620-23-206 14CD DWGS 1 of 2.pdf
PDF 40 MB Posted
- Solicitation number
- 36C24227B0001_1
About this file
This file is a set of architectural drawings for a renovation project at a Department of Veterans Affairs facility. The drawings are labeled "620-23-206 14CD DWGS 1 of 2" and depict floor plans and construction details for Buildings 14AB and CD as part of solicitation 36C24227B0001_1. The drawings illustrate the layout modifications, room configurations, and spatial arrangements required for the renovation work at the Veterans Integrated Service Network 2 facility.
The drawings serve as technical specifications for contractors bidding on the renovation solicitation titled "Z2DA--620-23-206 and 620-20-105 Renovate B. 14 AB and CD." These architectural plans are essential reference documents that define the scope of construction work, including structural modifications, room configurations, and facility layout changes required to complete the renovation project. This is the first of two drawing sets and represents critical technical documentation that prospective contractors must review to understand and accurately bid on the renovation requirements.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04/30/2026
EXISTING
BUILDING 14
121.13
EX SW
121.52
EX SW
121.53
EX SW
121.50
EX SW
120.69
EX SW
120.87
EX SW
120.80
EX SW
121.86
EX SW 122.19
EX SW
120.80
EX SW
120.79
EX SW
121.01
EX SW
121.07
EX SW
EX. 6" SAN. SEWER
EXISTING
BASKETBALL COURT
FF=124.0'
SOG=0'-0"
1"=10'F1 CIVIL SITE PLAN - SOUTH TOWER ENLARGED VIEW
VA FORM 08 - 6231
U.S. Department of Veterans Affairs
ISSUED FOR
CONSTRUCTION
Structural 2575 E Camelback Rd, Suite 740 Phoenix, AZ 85016
(602) 997-7536 Bryan K. Salt, P.E., S.E.
620-23-206
14CD
CIVIL SITE PLAN
010' 10' 20'5'
CONTRACTOR NOTE
"LIMITS OF CONSTRUCTION" IDENTIFIES AN IMAGINARY LINE AROUND ALL AREAS IN WHICH CONSTRUCTION WILL OCCUR. SOME ADDITIONAL AREAS MY BE IMPACTED BY UTILITY INFRASTRUCTURE TIE-INS. COORDINATE WITH COR.
"LIMITS OF CONTRACTOR FENCED AREA" IDENTIFIES THE CONTRACTOR'S FENCE (TO COMPLY WITH VA STANDARDS) AROUND
THE BUILDING CONSTRUCTION AREA. COORDINATE WITH COR.
"OPTIONAL TEMPORARY CONTRACTOR MATERIAL LAYDOWN AREA" IDENTIFIES AREAS FOR CONTRACTOR TO TEMPORARILY
STAGE MATERIALS.
LEGEND
EXISTING PROPOSED
LIMITS OF CONSTRUCTION
EX. CONCRETE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
SIDEWALK
X X8' HIGH CONSTRUCTION FENCE
SEWER/STORM PVC CLEAN-OUT
STORM DRAIN INLET
X X
SAW-CUT LINE
F/F FACE TO FACE
FF EL FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOW LINE
FM FORCED MAIN SEWER
FOC FACE OF CURB
FT FEET OR FOOT
FTG FOOTING
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HNDRL HANDRAIL
HORIZ HORIZONTAL
ID INSIDE DIAMETER OR INSIDE DIMENSION
INFO INFORMATION
INV INVERT
INV EL INVERT ELEVATION
LAT LATITUDE
LF LINEAR FEET (FOOT)
LOC LOCATION
LP LOW POINT
LS LUMP SUM
MATL MATERIAL
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
MTG MEETING
MULT MULTIPLE
N NORTH
NA NOT APPLICABLE
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
PC POINT OF CURVE
PCT PERCENT
PI POINT OF INTERSECTION
PL PROPERTY LINE
PRKG PARKING
PROJ PROJECT
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE (PLASTIC)
QTY QUANTITY
R RADIUS
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RD ROAD OR ROOF DRAIN
REQD REQUIRED
ROW RIGHT OF WAY
RT RIGHT
RW ROADWAY
ABBRV ABBREVIATION
ABC AGGREGATE BASE COURSE
AC ASPHALTIC CONCRETE
ACP ASPHALTIC CONCRETE PAVING
ADA AMERICANS WITH DISABILITIES ACT
AGGR AGGREGATE
APPROX APPROXIMATE
ASPH ASPHALT
ASSY ASSEMBLY
AVE AVENUE
BC BACK OF CURB
BDRY BOUNDARY
BITUM BITUMINOUS
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BRG BEARING
CB CATCH BASIN
CFS CUBIC FEET PER SECOND
CL CENTER LINE
CLASS CLASSIFICATION
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO SEWER CLEAN OUT
CONC CONCRETE
CONSTR CONSTRUCTION
COORD COORDINATE
CORR CORRIDOR
CU FT CUBIC FEET
CU YD CUBIC YARD
DA DRAINAGE AREA
DAT DATUM
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESCR DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DIST DISTANCE
DWG DRAWING
E EAST
EA EACH
EC EDGE OF CURB
EG EXISTING GRADE
EL ELEVATION
ENGR ENGINEER
ENTR ENTRANCE
EP EDGE OF PAVEMENT (PAVING)
EPA ENVIRONMENTAL PROTECTION AGENCY
EQUIP EQUIPMENT
ERD EXISTING ROOF DRAIN
ES EDGE OF SHOULDER
ESMT EASEMENT
EST ESTIMATE
EX EXISTING
EXIST EXISTING
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SECT SECTION
SF SQUARE FOOT (FEET)
SHLDR SHOULDER
SMH STEAM MANHOLE
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ YD SQUARE YARD
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
ST STREET
STLT STREETLIGHT
STA STATION
STD STANDARD
STM STEAM
SURF SURFACE
SURV SURVEY
SW SIDEWALK
SWR SEWER
SYM SYMBOL
TAN TANGENT
TC TOP OF CURB
TD TRENCH DRAIN
TE TOP ELEVATION
TEMP TEMPORARY
THK THICKNESS
THRU THROUGH
TMH TOP OF MANHOLE
TOC TOP OF CURB
TOC WALL TOP OF CONCRETE WALL
TOF TOP OF FOOTING
TOP TOP OF WALL
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TYP TYPICAL
UGND UNDERGROUND
UNPV RD UNPAVED ROAD
UON UNLESS OTHERWISE NOTED
UTIL UTILITY
VAR VARIES
VC VERTICAL CURVE
VERT VERTICAL
VIC VICINITY
VOL VOLUME
W WEST
W/ WITH
W/O WITHOUT
CIVIL SHEET ABBREVIATIONS
WATERLINE
SANITARY SEWER LINE
STORM DRAIN LINE
UNDERGROUND ELECTRICAL LINE
TELECOMMUNICATIONS
EXCAVATION NOTE
SURVEY DISCLAIMER
CONTRACTOR NOTE
1. EXCEPT AS PROVIDED HEREIN, GRADING SHALL BE PERFORMED AT THE ELEVATIONS AND IN ACCORDANCE WITH THE DETAILS
SHOWN ON THIS SHEET.
2. THE COST FOR REQUIRED CONSTRUCTION DUST AND EROSION CONTROL MEASURES SHALL BE INCIDENTAL TO THE PROJECT
COST.
3. ALL WORK RELATIVE TO FOUNDATION CONSTRUCTION, SITE PREPARATION, AND PAVEMENT INSTALLATION, AS SHOWN ON THIS PLAN, SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "GEOTECHNICAL INVESTIGATION", AS PROVIDED BY THE ARCHITECT OR OWNER. ALL OTHER WORK SHALL, UNLESS OTHERWISE STATED OR PROVIDED FOR HEREON, BE CONSTRUCTED IN ACCORDANCE WITH THE PROJECT, (FIRST PRIORITY) SPECIFICATIONS, AND/OR THE TOWN OF CORTLANDT, MUNICIPAL CODE
(SECOND PRIORITY).
4. EARTH SLOPES SHALL NOT EXCEED 3 HORIZONTAL TO 1 VERTICAL UNLESS SHOWN OTHERWISE.
5. IT IS THE INTENT OF THESE PLANS THAT THIS CONTRACTOR SHALL NOT PERFORM ANY WORK OUTSIDE OF THE PROPERTY
BOUNDARIES EXCEPT AS REQUIRED BY THIS PLAN.
6. THE CONTRACTOR IS TO ENSURE THAT NO SOIL ERODES FROM THE SITE ONTO ADJACENT PROPERTY OR PUBLIC RIGHT-OF-WAY. THIS SHOULD BE ACHIEVED BY CONSTRUCTING TEMPORARY BERMS OR SILT FENCE AT THE PROPERTY LINES
AND WETTING THE SOIL TO PROTECT IT FROM WIND EROSION.
7. A DISPOSAL SITE FOR ANY & ALL EXCAVATION MATERIAL, AND UNSUITABLE MATERIAL AND/OR A BORROW SITE CONTAINING ACCEPTABLE FILL MATERIAL SHALL BE OBTAINED BY THE CONTRACTOR IN COMPLIANCE WITH APPLICABLE ENVIRONMENTAL REGULATIONS AND APPROVED BY THE OBSERVER. ALL COSTS INCURRED IN OBTAINING A DISPOSAL OR BORROW SITE AND HAUL TO OR FROM SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT AND NO SEPARATE MEASURE OR PAYMENT SHALL BE
MADE.
8. PAVING AND ROADWAY GRADES SHALL BE +/- 0.1' FROM PLAN ELEVATIONS. PAD ELEVATIONS SHALL BE +/- 0.05' FROM
BUILDING PLAN ELEVATION.
9. VERIFY ALL ELEVATIONS SHOWN ON PLAN FROM BASIS OF ELEVATION CONTROL STATION PRIOR TO BEGINNING
CONSTRUCTION.
GRADING NOTES
CONSTRUCTION NOTES
CONSTRUCT TEMPORARY 8' HIGH CONSTRUCTION FENCING
EX. CONSTRUCTION YARD ENTRANCE GATE - 6' LOCKING - CONSTRUCTED W/ PKG 1
- E. FENCING CONSTRUCTED W/ PKG 1, TO BE REMOVED UPON COMPLETION OF RENOVATION
EXISTING TREE TO REMAIN, PROTECT IN PLACE
- PKG 1, PHASE 2 FENCING SHOWN THIS SHEET
>FOUNDATION DRAIN LINE
CONSTRUCT TRASH CART AT TRASH CHUTE TO BE EMPTIED DAILY - SEE ARCHITECTURE PLANS
EX. CONSTRUCTION YARD ENTRANCE GATE - 6' LOCKING - CONSTRUCTED W/ PKG 2
FURNISH AND INSTALL DUMPSTER - MAINTAIN 35' CLEAR OF ANY BUILDING. COORDINATE LOCATION
OF DUMPSTER WITH VA COR.
SURVEY INFORMATION OF SITE DETERMINED FROM VA SUPPLIED AS-BUILT DRAWINGS AND , PHOTOGRAPHIC, VISUAL, AND LIDAR SURVEY CONDUCTED BY TRIPLE C. CONSTRUCTION HAS OCCURRED ON THIS SITE SINCE THE SURVEY WAS COMPLETED.
CONDITION OF THE SITE MAY VARY FROM THE SURVEYED CONDITION. UTILITY LOCATIONS ARE IN APPROXIMATE LOCATION.
CONTRACTOR TO PROVIDE UTILITY LOCATION SERVICE PRIOR TO EXCAVATION FOR VERIFICATION OF LOCATION AND DEPTH OF ALL UTILITIES TO PROVIDE NON-INTERRUPTION OF SERVICE, TO ENSURE PROPER CLEARANCE/SEPARATION, AND TO AVOID DAMAGE THERETO. UTILITIES DAMAGED THROUGH NEGLIGENCE OF THE CONTRACTOR TO OBTAIN LOCATION OF SAME SHALL BE
REPAIRED OR REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN UTILITIES.
GENERAL CONTRACTOR TO RETAIN SERVICE FROM INDEPENDENT CONTRACTOR TO VERIFY AND MARK ON CONSTRUCTION DRAWINGS AND ON SITE THE LOCATION OF ALL UNDERGROUND UTILITIES ASSOCIATED WITH THIS PROJECT. CONTRACTOR SHALL
PROVIDE ONE HARD AND ONE ELECTRONIC COPY OF SURVEY TO THE VA.
1. ALL WORK DETAILED ON THESE PLANS AND PERFORMED UNDER THIS CONTRACT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND THE GEOTECHNICAL REPORT. WHERE APPLICABLE, TOWN OF CORTLANDT, MUNICIPAL
CODE SHALL APPLY.
2. THE CONTRACTOR SHALL ABIDE BY ALL LOCAL, STATE, AND FEDERAL LAWS, RULES AND REGULATIONS WHICH APPLY TO THE CONSTRUCTION OF THESE IMPROVEMENTS, INCLUDING EPA REGULATIONS WITH RESPECT TO STORM WATER DISCHARGE.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL POTENTIAL OBSTRUCTIONS INCLUDING ALL UNDERGROUND UTILITIES. THE CONTRACTOR'S SURVEYOR SHALL DOCUMENT THE HORIZONTAL LOCATION AND ELEVATION OF UTILITIES THAT ARE EXPOSED. SHOULD A CONFLICT EXIST, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) OR ENGINEER SO THE CONFLICT CAN BE RESOLVED WITH A
MINIMUM AMOUNT OF DELAY.
4. ALL ELECTRICAL, TELEPHONE, CABLE TV, GAS AND OTHER UTILITY LINES, CABLES, AND APPURTENANCES ENCOUNTERED DURING CONSTRUCTION THAT REQUIRE RELOCATION, SHALL BE COORDINATED WITH THE COR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL NECESSARY UTILITY ADJUSTMENTS. NO ADDITIONAL COMPENSATION WILL BE ALLOWED FOR DELAYS OR INCONVENIENCES CAUSED BY UTILITY COMPANY WORK CREWS. THE CONTRACTOR MAY BE REQUIRED TO RESCHEDULE HIS ACTIVITIES TO ALLOW UTILITY CREWS TO PERFORM THEIR REQUIRED WORK.
5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL EXISTING UTILITY LINES WITHIN THE CONSTRUCTION AREA. ANY DAMAGE TO EXISTING FACILITIES CAUSED BY CONSTRUCTION ACTIVITY SHALL BE REPAIRED OR REPLACED AT THE
CONTRACTOR'S EXPENSE AND APPROVED BY THE VA/COR.
6. CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE PROPERTY AND/OR PROJECT LIMITS. ANY DAMAGE TO ADJACENT PROPERTIES RESULTING FROM CONSTRUCTION PROCESS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
7. THE CONTRACTOR SHALL NOT STORE EQUIPMENT OR MATERIAL OUTSIDE THE CONSTRUCTION LIMITS WITHOUT THE
PERMISSION OF THE VA.
8. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS FOR THE PROJECT PRIOR TO COMMENCING CONSTRUCTION (I.E.
BARRICADING, TOPSOIL DISTURBANCE, EXCAVATION PERMITS, EPA STORM WATER PERMITS, ETC.)
9. ALL PROPERTY CORNERS DESTROYED DURING CONSTRUCTION SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. ALL
PROPERTY CORNERS MUST BE RESET BY A REGISTERED LAND SURVEYOR.
10. THE CONTRACTOR SHALL PREPARE A CONSTRUCTION TRAFFIC CONTROL AND SIGNING PLAN AND OBTAIN APPROVAL OF SUCH PLAN FROM THE CONTRACT OFFICER'S REPRESENTATIVE (COR), PRIOR TO BEGINNING ANY CONSTRUCTION WORK ON OR
ADJACENT TO EXISTING STREETS.
11. ALL BARRICADES AND CONSTRUCTION SIGNING SHALL CONFORM TO APPLICABLE SECTIONS OF THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), US DEPARTMENT OF TRANSPORTATION, LATEST EDITION.
12. THE CONTRACTOR SHALL MAINTAIN ALL CONSTRUCTION BARRICADES AND SIGNING AT ALL TIMES. THE CONTRACTOR SHALL VERIFY THE PROPER LOCATION OF ALL BARRICADING AT THE END AND BEGINNING OF EACH DAY.
13. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO CONFORM WITH EPA REQUIREMENTS, INCLUDING COMPLIANCE WITH NPDES PHASE 2 REQUIREMENTS. THIS INCLUDES PREPARATION OF A STORM WATER POLLUTION PREVENTION PLAN (SWPPP), FILING THE NOTICE OF INTENT AND MAINTENANCE OF SWPPP BEST MANAGEMENT PLANS (BMP'S).
GENERAL NOTES
NOTE:
1. CHAIN LINK CONSTRUCTION FENCING IS TO BE INSTALLED PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.
2. CHAIN LINK CONSTRUCTION FENCE SHALL BE A MINIMUM OF 96" ABOVE GRADE.
3. FENCE SHALL BE INSPECTED DAILY AFTER CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED FOR THE DAY. IF DAMAGED, FENCING SHALL BE REPAIRED
IMMEDIATELY.
4. CHAIN LINK CONSTRUCTION FENCE IS SHOWN ON IMPERVIOUS SURFACES, SUCH AS THE EXISTING DRIVE AND PARKING AND GRASS AREAS. POST ARE TO
BE ANCHORED ON SURFACE STANDS. STEEL PIPE IS NOT TO BE DRIVEN BELOW GRADE.
NOT TO SCALE B1
NOTES:
- TEMPORARY FENCE TO BE REMOVED UPON
COMPLETION OF RENOVATION.
8/7/2023 Page 16 of 16601/27/2026
Page 17 of 16601/27/2026
Page 18 of 16601/27/2026
Page 19 of 16601/27/2026
Page 20 of 16601/27/2026
Page 21 of 16601/27/2026
Page 22 of 16601/27/2026
File details come from the government source that posted it. Updated .