This document is a bid tabulation for Project #608707, a reconstruction project on Sea Street in Quincy, Massachusetts. The project is contracted through the Massachusetts Department of Transportation, District 6. The work includes various construction activities such as tree trimming, drainage structure work, water pipe installation, pavement milling and paving, sidewalk and curb construction, and traffic signal and lighting upgrades. Bid quantities are provided for over 100 line items. Bids were due on October 3, 2023, and the project has a fixed price schedule of operations component.
The bid tabulation shows pricing from 7 contractors, with the lowest bid of $9,195,190 from A R BELLI INC. Pricing for individual line items is provided, along with the engineer's office estimate. The project appears to be funded through state and local sources, but specific funding amounts and requirements are not detailed in the document. There is no information provided about any set-asides, incumbents, or the current contracting environment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 608707 A2~1.pdf | ||
| 608707 NTC.pdf | ||
| 608708 A1.pdf | ||
| 608707 WZS.pdf | ||
| 608707 SP.pdf | ||
| 608707 BidResults.pdf | ||
| 608707 PD.pdf | ||
| 608707 MPM.pdf | ||
| 608707 NoI P2.pdf | ||
| 608707 OoC.pdf | ||
| BIL 608707.txt | TXT text file | |
| 608707 ACF.pdf | ||
| 608707 DS.pdf | ||
| 608707 DBE.pdf | ||
| 608707 FW.pdf | ||
| 608707 PUCF.pdf | ||
| 608707 NoI P1.pdf | ||
| 608707 MPMA.pdf | ||
| BIL 608707 A1.txt | TXT text file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prelims Unit
Bid Tabulations
Project # : 608707 Bids Open Date : 03 Oct 2023 Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
Office Estimate A R BELLI INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00 $73,500.00 $73,500.00
102.2 1.000 LS TREE TRIMMING $4,999.00 $4,999.00 $7,000.00 $7,000.00
102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $400.00 $10,000.00 $475.00 $11,875.00
102.55 40.000 HR ARBORIST $200.00 $8,000.00 $225.00 $9,000.00
103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $1,100.00 $3,300.00 $2,778.00 $8,334.00
120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $50.00 $125,000.00 $78.00 $195,000.00
141.1 90.000 CY TEST PIT FOR EXPLORATION $110.00 $9,900.00 $185.00 $16,650.00
144. 20.000 CY CLASS B ROCK EXCAVATION $200.00 $4,000.00 $250.00 $5,000.00
145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $980.00 $980.00 $669.00 $669.00
146. 4.000 EA DRAINAGE STRUCTURE REMOVED $800.00 $3,200.00 $700.00 $2,800.00
151. 3,455.000 CY GRAVEL BORROW $60.00 $207,300.00 $1.00 $3,455.00
156. 20.000 TON CRUSHED STONE $65.00 $1,300.00 $45.00 $900.00
170. 10,000.000 SY FINE GRADING AND COMPACTING $11.00 $110,000.00 $17.70 $177,000.00
201. 12.000 EA CATCH BASIN $5,500.00 $66,000.00 $7,778.00 $93,336.00
202. 8.000 EA MANHOLE $6,600.00 $52,800.00 $8,500.00 $68,000.00
204. 4.000 EA GUTTER INLET $2,700.00 $10,800.00 $4,500.00 $18,000.00
220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $700.00 $40,600.00 $478.00 $27,724.00
220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,395.00 $4,185.00 $1,100.00 $3,300.00
220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $875.00 $1,750.00 $850.00 $1,700.00
220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $550.00 $14,300.00 $478.00 $12,428.00
220.8 1.000 EA SANITARY STRUCTURE REMODELED $1,000.00 $1,000.00 $1,200.00 $1,200.00
222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL
STANDARD
$1,000.00 $29,000.00 $1,112.00 $32,248.00
223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND
DISCARDED
$180.00 $1,620.00 $50.00 $450.00
227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $300.00 $12,000.00 $450.00 $18,000.00
227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $10.00 $15,000.00 $5.00 $7,500.00
227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $20,000.00 $20,000.00 $29,000.00 $29,000.00
238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $200.00 $20,000.00 $188.00 $18,800.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 1 of 24
Project # : 608707 Bids Open Date : 03 Oct 2023 Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
Office Estimate A R BELLI INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $135.00 $74,250.00 $169.00 $92,950.00
302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER
GASKET)
$150.00 $3,750.00 $196.00 $4,900.00
309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $15.00 $2,100.00 $10.00 $1,400.00
347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $130.00 $13,000.00 $177.00 $17,700.00
357.06 5.000 EA 6 INCH GATE BOX $735.00 $3,675.00 $3,777.00 $18,885.00
358. 40.000 EA GATE BOX ADJUSTED $300.00 $12,000.00 $339.00 $13,560.00
376. 3.000 EA HYDRANT $7,200.00 $21,600.00 $7,778.00 $23,334.00
376.3 3.000 EA HYDRANT - REMOVED AND STACKED $1,100.00 $3,300.00 $250.00 $750.00
381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $455.00 $9,100.00 $350.00 $7,000.00
381.3 80.000 EA SERVICE BOX ADJUSTED $300.00 $24,000.00 $225.00 $18,000.00
384. 10.000 EA CURB STOP $1,000.00 $10,000.00 $1,400.00 $14,000.00
390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $2,500.00 $12,500.00 $1,400.00 $7,000.00
402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $85.00 $36,975.00 $67.00 $29,145.00
415.3 31,785.000 SY PAVEMENT MICRO MILLING $30.00 $953,550.00 $7.20 $228,852.00
431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE
COURSE
$110.00 $99,550.00 $144.00 $130,320.00
440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.50 $7,500.00 $0.50 $7,500.00
443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $85.00 $2,550.00 $100.00 $3,000.00
450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $150.00 $600,000.00 $139.00 $556,000.00
450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$145.00 $50,750.00 $178.00 $62,300.00
450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $230.00 $112,700.00 $169.00 $82,810.00
450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $123.54 $219,901.20 $122.00 $217,160.00
451. 250.000 TON HMA FOR PATCHING $250.00 $62,500.00 $100.00 $25,000.00
452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $9.00 $22,410.00 $9.50 $23,655.00
453. 12,990.000 FT HMA JOINT SEALANT $2.00 $25,980.00 $1.00 $12,990.00
472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $275.00 $100,375.00 $210.00 $76,650.00
476. 250.000 SY CEMENT CONCRETE PAVEMENT $230.00 $57,500.00 $144.00 $36,000.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 2 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
Office Estimate A R BELLI INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX
WIDENING
$4.50 $18,000.00 $7.00 $28,000.00
503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $92.00 $239,200.00 $85.00 $221,000.00
503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $60.00 $12,600.00 $100.00 $21,000.00
504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $68.00 $403,240.00 $67.00 $397,310.00
504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $90.00 $96,300.00 $74.00 $79,180.00
509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - STRAIGHT
$75.00 $92,250.00 $73.00 $89,790.00
509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - CURVED
$100.00 $72,500.00 $78.00 $56,550.00
514. 10.000 EA GRANITE CURB INLET - STRAIGHT $678.00 $6,780.00 $700.00 $7,000.00
515. 5.000 EA GRANITE CURB INLET - CURVED $825.00 $4,125.00 $700.00 $3,500.00
570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $26.00 $2,600.00 $14.00 $1,400.00
580. 2,780.000 FT CURB REMOVED AND RESET $50.00 $139,000.00 $45.00 $125,100.00
581. 5.000 EA CURB INLET REMOVED AND RESET $310.00 $1,550.00 $300.00 $1,500.00
591. 2.000 EA CURB INLET REMOVED AND STACKED $150.00 $300.00 $10.00 $20.00
594. 2,780.000 FT CURB REMOVED AND DISCARDED $12.00 $33,360.00 $8.00 $22,240.00
645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$100.00 $15,000.00 $78.00 $11,700.00
670. 200.000 FT FENCE REMOVED AND RESET $106.00 $21,200.00 $14.00 $2,800.00
685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $1,100.00 $49,500.00 $919.00 $41,355.00
697.1 18.000 EA SILT SACK $200.00 $3,600.00 $177.00 $3,186.00
701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $90.00 $486,000.00 $78.00 $421,200.00
701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $85.00 $212,500.00 $108.00 $270,000.00
701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $135.00 $108,000.00 $119.00 $95,200.00
702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $250.00 $82,500.00 $229.00 $75,570.00
705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $350.00 $3,500.00 $477.00 $4,770.00
706.1 10.000 SY BRICK WALK REMOVED AND RELAID $650.00 $6,500.00 $477.00 $4,770.00
714. 1.000 EA MONUMENT REMOVED AND RESET $10,000.00 $10,000.00 $5,700.00 $5,700.00
718.1 1.000 LS FLAGPOLE REMOVED AND RESET $5,000.00 $5,000.00 $3,900.00 $3,900.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 3 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
Office Estimate A R BELLI INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE
A)
$3,500.00 $115,500.00 $5,339.00 $176,187.00
748. 1.000 LS MOBILIZATION $274,480.00 $274,480.00 $278,000.00 $278,000.00
751. 185.000 CY LOAM BORROW $80.00 $14,800.00 $85.00 $15,725.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$5,000.00 $5,000.00 $17,700.00 $17,700.00
765. 1,310.000 SY SEEDING $3.00 $3,930.00 $3.00 $3,930.00
767.6 145.000 CY AGED PINE BARK MULCH $85.00 $12,325.00 $100.00 $14,500.00
786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $50.00 $10,000.00 $85.00 $17,000.00
796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $25.00 $2,500.00 $78.00 $7,800.00
804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC
(UL)
$60.00 $600,000.00 $47.70 $477,000.00
804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -
(UL)
$60.00 $356,400.00 $50.00 $297,000.00
811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $2,200.00 $11,000.00 $2,448.00 $12,240.00
811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $1,500.00 $75,000.00 $1,998.00 $99,900.00
811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $2,000.00 $90,000.00 $1,448.00 $65,160.00
812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $5,000.00 $20,000.00 $3,500.00 $14,000.00
812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $2,500.00 $110,000.00 $2,778.00 $122,232.00
813.71 100.000 EA GROUND ROD 8 FEET LONG $200.00 $20,000.00 $277.00 $27,700.00
813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $85,000.00 $85,000.00 $78,000.00 $78,000.00
813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.
$5,000.00 $5,000.00 $9,800.00 $9,800.00
814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $153,000.00 $153,000.00 $190,900.00 $190,900.00
815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $254,000.00 $254,000.00 $378,000.00 $378,000.00
816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$121,000.00 $121,000.00 $198,800.00 $198,800.00
816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$219,000.00 $219,000.00 $329,900.00 $329,900.00
816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$182,000.00 $182,000.00 $259,900.00 $259,900.00
821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $20,000.00 $880,000.00 $17,700.00 $778,800.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 4 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
Office Estimate A R BELLI INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $25,000.00 $100,000.00 $85,000.00 $340,000.00
823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND RESET
$500.00 $12,500.00 $400.00 $10,000.00
823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $500.00 $500.00 $1,200.00 $1,200.00
823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND STACKED
$500.00 $5,000.00 $277.00 $2,770.00
824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 1
$30,000.00 $30,000.00 $27,700.00 $27,700.00
824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 2
$36,000.00 $36,000.00 $27,700.00 $27,700.00
824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $22,000.00 $88,000.00 $12,200.00 $48,800.00
832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$15.00 $7,500.00 $14.00 $7,000.00
847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$215.00 $16,125.00 $185.00 $13,875.00
848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST
ASSEMBLIES-STEEL
$400.00 $5,200.00 $350.00 $4,550.00
850.41 325.000 HR ROADWAY FLAGGER $65.00 $21,125.00 $58.00 $18,850.00
851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $100.00 $24,000.00 $10.00 $2,400.00
852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $35.00 $33,250.00 $34.00 $32,300.00
852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $25.00 $20,000.00 $45.00 $36,000.00
852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $250.00 $1,000.00 $1,700.00 $6,800.00
853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $150.00 $1,200.00 $85.00 $680.00
854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH
(PAINTED)
$0.50 $36,600.00 $0.40 $29,280.00
854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $2.00 $10,400.00 $1.50 $7,800.00
854.1 250.000 SF PAVEMENT MARKING REMOVAL $6.00 $1,500.00 $4.00 $1,000.00
856. 600.000 DAY ARROW BOARD $15.00 $9,000.00 $16.00 $9,600.00
856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $30.00 $900.00 $85.00 $2,550.00
859. 27,000.000 DAY REFLECTORIZED DRUM $0.25 $6,750.00 $0.25 $6,750.00
859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$4.00 $240.00 $11.00 $660.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 5 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
Office Estimate A R BELLI INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
864.07 900.000 SF PAVEMENT ARROW AND LEGENDS (EPOXY) $6.00 $5,400.00 $19.00 $17,100.00
868.04 11,300.000 FT 4 INCH REFLECTORIZED WHITE LINE (EPOXY) $2.50 $28,250.00 $1.80 $20,340.00
868.12 5,400.000 FT 12 INCH REFLECTORIZED WHITE LINE (EPOXY) $5.00 $27,000.00 $4.60 $24,840.00
869.04 9,000.000 FT 4 INCH REFLECTORIZED YELLOW LINE (EPOXY) $2.50 $22,500.00 $2.00 $18,000.00
869.12 200.000 FT 12 INCH REFLECTORIZED YELLOW LINE (EPOXY) $5.00 $1,000.00 $7.00 $1,400.00
874. 54.000 EA STREET NAME SIGN $200.00 $10,800.00 $100.00 $5,400.00
874.45 8.000 EA MISCELLANEOUS SIGNS REMOVED AND RESET $100.00 $800.00 $100.00 $800.00
874.52 130.000 EA MISCELLANEOUS SIGNS REMOVED AND
DISCARDED
$50.00 $6,500.00 $10.00 $1,300.00
903. 3.000 CY 3000 PSI, 1.5 IN., 470 CEMENT CONCRETE $700.00 $2,100.00 $700.00 $2,100.00
997. 1.000 LS VIBRATION MONITORING $20,000.00 $20,000.00 $48,000.00 $48,000.00
Total : $9,728,230.20 Total : $9,195,190.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 6 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00 $73,500.00 $73,500.00
102.2 1.000 LS TREE TRIMMING $25,000.00 $25,000.00 $31,000.00 $31,000.00
102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $550.00 $13,750.00 $500.00 $12,500.00
102.55 40.000 HR ARBORIST $240.00 $9,600.00 $295.00 $11,800.00
103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $4,500.00 $13,500.00 $3,400.00 $10,200.00
120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $90.00 $225,000.00 $65.00 $162,500.00
141.1 90.000 CY TEST PIT FOR EXPLORATION $110.00 $9,900.00 $120.00 $10,800.00
144. 20.000 CY CLASS B ROCK EXCAVATION $255.00 $5,100.00 $290.00 $5,800.00
145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $650.00 $650.00 $1,200.00 $1,200.00
146. 4.000 EA DRAINAGE STRUCTURE REMOVED $850.00 $3,400.00 $1,650.00 $6,600.00
151. 3,455.000 CY GRAVEL BORROW $7.50 $25,912.50 $54.00 $186,570.00
156. 20.000 TON CRUSHED STONE $50.00 $1,000.00 $60.00 $1,200.00
170. 10,000.000 SY FINE GRADING AND COMPACTING $20.00 $200,000.00 $12.00 $120,000.00
201. 12.000 EA CATCH BASIN $10,500.00 $126,000.00 $7,200.00 $86,400.00
202. 8.000 EA MANHOLE $10,500.00 $84,000.00 $9,000.00 $72,000.00
204. 4.000 EA GUTTER INLET $7,500.00 $30,000.00 $3,200.00 $12,800.00
220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $365.00 $21,170.00 $595.00 $34,510.00
220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,850.00 $5,550.00 $1,200.00 $3,600.00
220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $850.00 $1,700.00 $1,450.00 $2,900.00
220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $400.00 $10,400.00 $595.00 $15,470.00
220.8 1.000 EA SANITARY STRUCTURE REMODELED $850.00 $850.00 $1,400.00 $1,400.00
222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL
STANDARD
$2,385.00 $69,165.00 $1,290.00 $37,410.00
223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND
DISCARDED
$50.00 $450.00 $125.00 $1,125.00
227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $225.00 $9,000.00 $325.00 $13,000.00
227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $5.50 $8,250.00 $14.00 $21,000.00
227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $31,800.00 $31,800.00 $60,000.00 $60,000.00
238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $200.00 $20,000.00 $285.00 $28,500.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 7 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $155.00 $85,250.00 $260.00 $143,000.00
302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER
GASKET)
$250.00 $6,250.00 $240.00 $6,000.00
309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $15.00 $2,100.00 $20.00 $2,800.00
347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $200.00 $20,000.00 $130.00 $13,000.00
357.06 5.000 EA 6 INCH GATE BOX $850.00 $4,250.00 $700.00 $3,500.00
358. 40.000 EA GATE BOX ADJUSTED $250.00 $10,000.00 $365.00 $14,600.00
376. 3.000 EA HYDRANT $10,500.00 $31,500.00 $7,400.00 $22,200.00
376.3 3.000 EA HYDRANT - REMOVED AND STACKED $700.00 $2,100.00 $3,100.00 $9,300.00
381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $500.00 $10,000.00 $590.00 $11,800.00
381.3 80.000 EA SERVICE BOX ADJUSTED $185.00 $14,800.00 $340.00 $27,200.00
384. 10.000 EA CURB STOP $950.00 $9,500.00 $1,450.00 $14,500.00
390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $500.00 $2,500.00 $1,250.00 $6,250.00
402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $52.00 $22,620.00 $90.00 $39,150.00
415.3 31,785.000 SY PAVEMENT MICRO MILLING $6.50 $206,602.50 $7.85 $249,512.25
431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE
COURSE
$55.00 $49,775.00 $90.00 $81,450.00
440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.01 $150.00 $0.65 $9,750.00
443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $0.01 $0.30 $210.00 $6,300.00
450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $155.00 $620,000.00 $155.00 $620,000.00
450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$145.00 $50,750.00 $168.00 $58,800.00
450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $135.00 $66,150.00 $168.00 $82,320.00
450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $141.00 $250,980.00 $192.00 $341,760.00
451. 250.000 TON HMA FOR PATCHING $295.00 $73,750.00 $310.00 $77,500.00
452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $24,900.00 $11.00 $27,390.00
453. 12,990.000 FT HMA JOINT SEALANT $0.10 $1,299.00 $2.20 $28,578.00
472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $1.00 $365.00 $330.00 $120,450.00
476. 250.000 SY CEMENT CONCRETE PAVEMENT $245.00 $61,250.00 $95.00 $23,750.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 8 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX
WIDENING
$3.00 $12,000.00 $3.50 $14,000.00
503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $93.00 $241,800.00 $62.00 $161,200.00
503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $125.00 $26,250.00 $69.00 $14,490.00
504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $75.00 $444,750.00 $72.00 $426,960.00
504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $100.00 $107,000.00 $79.00 $84,530.00
509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - STRAIGHT
$75.00 $92,250.00 $83.00 $102,090.00
509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - CURVED
$100.00 $72,500.00 $105.00 $76,125.00
514. 10.000 EA GRANITE CURB INLET - STRAIGHT $700.00 $7,000.00 $790.00 $7,900.00
515. 5.000 EA GRANITE CURB INLET - CURVED $850.00 $4,250.00 $955.00 $4,775.00
570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $25.00 $2,500.00 $20.00 $2,000.00
580. 2,780.000 FT CURB REMOVED AND RESET $30.00 $83,400.00 $48.00 $133,440.00
581. 5.000 EA CURB INLET REMOVED AND RESET $155.00 $775.00 $550.00 $2,750.00
591. 2.000 EA CURB INLET REMOVED AND STACKED $75.00 $150.00 $50.00 $100.00
594. 2,780.000 FT CURB REMOVED AND DISCARDED $6.00 $16,680.00 $14.00 $38,920.00
645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$150.00 $22,500.00 $94.00 $14,100.00
670. 200.000 FT FENCE REMOVED AND RESET $55.00 $11,000.00 $90.00 $18,000.00
685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $1,458.00 $65,610.00 $1,300.00 $58,500.00
697.1 18.000 EA SILT SACK $320.00 $5,760.00 $300.00 $5,400.00
701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $125.00 $675,000.00 $95.00 $513,000.00
701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $145.00 $362,500.00 $105.00 $262,500.00
701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $145.00 $116,000.00 $165.00 $132,000.00
702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $315.00 $103,950.00 $290.00 $95,700.00
705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $550.00 $5,500.00 $275.00 $2,750.00
706.1 10.000 SY BRICK WALK REMOVED AND RELAID $550.00 $5,500.00 $275.00 $2,750.00
714. 1.000 EA MONUMENT REMOVED AND RESET $7,500.00 $7,500.00 $18,400.00 $18,400.00
718.1 1.000 LS FLAGPOLE REMOVED AND RESET $5,000.00 $5,000.00 $7,390.00 $7,390.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 9 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE
A)
$5,500.00 $181,500.00 $4,600.00 $151,800.00
748. 1.000 LS MOBILIZATION $262,500.00 $262,500.00 $275,000.00 $275,000.00
751. 185.000 CY LOAM BORROW $85.00 $15,725.00 $85.00 $15,725.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$8,500.00 $8,500.00 $9,500.00 $9,500.00
765. 1,310.000 SY SEEDING $3.00 $3,930.00 $3.50 $4,585.00
767.6 145.000 CY AGED PINE BARK MULCH $80.00 $11,600.00 $140.00 $20,300.00
786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $120.00 $24,000.00 $165.00 $33,000.00
796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $36.00 $3,600.00 $60.00 $6,000.00
804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC
(UL)
$60.00 $600,000.00 $54.00 $540,000.00
804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -
(UL)
$90.00 $534,600.00 $58.00 $344,520.00
811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $1,885.00 $9,425.00 $2,700.00 $13,500.00
811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $2,650.00 $132,500.00 $3,200.00 $160,000.00
811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $825.00 $37,125.00 $1,950.00 $87,750.00
812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $7,500.00 $30,000.00 $4,350.00 $17,400.00
812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $2,425.00 $106,700.00 $2,800.00 $123,200.00
813.71 100.000 EA GROUND ROD 8 FEET LONG $165.00 $16,500.00 $220.00 $22,000.00
813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $75,000.00 $75,000.00 $96,000.00 $96,000.00
813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.
$12,500.00 $12,500.00 $7,100.00 $7,100.00
814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $180,000.00 $180,000.00 $386,000.00 $386,000.00
815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $405,580.00 $405,580.00 $372,000.00 $372,000.00
816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$216,844.00 $216,844.00 $210,000.00 $210,000.00
816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$366,140.00 $366,140.00 $358,000.00 $358,000.00
816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$280,216.00 $280,216.00 $289,000.00 $289,000.00
821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $16,500.00 $726,000.00 $16,500.00 $726,000.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 10 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $80,000.00 $320,000.00 $89,000.00 $356,000.00
823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND RESET
$270.00 $6,750.00 $480.00 $12,000.00
823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $550.00 $550.00 $800.00 $800.00
823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND STACKED
$125.00 $1,250.00 $210.00 $2,100.00
824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 1
$28,000.00 $28,000.00 $18,350.00 $18,350.00
824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 2
$34,000.00 $34,000.00 $26,000.00 $26,000.00
824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $20,000.00 $80,000.00 $13,900.00 $55,600.00
832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$12.50 $6,250.00 $32.00 $16,000.00
847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$350.00 $26,250.00 $260.00 $19,500.00
848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST
ASSEMBLIES-STEEL
$700.00 $9,100.00 $530.00 $6,890.00
850.41 325.000 HR ROADWAY FLAGGER $1.00 $325.00 $1.00 $325.00
851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1.00 $240.00 $500.00 $120,000.00
852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $35.00 $33,250.00 $32.00 $30,400.00
852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $1.00 $800.00 $42.00 $33,600.00
852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $600.00 $2,400.00 $1,280.00 $5,120.00
853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $1.00 $8.00 $240.00 $1,920.00
854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH
(PAINTED)
$0.50 $36,600.00 $0.78 $57,096.00
854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $1.00 $5,200.00 $1.65 $8,580.00
854.1 250.000 SF PAVEMENT MARKING REMOVAL $3.50 $875.00 $4.00 $1,000.00
856. 600.000 DAY ARROW BOARD $8.00 $4,800.00 $14.00 $8,400.00
856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $75.00 $2,250.00 $33.00 $990.00
859. 27,000.000 DAY REFLECTORIZED DRUM $0.20 $5,400.00 $0.48 $12,960.00
859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$6.00 $360.00 $8.00 $480.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 11 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
864.07 900.000 SF PAVEMENT ARROW AND LEGENDS (EPOXY) $6.25 $5,625.00 $8.00 $7,200.00
868.04 11,300.000 FT 4 INCH REFLECTORIZED WHITE LINE (EPOXY) $0.75 $8,475.00 $1.25 $14,125.00
868.12 5,400.000 FT 12 INCH REFLECTORIZED WHITE LINE (EPOXY) $5.50 $29,700.00 $5.25 $28,350.00
869.04 9,000.000 FT 4 INCH REFLECTORIZED YELLOW LINE (EPOXY) $0.75 $6,750.00 $1.25 $11,250.00
869.12 200.000 FT 12 INCH REFLECTORIZED YELLOW LINE (EPOXY) $5.50 $1,100.00 $6.50 $1,300.00
874. 54.000 EA STREET NAME SIGN $230.00 $12,420.00 $290.00 $15,660.00
874.45 8.000 EA MISCELLANEOUS SIGNS REMOVED AND RESET $500.00 $4,000.00 $190.00 $1,520.00
874.52 130.000 EA MISCELLANEOUS SIGNS REMOVED AND
DISCARDED
$1.00 $130.00 $45.00 $5,850.00
903. 3.000 CY 3000 PSI, 1.5 IN., 470 CEMENT CONCRETE $650.00 $1,950.00 $1,600.00 $4,800.00
997. 1.000 LS VIBRATION MONITORING $57,100.00 $57,100.00 $23,590.00 $23,590.00
Total : $10,121,007.30 Total : $10,440,551.25
CMS105 - Report Date: 10/4/2023 7:43 AM Page 12 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
C NAUGHTON CORP R M PACELLA INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00 $73,500.00 $73,500.00
102.2 1.000 LS TREE TRIMMING $30,000.00 $30,000.00 $18,750.00 $18,750.00
102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $1,000.00 $25,000.00 $370.00 $9,250.00
102.55 40.000 HR ARBORIST $250.00 $10,000.00 $270.00 $10,800.00
103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $2,500.00 $7,500.00 $3,600.00 $10,800.00
120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $100.00 $250,000.00 $53.00 $132,500.00
141.1 90.000 CY TEST PIT FOR EXPLORATION $100.00 $9,000.00 $77.00 $6,930.00
144. 20.000 CY CLASS B ROCK EXCAVATION $100.00 $2,000.00 $188.00 $3,760.00
145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $500.00 $500.00 $788.00 $788.00
146. 4.000 EA DRAINAGE STRUCTURE REMOVED $1,000.00 $4,000.00 $1,231.00 $4,924.00
151. 3,455.000 CY GRAVEL BORROW $50.00 $172,750.00 $29.00 $100,195.00
156. 20.000 TON CRUSHED STONE $100.00 $2,000.00 $100.00 $2,000.00
170. 10,000.000 SY FINE GRADING AND COMPACTING $15.00 $150,000.00 $12.50 $125,000.00
201. 12.000 EA CATCH BASIN $10,000.00 $120,000.00 $9,185.00 $110,220.00
202. 8.000 EA MANHOLE $10,000.00 $80,000.00 $5,895.00 $47,160.00
204. 4.000 EA GUTTER INLET $5,000.00 $20,000.00 $3,165.00 $12,660.00
220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $600.00 $34,800.00 $345.00 $20,010.00
220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $2,000.00 $6,000.00 $2,540.00 $7,620.00
220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $2,000.00 $4,000.00 $615.00 $1,230.00
220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $600.00 $15,600.00 $292.00 $7,592.00
220.8 1.000 EA SANITARY STRUCTURE REMODELED $2,000.00 $2,000.00 $615.00 $615.00
222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL
STANDARD
$1,000.00 $29,000.00 $1,249.00 $36,221.00
223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND
DISCARDED
$100.00 $900.00 $61.00 $549.00
227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $200.00 $8,000.00 $188.00 $7,520.00
227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $10.00 $15,000.00 $12.50 $18,750.00
227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $10.00 $10.00 $17,500.00 $17,500.00
238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $500.00 $50,000.00 $162.00 $16,200.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 13 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
C NAUGHTON CORP R M PACELLA INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $300.00 $165,000.00 $114.00 $62,700.00
302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER
GASKET)
$500.00 $12,500.00 $81.00 $2,025.00
309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $10.00 $1,400.00 $26.00 $3,640.00
347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $200.00 $20,000.00 $70.00 $7,000.00
357.06 5.000 EA 6 INCH GATE BOX $500.00 $2,500.00 $545.00 $2,725.00
358. 40.000 EA GATE BOX ADJUSTED $400.00 $16,000.00 $261.00 $10,440.00
376. 3.000 EA HYDRANT $10,000.00 $30,000.00 $11,972.00 $35,916.00
376.3 3.000 EA HYDRANT - REMOVED AND STACKED $100.00 $300.00 $725.00 $2,175.00
381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $500.00 $10,000.00 $339.00 $6,780.00
381.3 80.000 EA SERVICE BOX ADJUSTED $300.00 $24,000.00 $200.00 $16,000.00
384. 10.000 EA CURB STOP $3,000.00 $30,000.00 $1,670.00 $16,700.00
390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $1,000.00 $5,000.00 $118.00 $590.00
402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $100.00 $43,500.00 $103.00 $44,805.00
415.3 31,785.000 SY PAVEMENT MICRO MILLING $10.00 $317,850.00 $5.50 $174,817.50
431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE
COURSE
$140.00 $126,700.00 $93.00 $84,165.00
440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.01 $150.00 $0.35 $5,250.00
443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $10.00 $300.00 $33.00 $990.00
450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $140.00 $560,000.00 $129.00 $516,000.00
450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$140.00 $49,000.00 $196.00 $68,600.00
450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $200.00 $98,000.00 $190.00 $93,100.00
450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $140.00 $249,200.00 $117.00 $208,260.00
451. 250.000 TON HMA FOR PATCHING $200.00 $50,000.00 $198.00 $49,500.00
452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $24,900.00 $11.00 $27,390.00
453. 12,990.000 FT HMA JOINT SEALANT $2.00 $25,980.00 $0.75 $9,742.50
472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $200.00 $73,000.00 $196.00 $71,540.00
476. 250.000 SY CEMENT CONCRETE PAVEMENT $200.00 $50,000.00 $189.00 $47,250.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 14 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
C NAUGHTON CORP R M PACELLA INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX
WIDENING
$10.00 $40,000.00 $4.50 $18,000.00
503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $75.00 $195,000.00 $91.00 $236,600.00
503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $75.00 $15,750.00 $91.00 $19,110.00
504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $75.00 $444,750.00 $81.00 $480,330.00
504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $75.00 $80,250.00 $81.00 $86,670.00
509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - STRAIGHT
$75.00 $92,250.00 $91.00 $111,930.00
509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - CURVED
$75.00 $54,375.00 $91.00 $65,975.00
514. 10.000 EA GRANITE CURB INLET - STRAIGHT $600.00 $6,000.00 $880.00 $8,800.00
515. 5.000 EA GRANITE CURB INLET - CURVED $1,000.00 $5,000.00 $990.00 $4,950.00
570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $10.00 $1,000.00 $29.00 $2,900.00
580. 2,780.000 FT CURB REMOVED AND RESET $50.00 $139,000.00 $49.00 $136,220.00
581. 5.000 EA CURB INLET REMOVED AND RESET $300.00 $1,500.00 $242.00 $1,210.00
591. 2.000 EA CURB INLET REMOVED AND STACKED $100.00 $200.00 $45.00 $90.00
594. 2,780.000 FT CURB REMOVED AND DISCARDED $5.00 $13,900.00 $9.00 $25,020.00
645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$200.00 $30,000.00 $74.00 $11,100.00
670. 200.000 FT FENCE REMOVED AND RESET $120.00 $24,000.00 $67.00 $13,400.00
685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $1,500.00 $67,500.00 $1,950.00 $87,750.00
697.1 18.000 EA SILT SACK $100.00 $1,800.00 $415.00 $7,470.00
701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $100.00 $540,000.00 $100.00 $540,000.00
701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $120.00 $300,000.00 $100.00 $250,000.00
701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $150.00 $120,000.00 $169.00 $135,200.00
702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $200.00 $66,000.00 $291.00 $96,030.00
705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $300.00 $3,000.00 $750.00 $7,500.00
706.1 10.000 SY BRICK WALK REMOVED AND RELAID $300.00 $3,000.00 $750.00 $7,500.00
714. 1.000 EA MONUMENT REMOVED AND RESET $10,000.00 $10,000.00 $10,700.00 $10,700.00
718.1 1.000 LS FLAGPOLE REMOVED AND RESET $10,000.00 $10,000.00 $9,600.00 $9,600.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 15 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
C NAUGHTON CORP R M PACELLA INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE
A)
$2,500.00 $82,500.00 $4,759.00 $157,047.00
748. 1.000 LS MOBILIZATION $400,000.00 $400,000.00 $271,000.00 $271,000.00
751. 185.000 CY LOAM BORROW $60.00 $11,100.00 $80.00 $14,800.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$10,000.00 $10,000.00 $19,450.00 $19,450.00
765. 1,310.000 SY SEEDING $5.00 $6,550.00 $2.90 $3,799.00
767.6 145.000 CY AGED PINE BARK MULCH $100.00 $14,500.00 $80.00 $11,600.00
786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $200.00 $40,000.00 $145.00 $29,000.00
796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $60.00 $6,000.00 $45.00 $4,500.00
804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC
(UL)
$60.00 $600,000.00 $89.00 $890,000.00
804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -
(UL)
$80.00 $475,200.00 $118.00 $700,920.00
811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $3,000.00 $15,000.00 $3,795.00 $18,975.00
811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $3,000.00 $150,000.00 $2,690.00 $134,500.00
811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $1,100.00 $49,500.00 $2,250.00 $101,250.00
812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $4,000.00 $16,000.00 $13,990.00 $55,960.00
812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $3,000.00 $132,000.00 $2,925.00 $128,700.00
813.71 100.000 EA GROUND ROD 8 FEET LONG $300.00 $30,000.00 $168.00 $16,800.00
813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $80,000.00 $80,000.00 $104,000.00 $104,000.00
813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.
$4,000.00 $4,000.00 $15,900.00 $15,900.00
814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $200,000.00 $200,000.00 $186,000.00 $186,000.00
815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $400,000.00 $400,000.00 $452,000.00 $452,000.00
816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$250,000.00 $250,000.00 $272,000.00 $272,000.00
816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$350,000.00 $350,000.00 $395,000.00 $395,000.00
816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$350,000.00 $350,000.00 $315,550.00 $315,550.00
821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $20,000.00 $880,000.00 $19,450.00 $855,800.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 16 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
C NAUGHTON CORP R M PACELLA INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $50,000.00 $200,000.00 $118,250.00 $473,000.00
823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND RESET
$500.00 $12,500.00 $395.00 $9,875.00
823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $500.00 $500.00 $4,200.00 $4,200.00
823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND STACKED
$200.00 $2,000.00 $195.00 $1,950.00
824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 1
$25,000.00 $25,000.00 $29,500.00 $29,500.00
824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 2
$25,000.00 $25,000.00 $40,650.00 $40,650.00
824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $20,000.00 $80,000.00 $22,670.00 $90,680.00
832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$20.00 $10,000.00 $14.00 $7,000.00
847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$220.00 $16,500.00 $395.00 $29,625.00
848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST
ASSEMBLIES-STEEL
$400.00 $5,200.00 $745.00 $9,685.00
850.41 325.000 HR ROADWAY FLAGGER $100.00 $32,500.00 $76.00 $24,700.00
851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1.00 $240.00 $77.00 $18,480.00
852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $30.00 $28,500.00 $51.00 $48,450.00
852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $30.00 $24,000.00 $34.00 $27,200.00
852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $1,000.00 $4,000.00 $514.00 $2,056.00
853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $150.00 $1,200.00 $73.00 $584.00
854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH
(PAINTED)
$0.50 $36,600.00 $0.50 $36,600.00
854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $1.00 $5,200.00 $1.50 $7,800.00
854.1 250.000 SF PAVEMENT MARKING REMOVAL $2.00 $500.00 $3.00 $750.00
856. 600.000 DAY ARROW BOARD $10.00 $6,000.00 $8.00 $4,800.00
856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $50.00 $1,500.00 $75.00 $2,250.00
859. 27,000.000 DAY REFLECTORIZED DRUM $0.50 $13,500.00 $0.23 $6,210.00
859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$5.00 $300.00 $7.50 $450.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 17 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
C NAUGHTON CORP R M PACELLA INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
864.07 900.000 SF PAVEMENT ARROW AND LEGENDS (EPOXY) $7.00 $6,300.00 $8.00 $7,200.00
868.04 11,300.000 FT 4 INCH REFLECTORIZED WHITE LINE (EPOXY) $0.70 $7,910.00 $0.95 $10,735.00
868.12 5,400.000 FT 12 INCH REFLECTORIZED WHITE LINE (EPOXY) $7.00 $37,800.00 $6.50 $35,100.00
869.04 9,000.000 FT 4 INCH REFLECTORIZED YELLOW LINE (EPOXY) $0.70 $6,300.00 $0.95 $8,550.00
869.12 200.000 FT 12 INCH REFLECTORIZED YELLOW LINE (EPOXY) $7.00 $1,400.00 $6.50 $1,300.00
874. 54.000 EA STREET NAME SIGN $100.00 $5,400.00 $95.00 $5,130.00
874.45 8.000 EA MISCELLANEOUS SIGNS REMOVED AND RESET $150.00 $1,200.00 $415.00 $3,320.00
874.52 130.000 EA MISCELLANEOUS SIGNS REMOVED AND
DISCARDED
$50.00 $6,500.00 $29.00 $3,770.00
903. 3.000 CY 3000 PSI, 1.5 IN., 470 CEMENT CONCRETE $500.00 $1,500.00 $905.00 $2,715.00
997. 1.000 LS VIBRATION MONITORING $10,000.00 $10,000.00 $29,700.00 $29,700.00
Total : $10,538,515.00 Total : $10,883,766.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 18 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
MACKAY CONST SERVICES INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00
102.2 1.000 LS TREE TRIMMING $25,000.00 $25,000.00
102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $430.00 $10,750.00
102.55 40.000 HR ARBORIST $140.00 $5,600.00
103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $3,200.00 $9,600.00
120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $75.00 $187,500.00
141.1 90.000 CY TEST PIT FOR EXPLORATION $200.00 $18,000.00
144. 20.000 CY CLASS B ROCK EXCAVATION $270.00 $5,400.00
145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $1,400.00 $1,400.00
146. 4.000 EA DRAINAGE STRUCTURE REMOVED $1,777.00 $7,108.00
151. 3,455.000 CY GRAVEL BORROW $65.00 $224,575.00
156. 20.000 TON CRUSHED STONE $61.00 $1,220.00
170. 10,000.000 SY FINE GRADING AND COMPACTING $25.00 $250,000.00
201. 12.000 EA CATCH BASIN $7,460.00 $89,520.00
202. 8.000 EA MANHOLE $8,400.00 $67,200.00
204. 4.000 EA GUTTER INLET $3,800.00 $15,200.00
220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $750.00 $43,500.00
220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $2,100.00 $6,300.00
220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $1,800.00 $3,600.00
220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $725.00 $18,850.00
220.8 1.000 EA SANITARY STRUCTURE REMODELED $2,100.00 $2,100.00
222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL
STANDARD
$1,280.00 $37,120.00
223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND
DISCARDED
$70.00 $630.00
227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $480.00 $19,200.00
227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $19.00 $28,500.00
227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $35,000.00 $35,000.00
238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $280.00 $28,000.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 19 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
MACKAY CONST SERVICES INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $214.00 $117,700.00
302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER
GASKET)
$320.00 $8,000.00
309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $18.00 $2,520.00
347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $130.00 $13,000.00
357.06 5.000 EA 6 INCH GATE BOX $3,100.00 $15,500.00
358. 40.000 EA GATE BOX ADJUSTED $360.00 $14,400.00
376. 3.000 EA HYDRANT $9,648.00 $28,944.00
376.3 3.000 EA HYDRANT - REMOVED AND STACKED $3,200.00 $9,600.00
381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $600.00 $12,000.00
381.3 80.000 EA SERVICE BOX ADJUSTED $370.00 $29,600.00
384. 10.000 EA CURB STOP $1,300.00 $13,000.00
390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $1,400.00 $7,000.00
402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $70.00 $30,450.00
415.3 31,785.000 SY PAVEMENT MICRO MILLING $7.25 $230,441.25
431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE
COURSE
$163.00 $147,515.00
440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST
CONTROL
$0.79 $11,850.00
443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $110.00 $3,300.00
450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $135.00 $540,000.00
450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -
19.0)
$165.00 $57,750.00
450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $290.00 $142,100.00
450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $145.00 $258,100.00
451. 250.000 TON HMA FOR PATCHING $350.00 $87,500.00
452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $8.00 $19,920.00
453. 12,990.000 FT HMA JOINT SEALANT $2.00 $25,980.00
472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $350.00 $127,750.00
476. 250.000 SY CEMENT CONCRETE PAVEMENT $120.00 $30,000.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 20 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
MACKAY CONST SERVICES INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX
WIDENING
$7.15 $28,600.00
503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $110.00 $286,000.00
503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $120.00 $25,200.00
504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $89.00 $527,770.00
504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $110.00 $117,700.00
509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - STRAIGHT
$93.00 $114,390.00
509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR
RAMPS - CURVED
$114.00 $82,650.00
514. 10.000 EA GRANITE CURB INLET - STRAIGHT $1,200.00 $12,000.00
515. 5.000 EA GRANITE CURB INLET - CURVED $1,600.00 $8,000.00
570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $18.00 $1,800.00
580. 2,780.000 FT CURB REMOVED AND RESET $71.00 $197,380.00
581. 5.000 EA CURB INLET REMOVED AND RESET $800.00 $4,000.00
591. 2.000 EA CURB INLET REMOVED AND STACKED $240.00 $480.00
594. 2,780.000 FT CURB REMOVED AND DISCARDED $10.00 $27,800.00
645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE
POST OPTION)
$162.00 $24,300.00
670. 200.000 FT FENCE REMOVED AND RESET $63.00 $12,600.00
685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $670.00 $30,150.00
697.1 18.000 EA SILT SACK $230.00 $4,140.00
701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $155.00 $837,000.00
701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $165.00 $412,500.00
701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $175.00 $140,000.00
702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $350.00 $115,500.00
705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $550.00 $5,500.00
706.1 10.000 SY BRICK WALK REMOVED AND RELAID $480.00 $4,800.00
714. 1.000 EA MONUMENT REMOVED AND RESET $55,000.00 $55,000.00
718.1 1.000 LS FLAGPOLE REMOVED AND RESET $45,000.00 $45,000.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 21 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
MACKAY CONST SERVICES INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE
A)
$6,900.00 $227,700.00
748. 1.000 LS MOBILIZATION $365,500.00 $365,500.00
751. 185.000 CY LOAM BORROW $90.00 $16,650.00
756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION
PLAN
$10,000.00 $10,000.00
765. 1,310.000 SY SEEDING $4.00 $5,240.00
767.6 145.000 CY AGED PINE BARK MULCH $100.00 $14,500.00
786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $240.00 $48,000.00
796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $180.00 $18,000.00
804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC
(UL)
$88.00 $880,000.00
804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -
(UL)
$108.00 $641,520.00
811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $2,200.00 $11,000.00
811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $2,400.00 $120,000.00
811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $1,050.00 $47,250.00
812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $26,000.00 $104,000.00
812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $5,500.00 $242,000.00
813.71 100.000 EA GROUND ROD 8 FEET LONG $192.00 $19,200.00
813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $285,000.00 $285,000.00
813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.
$6,800.00 $6,800.00
814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $215,500.00 $215,500.00
815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $378,500.00 $378,500.00
816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$225,000.00 $225,000.00
816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$356,000.00 $356,000.00
816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.
$275,000.00 $275,000.00
821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $18,000.00 $792,000.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 22 of 24
Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET
MACKAY CONST SERVICES INC
Item # Quantity Units Description Unit Price Amount Unit Price Amount
823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $90,000.00 $360,000.00
823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND RESET
$315.00 $7,875.00
823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $500.00 $500.00
823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED
AND STACKED
$145.00 $1,450.00
824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 1
$32,000.00 $32,000.00
824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC
POWER) LOCATION NO. 2
$41,000.00 $41,000.00
824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $21,000.00 $84,000.00
832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -
ALUMINUM PANEL (TYPE A)
$15.00 $7,500.00
847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
$410.00 $30,750.00
848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST
ASSEMBLIES-STEEL
$780.00 $10,140.00
850.41 325.000 HR ROADWAY FLAGGER $75.00 $24,375.00
851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1,100.00 $264,000.00
852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $12.00 $11,400.00
852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $43.00 $34,400.00
852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $800.00 $3,200.00
853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $163.00 $1,304.00
854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH
(PAINTED)
$1.00 $73,200.00
854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $2.60 $13,520.00
854.1 250.000 SF PAVEMENT MARKING REMOVAL $5.00 $1,250.00
856. 600.000 DAY ARROW BOARD $16.00 $9,600.00
856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $45.00 $1,350.00
859. 27,000.000 DAY REFLECTORIZED DRUM $1.00 $27,000.00
859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL
FLASHING WARNING LIGHTS
$8.00 $480.00
CMS105 - Report Date: 10/4/2023 7:43 AM Page 23 of 24
Location : QUINCY Contract…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .