This document outlines a federal solicitation to renovate the Canteen food court and offices at the Oklahoma City VA Medical Center. The purpose of the project is to create a more accessible space for disabled and bariatric patients and staff by centralizing and enlarging the dining, deli storage, tray wash, and kitchen grill storage areas. This will be accomplished by relocating some offices towards the mechanical room. A 24-hour dining area will also be added. Work includes HVAC, electrical, and emergency power upgrades along with new finishes. The total estimated cost is between $1-2 million. The opportunity is set aside for Service-Disabled Veteran Owned Small Businesses and the NAICS code is 236220. The full solicitation will be posted on or after October 21, 2020. The solicitation number is 36C25921R0004 and the project name is Z2DA--Renovate Canteen Food Court and Office Suite. The solicitation is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19.

View the file

Other files

File Type Posted
36C25921R0004 0010.docx DOCX document
RFI 5.pdf PDF
36C25921R0004 0009.docx DOCX document
36C25921R0004 0008.docx DOCX document
RFI 4.pdf PDF
36C25921R0004 0007.docx DOCX document
RFI 3.pdf PDF
VVOC17 PL201 plumb changes.pdf PDF
ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.pdf PDF
UPDATED bid docs sheets.pdf PDF
36C25921R0004 0006.docx DOCX document
RFI 2 Canteen Food Court Working 12.14.2020.pdf PDF
36C25921R0004 0005.docx DOCX document
36C25921R0004 0004.docx DOCX document
Pre-Bid Sign-In Sheet Canteen Food Court.pdf PDF
36C25921R0004 0003.docx DOCX document
36C25921R0004R2 Page 1.pdf PDF
16.1035.02_2020.04.27_bid docs_ total.pdf PDF
36C25921R0004 Pg1 Revised.pdf PDF
36C25921R0004 0002.docx DOCX document
RFIs 1.pdf PDF
36C25921R0004 0001.docx DOCX document
SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
635-16-104 Approved Construction Drawings.pdf PDF
OKC Canteen Specs Vol 1.pdf PDF
OKC Canteen Specs Vol 2.pdf PDF
S02 Past Performance Questionnaire.docx DOCX document
36C25921R0004_2.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEMOLITION GENERAL NOTES

A. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION

AND REPAIR NECESSARY TO COMPLETE NEW AND REMODEL

CONSTRUCTION SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE

EXISTING IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON

THE DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

B. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AS001 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

C. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

D. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OF UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

E. EXTENTS OF DEMOLITION SHALL BE COORDINATE WITH THE FLOOR PLAN

AS101 AND ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.

F. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

G. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF

CONSTRUCTION ASSEMBLIES IN THEIR ENTIRETY TO ACCOMMODATE NEW

CONSTRUCTION, UNLESS NOTED OTHERWISE.

H. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECABLE.

I. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANNER UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE

PATCHED AND COMPLETELY REPAINTED TO MATCH EXISTING CEILING

COLOR, FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL

INCLUDE REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL

ASSOCIATED ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED

CEILING PANELS, WITHIN AND BEYOND PROJECT LIMITS.

J. COORDINATE FULL SCOPE OF DEMOLITION WORK WITH ENGINEERING AND

VENDOR DRAWINGS.

K. WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB

SHALL BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW

FLOORING MANUFACTURES RECOMMENDATIONS. REFER TO

SPECIFICATION 09 05 16.

DEMOLITION PLAN NOTES

1. WALL CONSTRUCTION TO REMAIN. REMOVE GYPSUM BOARD

CONSTRUCTION TO STUDS ON PROJECT SIDE OF WALL. WALL TO REMAIN IN

PLACE ON OTHER SIDE OF WALL. CONTRACTOR IS RESPONSIBLE FOR ANY

DAMAGE CAUSED TO OTHER SIDE OF ROOM AND REMAINING WALL

CONSTRUCTION.

2. REMOVE WALL AND FLOOR MOUNTED CASEWORK.

3. REMOVE RESILIENT TILE FLOORING AND WALL BASE. COMPLETELY FROM

THIS ROOM

4. REMOVE CERAMIC TILE FLOORING, ASSUME THICK SET MORTAR BED

COMPLETELY FROM THIS ROOM

5. REMOVE CERAMIC WALL TILE, ASSUME 3/4" THICK SET MORTAR BED

COMPLETELY WHERE INDICATED

6. REMOVE INDICATED PORTION OF WALL TO ACCOMMODATE NEW WORK.

REFER TO AS101.

7. EXISTING EXPANSION JOINT. REMOVE COVER PLATE AND PREP FOR NEW

EXPANSION JOINT COVER, DO THIS FOR THE ENTIRE LENGTH OF THE

EXPANSION JOINT IN THE CONSTRUCTION AREA.

8. REMOVE EXISTING WALL FINISH FROM EXISTING WALL TO REMAIN. SAND

AND PREP TO RECEIVE SCHEDULED FINISH, REFER TO AF101.

9. REMOVE EXISTING VENDING MACHINES.

10. EXISTING TRAY WASH MACHINE TO BE REMOVED FROM THIS ROOM AND

RELOCATED AS INDICATED IN NEW CONSTRUCTION.

11. EXISTING BAG IN THE BOX LEAD LINES LOCATED IN THIS AREA. NEW

LOCATION OF BAG IN THE BOX SODA LINES REQUIRES COMPLETE REMOVAL

OF ALL EXISTING LINES AND REROUTING. EXISTING PENETRATIONS OF ALL

FLOOR AND OR UPPER DECK FOR LINES TO BE COMPLETELY PATCHED AND

PREPAIRED WITH SIMILAR MATERIAL TO FLOOR OR DECK TO MAINTAIN

FLOOR AND OR UPPER DECK RATING.

12. REMOVE EXISTING DOOR AND FRAME COMPLETELY. PREPARE WALL FOR

NEW DOOR AND FRAME IN SAME LOCATION.

13. EXISTING POINT OF SALE STATIONS TO BE REMOVED AND REINSTALLED AS

REQUIRED.

14. EXISTING TILE ON THIS WALL TO REMAIN. CONTRACTOR TO PROTECT AND

PRESERVE TILES DURING CONSTRUCTION, ANY DAMAGED TILE TO BE

REPLACED AT THE EXPENSE OF THE CONTRACTOR.

15. EXISTING SERVING LINE CASEWORK TO BE TEMPORARLIY REMOVED AND

REINSTALLED FOR INSTALLATION OF CURB UNDER CASEWORK. ALL

SERVING CASEWORK TO BE PRESERVED FOR THE ENTIRE CONSTRUCTION

PERIOD.

16. EXISTING SECURITY GATE TO BE REMOVED AND ALL ASSOCIATED

HARDWARE AND INSTALLATIONS. REPAIR EXISTING CONSTRUCTION WHERE

GATE HAS BEEN REMOVED TO RECIEVE NEW CONSTRUCTION.

17. EXISTING WALL TO REMAIN, PATCH AND REPAIR SURFACE FOR NEW

CONSTRUCTION.

18. EXISTING STANDPIPE TO BE REMOVED. STANDPIPE TO BE CAPPED BELOW

FIRST FLOOR IN BASEMENT. THE REMAINDER OF THE EXISTING STANDPIPE

TO BE REMOVED FROM THE FIRST FLOOR THROUGH THE FIFTH FLOOR.

CONTRACTOR TO COORDINATE CONDITIONS AND TIMING OF REMOVAL OF

PIPING FROM FLOORS ABOVE AREA OF WORK WITH THE COR AND

INFECTION CONTROL ONSITE PRIOR TO COMENCING WITH ANY WORK.

19. AREA IS IDENTIFIED AS HAVING ASBESTOS CONTAINING BLACK MASTIC

UNDER VINYL FLOORING. ASBESTOS TO BE MITIGATED PER SPECIFICATION

SECTION 02.82.13.19- ASBESTOS FLOOR TILE AND MASTIC ABATEMENT SPEC

STAIR 4

STAIR 3

TELE/DATA CLOSET

GB107

ELEC

GB104J

ELEC

GB104g

CANTEEN KITCHEN

GB104b

STORAGE

GB105

N.I.C

N.I.C

N.I.C

8 8

8 8

14 14 14 14

15 15

8 5

DELI

GB104f

OFFICE

GB106b

STORAGE

GB104f11

OFFICE

GB106a

OFFICE CANTEEN

SERVICE

GB106

OFFICE

GB106c

H.A.C

GB104l

TRAY WASH

GB104k1

STORAGE

GB104K

CANTEEN DINING

ROOM

GB104h

MECHANICAL ROOM

GB104i

CANTEEN

GB104

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

N O

T F O

R

C O

N S

TR

U

C

TIO

N

C U s e rs \a s c h a e w e \D o c u m e n ts

\1 .1

.0

V

A O k la h o m a

C it y C a n te e n

R e m o d e l_ a s c h a e w e g u id o n d e s ig n .c o m

.r v t

/2

/2

:0

:0

P

M

AD101

FIRST FLOOR DEMOLITION PLAN

GUIDON DESIGN, INC

1221 N. PENNSYLVANIA ST.

INDIANAPOLIS, IN 46202

317.800.6388

CMTA CONSULTING ENGINEERS, INC

10411 MEETING STREET

PROSPECT, KY 40059

RENOVATE CANTEEN FOOD &

OFFICE SUITE

OKLAHOMA CITY, OK

635-16-104

MAIN BLDG.

JOHN WILSON, COR

04/27/2020 AWS LC

BID DOCUMENTS

FULLY SPRINKLERED

Revisions: Date:

SCALE: 3/16" = 1'-0"AD101

1 DEMOLITION PLAN

N

NOT TO SCALE

KEYPLAN

N aschaewe Polygon aschaewe Contractor aschaewe Text Box aschaewe Arrow