646-21-101_UD SPS AHU RO Upgrade_251107.pdf

PDF 37 MB Posted

Attached to
Z1DA--646-21-101 UD SPS AHU & RO Upgrade (VA-26-00036217)
Solicitation number
36C24426R0049
Issued by

About this file

This file is a comprehensive set of architectural and construction drawings for a renovation project at the Pittsburgh Veterans Affairs Medical Center.

The project involves upgrading the University Drive Sterile Processing Services (SPS) Air Handling Unit (AHU) and Reverse Osmosis (RO) system at Pittsburgh VAMC, located at University Drive C, Pittsburgh, Pennsylvania 15240. The scope encompasses renovation of approximately 12,851 square feet of ground floor space within a fully sprinklered, four-story Type I-332 construction building. The work is organized into four construction phases designed to maintain operational continuity of the SPS and logistics functions. Phase 1 involves establishing temporary storage and staging areas in existing office spaces; Phase 2 converts the existing logistics area into the new SPS facility; Phase 3 converts the existing SPS area into the new logistics area; and Phase 4 restores temporary areas to usable spaces as directed by the VA. The construction includes comprehensive demolition, new partition installation with fire-rated walls, mechanical, plumbing, and electrical upgrades including reverse osmosis water treatment equipment, new ductwork and hydronic piping, interior finishes with new LVT flooring and acoustic ceiling tiles, fire protection modifications, and new life safety infrastructure. The drawings indicate an occupant load of 81 persons with required egress accommodating travel distances up to 300 feet in compliance with NFPA 101 Life Safety Code. Documentation includes detailed phasing plans, ICRA assessments confirming Levels 2 and 3 areas, equipment relocation schedules specifying storage shelving and cart movements, and extensive construction details for temporary and permanent partitions, door installations, and MEP system integration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet Number Sheet Name

General

GI-000 COVER SHEET

GI-002 GENERAL NOTES, SYMBOLS, ABBREVIATIONS, & CODE DATA

GI-003 ICRA ASSESSMENT

GI-101 LIFE SAFETY PLAN

GI-102 GROUND FLOOR PHASING PLAN - PHASE 1

GI-103 GROUND FLOOR PHASING PLAN - PHASE 2

GI-104 GROUND FLOOR PHASING PLAN - PHASE 3

GI-105 GROUND FLOOR PHASING PLAN - PHASE 4

GI-106 ENLARGED PHASING PLANS AREA 1 & 2 - PHASE 1

GI-107 ENLARGED PHASING PLANS AREA 1 & 3 - PHASE 1

GI-108 PHASING SCHEDULES & DETAILS

Structural

S-101 OVERALL GROUND FLOOR PLAN

Architectural

AE-513 ROOF DETAILS

AE-601 DOOR SCHEDULE, WALL TYPES, AND DETAILS

AE-701 OVERALL GROUND FLOOR - SIGNAGE PLAN

AE-702 SIGN DETAILS

Interior Design

IN-101 OVERALL GROUND FLOOR FINISH PLAN

IN-401 ENLARGED FINISH PLAN - A1

IN-402 ENLARGED FINISH PLAN - A2

IN-403 ENLARGED PLANS & ELEVATIONS

IN-404 SPS LOCKERS/SHOWER ROOM PLANS & ELEVATIONS

IN-405 ENLARGED LOGISTICS LOCKERS

IN-601 FINISH SCHEDULES AND DETAILS

Fire Protection

FPD-101 FIRE PROTECTION GROUND FLOOR - DEMO.

FP-101 FIRE PROTECTION GROUND FLOOR - NEW

Plumbing

AD-101 GROUND FLOOR DEMOLITION PLAN

AD-102 GROUND FLOOR DEMOLITION RCP

AD-103 ROOF PLAN (PARTIAL) - DEMOLITION

AE-100 OVERALL GROUND FLOOR PLAN - ROOM AREAS

AE-101 OVERALL GROUND FLOOR PLAN

AC-101 OVERALL GROUND FLOOR RCP

AE-102 ROOF PLAN (PARTIAL)

AE-211 BUILDING SECTIONS

AE-241 PLAN DETAILS

AE-261 ENLARGED DETAILS

AE-301 WALL TYPES

AE-401 ENLARGED GROUND FLOOR PLAN - A1

AE-402 ENLARGED GROUND FLOOR PLAN - A2

AC-401 ENLARGED GROUND FLOOR RCP - A1

AC-402 ENLARGED GROUND FLOOR RCP - A2

AE-411 ENLARGED EQUIPMENT LAYOUT PLAN

AE-412 EQUIPMENT ELEVATIONS

AE-511 ROOFING SYSTEM BASIS OF DESIGN

AE-512 ROOF DETAILS

P-500 PLUMBING DETAILS

P-501 PLUMBING DETAILS

P-600 PLUMBING SCHEDULES

Plumbing - Reverse Osmosis

PJ-201 REVERSE OSMOSIS

PJ-202 REVERSE OSMOSIS

Mechanical

M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MD-10G.1.TLS1 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #1

MD-10G.1.TLS2 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #2

MD-10G.2.A2 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 2 - AREA A2 & LOADING DOCK AREA

MD-10G.3.A1 GROUND LEVEL - MECHANICAL DEMOLITION - PHASE 3 - AREA A1

MD-102.3 SECOND LEVEL -MECHANICAL DEMOLITION - PHASE 3

MD-104.3 ROOF LEVEL PLAN - MECHANICAL DEMOLITION - PHASE 3

MH-20G.2.TLS1 GROUND LEVEL - DUCTWORK - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1

MH-20G.2.TLS2 GROUND LEVEL - DUCTWORK - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2

MH-20G.3.A2 GROUND LEVEL - DUCTWORK - PHASE 3 - AREA A2

P-000 PLUMBING SYMBOLS AND ABBREVIATIONS

PD-10B.2.A2 BASEMENT LEVEL - PLUMBING DEMOLITION - PHASE 2

PD-10B.3.A1 BASEMENT LEVEL - PLUMBING - DEMOLITION - PHASE 3 - AREA A1

PD-10G.2.A2 GROUND LEVEL - PLUMBING DEMOLITION - PHASE 2 - AREA A2

PD-10G.3.A1 GROUND LEVEL - PLUMBING DEMOLITION - PHASE 3 - AREA A1

PD-104.3 ROOF LEVEL PLAN - PLUMBING DEMOLITION - PHASE 3 - OVERALL

PP-20B.3.A1 BASEMENT LEVEL - PLUMBING PIPING - PHASE 3 - AREA A1

PP-20B.3.A2 BASEMENT LEVEL - PLUMBING PIPING - PHASE 3 - AREA A2

PP-20G.3.A2 GROUND LEVEL - PLUMBING PIPING - PHASE 3 - AREA A2

PP-20G.4.A1 GROUND LEVEL - PLUMBING PIPING - PHASE 4 - AREA A1

PW-20B.3.A2 BASEMENT LEVEL - PLUMBING DRAINAGE - PHASE 3 - AREA A2

PW-20B.4.A1 BASEMENT LEVEL - PLUMBING DRAINAGE - PHASE 4 - AREA A1

PW-20G.3.A2 GROUND LEVEL - PLUMBING DRAINAGE - PHASE 3 - AREA A2

PW-20G.4.A1 GROUND LEVEL - PLUMBING DRAINAGE - PHASE 4 - AREA A1

PW-202 ROOF LEVEL PLAN - PLUMBING DRAINAGE - PHASE 3

P-400 RO WATER RISER DIAGRAM - PHASE 3 - AREA A2

P-401 DOM WATER AND INSTRUMENT AIR RISER DIAGRAM - PHASE 3 - AREA A2

P-403 WASTE AND VENT RISER DIAGRAM - PHASE 3 - AREA A2

P-405 WASTE, VENT AND WATER RISER DIAGRAMS - PHASE 4 - AREA A1

EP-20G.2.TLS2 GROUND LEVEL - POWER - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2

EP-20G.3.A2 GROUND LEVEL - POWER - PHASE 3 - AREA A2

EP-20G.4.A1 GROUND LEVEL - POWER - PHASE 4 - AREA A1

EP-202.3 SECOND LEVEL - POWER - PHASE 3

EP-206.1 PENTHOUSE ROOF LEVEL - POWER - PHASE 3

ET-20G.2.TLS1 GROUND LEVEL - LOW VOLTAGE - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1

ET-20G.2.TLS2 GROUND LEVEL - LOW VOLTAGE - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2

ET-20G.3.A2 GROUND LEVEL - LOW VOLTAGE - PHASE 3 - AREA A2

ET-20G.4.A1 GROUND LEVEL - LOW VOLTAGE - PHASE 4 - AREA A1

E-500 ONE-LINE DIAGRAM

E-600 ELECTRICAL DETAILS

E-601 ELECTRICAL DETAILS

E-700 ELECTRICAL SCHEDULES

E-701 ELECTRICAL PANEL SCHEDULES

E-702 ELECTRICAL PANEL SCHEDULES

E-703 ELECTRICAL PANEL SCHEDULES

MH-20G.3.A4 GROUND LEVEL - DUCTWORK - PHASE 3 - LOADING DOCK AREA

MH-20G.4.A1 GROUND LEVEL - DUCTWORK - PHASE 4 - AREA A1

MH-202.3 SECOND LEVEL - DUCTWORK - PHASE 3

MP-20G.2.TLS1 GROUND LEVEL - HYDRONIC PIPING - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1

MP-20G.3.A2 GROUND LEVEL - HYDRONIC PIPING - PHASE 3 - AREA A2

MP-20G.4.A1 GROUND LEVEL - HYDRONIC PIPING - PHASE 4 - AREA A1

MP-202.3 SECOND LEVEL - HYDRONIC PIPING - PHASE 3

MP-203.3 THIRD LEVEL -HYDRONIC PIPING -PHASE 3

MP-203.4 ROOF LEVEL -HYDRONIC PIPING -PHASE 3

M-300 DUCTWORK AND PIPING - PHASE 3 - WEST ELEVATIONS

M-303 MECHANICAL ROOM ELEVATIONS - PHASE 3 - 2ND FLOOR MECHANICAL ROOM

M-304 DUCTWORK - PHASE 3 - NORTH ELEVATIONS

M-400 MECHANICAL SCHEMATICS

M-500 MECHANICAL DETAILS

M-501 MECHANICAL DETAILS

M-600 MECHANICAL SCHEDULES

M-601 MECHANICAL SCHEDULES

M-700 MECHANICAL CONTROLS

M-701 MECHANICAL CONTROLS

M-702 MECHANICAL CONTROLS

Electrical

E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

E-001 ELECTRICAL SYMBOLS AND ABBREVIATIONS

ED-10G.1.TLS1 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #1

ED-10G.1.TLS2 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 1 - TEMPORARY LOGISTICS STORAGE #2

ED-10G.2.A2 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 2 - AREA A2

ED-10G.3.A1 GROUND LEVEL - ELECTRICAL DEMOLITION - PHASE 3 - AREA A1

EL-20G.2.TLS1 GROUND LEVEL - LIGHTING - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1

EL-20G.2.TLS2 GROUND LEVEL - LIGHTING - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2

EL-20G.3.A2 GROUND LEVEL - LIGHTING - PHASE 3 - AREA A2

EL-20G.3.A4 GROUND LEVEL - LIGHTING - PHASE 3 - LOADING DOCK AREA

EL-20G.4.A1 GROUND LEVEL - LIGHTING - PHASE 4 - AREA A1

EJ-20G.2.TLS1 GROUND LEVEL - LIGHTING CONTROL - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1

EJ-20G.2.TLS2 GROUND LEVEL - LIGHTING CONTROL - PHASE 2 - TEMPORARY LOGISTICS STORAGE #2

EJ-20G.3.A2 GROUND LEVEL - LIGHTING CONTROL - PHASE 3 - AREA A2

EJ-20G.4.A1 GROUND LEVEL - LIGHTING CONTROL - PHASE 4 - AREA A1

EP-20G.2.TLS1 GROUND LEVEL - POWER - PHASE 2 - TEMPORARY LOGISTICS STORAGE #1

Sheet Number Sheet Name

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS P.C.

111 WOOD AVENUE SOUTH

SUITE 102

ISELIN, NJ, 08830-4112 U.S.A.

11-07-2025

A u to d e s k D o c s /2

.0

V A

P it ts b u rg

S P

S A

H U a n d

R O

U p g ra d e s /6

-1

.M

E P

.2

.r v t

/7 /2

:4

:1

P

M

GI-000

COVER SHEET UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 JLN AEA

646-21-101

PITTSBURGH VAMC UD SPS AHU & RO UPGRADE

U.S. Department of Veterans Affairs

University Drive C, Pittsburgh, PA 15240

Revisions: Date:

ABBREVIATIONS

ACT

A.F.F

ALUM.

APPROX

ASHRAE

ASTM

BLDG

CLG

CMU

CONC

CONT.

DIA

DIM

DWGS

EA

EF

ELEV

ETC.

EQ

EXIST.

F.E.

FIN.FL.LVL.

GA

GWB

HM

HORIZ

HR

HW

I.D.

ACOUSTICAL CEILING TILE

ABOVE FINISHED FLOOR

ALUMINUM

APPROXIMATELY

AMERICAN SOCIETY OF HEATING,

REFRIGERATING, & AIR-CONDITIONING

ENGINEERS

AMERICAN SOCIETY FOR TESTING & MATERIALS

BUILDING

CEILING

CONCRETE MASONRY UNIT

CONCRETE

CONTINUOUS

DIAMETER

DIMENSION

DRAWINGS

EACH

EXHAUST FAN

ELEVATION

ETCETERA

EQUAL

EXISTING

FIRE EXTINGUISHER

FINISHED FLOOR LEVEL

GAUGE

GYPSUM WALLBOARD

HOLLOW METAL

HORIZONTAL

HOUR

HARDWARE

IDENTIFICATION

MAX

MECH.

MIN

M.O.

NFPA

N.I.C.

N.I.S.

NO.

NTS

O.C.

OCC

OSHA

PT

REQ.

RM

R.O.

SS

STL

SF

THK

T.O.

TYP.

UL

V.I.F.

WD

W/ W/O Ø

MAXIMUM

MECHANICAL

MINIMUM

MASONRY OPENING

NATIONAL FIRE PROTECTION

ASSOCIATION

NOT IN CONTRACT

NOT IN SCOPE

NUMBER

NOT TO SCALE

ON CENTER

OCCUPANTS

OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION

PAINT

REQUIRED

ROOM

ROUGH OPENING

STAINLESS STEEL

STEEL

SQUARE FEET

THICK

TOP OF

TYPICAL

UNDERWRITER'S LABORATORY

VERIFY IN FIELD

WOOD

WITH

WITHOUT

DIAMETER

AT

AND

CENTERLINE

NUMBER

GENERAL NOTES

1. ALL EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT, INCLUDING BUT NOT LIMITED TO, EXHAUST FANS, CONDUITS, ETC., SHALL BE EXAMINED AND TESTED AS REQUIRED BY THE CONTRACTOR'S LICENSED MECHANICAL AND/OR ELECTRICAL SUB-CONTRACTOR, PRIOR TO THE START OF THE WORK. THE EXAMINATION AND TESTING SHALL BE PERFORMED IN THE PRESENCE OF THE BUILDING MAINTENANCE PERSONNEL. THE CONTRACTOR SHALL SUBMIT WRITTEN NOTIFICATION TO THE OWNER, PRIOR TO START OF THE WORK, IDENTIFYING ALL DAMAGED OR IMPROPERLY FUNCTIONING ITEMS ENCOUNTERED. IF THESE ITEMS ARE NOT IDENTIFIED IN WRITING PRIOR TO THE START OF THE WORK, THEY SHALL BE REPAIRED OR REPLACED AS REQUIRED, AT THE CONTRACTOR'S EXPENSE.

2. ALL WORK, MATERIALS, AND WORKMANSHIP SHALL BE PERFORMED IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL CODES, ORDINANCES, RULES, AND REGULATIONS, TO THE PUBLISHED SPECIFICATIONS, TO THE RECOMMENDED PRACTICES OF THE MANUFACTURERS, AND THE APPROPRIATE APPLICABLE STANDARDS. WHERE SUCH CODES, RULES, AND REGULATIONS ARE AT VARIANCE WITH THE PLANS AND NOTES, THE CODES, RULES, AND REGULATIONS, ETC. SHALL TAKE PRECEDENCE OVER THE PLANS AND

NOTES.

3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS AT THE JOB SITE AND SHALL REPORT ANY DISCREPANCIES TO THE OWNER PRIOR TO STARTING CONSTRUCTION. COMMENCEMENT OF THE WORK BY THE CONTRACTOR SHALL

IMPLY THE ACCEPTANCE OF ALL EXISTING CONDITIONS.

4. ALL WORK SHALL BE EXECUTED IN A CAREFUL AND ORDERLY MANNER WITH THE LEAST POSSIBLE NOISE, DUST, OR DISTURBANCE TO

OCCUPANTS, ADJACENT SITES, OR BUILDINGS.

5. DETAILS ON THE DRAWINGS ARE SHOWN AT SPECIFIC LOCATIONS AND ARE INTENDED TO SHOW GENERAL REQUIREMENTS. DETAILS

NOTED "TYP." IMPLY ALL CONDITIONS TREATED SIMILARLY.

6. MINOR DETAILS NOT USUALLY SHOWN OR SPECIFIED BUT NECESSARY FOR PROPER CONSTRUCTION OF ANY PART OF THE WORK SHALL

BE INCLUDED AS IF THEY WERE INCLUDED AND INDICATED ON THE DRAWINGS.

7. THE BUILDING SHALL REMAIN ACCESSIBLE TO THE OWNER AT ALL TIMES.

8. FIELD VERIFY CONSTRUCTION AND INSTALLATION REQUIREMENTS.

9. REPRODUCED CONTRACT DRAWINGS WILL NOT BE ACCEPTED AS SHOP DRAWINGS.

10. ALL CONSTRUCTION AND OTHER MATERIALS SHALL BE STORED AT A DESIGNATED STORAGE AREA AND ON COMPLETION OF WORK OR AS DEEMED NECESSARY, ALL SURPLUS/ REFUSE/ DEBRIS MATERIAL SHALL BE REMOVED AND LEGALLY DISPOSED OF OFF-SITE AT NO

ADDITIONAL COST TO THE OWNER.

11. SHOULD DISCREPANCIES OCCUR BETWEEN CONTRACT DRAWINGS AND CONTRACT SPECIFICATIONS, THE CONTRACT SPECIFICATIONS IN CONJUNCTION WITH ALL APPLICABLE CODES, STANDARDS, RULES, REGULATIONS, LAWS, ETC. SHALL TAKE PRECEDENCE OVER THE

CONTRACT DRAWINGS.

12. THE CONTRACTOR SHALL CUT AND REMOVE EXISTING WALL AND FLOOR ASSEMBLIES AS REQUIRED TO INSTALL STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL WORK AND PATCH ALL DISTURBED AREAS.

13. OCCUPATION OF AREAS THAT ARE UNDER THE CONSTRUCTION SCOPE SHOULD BE COORDINATED BY THE CONTRACTOR AS PART OF

THE PHASING PLAN.

14. THE CONSTRUCTION AREA SHALL BE THOROUGHLY CLEANED PRIOR, DURING, AND AFTER THE CONSTRUCTION.

15. THE CONTRACTOR MUST BE FULLY FAMILIAR WITH THE CONDITIONS RELATING TO THE CONSTRUCTION AND LABOR UNDER WHICH THE WORK WILL BE PERFORMED AND COMPARE THE DRAWINGS AND SPECIFICATIONS WITH THE WORK IN PLACE. FAILURE TO DO SO WILL NOT RELIEVE THE CONTRACTOR OF THEIR OBLIGATION TO FURNISH ALL LABOR AND MATERIAL NECESSARY TO CARRY OUT THE PROVISIONS OF THE CONTRACT DOCUMENTS. EACH SUB-CONTRACTOR SHALL EMPLOY CONSTRUCTION MEANS OR METHODS THAT

WILL NOT CAUSE ANY INTERRUPTIONS OR INTERFERENCE WITH THE WORK OF OTHER TRADES.

16. THE CONTRACT DOCUMENTS, INCLUDING SPECIFIC INSTALLATION DETAILS SHOWN ON THE DRAWINGS, ESTABLISH THE MINIMUM INSTALLATION REQUIREMENTS FOR THIS PROJECT. ALL MANUFACTURER'S REQUIREMENTS THAT EXCEED WHAT IS REQUIRED BY THE CONTRACT DOCUMENTS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL REVIEW THE DRAWINGS WITH THE MANUFACTURER, PRIOR TO SUBMITTING A BID. ANY MANUFACTURER OBJECTIONS TO DETAILS SHOWN SHALL BE

SUBMITTED TO THE OWNER, PRIOR TO SUBMITTING A BID.

17. PROVIDE BARRICADES, WARNING SIGNS, AND LIGHTS AT OPENINGS AND OTHER AREAS HAZARDOUS TO PEDESTRIANS AND TRAFFIC.

KEEP CONSTRUCTION DEBRIS CLEAR OF TRAFFIC AREAS.

18. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE REGULATIONS AND GUIDELINES SET FORTH BY ALL AGENCIES HAVING JURISDICTION OVER THE WORK. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION (OSHA) RULES AND REGULATIONS.

19. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE BUILDING CODES AND REGULATIONS, PAYMENTS AND OBTAINING ALL NECESSARY AND REQUIRED INSPECTIONS, AND APPROVALS AND PERMITS, NECESSARY TO PERFORM ALL WORK AND

SERVICES HEREIN NOTED OR INDICATED ON THE DRAWINGS.

20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING WATERTIGHT INTEGRITY OF THE BUILDING AT ALL TIMES. ALL WATER DAMAGE SHALL BE REPAIRED AT NO ADDITIONAL COST AND TO THE SATISFACTION OF THE OWNER.

21. THE CONTRACTOR SHALL PROVIDE PROTECTION FOR THE GENERAL PUBLIC AND CONSTRUCTION WORKERS IN AND AROUND THE CONSTRUCTION SITE. ADEQUATE BARRIERS SHALL BE PROVIDED TO EXERCISE CONTROL OF SAFE INGRESS AND EGRESS OF PREMISES.

FIRE EXITS SHALL AT NO TIME BE BLOCKED.

22. ALL ITEMS, SYSTEMS, AND PRODUCTS NOTED ON THE DRAWINGS SHALL BE NEW UNLESS NOTED AS EXISTING.

23. THE APPROVAL OF SUBMITTALS BY THE ENGINEER/ARCHITECT SHALL NOT BE CONSTRUED AS A COMPLETE CHECK, BUT WILL INDICATE ONLY THAT THE GENERAL METHOD OF CONSTRUCTION, MATERIALS, DETAILING, AND OTHER INFORMATION ARE SATISFACTORY.

APPROVAL WILL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR ANY ERROR OR OMISSION, WHICH MAY EXIST IN THE SUBMITTALS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIMENSIONS AND DESIGN OF ADEQUATE CONNECTIONS, DETAILS, AND SATISFACTORY CONSTRUCTION OF ALL WORK.

24. SUBMITTALS SHALL BE IN COMPLIANCE WITH CONTRACT REQUIREMENTS AND ACTUAL FIELD CONDITIONS. INCOMPLETE SUBMITTALS WILL NOT BE REVIEWED BY THE ENGINEER/ARCHITECT AND WILL BE RETURNED TO THE CONTRACTOR. DELAYS CAUSED BY INCOMPLETE SUBMITTALS SHALL NOT BE EXCUSED AND SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

GENERAL DEMOLITION NOTES

1. THE SCOPE OF DEMOLITION WORK, SPECIFICALLY CUTTING AND PATCHING, SHALL NOT BE LIMITED TO AREAS BEING RENOVATED, BUT SHALL INCLUDE ALL WORK NECESSARY TO COMPLETE THE FINISHED PROJECT TO THE SATISFACTION OF THE OWNER.

2. PRIOR TO THE START OF DEMOLITION, CONTRACTOR SHALL INSPECT AREAS IN WHICH WORK WILL BE PERFORMED. NOTE EXISTING CONDITIONS OF SURFACES, EQUIPMENT, OR SURROUNDING PROPERTY THAT COULD BE MISCONSTRUED AS DAMAGE RESULTING FROM

SELECTIVE DEMOLITION WORK; NOTIFY OWNER PRIOR TO STARTING WORK.

3. THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED OR REMOVED.

4. THE CONTRACTOR SHALL MAKE CONTINUOUS OBSERVATIONS OF THE EXISTING STRUCTURE DURING THE PERFORMANCE OF THE WORK AND SHALL NOTIFY THE OWNER OF ANY CRACKS, DEFLECTIONS, ETC., THAT MAY REQUIRE FURTHER INVESTIGATION.

5. ALL DEMOLITION ACTIVITIES, CUTTING, AND PATCHING REQUIRED IN CONNECTION WITH THE WORK, SHALL BE PERFORMED BY SPECIFIC TRADES INVOLVED AND AS REQUIRED TO EXECUTE EACH LINE OF WORK. ALL PATCHING SHALL BE FINISHED TO MATCH ADJACENT

SURFACES EITHER NEW OR EXISTING TO REMAIN.

6. CONDUIT DEMOLITION OPERATIONS AND REMOVAL OF DEBRIS IN A MANNER TO ENSURE MINIMUM INTERFERENCE WITH WALKS AND

OTHER ADJACENT OCCUPIED AND USED FACILITIES.

7. PROVIDE BARRICADES, WARNING SIGNS, AND LIGHTS AT OPENINGS AND OTHER AREAS HAZARDOUS TO PEDESTRIANS AND TRAFFIC.

KEEP CONSTRUCTION DEBRIS CLEAR OF TRAFFIC AREAS.

8. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE REGULATIONS AND GUIDELINES SET FORTH BY ALL AGENCIES HAVING

JURISDICTION OVER THE WORK.

9. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) RULES

AND REGULATIONS.

10. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), LATEST EDITION.

11. CONTRACTOR SHALL REMOVE AND RELOCATE ALL EXISTING CONDUITS, PIPING, WIRING, UTILITIES, ETC., THAT MAY INTEREFERE WITH

NEW CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.

12. THE CONTRACTOR SHALL PROTECT AND PRESERVE ALL EXISTING ITEMS TO REMAIN AND SHALL REPAIR AND/OR REPLACE ANY ITEMS DAMAGED DURING THE COURSE OF WORK TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST.

13. ALL DEMOLITION MATERIALS AND DEBRIS SHALL BE LEGALLY OF OF-SITE.

14. IF ANY EXISTING CONSTRUCTION THAT IS TO REMAIN IN PLACE IS DAMAGED DURING THE PERFORMANCE OF THE WORK, SHALL BE RESTORED TO ITS ORIGINAL CONDITION TO THE SATISFACTION OF THE OWNER AND AT THE CONTRACTOR'S SOLE EXPENSE.

15. EXISTING PENETRATIONS SHOWN ARE NOT ALL-INCLUSIVE. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO

SUBMISSION OF BID.

SYMBOLS

NUMBER

IDENTIFICATION

X

X

ELEVATION

SECTION

X

X

DETAIL

DRAWING NUMBER

WHERE REFERENCE

IS LOCATED

LETTER

IDENTIFICATION

DRAWING NUMBER

WHERE REFERENCE

IS LOCATED

LETTER

IDENTIFICATION

DRAWING NUMBER

WHERE REFERENCE

IS LOCATED

AXXXX

AXXXX

NUMBER

IDENTIFICATION

DRAWING NUMBER

WHERE REFERENCE

IS LOCATED

INTERIOR ELEVATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:2

P

M

GI-002

GENERAL NOTES, SYMBOLS,

ABBREVIATIONS, & CODE DATA

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA MS

TOTAL TRAVEL DISTANCE TO EXIT:

(AMBULATORY HEALTH CARE )

300'-0" MAX W/ SPRINKLERS

297'-10" MAX - SEE LIFE SAFETY

PLAN ON SHEET GI-101

COMMON PATH OF TRAVEL:

(BUSINESS)

100'-0" MAX W/ SPRINKLERS 99'-6" MAX

DEAD END LIMITS (B) 50'-0" MAX NONE

TRAVEL DISTANCE

ACCESSIBLE MEANS OF EGRESS NOT REQUIRED N/A

4 EXITS > 1000 OCCUPANTS N/A

3 EXITS 501-1000 N/ANUMBER OF MEANS OF EGRESS

2 EXITS PER STORY OCCUPANT LOAD 76 = 2 EXITS

EGRESS

MINIMUM CORRIDOR WIDTH: 44" MINIMUM CLEAR

52" CLEAR MINIMUM IN

CORRIDOR CAA1

MIN. DOOR WIDTH 32" CLEAR 33" CLEAR

EGRESS CAPACITY: DOORS .20" PER PERSON 33"

STORAGE: 500 SF PER PERSON

REFER TO LIFE SAFETY PLAN

DWG SHEET GI-101

BUSINESS 150 SF PER PERSON

REFER TO LIFE SAFETY PLAN

DWG SHEET GI-101

OCCUPANT LOAD

ELECTRICAL ROOM 1 HR OR SPRINKLER SYSTEM SPRINKLER SYSTEM PROVIDED

MECHANICAL ROOM 1 HR 1 HR PROVIDED

STORAGE ORDINARY HAZARD SMOKE PARTITION SMOKE PARTITION PROVIDED

ENCLOSURE PROTECTION

AREA:

276,000 S.F. W/ SPRINKLER

MODIFICATION

RENOVATION SCOPE OF

WORK: 12,851 S.F. + 3,121 S.F.

