635-16-104 Approved Construction Drawings.pdf

PDF 9 MB Posted

Attached to
Z2DA--Renovate Canteen Food Court and Office Suite
Solicitation number
36C25921R0004
Issued by

About this file

This document contains a presolicitation notice and construction drawings for a renovation project at a Department of Veterans Affairs medical center. The notice provides details for the full solicitation to be posted on or after October 21, 2020, seeking proposals to renovate the existing Canteen food court and offices at the Oklahoma City VA Medical Center. The $1-2 million project aims to centralize and enlarge the dining and food court area, relocate offices, update HVAC and electrical systems, add emergency power, and install new finishes. The construction drawings provide the existing conditions and proposed renovation plans. The solicitation will be a total SDVOSB set-aside awarded by the VA Veterans Health Administration VISN 19.

View the file

Other files

File Type Posted
36C25921R0004 0010.docx DOCX document
RFI 5 Response_AD101.pdf PDF
RFI 5.pdf PDF
36C25921R0004 0009.docx DOCX document
36C25921R0004 0008.docx DOCX document
RFI 4.pdf PDF
36C25921R0004 0007.docx DOCX document
RFI 3.pdf PDF
VVOC17 PL201 plumb changes.pdf PDF
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf PDF
UPDATED bid docs sheets.pdf PDF
36C25921R0004 0006.docx DOCX document
RFI 2 Canteen Food Court Working 12.14.2020.pdf PDF
36C25921R0004 0005.docx DOCX document
36C25921R0004 0004.docx DOCX document
Pre-Bid Sign-In Sheet Canteen Food Court.pdf PDF
36C25921R0004 0003.docx DOCX document
36C25921R0004R2 Page 1.pdf PDF
16.1035.02_2020.04.27_bid docs_ total.pdf PDF
36C25921R0004 Pg1 Revised.pdf PDF
36C25921R0004 0002.docx DOCX document
RFIs 1.pdf PDF
36C25921R0004 0001.docx DOCX document
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
OKC Canteen Specs Vol 1.pdf PDF
OKC Canteen Specs Vol 2.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
36C25921R0004_2.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA SIGNATURE BLOCK

JOHN WILSON, PROJECT MANAGER, COR __________________________________________________________

ALDO FRED GIRANY, CONTRACTING OFFICCER _____________________________________________________

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F O

R

C

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:1

P

M

GI000

COVER SHEET

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020 AWS ELB

BID DOCUMENTS

FULLY SPRINKLERED

OKLAHOMA CITY VA MEDICAL CENTER

OKLAHOMA CITY, OK

BID DOCUMENTS

RENOVATE CANTEEN FOOD & OFFICE SUITE

635-16-104

SHEET LIST

SHEET NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 OVERALL GROUND FLOOR EXISTING LIFE SAFETY PLAN

GI102 LIFE SAFETY PLAN

GI103 PHASING PLAN - PHASE 1

GI104 PHASING PLAN - PHASE 2

GI105 PHASING PLAN - PHASE 3

GI106 PHASING PLAN - PHASE 4

GI107 PHASING PLAN - PHASE 5

DEMOLITION

AD101 FIRST FLOOR DEMOLITION PLAN

AD102 REFLECTED CEILING DEMOLITION PLAN

ARCHITECTURAL

AS001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AS002 ARCHITECTURAL STANDARDS

AS101 FIRST FLOOR ARCHITECTURAL PLAN

AS111 FIRST FLOOR REFLECTED CEILING PLAN

AS501 INTERIOR ELEVATIONS AND DETAILS

AS502 INTERIOR ELEVATIONS AND DETAILS

AS503 INTERIOR ELEVATIONS AND DETAILS

AS601 DOOR SCHEDULE

AS802 INTERIOR SECTIONS AND DETAILS

AF101 FINISH PLAN

AQ101 EQUIPMENT FLOOR PLAN

ELECTRICAL

ED101 PARTIAL GROUND FLOOR PLAN - ELECTRICAL DEMOLITION

ES101 ELECTRICAL LEGEND

ES201 PARTIAL GROUND FLOOR PLAN - LIGHTING

ES301 PARTIAL GROUND FLOOR PLAN - POWER

ES401 PARTIAL GROUND FLOOR PLAN - SYSTEMS

ES501 PARTIAL GROUND FLOOR PLAN - ELECTRICAL INTERCONNECTIONS

ES601 POWER DISTRIBUTION RISER DIAGRAM

ES701 LIGHT FIXTURE SCHEDULE AND DETAILS

ES801 TELECOMMUNICATION DETAILS

ES802 ELECTRICAL DETAILS

MECHANICAL

MH001 MECHANICAL LEGEND AND NOTES

MD101 PARTIAL GROUND FLOOR PLAN - MECHANICAL DEMOLITION

MH201 PARTIAL GROUND FLOOR PLAN - MECHANICAL

MH301 MECHANICAL DETAILS

MH401 MECHANICAL SCHEDULES

PLUMBING

PD101 PLUMBING LEGENDS, NOTES, DETAILS, AND SCHEDULES

PL001 PARTIAL GROUND FLOOR PLAN - PLUMBING DEMOLITION

PL201 PARTIAL GROUND FLOOR PLAN - PLUMBING

FIRE PROTECTION

FX101 PARTIAL GROUND FLOOR PLAN - FIRE PROTECTION

Contact:Contact: Contact:

CMTA CONSULTING

ENGINEERS, INC.

Andy Meyers

Project Manager

MECHANICAL,

ELECTRICAL &

PLUMBING

OKLAHOMA CITY VAMC

John Wilson

COR

921 N.E. 13th Street Oklahoma City, OK 73104 p: 405.456.3870 e: byron.clark@va.gov

OWNER

GUIDON DESIGN INC.

Andrew Schaewe

Project Manager p: 317.800.6388 x 141 e: aschaewe@guidondesign.com

ARCHITECT

10411 Meeting Street Prospect, KY 40059 p: 502.326.3085 e: amyers@cmtaegrs.com

AREA MAP

VICINITY MAP

Revisions: Date:

CANTEEN

1221 N Pennsylvania St Indianapolis, IN 46202

SCALE: 1" = 160'-0"

KEYPLAN

N

N aschaewe Snapshot

Image aschaewe Polygon aschaewe Line aschaewe Engineer aschaewe Line aschaewe Engineer

AREA OF CURRENT PROJECT ON THE GROUND FLOOR.

aschaewe Engineer

GI101

CODE ANALYSIS - NFPA 101, BUSINESS CHAPTER 38

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON

NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR

DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS

OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN

FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A

DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE

DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS

APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT

SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES

(DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST

FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE

RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING

ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA

REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND

VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT

SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE

CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO

ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO

REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY

REQUIREMENTS. FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE

REFERENCED NATIONAL FIRE CODES, THE 2015 EDITION OF THE INTERNATIONAL

BUILDING CODE HAS BEEN USED. THIS PROJECTAS SHOWN MAKES NO

SIGNIFICANT CHANGES TO THE CODE INTERPRETATION OF THIS SPACE.

PROJECT SCOPE

THE PROJECT SCOPE INCLUDES THE INTERIOR RENOVATION OF THE CANTEEN

FOOD COURT, VENDING AREA AND OFFICE SUITE. THIS PROJECT AS SHOWN

MAKES NO SIGNIFICANT CHANGES TO THE CODE INTERPRETATION OF THIS

SPACE.

THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA

AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2015 IBC. CONSTRUCTION

TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE 1

CONSTRUCTION AS FOLLOWS:

OCCUPANCY TYPE: A-2 ASSEMBLY, IBC CHAPTER 3/LSC CHAPTER 38

CONSTRUCTION TYPE: 1-B (IBC CHAPTER 5)

3. FIRE RESISTIVE RATINGS TYPE 1 CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, VARIES PER TABLE 602

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE

ROOF: NONCOMBUSTIBLE, 1-HOUR FIRE RESISTIVE

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT IS EXISTING AND NOT CHANGED BY THIS PROJECT. (IBC,

TABLE 504.3)

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN IS EXISTING AND NOT

CHANGED BY THIS PROJECT. (IBC, TABLE 504.4)

7. ALLOWABLE AREA IS EXISTING AND NOT CHANGED BY THIS PROJECT. (IBC,

TABLE 506.2)

8. BUILDING SEPARATION IS EXISTING AND NOT CHANGED BY THIS PROJECT.

(IBC, TABLE 602)

9. OCCUPANCY SEPARATION IS REQUIRED BETWEEN THE CANTEEN AND THE

EXISTING CORRIDOR, EXISTING IS TO REMAIN INTACT. ANY NEW WORK WILL BE

REQUIRED TO MAINTAIN THE RATING. (LSC CHAPTER 18). (LSC 18.1.3.4)

10. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 44 INCHES.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC

7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 300 FEET (LSC 38.2.6.3)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 38.2.5.3.1)

• DEAD END CORRIDORS SHALL NOT EXCEED 50 FEET. (LSC 38.2.5.2.1)

• MEANS OF EGRESS SHALL BE ILLUMINATED. (LSC 38.2.8)

• EMERGENCY LIGHTING SHALL BE PROVIDED, BUILDING OVER 3

STORIES. (LSC 38.2.9.1)

• EXIT SIGNAGE SHALL BE PROVIDED. (LSC 38.2.10)

11. PROTECTION FROM ANY AREA HAVING A DEGREE OF HAZARD GREATER THAN

THAT NORMAL TO THE GENERAL OCCUPANCY OF THE BUILDING OR STRUCTURE

SHALL BE PROVIDED BY PROTECTING THE AREA WITH AUTOMATIC

EXTINGUISHING SYSTEMS IN ACCORDANCE WITH SECTION 9.7(3). WHERE HAZARD

IS SEVERE PER LSC CHAPTER 38, SOILED HOLDING, PROTECTION IS PROVIDED

WITH AN AUTOMATIC EXTINGUISHING SYSTEMS THE SPACE SHALL ALSO BE

ENCLOSED WITH SMOKE PARTITIONS IN ACCORDANCE WITH SECTION 8.4.

• 1-HOUR FIRE RESISTANCE RATING AND AUTOMATIC SPRINKLER SYSTEM

IS REQUIRED FOR THE FOLLOWING: SOILED HOLDING AND HIGH HAZARD

CONTENT AREAS PER LSC 38.2.2.

12. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE

LIMITED PER CHAPTER 8 OF THE NFPA 101 TO CLASS A, B AND C

MATERIALS. INTERIOR WALL AND CEILING FINISH SHALL BE CLASS A OR

CLASS B IN EXITS, CORRIDORS AND LOBBIES; AND CLASS A, CLASS B, OR

CLASS C IN ALL OTHER AREAS. (LSC 38.3.3)

·CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

·CLASS B: FLAME SPREAD 26-75; SMOKE DEVELOPED 0-450.

·CLASS C: FLAME SPREAD 76-200; SMOKE DEVELOPED 0-450

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I OR CLASS II IN

CORRIDORS AND EXITS.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT

INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING

FABRICS AND FILMS SERVING AS FURNISHINGS OR DECORATIONS IN

HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE

REQUIREMENTS OF NFPA 701, STANDARD METHODS OF FIRE TESTS FOR

FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED

FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED

REQUIREMENTS, BASED ON NFPA 260, NFPA 261, NFPA 266, 16 CFR 1632,

ASTME E1537, AND ASTME E1590

13. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL

BE PROVIDED PER NFPA 10. (38.3.5)

14. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA

72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 38.4.2)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS. (LSC

38.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM

AND DETECTION SYSTEM. (LSC 38.3.4.4)

15. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN

ACCORDANCE WITH NFPA 13.

THE EXISTING FULLY SPRINKLERED BUILDING WILL HAVE THE SYSTEM MODIFIED

ACCORDINGLY BASED ON ANY PLAN CHANGES DUE TO THIS RENOVATION.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE

WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN

REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE

SPRINKLERS.

16. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS ALONG

HEALTHCARE OCCUPANCIES (LSC CHAPTER 18 AND 19) SHALL BE CONSTRUCTED

AND MAINTAINED PER NFPA 241.

CODE ANALYSIS LEGEND

TOTAL OCCUPANCY

FEC

EXIT

OCCUPANCY LOAD FACTOR

EXITS REQUIRED

SQUARE FOOTAGE

OCCUPANCY TYPE

EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE

HAZARDOUS AREA

B

1500 SF

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS,

GUIDELINES AND REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016

EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE

SYSTEM, 2016 EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR

FIRE PROTECTION, 2016 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE

MAINS AND THEIR APPURTENANCE, 2016 EDITION.

NFPA 54 NATOINAL FUEL GAS CODE, 2015 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL

COMPUTER/DATA PROCESSING EQUIPMENT, 2017 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND

VENTILATING SYSTEMS, 2015 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION

NFPA 101, LIFE SAFETY CODE, 2018 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION

SYSTEMS, 2017 EDITION

NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE

EXCEPTION OF NFPA 5000 AND NFPA 900

ASHRAE 90.1-2016 HVAC SYSTEMS

ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND

FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)

STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,

ENERGY, AND TRANSPORTATION MANAGEMENT.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON

THE TECHNICAL INFORMATION LIBRARY (TIL)

(HTTP://WWW.CFM.VA.GOV/TIL/).

VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV.

08/01/2014)

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2015

ENERGY SUSTAINABILITY, MAY 2014

EQUIPMENT, JANUARY 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES,

MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM

GUIDELINES FOR PROJECTS SEPTEMBER 30, 2010

ELEVATOR DESIGN MANUAL, AUGUST 2016

EPA GUIDELINES CHECKLIST

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

MECHANICAL ROOM

GB104i

STAIR 4

STAIR 3

TELE/DATA CLOSET

GB107

ELEC

GB104J

ELEC

GB104g

CANTEEN KITCHEN

GB104b

STORAGE

GB105

OFFICE

GB106A

OFFICE

GB106B

OFFICE

GB106 CASH ROOM

GB106C

TRAY WASH

GB104MSTORAGE

GB104I

DELI

GB104F

CANTEEN

GB104

STORAGE

GB104K

ALIGN

TRAVEL DISTANCE 110'

TRAVEL DISTANCE: 97'

A

5878 SF

OPEN DINING AND FOOD AREA

B

663 SF

EXIT

DIAGONAL DISTANCE: 147'-0"

EXIT

EXIT SEPARATION DISTANCE: 130'-8"

B

890 SF

SUPPORT AREA

FEC

FEC

FEC

TRAY WASH

GB104M

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:2

P

M

GI102

LIFE SAFETY PLAN

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020 AWS ELB

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/16" = 1'-0"GI102

1 LIFE SAFETY PLAN

N

SCALE: 1" = 160'-0"

KEYPLAN

N

ST-2 EXITEXIT

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: III

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES

A

B

C

D

E.

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT

SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS

THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO

BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S

WORK.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN

FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE

REBUILT.

INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 4/GI100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI100.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE

INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO

SPECIFICATION FOR ADDITIONAL INFORMATION.

EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH

THE CONSTRUCTION AREA AT ALL TIMES.

CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR

DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION

CONTROL AND COR.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

PHASING SCHEDULE

PHASE ONE WILL BE UNDER

CONSTRUCTION , WHILE THE REST OF

THE FACILTY WILL BE OPERATIONAL. EXIT

ACCESS MUST BE MAINTAINED DURING

THIS PHASE

THE AREA IN PHASE TWO WILL BE

UNDER CONSTRUCTION. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

THE AREA IN PHASE THREE WILL BE

UNDER CONSTRUCTION. THE

CONSTRUCTION IN AREA TWO WILL BE

COMPLETED AND OPERATIONAL

THIS AREA OF THE WORK TO BE

CONDUCTED ON NIGHTS AND WEEKENDS

SIMULTANEOUSLY DURING THE OTHER

PHASES OR DURING 7 DAY SHUT DOWN.

COORDINATE THE TIME FOR THIS WORK

WITH THE COR AND CANTEEN SERVICES.

THE AREA TO BE COMPLETED IN PARTS

AND ALL PARTS MUST BE BEGUN AND

COMPLETED WITHIN THE DOWN HOURS

(NIGHTS OR WEEKENDS) AND BE READY

FOR USE BY STAFF AND VETERANS FOR

THE NEXT BUSINESS HOURS.

PHASE 1

PHASE 2

PHASE 5

THE AREA IN PHASE TWO A WILL BE

UNDER TESTING FOR ASBESTOS

MASTIC ABATEMENT. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

PHASE 3

PHASE 4

THIS AREA TO BE A TRANSITION AREA

BETWEEN PHASES 3 AND 5. ALL WORK

IN THIS ARE TO BE ACCOMPLISHED

DURING 7 DAY SHUTDOWN OF AREA.

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION

BATT.

5/8" TYPE X GYPSUM BOARD, BOTH

SIDES

3 5/8" METAL STUD @ 16" O.C.

WITH RUNNER CHANNELS ALONG

TOP AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY

ADHERE TO THE STRUCTURAL DECK

ABOVE AND TO THE FLOOR BELOW

WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING:

U465

COORDINATE WITH EXISTING

CEILING

PAINTED

SURFACE

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

5/8" TYPE X GYP BD

3 5/8" STEEL STUDS @ 16" O.C.

BEAD OF CONT. SEALANT

6-MIL FIRE RETARDENT POLY

INTERIOR SIDE

CEILING

2" DEEP LEG 3 5/8" STEEL SLIP TRACK

3 5/8" STEEL STUD TRACK

6" M

IN

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDENT

POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

PUBLIC

SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, CARD READER,

HARDWARE AND CLOSER

TRIATEK MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE

FOR REQUIRED CONDITION TO

STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:2

P

M

GI103

PHASING PLAN - PHASE 1

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020 AWS JDJ

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/16" = 1'-0"GI103

1 PHASING PLAN - PHASE 1

SCALE: 1 1/2" = 1'-0"GI103

2 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241

SCALE: 1 1/2" = 1'-0"GI103

3 TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION

SCALE: 1/4" = 1'-0"GI103

4 TEMPORARY WALL CONSTRUCTION ELEVATION

N

NOT TO SCALE

KEYPLAN

ST-2EXIT

EXIT

PHASING SCHEDULE

PHASE ONE WILL BE UNDER

CONSTRUCTION , WHILE THE REST OF

THE FACILTY WILL BE OPERATIONAL. EXIT

ACCESS MUST BE MAINTAINED DURING

THIS PHASE

THE AREA IN PHASE TWO WILL BE

UNDER CONSTRUCTION. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

THE AREA IN PHASE THREE WILL BE

UNDER CONSTRUCTION. THE

CONSTRUCTION IN AREA TWO WILL BE

COMPLETED AND OPERATIONAL

THIS AREA OF THE WORK TO BE

CONDUCTED ON NIGHTS AND WEEKENDS

SIMULTANEOUSLY DURING THE OTHER

PHASES OR DURING 7 DAY SHUT DOWN.

COORDINATE THE TIME FOR THIS WORK

WITH THE COR AND CANTEEN SERVICES.

THE AREA TO BE COMPLETED IN PARTS

AND ALL PARTS MUST BE BEGUN AND

COMPLETED WITHIN THE DOWN HOURS

(NIGHTS OR WEEKENDS) AND BE READY

FOR USE BY STAFF AND VETERANS FOR

THE NEXT BUSINESS HOURS.

PHASE 1

PHASE 2

PHASE 5

THE AREA IN PHASE TWO A WILL BE

UNDER TESTING FOR ASBESTOS

MASTIC ABATEMENT. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

PHASE 3

PHASE 4

THIS AREA TO BE A TRANSITION AREA

BETWEEN PHASES 3 AND 5. ALL WORK

IN THIS ARE TO BE ACCOMPLISHED

DURING 7 DAY SHUTDOWN OF AREA.

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: III

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES

A

B

C

D

E.

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT

SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS

THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO

BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S

WORK.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN

FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE

REBUILT.

INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 4/GI100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI100.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE

INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO

SPECIFICATION FOR ADDITIONAL INFORMATION.

EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH

THE CONSTRUCTION AREA AT ALL TIMES.

CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR

DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION

CONTROL AND COR.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:2

P

M

GI104

PHASING PLAN - PHASE 2

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020 AWS JDJ

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/16" = 1'-0"GI104

1 PHASING PLAN - PHASE 2

N

NOT TO SCALE

KEYPLAN

TEMPOTARY POWER AND DATA

FOR TEMP. POS STATION

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: III

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES

A

B

C

D

E.

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT

SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS

THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO

BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S

WORK.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN

FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE

REBUILT.

INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 4/GI100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI100.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE

INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO

SPECIFICATION FOR ADDITIONAL INFORMATION.

EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH

THE CONSTRUCTION AREA AT ALL TIMES.

CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR

DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION

CONTROL AND COR.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

PHASING SCHEDULE

PHASE ONE WILL BE UNDER

CONSTRUCTION , WHILE THE REST OF

THE FACILTY WILL BE OPERATIONAL. EXIT

ACCESS MUST BE MAINTAINED DURING

THIS PHASE

THE AREA IN PHASE TWO WILL BE

UNDER CONSTRUCTION. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

THE AREA IN PHASE THREE WILL BE

UNDER CONSTRUCTION. THE

CONSTRUCTION IN AREA TWO WILL BE

COMPLETED AND OPERATIONAL

THIS AREA OF THE WORK TO BE

CONDUCTED ON NIGHTS AND WEEKENDS

SIMULTANEOUSLY DURING THE OTHER

PHASES OR DURING 7 DAY SHUT DOWN.

COORDINATE THE TIME FOR THIS WORK

WITH THE COR AND CANTEEN SERVICES.

THE AREA TO BE COMPLETED IN PARTS

AND ALL PARTS MUST BE BEGUN AND

COMPLETED WITHIN THE DOWN HOURS

(NIGHTS OR WEEKENDS) AND BE READY

FOR USE BY STAFF AND VETERANS FOR

THE NEXT BUSINESS HOURS.

PHASE 1

PHASE 2

PHASE 5

THE AREA IN PHASE TWO A WILL BE

UNDER TESTING FOR ASBESTOS

MASTIC ABATEMENT. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

PHASE 3

PHASE 4

THIS AREA TO BE A TRANSITION AREA

BETWEEN PHASES 3 AND 5. ALL WORK

IN THIS ARE TO BE ACCOMPLISHED

DURING 7 DAY SHUTDOWN OF AREA.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:2

P

M

GI105

PHASING PLAN - PHASE 3

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020 AWS JDJ

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/16" = 1'-0"GI105

1 PHASING PLAN - PHASE 3

N

NOT TO SCALE

KEYPLAN

TEMPOTARY POWER AND DATA

FOR TEMP. POS STATION

THIS AREA OF FLOOR TILE TO BE ABATED

DURING ALLOWED 7 DAY SHUT DOWN AS

PHASE 4

THIS AREA OF FLOOR TILE TO BE ABATED

DURING ALLOWED 7 DAY SHUT DOWN AS

PHASE 4

1 1

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: III

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES

A

B

C

D

E.

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT

SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS

THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO

BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S

WORK.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN

FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE

REBUILT.

INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 4/GI100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI100.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE

INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO

SPECIFICATION FOR ADDITIONAL INFORMATION.

EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH

THE CONSTRUCTION AREA AT ALL TIMES.

CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR

DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION

CONTROL AND COR.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

PHASING SCHEDULE

PHASE ONE WILL BE UNDER

CONSTRUCTION , WHILE THE REST OF

THE FACILTY WILL BE OPERATIONAL. EXIT

ACCESS MUST BE MAINTAINED DURING

THIS PHASE

THE AREA IN PHASE TWO WILL BE

UNDER CONSTRUCTION. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

THE AREA IN PHASE THREE WILL BE

UNDER CONSTRUCTION. THE

CONSTRUCTION IN AREA TWO WILL BE

COMPLETED AND OPERATIONAL

THIS AREA OF THE WORK TO BE

CONDUCTED ON NIGHTS AND WEEKENDS

SIMULTANEOUSLY DURING THE OTHER

PHASES OR DURING 7 DAY SHUT DOWN.

COORDINATE THE TIME FOR THIS WORK

WITH THE COR AND CANTEEN SERVICES.

THE AREA TO BE COMPLETED IN PARTS

AND ALL PARTS MUST BE BEGUN AND

COMPLETED WITHIN THE DOWN HOURS

(NIGHTS OR WEEKENDS) AND BE READY

FOR USE BY STAFF AND VETERANS FOR

THE NEXT BUSINESS HOURS.

PHASE 1

PHASE 2

PHASE 5

THE AREA IN PHASE TWO A WILL BE

UNDER TESTING FOR ASBESTOS

MASTIC ABATEMENT. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

PHASE 3

PHASE 4

THIS AREA TO BE A TRANSITION AREA

BETWEEN PHASES 3 AND 5. ALL WORK

IN THIS ARE TO BE ACCOMPLISHED

DURING 7 DAY SHUTDOWN OF AREA.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:2

P

M

GI106

PHASING PLAN - PHASE 4

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/16" = 1'-0"GI106

1 PHASING PLAN - PHASE 4

N

NOT TO SCALE

KEYPLAN

PHASING SCHEDULE

PHASE ONE WILL BE UNDER

CONSTRUCTION , WHILE THE REST OF

THE FACILTY WILL BE OPERATIONAL. EXIT

ACCESS MUST BE MAINTAINED DURING

THIS PHASE

THE AREA IN PHASE TWO WILL BE

UNDER CONSTRUCTION. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

THE AREA IN PHASE THREE WILL BE

UNDER CONSTRUCTION. THE

CONSTRUCTION IN AREA TWO WILL BE

COMPLETED AND OPERATIONAL

THIS AREA OF THE WORK TO BE

CONDUCTED ON NIGHTS AND WEEKENDS

SIMULTANEOUSLY DURING THE OTHER

PHASES OR DURING 7 DAY SHUT DOWN.

COORDINATE THE TIME FOR THIS WORK

WITH THE COR AND CANTEEN SERVICES.

THE AREA TO BE COMPLETED IN PARTS

AND ALL PARTS MUST BE BEGUN AND

COMPLETED WITHIN THE DOWN HOURS

(NIGHTS OR WEEKENDS) AND BE READY

FOR USE BY STAFF AND VETERANS FOR

THE NEXT BUSINESS HOURS.

PHASE 1

PHASE 2

PHASE 5

THE AREA IN PHASE TWO A WILL BE

UNDER TESTING FOR ASBESTOS

MASTIC ABATEMENT. THE AREA IN

PHASE ONE WILL BE OPERATIONAL.

PHASE 3

PHASE 4

THIS AREA TO BE A TRANSITION AREA

BETWEEN PHASES 3 AND 5. ALL WORK

IN THIS ARE TO BE ACCOMPLISHED

DURING 7 DAY SHUTDOWN OF AREA.

IC/PHASING LEGEND

TEMPORARY WALLS. SEE PLAN AND

PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS

REFERENCE AREA FOR ABOVE

CEILING WORK ON FLOOR BELOW.

REFER TO ENGINEERING DRAWINGS

FOR FULL SCOPE OF WORK

BEYOND PROJECT BOUNDARY

PROJECT BOUNDARY

INFECTION CONTROL PROJECT INFORMATION

CONSTRUCTION ACTIVITY - FIRE RISK: C

PATIENT RISK GROUP: LOW

CLASS OF PRECAUTION MATRIX: III

REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED

BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN THREE (3) PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND CANTEEN STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE

PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR

PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW

THE FLOOR PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN

THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO

KEEP NOISE AND VIBRATION TO A MINIMUM.

PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36" STICKY

WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR LOCATION.

MAT SHALL BE REPLACED OR CLEANED AS NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,

MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE

LIQUIDS UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

4 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED

WITH A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

INFECTION CONTROL GENERAL NOTES

PHASING GENERAL NOTES

A

B

C

D

E.

PROJECT AREAS TO BE OCCUPIED BY STAFF AND VETERANS THROUGHOUT

CONSTRUCTION.

PROJECT SHALL BE COMPLETED DURING REGULAR BUSINESS HOURS. NIGHT

SHIFTS, 5:00 PM TO 5:00 AM AND WEEKENDS SHALL BE USED TO FOR AREAS

THAT CANNOT BE CLOSED TO PUBLIC COORDINATED WITH COR. ALL WORK TO

BE COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S

WORK.

CONSTRUCTION WORK BEHIND TEMPORARY CONSTRUCTION PARTITIONS

SHALL BE COMPLETED REGULAR BUSINESS HOURS 5:00 AM TO 5:00 PM.

REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION

FOR EACH PHASE AND AREA OF WORK.

WHERE WALLS FROM SEQUENCED PHASES OVER LAP, WALLS CAN REMAIN

FROM SEQUENTIAL PHASE TO SEQUENTIAL PHASE WITHOUT HAVING TO BE

REBUILT.

INFECTION CONTROL PLAN NOTES #

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 3/GI100.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 4/GI100.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 2/GI100.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. SERVING LINE TO REMAIN OPERATIONAL. BARRIER TO BE

INSTALLED AND REMOVED DURING NIGHTS AND WEEKENDS WORK. REFER TO

SPECIFICATION FOR ADDITIONAL INFORMATION.

EXISTING EMERGENCY EGRESS EXIT ACCESS TO BE MAINTAINED THROUGH

THE CONSTRUCTION AREA AT ALL TIMES.

CREATE CONSTRUCTION VESTIBULE IN THIS APPROXIMATE LOCATION FOR

DURATION OF THE PHASE. COORDINATE FINAL LOCATION WITH INFECTION

CONTROL AND COR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:2

P

M

GI107

PHASING PLAN - PHASE 5

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020 AWS JDJ

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/16" = 1'-0"GI107

1 PHASING PLAN - PHASE 5

N

NOT TO SCALE

KEYPLAN

DEMOLITION GENERAL NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE FLOOR PLAN

AS101 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION…