Amendment 0003 - OKC Hotwater RFI List responses 06-29-23.xlsx
XLSX spreadsheet 58 KB Posted
- Attached to
- Z2DA--635-18-108 - Correct Domestic Hot Water Distribution System Deficiencies (VA-22-00087870)
- Solicitation number
- 36C25923R0072
About this file
This document is a statement of work for a construction services contract opportunity to correct domestic hot water distribution system deficiencies at the Oklahoma City VA Medical Center. The scope of work includes demolition, architectural, interiors, and FF&E work to improve the domestic hot water system and address Legionella deficiencies. Specific tasks involve replacing steam to water heat exchangers, pumps, valves, and adding new recirculation piping and water monitoring equipment. The contractor must follow all applicable codes and standards, and coordinate work with the COR to minimize facility impacts. The period of performance is anticipated to be 240 days with a 30 day solicitation period. The selected contractor will be responsible for managing all associated labor, equipment, materials and inspection costs to meet the project requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Name: | Correct Domestice Hot Water at Oklahoma City VAMC |
| Project # | 635-18-109 |
| COR: | Cody Cooper |
| Date | 6/29/23 | ||||||
| Question No. | Reference. No. | Area | Description / Question | Date Submitted | Response (From) | Status | Date Completed |
| 1 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | There are no balancing valves shown being installed on the existing returns we are to tie new returns into. Without these there is no way to balance the hot water return system correctly. This will lead to dead cold lines, and defeating the purpose of this project. | 6/12/23 | (FFD): Concur, install balancing valves in new and existing hot water returns to balance the new hot water return. | Open | 6/15/23 |
| 2 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | In reference to PRFI 3. These foot pedal valves have stops made internal to the foot pedals. They cannot be used for feeding a faucet. The pipes coming out of the walls feeding the foot pedals arc on the floor, and 2" apart. There is no possible way to reuse the existing stops. To install new stops these walls will have to be opened and the hot and cold water rough in will need to be modified. We would also need to install shut off valves in the ceiling at each location to prevent shutting wings of the hospital down for long intervals of time needed to change this rough in. There are hundreds of these locations. In addition, the majority of the foot petal valves are in tile walls. | 6/12/23 | (VA): Concur, modify walls accordingly, install shut off valves and lastly install new stops. (FFD): Concur with VA, in addition, provide stainless steel cover similar to showers to avoid tile replacement. | 6/12/23 | |
| 3 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | In reference to PRFI 2. The intent may be to access the walls behind the shower valves, but the majority of these are back to back and cannot be accessed without removing one side of the shower. The back side of the shower mixing valves are either inaccessible or in tiled walls. We would also need to install shut off valves in the ceiling at each location to prevent shutting wings of the hospital down for long intervals of time needed to change this water rough in | 6/12/23 | (VA): Concur. (FFD): Concur, install shutoff valves, replace mixing valves, per PRFI 2 updated response 05-09-23, provide stainless steel cover to avoid tile replacement. | 6/12/2023 6/15/2023 | |
| 4 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | In reference to PRFI 12. We take exception to this answer. There is no possible way to run off a hot water supply line, make a loop around an area feeding new faucets, and tie it back onto the same supply line you are feeding the sinks with. This will lead to cold stagnant lines defeating the purpose of this project. These need to return back to the location of the closest hot water return line. A lot of these return risers are 100' feet or more away installed in utility shafts. | 6/12/23 | (FFD): PRFI 12 updated response 05/09/23, install small recirculation pump (approximate qty x30) in referenced return lines to provide constant branch circulation back to existing circulated hot water supply. | 6/15/23 | |
