESSURE CONTAINMENT, MOBILE MINI-CONTAINMENT, OR HEPA CART. IF
HANGER / BRACKET / ROD ASSEMBLIES CAN BE DISMANTLED AND REMOVED
WITHOUT DISTURBING THE LEAD-BASED PAINT, THE USE OF NEGATIVE
PRESSURE CONTAINMENT WILL NOT BE REQUIRED PROVIDING THE
ABATEMENT CONTRACTOR HAS SUBMITTED AN APPROVED NEGATIVE
EXPOSURE ASSESSMENT WITH THEIR WORK PLAN. THE INSERTS, EMBEDS,
OR INTACT ORANGE PAINT ON THE CONCRETE SHOULD REMAIN IN PLACE.
MECHANICAL PIPING SHALL BE TEMPORARILY SUPPORTED AS REQUIRED, IF
THE HANGER/BRACKET/ROD ASSEMBLIES ARE REMOVED PRIOR TO
MECHANICAL PIPE REMOVAL.
- 10 EACH ORANGE LEAD-BASED PAINTED HANGER ASSEMBLIES
L1
A1
HA100
ABATEMENT, BUILDING 1, 1ST FLOOR
RAJGKY
657-18-115JC
A2
A2 A2
A2
A2
A2 A2 A2
A2
A2
A2
A2
A2
A1
A2
A2
St. Louis
6 South Old Orchard
St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the
Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The
Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the
Engineer or with the Engineer's written authorization.
KEY PLAN
ABATEMENT GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
100% BID DOCUMENTS
P
M
MARCH 23, 2023
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING
NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS
PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE
SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT
SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF
REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.
THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT
MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL
CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT
SPECIFICATIONS.
ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE
FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES
NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,
FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED
HANGER/BRACKET/ROD ASSEMBLIES.
UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF
ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL
USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED
PIPE SECTIONS (ENDS).
MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1
SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)
MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON
THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR
LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -
FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).
ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL
BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH
THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE
KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY
CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE
SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT
CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS
SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE
BLOCKED/CLOSED AT ANY ONE TIME.
NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE
BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN
ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS
“PIGGYBACKING” THE EXHAUST.
LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT
CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT
WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE
TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE
OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE
DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.
ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND
COORDINATED WITH THE VA COR AND VPIH.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD
WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL
DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,
ETC., FROM THE ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,
STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE
STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS
THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE
PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL
OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL
CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING
TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL
METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED
PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED
THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION
OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER
WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED
PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR
HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL
AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS
TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.
ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE
PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY
ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.
PROTECT AS REQUIRED.
STAIRWELL NO. 3
S303
CORRIDOR
H310
TOILET, FEMALE
B316A
TOILET, MALE
B317A
STORAGE
B314A
DINING RM.
B315
DINING RM.
B315C
P.O.S.
B314
MERCHANDISE
B314B
DINING SERVING LINE
B315B
STORAGE
B320C
STORAGE
B320B
OFFICE
B320J
WALK-IN
B319A
NOUR.
B319
POT WASH
B320A
VESTIBULE
B317
VESTIBULE
B316
STORAGE
B318A
MECH. RM.
B318
WALK-IN
B320H
WALK-IN
B320G
WALK-IN
B320F
OFFICE
B320D
VACANT
A340
HAC
A341
HAC
B320E
SERVICE ELEVATOR LOBBY
H308
ELEC. CLOSET
A336
DISH WASHER
A342A
CART WASH
A342B
KITCHEN
B320
RECEPTION
A343
WAITING RM.
A344
STAIRWELL NO. 5
S305
PT WORK
A345
EXAM
A348
EXAM
A349
ELEC. CLOSET
A347
PHYSICAL THERAPY GYM
A346
STAIRWELL NO. 4
S304
ELEC. CLOSET
B313A
CHASE
CH-A-1
CHASE
CH-B-6
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BUILDING 1, 3RD FLOOR LEAD ABATEMENT PLAN
ABATEMENT KEYNOTES
ASBESTOS PIPE INSULATION IS PRESENT INSIDE PIPE CHASES. PROTECT AS
REQUIRED.
REMOVE PIPE HANGER/BRACKET/ROD ASSEMBLIES CONTAINING ORANGE
LEAD-BASED PAINT INTACT INSIDE REGULATED AREAS. IF THE ASSEMBLIES
HAVE TO BE CUT, THEN THE USE OF NEGATIVE PRESSURE MINI-
CONTAINMENTS OR GLOVEBAGS WILL BE REQUIRED.
- 30 EA HANGER/BRACKET/ROD ASSEMBLIES WITH LEAD-BASED PAINT
PIPES CONTAINING ORANGE LEAD-BASED PAINT ARE PRESENT INSIDE PIPE
CHASES. PROTECT AS REQUIRED.
LEAD-CONTAINING GLAZED BLOCK WALLS ARE PRESENT IN THE WORK AREAS.
PROTECT AS REQUIRED. DO NOT SAND, ABRADE, CUT, DRILL, OR OTHERWISE
PENETRATE GLAZED BLOCK.
L2
A1
L1
L1
HA101
ABATEMENT, BUILDING 1, 3RD FLOOR
RAJGKY
657-18-115JC
L1
L1
L1
L1
L1
L1
L3
A1
L2
A1
L2
A1
L2
A1
L2
A1
L2
A1
L2
A1
L2
L3
L3
L3
L3
L1
L1
St. Louis
6 South Old Orchard
St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the
Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The
Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the
Engineer or with the Engineer's written authorization.
P
M
KEY PLAN
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
ABATEMENT GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING
NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS
PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE
SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT
SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF
REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.
THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT
MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL
CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT
SPECIFICATIONS.
ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE
FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES
NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,
FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED
HANGER/BRACKET/ROD ASSEMBLIES.
UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF
ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL
USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED
PIPE SECTIONS (ENDS).
MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1
SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)
MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON
THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR
LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -
FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).
ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL
BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH
THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE
KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY
CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE
SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT
CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS
SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE
BLOCKED/CLOSED AT ANY ONE TIME.
NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE
BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN
ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS
“PIGGYBACKING” THE EXHAUST.
LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT
CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT
WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE
TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE
OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE
DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.
ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND
COORDINATED WITH THE VA COR AND VPIH.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD
WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL
DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,
ETC., FROM THE ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,
STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE
STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS
THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE
PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL
OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL
CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING
TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL
METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED
PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED
THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION
OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER
WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED
PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR
HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL
AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS
TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.
ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE
PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY
ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.
PROTECT AS REQUIRED.
100% BID DOCUMENTS
TOILET
A650A
BED RM.
A651
CONFERENCE RM.
A636
LOCKER RM.
A635
STORAGE
H606C
LOUNGE
A637
LOCKER RM.
A638
LOBBY
H607
STORAGE
A640
TOILET
A641A
BED RM.
A641
BED RM.
A642
TOILET
A642A
BED RM.
A643
STAIRWELL NO. 5
S605
CORRIDOR
H603
CLEAN
A645
TOILET
A646A
STORAGE
A645A
BED RM.
A646
ELEC. CLOSET
A647
BED RM.
A652
HAC
A653
TOILET
A652A
MEQ. STORAGE
A654
SOILED
A656
EQUIPTMENT STORAGE
A657
ISOLATION
A658
ANTE RM.
A658B
TOILET
A658A
BED RM.
A659
TOILET
A660A
BED RM.
A660
CORRIDOR
H604
BED RM.
A661
TOILET
A661A
CORRIDOR
H605
BED RM.
A662
TOILET
A663A
ANTE RM.
A663B
ISOLATION
A663
NURSE STATION
A664
NOUR.
A664A
OFFICE
A666
SUPPLIES
A665
NURSE MANAGER
A668
TOILET, STAFF
A668B
TOILET
A668A
STORAGE
A669
BREAK RM.
A670
OFFICE
A671
BED RM.
A650
TOILET
A649A
BED RM.
A649
BED RM.
A648
ELEC. CLOSET
A655
CHASE
CH-B-1
CHASE
CH-A-5
ELEC. CLOSET
A638A
SEE SHEET HA103 FOR CONT
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BUILDING 1, 6TH FLOOR NORTH LEAD ABATEMENT PLAN
ABATEMENT KEYNOTES
REMOVE ASSUMED ASBESTOS VIBRATION JOINTS (SLEEVE) AND ASSUMED
ASBESTOS FITTINGS FROM THE INSIDE AND/OR AROUND FAN COIL UNITS
SCHEDULED FOR REMOVAL. BASED ON PAST PROJECTS, THE PRESENCE OF
THESE MATERIALS HAVE NOT BE BEEN CONSISTENT, BUT SHOULD BE
ANTICIPATED. FIELD VERIFICATION OF EACH UNIT SHALL BE REQUIRED.
- 18 FAN COIL UNITS WITH ASSUMED ASBESTOS VIBRATION JOINTS AND
ASSUMED ASBESTOS FITTINGS
DEDUCT ALTERNATE NO. 1:
DISMANTLE AND REMOVE PIPE HANGER/BRACKET/ROD ASSEMBLIES
CONTAINING ORANGE LEAD-BASED PAINT IN CONJUNCTION WITH
MECHANICAL PIPE REMOVAL. INSIDE A NEGATIVE PRESSURE CONTAINMENT,
MOBILE MINI-CONTAINMENT, OR HEPA CART. IF HANGER/BRACKET/ROD
ASSEMBLIES CAN BE DISMANTLED AND REMOVED WITHOUT DISTURBING THE
LEAD-BASED PAINT, THE USE OF A NEGATIVE PRESSURE CONTAINMENT WILL
NOT BE REQUIRED, PROVIDING THE ABATEMENT CONTRACTOR HAS
SUBMITTED AN APPROVED NEGATIVE EXPOSURE ASSESSMENT SUBMITTED
WITH THEIR WORK PLAN. THE INSERTS, EMBEDS, OR INTACT ORANGE PAINT
ON THE CONCRETE SHALL REMAIN IN PLACE. MECHANICAL PIPING SHALL BE
TEMPORARILY SUPPORTED AS REQUIRED, IF THE HANGER/BRACKET/ROD
ASSEMBLIES ARE REMOVED PRIOR TO MECHANICAL PIPE REMOVAL.
- 10 EACH ORANGE LEAD-BASED PAINTED HANGER ASSEMBLIES
L1
L1
L1
ABATEMENT LEGEND:
REMOVE ORANGE LEAD-BASED PAINTED HANGER
ASSEMBLIES AS INDICATED IN THE KEYNOTES
HA102
ABATEMENT, BUILDING 1, 6TH FLOOR -
NORTH
RAJGKY
657-18-115JC
St. Louis
6 South Old Orchard
St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the
Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The
Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the
Engineer or with the Engineer's written authorization.
P
M
KEY PLAN
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1 A1
A1
A1
A1
A1
A1
A1
A1
A1
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
ABATEMENT GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING
NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS
PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE
SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT
SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF
REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.
THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT
MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL
CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT
SPECIFICATIONS.
ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE
FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES
NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,
FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED
HANGER/BRACKET/ROD ASSEMBLIES.
UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF
ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL
USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED
PIPE SECTIONS (ENDS).
MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1
SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)
MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON
THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR
LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -
FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).
ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL
BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH
THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE
KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY
CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE
SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT
CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS
SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE
BLOCKED/CLOSED AT ANY ONE TIME.
NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE
BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN
ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS
“PIGGYBACKING” THE EXHAUST.
LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT
CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT
WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE
TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE
OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE
DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.
ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND
COORDINATED WITH THE VA COR AND VPIH.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD
WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL
DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,
ETC., FROM THE ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,
STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE
STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS
THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE
PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL
OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL
CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING
TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL
METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED
PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED
THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION
OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER
WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED
PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR
HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL
AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS
TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.
ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE
PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY
ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.
PROTECT AS REQUIRED.
LOUNGE
A601
OFFICE
A602
HAC
A603
NURSE MANAGER
A604
MED. PREP.
A605
NURSE STATION
A606
NOUR.
A607
ENDO INTERVIEW RM.
A608
PROCEDURE RM.
A609
PROCEDURE RM.
A610
TOILET
A608A
SCOPE
A610A
PROCEDURE RM.
A611
PROCEDURE RM.
A612
SCOPE CLEANING
A613
CLEAN
A614
SOILED
A615
ANTE RM.
A613A
CLEAN UTILITY
A611A
TOILET
A613B
CORRIDOR
H601
NURSE BREAK RM.
A616
STORAGE
A617
OFFICE
A618
OFFICE
A619
TOILET
A619A
OFFICE
A620
TOILET
A616A
OFFICE
A621
OFFICE
A622
STORAGE
A623
WORKSTATION
A624
TOILET
A622A
CLOSET
A623D
ELEC. CLOSET
A623C
STORAGE
A623B
STAIRWELL NO. 2
S602
CORRIDOR
H602
TOILET
A623A
TOILET
A626A
OFFICE
A629
TOILET
A627A
TOILET
A628
OI&T
A629B
OFFICE
A631
OFFICE
A632
OFFICE
A633
OFFICE
A634
OFFICE
A634A
BED RM.
A626
CORRIDOR
H606
CORRIDOR
H603
STAIRWELL NO. 1
S601
BED RM.
A627
CHASE
CH-A-8
ELEC. CLOSET
A629A
LOCKER RM.
A635
STORAGE
H606C
CORRIDOR
H603
OFFICE
A671
CHASE
CH-B-1
SEE SHEET HA102 FOR CONT
AREA NOT IN SCOPE
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BUILDING 1, 6TH FLOOR SOUTH ASBESTOS AND LEAD ABATEMENT PLAN
ABATEMENT KEYNOTES
REMOVE ASSUMED ASBESTOS VIBRATION JOINTS (SLEEVE) AND ASSUMED
ASBESTOS FITTINGS FROM THE INSIDE AND/OR AROUND FAN COIL UNITS
SCHEDULED FOR REMOVAL. BASED ON PAST PROJECTS, THE PRESENCE OF
THESE MATERIALS HAVE NOT BE BEEN CONSISTENT, BUT SHOULD BE
ANTICIPATED. FIELD VERIFICATION OF EACH UNIT SHALL BE REQUIRED.
- 13 FAN COIL UNITS WITH ASSUMED ASBESTOS VIBRATION JOINTS AND
ASSUMED ASBESTOS FITTINGS
DEDUCT ALTERNATE NO. 1:
REMOVE ASBESTOS TAR FITTINGS FROM CHILLED WATER PIPES USING
GLOVEBAG REMOVAL METHODS INSIDE A NEGATIVE PRESSURE
CONTAINMENT, MOBILE MINI-CONTAINMENT, OR HEPA CART.
- 30 EACH ASBESTOS TAR FITTINGS
DEDUCT ALTERNATE NO. 1:
REMOVE ASBESTOS PIPE SADDLES USING GLOVEBAG REMOVAL METHODS
INSIDE A NEGATIVE PRESSURE CONTAINMENT, MOBILE MINI-CONTAINMENT,
OR HEPA CART.
- 25 EACH ASBESTOS PIPE SADDLES
DEDUCT ALTERNATE NO. 1:
REMOVE ASBESTOS MUDDED FITTINGS FROM CHILLED WATER DRAIN PIPE
USING GLOVEBAG REMOVAL METHODS INSIDE A NEGATIVE PRESSURE
CONTAINMENT, MOBILE MINI-CONTAINMENT, OR HEPA CART.
- 1 EACH ASBESTOS MUDDED FITTINGS
DEDUCT ALTERNATE NO. 1:
DISMANTLE AND REMOVE PIPE HANGER/BRACKET/ROD ASSEMBLIES
CONTAINING ORANGE LEAD-BASED PAINT IN CONJUNCTION WITH
MECHANICAL PIPE REMOVAL. INSIDE A NEGATIVE PRESSURE CONTAINMENT,
MOBILE MINI-CONTAINMENT, OR HEPA CART. IF HANGER/BRACKET/ROD
ASSEMBLIES CAN BE DISMANTLED AND REMOVED WITHOUT DISTURBING THE
LEAD-BASED PAINT, THE USE OF A NEGATIVE PRESSURE CONTAINMENT WILL
NOT BE REQUIRED, PROVIDING THE ABATEMENT CONTRACTOR HAS
SUBMITTED AN APPROVED NEGATIVE EXPOSURE ASSESSMENT SUBMITTED
WITH THEIR WORK PLAN. THE INSERTS, EMBEDS, OR INTACT ORANGE PAINT
ON THE CONCRETE SHALL REMAIN IN PLACE. MECHANICAL PIPING SHALL BE
TEMPORARILY SUPPORTED AS REQUIRED, IF THE HANGER/BRACKET/ROD
ASSEMBLIES ARE REMOVED PRIOR TO MECHANICAL PIPE REMOVAL.
- 20 EACH ORANGE LEAD-BASED PAINTED HANGER ASSEMBLIES
LEAD-BASED PAINTED PIPE HANGERS PRESENT IN ROOMS ON THE 6TH AND
7TH FLOORS WHERE NEW DUCTWORK WILL ENTER THE BUILDING. PROTECT
AS REQUIRED.
A1
A2
A3
A4
A2 A3 L1
A2
L1A3A2
A4
ABATEMENT LEGEND:
REMOVE ASBESTOS TAR WRAP FITTINGS AS INDICATED IN
THE KEYNOTES
REMOVE ASBESTOS PIPE SADDLES AS INDICATED IN THE
KEYNOTES
REMOVE ASBESTOS FITTINGS AS INDICATED IN THE
KEYNOTES
REMOVE ORANGE LEAD-BASED PAINTED HANGER
ASSEMBLIES AS INDICATED IN THE KEYNOTES
HA103
ABATEMENT, BUILDING 1, 6TH FLOOR -
SOUTH
RAJGKY
657-18-115JC
St. Louis
6 South Old Orchard
St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
8718 BOTTS LANE,
SAN ANTONIO, TX 78217
T 210.881.9714
F 210.881.6808 www.hfscompany.com t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t h i n c h o n e f o o t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Veterans
Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
PRIME CONSULTANT:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
JOHN COCHRAN VA MEDICAL CENTER, ST. LOUIS, MO
STAMPThe Professional Engineer, whose signature and personal seal appear on this document, assumes responsibility only for what appears hereon, and disclaims responsibility for all other plans, specifications, estimates, reports, documents, or instruments not sealed by the Professional Engineer relating to, or intended to be used for, any part or parts of the engineering project to which this document refers. Prints sealed by the
Engineer bear the seal of the Engineer across the signature and date. Copies of this document, as signed and sealed, have been retained by the Professional Engineer. The
Professional Engineer will not be responsible for subsequent changes to this documents, unless the changes are made by the
Engineer or with the Engineer's written authorization.
P
M
KEY PLAN
L2
L2
L2
L1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
FCA REPLACE VARIOUS AIR HANDLING
UNITS AND VARIABLE AIR VOLUME
UNITS
ABATEMENT GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
THE SCOPE OF THE ASBESTOS ABATEMENT WORK CONSISTS OF REMOVING
NON-ASBESTOS PLASTER CEILINGS, NON-ASBESTOS CEILING TILES, ASBESTOS
PIPE INSULATION AND FITTINGS, ASBESTOS TAR FITTINGS, ASBESTOS PIPE
SADDLES / SUPPORTS, ASBESTOS DUCT JOINT COATING AND ASBESTOS DUCT
SEAM SEALANT. THE SCOPE OF THE LEAD ABATEMENT WORK CONSISTS OF
REMOVING LEAD-BASED PAINTED PIPE HANGER/BRACKET/ROD ASSEMBLIES.
THE SCOPE OF THE MOLD ABATEMENT WORK CONSISTS OF REMOVING SUSPECT
MOLD CONTAMINATED PIPE INSULATION, DUCT INSULATION AND DRYWALL
CEILINGS. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS AND THE CONTRACT
SPECIFICATIONS.
ABATEMENT CONTRACTOR SHALL REMOVE CEILING TILES, PROPERLY STORE
FOR INSTALLATION BY OTHERS. ONLY REMOVE THE NUMBER OF CEILING TILES
NECESSARY TO PROPERLY ABATE ASBESTOS PIPE INSULATION AND FITTINGS,
FIBERGLASS PIPE INSULATION WITH MOLD GROWTHS AND LEAD-BASED PAINTED
HANGER/BRACKET/ROD ASSEMBLIES.
UPON CONCLUSION OF ABATEMENT, IF ANY EXPOSED SECTIONS (ENDS) OF
ASBESTOS PIPE INSULATION ARE PRESENT, THE ABATEMENT CONTRACTOR WILL
USE LAG CLOTH AND SEALANT (VERMASCO OR SIMILAR) TO SEAL THE EXPOSED
PIPE SECTIONS (ENDS).
MAJORITY OF WORK ON THE TENTH AND ELEVENTH FLOORS OF BUILDING 1
SHALL BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM)
MONDAY - FRIDAY EXCLUDING FEDERAL HOLIDAYS. ALL ABATEMENT WORK ON
THE FIRST AND THIRD FLOORS, AND SIXTH AND SEVENTH FLOOR ELEVATOR
LOBBIES SHALL BE ACCOMPLISHED OFF HOURS (5:00 PM TO 5:00 AM) MONDAY -
FRIDAY OR ON THE WEEKEND (5:00 PM FRIDAY TO 6:00 PM SUNDAY).
ABATEMENT WORK ON THE SIXTH AND SEVENTH FLOORS OF BUILDING 1 SHALL
BE CONDUCTED DURING ADMINISTRATIVE HOURS (8:00 AM TO 5:00 PM) MONDAY -
FRIDAY EXCLUDING FEDERAL HOLIDAYS.
WORK SCHEDULES AND LIMITS OF ABATEMENT SHALL BE COORDINATED WITH
THE VA COR AND VPIH FOR APPROVALS, UNLESS OTHERWISE INDICATED ON THE
KEYNOTES. THE ABATEMENT CONTRACTOR SHALL SUBMIT A DETAILED WORK
PLAN AND ABATEMENT SCHEDULE WITH THE REQUIRED SUBMITTALS. ANY
CHANGES TO THE PROCEDURES, CONTAINMENT LIMITS AND PHASING SHALL BE
SUBMITTED TO THE VA COR AND VPIH FOR APPROVALS.
THE LOCATIONS AND QUANTITIES SHALL BE FIELD VERIFIED BY THE ABATEMENT
CONTRACTOR. THE LIMITS OF REMOVAL AND EXTENT OF THE CONTAINMENTS
SHALL BE VERIFIED WITH THE VA COR AND VPIH. FOR CLARITY, THE DRAWINGS
ONLY SHOW REPRESENTATIVE LOCATIONS OF PIPING.
DUE TO IMPACT TO HOSPITAL OPERATIONS, ONLY ONE CORRIDOR CAN BE
BLOCKED/CLOSED AT ANY ONE TIME.