(TEMPORARY STORAGE

ROOMS) = 15,972 S.F.

BUILDING HEIGHT UNLIMITED (A)

EXISTING 4 STORY BUILDING -

NO CHANGE

CONSTRUCTION TYPE: I-(332) (FULLY SPRINKLERED) I-(332) (FULLY SPRINKLERED)

OCCUPANCY CLASSIFICATION:

NFPA 101 & CHAPTER 19 - EXISTING

HEALTH CARE OCCUPANCIES

(BUSINESS)

(B) BUSINESS

CATEGORY CODE ACTUAL

CODE ANALYSIS

SAFETY STANDARDS FOR REFRIGERATION SYSTEMS (ASHRAE STANDARD 15 - 2007)

VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1 - 2004)

ENERGY CONSERVATION CODE - ASHRAE 90.1 - 2019

ENERGY POLICY ACT OF 2005 (EPACT)

UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

VA SEISMIC DESIGN REQUIREMENTS (H-18-8)

U.S. DEPARTMENT of VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL - REV. 3/1/20

U.S. DEPARTMENT of VETERANS AFFAIRS PLUMBING DESIGN MANUAL - REV. 3/1/20

NATIONAL STANDARD PLUMBING CODE (NSPC)

NFPA 13 SPRINKLER SYSTEMS

INTERNATIONAL MECHANICAL CODE (2018)

NATIONAL ELECTRICAL CODE (2017)

INTERNATIONAL BUILDING CODE (IBC) - WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS

NFPA NATIONAL FIRE CODES, EXCLUDING NFPA 5000 AND NFPA 900

NFPA 99 HEALTH CARE FACILITIES CODE (2021)

NFPA 101 LIFE SAFETY CODE (2024)

APPLICABLE CODES AND STANDARDS

INCLUDE SUPPORTING BEAMS AND

JOISTS

1 1/2 HR 1 1/2 HR

ROOF CONSTRUCTION

INCLUDE SUPPORTING BEAMS AND

JOISTS

2 HR 2 HR

FLOOR CONSTRUCTION

SUPPORTING ROOFS ONLY 2 HR 2 HR

SUPPORTING ONE FLOOR ONLY 3 HR 2 HR

SUPPORTING MORE THAN ONE FLOOR 3 HR 3 HR

INTERIOR BEARING WALLS

SUPPORTING ROOFS ONLY 3 HR 3 HR

SUPPORTING ONE FLOOR ONLY 3 HR 3 HR

SUPPORTING MORE THAN ONE FLOOR 3 HR 3 HR

EXTERIOR BEARING WALLS

SUPPORTING ROOFS ONLY 1 1/2 HR 2 HR

SUPPORTING ONE FLOOR ONLY 2 HR 2 HR

SUPPORTING MORE THAN ONE FLOOR 2 HR 3 HR

BEAMS, GIRDERS, TRUSSES

SUPPORTING ROOFS ONLY 2 HR 2 HR

SUPPORTING ONE FLOOR ONLY 3 HR 2 HR

SUPPORTING MORE THAN ONE FLOOR 3 HR 3 HR

STRUCTURAL FRAME COLUMNS

BUILDING ELEMENT IBC TYPE 1A NFPA TYPE 1 (332)

FIRE RESISTANCE RATINGS OF BUILDING ELEMENTS - IBC TABLE 601 & NFPA 220

TABLE 3-1

D

NOT APPLICABLE

NOT APPLICABLE

SPD - DIRTY & CLEAN

CORRIDOR / MECH AREA

CORRIDOR / RECEIVING

CORRIDOR / STORAGE

CORRIDOR / KITCHEN /

FOOD STORAGE

646-21-101

1 University DR, Pittburgh, PA 15240

MEDIUM /

HIGHEST

X

X

D

MEDIUM /

HIGHEST

X

X

X

SEE

PHASING

PLANS

XX

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:2

P

M

GI-003

ICRA ASSESSMENT UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 LAA LAARevisions: Date:

8 10 11 12 14 16 17

N

N1

L

J

6 18

AA210

SPS OFFICE

AA310

RES-1 RES-1

P-1 (EPY)

HAC

AA313

DIRTY CART

VESTIBULE

AA311

SHIFT

SUPERVISOR

AA312

SHIFT

SUPERVISOR

AA301

FLEX STORAGE

AA300

SPS BREAKOUT

AA154

CONFERENCE

ROOM

AA201

WATER

TREATMENT

ROOM

AA202

SOILED

ANTEROOM

AA203

VENDOR

DROP-OFF

AA309

LOGISTICS

BREAKROOM

AA308

LOGISTICS

LOCKERS

AA308A

CHANGING

ROOM 1

AA308B

CHANGING

ROOM 2

AA211

SPS OFFICE

AA212

SPS OFFICE

AA220

DECONTAMINATION

AA209

SPS

BREAKROOMAA307

EQUIPMENT

STORAGE

AA305

EMERGENCY

STORAGE

AA304

LOGISTICS

DISPATCH

AREA

CAA3

LOGISTICS

CORRIDOR

AA213

CLEAN

ANTEROOM

AA306

NCRMD

CLEANING

AA206

SPS MEN'S

LOCKER/SHOWER

AA205

ELECTRICAL

AA208

TOILET

AA207

SPS WOMEN'S

LOCKER/SHOWER

AA303

OPEN OFFICE

INVENTORY

MANAGERS /

SUPPLY TECH

AA302

BULK STORAGE

AA217

STERILIZER

CART

COOLDOWN

ROOM

EXISTING OXY

MANF.

STORAGE

EXISTING

MACHINE ROOM

EXISTING

CLEAN

VERTICAL

AA215

STERILE

STORAGE

AA216

CART STORAGE

/ ASSEMBLY /

DISPATCH

EXISTING

TOILET

EXISTING

TOILET

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

OFFICE

EXISTING

STORAGE

EXISTING

CORRIDOR

EXISTING

MECHANICAL

EQUIPMENT

ROOM 'D'

298'

(B)

COMMON PATH = 77'-4"

(A&B)

94'

(A)

263'

(C)

171'

(D)

C O

M M

O N

P A

T H

(C

D

178'

(E)

181'

(F)

COMMON PATH = 99'-6" (E&F)

TO CORRIDOR

CAW24B

TO CORRIDOR

CAA5 EXIT

TO CORRIDOR

CAA3 EXIT

TO STAIR # 2

AA204

LASER

ENGRAVING AA219

HAC

AA218

HAC

G

FE

FE

FE

FE

FE

EXISTING

CORRIDOR

EXISTING

CORRIDOR

CAA4

CORRIDOR

CAA4

CORRIDOR

EXISTING

STORAGE

P1

12 15

M

IN

1' - 6" MIN.

M

IN

" 212'

(G)

TO PASSAGE AN217 EXIT

211'

(H)

COMMON PATH = 86'-0" (G&H)

AA214

SPS CLEAN

SUITE

PREP/

STERILIZATION

EXISTING

BIO-MED

WORKROOM

EXISTING

DATA CLOSET

EXISTING

LOUNGE

EXISTING

MED. GAS

MANIFOLD

EXISTING

ELECTRONIC

SHOP

EXISTING

MECHANICAL

EXISTING

HAC

EXISTING

EMS

CAA2

CORRIDOR

AN205

EXISTING

RECEIVING

ENTRY

AA222

PUMP CL.

AA221

WASHER CART

COOLDOWN

ROOM

AA223

ELEC. CLOSET

15 16

FE

EGRESS DOOR OPENING

MAX. EGRESS CAPACITY (OCCUPANTS)

NET CLEAR EGRESS WIDTH PROVIDED (INCHES)

OCCUPANT LOADXX

XX

LIFE SAFETY LEGEND

EMERGENCY EXIT SIGN, SEE

ELECTRICAL DWGS

2-HR FIRE RATING

FIRE EXTINGUISHER &

CABINET

XXX

XXX

ROOM NUMBER

DESIGN LOAD (OCCUPANTS)

EGRESS ROOM/SPACE AREA TAG

XX COMPONENT I.D.

XXX

REMOTE EXIT ACESS

TRAVEL DISTANCE (IN FEET)

PATH OF TRAVEL TO POINT OF EXIT

ACCUMULATED NUMBER OF OCCUPANTS

ALONG PATH OF TRAVEL

XX

1-HR FIRE RATING

EXISTING 2-HR FIRE RATING

EXISTING WALLS

XX

EXISTING SMOKE BARRIER

NEW PARTITION

NEW SMOKE PARTITION

EXISTING 1-HR FIRE RATING

FE

KEY PLAN

NOT TO SCALE

NORTH

AREA OF

WORK

EXISTING FLOOR

AREA

SMOKE COMPARTMENT MODIFICATION

12,851 S.F.

ADDITIONAL

FLOOR AREA

N/A

TOTAL FLOOR

AREA

12,851 S.F.

MAX. ALLOWABLE FLOOR

AREA PER COMPARTMENT

NOTE: SMOKE COMPARTMENT ARE UNCHANGED FROM EXISTING.

1/8" = 1'-0"

GROUND FLOOR LIFE SAFETY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:3

P

M

GI-101

LIFE SAFETY PLAN UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA JD/MS

EGRESS TRAVEL DISTANCES

POINT DISTANCE

MAX ALLOWED AS PER NFPA 101

LIFE SAFETY CODE

(A) 94' - 2" 300'-0" (COMPLIES)

(B) 298' - 2" 300'-0" (COMPLIES)

(C) 263' - 5" 300'-0" (COMPLIES)

(D) 171' - 6" 300'-0" (COMPLIES)

(E) 177' - 11" 300'-0" (COMPLIES)

(F) 181' - 3" 300'-0" (COMPLIES)

(G) 212' - 1" 300'-0" (COMPLIES)

(H) 210' - 10" 300'-0" (COMPLIES)

OCCUPANCY LOAD (AS PER NFPA 101)

ROOM NAME ROOM NUMBER S.F. OCCUPANTS NFPA LOAD FACTOR

PREP/ STERILIZATION 126 SF 1 150 SF / OCCUPANT

CONFERENCE ROOM AA154 109 SF 4 30 SF / OCCUPANT

WATER TREATMENT ROOM AA201 109 SF 1 150 SF / OCCUPANT

SOILED ANTEROOM AA202 82 SF 1 150 SF / OCCUPANT

VENDOR DROP-OFF AA203 45 SF 1 150 SF / OCCUPANT

LASER ENGRAVING AA204 88 SF 1 150 SF / OCCUPANT

ELECTRICAL AA205 53 SF 1 500 SF / OCCUPANT

SPS MEN'S LOCKER/SHOWER AA206 183 SF 2 150 SF / OCCUPANT

SPS WOMEN'S LOCKER/SHOWER AA207 182 SF 2 150 SF / OCCUPANT

SPS BREAKROOM AA209 117 SF 1 150 SF / OCCUPANT

SPS OFFICE AA210 99 SF 1 150 SF / OCCUPANT

SPS OFFICE AA211 88 SF 1 150 SF / OCCUPANT

SPS OFFICE AA212 88 SF 1 150 SF / OCCUPANT

CLEAN ANTEROOM AA213 87 SF 1 150 SF / OCCUPANT

SPS CLEAN SUITE AA214 1357 SF 13 150 SF / OCCUPANT

STERILE STORAGE AA215 1061 SF 3 500 SF / OCCUPANT

CART STORAGE / ASSEMBLY / DISPATCH AA216 471 SF 2 500 SF / OCCUPANT

STERILIZER CART COOLDOWN ROOM AA217 363 SF 2 150 SF / OCCUPANT

HAC AA218 30 SF 1 500 SF / OCCUPANT

HAC AA219 30 SF 1 500 SF / OCCUPANT

DECONTAMINATION AA220 1105 SF 7 150 SF / OCCUPANT

WASHER CART COOLDOWN ROOM AA221 202 SF 2 150 SF / OCCUPANT

PUMP CL. AA222 27 SF 1 500 SF / OCCUPANT

ELEC. CLOSET AA223 47 SF 1 500 SF / OCCUPANT

SPS BREAKOUT AA300 357 SF 3 150 SF / OCCUPANT

FLEX STORAGE AA301 394 SF 1 500 SF / OCCUPANT

BULK STORAGE AA302 2680 SF 6 500 SF / OCCUPANT

OPEN OFFICE INVENTORY MANAGERS /

SUPPLY TECH

AA303 325 SF 3 150 SF / OCCUPANT

LOGISTICS DISPATCH AREA AA304 139 SF 1 150 SF / OCCUPANT

EMERGENCY STORAGE AA305 97 SF 1 500 SF / OCCUPANT

NCRMD CLEANING AA306 250 SF 2 150 SF / OCCUPANT

EQUIPMENT STORAGE AA307 196 SF 1 500 SF / OCCUPANT

LOGISTICS LOCKERS AA308 154 SF 2 150 SF / OCCUPANT

CHANGING ROOM 1 AA308A 45 SF 1 150 SF / OCCUPANT

CHANGING ROOM 2 AA308B 26 SF 1 150 SF / OCCUPANT

LOGISTICS BREAKROOM AA309 240 SF 2 150 SF / OCCUPANT

HAC AA310 59 SF 1 500 SF / OCCUPANT

SHIFT SUPERVISOR AA311 95 SF 1 150 SF / OCCUPANT

SHIFT SUPERVISOR AA312 100 SF 1 150 SF / OCCUPANT

DIRTY CART VESTIBULE AA313 198 SF 2 150 SF / OCCUPANT

TOTAL OCCUPANCY 81

SCALE: 1/8" = 1'-0"

1680 4

DOOR

68" 340

DOOR

32" 160

DOOR

32" 160

DOOR

32" 160

FIRE EXTINGUISHER CALCULATIONS (AS PER NFPA 10)

CLASS CLASSIFICATION QUANTITY

TOTAL FLOOR

AREA

MAX. FLOOR

AREA PER F.E.

MAX. TRAVEL

DISTANCE

A ORDINARY

(MODERATE)

5 12,851 S.F. 11,250 S.F. 75'-0"

UP

KEY PLAN

NOT TO SCALE

NORTH

LOCATION OF

OVERALL

PHASING PLAN

PHASING LEGEND

AREA OF WORK

WALLS TO BE DEMOLISHED

EXISTING STEEL COLUMNS

PHASE UNDER DEMOLITION

EXISTING WALLS TO REMAIN

EXISTING 2-HR FIRE RATING

EXISTING 1-HR FIRE RATING

EXISTING SMOKE BARRIER

NEW PARTITION

1-HR FIRE RATED

2-HR FIRE RATED

NEW SMOKE PARTITION

PRIORITY AREA

8 10 11 12 14 16 17

N

N1

L

J

6 18

G

P1

P

5 2019 21 22 23 24 25

F

E

D

C

B

Q

GI-106

S

GI-106

AREA #1

AREA #2

EXISTING

SOILED RECEIVING &

DECONTAMINATION

AA117

EXISTING

PREPARATION &

STERILIZATION

WORKROOM

AA122

EXISTING

BREAKROOM

AA109

EXISTING

CART WASH

AA110

EXISTING

AUTOMATIC

CART WASH

EXIST.

OFFICE

AA101B

EXIST.

OFFICE

AA101A

EXIST.

OFFICE

AA101

EXIST.

TOILET

AA102

EXIST.

ELEC.

ROOM

AA127

EXIST. HAC

AA128

EXIST.

OFFICE

AA126

EXISTING

SPD - BREAKOUT

AA152

EXISTING

HOLD - BREAKOUT

AA125

EXISTING

STERILE & NON-STERILE

STORAGE

AA106 EXISTING

LOUNGE

AA105

EXIST.

OFFICE

AA104

EXISTING

RECEIVING AND

ISSUING

AA100

EXIST.

OFFICE

EXIST.

OFFICE

EXIST. CORRIDOR

CA3

EXIST.

OFFICE

EXISTING

DISPATCH AREA

AA103

EXISTING

CONFERENCE

ROOM

AA154

EXISTING

MECHANICAL

EQUIPMENT

ROOM 'D'

AA116

EXISTING

LOGISTICS

RECEIVING

AE153

EXIST.

OFFICE

AA153A

EXISTING GIP

OFFICE

AA145

EXISTING

TRAINING ROOM

AE123

EXIST.

OFFICE EXISTING

MACHINE ROOM

AA106A

EXIST. CORRIDOR

CAA1

EXIST. RECEIVING

ENTRY

AN205

EXIST. OXY

MANF. STORAGE

AN206

EXISTING

LOGISTICS AREAEXISTING SPS

AREA

EXIST.

OFFICE

AA145A

EXIST.

OFFICE

AA145C

EXIST. CORRIDOR

CA4

EXIST. CORRIDOR

CA5

EXIST. WIPE

DOWN AREA

AA109

EXIST. WATER

TREATMENT

AA117A

EXISTING FEMALE

LOCKERS

AA111

EXIST. CORRIDOR

CAA1

EXISTING MALE

LOCKERS

AA111

EXISTING

CORRIDOR

CA8

EXISTING

CORRIDOR

CAA5

EXIST.

MECH.

AA131

EXIST. HAC

AA142

EXIST.

TOILET

AA140

EXIST. ETO

ABATER

AA118

EXISTING

STORAGE

EXIST.

CONFERENCE

ROOM

AN220

EXIST.

INT. DESIGN

ROOM

AN215

AREA #3

ICRA LEVEL 2

EXISTING

FMS AREA

ICRA LEVEL 3

ICRA LEVEL 3

1. FMS AREA WILL RELOCATE TO AREA TBD (COORDINATE

WITH VA)

2. EXISTING GIP OFFICE AA145 TO BE RELOCATED TO EXISTING

FMS AREA

PRE-CONSTRUCTION:

1. AREAS #1, #2 AND #3 ARE RENOVATED FOR TEMPORARY USES

2. LOGISTICS STORAGE MOVES TO AREAS #1 AND #2

3. SPS STORAGE MOVES TO AREA #3

PHASE 1:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:4

P

M

GI-102

GROUND FLOOR PHASING PLAN -

PHASE 1

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA MS

1/16" = 1'-0"

GROUND FLOOR PHASING PLAN - PHASE 1

SCALE: 1/16" = 1'-0"

32160 8

NOT TO SCALE

NORTH

LOCATION OF

OVERALL

PHASING PLAN

8 10 11 12 14 16 17

N

N1

L

J

6 18

G

P1

P

5 2019 21 22 23 24 25

F

E

D

C

B

Q

P2.3

S

P2.0

P2.2

GI-107

GI-106

P2.1

P2.1

P2.1

P2.1

AREA #1

AREA #2

EXISTING SPS

AREA

EXISTING

SOILED RECEIVING &

DECONTAMINATION

AA117

EXISTING

PREPARATION &

STERILIZATION

WORKROOM

AA122

EXISTING

BREAKROOM

AA109

EXIST. WIPE

DOWN AREA

AA109

EXISTING

CART WASH

AA110

EXISTING

AUTOMATIC

CART WASH

EXIST.

OFFICE

AA101B

EXIST.

OFFICE

AA101A

EXIST.

OFFICE

AA101

EXIST.

TOILET

AA102

EXIST.

ELEC.

ROOM

AA127

EXIST. HAC

AA128

EXIST.

OFFICE

AA126

EXISTING

SPD - BREAKOUT

AA152

EXISTING

HOLD - BREAKOUT

AA125

EXISTING

LOGISTICS

AREA

EXISTING

LOUNGE

AA105

EXIST.

OFFICE

AA104

EXISTING

RECEIVING AND

ISSUING

AA100

EXIST.

OFFICE

EXIST.

OFFICE

EXIST. CORRIDOR

CA3

EXIST.

OFFICE

EXISTING

DISPATCH AREA

AA103

EXISTING

CONFERENCE

ROOM

AA154

EXISTING

MECHANICAL

EQUIPMENT

ROOM 'D'

AA116

EXIST.

OFFICE EXISTING

MACHINE ROOM

AA106A

EXIST. RECEIVING

ENTRY

AN205

EXIST. OXY

MANF.

STORAGE

AN206

EXIST. CORRIDOR

CA4

EXIST. CORRIDOR

CA5

EXISTING

LOGISTICS

RECEIVING

AE153

EXIST.

OFFICE

AA153A

TEMPORARY

LOGISTICS

STORAGE #1

AA145

TEMPORARY

BREAKOUT

SPACE

EXIST. WATER

TREATMENT

AA117A

EXISTING FEMALE

LOCKERS

AA111

EXIST. CORRIDOR

CAA1

EXISTING MALE

LOCKERS

AA111

EXISTING

CORRIDOR

CA8

EXISTING

CORRIDOR

CAA5

EXIST.

MECH.

AA131

EXIST. HAC

AA142

EXIST.

TOILET

AA140

EXIST. ETO

ABATER

AA118

EXISTING

STORAGE

TEMPORARY LOGISTICS

STORAGE #2/

AE123

ICRA LEVEL 4

TEMPORARY

SPS

STORAGE

AREA #3

TEMPORARY SPS

STORAGE

GI-107

TEMPORARY

ANTEROOM

P2.4

P2.5

ELEC

ROOM

AA205

P2.6

*PRIORITY - EXISTING RECEIVING ENTRY AN205 INTO AN206

• NEW DOOR, ACCESS CONTROLS, SUPPLY AND EXHAUST WITH

REQUIRED AIR CHANGES

• WORK DURATION LIMITED TO (2) DAYS NON-BUSINESS HOURS

(WEEKEND)

1. EXISTING LOGISTICS AREA IS RENOVATED TO NEW SPS

2. SPS RELOCATED TO NEW SPACE

PHASE 2:

PHASING LEGEND

AREA OF WORK

WALLS TO BE DEMOLISHED

EXISTING STEEL COLUMNS

PHASE UNDER DEMOLITION

EXISTING WALLS TO REMAIN

EXISTING 2-HR FIRE RATING

EXISTING 1-HR FIRE RATING

EXISTING SMOKE BARRIER

NEW PARTITION

1-HR FIRE RATED

2-HR FIRE RATED

NEW SMOKE PARTITION

PRIORITY AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:4

P

M

GI-103

GROUND FLOOR PHASING PLAN -

PHASE 2

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA MS

1/16" = 1'-0"

GROUND FLOOR PHASING PLAN - PHASE 2

PHASE 2 KEYNOTES FOR EXISTING LOGISTICS AREA

# COMMENT

P2.0 CHANGE EXISTING DOOR LOCKSETS TO CONSTRUCTION LOCKSETS.

P2.1 CONFIRM IF EXISTING WALLS EXTEND TO DECK ABOVE. EXTEND WALL TO CREATE

CONSTRUCTION BARRIER IF NEEDED. SEE WALL TYPE TP2 ON SHEET GI-108.

P2.2 CONSTRUCT TEMPORARY 1-HOUR RATED CONSTRUCTION PARTITION.

P2.3 COMPLETE DEMOLITION AND CONSTRUCTION IN THIS AREA AS INDICATED IN THE

CONSTRUCTION DRAWINGS.

P2.4 PRIORTIZE DOOR DURING CONSTRUCTION PHASE TO MINMIZE INTERUPTIONS TO

FUNCTION OF ROOM AN206, LIMIT DISPLACEMENT TO TWO DAYS MAX

P2.5 TEMPORARY NEGATIVE PRESSURE ANTE-ROOM FOR CONSTRUCTION ACTIVITIES

P2.6 CONSTRUCT ELECTRIC ROOM AA205 BEFORE EXISTING SPS IS DEMOLISHED

TP3

SCALE: 1/16" = 1'-0"

32160 8

NOT TO SCALE

NORTH

LOCATION OF

OVERALL

PHASING PLAN

8 10 11 12 14 16 17

N

N1

L

J

6 18

G

P1

P

5 2019 21 22 23 24 25

F

E

D

C

B

Q

S

NEW

SPS

AREA

P3.1

P3.0

P3.3

P3.3

P3.3

P3.3

P3.3

P3.3

P3.2

STERILE

STORAGE

CART STORAGE

/ ASSEMBLY /

DISPATCH

SPS CLEAN

SUITE

DECONTAMINATION

STERILIZER

CART

COOLDOWN

ROOMCLEAN

ANTEROOM

CONFERENCE

ROOM

WATER

TREATMENT

ROOM

SOILED

ANTEROOM /

CART DROP

VENDOR

DROP-OFF

LASER

ENGRAVING

ELECTRICAL

ROOM

SPS MEN'S

LOCKER/SHOWER

SPS WOMEN'S

LOCKER/SHOWER

CORRIDORSPS OFFICE

SPS OFFICE

SPS OFFICE

SPS BREAK

ROOM

LOGISTICS

CORRIDOR

TOILET

EXISTING

MACHINE ROOM

EXISTING

CLEAN

VERTICAL

PREP/

STERILIZATION

HAC

HAC

EXIST. WATER

TREATMENT

AA117A

EXISTING

SOILED RECEIVING &

DECONTAMINATION

AA117

EXISTING

PREPARATION &

STERILIZATION

WORKROOM

AA122

EXISTING FEMALE

LOCKERS

AA111

EXISTING

BREAKROOM

AA109

EXISTING

CART WASH

AA110

EXISTING

AUTOMATIC

CART WASH

EXISTING

MECHANICAL

EQUIPMENT

ROOM 'D'

AA116

EXISTING

STORAGE

EXIST. ETO

ABATER

AA118

EXIST. CORRIDOR

CAA1

EXIST. CORRIDOR

CA4

EXIST. CORRIDOR

CA5

EXIST. WIPE

DOWN AREA

AA109

EXIST. RECEIVING

ENTRY

AN205

EXIST. OXY

MANF. STORAGE

AN206

EXISTING

LOGISTICS

RECEIVING

AE153

EXIST.

OFFICE

AA153A

TEMPORARY

BREAKOUT

SPACE

PUMP CL.

WASHER CART

COOLDOWN

ROOM

ELEC. CLOSET

EXISTING MALE

LOCKERS

AA111

EXISTING

CORRIDOR

CA8

EXISTING

CORRIDOR

CAA5

EXIST.

MECH.

AA131

EXIST. HAC

AA142

EXIST.

TOILET

AA140

TEMPORARY

LOGISTICS

STORAGE #1

AA145

TEMPORARY LOGISTICS

STORAGE #2/

AE123

NEW

LOGISTICS

AREA

(ICRA LEVEL 4)

TEMP ANTE-ROOM

1 HR

CONSTRUCTION

BARRIER

P3.7

P3.8

*PRIORITY - EXISTING CORRIDOR CA5

• REMOVE TEMPORARY PARTITION ACROSS EGRESS

CORRIDOR

• ADD 1-HR RATED CORRIDOR WALL AT SOUTH WALL OF

EXISTING CORRIDOR CA4 AND NEW SPS OFFICE TO PROVIDE

CONTINUOUS PATH OF EGRESS FROM NEW SPS AREA

1. EXISTING SPS AREA RENOVATED TO NEW LOGISTICS AREA

2. LOGISTICS MOVES INTO NEW SPACE

PHASE 3:

PHASING LEGEND

AREA OF WORK

WALLS TO BE DEMOLISHED

EXISTING STEEL COLUMNS

PHASE UNDER DEMOLITION

EXISTING WALLS TO REMAIN

EXISTING 2-HR FIRE RATING

EXISTING 1-HR FIRE RATING

EXISTING SMOKE BARRIER

NEW PARTITION

1-HR FIRE RATED

2-HR FIRE RATED

NEW SMOKE PARTITION

PRIORITY AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:5

P

M

GI-104

GROUND FLOOR PHASING PLAN -

PHASE 3

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA MS

SCALE: 1/16" = 1'-0"

32160 8

1/16" = 1'-0"

GROUND FLOOR PHASING PLAN - PHASE 3

PHASE 3 KEYNOTES

# COMMENT

P3.0 CHANGE EXISTING DOOR LOCKSETS TO CONSTRUCTION LOCKSETS.

P3.1 COMPLETE DEMOLITION AND CONSTRUCTION IN THIS AREA AS INDICATED IN

CONSTRUCTION DRAWINGS.

P3.2 CONSTRUCT TEMPORARY CONSTRUCTION PARTITION.

P3.3 CONFIRM IF EXISTING WALLS EXTEND TO DECK ABOVE. EXTEND WALL TO CREATE

CONSTRUCTION BARRIER IF NEEDED. SEE WALL TYPE TP2 ON SHEET GI-108.

P3.7 TEMPORARY NEGATIVE PRESSURE ANTE-ROOM FOR CONSTRUCTION ACTIVITIES

P3.8 DOOR, FRAME, ASSOCIATED HARDWARE AND CONTROLS TO BE REMOVED AND

REPLACED - COORDINATE WITH VA PHASING SEQUENCE

TP3

NOTE: COORDINATE TESTING OF NEW SPS PRIOR TO SHUTTING DOWN EXISTING SPS -

SEE MEP DRAWINGS

NOT TO SCALE

NORTH

LOCATION OF

OVERALL

PHASING PLAN

8 10 11 12 14 16 17

N

N1

L

J

6 18

G

P1

P

5 2019 21 22 23 24 25

F

E

D

C

B

Q

S

EXISTING

MACHINE ROOM

EXISTING

CLEAN

VERTICAL

SPS BREAKOUT

SPS

BREAKROOM

SPS OFFICE

SPS OFFICE

STERILE

STORAGE

CART STORAGE

/ ASSEMBLY /

DISPATCH

STERILIZER

CART

COOLDOWN

ROOM

CLEAN

ANTEROOM

SPS MEN'S

LOCKER/SHOWER

SPS WOMEN'S

LOCKER/SHOWER

ELECTRICAL

TOILET

LASER

ENGRAVING

VENDOR

DROP-OFF

SOILED

ANTEROOM

WATER

TREATMENT

ROOM

DECONTAMINATION

HAC

HAC

CONFERENCE

ROOM

CORRIDOR

P4.0

P4.0

BULK STORAGE

FLEX STORAGE

DIRTY CART

VESTIBULE

SHIFT

SUPERVISOR

SHIFT

SUPERVISOR

HAC

OPEN OFFICE

INVENTORY

MANAGERS /

SUPPLY TECH

NCRMD

CLEANING

LOGISTICS

DISPATCH

AREA

LOGISTICS

CORRIDOR

EQUIPMENT

STORAGE

EMERGENCY

STORAGE

LOGISTICS

LOCKERS

CHANGING

ROOM 1

CHANGING

ROOM 2

SPS OFFICE

LOGISTICS

BREAKROOM

AREA #1

AREA #2

NEW

LOGISTICS

AREA

SPS CLEAN

SUITE

EXISTING

LOGISTICS

RECEIVING

AE153

EXIST.

OFFICE

AA153A

EXISTING

MECHANICAL

EQUIPMENT

ROOM 'D'

AA116

EXIST. CORRIDOR

CA5

EXIST. RECEIVING

ENTRY

AN205

EXIST. OXY

MANF. STORAGE

AN206

EXISTING GIP

OFFICE

AA145

EXISTING TRAINING

ROOM

AE123

PUMP CL.

WASHER CART

COOLDOWN

ROOM

ELEC. CLOSET

EXIST. CORRIDOR

CAA1

EXISTING

CORRIDOR

CA8

EXISTING

CORRIDOR

CAA5

EXIST.

MECH.

AA131

EXIST. HAC

AA142

EXIST.

TOILET

AA140

GI-107

TEMPORARY

BREAKOUT

SPACE

AREA #3

ICRA LEVEL 2

NEW

SPS

AREA

ICRA LEVEL 3

ICRA LEVEL 3

P4.0

P4.0

AREAS #1, #2 AND #3 RENOVATED BACK TO USABLE

SPACES TBD - COORDINATE WITH VA

PHASE 4:

PHASING LEGEND

AREA OF WORK

WALLS TO BE DEMOLISHED

EXISTING STEEL COLUMNS

PHASE UNDER DEMOLITION

EXISTING WALLS TO REMAIN

EXISTING 2-HR FIRE RATING

EXISTING 1-HR FIRE RATING

EXISTING SMOKE BARRIER

NEW PARTITION

1-HR FIRE RATED

2-HR FIRE RATED

NEW SMOKE PARTITION

PRIORITY AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:5

P

M

GI-105

GROUND FLOOR PHASING PLAN -

PHASE 4

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA MS

SCALE: 1/16" = 1'-0"

32160 8

1/16" = 1'-0"

GROUND FLOOR PHASING PLAN - PHASE 4

PHASE 4 KEYNOTES

# COMMENT

P4.0 REMOVE STORAGE EQUIPMENT AND REINSTALL EXISTING FURNITURE AS

DIRECTED BY OWNER.

S

8 10 11 12

P

Q

P1.10

P1.11

P1.4

P1.4

P1.5

P1.3

EXISTING CORRIDOR

CAA1

± 54' - 8"

P1.4

P1.2

P1.2

P1.0

P1.1

P1.3

P1.1

EXISTING GIP

OFFICES

AA145

EXISTING

LOGISTICS

RECEIVING

AE153

EXISTING

OFFICE

AA145A

EXISTING

OFFICE

AA145C

P1.10

P1.10 P1.11

P1.11

P1.11

P1.0

P1.6

± 14' - 0"

P1.18

P1.11

8 10 11 12

P

Q

EXISTING

CORRIDOR

CAA1

EXISTING GIP OFFICES

AA145

EXISTING

LOGISTICS

RECEIVING

AA153

± 14' - 0"

P1.12

P1.13 P1.13

P1.16

23 24

D

C

B

RAMP UP RAMP UP

P1.3

± 32' - 1"

P1.0 P1.0

P1.1

P1.1 P1.1

P1.1P1.1

EXISTING

TRAINING

ROOM

AE123

EXISTING

OFFICE

AE124

P1.18

KEY PLAN

NOT TO SCALE

NORTH

TEMPORARY

LOGISTICS

STORAGE #2

TEMPORARY

LOGISTICS

STORAGE #1

TEMPORARY SPS

STAGING STORAGE /

OFFICE AREA

PHASING LEGEND

AREA OF WORK

WALLS TO BE DEMOLISHED

EXISTING STEEL COLUMNS

PHASE UNDER DEMOLITION

EXISTING WALLS TO REMAIN

EXISTING 2-HR FIRE RATING

EXISTING 1-HR FIRE RATING

EXISTING SMOKE BARRIER

NEW PARTITION

1-HR FIRE RATED

2-HR FIRE RATED

NEW SMOKE PARTITION

PRIORITY AREA

23 24

TS5TS5

TS4

TS7 TS7 TS7 TS7

TS2

TS6

TS2

TS1 TS1 TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS2

TS6

TS2

TS2

TS6

TS2

TS2

TS6

TS2

TEMPORARY LOGISTICS STORAGE #2

RAMP

UP

D

C

B

± 32' - 1"

TS4

TS4 TS4

TS8

TS8

RAMP

UP T

U G

P A

T H

I N

T U

G P

A T

H O

U T

P1.9

EXISTING

OFFICE

AE124

P1.14 P1.14

ITEM NO.

PHASING PLAN STORAGE EQUIPMENT LEGEND

COUNT DESCRIPTION

EXISTING LOGISTICS STORAGE (FOR REFERENCE)

- 88 5-TIER SHELVES

- 9 4-TIER WIRE SHELVES

- 4 7-TIER BASKETS

- 5 CARTS

ITEM NO. COUNT DESCRIPTION

TEMPORARY LOGISTICS STORAGE #1

TS1 60 HIGH DENSITY 5-TIER SHELVES

TS2 0 4-TIER WIRE SHELVES

TS3 0 7-TIER BASKETS

TS4 4 CARTS

TS5 2 WORKSTATIONS

ITEM NO. COUNT DESCRIPTION

TS1 33 HIGH DENSITY 5-TIER SHELVES

TS2 8 4-TIER WIRE SHELVES

SIZE

2' X 5' X 6'-8"

2' X 6'

2' X 2'

SIZE

2' X 5' X 6'-8"

2' X 6'

2' X 2'

5' X 5'

SIZE

2' X 5' X 6'-8"

2' X 6'

TEMPORARY LOGISTICS STORAGE #2

TS6 4 4-TIER WIRE SHELVES

TS7 4 7-TIER BASKETS

2' X 4'

1' X 6' X 2'

TS4 4 CARTS

TS5 2 WORKSTATIONS

5' X 5'

TS8 2 TUG -

TEMPORARY SPS STAGING STORAGE / OFFICE AREAS

ITEM NO. COUNT DESCRIPTION

TS9 18 CASE CARTS

TS10 7 SHELVES

SIZE

2'-4" X 4'-0"

4'-0" X 2'-0"

TS11 20 STORAGE UNITS 2'-6" X 1'-6"

NEW/EXISTING

NEW/EXISTING

NEW/EXISTING

NEW/EXISTING

9 CONTRACTOR

PROVIDED - 24 EXISTING -

RELOCATED - PROVIDE

NEW TOP RAILS FOR ALL

EXISTING - RELOCATED -

PROVIDE NEW TOP RAILS

NEW - VA PROVIDED

EXISTING - RELOCATED -

PROVIDE NEW TOP RAILS

EXISTING - RELOCATED

CONTRACTOR PROVIDED

CONTRACTOR PROVIDED

EXISTING - RELOCATED

EXISTING - REMAPPED

NEW - VA PROVIDED

EXISTING - RELOCATED

NEW - VA PROVIDED

NEW - VA PROVIDED

EXISTING - RELOCATED

EXISTING - RELOCATED

NOTE: CONTRACTOR RESPONSIBLE FOR TOP RAILS AT APPROPIATE LENGTH FOR BOTH RELOCATED AND NEW

EQUIPMENT - CONFIRM EQUIPMENT WITH VA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:0

P

M

GI-106

ENLARGED PHASING PLANS AREA

1 & 2 - PHASE 1

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA 15240

646-21-101

11/07/2025 DH/LAA MS

3/16" = 1'-0"

PHASE 1 - EXISTING GIS OFFICE PLAN (DEMOLITION) - AREA #1

3/16" = 1'-0"

PHASE 1 - EXISTING GIS OFFICE RCP (DEMOLITION) - AREA #1

PHASE 1 KEYNOTES

# COMMENT

P1.0 CHANGE EXISTING DOOR LOCKSETS TO CONSTRUCTION LOCKSETS. COORDINATE

REQUIRED HARDWARE WITH VA.

P1.1 CONFIRM IF EXISTING WALLS EXTEND TO DECK ABOVE. EXTEND WALL TO CREATE

CONSTRUCTION BARRIER IF NEEDED. SEE WALL TYPE TP2 ON SHEET GI-108.

P1.2 EXISTING DOOR TO BE TEMPORARILY CLOSED FOR DURATION OF ALL PHASES.

P1.3 REMOVE EXISTING FURNITURE - CONTRACTOR TO DISCARD FURNITURE

P1.4 REMOVE CUBICLE PARTITIONS AND ASSOCIATED MOUNTING HARDWARE -

CONTRACTOR TO DISCARD CUBICLES

P1.5 REMOVE PORTION OF EXISTING WALL TO ACCOMODATE NEW DOOR OPENING.

P1.6 REPAIR OR MODIFY EXISTING FLOOR FINISHES AS NEEDED TO ACCOMODATE NEW

TEMPORARY SPACES.

P1.7 CONSTRUCT NEW WALL.

P1.8 INSTALL DOOR, FRAME, AND HARDWARE.

P1.9 INSTALL STORAGE EQUIPMENT. REFER TO EQUIPMENT LEGEND.

P1.10 REMOVE EXISTING DOOR, FRAME, AND ASSOCIATED HARDWARE IN ITS ENTIRETY.

P1.11 DEMOLISH EXISTING WALLS IN THEIR ENTIRETY.

P1.12 REMOVE PORTION OF EXISTING ACT CEILING PANELS. CUT AT NEAREST EXISTING

TILE GRID. PROVIDE NEW ACT PANELS & MAINTAIN EXISTING CEILING HEIGHT.

P1.13 REMOVE EXISTING ACT CEILING PANELS, SUSPENSION SYSTEM IN THEIR

ENTIRETY - RETAIN LIGHT FIXTURES AND ALL CEILING DEVICES FOR

REINSTALLATION

P1.14 CONTRACTOR TO REROUTE TUG SYSTEM TO TEMP STORAGE AREAS, AS

CONSTRUCTION IS OCCURING AND AS PART OF NEW WORK AS REQUIRED

P1.15 INSTALL STORAGE EQUIPMENT. REFER TO EQUIPMENT LEGEND.

P1.16 EXISTING ACT CEILING PANELS, SUSPENSION SYSTEM, LIGHT FIXTURES, AND

MECHANICAL DEVICES TO REMAIN - SEE MEP DRAWINGS

P1.17 INSTALL NEW ACT SUSPENDED CEILING AND INTEGRATE PATTERN AND GRID INTO

EXISTING - SEE MEP DRAWINGS

P1.18 REMOVE EXISTING CARPET AND PREPARE ROOM TO RECEIVE NEW LVT

FLOORING

3/16" = 1'-0"

PHASE 1 - EXISTING TRAINING ROOM (DEMOLITION) - AREA #2

SCALE: 3/16" = 1'-0"

1680 4

SCALE: 3/16" = 1'-0"

1680 4

SCALE: 3/16" = 1'-0"

1680 4

SCALE: 3/16" = 1'-0"

1680 4

3/16" = 1'-0"

PHASE 1 - TEMPORARY LOGISTICS STORAGE #2 - AREA #2

ITEM NO.

PHASING PLAN STORAGE EQUIPMENT LEGEND

COUNT DESCRIPTION

EXISTING LOGISTICS STORAGE (FOR REFERENCE)

- 88 5-TIER SHELVES

- 9 4-TIER WIRE SHELVES

- 4 7-TIER BASKETS

- 5 CARTS

ITEM NO. COUNT DESCRIPTION

TEMPORARY LOGISTICS STORAGE #1

TS1 60 HIGH DENSITY 5-TIER SHELVES

TS2 0 4-TIER WIRE SHELVES

TS3 0 7-TIER BASKETS

TS4 4 CARTS

TS5 2 WORKSTATIONS

ITEM NO. COUNT DESCRIPTION

TS1 33 HIGH DENSITY 5-TIER SHELVES

TS2 8 4-TIER WIRE SHELVES

SIZE

2' X 5' X 6'-8"

2' X 6'

2' X 2'

SIZE

2' X 5' X 6'-8"

2' X 6'

2' X 2'

5' X 5'

SIZE

2' X 5' X 6'-8"

2' X 6'

TEMPORARY LOGISTICS STORAGE #2

TS6 4 4-TIER WIRE SHELVES

TS7 4 7-TIER BASKETS

2' X 4'

1' X 6' X 2'

TS4 4 CARTS

TS5 2 WORKSTATIONS

5' X 5'

TS8 2 TUG -

TEMPORARY SPS STAGING STORAGE / OFFICE AREAS

ITEM NO. COUNT DESCRIPTION

TS9 18 CASE CARTS

TS10 7 SHELVES

SIZE

2'-4" X 4'-0"

4'-0" X 2'-0"

TS11 20 STORAGE UNITS 2'-6" X 1'-6"

NEW/EXISTING

NEW/EXISTING

NEW/EXISTING

NEW/EXISTING

9 CONTRACTOR

PROVIDED - 24 EXISTING -

RELOCATED - PROVIDE

NEW TOP RAILS FOR ALL

EXISTING - RELOCATED -

PROVIDE NEW TOP RAILS

NEW - VA PROVIDED

EXISTING - RELOCATED -

PROVIDE NEW TOP RAILS

EXISTING - RELOCATED

CONTRACTOR PROVIDED

CONTRACTOR PROVIDED

EXISTING - RELOCATED

EXISTING - REMAPPED

NEW - VA PROVIDED

EXISTING - RELOCATED

NEW - VA PROVIDED

NEW - VA PROVIDED

EXISTING - RELOCATED

EXISTING - RELOCATED

NOTE: CONTRACTOR RESPONSIBLE FOR TOP RAILS AT APPROPIATE LENGTH FOR BOTH RELOCATED AND NEW

EQUIPMENT - CONFIRM EQUIPMENT WITH VA

PHASING LEGEND

AREA OF WORK

WALLS TO BE DEMOLISHED

EXISTING STEEL COLUMNS

PHASE UNDER DEMOLITION

EXISTING WALLS TO REMAIN

EXISTING 2-HR FIRE RATING

EXISTING 1-HR FIRE RATING

EXISTING SMOKE BARRIER

NEW PARTITION

1-HR FIRE RATED

2-HR FIRE RATED

NEW SMOKE PARTITION

PRIORITY AREA

8 10 11 12

P

AISLE

4' - 6"

AISLE

4' - 6"

AISLE

4' - 6"

TS4

(5

R O

L L

IN

G

C A

G E

S

F C

C S

T O

R A

G E

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

TS1

P1.8

P1.7

TS5

TS5

TS4TS4TS4

Q

± 14' - 0"

ALIGN1

R .O

" TP1

TP1

± 54' - 8"

P1.6

P1.7

P1.8

P1.9

EXISTING

LOGISTICS

RECEIVING

AE153

EXISTING CORRIDOR

CAA1

TEMPORARY

LOGISTICS

STORAGE #1

TEMPORARY

BREAKOUT

SPACE

8 10 11 12

P

Q

EXISTING GIP OFFICES /

TEMPORARY LOGISTICS

STORAGE #1

TEMPORARY

BREAKOUT

SPACE

P1.17

A L

IG

N

W

IT

H N

E A

R E

S T

E X

IS

T

IN

G

A C

T

ALIGN WITH NEAREST EXISTING ACT

± 14' - 0"

± 54' - 8"

P1.17

P1.17

18 2019 21

S

TS9 TS9TS9

TS9TS9TS9

TS9TS9TS9

TS9TS9TS9

TS9TS9TS9

TS9TS9TS9

EXISTING

OFFICE

AN221

TEMPORARY

SPS OFFICE

AN218

TEMPORARY

SPS OFFICE

AN219

TS10

TS10

TS10

TS10

TS10

TS10

TS10

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TS11

TEMPORARY

STORAGE

AN215

TEMPORARY

STORAGE

AN220

EXISTING PASSAGE

AN217

EXISTING OFFICE

AN222

EXISTING OFFICE

AN223

EXISTING OFFICE

AN225

EXISTING

CORRIDOR

CAN51

EXISTING

TOILET

AN224

P1.15

P1.15

P1.15

P1.15P1.15

P1.0

P1.0

KEY PLAN

NOT TO SCALE

NORTH

TEMPORARY

LOGISTICS

STORAGE #2

TEMPORARY

LOGISTICS

STORAGE #1

TEMPORARY SPS

STAGING STORAGE /

OFFICE AREA

18 2019 21

S

± 11' - 10" ± 12' - 10" ± 17' - 11"

± 16' - 9"

EXISTING PASSAGE

AN217

EXISTING OFFICE

AN222

EXISTING OFFICE

AN223

EXISTING OFFICE

AN225

EXISTING

CORRIDOR

CAN51

EXISTING

TOILET

AN224

EXISTING

INTERIOR DESIGN

OFFICE

AN215

EXISTING

OFFICE

AN221

EXISTING

OFFICE

AN218

EXISTING

OFFICE

AN219

EXISTING

CONFERENCE ROOM

AN220

P1.18

P1.18

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

1300 Baxter St.

Suite 230 Charlotte, NC 28204 Phone: 704.348.3097 www.specializedeng.com

SES Project : 22164.001

MOTT MACDONALD

ARCHITECTS PENN, P.C.

325 CHESTNUT STREET,

SUITE 300

PHILADELPHIA, PA 19016 U.S.A.

A u to d e s k D o c s /2

.0

V

A P it ts b u rg S

P S

A H

U a n d

R O

U p g ra d e s /6

-2

-1

U

D S

P S

A H

U

R O

U p g ra d e A rc h it e c tu re R

.r v t

/6 /2

:2

:0

P

M

GI-107

ENLARGED PHASING PLANS AREA

1 & 3 - PHASE 1

UD SPS AHU & RO UPGRADE,

PITTSBURGH VAMC

University Drive C, Pittsburgh, PA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .