This document contains a presolicitation notice and construction drawings for a renovation project at a Department of Veterans Affairs medical center. The notice provides details for the full solicitation to be posted on or after October 21, 2020, seeking proposals to renovate the existing Canteen food court and offices at the Oklahoma City VA Medical Center. The $1-2 million project aims to centralize and enlarge the dining and food court area, relocate offices, update HVAC and electrical systems, add emergency power, and install new finishes. The construction drawings provide the existing conditions and proposed renovation plans. The solicitation will be a total SDVOSB set-aside awarded by the VA Veterans Health Administration VISN 19.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA SIGNATURE BLOCK
JOHN WILSON, PROJECT MANAGER, COR __________________________________________________________
ALDO FRED GIRANY, CONTRACTING OFFICCER _____________________________________________________
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
N O
T F O
R
C
N S
TR
U
C
TIO
N
C U s e rs \a s c h a e w e \D o c u m e n ts
\1 .1
.0
V
A O k la h o m a
C it y C a n te e n
R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m
.r v t
/2
/2
:0
:1
P
M
GI000
COVER SHEET
GUIDON DESIGN, INC
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317.800.6388
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
RENOVATE CANTEEN FOOD &
OFFICE SUITE
OKLAHOMA CITY, OK
635-16-104
MAIN BLDG.
JOHN WILSON, COR
04/27/2020 AWS ELB
BID DOCUMENTS
FULLY SPRINKLERED
OKLAHOMA CITY VA MEDICAL CENTER
OKLAHOMA CITY, OK
BID DOCUMENTS
RENOVATE CANTEEN FOOD & OFFICE SUITE
635-16-104
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI000 COVER SHEET
GI101 OVERALL GROUND FLOOR EXISTING LIFE SAFETY PLAN
GI102 LIFE SAFETY PLAN
GI103 PHASING PLAN - PHASE 1
GI104 PHASING PLAN - PHASE 2
GI105 PHASING PLAN - PHASE 3
GI106 PHASING PLAN - PHASE 4
GI107 PHASING PLAN - PHASE 5
DEMOLITION
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 REFLECTED CEILING DEMOLITION PLAN
ARCHITECTURAL
AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AS002 ARCHITECTURAL STANDARDS
AS101 FIRST FLOOR ARCHITECTURAL PLAN
AS111 FIRST FLOOR REFLECTED CEILING PLAN
AS501 INTERIOR ELEVATIONS AND DETAILS
AS502 INTERIOR ELEVATIONS AND DETAILS
AS503 INTERIOR ELEVATIONS AND DETAILS
AS601 DOOR SCHEDULE
AS802 INTERIOR SECTIONS AND DETAILS
AF101 FINISH PLAN
AQ101 EQUIPMENT FLOOR PLAN
ELECTRICAL
ED101 PARTIAL GROUND FLOOR PLAN - ELECTRICAL DEMOLITION
ES101 ELECTRICAL LEGEND
ES201 PARTIAL GROUND FLOOR PLAN - LIGHTING
ES301 PARTIAL GROUND FLOOR PLAN - POWER
ES401 PARTIAL GROUND FLOOR PLAN - SYSTEMS
ES501 PARTIAL GROUND FLOOR PLAN - ELECTRICAL INTERCONNECTIONS
ES601 POWER DISTRIBUTION RISER DIAGRAM
ES701 LIGHT FIXTURE SCHEDULE AND DETAILS
ES801 TELECOMMUNICATION DETAILS
ES802 ELECTRICAL DETAILS
MECHANICAL
MH001 MECHANICAL LEGEND AND NOTES
MD101 PARTIAL GROUND FLOOR PLAN - MECHANICAL DEMOLITION
MH201 PARTIAL GROUND FLOOR PLAN - MECHANICAL
MH301 MECHANICAL DETAILS
MH401 MECHANICAL SCHEDULES
PLUMBING
PD101 PLUMBING LEGENDS, NOTES, DETAILS, AND SCHEDULES
PL001 PARTIAL GROUND FLOOR PLAN - PLUMBING DEMOLITION
PL201 PARTIAL GROUND FLOOR PLAN - PLUMBING
FIRE PROTECTION
FX101 PARTIAL GROUND FLOOR PLAN - FIRE PROTECTION
Contact:Contact: Contact:
CMTA CONSULTING
ENGINEERS, INC.