NEGATIVE AIR EXHAUST SHALL BE EXHAUSTED TO THE EXTERIOR OF THE
BUILDING WHEN ACHIEVABLE. IF NOT ACHIEVABLE, EXHAUST THROUGH AN
ADDITIONAL HEPA FILTRATION SYSTEM, COMMONLY REFERRED TO AS
“PIGGYBACKING” THE EXHAUST.
LIMITS OF ABATEMENT CONTRACTORS WORK AS SHOWN ON DRAWINGS DO NOT
CONSTITUTE CONTAINMENT LIMITS BUT SERVE TO SHOW AREA OF ABATEMENT
WORK. WORK IN THESE AREAS MAY BE CONDUCTED AT ONE TIME OR MAY HAVE
TO BE ACCOMPLISHED IN MULTIPLE PHASES BASED ON HOSPITAL OPERATIONS.
ALL POLYETHYLENE SHEETING USED FOR THE ABATEMENT PROJECT SHALL BE
OF THE FIRE RETARDANT TYPE.
THE LOCATIONS OF ABATEMENT DECONTAMINATION UNITS AND WASTE
DISPOSAL CONTAINERS SHALL BE FIELD VERIFIED WITH THE VA COR AND VPIH.
ALL LOADOUT PROCEDURES SHALL BE AFTER NORMAL BUSINESS HOURS AND
COORDINATED WITH THE VA COR AND VPIH.
ALL PERIMETER AIR MONITORING AND CLEARANCE SAMPLING (INCLUDING LEAD
WIPES WHERE REQUIRED) WILL BE CONDUCTED BY THE VPIH.
VA PERSONNEL SHALL BE RESPONSIBLE FOR REMOVING OR RELOCATING ALL
DATA EQUIPMENT, COMPUTERS, SUPPLIES, FURNITURE, DESKS, WALL HANGINGS,
ETC., FROM THE ABATEMENT AREAS.
ALL MECHANICAL SYSTEMS, INCLUDING BUT NOT LIMITED TO, HVAC SYSTEMS,
STEAM PIPING, ETC., SHALL BE SHUT DOWN DURING ALL ABATEMENT ACTIVITIES.
ABATEMENT OF ASBESTOS PIPE INSULATION AND FITTING INSULATION FROM THE
STEAM PIPING MUST BE ACCOMPLISHED WHEN THE STEAM PIPES ARE LESS
THAN 150 DEGREES FAHRENHEIT. ALL REQUIRED STEAM SHUTDOWNS SHALL BE
PROPERLY COORDINATED WITH THE VA TO MINIMIZE IMPACT TO THE HOSPITAL
OPERATIONS.
STRICT COORDINATION BETWEEN THE VA OCCUPANTS, VA COR, VPIH, GENERAL
CONTRACTOR AND ABATEMENT CONTRACTOR SHALL BE REQUIRED.
ALL LEAD WASTE SHALL BE TESTED BY THE ABATEMENT CONTRACTOR USING
TCLP ANALYTICAL METHODS TO DETERMINE PROPER WASTE DISPOSAL
METHODS.
TRACE AMOUNTS OF LEAD BELOW THE EPA HUD DEFINITION OF LEAD-BASED
PAINT WERE ALSO IDENTIFIED IN THE PROJECT AREAS. IT SHOULD BE NOTED
THAT OSHA DOES NOT RECOGNIZE THIS AS A THRESHOLD VALUE FOR LEAD
EXPOSURE. ALTHOUGH THE POTENTIAL LEAD HAZARD FOR NORMAL DEMOLITION
OR CONSTRUCTION ACTIVITIES IS LOW, ACTUAL LEAD EXPOSURE MAY VARY
SIGNIFICANTLY DEPENDING UPON THE SPECIFIC TASK, PROCEDURE AND OTHER
WORK AREA CONDITIONS. PROPER OSHA COMPLIANCE IS CONSIDERED
PERFORMANCE BASED AND INCLUDES EVALUATING POTENTIAL WORK
EXPOSURES WITH AIR MONITORING OR BIOLOGICAL EXPOSURE MONITORING
(BLOOD LEAD TESTING), IF REQUIRED. UNLESS THE DEMOLITION CONTRACTOR
HAS HISTORICAL DATA DOCUMENTING THIS POTENTIAL EXPOSURE, PERSONAL
AIR SAMPLING SHALL BE CONDUCTED BY THE CPIH ON REPRESENTATIVE TASKS
TO DOCUMENT A NEGATIVE EXPOSURE FOR LEAD.
ASBESTOS PIPE INSULATION AND ASSOCIATED MUDDED PIPE FITTINGS ARE
PRESENT INSIDE MECHANICAL ROOM CB03 NEAR, BUT NOT DIRECTLY
ASSOCIATED WITH THE WORK REQUIRED FOR AC UNITS 1-AC-21 AND 1-AC-22.
PROTECT AS REQUIRED.
CONFERENCE RM.
A701
CONFERENCE RM.
A741
LOCKER RM.
A742
TOILET
A742A
LOCKER RM.
A742B
CORRIDOR
H707
OFFICE
A743D
OFFICE
A743C
OFFICE
A743B
LOCKER RM.
A743
SERVICE ELEVATOR LOBBY
H706
OI&T
A742E
HAC
A742D
TOILET
A742C
ELEVATOR LOBBY
H709
CORRIDOR
H703
CORRIDOR
H704
CORRIDOR
H705
STAIRWELL NO. 5
S705
CLEAN UTILITY
A747
PATIENT RM.
A748
ELEC. CLOSET
A747B
TOILET
A748A
ELEC. CLOSET
A748B
STORAGE
A749
5 BED PATIENT RM.
A751
TOILET
A751A
2 BED PATIENT RM.
A753
TANK STORAGE
A753A
TOILET
A754A
2 BED PATIENT RM.
A754
CLEAN LINEN
A756
PATIENT RM.
A757
TOILET
A757B
ANTE RM.
A757A
PATIENT RM.
A758
TOILET
A759A
2 BED PATIENT RM.
A759
2 BED PATIENT RM.
A760
PATIENT RM.
A761
PATIENT RM.
A762
TOILET
A760A
TOILET
A762A
NURSE STATION
A763
NOUR.
A763A
MED. PREP.
A765
BREAK RM.
A766
HAC
A767
OFFICE
A768
OFFICE
A769
OFFICE
A740
TOILET
A745C
TOILET
A745A
2 BED PATIENT RM.
A745B
CLEAN SUPPLY
A750A
PATIENT RM.
A752
SOILED UTILITY
A755
TOILET
A740A
TOILET
A744A
2 BED PATIENT RM.
A744
2 BED PATIENT RM.
A745
STORAGE
A739
SEE SHEET HA105 FOR CONT
PLAN
NORTH
SCALE: 1/8" = 1'-0"
BUILDING 1, 7TH FLOOR NORTH ASBESTOS, LEAD, AND MOLD ABATEMENT PLAN
ABATEMENT KEYNOTES
REMOVE ASSUMED ASBESTOS VIBRATION JOINTS (SLEEVE) AND ASSUMED
ASBESTOS FITTINGS FROM THE INSIDE AND/OR AROUND FAN COIL UNITS
SCHEDULED FOR REMOVAL. BASED ON PAST PROJECTS, THE PRESENCE OF
THESE MATERIALS HAVE NOT BE BEEN CONSISTENT, BUT SHOULD BE
ANTICIPATED. FIELD VERIFICATION OF EACH UNIT SHALL BE REQUIRED.
- 24 FAN COIL UNITS WITH ASSUMED ASBESTOS VIBRATION JOINTS AND
ASSUMED ASBESTOS FITTINGS
DEDUCT ALTERNATE NO. 1:
REMOVE ASBESTOS PIPE…