This solicitation is for a construction project to correct deficiencies in the domestic hot water distribution system at the Oklahoma City VA Medical Center. The scope of work includes replacing steam to water heat exchangers, hot water pumps and piping, adding thermostatic mixing valves and recirculation lines throughout the facility, and installing a water monitoring system. The project will follow all applicable construction codes and VA design standards. The anticipated construction period is 240 days with a 30-day solicitation period. The selected contractor will be responsible for managing all labor, materials, equipment and inspection work to meet the project requirements.

View the file

Other files

File Type Posted
Sign in Sheet.pdf PDF
Amendment 0004 - 36C25923R0072.docx DOCX document
Amendment 0003 - Abestos Abatement drawings for informational purpose 2 of 3.pdf PDF
Amendment 0003 - Architectural Specs.pdf PDF
Amendment 0003 - Oklahoma Correct Domestic Hotwater_Stainless Steel Plate Details - RFI 44.pdf PDF
Amendment 0003 - Domestic Hot Water Documents Combined_Part2.pdf PDF
Amendment 0003 - MEP Specs Combined.pdf PDF
Amendment 0003 - Abestos Abatement drawings for informational purpose 3 of 3.pdf PDF
Amendment 0003 - 36C25923R0072.docx DOCX document
Amendment 0003 - Front End Specifications Combined.pdf PDF
Amendment 0003 - OKC Hotwater RFI List responses 06-29-23.xlsx XLSX spreadsheet
Amendment 0003 - Domestic Hot Water Documents Combined_Part1.pdf PDF
Amendment 0003 - Abestos Abatement drawings for informational purpose 1 of 3.pdf PDF
36C25923R0072 0002.docx DOCX document
36C25923R0072 0001.docx DOCX document
S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf PDF
635-18-108 Approved Drawings file_Part2.pdf PDF
Site Visit Instructions.docx DOCX document
36C25923R0072_1.docx DOCX document
635-18-108 Specifications.pdf PDF
NEW - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

HA100

GENERAL NOTES

A

F i l e

P a t h

P

M

95% DESIGN

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT STAMPCONSULTANT

321 4 5 6 7 8 9

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SD 57701

(605) 342-9470

JEFF REUPPEL

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JUNE 4, 2020 WHC METRevisions: Date:

EE

ASBESTOS NOTES:

1. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN WALLS, PIPE CHASES

AND ABOVE RIGID CEILINGS. COORDINATE ACCESS WITH DEMOLITION DRAWINGS

AND THE GENERAL CONTRACTOR. SOME EXPLORATORY DEMOLITION MAY BE

REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

2. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES

(NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE

SPECIFICATION SECTIONS: SEC 02 82 13-13, GLOVEBAG ASBESTOS ABATEMENT;

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES

(NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE

DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST

PRACTICES AND PHASING REQUIREMENTS.

GASKETS ARE CONCEALED IN VALVES AND ARE INACCESSIBLE FOR SAMPLING.

GASKETS ARE ASSUMED AS ACM UNLESS SAMPLED, ANALYZED, AND

DETERMINED TO BE NON-ASBESTOS.

3. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR

ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN

-0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE

AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR

DISCHARGE LOCATIONS WITH GENERAL CONTRACTOR, OWNER'S

REPRESENTATIVE, AND VPIH, IF NEEDED.

4. TSI ABATEMENT FROM SECTIONS OF PIPE AND FITTINGS TO BE DEMOLISHED MAY

BE PERFORMED USING GLOVEBAGS TO ACCOMPLISH WRAP AND CUT METHODS IF

APPROVED BY THE GENERAL CONTRACTOR. COORDINATE WITH MECHANICAL

DEMOLITION DRAWINGS AND THE MECHANICAL CONTRACTOR.

5. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI

ENVIRONMENTAL, DATED MAY 28, 2020, FOR INFORMATION CONCERNING THE

PRESENCE OF ASBESTOS CONTAINING MATERIALS IN THE PROJECT AREAS.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL

CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE,

AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH

PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME

AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT

TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY OPERATIONS.

LEAD-BASED PAINT AND PAINT CONTAINING LEAD:

1. LEAD-BASED PAINT (LBP) ARE PAINTS THAT CONTAIN LEAD ≥1.0 MG/M² OR ≥0.5

PERCENT BY WEIGHT.

2. PAINT CONTAINING LEAD (PCL) IS PAINT WITH A DETECTABLE LEVEL OF LEAD.

3. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS, COMPONENTS, AND

SURFACES THAT MAY BE DISTURBED, PENETRATED, REFINISHED, OR

DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND COMPONENTS WITH

LBP AND/OR PCL IN ACCORDANCE WITH APPLICABLE REGULATIONS, SECTION 02

83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.

AND THE APPROVED WORK PLAN.

4. IF WALLS WITH LBP ARE TO BE DEMOLISHED, WALL MAY BE REMOVED AND

DISPOSED OF IN ACCORDANCE WITH APPROVAL FROM GENERAL CONTRACTOR.

PERFORM REMOVAL AND DISPOSAL IN ACCORDANCE WITH SECTION 02 83 33.13,

OR 29 CFR 1926.62 LEAD IN CONSTRUCTION FOR MINIMAL NON-ABATEMENT

LEAD-BASED PAINT DISTURBANCE.

5. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI

ENVIRONMENTAL, DATED MAY 28, 2020, FOR INFORMATION CONCERNING THE

PRESENCE OF LBP, LEAD CONTAINING MATERIALS AND PCL IN THE PROJECT

AREAS.

JUNE 22, 2020

100% CONSTRUCTION

DOCUMENTS

JULY 15, 2020

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

HA101

LEAD-BASED PAINT NOTES

A

F i l e

P a t h

P

M

95% DESIGN

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT STAMPCONSULTANT

321 4 5 6 7 8 9

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JUNE 4, 2020 WHC METRevisions: Date:

EE

LEAD-BASED PAINT AND PAINT CONTAINING LEAD:

1. LBP AND PCL ARE KNOWN TO EXIST ON MATERIALS, COMPONENTS, AND

SURFACES THAT MAY BE DISTURBED, PENETRATED, REFINISHED, OR

DEMOLISHED. PERFORM DEMOLITION OF MATERIALS AND COMPONENTS WITH

LBP AND/OR PCL IN ACCORDANCE WITH APPLICABLE REGULATIONS, SECTION

02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL AND THE APPROVED

WORK PLAN.

2. LBP AND PCL ARE PRESENT ON SURFACES. LEAD DUST MUST BE CONTROLLED

ACCORDING TO 29 CFR 1926.26 WHEN DISMANTLED, DEMOLISHED, OR IMPACTED.

PERFORM CLEANUP AND DISPOSAL OF LBP DUST AND DEBRIS IN ACCORDANCE

WITH SECTION 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SD 57701

(605) 342-9470

JEFF REUPPEL

JUNE 22, 2020

100% CONSTRUCTION

DOCUMENTS

JULY 15, 2020

CONTROL VALVE

T

ROOM OR ZONE THERMOSTAT

DUCT THERMOSTAT

EXPANSION VALVE

MOTORIZED DAMPER ACTUATOR

DAMPER, OPPOSED BLADE

CENTRIFUGAL FAN

HUMIDISTAT, ROOM

HUMIDISTAT, DUCT

M MOTOR

PRESSURE SWITCH

, 2-WAY

CONTROL VALVE, 3-WAY

STEAM TRAP

SMOKE DETECTOR, DUCT

DIFFERENTIAL PRESSURE CONTROLLER

HVAC & CONTROL SYMBOLS

SYMBOL

GLOBE VALVE

GAS COCK

SOLENOID VALVE

PRV

PRESSURE REDUCING VALVE

UNION, THREADED OR FLANGED

WATER HAMMER ARRESTOR

THERMOMETER WITH WELL

FLOOR CLEANOUT, INT. OR EXT.

FLOOR SINK

90 DEGREE ELBOW (UP, DOWN, PLAN)

CHECK VALVE

TEE FITTING (UP, DOWN, PLAN)

PLUG VALVE

PRESSURE GAGE WITH SHUTOFF

PRESSURE SWITCH

PUMP

PRESS./TEMP. RELIEF VALVE

DESCRIPTION

LONG RADIUS SAN. SEWER FITTING

DIRECTION OF FLOW

PLUMBING/PIPING SYMBOLS

COMBINATION WYE & 1/8 BEND

PT/PS

TT

FS

FLOOR DRAIN

RPP BACKFLOW PREVENTOR

DOUBLE CHECK BACKFLOW PREV.

PRESSURE REDUCING VALVE

WATER METER

STRAINER, CAST IRON OR BRONZE

STRAINER WITH BLOW DOWN & PLUG

NG OR LP EQUIPMENT REGULATOR

GATE, BALL, OR FUEL SOV VALVE

FLEXIBLE PIPE CONNECTOR

WH

HOSE BIBB, INTERIOR OR EXTERIOR

CO

WALL CLEANOUT

WYE (PLAN VIEW)

WYE (VERTICAL) WITH 1/4 BEND

1/4 TURN BOILER DRAIN W/CAP

FLOW SWITCH

TEMPERATURE TRANSMITTER (SENSOR)

PRESSURE TRANSMITTER OR SWITCH

AUTO AIR VENT, EXTEND TO DRAIN

ABV

AUTOMATIC BALANCING VALVE

S

MBV

MANUAL BALANCING VALVE, CIRCUIT SETTER

RECTANGULAR DUCT (REFER TO SYS)

LINED RECTANGULAR DUCT

ROUND DUCT-REFER TO SYSTEM SERVED

ROUND LINED OR DOUBLE WALL DUCT

12"X10"

8"Ø

12"X10"

8"Ø

BASIC MECHANICAL REQUIREMENTS

FURNISH ALL LABOR AND MATERIALS AND PERFORM ALL

OPERATIONS NECESSARY FOR THE INSTALLATION OF COMPLETE

AND OPERATING MECHANICAL SYSTEMS SUBJECT TO THE

CONDITIONS OF THE CONTRACT. PROVIDE SATISFACTORY

OPERATION OF ALL EQUIPMENT AND CONTROLS TO THE

ARCHITECT/ENGINEER UPON REQUEST.