Andy Meyers
Project Manager
MECHANICAL,
ELECTRICAL &
PLUMBING
OKLAHOMA CITY VAMC
John Wilson
COR
921 N.E. 13th Street Oklahoma City, OK 73104 p: 405.456.3870 e: byron.clark@va.gov
OWNER
GUIDON DESIGN INC.
Andrew Schaewe
Project Manager p: 317.800.6388 x 141 e: aschaewe@guidondesign.com
ARCHITECT
10411 Meeting Street Prospect, KY 40059 p: 502.326.3085 e: amyers@cmtaegrs.com
AREA MAP
VICINITY MAP
Revisions: Date:
CANTEEN
1221 N Pennsylvania St Indianapolis, IN 46202
SCALE: 1" = 160'-0"
KEYPLAN
N
N aschaewe Snapshot
Image aschaewe Polygon aschaewe Line aschaewe Engineer aschaewe Line aschaewe Engineer
AREA OF CURRENT PROJECT ON THE GROUND FLOOR.
aschaewe Engineer
GI101
CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38
CODE CRITERIA
GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON
NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR
DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS
OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN
FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A
DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE
DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS
APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT
SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES
(DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST
FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE
RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING
ITS ADOPTED CODES.
NOTES:
CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA
REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND
VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT
SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE
CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO
ENSURE A CONSISTENCY SYSTEM WIDE.
CODE REVIEW
THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO
REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY
REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE
REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE INTERNATIONAL
BUILDING CODE HAS BEEN USED. THIS PROJECTAS SHOWN MAKES NO
SIGNIFICANT CHANGES TO THE CODE INTERPRETATION OF THIS SPACE.
PROJECT SCOPE
THE PROJECT SCOPE INCLUDES THE INTERIOR RENOVATION OF THE CANTEEN
FOOD COURT, VENDING AREA AND OFFICE SUITE. THIS PROJECT AS SHOWN
MAKES NO SIGNIFICANT CHANGES TO THE CODE INTERPRETATION OF THIS
SPACE.
THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA
AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2015 IBC. CONSTRUCTION
TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE 1
CONSTRUCTION AS FOLLOWS:
OCCUPANCY TYPE: A-2 ASSEMBLY, IBC CHAPTER 3/LSC CHAPTER 38
CONSTRUCTION TYPE: 1-B (IBC CHAPTER 5)
3. FIRE RESISTIVE RATINGS TYPE 1 CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:
STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
BEARING WALLS
EXTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
NON-BEARING WALLS AND PARTITIONS
EXTERIOR: NONCOMBUSTIBLE, VARIES PER TABLE 602
INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE
FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE
ROOF: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE
4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.
5. ALLOWABLE HEIGHT IS EXISTING AND NOT CHANGED BY THIS PROJECT. (IBC,
TABLE 504.3)
6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN IS EXISTING AND NOT
CHANGED BY THIS PROJECT. (IBC, TABLE 504.4)
7. ALLOWABLE AREA IS EXISTING AND NOT CHANGED BY THIS PROJECT. (IBC,
TABLE 506.2)
8. BUILDING SEPARATION IS EXISTING AND NOT CHANGED BY THIS PROJECT.
(IBC, TABLE 602)
9. OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE CANTEEN AND THE
EXISTING CORRIDOR, EXISTING IS TO REMAIN INTACT. ANY NEW WORK WILL BE
REQUIRED TO MAINTAIN THE RATING. (LSC CHAPTER 18). (LSC 18.1.3.4)
10. MEANS OF EGRESS
• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.
• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES
• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.
• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC
7.4.1)
• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 300 FEET (LSC 38.2.6.3)
• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)
• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)
• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)
• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3
STORIES. (LSC 38.2.9.1)
• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)
11. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN
THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE
SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC
EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD
IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED
WITH AN AUTOMATIC EXTINGUISHING SYSTEMS THE SPACE SHALL ALSO BE
ENCLOSED WITH SMOKE PARTITIONS IN ACCORDANCE WITH SECTION 8.4.
• 1-HOUR FIRE RESISTANCE RATING AND AUTOMATIC SPRINKLER SYSTEM
IS REQUIRED FOR THE FOLLOWING: SOILED HOLDING AND HIGH HAZARD
CONTENT AREAS PER LSC 38.2.2.
12. INTERIOR FINISH
• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE
LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C
MATERIALS. INTERIOR WALL AND CEILING FINISH SHALL BE CLASS A OR
CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR
CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)
·CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.
·CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.
·CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450
• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN
CORRIDORS AND EXITS.
• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT
INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING
FABRICS AND FILMS SERVING AS FURNISHINGS OR DECORATIONS IN
HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE
REQUIREMENTS OF NFPA 701, STANDARD METHODS OF FIRE TESTS FOR
FLAME-RESISTANT TEXTILES AND FILMS.
• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED
FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED
REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR 1632,
ASTME E1537, AND ASTME E1590
13. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL
BE PROVIDED PER NFPA 10. (38.3.5)
14. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.
• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA
72. (LSC 9.6.1)
• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)
• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC
38.3.4.3)
• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.
• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM
AND DETECTION SYSTEM. (LSC 38.3.4.4)
15. FIRE SUPPRESSION:
SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN
ACCORDANCE WITH NFPA 13.
THE EXISTING FULLY SPRINKLERED BUILDING WILL HAVE THE SYSTEM MODIFIED
ACCORDINGLY BASED ON ANY PLAN CHANGES DUE TO THIS RENOVATION.
THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE
WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF
VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN
REQUIREMENTS:
STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:
ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 250 GPM
ALL OTHER AREAS SHALL BE PROTECTED AS:
LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.
HOSE STREAM ALLOWANCE: 100 GPM
ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE
SPRINKLERS.
16. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG
HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED
AND MAINTAINED PER NFPA 241.
CODE ANALYSIS LEGEND
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE
HAZARDOUS AREA
B
1500 SF
REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS,
GUIDELINES AND REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.
ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)
ASCE-07-10
ACI 318-11
ACI 530-11
AISC 341-10
AISC 360-10
PCI MNL 120-10, DESIGN HANDBOOK
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION
NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016
EDITION
NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE
SYSTEM, 2016 EDITION
NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR
FIRE PROTECTION, 2016 EDITION
NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE
MAINS AND THEIR APPURTENANCE, 2016 EDITION.
NFPA 54 NATOINAL FUEL GAS CODE, 2015 EDITION
NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION
NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION
NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL
COMPUTER/DATA PROCESSING EQUIPMENT, 2017 EDITION
NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION
NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND
VENTILATING SYSTEMS, 2015 EDITION.
NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION
NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION
NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION
NFPA 101, LIFE SAFETY CODE, 2018 EDITION
NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS
NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.
NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION
SYSTEMS, 2017 EDITION
NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION
MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE
EXCEPTION OF NFPA 5000 AND NFPA 900
ASHRAE 90.1-2016 HVAC SYSTEMS
ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND
FACILITIES
2010 ADA STANDARDS FOR ACCESSIBLE DESIGN
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS
ENERGY POLICY ACT OF 2005 (EPACT)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,
ENERGY, AND TRANSPORTATION MANAGEMENT.
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON
THE TECHNICAL INFORMATION LIBRARY (TIL)
(HTTP://WWW.CFM.VA.GOV/TIL/).
VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV.
08/01/2014)
VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS
ARCHITECTURAL, AUGUST 1, 2014
ASBESTOS ABATEMENT, JULY 2011
CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012
ELECTRICAL, DECEMBER 2015
ENERGY SUSTAINABILITY, MAY 2014
EQUIPMENT, JANUARY 2006
ESTIMATING, MARCH 8, 2011
NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010
FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015
HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES,
MARCH 2011
INTERIOR DESIGN, MAY 2008
PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015
PLUMBING, NOVEMBER 2014
STRUCTURAL, FEBRUARY 1, 2014
WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012
SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013
ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM
GUIDELINES FOR PROJECTS SEPTEMBER 30, 2010
ELEVATOR DESIGN MANUAL, AUGUST 2016
EPA GUIDELINES CHECKLIST
VA DESIGN MANUALS PG-18-10:
GOVERNING CODES:
MECHANICAL ROOM
GB104i
STAIR 4
STAIR 3
TELE/DATA CLOSET
GB107
ELEC
GB104J
ELEC
GB104g
CANTEEN KITCHEN
GB104b
STORAGE
GB105
OFFICE
GB106A
OFFICE
GB106B
OFFICE
GB106 CASH ROOM
GB106C
TRAY WASH
GB104MSTORAGE
GB104I
DELI
GB104F
CANTEEN
GB104
STORAGE
GB104K
ALIGN
TRAVEL DISTANCE 110'
TRAVEL DISTANCE: 97'
A
5878 SF
OPEN DINING AND FOOD AREA
B
663 SF
EXIT
DIAGONAL DISTANCE: 147'-0"
EXIT
EXIT SEPARATION DISTANCE: 130'-8"
B
890 SF
SUPPORT AREA
FEC
FEC
FEC
TRAY WASH
GB104M
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
N O
T F
N S
TR
U
C
TIO
N
C U s e rs \a s c h a e w e \D o c u m e n ts
\1 .1
.0
V
A O k la h o m a
C it y C a n te e n
R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m
.r v t
/2
/2
:0
:2
P
M
GI102
LIFE SAFETY PLAN
GUIDON DESIGN, INC
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317.800.6388
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
RENOVATE CANTEEN FOOD &
OFFICE SUITE
OKLAHOMA CITY, OK
635-16-104
MAIN BLDG.
JOHN WILSON, COR
04/27/2020 AWS ELB
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/16" = 1'-0"GI102
1 LIFE SAFETY PLAN
N
SCALE: 1" = 160'-0"
KEYPLAN
N
ST-2 EXITEXIT
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: III
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
D
E.
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT
SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS
THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO
BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN
FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE
REBUILT.
INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 4/GI100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI100.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE
INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO
SPECIFICATION FOR ADDITIONAL INFORMATION.
EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH
THE CONSTRUCTION AREA AT ALL TIMES.
CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR
DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION
CONTROL AND COR.
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
PHASING SCHEDULE
PHASE ONE WILL BE UNDER
CONSTRUCTION , WHILE THE REST OF
THE FACILTY WILL BE OPERATIONAL. EXIT
ACCESS MUST BE MAINTAINED DURING
THIS PHASE
THE AREA IN PHASE TWO WILL BE
UNDER CONSTRUCTION. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
THE AREA IN PHASE THREE WILL BE
UNDER CONSTRUCTION. THE
CONSTRUCTION IN AREA TWO WILL BE
COMPLETED AND OPERATIONAL
THIS AREA OF THE WORK TO BE
CONDUCTED ON NIGHTS AND WEEKENDS
SIMULTANEOUSLY DURING THE OTHER
PHASES OR DURING 7 DAY SHUT DOWN.
COORDINATE THE TIME FOR THIS WORK
WITH THE COR AND CANTEEN SERVICES.
THE AREA TO BE COMPLETED IN PARTS
AND ALL PARTS MUST BE BEGUN AND
COMPLETED WITHIN THE DOWN HOURS
(NIGHTS OR WEEKENDS) AND BE READY
FOR USE BY STAFF AND VETERANS FOR
THE NEXT BUSINESS HOURS.
PHASE 1
PHASE 2
PHASE 5
THE AREA IN PHASE TWO A WILL BE
UNDER TESTING FOR ASBESTOS
MASTIC ABATEMENT. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
PHASE 3
PHASE 4
THIS AREA TO BE A TRANSITION AREA
BETWEEN PHASES 3 AND 5. ALL WORK
IN THIS ARE TO BE ACCOMPLISHED
DURING 7 DAY SHUTDOWN OF AREA.
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION
BATT.
5/8" TYPE X GYPSUM BOARD, BOTH
SIDES
3 5/8" METAL STUD @ 16" O.C.
WITH RUNNER CHANNELS ALONG
TOP AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY
ADHERE TO THE STRUCTURAL DECK
ABOVE AND TO THE FLOOR BELOW
WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING:
U465
COORDINATE WITH EXISTING
CEILING
PAINTED
SURFACE
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
5/8" TYPE X GYP BD
3 5/8" STEEL STUDS @ 16" O.C.
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDENT POLY
INTERIOR SIDE
CEILING
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
6" M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDENT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE
FOR REQUIRED CONDITION TO
STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
N O
T F
N S
TR
U
C
TIO
N
C U s e rs \a s c h a e w e \D o c u m e n ts
\1 .1
.0
V
A O k la h o m a
C it y C a n te e n
R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m
.r v t
/2
/2
:0
:2
P
M
GI103
PHASING PLAN - PHASE 1
GUIDON DESIGN, INC
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317.800.6388
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
RENOVATE CANTEEN FOOD &
OFFICE SUITE
OKLAHOMA CITY, OK
635-16-104
MAIN BLDG.
JOHN WILSON, COR
04/27/2020 AWS JDJ
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/16" = 1'-0"GI103
1 PHASING PLAN - PHASE 1
SCALE: 1 1/2" = 1'-0"GI103
2 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241
SCALE: 1 1/2" = 1'-0"GI103
3 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION
SCALE: 1/4" = 1'-0"GI103
4 TEMPORARY WALL CONSTRUCTION ELEVATION
N
NOT TO SCALE
KEYPLAN
ST-2EXIT
EXIT
PHASING SCHEDULE
PHASE ONE WILL BE UNDER
CONSTRUCTION , WHILE THE REST OF
THE FACILTY WILL BE OPERATIONAL. EXIT
ACCESS MUST BE MAINTAINED DURING
THIS PHASE
THE AREA IN PHASE TWO WILL BE
UNDER CONSTRUCTION. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
THE AREA IN PHASE THREE WILL BE
UNDER CONSTRUCTION. THE
CONSTRUCTION IN AREA TWO WILL BE
COMPLETED AND OPERATIONAL
THIS AREA OF THE WORK TO BE
CONDUCTED ON NIGHTS AND WEEKENDS
SIMULTANEOUSLY DURING THE OTHER
PHASES OR DURING 7 DAY SHUT DOWN.
COORDINATE THE TIME FOR THIS WORK
WITH THE COR AND CANTEEN SERVICES.
THE AREA TO BE COMPLETED IN PARTS
AND ALL PARTS MUST BE BEGUN AND
COMPLETED WITHIN THE DOWN HOURS
(NIGHTS OR WEEKENDS) AND BE READY
FOR USE BY STAFF AND VETERANS FOR
THE NEXT BUSINESS HOURS.
PHASE 1
PHASE 2
PHASE 5
THE AREA IN PHASE TWO A WILL BE
UNDER TESTING FOR ASBESTOS
MASTIC ABATEMENT. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
PHASE 3
PHASE 4
THIS AREA TO BE A TRANSITION AREA
BETWEEN PHASES 3 AND 5. ALL WORK
IN THIS ARE TO BE ACCOMPLISHED
DURING 7 DAY SHUTDOWN OF AREA.
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: III
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
D
E.
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT
SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS
THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO
BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN
FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE
REBUILT.
INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 4/GI100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI100.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE
INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO
SPECIFICATION FOR ADDITIONAL INFORMATION.
EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH
THE CONSTRUCTION AREA AT ALL TIMES.
CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR
DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION
CONTROL AND COR.
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
N O
T F
N S
TR
U
C
TIO
N
C U s e rs \a s c h a e w e \D o c u m e n ts
\1 .1
.0
V
A O k la h o m a
C it y C a n te e n
R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m
.r v t
/2
/2
:0
:2
P
M
GI104
PHASING PLAN - PHASE 2
GUIDON DESIGN, INC
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317.800.6388
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
RENOVATE CANTEEN FOOD &
OFFICE SUITE
OKLAHOMA CITY, OK
635-16-104
MAIN BLDG.
JOHN WILSON, COR
04/27/2020 AWS JDJ
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/16" = 1'-0"GI104
1 PHASING PLAN - PHASE 2
N
NOT TO SCALE
KEYPLAN
TEMPOTARY POWER AND DATA
FOR TEMP. POS STATION
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: III
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
D
E.
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT
SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS
THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO
BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN
FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE
REBUILT.
INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 4/GI100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI100.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE
INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO
SPECIFICATION FOR ADDITIONAL INFORMATION.
EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH
THE CONSTRUCTION AREA AT ALL TIMES.
CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR
DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION
CONTROL AND COR.
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
PHASING SCHEDULE
PHASE ONE WILL BE UNDER
CONSTRUCTION , WHILE THE REST OF
THE FACILTY WILL BE OPERATIONAL. EXIT
ACCESS MUST BE MAINTAINED DURING
THIS PHASE
THE AREA IN PHASE TWO WILL BE
UNDER CONSTRUCTION. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
THE AREA IN PHASE THREE WILL BE
UNDER CONSTRUCTION. THE
CONSTRUCTION IN AREA TWO WILL BE
COMPLETED AND OPERATIONAL
THIS AREA OF THE WORK TO BE
CONDUCTED ON NIGHTS AND WEEKENDS
SIMULTANEOUSLY DURING THE OTHER
PHASES OR DURING 7 DAY SHUT DOWN.
COORDINATE THE TIME FOR THIS WORK
WITH THE COR AND CANTEEN SERVICES.
THE AREA TO BE COMPLETED IN PARTS
AND ALL PARTS MUST BE BEGUN AND
COMPLETED WITHIN THE DOWN HOURS
(NIGHTS OR WEEKENDS) AND BE READY
FOR USE BY STAFF AND VETERANS FOR
THE NEXT BUSINESS HOURS.
PHASE 1
PHASE 2
PHASE 5
THE AREA IN PHASE TWO A WILL BE
UNDER TESTING FOR ASBESTOS
MASTIC ABATEMENT. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
PHASE 3
PHASE 4
THIS AREA TO BE A TRANSITION AREA
BETWEEN PHASES 3 AND 5. ALL WORK
IN THIS ARE TO BE ACCOMPLISHED
DURING 7 DAY SHUTDOWN OF AREA.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
N O
T F
N S
TR
U
C
TIO
N
C U s e rs \a s c h a e w e \D o c u m e n ts
\1 .1
.0
V
A O k la h o m a
C it y C a n te e n
R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m
.r v t
/2
/2
:0
:2
P
M
GI105
PHASING PLAN - PHASE 3
GUIDON DESIGN, INC
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317.800.6388
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
RENOVATE CANTEEN FOOD &
OFFICE SUITE
OKLAHOMA CITY, OK
635-16-104
MAIN BLDG.
JOHN WILSON, COR
04/27/2020 AWS JDJ
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/16" = 1'-0"GI105
1 PHASING PLAN - PHASE 3
N
NOT TO SCALE
KEYPLAN
TEMPOTARY POWER AND DATA
FOR TEMP. POS STATION
THIS AREA OF FLOOR TILE TO BE ABATED
DURING ALLOWED 7 DAY SHUT DOWN AS
PHASE 4
THIS AREA OF FLOOR TILE TO BE ABATED
DURING ALLOWED 7 DAY SHUT DOWN AS
PHASE 4
1 1
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: III
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
D
E.
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT
SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS
THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO
BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN
FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE
REBUILT.
INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 4/GI100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI100.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE
INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO
SPECIFICATION FOR ADDITIONAL INFORMATION.
EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH
THE CONSTRUCTION AREA AT ALL TIMES.
CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR
DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION
CONTROL AND COR.
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
PHASING SCHEDULE
PHASE ONE WILL BE UNDER
CONSTRUCTION , WHILE THE REST OF
THE FACILTY WILL BE OPERATIONAL. EXIT
ACCESS MUST BE MAINTAINED DURING
THIS PHASE
THE AREA IN PHASE TWO WILL BE
UNDER CONSTRUCTION. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
THE AREA IN PHASE THREE WILL BE
UNDER CONSTRUCTION. THE
CONSTRUCTION IN AREA TWO WILL BE
COMPLETED AND OPERATIONAL
THIS AREA OF THE WORK TO BE
CONDUCTED ON NIGHTS AND WEEKENDS
SIMULTANEOUSLY DURING THE OTHER
PHASES OR DURING 7 DAY SHUT DOWN.
COORDINATE THE TIME FOR THIS WORK
WITH THE COR AND CANTEEN SERVICES.
THE AREA TO BE COMPLETED IN PARTS
AND ALL PARTS MUST BE BEGUN AND
COMPLETED WITHIN THE DOWN HOURS
(NIGHTS OR WEEKENDS) AND BE READY
FOR USE BY STAFF AND VETERANS FOR
THE NEXT BUSINESS HOURS.
PHASE 1
PHASE 2
PHASE 5
THE AREA IN PHASE TWO A WILL BE
UNDER TESTING FOR ASBESTOS
MASTIC ABATEMENT. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
PHASE 3
PHASE 4
THIS AREA TO BE A TRANSITION AREA
BETWEEN PHASES 3 AND 5. ALL WORK
IN THIS ARE TO BE ACCOMPLISHED
DURING 7 DAY SHUTDOWN OF AREA.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
N O
T F
N S
TR
U
C
TIO
N
C U s e rs \a s c h a e w e \D o c u m e n ts
\1 .1
.0
V
A O k la h o m a
C it y C a n te e n
R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m
.r v t
/2
/2
:0
:2
P
M
GI106
PHASING PLAN - PHASE 4
GUIDON DESIGN, INC
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317.800.6388
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
RENOVATE CANTEEN FOOD &
OFFICE SUITE
OKLAHOMA CITY, OK
635-16-104
MAIN BLDG.
JOHN WILSON, COR
04/27/2020
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/16" = 1'-0"GI106
1 PHASING PLAN - PHASE 4
N
NOT TO SCALE
KEYPLAN
PHASING SCHEDULE
PHASE ONE WILL BE UNDER
CONSTRUCTION , WHILE THE REST OF
THE FACILTY WILL BE OPERATIONAL. EXIT
ACCESS MUST BE MAINTAINED DURING
THIS PHASE
THE AREA IN PHASE TWO WILL BE
UNDER CONSTRUCTION. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
THE AREA IN PHASE THREE WILL BE
UNDER CONSTRUCTION. THE
CONSTRUCTION IN AREA TWO WILL BE
COMPLETED AND OPERATIONAL
THIS AREA OF THE WORK TO BE
CONDUCTED ON NIGHTS AND WEEKENDS
SIMULTANEOUSLY DURING THE OTHER
PHASES OR DURING 7 DAY SHUT DOWN.
COORDINATE THE TIME FOR THIS WORK
WITH THE COR AND CANTEEN SERVICES.
THE AREA TO BE COMPLETED IN PARTS
AND ALL PARTS MUST BE BEGUN AND
COMPLETED WITHIN THE DOWN HOURS
(NIGHTS OR WEEKENDS) AND BE READY
FOR USE BY STAFF AND VETERANS FOR
THE NEXT BUSINESS HOURS.
PHASE 1
PHASE 2
PHASE 5
THE AREA IN PHASE TWO A WILL BE
UNDER TESTING FOR ASBESTOS
MASTIC ABATEMENT. THE AREA IN
PHASE ONE WILL BE OPERATIONAL.
PHASE 3
PHASE 4
THIS AREA TO BE A TRANSITION AREA
BETWEEN PHASES 3 AND 5. ALL WORK
IN THIS ARE TO BE ACCOMPLISHED
DURING 7 DAY SHUTDOWN OF AREA.
IC/PHASING LEGEND
TEMPORARY WALLS. SEE PLAN AND
PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS
DOORS
REFERENCE AREA FOR ABOVE
CEILING WORK ON FLOOR BELOW.
REFER TO ENGINEERING DRAWINGS
FOR FULL SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
INFECTION CONTROL PROJECT INFORMATION
CONSTRUCTION ACTIVITY - FIRE RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: III
REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.
COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN
A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND
BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY
WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.
MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH
4 MIL. POLY SHEET.
ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
INFECTION CONTROL GENERAL NOTES
PHASING GENERAL NOTES
A
B
C
D
E.
PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT
CONSTRUCTION.
PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT
SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS
THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO
BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS
SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.
REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN
FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE
REBUILT.
INFECTION CONTROL PLAN NOTES #
PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL
CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.
PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD
READER ACCESS. REFER TO ELEVATION 4/GI100.
PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.
REFER TO DETAIL 2/GI100.
PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL
CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE
INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO
SPECIFICATION FOR ADDITIONAL INFORMATION.
EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH
THE CONSTRUCTION AREA AT ALL TIMES.
CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR
DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION
CONTROL AND COR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
N O
T F
N S
TR
U
C
TIO
N
C U s e rs \a s c h a e w e \D o c u m e n ts
\1 .1
.0
V
A O k la h o m a
C it y C a n te e n
R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m
.r v t
/2
/2
:0
:2
P
M
GI107
PHASING PLAN - PHASE 5
GUIDON DESIGN, INC
1221 N. PENNSYLVANIA ST.
INDIANAPOLIS, IN 46202
317.800.6388
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
RENOVATE CANTEEN FOOD &
OFFICE SUITE
OKLAHOMA CITY, OK
635-16-104
MAIN BLDG.
JOHN WILSON, COR
04/27/2020 AWS JDJ
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
SCALE: 3/16" = 1'-0"GI107
1 PHASING PLAN - PHASE 5
N
NOT TO SCALE
KEYPLAN
DEMOLITION GENERAL NOTES
A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION
AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL
CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE
EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON
THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE FLOOR PLAN
AS101 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION…