Pre-Bid RFI Answers Rev 657-18-115JC.pdf
PDF 74 KB Posted
- Attached to
- 657-18-115JC Replace Various AHU's and VAV's
- Solicitation number
- 36C25523R0095
About this file
This document contains answers to pre-bid questions regarding solicitation number 36C25523R0095 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The solicitation is for project 657-18-115JC to replace various air handling units and variable air volume units at VA St. Louis HCS facilities. The period of performance for the work is specified as 550 calendar days after notice to proceed. No above ceiling photos of areas unavailable during the site visit could be provided. The answers clarify that requirement number 3 in Factor 4 refers to maintenance records required after new equipment is installed, not for equipment not yet in place.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA St. Louis HCS - Facilities Engineering Service Pre-Bid RFI Questions & Answers
657-18-115JC115JC
Pre-Bid RFI Questions and Answers for Projects 657-18-115JC
FCA Replace Various Air Handling Units and Variable Air Volume Units
1. There are varying dates throughout the solicitation for the period of performance. Please specify the correct days to complete. CO – For project 657-18-115JC the Period of Performance (POP) shall be: 550 calendar days after notice to proceed (NTP).
2. Factor 4 Number 3 appears to be set up similar to a submittal. The requirements of service departments do not make sense, and the approval of equipment is not relevant to a proposal requirement, as maintenance records are taken after a piece of equipment has been installed. The proposed installed equipment has not yet been installed to require maintenance records. CO – Requirement of maintenance records after installation.
3. Please provide above ceiling photos for the areas that were not made available during the site visit.
COR – Above ceiling photos not available.