ALL MATERIALS SHALL BE NEW. SUBSTITUTIONS SHALL BE

APPROVED BY OWNER AND/OR ENGINEER.

VISIT THE PREMISES BEFORE SUBMITTING BID AS NO CHANGE

ORDERS WILL BE ALLOWED FOR LACK OF KNOWLEDGE OF EXISTING

CONDITIONS.

COORDINATE AND ORDER THE PROGRESS OF WORK TO CONFORM

TO THE PROJECT SCHEDULE AND THE PROGRESS OF THE WORK OF

THE OTHER TRADES.

MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND BECAUSE OF THE

SMALL SCALE, IT IS NOT POSSIBLE TO INDICATE EVERY REQUIRED

OFFSET, FITTING, ETC. VERIFY ALL SPACE REQUIREMENTS,

COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS

IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE

OWNER.

PERFORM WORK IN ACCORDANCE WITH GOOD COMMERCIAL

PRACTICE. THE GOOD APPEARANCE OF THE FINISHED WORK SHALL

BE OF EQUAL IMPORTANCE WITH ITS MECHANICAL EFFICIENCY AND

INTENT. THE OWNER MAY REJECT WORK IF WORKMANSHIP AND

APPEARANCE ARE NOT SATISFACTORY.

INSTALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH THE

MANUFACTURERS' RECOMMENDATIONS UNLESS SPECIFICALLY

INDICATED OTHERWISE, OR WHERE LOCAL CODES OR

REGULATIONS TAKE PRECEDENCE.

COMPLY WITH STATE AND LOCAL CODE REQUIREMENTS AND

ORDINANCES. COMPLY WITH REQUIREMENTS OF THE UTILITY

COMPANIES. IN THE CASE OF DIFFERENCES BETWEEN THESE

REQUIREMENTS AND ORDINANCES, THE MOST STRINGENT SHALL

GOVERN. CALL FOR INSPECTIONS REQUIRED BY LOCAL BUILDING

INSPECTION AUTHORITY.

PLANS AND SPECIFICATIONS GO HAND IN HAND. WHAT IS REQUIRED

IN ONE IS REQUIRED IN BOTH. WHERE CONFLICTS BETWEEN

SPECIFICATIONS AND PLANS EXIST, THE MOST STRINGENT

REQUIREMENTS SHALL APPLY.

MECHANICAL PLANS SUPERCEDE ARCHITECTURAL PLANS.

BACKGROUND FLOOR PLANS USED FOR MECHANICAL DRAWINGS

MAY SHOW DIFFERENT THAN THE FINAL ARCHITECTURAL LAYOUT.

REFER TO ARCHITECTURAL DRAWINGS FOR ACTUAL DIMENSIONS

AND LAYOUT PLACEMENTS FOR SPACE CONDITIONS.

MECHANICAL DETAILS MAY OR MAY NOT BE DIRECTLY REFERENCED.

ALL DETAILS SHOWN ARE TO BE USED FOR BASIS OF INSTALLATION

IN ALL CASES, IN COORDINATED EFFORT WITH MANUFACTURERS

INSTALLATION RECOMMENDATIONS.

MECHANICAL SHEETS ARE NOT INTENDED TO SPECIFICALLY BE

TRADE SPECIFIC TO MECHANICAL INSTALLATION WORK. ALL

MECHANICAL AND ELECTRICAL TRADES ARE RESPONSIBLE FOR

FAMILIARIZING THEMSELVES AND INCLUDING A COMPLETE PACKAGE

WITHIN THEIR OFFER FOR A COMPLETE SYSTEM.

AT COMPLETION OF WORK, DELIVER COMPLETED PROJECT RECORD

DOCUMENTS MARKED WITH FIELD CHANGES TO OWNER.

PROVIDE A WRITTEN WARRANTY TO THE OWNER COVERING THE

ENTIRE MECHANICAL WORK TO BE FREE FROM DEFECTIVE

MATERIALS, EQUIPMENT AND WORKMANSHIP FOR A PERIOD OF 1

YEAR AFTER DATE OF ACCEPTANCE.

CLEAN EXPOSED SURFACES OF FURNACES, HOT WATER HEATERS,

PLUMBING FIXTURES AND OTHER EXPOSED ITEMS OF GREASE, DIRT

OR OTHER FOREIGN MATERIAL. REMOVE RUBBISH AND DEBRIS

RESULTING FROM THE OPERATIONS AND LEAVE EQUIPMENT

SPACES CLEAN AND READY FOR USE.

MAINTAIN ALL CEILING, FLOOR AND WALL FIRE AND SMOKE

PROTECTION RATINGS. SEAL ALL CONDUIT AND ENCLOSURE

PENETRATIONS TO COMPLY WITH UL ASSEMBLY AND BUILDING

CODE REQUIREMENTS. ALL SEALANTS AND CONSTRUCTIONS SHALL

BE APPROVED BY OWNER PRIOR TO APPLICATION. ALL OPENINGS

SHALL BE SEALED DAILY.

CONTRACT DRAWINGS FOR MECHANICAL WORK ARE IN PART

DIAGRAMMATIC, INTENDED TO CONVEY THE SCOPE OF WORK AND

INDICATE GENERAL ARRANGEMENT OF EQUIPMENT, CONDUITS, AND

APPROXIMATE SIZES AND LOCATIONS OF EQUIPMENT AND OUTLETS.

MECHANICAL/ELECTRICAL TRADES SHALL FOLLOW THESE

DRAWINGS IN LAYING OUT THEIR WORK, CONSULT GENERAL

CONSTRUCTION DRAWINGS TO FAMILIARIZE THEMSELVES WITH ALL

CONDITIONS AFFECTING THEIR WORK, AND SHALL VERIFY SPACES

IN WHICH THEIR WORK WILL BE INSTALLED. COORDINATE WORK

WITH OTHER TRADES AND AS PROJECT CONDITIONS REASONABLY

REQUIRE WITHOUT EXTRA COSTS TO OWNER.

HVAC SPECIFIC:

ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE

INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE INCREASED

TO COMPENSATE FOR DUCT LINING THICKNESS.

PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH SINGLE RADIUS

TURNING VANES UNLESS OTHERWISE INDICATED.

COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH

ARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING, AND OTHER

CEILING ITEMS AND MAKE DUCT MODIFICATIONS TO SUIT.

AT CONTRATORS OPTION, FLEXIBLE DUCT MAY BE USED TO

CONNECT SUPPLY REGISTERS AND DIFFUSERS ON THIS PROJECT

ONLY. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5 FEET,

UNLESS SPECIFICALLY SHOWN ON DRAWING.

ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES

INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND

TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO

ADDITIONAL COST TO THE OWNER.

MECHANICAL SYSTEMS SHALL COMPLY WITH INTERNATIONAL

MECHANICAL CODE VER 2018 AND INTERNATIONAL ENERGY CODE

VER 2012.

PLUMBING/PIPING SPECIFIC:

PLUMBING/PIPING SYSTEMS SHALL COMPLY WITH INTERNATIONAL

FUEL GAS CODE VER 2018 AND UNIFORM PLUMBING CODE VER 2018.

UTILITIES:

LOCATION OF UNDERGROUND UTILITIES ARE APPROXIMATE. IT IS

THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE EXACT

LOCATIONS IN THE FIELD (NOT ALL UTILITIES ARE SHOWN).

REGULATORY AND CODE REQUIREMENTS:

APPLY FOR AND PAY FOR ALL PERMITS, FEES, LICENSES AND

INSPECTIONS. ALL WORK IS SUBJECT TO APPROVAL BY THE CODE

OFFICIAL AND ENGINEER. ALL CORRECTIONS SHALL BE MADE

WITHOUT EXTRA COSTS TO OWNER.

TEST & BALANCE INSTRUCTIONS:

1. OPERATING AMPERAGE MEASURED UNDER FULL LOAD.

2. MEASURED VOLTAGE AT EACH UNIT.

3. GPM AND HEAD OF PUMPS.

THE FOLLOWING PIECES OF EQUIPMENT SHALL RECEIVE TESTING & BALANCING

TREATMENT:

A. HEX-1, 2, 3, 4, 5, 6.

B. P-1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11.

SYMBOL

DESCRIPTION

H

P

MD

SD

H

S

SYMBOL

DESCRIPTION

SYMBOL

DESCRIPTION

FOR

T

SP

FIRE DAMPERFD

SMOKE DAMPERSD

COMBINATION FIRE/SMOKE DAMPERFSD

BACKDRAFT DAMPER, GRAVITYBDD

THE BALANCING CONTRACTOR SHALL PERFORM WATER BALANCE IN ACCORDANCE

WITH MINIMUM NEBB GUIDELINES AND REPORT THE FOLLOWING DATA:

A REPORT AND REDLINE CONDITIONS, BALANCING INFORMATION, AND INFORMATION REQUESTED

ABOVE SHALL BE SUBMITTED TO THE ENGINEER.

1" FIBERGLASS

1,2,31/2" FIBERGLASSALL

PIPE SIZE

SERVICE OR

SYSTEM

MATERIAL

INSULATION THICKNESS NOTES:

DOMESTIC COLD WATER

DOMESTIC HOT WATER

(100-180 DEG F)

TYPE L COPPER, PRO-PRESS

ALL 1,2,3

NATURAL GAS

BLACK T&C WITH BMI FITTINGS

WELDED STEEL SCH 40

<=2"

>2"

NONE

ALL

PIPE SIZE

ALL

N/A

SANITARY SEWER U/G

SANITARY SEWER A/G

CONDENSATE

SCHEDULE 40 PVC DWV, HUBLESS CAST IRON

ALL

ALL

ALL

NONE

N/A

NONE

N/A

NONE

N/A

SCHEDULE 40 PVC DWV, HUBLESS CAST IRON

SCHEDULE 40 PVC DWV

(FLEXIBLE TUBING NOT ALLOWED)

NOTES:

1. INSULATION TO BE OF HEAVY DENSITY BONDED FIBERGLASS WITH ALL SERVICE JACKET (WHITE). FITTING TO BE PVC ZESTON COVERS WITH FLEXIBLE INSULATION WRAP. SEAL

ALL JOINTS WITH SEALANT. K VALUE NOT EXCEEDING 0.27 BTU PER IN/H*FT^2*DEG F.

2. SEISMIC BRACE ALL PIPE GREATER THAN 2-1/2" ID PER LOCAL CODE.

3. ALL PIPING IN MECHANICAL ROOMS AND WATER SERVICES TO BE NSF RATED METALLIC PIPE. NO EXCEPTIONS.

GENERAL NOTE ALL: SEAL ALL NON RATED STRUCTURE PIPE PENETRATIONS INCLUDING DRAFT STOPS WITH SILICON OR FIRE RATED EXPANDING FOAM. SEAL ALL RATED PIPE

PENETRATIONS IN ACCORDANCE WITH CONTRACTOR SELECTED MFR FIRE CAULK SYSTEM (AND/OR FIRE COLLAR) AND MATCH RATING WITH SPECIFIC UL LISTING. PROVIDE

ENGINEER AND INSPECTOR FOR AHJ WITH SHOP DRAWING OF RATED ASSEMBLY PRIOR TO INSTALLATION.

* PROVIDE WRITTEN AND SIGNED REPORT BY CONTRACTOR FOR ALL SYSTEMS TESTED, TYPE OF TEST, DATE, PRESSURE, TIME START, TIME END, AND SYSTEM TESTED. SUBMIT TO

ENGINEER IN IOM SUBMITTAL.

PRESSURE TEST*

100 PSI AIR-30 MIN

100 PSI AIR-30 MIN

40 PSI AIR-60 MIN

20 PSI AIR-60 MIN

20 PSI AIR-60 MIN

VISUAL INSPECTION

PIPE MATERIAL AND INSTALLATION REQUIREMENTS

TYPE L COPPER, PRO-PRESS

STEAM CONDENSATE

RETURN

TYPE L COPPER, BLACK STEEL T&C

TYPE L COPPER, BLACK STEEL T&C

WELDED STEEL SCH 40, GROOVED STEEL

1-1/2" FIBERGLASS

2" FIBERGLASS

2" FIBERGLASS

1,2

75 PSI AIR-60 MIN

30 PSI AIR-120 MIN PEX

N/A

<1-1/2"

1-1/2" - 2"

>2"

HYDRONIC HOT WATER

S&R

1,2

75 PSI AIR-60 MIN

30 PSI AIR-120 MIN PEX

N/A

1-1/2" FIBERGLASS

2" FIBERGLASS

2" FIBERGLASS

<1-1/2"

1-1/2" - 2"

>2"

TYPE L COPPER, BLACK STEEL T&C

TYPE L COPPER, BLACK STEEL T&C

WELDED STEEL SCH 40

STEAM

1,2

75 PSI AIR-60 MIN

30 PSI AIR-120 MIN PEX

N/A

2-1/2" FIBERGLASS

2-1/2" FIBERGLASS

4" FIBERGLASS

<2"

2" - 4"

>4"

TYPE L COPPER, BLACK STEEL T&C

WELDED STEEL SCH 40

WELDED STEEL SCH 40

ALL WORK PERFORMED IN CONJUNCTION WITH THESE

DRAWINGS SHALL MEET ALL CURRENT APPLICABLE

BUILDING AND ENERGY CODES.

ALL WORK PERFORMED IN CONJUNCTION WITH THESE

DRAWINGS IS SUBJECT TO APPROVAL BY THE

AUTHORITY HAVING JURISDICTION (CODE OFFICIAL).

THIS SET OF DOCUMENTS IS INTENDED FOR AHJ

REVIEW AND SHALL BE CONSIDERED AS

CONSTRUCTION DOCUMENTS. IT SHALL BE THE SOLE

RESPONSIBILITY OF THE CONTRACTOR TO

COORDINATE ALL CONDITIONS, EXISTING AND/OR NEW,

OF THE SITE AS WELL AS LOCATIONS, QUANTITIES,

TYPE AND STYLE OF ALL PRODUCTS PROVIDED, WITH

OWNER, PRIOR TO ORDERING OR INSTALLING.

GENERAL CONSTRUCTION NOTES

MEP ABBREVIATIONS

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

A/G ABOVE GRADE

B/G BELOW GRADE

COND CONDENSATE DRAIN

CPCI CONTRACTOR PROVIDED

CONTRACTOR INSTALLED

CPOI CONTRACTOR PROVIDED OWNER

INSTALLED

CWR CHILLED (HYDRONIC) WATER RETURN

CWS CHILLED (HYDRONIC) WATER SUPPLY

DCW/CW DOMESTIC (POTABLE) COLD WATER

DHW/HW DOMESTIC (POTABLE) HOT WATER

HWR/DHWR DOMESTIC HOT WATER RETURN

EA ENTERING AIR

EC ELECTRICAL CONTRACTOR

EX EXHAUST

G-SAN GREASE SANITARY SEWER

GC GENERAL CONTRACTOR

HC HVAC CONTRACTOR

HYWR HOT (HYDRONIC) WATER RETURN

HYWS HOT (HYDRONIC) WATER SUPPLY

HP HIGH PRESSURE

IJS IN JOIST SPACE

LA LEAVING AIR

LP PROPANE GAS

MA MIXED AIR

MC MECHANICAL CONTRACTOR

MP MEDIUM PRESSURE

MPG MEDIUM PRESSURE NATURAL GAS

NG NATURAL GAS

OA OUTSIDE/OUTDOOR AIR

OPCI OWNER PROVIDED CONTRACTOR

INSTALLED

OPOI OWNER PROVIDED OWNER INSTALLED

PC PLUMBING CONTRACTOR

RA RETURN AIR

RECT RECTANGULAR

SA SUPPLY AIR

SCR STEAM CONDENSATE RETURN

SAN SANITARY SEWER

SS STORM WATER SEWER

STM STEAM

SYS SYSTEM

TEMP TEMPERATURE

V VENT

CALL BEFORE YOU DIG

POINT OF CONNECTION SYMBOL

POINT OF CONNECTION SYMBOL

BALL VALVE

BUTTERFLY VALVE

VACUUM BREAKER

PLUG

AV

AUTOMATIC AIR VENT

ECCENTRIC PIPE REDUCER

PLUMBING PIPE KEY

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRCULATION

#" DCW

#" DHW

#" DHWR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

(605) 342-9470

JEFF REUPPEL

MECHANICAL/ELECTRICAL:

FOURFRONT DESIGN, INC.

46 HIBBARD WAY

HELENA, MONTANA 59601

(406) 441-4000 (EXT) 403

RAY DAWES

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JULY 15, 2020 RD PMRevisions: Date:

EE

PROJECT REQUIREMENTS

& SPECIFICATIONS

M 000

Sheet List Table

Sheet Title

Sheet Description

M 000

PROJECT REQUIREMENTS & SPECIFICATIONS

M 001 SCHEDULES & DETAILS

M 100 BUILDING #1 - SUB-BASEMENT FLOOR PLAN

M 200

BUILDING #1 - BASEMENT FLOOR KEY PLAN

M 201 BUILDING #1 - BASEMENT FLOOR SOUTH PLAN

M 202 BUILDING #1 - BASEMENT FLOOR NORTH PLAN

M 203

BUILDING #1 - BASEMENT BF-118 HEAT EXCHANGER (HEX 2, HEX-3) ISOMETRIC DETAILS

M 205

BUILDING #1 - BASEMENT BF-155 HEAT EXCHANGER (HEX-6) ISOMETRIC DETAILS

M 206

BUILDING #1 - BASEMENT BF 155 HEAT EXCHANGER (HEX-6) PIPING DIAGRAM

M 300 BUILDING #1 - GROUND FLOOR KEY PLAN

M 301 BUILDING #1 - GROUND FLOOR SOUTH PLAN

M 302 BUILDING #1 - GROUND FLOOR NORTH PLAN

M 400 BUILDING #1 - FIRST FLOOR KEY PLAN

M 401 BUILDING #1 - FIRST FLOOR SOUTH PLAN

M 402 BUILDING #1 - FIRST FLOOR NORTH PLAN

M 500 BUILDING #1 - SECOND FLOOR KEY PLAN

M 501 BUILDING #1 - SECOND FLOOR SOUTH PLAN

M 502 BUILDING #1 - SECOND FLOOR NORTH PLAN

M 600 BUILDING #1 - THIRD FLOOR KEY PLAN

M 601 BUILDING #1 - THIRD FLOOR SOUTH PLAN

M 602 BUILDING #1 - THIRD FLOOR NORTH PLAN

M 700 BUILDING #1 - FOURTH FLOOR KEY PLAN

M 701 BUILDING #1 - FOURTH FLOOR SOUTH PLAN

M 702 BUILDING #1 - FOURTH FLOOR NORTH PLAN

M 800 BUILDING #1 - FIFTH FLOOR KEY PLAN

M 801 BUILDING #1 - FIFTH FLOOR SOUTH PLAN

M 802 BUILDING #1 - FIFTH FLOOR NORTH PLAN

M 900 BUILDING #1 - SIXTH FLOOR KEY PLAN

M 901 BUILDING #1 - SIXTH FLOOR SOUTH PLAN

M 902 BUILDING #1 - SIXTH FLOOR NORTH PLAN

M 1000 BUILDING #1 - SEVENTH FLOOR KEY PLAN

M 1001 BUILDING #1 - SEVENTH FLOOR SOUTH PLAN

M 1002 BUILDING #1 - SEVENTH FLOOR NORTH PLAN

M 1100 BUILDING #1 - EIGHTH FLOOR KEY PLAN

M 1101 BUILDING #1 - EIGHTH FLOOR SOUTH PLAN

M 1102 BUILDING #1 - EIGHTH FLOOR NORTH PLAN

M 1200 BUILDING #1 - NINTH FLOOR KEY PLAN

M 1201 BUILDING #1 - NINTH FLOOR NORTH PLAN

M 1300 BUILDING #19 - GROUND & FIRST FLOOR PLANS

M 1302

BUILDING #19 - GR106 HEAT EXCHANGER (HEX-4, HEX-5) ISOMETRIC DETAILS

M 1400 BUILDING #1 - DOMESTIC WATER 3D VIEW

M 204

BUILDING #1 - BASEMENT BF-118 HEAT EXCHANGER (HEX 2, HEX-3) PIPING DIAGRAM

M 101

BUILDING #1 - SUB-BASEMENT SB100 BUILDING #1 HEAT EXCHANGER (HEX-1) ISOMETRIC DETAILS

M 102

BUILDING #1 - SUB-BASEMENT SB100 BUILDING #1 HEAT EXCHANGER (HEX-1) PIPING DIAGRAM

M 1301 BUILDING #19 - SECOND & THIRD FLOOR PLANS

M 1303

BUILDING #19 - GR106 HEAT EXCHANGER (HEX-4, HEX-5) PIPING DIAGRAM

E 100

E 000

ELECTRICAL REQUIREMENTS & SPECIFICATIONS

BUILDING #1 & #19 - ELECTRICAL PLANS

E 200 BUILDING #1 - SUB-BASEMENT WATER MONITORING AND CONTROL PLAN

E 300 BUILDING #1 - BASEMENT WATER MONITORING AND CONTROL PLAN

E 400 BUILDING #1 - GROUND FLOOR WATER MONITORING AND CONTROL PLAN

E 500 BUILDING #1 - FIRST FLOOR WATER MONITORING AND CONTROL PLAN

E 600 BUILDING #1 - SECOND FLOOR WATER MONITORING AND CONTROL PLAN

E 700 BUILDING #1 - THIRD FLOOR WATER MONITORING AND CONTROL PLAN

E 900

BUILDING #1 - FIFTH FLOOR WATER MONITORING AND CONTROL PLAN

E 1100 BUILDING #1 - SEVENTH FLOOR WATER MONITORING AND CONTROL PLAN

E 800 BUILDING #1 - FOURTH FLOOR WATER MONITORING AND CONTROL PLAN

E 1000

BUILDING #1 - SIXTH FLOOR WATER MONITORING AND CONTROL PLAN

E 1300

E 1200

BUILDING #1 - EIGHTH FLOOR WATER MONITORING AND CONTROL PLAN

BUILDING #19 - WATER MONITORING AND CONTROL PLANS

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text

RAYMOND E. DAWES

COUNTER

EXISTING SINK/LAVATORY & FAUCET,

SHOWN FOR REFERENCE ONLY. ACTUAL

STYLE MAY VARY.

NEW CALEFFI 5213 MIXING

VALVE. COORDINATE MODEL

WITH EXISTING WATER SUPPLY

SIZE AND CONNECTION TYPE.

NEW EXISTING HOT WATER

SUPPLY AND STOP, RE-USE

ESCUTCHEON

NEW COLD WATER

SUPPLY AND STOP,

RE-USE ESCUTCHEON

FLOOR

NEW COLD WATER TO NEW

MIXING VALVE

NEW COLD WATER TO

SERVE EXISTING SINK

NEW ~140°F HOT WATER

TO NEW MIXING VALVE

~110°F MIXED WATER TO

SERVE EXISTING SINK

COUNTER

EXISTING SINK/LAVATORY & FAUCET,

SHOWN FOR REFERENCE ONLY. ACTUAL

STYLE MAY VARY

REMOVE EXISTING

HOT WATER STOP,

RETAIN ESCUTCHEON

REMOVE EXISTING

COLD STOP, RETAIN

ESCUTCHEON

FLOOR

REMOVE EXISTING COLD

WATER TO SERVE

EXISTING SINK.

REMOVE EXISTING HOT WATER

TO SERVE EXISTING SINK

EXISTING/DEMO NEW CONSTRUCTION

MV

NOTE:

CONTRACTOR TO VERIFY AND

UTILIZE EXISTING CEILING SOV'S

ON DCW/DHW SERVING FIXTURE.

COUNTER

NEW FAUCET FOR EXISTING SINK/

LAVATORY, SHOWN FOR REFERENCE

ONLY. ACTUAL STYLE MAY VARY.

NEW CALEFFI 5213 MIXING

VALVE. COORDINATE MODEL

WITH EXISTING WATER SUPPLY

SIZE AND CONNECTION TYPE.

NEW HOT WATER

SUPPLY AND STOP,

RE-USE ESCUTCHEON

NEW COLD WATER

SUPPLY AND STOP,

RE-USE ESCUTCHEON

FLOOR

NEW COLD WATER TO NEW

MIXING VALVE

NEW ~140°F HOT WATER

TO NEW MIXING VALVE

~110°F MIXED WATER TO

SMART SINK MANIFOLD

COUNTER

REMOVE FAUCET ON EXISTING

SINK/LAVATORY, SHOWN FOR REFERENCE

ONLY. ACTUAL STYLE MAY VARY

REMOVE EXISTING

HOT WATER STOP,

RETAIN ESCUTCHEON

REMOVE EXISTING

COLD STOP, RETAIN

ESCUTCHEON

FLOOR

REMOVE EXISTING COLD

WATER TO SERVE

EXISTING SINK.

REMOVE EXISTING HOT WATER

TO SERVE EXISTING SINK

EXISTING/DEMO NEW CONSTRUCTION

P

MV

MIXED TEMP WATER TO

NEW FAUCET

NEW SMART SINK MANIFOLD

FROM FAUCET PACKAGE

NOTE:

CONTRACTOR TO VERIFY AND

UTILIZE EXISTING CEILING SOV'S

ON DCW/DHW SERVING FIXTURE.

C.W.

PLUMBING FIXTURE SCHEDULE

FIXTURE TAG DESCRIPTION

MANUFACTURER & MODEL #

PIPING CONNECTIONS

H.W.

NOTES

NOTES:

1. CONTRACTOR TO PROVIDE MATCHING COVER/CAP FOR UNUSED FAUCET HOLES IF LEFT FROM DEMOLISHED FAUCET.

P-401

UNDERSINK MIXING VALVE REFER TO MV-1 IN PLUMBING SPECIALTY SCHEDULE

"SLOAN EBF-751-4-TUR-TEE-CP-1.5GPM-LAM-IR-S-BT-FCT

AUTO SENSING FAUCET

P-702

SHOWER VALVE TRIM KIT W/ DRAIN

THERMOSTATIC/PRESSURE BALANCING VALVE

CHICAGO FAUCETS 1921-VOCCP

HYPERLINK

INCLUDED IN SHOWER PACKAGE

SPEC INSTALL

SPEC INSTALL

SPECIALTY TAG DESCRIPTION

MANUFACTURER & MODEL #

PIPING CONNECTIONS

TRAP

S/W

VENT C.W. H.W.

PLUMBING SPECIALTY SCHEDULE

NOTES:

1. INCLUDES INTERNAL CHECK VALVES AT THE HOT AND COLD INLETS.

PLUMBING SPECIALTY MAY BE CALLED OUT ON PLANS AS TAGGED, SPECIFICALLY CALLED FOR IN NOTES/DETAILS, OR NOT AT ALL. IF

REFERENCE TO ANY OF THE ABOVE SPECIALTY IS NOT SPECIFICALLY CALLED OUT, THIS SCHEDULE ALSO PROVIDES BASIS OF

SPECIFICATION FOR SUPPLY BY THE CONTRACTOR.

"UNDERSINK THERMOSTATIC MIXING VALVE CALEFFI 5213 SERIES

MV-1

REMARKS HYPERLINK

SPEC INSTALL

"QUICK SETTER BALANCING VALVE CALEFFI 132 SERIES

MBV 1

SPEC INSTALL

PUMP SCHEDULE

ITEM

NO.

NOTES:

LOCATION GPM

HEAD (FT)

MOTOR

HP/W VOLT.-PH.-CY.

MANUFACTURER & MODEL

SERVICE

OPTIONS-ACCESSORIES

FLA

P

P-1 RECIRCULATION SB-100 GRUNDFOS UPS 40-240-FB30 208-3-60 4.5 1,21.5HP55

1. PUMP TO RUN CONTINUOUSLY.

2. CONTRACTOR TO VERIFY EXISTING CIRCUIT MATCHES NEW PUMP REQUIREMENTS, NOTIFY ENGINEER OF DISCREPANCIES.

3. CONTRACTOR TO MATCH PUMP FUNCTIONALITY, CONTROL, SCHEDULE TO EXISTING PUMPS BEING REPLACED.

P-2 RECIRCULATION SB-100 GRUNDFOS UPS 40-240-FB30 208-3-60 4.51.5HP55

P-3 RECIRCULATION SB-100 GRUNDFOS UPS 43-100-SF5 115-1-60 3.5403W15

P-4 RECIRCULATION GR-106 GRUNDFOS UPS 43-100-SF12 115-1-60 3.5403W20

P-8 RECIRCULATION BF 155 GRUNDFOS UPS 26-99-SFC5 115-1-60 1.8200W20

P-5 RECIRCULATION BF-118 GRUNDFOS UPS 32-80-FB12 115-1-60 2.7310W20

P-6 RECIRCULATION BF-118 GRUNDFOS UPS 26-99-SFC12 115-1-60 2.0230W15

P-7 RECIRCULATION BF-118 GRUNDFOS UPS 40-160-FB15 208-3-60 2.5900W30

P-9 CWS/CWR GR 106 GRUNDFOS CM 25-1 A-S-A-E-AQQE E-A-A-N133 208-3-60 14.8 2,35HP60

P-10 HYWS/HYWR GR 106 GRUNDFOS CM 25-1 A-S-A-E-AQQE E-A-A-N75 208-3-60 14.85HP80

P-11 HYWS/HYWR GR 106 GRUNDFOS CM 25-1 A-S-A-E-AQQE E-A-A-N75 208-3-60 14.85HP80

1,2

1,2

1,2

1,2

1,2

1,2

1,2

2,3

2,3

HVAC SPECIALTY SCHEDULE

TAG NO. TYPE MANUFACTURER & MODEL

NOTES

ADDITIONAL NOTES

HORIZONTAL FLASH TANK ARMSTRONG HAFT-8

CAST IRON STEAM PUMP ARMSTRONG PT-206

1. PROVIDE WITH FLOOR MOUNTED STAND TO MATCH EXISTING FLASH TANK HEIGHT.

2. CONNECT TO EXISTING PIPING TO MATCH EXISTING CONFIGURATION.

NOTE: ALL ITEMS LISTED ON THIS SCHEDULE ARE CONSIDERED BASIS OF DESIGN, AND PRODUCTS CONSIDERED EQUAL SHALL BE ELIGIBLE TO BE SUPPLIED AND

INSTALLED ON THIS PROJECT, UPON APPROVAL OF ENGINEER.

* INDICATES ITEMS THAT MAY NOT BE SPECIFICALLY TAGGED ON PLAN SHEETS, BUT ARE NOTED IN FLOOR PLANS, DETAILS, SECTIONS, OR CALLOUTS SHALL BE

PROVIDED AND INSTALLED BY THE CONTRACTOR BASED ON REQUIREMENTS ASSOCIATED WITH THIS PROJECT.

SP-1,2*

FT-1*

1, 2

HEAT EXCHANGER SCHEDULE

EQUIPMENT

NO.

NOTES:

MANUFACTURER & MODEL

SERVICE

NOTES

HEX

WATER TEMPERATURES

(DEG. F.)

COLD INLET HOT OUTLET

(DEG. F.)

HEX-1 DHW 55 150 15 10 ARMSTRONG DF665DWP80BS 1,2,3

1. CONTRACTOR TO PROVIDE 1 CONDENSATE TRAP REPAIR KIT FOR EVERY TRAP INTEGRAL TO THE

HEAT EXCHANGER SKID.

2. DHW OUTLET AND RETURN TEMPS TO BE INTEGRATED INTO EXISTING WATER QUALITY AND

TEMPERATURE MONITORING SYSTEM CURRENTLY BEING MONITORED BY PHIGENICS.

3. FACTORY SKID PACKAGE TO INCLUDE ELECTRICAL PANEL, DRV 80 MIXING VALVE, CONDENSATE

TRAP, ACTUATED BALL VALVE SAFETY SHUT OFF, THERMOMETERS (x3), AND VACUUM BREAKER.

4. FACTORY SKID PACKAGE TO INCLUDE ELECTRICAL PANEL, DRV 40 MIXING VALVE, CONDENSATE

TRAP, ACTUATED BALL VALVE SAFETY SHUT OFF, THERMOMETERS (x3), AND VACUUM BREAKER.

5. FACTORY SKID PACKAGE TO INCLUDE ELECTRICAL PANEL, DRV 50 MIXING VALVE, CONDENSATE

TRAP, ACTUATED BALL VALVE SAFETY SHUT OFF, THERMOMETERS (x3), AND VACUUM BREAKER.

OPERATING

STEAM

PRESSURE

(PSIG)

STEAM

PRESSURE

DROP (PSI)

HEX-2 DHW ARMSTRONG DFS50DW50BS

HEX-3 DHW

HEX-4 DHW

HEX-5 DHW

HEX-6 DHW

ARMSTRONG DFS50DW50BS

ARMSTRONG DFS35DW40BS

ARMSTRONG DFS35DW40BS

55 150

55 150

55 150

55 150

55 150

15 45

15 10

15 10

15 10

15 45

ARMSTRONG DFS35DW40BS

INLET

STEAM

PRESSURE

(PSIG)

ELECTRICAL

V-PH-CY MCA

120-1-60 5

120-1-60 5

120-1-60 5

120-1-60 5

120-1-60 5

120-1-60 5

1,2,5

1,2,5

1,2,4

1,2,4

1,2,4

FLOW

(GPM)

MOTOR

FLOW

P

1-8

BUTTERFLY

VALVE (TYPICAL)

(BALL VALVE IF

LESS THAN 2

1/2" SIZE)

RIGID SUPPORTS TO

BUILDING STRUCTURE

REFER TO SPECS

NOTE:

MOTOR MOUNTED ON TOP.

REDUCE FROM PIPE

LINE SIZE TO CONN.

SIZE (IF REQUIRED)

(TYPICAL)

REDUCING TEE

CHECK VALVE

1/2"

GAUGE

BALL VALVE

(TYP)

COMPANION FLANGE TYPE

CONNECTION (INSTALL

PIPE SO PUMP CAN BE

REMOVED FOR REPAIR)

REDUCING TEE

F L

O W

F L

O W

FLOOR

FROM SYSTEM

GAUGE SHALL BE 4

1/2 "SIZE, GLYCERIN

FILLED, 1/2% ACCURACY.

NON-SLAM CHECK VALVE

(MULTIPLE PUMP

INSTALLATIONS)

FLOW BALANCING

VALVE. OMIT ON

PUMPS WITH VFDS

BUTTERFLY

VALVE

BUTTERFLY

VALVE

CHEMICAL

FEEDER

CONNECTIONS

THIS CONN. SIZE

SHALL BE SAME

SIZE AS PIPE SIZE.

COMBINATION INLET

ELL & STRAINER. SIZE

FOR MAX. 1 PSI P.D.

STRAINER

BASKET

PULL AREA

KEEP CLEAR

BLOW DOWN

CONN. SIZE

DRAIN VALVE

MIN. 1". PIPE

TO FLR. DRAIN

ADJUSTABLE SUPPORT FOOT-EXTEND

CONCRETE PAD OR ISOLATION BASE

TO BE BELOW SUCTION DIFFUSER

FOOT. SUPPORT ALL PIPING SO PUMP

CARRIES NONE OF PIPING WEIGHT.

MOUNT PUMP ON HOUSEKEEPING PAD

WHERE SPECIFIED, INSTALL INERTIA

BASE ON TOP OF HOUSE KEEPING PAD.

SIZE INLET FITTING

SAME SIZE AS PUMP

SUCTION

1/2"

BALL

VALVE

(TYPICAL)

COUPLING COVER

P

P

P

NOTE: P-10 AND P-11 TO BE PIPED IN PARALLEL WITH THIS DETAIL.

M001

FLOOR LEVEL

1/4" PLATE WELDED

STEEL SUPPORT

CONCRETE

INERTIA

BASE

ADJUSTABLE

SPRING

ISOLATORS

CONCRETE

PAD (4" MIN)

SECURE NEW STRUT

RACK BASE TO FLOOR

WITH ANCHOR BOLTS

EXISTING CHEMICAL POT

FEEDER. SECURE WITH

STRAPS TO NEW UNISTRUT

RACK

SOV (TYP)

1/2" POT FEEDER PIPING

TO EITHER SIDE OF

SYSTEM PUMP(S) (TYP)

NEW UNISTRUT POST

BASE. SECURE RACK TO

BASE WITH 3/8" BOLTS

SECURE EIXSTRING

CHEMICAL FEEDER TO

NEW STRUT WITH

SHEETMETAL STRAPS

AND BOLTS

VERTICAL UNISTRUT

1/2" DRAIN TO

NEAREST FLOOR

DRAIN/SINK

NOTE: RELOCATE EXISTING CHEMICAL FEEDER FROM

EXISTING CHILLED WATER PUMP TO NEW P-9 LOCATION.

PROVIDE NEW PIPING, VALVES, AND STRUT STAND AS SHOWN.

UNION (TYP)

ITEM

NO.

CAPACITY

MAX

WORKING

PRESSURE

WATER

CONN.

MANUFACTURER

& MODEL

REMARKS

EXPANSION TANK SCHEDULE

ET

NOTES:

ET-1,2

STORAGE

106 150 PSIG 240°F

1-1/4"

AMTROL THERM-X-TROL ST-210VC

MAX

OPERATING

TEMPERATURE

(GALLONS)

1. GENERAL LOCATIONS SHOWN IN DETAILS 3,4-M101. CONTRACTOR TO ENSURE

CLEARANCE AND ACCESSIBILITY OF FINAL TANK LOCATIONS.

3/16" THICK HILTI CP 648E,

OR EQUAL, WRAP STRIP

1-3/4" WIDE

DCW/DHW/DHWR PIPE

MINERAL WOOL

BATT INSULATION

PACKED INTO

OPENING

GYP. BOARD

MIN. 5/8" WIDTH HILTI

FS-ONE MAX INTUMESCENT

FIRESTOP SEALANT (UL 723

AND UL 1479 RATED), OR

EQUAL (TYP).

GALV. STEEL (28GA)

SLEEVE W/ ENDS

FLUSH W/ WALL

SURFACE

PIPE INSULATION

(MAX 2" THICK)

STEEL STUDS

(2x) GYP BOARD

TYPICAL RATED WALL EXAMPLE

(ACTUAL WALL ASSEMBLY MAY VARY)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

(605) 342-9470

JEFF REUPPEL

MECHANICAL/ELECTRICAL:

FOURFRONT DESIGN, INC.

46 HIBBARD WAY

HELENA, MONTANA 59601

(406) 441-4000 (EXT) 403

RAY DAWES

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JULY 15, 2020 RD PMRevisions: Date:

EE

SCHEDULES & DETAILS

M 001

TYPICAL SINK/LAVATORY MIXING VALVE DETAIL

SCALE: NTS

M001

TYPICAL SINK/LAVATORY FAUCET REPLACEMENT & MIXING VALVE DETAIL

SCALE: NTS

M001

RE-CIRCULATING PUMP DETAIL

SCALE: NTS

M001

BASE MOUNTED PUMP DETAIL

SCALE: NTS

M001

INERTIA BASE DETAIL

SCALE: NTS

M001

CHEMICAL FEEDER DETAIL

SCALE: NTS

M001

WALL PENETRATION FIRESTOP DETAIL

SCALE: NTS

M001 https://www.sloan.com/spec-sheet/3315368BT https://www.sloan.com/sites/default/files/2019-01/0816843Rev1_10-15-18.pdf https://www.chicagofaucets.com/sites/default/files/spec-sheets/faucets/1921-VOCCP.pdf https://www.chicagofaucets.com/sites/default/files/2019-08/TAG-1921_1.pdf https://www.caleffi.com/sites/default/files/file/01092_13_na.pdf https://www.caleffi.com/sites/default/files/file/38531.08.pdf https://www.caleffi.com/sites/default/files/file/01283_20_na.pdf https://www.caleffi.com/sites/default/files/file/na18070_04.pdf AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

SECT A

SECT B

SECT A

SECT B

SB 100

SECTION A

SECTION B

BOILER

PLANT

BASEMENT

LAUNDRY

BASMENT

SUB

UP

UP

SECTION A

SECTION B

BOILER

PLANT

BASEMENT

LAUNDRY

BASMENT

SUB

UP

UP

SECTION A

SECTION B

BOILER

PLANT

BASEMENT

LAUNDRY

BASMENT

SUB

UP

UP

1 1/4" CW

2" HWR

4" HW

2" HWR

3/4" HWR

WH

2" CW

3" CW

2" CW

3" CW

2 1/2" HW

2" HWR

2" CW

2 1/2" HW

3" CW

1 1/4" HW

1 1/4" HWR

3/4" CW

3/4" HWR

3/4" HWR

3/4" CW

1/2" HWR

1 1/2" HWR

3/4" CW

3/4" HWR

3/4" HWR

1" HW

1" CW

1/2" HWR

3/4" CW

3/4" HWR

2 1/2" HW

1 1/4" HWR

3" CW

1 1/4" HW

1" HWR

3/4" HWR

3/4" HWR

4" HW

1 1/4" HW

1 1/4" CW

1/2" HWR

1 1/4" CW

1" HW

3/4" HWR

1/2" HWR

1/2" HWR

3/4" HWR

1" HW

1 1/4" CW

6" CW

3/4" HWR

3/4" HWR

1/2" HWR

3/4" HWR

3/4" CW

3/4" HW

4" HW

6" CW

1 1/4" CW

1/2" HWR

1" HWR

1/2" HWR

1 1/2" HWR

3/4" CW

3/4" CW

1 1/4" HWR

1/2" HWR

1 1/2" HWR

3/4" HWR

1/2" HWR

3/4" CW

3/4" HW

3/4" HWR

3/4" CW

3/4" HWR

3/4" HW

3/4" CW

1/2" HWR

3/4" HWR

3/4" CW

1" HWR

2" HWR

1 1/4" CW

3/4" CW

1" CW

1 1/4" HWR

3/4" HWR

1" HWR

3" CW

3" HW

3" HW

3" CW

1" HWR

3" CW

4" CW

3" CW

4" HW

4" HW

2 1/2" HW

2" CW

6" CW

2" HWR

2" CW

1" HW

3/4" HWR

3/4" CW

WATER SOFTNER

COLD WATER PUMP 1

COLD WATER PUMP 1

HOT WATER

CIRCULATING PUMPS

1 1/2" HWR

SB100 - LOCATION OF BLDG #1

(LAUNDRY BACKUP) HEAT

EXCHANGER (HEX-1) TO BE

REPLACED

EXISTING LAUNDRY HEAT

EXCHANGER (TO REMAIN)

M102

1,2,3,4

M101

HEX

GENERAL PLUMBING NOTES

· PLANS SHOW EXISTING CONDITIONS OF DOMESTIC

WATER PIPING THROUGHOUT THE FACILITY.

CONTRACTOR TO VERIFY LOCATIONS OF ZONE AND

BRANCH SHUTOFF VALVES SHOWN, AND UTILIZE FOR

SCHEDULED SHUTDOWNS, PERFORMING INSTALLATION

WORK FOR MIXING VALVES AND FAUCETS.

· EXISTING CEILING LOCATED SHUTOFF VALVES ARE

LABELS AS EXISTING, AND NEW VALVES ARE SHOWN

TO BE BOLD RED/BLUE LINES. ADD NEW VALVES

SHOWN.

· CONTRACTOR TO COORDINATE ALL WATER

SHUTDOWNS FOR VALVES INSTALLATIONS, AS WELL AS

FOR PHASED ZONE FAUCET AND TERMINAL TXV

INSTALLATIONS WITH COR. SHUTDOWNS NOT

COORDINATED WITH COR ARE PROHIBITED.

· CONTRACTOR TO RECORD AND CREATE A SCHEDULE

OF NEW AND EXISTING VALVES WITH LOCATION AND

AREA OF SERVICE SHUTOFF WHEN SERVICING

EXISTING SINKS AND LAVATORIES.

## X

INDICATES DOMESTIC WATER RISER

LOCATIONS. INTENDED TO HELP THE

CONTRACTOR TRACK DOMESTIC WATER FROM

FLOOR TO FLOOR FOR SHUTOFF AND SERVICE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

(605) 342-9470

JEFF REUPPEL

MECHANICAL/ELECTRICAL:

FOURFRONT DESIGN, INC.

46 HIBBARD WAY

HELENA, MONTANA 59601

(406) 441-4000 (EXT) 403

RAY DAWES

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JULY 15, 2020 RD PMRevisions: Date:

EE

BUILDING #1 -

SUB-BASEMENT FLOOR

PLAN

M 100

SUB-BASEMENT FLOOR PLAN

SCALE: 3/64" = 1'

M100

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

REMOVE EXISTING HEAT

EXCHANGER, STEAM PIPING,

CONDENSATE PIPING, DCW PIPING,

DHW PIPING AND DHWR PIPING

SHOWN IN DARK. PREP REMAINING

PIPING FOR CONNECTION TO NEW

AS SHOWN IN THESE PLANS

REMOVE EXISTING MAIN DHWR

RE-CIRCULATING PUMPS FOR

REPLACEMENT.

REMOVE EXISTING ONCOLOGY

DHWR RE-CIRCULATING PUMP FOR

REPLACEMENT.

EXISTING DOMESTIC WATER MIXING

STATION TO REMAIN.

REMOVE EXISTING HEAT

EXCHANGER, STEAM PIPING,

CONDENSATE PIPING, DCW PIPING,

DHW PIPING AND DHWR PIPING

SHOWN IN DARK. PREP REMAINING

PIPING FOR CONNECTION TO NEW

AS SHOWN IN THESE PLANS

REMOVE EXISTING MAIN DHWR

RE-CIRCULATING PUMPS FOR

REPLACEMENT.

REMOVE EXISTING ONCOLOGY

DHWR RE-CIRCULATING PUMP FOR

REPLACEMENT.

EXISTING DOMESTIC WATER MIXING

STATION TO REMAIN.

1" COND FROM

HEX-1 TO

EXISTING (x2)

NEW 3" DCW TO HEX-1

FROM EXISTING

P

HEX

P

P

NEW 3" 25# STEAM TO HEX-1 FROM

EXISTING (x2)

NEW 1-1/2" DHWR TO HEX-1 FROM

EXISTING

NEW 3" DHW SUPPLY FROM HEX-1 TO EXISTING

BLDG #1 DHW

CONNECT NEW PUMPS (P-1,2,3) TO

EXISTING DHWR PIPING.

M001

· EXISTING 3" DHW CROSSOVER BETWEEN EXISTING

LAUNDRY DHW AND BLDG #1 DHW TO REMAIN SO

THAT THE EXISTING LAUNDRY HEAT EXCHANGER

SERVES EXISTING BLDG #1 DHW WHILE NEW HEX-1 IS

BEING INSTALLED.

GENERAL PLUMBING NOTE

NEW 1-1/2" DHWR TO HEX-1 FROM

EXISTING

EXISTING CROSSOVER TO LAUNDRY

HEX TO REMAIN.

EXISTING DOMESTIC WATER MIXING

STATION TO REMAIN.

ET

ET

NEW 1-1/4" DCW W/ SOV

& UNION TO ET-2 FROM

EXISTING DCW

SERVING EXISTING

LAUNDRY HEAT

EXCHANGER

NEW 1-1/4" DCW TO ET-2

FROM NEW 3" DCW TO

HEX-1

P

HEX

P

NEW 3" 25# STEAM TO HEX-1 FROM

EXISTING (x2)

EXISTING CROSSOVER TO LAUNDRY

HEX TO REMAIN.

CONNECT NEW PUMPS (P-1,2,3) TO

EXISTING DHWR PIPING.

NEW 1-1/2" DHWR TO HEX-1 FROM

EXISTING

NEW 3" DHW SUPPLY FROM HEX-1 TO EXISTING

BLDG #1 DHW

NEW 3" DCW TO HEX-1

FROM EXISTING

1" COND FROM HEX-1 (x2) TO

EXISTING.

M001

NEW 3" DCW TO HEX-1

FROM EXISTING

NEW 1-1/2" DHWR TO HEX-1 FROM

EXISTING

EXISTING DOMESTIC WATER MIXING

STATION TO REMAIN.

P

M001

M001

· EXISTING 3" DHW CROSSOVER BETWEEN EXISTING

LAUNDRY DHW AND BLDG #1 DHW TO REMAIN SO

THAT THE EXISTING LAUNDRY HEAT EXCHANGER

SERVES EXISTING BLDG #1 DHW WHILE NEW HEX-1 IS

BEING INSTALLED.

GENERAL PLUMBING NOTE

ET

ET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

(605) 342-9470

JEFF REUPPEL

MECHANICAL/ELECTRICAL:

FOURFRONT DESIGN, INC.

46 HIBBARD WAY

HELENA, MONTANA 59601

(406) 441-4000 (EXT) 403

RAY DAWES

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JULY 15, 2020 RD PMRevisions: Date:

EE

BUILDING #1 - SUB-BASEMENT SB100

BUILDING #1 HEAT EXCHANGER (HEX-1)

ISOMETRIC DETAILS

M 101

BUILDING #1 EXCHANGER DEMOLITION ISO #1

SCALE: NTS

M101

BUILDING #1 HEAT EXCHANGER DEMOLITION ISO #2

SCALE: NTS

M101

BUILDING #1 NEW HEAT EXCHANGER (HEX-1) ISO #1

SCALE: NTS

M101

BUILDING #1 NEW HEAT EXCHANGER (HEX-1) ISO #2

SCALE: NTS

M101

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

1-1/2" DHWR

TO HEX-1

3" DCW FROM EXISTING

3" DHW TO EXISTING BLDG #1

3" STEAM TO

EXISTING HEAT

EXCHANGER

3" STEAM TO

EXISTING HEAT

EXCHANGER

EXISTING 6" STEAM

1 1/4" COND. TO EXISTING

AV

AV

3" STEAM

1 1/4" COND. TO EXISTING

SRV CONNECTION

DRV80 - DIGITAL

RECIRCULATION MIXING VALVE.

N.C. ACTUATED BUTTERFLY VALVE SAFETY SHUT-OFF

SRV CONNECTION

SRV CONNECTION

BUCKET

TRAP, TYP.

HEX

3" DHW TO EXISTING LAUNDRY

· PIPING AND COMPONENTS INSIDE THE GRAY DASHED

BOX ARE INCLUDED ON THE BASIS OF DESIGN HEAT

EXCHANGER SKID FROM THE FACTORY.

CONTRACTOR TO MINIMALLY PROVIDE ALL

COMPONENTS SHOWN IF ALTERNATE

MANUFACTURER IS PROVIDED.

· DARK, DASHED PIPING AND DARK COMPONENTS

OUTSIDE OF THE GRAY DASHED BOX ARE TO BE

FIELD SUPPLIED AND INSTALLED BY THE

CONTRACTOR.

GENERAL PIPING DETAIL NOTES

HEX

CROSSOVER VALVE

EXISTING LAUNDRY DHW

EXISTING

DHWR TO

LAUNDRY

HEX

P

P

P

EXISTING

DHWR FROM

BLDG#1 &

LAUNDRY

EXISTING

DHWR FROM

ONCOLOGY

EXISTING DHWR FROM

BLDG#1, LAUNDRY, &

ONCOLOGY

EXISTING DHW FROM EXISTING LAUNDRY HEAT EXCHANGER

DRAIN VALVE (TYP)

ET

PRESSURE GAUGE

W/ SOV (TYP)

ARMSTRONG

GP-2000 PRV SET

TO 15 PSIG

ARMSTRONG

GP-2000 PRV SET

TO 15 PSIG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

(605) 342-9470

JEFF REUPPEL

MECHANICAL/ELECTRICAL:

FOURFRONT DESIGN, INC.

46 HIBBARD WAY

HELENA, MONTANA 59601

(406) 441-4000 (EXT) 403

RAY DAWES

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JULY 15, 2020 RD PMRevisions: Date:

EE

BUILDING #1 - SUB-BASEMENT SB100

BUILDING #1 HEAT EXCHANGER (HEX-1)

PIPING DIAGRAM

M 102

BUILDING #1 EXCHANGER (HEX-1) PIPING DIAGRAM

SCALE: NTS

M102

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

DOWN

300 H.P.

BOILER #1

BOILER #2

300 H.P.

BOILER #3

300 H.P.

VENT TO ROOF

CONTROL PANEL FOR

ZONE CONTROL VALVES

EYE WASH

HC

AWAITING ASBUILTS

S

F

381 SF

308 SF

S

F

S

F

S

F

1203 SF

263 SF

776 SF

457 SF

287 SF

S

F

S

F

1132 SF

621 SF

S

F

S

F

S

F

862 SF 250 SF

S

F

102 SF

618 SF

367 SF293 SF

S

F

574 SF

S

F

S

F

734 SF

154 SF

S

F

S

F

CBF 2

CBF 14

C B

F

C B

F

CBF 8

CBF 10

C B

F

C B

A

C B

B

CBB 2

C B

B

C B

B

C B

B

CBD 2-1

CBD 1-1

CBB 5 CBB 4

C B

C

A

CBA 3

C B

F

CBA 1 CBA 2

C B

A

C B

F

CBF 3 CBF5

C B

F

CBF 7

CBF 9

CBF 12

C B

F

C B

B

C B

B

CBF 12

C B

B

ACCESS

PNL

TANK PUMPOUT CONNECTION

DECON SHOWER

HOLDING TANK

CONTAMINATED WATER

DIVERSION VALVE PIT

DWN

RAMP

CENTRIFUGAL

CHILLER

ABSORPTION

CHILLER

#6

#5

#4

#7

#4

#6

UNEXCAVATED

PLANTER

PARKING

PLANTER

PLANTER

PLANTER

MAIL ROOM

MAIL ROOM

ELECTRICAL

ENG

OFFICE

ENG

SHOP

IM

OFFICE

OFFICE

IM

OFFICE

SOILED LINEN

TELEPONE OPERATORS

BREAK ROOM

TELEPHONE

EQUIPMENT

STORAGE

RESTROOM

TELEPHONE EQUIPMENT

PHARMACY STORAGE

ACQUISITIONS

OFFICE

PSYCH.

OBSERVATION

PSYCH. OBSV.

SPS

STORAGE

SOILED

HOLDING

TELE/DATA

DUMB

WAITER

FAMILY ROOM

WHEEL CHAIR/

STRETCHER

AMMO

STORAGE

STORAGE

SMOKING ROOM

CANTEEN

STORAGE

BIO MED

OFFICE

IV

STORAGE

MEDICAL GAS

STORAGE

ER BREAKROOM

ACQUISITIONS

GENERAL

STORAGE

EMS

TRASHCART

WASH ROOM

EMS

CLEAN LINEN

EMS

STORAGE

ENG

PAINT SHOP

ENG

ELECTRICAL

SUB-STATION - 2

EMS

WAREHOUSE

ENG

AC SHOP

ENG

WELDING SHOP

ENG

ELECTRICAL

SHOP

ENG

PAINT SHOP

ENG

CARPENTER

SHOP

SWITCH GEAR ROOM #1

MEN'S

RESTROOM

IM

STORAGE

WAREHOUSE

LOADING DOCK

NUTRITION &

FOOD SERVICE

WAREHOUSE

SPS

MEDICAL

STORAGE

AQUISITIONS

SUPPLY

RECEIVING

MECHANICAL

EQUIPMENT RM

EMS

EQUIPMENT

STORAGE

IM

MULTIPURPOSE

EMS

OFFICE

EXAM ROOM

(INFECT. ISOL.)

EMERGENCY

GENERATOR

ELEVATOR

LOBBY

ELEVATOR

ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

FAST TRACK

S T

O R

A G

E

EXAM ROOM

TREATMENT ROOM 1

TRAUMA ROOM

TREATMENT ROOM 2

TREATMENT ROOM 3

TREATMENT ROOM 4

TREATMENT ROOM 5

TREATMENT

ROOM

TREATMENT

ROOM

MEDS

BREAKROOM/

LOCKERS

H.A.C.

NURSE

STATION

SLEEP

ROOM

MECH.

TOILET

RESTROOM/

SHOWER

STORAGE

TOILET

TOILET MALE

TOILET FEMALE

ELEC.

BUILDING 5

BOILER PLANT

CONTROL RM.

BREAK

TOILET

OFFICE

BUILDING 18

CHILLER PLANT

OFFICE

BIO MED

OFFICE

BIO MED

SHOP

X-RAY

MAINT

ELEC. CLO.

MECANICAL ROOM

MECANICAL ROOM

AREAWAY

BIO MED

RECEPTION

BIO MED

SHOP

OFFICE

NURSING OFFICE

EMS

SOILED

LINEN

LOGISTIC

STORAGE

PATHOLOGY

COOLER

HAZARDOUS

WASTE

STORAGE

ACQUISITIONS

OFFICE

ACQUISITIONS

GENERAL

STORAGE

CANTEEN

STORAGE

TELE/DATA

ENGINEERING STORAGE

ENGINEERING STORAGE

ENGINEERING STORAGE

ENGINEERING STORAGE

ENGINEERING STORAGE

UNEXCAVATED

ENG

STORAGE

EMS

WALK-IN

REFRIG.

T O

I L E

T

TELE/

DATA

ENG

MECHANICAL

CANTEEN STORAGE

FOOD SVC

STORAGE

FOOD SVC

DUMBWAITER

FOOD SVC

WALK-IN

FREEZER

FOOD SVC

WALK-IN

REFRIGERATOR

FOOD SVC

WALK-IN FREEZER

A F

G E

S T

O R

A G

E

EMS

RED BAG

FOOD SVC

WALK-IN

REFRIGERATOR

FOOD SVC

STORAGE

FOOD SVC

KITCHEN MISC.

FOOD SVC

STORAGE

FOOD SVC

WALK-IN

REFRIGERATOR

FOOD SVC

WAREHOUSE

IM

STORAGE

ENG

EQUIPMENT

STORAGE

ENG

EQUIPMENT

STORAGE

EMS

LINEN CHUTE

LOCKSMITH

ENG OFFICE

E L E

C T

R I C

C L O

S E

T

ENG

OFFICE

ENG

OFFICE

TOILET

ENG

STORAGE

OFFICE

ENG

BREAK ROOM

ENG

OFFICE

ENG

OFFICE

ENG

OFFICE

ENG

OFFICE

ENG

PLUMBING SHOP

CLOSET

EMERGENCY GENERATOR

EMS

STORAGE

ELEC.

CLOSET

EMS

WAREHOUSE

EMS

STORAGE

EMS

STORAGE

EMS

STORAGE

CLOSET

EMS

STORAGE

EMS

LAUNDRY

EMS

OFFICE

EMS

SOILED LINEN

IM

FOYER

EMS H.A.C.

EOC

STORAGE

ENG

PATHOLOGY

STORAGE

OFFICE

H.A.C.

EMS

STORAGE

EMS

CLEAN

LINEN

EXAM ROOM 7

EXAM ROOM 8

EXAM ROOM

(INFECT. ISOL.)

DECONTAMINATION

TOILET

P

A

T

I

E

N

T

R

E

C

E

I

V

I

N

G

HOLDING

POLICE

POLICE

LOCKERS

INTERVIEW

(TRIAGE)

H.A.C.

X-RAY ROOM

CLEAN LINEN

MEDS

NURSE STATION

FIRE PUMP

SUBSTATION #3

EXAM ROOM 6 EXAM ROOM 5

MECHANICAL

ELECRICAL

CLOSET

VENDING

ENTRANCE

T E

L E

D A

T A

MECHANICAL ROOM

TELE/DATA

WAITING

ELEC

FEC

FEC

F E

C

WATER

LAB

MEDICAL GAS

STORAGE

AMBULANCE ENTRANCE

OFFICE

ELECTRICAL

S T

O R

A G

E S

T O

R A

G E

EXIT

EXIT

STORAGE

MAIL ROOM

D R

E S

S I N

G

R

O O

M

SMOKE SHACK SMOKE SHELTER

(OUTSIDE

SMOKING)

(INSIDE SMOKING)

EXAM

ROOM

EXAM

ROOM

MED

EOC

STORAGE

BUILDING 5

UPSTAIRS OFFICE

BF144e

BF111

BF146

BF147

BF148

BF144a

BF144

BF142

BF141

B F q

BF145a

BF145b

BF145c

BF145d

BF145e

BF145f

BF145g

BF145g1

BF145h

BF145iBF145j

BF145k

BF145p

BF145m

BF145o

BF145l

BE102c

100a

100a1

100a1a

100a

BE100a

BE101

BE100

BE100b

BE100c

BE100d

BE102a

BE102b

BE102d

BE102

BF118

BF118a

BA119f

BA117

BA116

BA116a

BA127

BA118

BA119

BA119b

BA119c

BA121

BA122

BF106

BA119g

BA125

BA126

BA128

BA130

BA130b1

BA130b

BA123

BA124

BA130a

BA114

BA115a

BA115

BA115b

BA113

BA112e

BA112

BA111

BA112a

BA112b

BA112c

BA112d

BA112e1

BA110

BA108

BA109

BA106

BA107a

BA107

BA105a

BA105b

BA105

BA105d

BA105c

BB133

BB134

BA104BA103

BA102

B A

B A

BA131

BB135

BB100

BB102

BB103

BB104

BB106

BB105

BB105a

BB107

B B

BB108

BB108d

BB108a BB108c

BB109

BB110

BB133

BB110a1

BB110a

BB132

BB132a

BB131

B B

B B

BB128

BB129

BB130

BB126

BB127

BD100k

BD100l

BD100o

BD100n

BD100m

BD100h

BD100i

BD100g

BD100d

BD100a

BD100

BD100c

BD100b

BD100e

BD100f

BD100j

BB111BB113

BB115

BB114

BB116

BB117

BB118

BB119

BB120 BB121

BB122

BB121a

BC100

BC100a

BC100b

BF108

BF107

BF114

BF115

BF130

BF131

BF132

BF133

BF129

BF129a

BF128

BF125b

BF126

BF125

BF127

BF127a

BF153

BF154

BF124

BF123

BF122

BF121

BF119

BF120

BF135

BF134

BF136

BF137 BF138

BF113

BF112

BF139 BF140

BF155

BF150

BF151

BD107

BF117

BF116

BF149

BF128

BF145n

BF145

BF128

BB107a

100a1

BE102e

BF153

B F a

B F b

B B a

BF144b

BF144c

BF144d

CHASE

STAIR #8

STAIR #7

ELEV. P-12

ELEV. P-11

P-10

ELEVATOR

P-9

ELEVATOR

ELEVATOR

P-8

ELEVATOR

P-7

CHASE

STAIR #1

DN

UP

STAIR #2

STAIR #3

P I P

E

C

H A

S E

AREAWAY

AREAWAYAREAWAY

AREAWAY

STAIR #3

AREAWAY

STAIR #4STAIR #4

C O

N C

R

A M

P C

O N

C

R

A M

P

AREAWAY AREAWAY

ELEV. P-3

ELEV. P-4

ELEV. P-5

ELEV. P-6

ELEV. P-2

ELEV. P-1

STAIR 10

STAIR #6

MAIL

DROP

C O

N C

R E

E

B

A

M

H

E I G

H T

F F

T

O

A

P P

R O

X

A

F

F

C O

N C

R E

A

M

H

E I G

H T

F

F

T

O

A

P P

R O

X

A

F

F

C O

N C

R E

A

M

H

E I G

H T

F

F

T

O

A

P P

R O

X

A

F

F

CONCRETE BEAM HEIGHT: F.F. TO APPROX. 58" A.F.F.

STAIR

#15

U P

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% CONSTRUCTION

DOCUMENTS

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

21 4 5 6 7 8 9

PhaseARCHITECT A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

(605) 342-9470

JEFF REUPPEL

MECHANICAL/ELECTRICAL:

FOURFRONT DESIGN, INC.

46 HIBBARD WAY

HELENA, MONTANA 59601

(406) 441-4000 (EXT) 403

RAY DAWES

CORRECT THE DOMESTIC HOT

WATER VA LEGIONELLA DIRECTIVE

AND LATENCY DEFICIENCIES

OKLAHOMA CITY, OKLAHOMA

VA259-16-D-217

Project Director

JULY 15, 2020 RD PMRevisions: Date:

EE

BUILDING #1 -

BASEMENT FLOOR KEY

PLAN

M 200

BASEMENT FLOOR KEY PLAN PLAN

SCALE: 1/32" = 1'

M200

M201

M202

AutoCAD SHX Text 3'x3'

AutoCAD SHX Text 2'x2'

AutoCAD SHX Text 19"x19"

AutoCAD SHX Text 19"x19"

AutoCAD SHX Text 30"x60"

AutoCAD SHX Text 2'x2'

AutoCAD SHX Text 3'x3'

AutoCAD SHX Text 15"x15"

AutoCAD SHX Text 20"x18"

AutoCAD SHX Text 3'x3'

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text No. 19926PE

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

DOWN

EYE WASH

AWAITING ASBUILTS

S

F

381 SF

308 SF

S

F

S

F

S

F

1203 SF

263 SF

776 SF

457 SF

287 SF

S

F

S

F

1132 SF

S

F

S

F

367 SF293 SF

S

F

574 SF

S

F

S

F

734 SF

154 SF

CBF 2

CBF 14

C B

F

C B

F

CBF 8

CBF 10

C B

F

C B

A

C B

B

C B

B

CBA 3

C B

F

CBA 1 CBA 2

C B

A

C B

F

CBF 3 CBF5

C B

F

CBF 7

CBF 9

CBF 12

C B

F

CBF 12

TANK PUMPOUT CONNECTION

DECON SHOWER

HOLDING TANK

CONTAMINATED WATER

DIVERSION VALVE PIT

DWN

RAMP

CENTRIFUGAL

CHILLER

ABSORPTION

CHILLER

#6

#5

#4

#7

#4

#6

PLANTER

PARKING

PLANTER

PLANTER

PLANTER

MAIL ROOM

MAIL ROOM

ELECTRICAL

ENG

OFFICE

ENG

SHOP

IM

OFFICE

OFFICE

IM

OFFICE

SOILED LINEN

TELEPONE OPERATORS

BREAK ROOM

TELEPHONE

EQUIPMENT

STORAGE

RESTROOM

TELEPHONE EQUIPMENT

PHARMACY STORAGE

ACQUISITIONS

OFFICE

PSYCH.

OBSERVATION

PSYCH. OBSV.

SPS

STORAGE

SOILED

HOLDING

TELE/DATA

DUMB

WAITER

FAMILY ROOM

WHEEL CHAIR/

STRETCHER

AMMO

STORAGE

STORAGE

SMOKING ROOM

CANTEEN

STORAGE

BIO MED

OFFICE

IV

STORAGE

MEDICAL GAS

STORAGE

ER BREAKROOM

ACQUISITIONS

GENERAL

STORAGE

EMS

TRASHCART

WASH ROOM

EMS

CLEAN LINEN

EMS

STORAGE

ENG

PAINT SHOP

MECHANICAL

EQUIPMENT RM

EXAM ROOM

(INFECT. ISOL.)

EMERGENCY

GENERATOR

ELEVATOR

LOBBY

ELEVATOR

ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

FAST TRACK

S T

O R

A G

E

EXAM ROOM

TREATMENT ROOM 1

TRAUMA ROOM

TREATMENT ROOM 2

TREATMENT ROOM 3

TREATMENT ROOM 4

TREATMENT ROOM 5

TREATMENT

ROOM

TREATMENT

ROOM

MEDS

BREAKROOM/

LOCKERS

H.A.C.

NURSE

STATION

SLEEP

ROOM

MECH.

TOILET

RESTROOM/

SHOWER

STORAGE

TOILET

TOILET MALE

TOILET FEMALE

ELEC.

BIO MED

OFFICE

BIO MED

SHOP

X-RAY

MAINT

ELEC. CLO.

MECANICAL ROOM

MECANICAL ROOM

AREAWAY

BIO MED

RECEPTION

BIO MED

SHOP

OFFICE

NURSING OFFICE

EMS

SOILED

LINEN

LOGISTIC

STORAGE

PATHOLOGY

COOLER

HAZARDOUS

WASTE

STORAGE

ACQUISITIONS

OFFICE

ACQUISITIONS

GENERAL

STORAGE

CANTEEN

STORAGE

TELE/DATA

ENGINEERING STORAGE

ENGINEERING STORAGE

ENGINEERING STORAGE

ENGINEERING STORAGE

ENGINEERING STORAGE

EMS

WALK-IN

REFRIG.

T O

I L

E T

TELE/

DATA

FOOD SVC

STORAGE

FOOD SVC

DUMBW…