| 5 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | PRFI 13 addressed anti ligature faucets, and a basis of design would be provided. In this same ward there are anti ligature shower mixing valves to be replaced. They do not currently make an anti-ligature shower valve with automatic drain down like the multiple other shower mixing valves. They are in current design stage but won't be available for 18 months. Can we assume this will work into the schedule? | 6/12/23 | (FFD): Anti ligature fixtures basis of design provided in addendum #1 dated 05-22-23. | 6/15/23 | |
| 6 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | The current hydronic pumps scheduled to be replaced in building 19 are being replaced with a much smaller pump than what is currently there now. The pumps there now appear to be in very good shape maybe recently replaced. We just want to verify the new pumps are sized correctly and that is what the maintenance director want to do? | 6/12/23 | (FFD): VA to confirm if hydronic pumps in Building 19 GR106 have been replaced since project submittal. | They have not been replaced. | 6/15/23 |
| 7 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | All of the current heat exchangers are being monitored by the BAS. There is nothing in the design documents or scope of work telling us to reconnect these. | 6/12/23 | (FFD): New heat exchagers to be reconnected to existing BAS. | 6/15/23 | |
| 8 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | The crossover valve and related piping at the laundry heat exchanger (that will be feeding the heat exchanger we are to replace) looks to be close to failure. This should be addressed as a part of this project. | 6/12/23 | (VA): Concur. (FFD): Contractor to coordinate extent of crossover valve and piping replacement with the VA. | 6/12/2023 6/15/2023 | |
| 9 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Electrical | All of the new heat exchangers are being controlled with an on board *smart* controller which requires electrical power. The existing heat exchangers did not have this feature. Electrical power will have to be provided. | 6/12/23 | (VA): Concur (FFD): Refer to sheet E100, detail number 5, 6, 7, and 8. These call for power to be added for the heat exchangers. | 6/12/2023 6/15/2023 | |
| 10 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Spec | When will the rest of the spec's be uploaded into SAM.GOV? Only division 00 and 01 of the table of contents are included. | 6/12/23 | The updated specs are attached. | ||
| 11 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Spec | The specification package issued with the solicitation only contains administrative specifications ending in Div 01 74 19. Please provide the remainder of the technical specifications. | 6/12/23 | The updated specs are attached. | ||
| 12 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Spec | Once the specifications are updated does the Government intend to entertain further RFI’s that may be generated as a result of the contents of those specifications? | 6/12/23 | Yes | ||
| 13 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Demo | Can we cut access panels into the existing hard pan ceiling? | 6/12/23 | (VA): Yes, with approval from OKC VAMC and approved submittal of access door. | 6/12/23 | |
| 14 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | Note 5 throughout the plans require the addition of a new re-circulation line and balancing valve. The valve symbol used at these locations is for a shut off valve per the Plumbing /Piping Symbols. No balancing valve is indicated. Note 7 does indicate circuit setters or MBV (manual balancing valve) in a few locations that are symbolled in accordance with the Plumbing /Piping Symbols. Please advise. | 6/12/23 | (FFD): As note 5 indicates, balancing valves are inteded to be installed. | 6/15/23 | |
| 15 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | There is no detailed reference for the shower drain replacement. Please provide an installation detail to clarify the extent of the shower drain replacement. | 6/12/23 | (FFD): There is no shower drain replacement in this prjoect. | 6/15/23 | |
| 16 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | There is no detailed reference for water valve or balancing valve installations. Please provide an installation detail. | 6/12/23 | (FFD): Contractor to install valves per manufacturer and code written instructions. | 6/19/23 | |
| 18 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | It was noted during the site visit that some faucets are going to require removal of foot pedals but this is not noted anywhere in the drawings. For bidding purposes, will you please provide locations or at least a quantity (allowance) for foot pedal removals? | 6/12/23 | (FFD): Contractor to use an allowance of 350 foot pedal removals for bidding. | 6/19/23 | |
| 19 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | General | During the site visit it was mentioned that areas of the hospital will be relocated/cleared so that the awarded contractor can complete work. Can you provide more information on how many rooms will be available at one time to complete our work? | 6/12/23 | (VA): No, as it depends on patient index and Pentad approval. | 6/12/23 | |
| 20 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | At all other VA Medical Centers, they have ruled out the use of ProPress. Please confirm if propress is allowed for this project? (Propress is mentioned on Mechanical Note M-000) | 6/12/23 | (VA): A/E to confirm that its not against the TIL or Master Spec to use Propress. (FFD): At time of project submittal, mechanical press fittings were allowed by the VA Master Spec. Mechanical press fittings are no longer allowed by the current VA Master Spec. | 6/12/2023 6/15/2023 | |
| 21 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | General | For past performance references, may we submit projects that are substantially completed and have a CPARS rating? (Substantially completed meaning 90%+ completion) | 6/12/23 | (VA): Must be completed project. | 6/12/23 | |
| 22 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | For bidding purposes, are we to assume all ceiling dead-legs are accessible through a drop ceiling and that demo of hard ceiling will not be required? | 6/12/23 | (VA): No, ceiling in the controlled access areas, like shown during site walk are all hard ceiling. | 6/12/23 | |
| 23 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | Drawing number E-200 appears to call out a new water monitoring system(s) from Phigenics but its unclear the extent of this scope. Please clarify if we are to provide new water monitoring stations to replace existing and how many? | 6/12/23 | (FFD): New water monitoring station to be installed in GR106 per sheet E1300. No existing water monitoring in building #19. Sheet E200 and E300 call out existing water monitoring stations to remain. Sheets E200 through E1300 show new and existing sensor and wireless module locations. All new sensor locations shown to wire to new wireless module locations. New wireless modules to use existing site AT&T wireless communication and be added to the existing site monitoring system. | 6/15/23 | |
| 24 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | If we are to provide new water monitoring stations, are the requirements/capabilities to match existing? | 6/12/23 | (FFD): Per sheets E200 through E1300, new water monitoring station in building #19 and new water monitoring equipment throughtout buildings #1 and #19 to be purchased from and installed by Phigenics and integrated into the existing Phigenics monitoring system at the site. | 6/15/23 | |
| 25 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | For bidding purposes, please quantify the locations and quantity of asbestos that will need to be abated or provide an allowance that contractors should carry. | 6/12/23 | (VA): Will include asbestos drawings with this RFI. | 6/12/23 | |
| 26 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | For bidding purposes, please quantify the locations and quantity of lead-based paint that will need to be abated or provide an allowance that contractors should carry. | 6/12/23 | (VA): A/E? Not sure of lead based paint areas. (FFD): See answer to #46 in this list. | 6/19/23 | |
| 27 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | The NAICS for this solicitation 237110 is described as construction of sewer lines, mains, pumping stations, treatment plants and storage tanks. This does not appear to represent the work outlined in the project documents. We request contracting please consider reassigning the NAICS to 238220 as this is the NAICS used on most of the other VA legionella or domestic water upgrade projects of similar size and scope. | 6/12/23 | NAICS Code will be updated to show 238220. | ||
| 28 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | General | Will a tax-exempt certificate be provided to the awarded contractor? | 6/12/23 | We can provide a tax-exempt number. | ||
| 29 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | General | Do we expect all work to be accomplished during normal business hours or should we plan for nights and/or weekends? | 6/12/23 | (VA): Normal working hours | 6/12/23 | |
| 30 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | The solicitation documents state to submit EMR and OSHA information. Should this be included with the Past Performance proposal or the Price Proposal? | 6/12/23 | Submit with past performance. | ||
| 31 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Spec | Spec 01 35 26 – 12: Can the Prime Contractor Superintendent dual role as the SSHO? | 6/12/23 | (VA): Yes | 6/12/23 | |
| 32 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Spec | The specification package provided on SAM only includes division 1. We are missing Div 2, 8, 9, 22, 23, 25 , 26 and 27. Please provide | 6/12/23 | Duplicate of 10 | ||
| 33 | Pg. 1_Questions and Answers for Correct Domestic Hot Water Site Prep | Demo | If we are unable to access the showers from the back wall, will a steel panel be acceptable for repair or will tile need to be matched as close as possible? | 6/12/23 | (VA): Access door will suffice with approval from COR and Submittal Approval. | 6/12/23 | |
| 34 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Spec | Can the superintendent, SSHO, and/or QCM be the same person? Or must these be separate individuals? | 6/12/23 | Duplicate of 31 | ||
| 35 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | Please provide an asbestos report with quantities for bidding purposes | 6/12/23 | Duplicate of 25 | ||
| 36 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Spec | The specifications only include specs 00 01 15 List of Drawing Sheets through 01 74 19 Construction Waste Management. Specification Divisions 02 Existing Conditions through 27 Communications identified in the table of contents are not included in the document. Please provide the additional applicable specifications | 6/12/23 | Duplicate of 10 | ||
| 37 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | HVAC | All the current heat exchangers are being monitored by the BAS. There is nothing in the document telling us to reconnect these. Please clarify whether these are to be disconnected and reconnected as part of this contract | 6/12/23 | Duplicate of 7 | ||
| 38 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | The Contract documents do not depict balancing valves shown being installed on the existing returns we are to tie new returns into. Without new balancing valves there is no way to balance the hot water return system correctly. This will lead to dead cold lines, and defeating the purpose of this project. Please provide provisions to install new balancing valves for proper system function. | 6/12/23 | Duplicate of 1 | ||
| 39 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | In reference to PRFI 12. We take exception to this answer. There is no possible way to run off a hot water supply line make a loop around an area feeding new faucets and tie it back onto the same supply line you are feeding the sinks with. This will lead to cold stagnant lines defeating the purpose of this project. These need to return to the location of the closest hot water return line. A lot of these return risers are 100' feet or more away installed in utility shafts. Please provide documents depicting action to be taken by the contractor to address this. | 6/12/23 | Duplicate of 4 | ||
| 40 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | PRFI 13 addressed anti ligature faucets, and a basis of design would be provided. In this same ward there are anti ligature shower mixing valves to be replaced. They do not currently make an anti-ligature shower valve with automatic drain down like the multiple other shower mixing valves. They are in current design stage but wont be available for 18 months. Can we assume this will work into the schedule? | 6/12/23 | Duplicate of 5 | ||
| 41 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | The current hydronic pumps scheduled to be replaced in building 19 are being replaced with a much smaller pump than what is currently there now. If possible specify the difference between existing to new. Please verify the new pumps are sized correctly to supply the existing system, allow for system modifications, and take over primary use once the original pumps are replaced. | 6/12/23 | Duplicate of 6 | ||
| 42 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing | In the Northwest corner of south end of the first floor, all of the "new hot water return lines" are tying back into the hot water supply in this area. This doesn’t provide a way for there to be constant circulation of the system. which means all the water in this section of piping will eventually cool down into the temperature range where legionella grows, defeating the purpose of the project at large. There are more locations like this throughout the project. Please provide where this is witnessed. There are no cardinal directions on the drawing set. | 6/12/23 | Duplicate of 4 | ||
| 43 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Electrical | All the new heat exchangers are being controlled with an on board *smart* controller which requires electrical power. The existing heat exchangers did not have this feature. Will electrical power have to be provided as part of this contract? | 6/12/23 | Duplicate of 9 | ||
| 45 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Arch | If disturbed partitions are constructed of wall types different than steel studs and gypsum, please confirm if contractor is allowed to restore disturbed partitions with non-structural metal framing & gypsum/moisture board per finish needs. Simply stating “Match Existing” is insufficient direction unless wall type and construction is provided at each partition to be disturbed. | 6/12/23 | (FFD): Contrctor is allowed to restore disturbed partitions per finish needs if wall type is different than steel stsuds and gypsum. | 6/19/23 | |
| 46 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Arch | Please provide the referenced Report in Drawing HA100 Lead-Based Paint and Paint Containing Lead Note 5. “Hazardous building materials inspection report by AMI Environmental, Dated May 28, 2020, for information concerning the presence of LBP, lead containing materials, and PCL in project areas, or newer report. Please also identify quantities of Lead-Based Paint to be abated. If quantities are not provided for bidding purposes, please provide a separate CLIN Alternate to establish Lead-Based Paint abatement unit pricing of X Sq. ft. and a single mobilization. | 6/12/23 | (FFD): Referenced report included in specification section 028213.12. Lead based paint identified in 11 instances. 5 red valves in B118 and 6 brown valves in B155. Contractor to plan abatement accordingly. | 6/19/23 | |
| 47 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | General | To properly plan infection control requirements at the facility two (2) items need to be identified; 1. Construction Activity Type & 2. Patient Risk Groups. The drawings currently provide item 1 but fail to provide sufficient information related to item 2. Patient Risk Groups. Please provide the facility layout with identified Patient Risk Groups to determine what areas will require Class I, II, III, and IV Infection Control. | 6/12/23 | (FFD): VA/COR to provide infectious control classifications for project areas. | 6/19/23 | |
| 48 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Arch | The project will require many areas to be set up under infection control & temporary occupancy. To develop proper work zones and schedule rooms accordingly, egress routes need to be considered. Please provide facility Life Safety Drawings to properly sequence the project work zones to minimize facility impact. | 6/12/23 | (FFD): VA/COR to provide current life safety drawings. Work to be performed above ceilings in patient care and patient access areas will require infection control containment in accordance with specification section 013526. | 6/19/23 | |
| 49 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | It is understood the facility is an active hospital with many ongoing operations. To properly bid the project, hours of operation need to be identified. For instance, if working near or in a surgical suite, contractor will need to schedule work off hours and or over weekends during premium time. Other sensitive areas requiring premium time may be lab spaces, surgical suites, pharmacy & pharmacy storage, canteen services, in patient wards, imaging, dialysis treatment, etc. Please provide main hospital areas with sensitive operations requiring off hours and weekend effort | 6/12/23 | (FFD): Contractor to be prepared to work during off hours in the sensitive areas listed. Coordinate schedule with the COR. | 6/19/23 | |
| 50 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | Asbestos Note 2 the last paragraph states “Gaskets are concealed in valves and are inaccessible for sampling. Gaskets are ASSUMED as ACM unless sampled, analyzed, and determined to be non-Asbestos”. Please clarify for bidding purposes the following: 1. is Contractor to assume all gaskets are to be treated as ACM and glovebag accordingly. If Contractor is to assume all gaskets are ACM, please provide the quantities of gaskets anticipated to be abated on the project. Or, is Contractor to assume gaskets are not ACM, perform an ACM test to determine if gaskets are in fact ACM. |
a. If test results are negative, gaskets will be removed as normal demolition.
| b. If test results are positive a post-award contract modification will be required to abate the additional ACM. | 6/12/23 | (FFD): Contractor to perfrom ACM test to determine if gaskets are ACM. If negative, remove as normal demolition. If positive, post-award modification to be awarded on individual basis for abatement. | 6/19/23 | |||||||
| 51 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Bidding | Contract Documents as they stand only identify how ACM is to be handled if encountered on the project. For bidding purposes, please clarify the following: 1. Provide quantities of ACM anticipated to be removed on the project; # of fittings, LF of insulation, SF of ACM plaster/mud compound, etc. a. If quantities are not provided, please provide a separate CLIN alternate to establish Asbestos Abatement unit pricing and a single mobilization. 2. If ACM quantities are not provided, should contractor retain ACM testing services to be conducted on the project? a. If yes, quantities are not provided and ACM is discovered on the project, a post-award contract modification will be required to abate the additional ACM. | 6/12/23 | (FFD): ACM testing to be performed on a case by case basis on potential ACM post contract award. | 6/19/23 | ||||
| 52 | Pg. 2_Questions and Answers for Correct Domestic Hot Water Site Prep | Plumbing/Electrical | The basis of design Sloan EBF-751 appears to have power requirement options of Battery, 6VDC (plug adapter sold separately), 6VDC ganged adapter kit (up to 6 units) (sold separately), 24VAC box transformer (up to 3 units) (sold separately), and optional turbine energy harvesting. Please clarify if the new P-401 plumbing fixture can operate by batter, 6VDC plug, 6VDC ganged, 24VAC box, or turbine energy harvesting. If the response is other than battery, please provide electrical drawings where power supply is coming from. | 6/12/23 | (FFD): TUR in faucet model number indicates battery power with the turbine. All powered fixtures requested to be battery powered by the VA due to intermitent power bumps to the building. VA has had problems with having to reset wired fixtures after power bumps. | 6/15/23 | ||||
| 53 | RFI Correct HW Email dtd 6/22/23 | HVAC | Is there a written specification for the domestic hot water heat exchangers? | 6/22/23 | (FFD): Yes, VA TIL 22 35 00, Domestice Water Heat Exchangers, dtd 09-01-20. | 6/26/23 | ||||
| 54 | RFI Correct HW Email dtd 6/22/23 | Plumbing | Question #12 in the pre-construction RFI’s brings up a serious design flaw that was not answered correctly. The “recirculation line” will not recirculate the water without a dedicated recirculation line. We agree with the recommendation in the RFI to add the recirculation line and ask for those to be added to the plans. | 6/22/23 | Ref Question 4 response above | 6/26/23 | ||||
| 55 | RFI Correct HW Email dtd 6/22/23 | Plumbing | This solicitation is for installing new mixing valves, faucets, pumps and monitoring to the OKC VA Complex water supply system. There are approximately 1,000 sinks to be retroffitted in some way. The site walk thru visit of June 3rd photos shows hands free operation foot pedals mounted on the wall or extending out of a base cabinet toe kick space. Will the foot pedals be totally removed from all sinks or will the mixing valve unit installed above to work in conjunction with the pedals? It is unclear how many of these units are mounted in wood base cabinets. If the foot pedals are to be removed, the woodwork inside the cabinets will need to be restoered to the VA's approval. We need to know how many of these sinks are in wood base cabinet. | 6/22/23 | IRT item 55, of the 1000+ sinks we do not have an accurate count on each type. As stated, some are in a cabinet, some are a pedestal type, etc. To quantify each type would be a guestimate at best. We can try to review any pictures on hand to determine a more accurate count, but this is a tough question. Stated in Q18, FFD stated a planning factor of 350-foot pedal removals. | 6/26/23 | ||||
| 56 | RFI Correct HW Email dtd 6/22/23 | Plumbing | You are correct, there is no mention of chlorination or testing within the project. Chlorination and testing are typically required to assure proper sanitation is achieved before a new or modified domestic water system is placed into service. At the Engineers discretion the standard procedure or requirement could be modified if the work being performed at an existing facility. A detailed procedure should be provided indicating how and where new pipe systems and connections to existing piping should be chlorinated. | 6/22/23 | The MEP Tech Specifications that were submitted w/in division 22100, Facility Water Distribution. These specs are dated 07-15-2020 for reference. Section 3.2, TESTS, B. states: “Potable Water System: Test after installation of piping and domestic water heaters, but before piping is concealed, before covering is applied, and before plumbing fixtures are connected. Fill systems with water and maintain hydrostatic pressure of 1035 kPa (150 psig) gage for two hours. No decrease in pressure is allowed. Provide a pressure gage with a shutoff and bleeder valve at the highest point of the piping being tested. Pressure gauge shall have 1 psig increments.” Section 3.3, Sterilization A. & B. state: A. | “After tests have been successfully completed, thoroughly flush and sterilize the interior domestic water distribution system in accordance with AWWA C651.” B. | “Use liquid chlorine or hypochlorite for sterilization.” | 6/26/23 |