This document is a bid tabulation for Project #608707, a reconstruction project on Sea Street in Quincy, Massachusetts. The project is contracted through the Massachusetts Department of Transportation, District 6. The work includes various construction activities such as tree trimming, drainage structure work, water pipe installation, pavement milling and paving, sidewalk and curb construction, and traffic signal and lighting upgrades. Bid quantities are provided for over 100 line items. Bids were due on October 3, 2023, and the project has a fixed price schedule of operations component.

The bid tabulation shows pricing from 7 contractors, with the lowest bid of $9,195,190 from A R BELLI INC. Pricing for individual line items is provided, along with the engineer's office estimate. The project appears to be funded through state and local sources, but specific funding amounts and requirements are not detailed in the document. There is no information provided about any set-asides, incumbents, or the current contracting environment.

View the file

Other files

File Type Posted
608707 A2~1.pdf PDF
608707 NTC.pdf PDF
608708 A1.pdf PDF
608707 WZS.pdf PDF
608707 SP.pdf PDF
608707 BidResults.pdf PDF
608707 PD.pdf PDF
608707 MPM.pdf PDF
608707 NoI P2.pdf PDF
608707 OoC.pdf PDF
BIL 608707.txt TXT text file
608707 ACF.pdf PDF
608707 DS.pdf PDF
608707 DBE.pdf PDF
608707 FW.pdf PDF
608707 PUCF.pdf PDF
608707 NoI P1.pdf PDF
608707 MPMA.pdf PDF
BIL 608707 A1.txt TXT text file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prelims Unit

Bid Tabulations

Project # : 608707 Bids Open Date : 03 Oct 2023 Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

Office Estimate A R BELLI INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00 $73,500.00 $73,500.00

102.2 1.000 LS TREE TRIMMING $4,999.00 $4,999.00 $7,000.00 $7,000.00

102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $400.00 $10,000.00 $475.00 $11,875.00

102.55 40.000 HR ARBORIST $200.00 $8,000.00 $225.00 $9,000.00

103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $1,100.00 $3,300.00 $2,778.00 $8,334.00

120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $50.00 $125,000.00 $78.00 $195,000.00

141.1 90.000 CY TEST PIT FOR EXPLORATION $110.00 $9,900.00 $185.00 $16,650.00

144. 20.000 CY CLASS B ROCK EXCAVATION $200.00 $4,000.00 $250.00 $5,000.00

145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $980.00 $980.00 $669.00 $669.00

146. 4.000 EA DRAINAGE STRUCTURE REMOVED $800.00 $3,200.00 $700.00 $2,800.00

151. 3,455.000 CY GRAVEL BORROW $60.00 $207,300.00 $1.00 $3,455.00

156. 20.000 TON CRUSHED STONE $65.00 $1,300.00 $45.00 $900.00

170. 10,000.000 SY FINE GRADING AND COMPACTING $11.00 $110,000.00 $17.70 $177,000.00

201. 12.000 EA CATCH BASIN $5,500.00 $66,000.00 $7,778.00 $93,336.00

202. 8.000 EA MANHOLE $6,600.00 $52,800.00 $8,500.00 $68,000.00

204. 4.000 EA GUTTER INLET $2,700.00 $10,800.00 $4,500.00 $18,000.00

220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $700.00 $40,600.00 $478.00 $27,724.00

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,395.00 $4,185.00 $1,100.00 $3,300.00

220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $875.00 $1,750.00 $850.00 $1,700.00

220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $550.00 $14,300.00 $478.00 $12,428.00

220.8 1.000 EA SANITARY STRUCTURE REMODELED $1,000.00 $1,000.00 $1,200.00 $1,200.00

222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$1,000.00 $29,000.00 $1,112.00 $32,248.00

223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$180.00 $1,620.00 $50.00 $450.00

227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $300.00 $12,000.00 $450.00 $18,000.00

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $10.00 $15,000.00 $5.00 $7,500.00

227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $20,000.00 $20,000.00 $29,000.00 $29,000.00

238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $200.00 $20,000.00 $188.00 $18,800.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 1 of 24

Project # : 608707 Bids Open Date : 03 Oct 2023 Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

Office Estimate A R BELLI INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $135.00 $74,250.00 $169.00 $92,950.00

302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER

GASKET)

$150.00 $3,750.00 $196.00 $4,900.00

309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $15.00 $2,100.00 $10.00 $1,400.00

347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $130.00 $13,000.00 $177.00 $17,700.00

357.06 5.000 EA 6 INCH GATE BOX $735.00 $3,675.00 $3,777.00 $18,885.00

358. 40.000 EA GATE BOX ADJUSTED $300.00 $12,000.00 $339.00 $13,560.00

376. 3.000 EA HYDRANT $7,200.00 $21,600.00 $7,778.00 $23,334.00

376.3 3.000 EA HYDRANT - REMOVED AND STACKED $1,100.00 $3,300.00 $250.00 $750.00

381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $455.00 $9,100.00 $350.00 $7,000.00

381.3 80.000 EA SERVICE BOX ADJUSTED $300.00 $24,000.00 $225.00 $18,000.00

384. 10.000 EA CURB STOP $1,000.00 $10,000.00 $1,400.00 $14,000.00

390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $2,500.00 $12,500.00 $1,400.00 $7,000.00

402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $85.00 $36,975.00 $67.00 $29,145.00

415.3 31,785.000 SY PAVEMENT MICRO MILLING $30.00 $953,550.00 $7.20 $228,852.00

431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$110.00 $99,550.00 $144.00 $130,320.00

440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.50 $7,500.00 $0.50 $7,500.00

443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $85.00 $2,550.00 $100.00 $3,000.00

450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $150.00 $600,000.00 $139.00 $556,000.00

450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$145.00 $50,750.00 $178.00 $62,300.00

450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $230.00 $112,700.00 $169.00 $82,810.00

450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $123.54 $219,901.20 $122.00 $217,160.00

451. 250.000 TON HMA FOR PATCHING $250.00 $62,500.00 $100.00 $25,000.00

452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $9.00 $22,410.00 $9.50 $23,655.00

453. 12,990.000 FT HMA JOINT SEALANT $2.00 $25,980.00 $1.00 $12,990.00

472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $275.00 $100,375.00 $210.00 $76,650.00

476. 250.000 SY CEMENT CONCRETE PAVEMENT $230.00 $57,500.00 $144.00 $36,000.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 2 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

Office Estimate A R BELLI INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$4.50 $18,000.00 $7.00 $28,000.00

503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $92.00 $239,200.00 $85.00 $221,000.00

503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $60.00 $12,600.00 $100.00 $21,000.00

504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $68.00 $403,240.00 $67.00 $397,310.00

504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $90.00 $96,300.00 $74.00 $79,180.00

509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - STRAIGHT

$75.00 $92,250.00 $73.00 $89,790.00

509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - CURVED

$100.00 $72,500.00 $78.00 $56,550.00

514. 10.000 EA GRANITE CURB INLET - STRAIGHT $678.00 $6,780.00 $700.00 $7,000.00

515. 5.000 EA GRANITE CURB INLET - CURVED $825.00 $4,125.00 $700.00 $3,500.00

570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $26.00 $2,600.00 $14.00 $1,400.00

580. 2,780.000 FT CURB REMOVED AND RESET $50.00 $139,000.00 $45.00 $125,100.00

581. 5.000 EA CURB INLET REMOVED AND RESET $310.00 $1,550.00 $300.00 $1,500.00

591. 2.000 EA CURB INLET REMOVED AND STACKED $150.00 $300.00 $10.00 $20.00

594. 2,780.000 FT CURB REMOVED AND DISCARDED $12.00 $33,360.00 $8.00 $22,240.00

645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE

POST OPTION)

$100.00 $15,000.00 $78.00 $11,700.00

670. 200.000 FT FENCE REMOVED AND RESET $106.00 $21,200.00 $14.00 $2,800.00

685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $1,100.00 $49,500.00 $919.00 $41,355.00

697.1 18.000 EA SILT SACK $200.00 $3,600.00 $177.00 $3,186.00

701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $90.00 $486,000.00 $78.00 $421,200.00

701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $85.00 $212,500.00 $108.00 $270,000.00

701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $135.00 $108,000.00 $119.00 $95,200.00

702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $250.00 $82,500.00 $229.00 $75,570.00

705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $350.00 $3,500.00 $477.00 $4,770.00

706.1 10.000 SY BRICK WALK REMOVED AND RELAID $650.00 $6,500.00 $477.00 $4,770.00

714. 1.000 EA MONUMENT REMOVED AND RESET $10,000.00 $10,000.00 $5,700.00 $5,700.00

718.1 1.000 LS FLAGPOLE REMOVED AND RESET $5,000.00 $5,000.00 $3,900.00 $3,900.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 3 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

Office Estimate A R BELLI INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE

A)

$3,500.00 $115,500.00 $5,339.00 $176,187.00

748. 1.000 LS MOBILIZATION $274,480.00 $274,480.00 $278,000.00 $278,000.00

751. 185.000 CY LOAM BORROW $80.00 $14,800.00 $85.00 $15,725.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$5,000.00 $5,000.00 $17,700.00 $17,700.00

765. 1,310.000 SY SEEDING $3.00 $3,930.00 $3.00 $3,930.00

767.6 145.000 CY AGED PINE BARK MULCH $85.00 $12,325.00 $100.00 $14,500.00

786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $50.00 $10,000.00 $85.00 $17,000.00

796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $25.00 $2,500.00 $78.00 $7,800.00

804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$60.00 $600,000.00 $47.70 $477,000.00

804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$60.00 $356,400.00 $50.00 $297,000.00

811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $2,200.00 $11,000.00 $2,448.00 $12,240.00

811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $1,500.00 $75,000.00 $1,998.00 $99,900.00

811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $2,000.00 $90,000.00 $1,448.00 $65,160.00

812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $5,000.00 $20,000.00 $3,500.00 $14,000.00

812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $2,500.00 $110,000.00 $2,778.00 $122,232.00

813.71 100.000 EA GROUND ROD 8 FEET LONG $200.00 $20,000.00 $277.00 $27,700.00

813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $85,000.00 $85,000.00 $78,000.00 $78,000.00

813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.

$5,000.00 $5,000.00 $9,800.00 $9,800.00

814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $153,000.00 $153,000.00 $190,900.00 $190,900.00

815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $254,000.00 $254,000.00 $378,000.00 $378,000.00

816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$121,000.00 $121,000.00 $198,800.00 $198,800.00

816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$219,000.00 $219,000.00 $329,900.00 $329,900.00

816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$182,000.00 $182,000.00 $259,900.00 $259,900.00

821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $20,000.00 $880,000.00 $17,700.00 $778,800.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 4 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

Office Estimate A R BELLI INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $25,000.00 $100,000.00 $85,000.00 $340,000.00

823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND RESET

$500.00 $12,500.00 $400.00 $10,000.00

823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $500.00 $500.00 $1,200.00 $1,200.00

823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND STACKED

$500.00 $5,000.00 $277.00 $2,770.00

824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 1

$30,000.00 $30,000.00 $27,700.00 $27,700.00

824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 2

$36,000.00 $36,000.00 $27,700.00 $27,700.00

824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $22,000.00 $88,000.00 $12,200.00 $48,800.00

832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$15.00 $7,500.00 $14.00 $7,000.00

847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$215.00 $16,125.00 $185.00 $13,875.00

848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST

ASSEMBLIES-STEEL

$400.00 $5,200.00 $350.00 $4,550.00

850.41 325.000 HR ROADWAY FLAGGER $65.00 $21,125.00 $58.00 $18,850.00

851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $100.00 $24,000.00 $10.00 $2,400.00

852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $35.00 $33,250.00 $34.00 $32,300.00

852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $25.00 $20,000.00 $45.00 $36,000.00

852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $250.00 $1,000.00 $1,700.00 $6,800.00

853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $150.00 $1,200.00 $85.00 $680.00

854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.50 $36,600.00 $0.40 $29,280.00

854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $2.00 $10,400.00 $1.50 $7,800.00

854.1 250.000 SF PAVEMENT MARKING REMOVAL $6.00 $1,500.00 $4.00 $1,000.00

856. 600.000 DAY ARROW BOARD $15.00 $9,000.00 $16.00 $9,600.00

856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $30.00 $900.00 $85.00 $2,550.00

859. 27,000.000 DAY REFLECTORIZED DRUM $0.25 $6,750.00 $0.25 $6,750.00

859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL

FLASHING WARNING LIGHTS

$4.00 $240.00 $11.00 $660.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 5 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

Office Estimate A R BELLI INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

864.07 900.000 SF PAVEMENT ARROW AND LEGENDS (EPOXY) $6.00 $5,400.00 $19.00 $17,100.00

868.04 11,300.000 FT 4 INCH REFLECTORIZED WHITE LINE (EPOXY) $2.50 $28,250.00 $1.80 $20,340.00

868.12 5,400.000 FT 12 INCH REFLECTORIZED WHITE LINE (EPOXY) $5.00 $27,000.00 $4.60 $24,840.00

869.04 9,000.000 FT 4 INCH REFLECTORIZED YELLOW LINE (EPOXY) $2.50 $22,500.00 $2.00 $18,000.00

869.12 200.000 FT 12 INCH REFLECTORIZED YELLOW LINE (EPOXY) $5.00 $1,000.00 $7.00 $1,400.00

874. 54.000 EA STREET NAME SIGN $200.00 $10,800.00 $100.00 $5,400.00

874.45 8.000 EA MISCELLANEOUS SIGNS REMOVED AND RESET $100.00 $800.00 $100.00 $800.00

874.52 130.000 EA MISCELLANEOUS SIGNS REMOVED AND

DISCARDED

$50.00 $6,500.00 $10.00 $1,300.00

903. 3.000 CY 3000 PSI, 1.5 IN., 470 CEMENT CONCRETE $700.00 $2,100.00 $700.00 $2,100.00

997. 1.000 LS VIBRATION MONITORING $20,000.00 $20,000.00 $48,000.00 $48,000.00

Total : $9,728,230.20 Total : $9,195,190.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 6 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00 $73,500.00 $73,500.00

102.2 1.000 LS TREE TRIMMING $25,000.00 $25,000.00 $31,000.00 $31,000.00

102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $550.00 $13,750.00 $500.00 $12,500.00

102.55 40.000 HR ARBORIST $240.00 $9,600.00 $295.00 $11,800.00

103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $4,500.00 $13,500.00 $3,400.00 $10,200.00

120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $90.00 $225,000.00 $65.00 $162,500.00

141.1 90.000 CY TEST PIT FOR EXPLORATION $110.00 $9,900.00 $120.00 $10,800.00

144. 20.000 CY CLASS B ROCK EXCAVATION $255.00 $5,100.00 $290.00 $5,800.00

145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $650.00 $650.00 $1,200.00 $1,200.00

146. 4.000 EA DRAINAGE STRUCTURE REMOVED $850.00 $3,400.00 $1,650.00 $6,600.00

151. 3,455.000 CY GRAVEL BORROW $7.50 $25,912.50 $54.00 $186,570.00

156. 20.000 TON CRUSHED STONE $50.00 $1,000.00 $60.00 $1,200.00

170. 10,000.000 SY FINE GRADING AND COMPACTING $20.00 $200,000.00 $12.00 $120,000.00

201. 12.000 EA CATCH BASIN $10,500.00 $126,000.00 $7,200.00 $86,400.00

202. 8.000 EA MANHOLE $10,500.00 $84,000.00 $9,000.00 $72,000.00

204. 4.000 EA GUTTER INLET $7,500.00 $30,000.00 $3,200.00 $12,800.00

220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $365.00 $21,170.00 $595.00 $34,510.00

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,850.00 $5,550.00 $1,200.00 $3,600.00

220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $850.00 $1,700.00 $1,450.00 $2,900.00

220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $400.00 $10,400.00 $595.00 $15,470.00

220.8 1.000 EA SANITARY STRUCTURE REMODELED $850.00 $850.00 $1,400.00 $1,400.00

222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$2,385.00 $69,165.00 $1,290.00 $37,410.00

223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$50.00 $450.00 $125.00 $1,125.00

227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $225.00 $9,000.00 $325.00 $13,000.00

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $5.50 $8,250.00 $14.00 $21,000.00

227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $31,800.00 $31,800.00 $60,000.00 $60,000.00

238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $200.00 $20,000.00 $285.00 $28,500.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 7 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $155.00 $85,250.00 $260.00 $143,000.00

302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER

GASKET)

$250.00 $6,250.00 $240.00 $6,000.00

309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $15.00 $2,100.00 $20.00 $2,800.00

347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $200.00 $20,000.00 $130.00 $13,000.00

357.06 5.000 EA 6 INCH GATE BOX $850.00 $4,250.00 $700.00 $3,500.00

358. 40.000 EA GATE BOX ADJUSTED $250.00 $10,000.00 $365.00 $14,600.00

376. 3.000 EA HYDRANT $10,500.00 $31,500.00 $7,400.00 $22,200.00

376.3 3.000 EA HYDRANT - REMOVED AND STACKED $700.00 $2,100.00 $3,100.00 $9,300.00

381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $500.00 $10,000.00 $590.00 $11,800.00

381.3 80.000 EA SERVICE BOX ADJUSTED $185.00 $14,800.00 $340.00 $27,200.00

384. 10.000 EA CURB STOP $950.00 $9,500.00 $1,450.00 $14,500.00

390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $500.00 $2,500.00 $1,250.00 $6,250.00

402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $52.00 $22,620.00 $90.00 $39,150.00

415.3 31,785.000 SY PAVEMENT MICRO MILLING $6.50 $206,602.50 $7.85 $249,512.25

431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$55.00 $49,775.00 $90.00 $81,450.00

440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.01 $150.00 $0.65 $9,750.00

443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $0.01 $0.30 $210.00 $6,300.00

450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $155.00 $620,000.00 $155.00 $620,000.00

450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$145.00 $50,750.00 $168.00 $58,800.00

450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $135.00 $66,150.00 $168.00 $82,320.00

450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $141.00 $250,980.00 $192.00 $341,760.00

451. 250.000 TON HMA FOR PATCHING $295.00 $73,750.00 $310.00 $77,500.00

452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $24,900.00 $11.00 $27,390.00

453. 12,990.000 FT HMA JOINT SEALANT $0.10 $1,299.00 $2.20 $28,578.00

472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $1.00 $365.00 $330.00 $120,450.00

476. 250.000 SY CEMENT CONCRETE PAVEMENT $245.00 $61,250.00 $95.00 $23,750.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 8 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$3.00 $12,000.00 $3.50 $14,000.00

503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $93.00 $241,800.00 $62.00 $161,200.00

503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $125.00 $26,250.00 $69.00 $14,490.00

504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $75.00 $444,750.00 $72.00 $426,960.00

504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $100.00 $107,000.00 $79.00 $84,530.00

509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - STRAIGHT

$75.00 $92,250.00 $83.00 $102,090.00

509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - CURVED

$100.00 $72,500.00 $105.00 $76,125.00

514. 10.000 EA GRANITE CURB INLET - STRAIGHT $700.00 $7,000.00 $790.00 $7,900.00

515. 5.000 EA GRANITE CURB INLET - CURVED $850.00 $4,250.00 $955.00 $4,775.00

570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $25.00 $2,500.00 $20.00 $2,000.00

580. 2,780.000 FT CURB REMOVED AND RESET $30.00 $83,400.00 $48.00 $133,440.00

581. 5.000 EA CURB INLET REMOVED AND RESET $155.00 $775.00 $550.00 $2,750.00

591. 2.000 EA CURB INLET REMOVED AND STACKED $75.00 $150.00 $50.00 $100.00

594. 2,780.000 FT CURB REMOVED AND DISCARDED $6.00 $16,680.00 $14.00 $38,920.00

645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE

POST OPTION)

$150.00 $22,500.00 $94.00 $14,100.00

670. 200.000 FT FENCE REMOVED AND RESET $55.00 $11,000.00 $90.00 $18,000.00

685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $1,458.00 $65,610.00 $1,300.00 $58,500.00

697.1 18.000 EA SILT SACK $320.00 $5,760.00 $300.00 $5,400.00

701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $125.00 $675,000.00 $95.00 $513,000.00

701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $145.00 $362,500.00 $105.00 $262,500.00

701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $145.00 $116,000.00 $165.00 $132,000.00

702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $315.00 $103,950.00 $290.00 $95,700.00

705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $550.00 $5,500.00 $275.00 $2,750.00

706.1 10.000 SY BRICK WALK REMOVED AND RELAID $550.00 $5,500.00 $275.00 $2,750.00

714. 1.000 EA MONUMENT REMOVED AND RESET $7,500.00 $7,500.00 $18,400.00 $18,400.00

718.1 1.000 LS FLAGPOLE REMOVED AND RESET $5,000.00 $5,000.00 $7,390.00 $7,390.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 9 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE

A)

$5,500.00 $181,500.00 $4,600.00 $151,800.00

748. 1.000 LS MOBILIZATION $262,500.00 $262,500.00 $275,000.00 $275,000.00

751. 185.000 CY LOAM BORROW $85.00 $15,725.00 $85.00 $15,725.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$8,500.00 $8,500.00 $9,500.00 $9,500.00

765. 1,310.000 SY SEEDING $3.00 $3,930.00 $3.50 $4,585.00

767.6 145.000 CY AGED PINE BARK MULCH $80.00 $11,600.00 $140.00 $20,300.00

786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $120.00 $24,000.00 $165.00 $33,000.00

796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $36.00 $3,600.00 $60.00 $6,000.00

804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$60.00 $600,000.00 $54.00 $540,000.00

804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$90.00 $534,600.00 $58.00 $344,520.00

811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $1,885.00 $9,425.00 $2,700.00 $13,500.00

811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $2,650.00 $132,500.00 $3,200.00 $160,000.00

811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $825.00 $37,125.00 $1,950.00 $87,750.00

812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $7,500.00 $30,000.00 $4,350.00 $17,400.00

812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $2,425.00 $106,700.00 $2,800.00 $123,200.00

813.71 100.000 EA GROUND ROD 8 FEET LONG $165.00 $16,500.00 $220.00 $22,000.00

813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $75,000.00 $75,000.00 $96,000.00 $96,000.00

813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.

$12,500.00 $12,500.00 $7,100.00 $7,100.00

814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $180,000.00 $180,000.00 $386,000.00 $386,000.00

815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $405,580.00 $405,580.00 $372,000.00 $372,000.00

816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$216,844.00 $216,844.00 $210,000.00 $210,000.00

816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$366,140.00 $366,140.00 $358,000.00 $358,000.00

816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$280,216.00 $280,216.00 $289,000.00 $289,000.00

821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $16,500.00 $726,000.00 $16,500.00 $726,000.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 10 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $80,000.00 $320,000.00 $89,000.00 $356,000.00

823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND RESET

$270.00 $6,750.00 $480.00 $12,000.00

823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $550.00 $550.00 $800.00 $800.00

823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND STACKED

$125.00 $1,250.00 $210.00 $2,100.00

824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 1

$28,000.00 $28,000.00 $18,350.00 $18,350.00

824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 2

$34,000.00 $34,000.00 $26,000.00 $26,000.00

824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $20,000.00 $80,000.00 $13,900.00 $55,600.00

832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$12.50 $6,250.00 $32.00 $16,000.00

847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$350.00 $26,250.00 $260.00 $19,500.00

848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST

ASSEMBLIES-STEEL

$700.00 $9,100.00 $530.00 $6,890.00

850.41 325.000 HR ROADWAY FLAGGER $1.00 $325.00 $1.00 $325.00

851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1.00 $240.00 $500.00 $120,000.00

852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $35.00 $33,250.00 $32.00 $30,400.00

852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $1.00 $800.00 $42.00 $33,600.00

852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $600.00 $2,400.00 $1,280.00 $5,120.00

853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $1.00 $8.00 $240.00 $1,920.00

854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.50 $36,600.00 $0.78 $57,096.00

854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $1.00 $5,200.00 $1.65 $8,580.00

854.1 250.000 SF PAVEMENT MARKING REMOVAL $3.50 $875.00 $4.00 $1,000.00

856. 600.000 DAY ARROW BOARD $8.00 $4,800.00 $14.00 $8,400.00

856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $75.00 $2,250.00 $33.00 $990.00

859. 27,000.000 DAY REFLECTORIZED DRUM $0.20 $5,400.00 $0.48 $12,960.00

859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL

FLASHING WARNING LIGHTS

$6.00 $360.00 $8.00 $480.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 11 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

NEWPORT CONSTRUCTION CORP MDR CONSTRUCTION CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

864.07 900.000 SF PAVEMENT ARROW AND LEGENDS (EPOXY) $6.25 $5,625.00 $8.00 $7,200.00

868.04 11,300.000 FT 4 INCH REFLECTORIZED WHITE LINE (EPOXY) $0.75 $8,475.00 $1.25 $14,125.00

868.12 5,400.000 FT 12 INCH REFLECTORIZED WHITE LINE (EPOXY) $5.50 $29,700.00 $5.25 $28,350.00

869.04 9,000.000 FT 4 INCH REFLECTORIZED YELLOW LINE (EPOXY) $0.75 $6,750.00 $1.25 $11,250.00

869.12 200.000 FT 12 INCH REFLECTORIZED YELLOW LINE (EPOXY) $5.50 $1,100.00 $6.50 $1,300.00

874. 54.000 EA STREET NAME SIGN $230.00 $12,420.00 $290.00 $15,660.00

874.45 8.000 EA MISCELLANEOUS SIGNS REMOVED AND RESET $500.00 $4,000.00 $190.00 $1,520.00

874.52 130.000 EA MISCELLANEOUS SIGNS REMOVED AND

DISCARDED

$1.00 $130.00 $45.00 $5,850.00

903. 3.000 CY 3000 PSI, 1.5 IN., 470 CEMENT CONCRETE $650.00 $1,950.00 $1,600.00 $4,800.00

997. 1.000 LS VIBRATION MONITORING $57,100.00 $57,100.00 $23,590.00 $23,590.00

Total : $10,121,007.30 Total : $10,440,551.25

CMS105 - Report Date: 10/4/2023 7:43 AM Page 12 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

C NAUGHTON CORP R M PACELLA INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00 $73,500.00 $73,500.00

102.2 1.000 LS TREE TRIMMING $30,000.00 $30,000.00 $18,750.00 $18,750.00

102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $1,000.00 $25,000.00 $370.00 $9,250.00

102.55 40.000 HR ARBORIST $250.00 $10,000.00 $270.00 $10,800.00

103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $2,500.00 $7,500.00 $3,600.00 $10,800.00

120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $100.00 $250,000.00 $53.00 $132,500.00

141.1 90.000 CY TEST PIT FOR EXPLORATION $100.00 $9,000.00 $77.00 $6,930.00

144. 20.000 CY CLASS B ROCK EXCAVATION $100.00 $2,000.00 $188.00 $3,760.00

145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $500.00 $500.00 $788.00 $788.00

146. 4.000 EA DRAINAGE STRUCTURE REMOVED $1,000.00 $4,000.00 $1,231.00 $4,924.00

151. 3,455.000 CY GRAVEL BORROW $50.00 $172,750.00 $29.00 $100,195.00

156. 20.000 TON CRUSHED STONE $100.00 $2,000.00 $100.00 $2,000.00

170. 10,000.000 SY FINE GRADING AND COMPACTING $15.00 $150,000.00 $12.50 $125,000.00

201. 12.000 EA CATCH BASIN $10,000.00 $120,000.00 $9,185.00 $110,220.00

202. 8.000 EA MANHOLE $10,000.00 $80,000.00 $5,895.00 $47,160.00

204. 4.000 EA GUTTER INLET $5,000.00 $20,000.00 $3,165.00 $12,660.00

220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $600.00 $34,800.00 $345.00 $20,010.00

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $2,000.00 $6,000.00 $2,540.00 $7,620.00

220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $2,000.00 $4,000.00 $615.00 $1,230.00

220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $600.00 $15,600.00 $292.00 $7,592.00

220.8 1.000 EA SANITARY STRUCTURE REMODELED $2,000.00 $2,000.00 $615.00 $615.00

222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$1,000.00 $29,000.00 $1,249.00 $36,221.00

223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$100.00 $900.00 $61.00 $549.00

227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $200.00 $8,000.00 $188.00 $7,520.00

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $10.00 $15,000.00 $12.50 $18,750.00

227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $10.00 $10.00 $17,500.00 $17,500.00

238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $500.00 $50,000.00 $162.00 $16,200.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 13 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

C NAUGHTON CORP R M PACELLA INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $300.00 $165,000.00 $114.00 $62,700.00

302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER

GASKET)

$500.00 $12,500.00 $81.00 $2,025.00

309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $10.00 $1,400.00 $26.00 $3,640.00

347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $200.00 $20,000.00 $70.00 $7,000.00

357.06 5.000 EA 6 INCH GATE BOX $500.00 $2,500.00 $545.00 $2,725.00

358. 40.000 EA GATE BOX ADJUSTED $400.00 $16,000.00 $261.00 $10,440.00

376. 3.000 EA HYDRANT $10,000.00 $30,000.00 $11,972.00 $35,916.00

376.3 3.000 EA HYDRANT - REMOVED AND STACKED $100.00 $300.00 $725.00 $2,175.00

381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $500.00 $10,000.00 $339.00 $6,780.00

381.3 80.000 EA SERVICE BOX ADJUSTED $300.00 $24,000.00 $200.00 $16,000.00

384. 10.000 EA CURB STOP $3,000.00 $30,000.00 $1,670.00 $16,700.00

390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $1,000.00 $5,000.00 $118.00 $590.00

402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $100.00 $43,500.00 $103.00 $44,805.00

415.3 31,785.000 SY PAVEMENT MICRO MILLING $10.00 $317,850.00 $5.50 $174,817.50

431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$140.00 $126,700.00 $93.00 $84,165.00

440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.01 $150.00 $0.35 $5,250.00

443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $10.00 $300.00 $33.00 $990.00

450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $140.00 $560,000.00 $129.00 $516,000.00

450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$140.00 $49,000.00 $196.00 $68,600.00

450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $200.00 $98,000.00 $190.00 $93,100.00

450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $140.00 $249,200.00 $117.00 $208,260.00

451. 250.000 TON HMA FOR PATCHING $200.00 $50,000.00 $198.00 $49,500.00

452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $24,900.00 $11.00 $27,390.00

453. 12,990.000 FT HMA JOINT SEALANT $2.00 $25,980.00 $0.75 $9,742.50

472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $200.00 $73,000.00 $196.00 $71,540.00

476. 250.000 SY CEMENT CONCRETE PAVEMENT $200.00 $50,000.00 $189.00 $47,250.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 14 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

C NAUGHTON CORP R M PACELLA INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$10.00 $40,000.00 $4.50 $18,000.00

503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $75.00 $195,000.00 $91.00 $236,600.00

503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $75.00 $15,750.00 $91.00 $19,110.00

504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $75.00 $444,750.00 $81.00 $480,330.00

504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $75.00 $80,250.00 $81.00 $86,670.00

509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - STRAIGHT

$75.00 $92,250.00 $91.00 $111,930.00

509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - CURVED

$75.00 $54,375.00 $91.00 $65,975.00

514. 10.000 EA GRANITE CURB INLET - STRAIGHT $600.00 $6,000.00 $880.00 $8,800.00

515. 5.000 EA GRANITE CURB INLET - CURVED $1,000.00 $5,000.00 $990.00 $4,950.00

570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $10.00 $1,000.00 $29.00 $2,900.00

580. 2,780.000 FT CURB REMOVED AND RESET $50.00 $139,000.00 $49.00 $136,220.00

581. 5.000 EA CURB INLET REMOVED AND RESET $300.00 $1,500.00 $242.00 $1,210.00

591. 2.000 EA CURB INLET REMOVED AND STACKED $100.00 $200.00 $45.00 $90.00

594. 2,780.000 FT CURB REMOVED AND DISCARDED $5.00 $13,900.00 $9.00 $25,020.00

645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE

POST OPTION)

$200.00 $30,000.00 $74.00 $11,100.00

670. 200.000 FT FENCE REMOVED AND RESET $120.00 $24,000.00 $67.00 $13,400.00

685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $1,500.00 $67,500.00 $1,950.00 $87,750.00

697.1 18.000 EA SILT SACK $100.00 $1,800.00 $415.00 $7,470.00

701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $100.00 $540,000.00 $100.00 $540,000.00

701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $120.00 $300,000.00 $100.00 $250,000.00

701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $150.00 $120,000.00 $169.00 $135,200.00

702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $200.00 $66,000.00 $291.00 $96,030.00

705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $300.00 $3,000.00 $750.00 $7,500.00

706.1 10.000 SY BRICK WALK REMOVED AND RELAID $300.00 $3,000.00 $750.00 $7,500.00

714. 1.000 EA MONUMENT REMOVED AND RESET $10,000.00 $10,000.00 $10,700.00 $10,700.00

718.1 1.000 LS FLAGPOLE REMOVED AND RESET $10,000.00 $10,000.00 $9,600.00 $9,600.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 15 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

C NAUGHTON CORP R M PACELLA INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE

A)

$2,500.00 $82,500.00 $4,759.00 $157,047.00

748. 1.000 LS MOBILIZATION $400,000.00 $400,000.00 $271,000.00 $271,000.00

751. 185.000 CY LOAM BORROW $60.00 $11,100.00 $80.00 $14,800.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$10,000.00 $10,000.00 $19,450.00 $19,450.00

765. 1,310.000 SY SEEDING $5.00 $6,550.00 $2.90 $3,799.00

767.6 145.000 CY AGED PINE BARK MULCH $100.00 $14,500.00 $80.00 $11,600.00

786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $200.00 $40,000.00 $145.00 $29,000.00

796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $60.00 $6,000.00 $45.00 $4,500.00

804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$60.00 $600,000.00 $89.00 $890,000.00

804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$80.00 $475,200.00 $118.00 $700,920.00

811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $3,000.00 $15,000.00 $3,795.00 $18,975.00

811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $3,000.00 $150,000.00 $2,690.00 $134,500.00

811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $1,100.00 $49,500.00 $2,250.00 $101,250.00

812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $4,000.00 $16,000.00 $13,990.00 $55,960.00

812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $3,000.00 $132,000.00 $2,925.00 $128,700.00

813.71 100.000 EA GROUND ROD 8 FEET LONG $300.00 $30,000.00 $168.00 $16,800.00

813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $80,000.00 $80,000.00 $104,000.00 $104,000.00

813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.

$4,000.00 $4,000.00 $15,900.00 $15,900.00

814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $200,000.00 $200,000.00 $186,000.00 $186,000.00

815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $400,000.00 $400,000.00 $452,000.00 $452,000.00

816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$250,000.00 $250,000.00 $272,000.00 $272,000.00

816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$350,000.00 $350,000.00 $395,000.00 $395,000.00

816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$350,000.00 $350,000.00 $315,550.00 $315,550.00

821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $20,000.00 $880,000.00 $19,450.00 $855,800.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 16 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

C NAUGHTON CORP R M PACELLA INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $50,000.00 $200,000.00 $118,250.00 $473,000.00

823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND RESET

$500.00 $12,500.00 $395.00 $9,875.00

823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $500.00 $500.00 $4,200.00 $4,200.00

823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND STACKED

$200.00 $2,000.00 $195.00 $1,950.00

824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 1

$25,000.00 $25,000.00 $29,500.00 $29,500.00

824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 2

$25,000.00 $25,000.00 $40,650.00 $40,650.00

824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $20,000.00 $80,000.00 $22,670.00 $90,680.00

832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$20.00 $10,000.00 $14.00 $7,000.00

847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$220.00 $16,500.00 $395.00 $29,625.00

848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST

ASSEMBLIES-STEEL

$400.00 $5,200.00 $745.00 $9,685.00

850.41 325.000 HR ROADWAY FLAGGER $100.00 $32,500.00 $76.00 $24,700.00

851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1.00 $240.00 $77.00 $18,480.00

852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $30.00 $28,500.00 $51.00 $48,450.00

852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $30.00 $24,000.00 $34.00 $27,200.00

852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $1,000.00 $4,000.00 $514.00 $2,056.00

853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $150.00 $1,200.00 $73.00 $584.00

854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$0.50 $36,600.00 $0.50 $36,600.00

854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $1.00 $5,200.00 $1.50 $7,800.00

854.1 250.000 SF PAVEMENT MARKING REMOVAL $2.00 $500.00 $3.00 $750.00

856. 600.000 DAY ARROW BOARD $10.00 $6,000.00 $8.00 $4,800.00

856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $50.00 $1,500.00 $75.00 $2,250.00

859. 27,000.000 DAY REFLECTORIZED DRUM $0.50 $13,500.00 $0.23 $6,210.00

859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL

FLASHING WARNING LIGHTS

$5.00 $300.00 $7.50 $450.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 17 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

C NAUGHTON CORP R M PACELLA INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

864.07 900.000 SF PAVEMENT ARROW AND LEGENDS (EPOXY) $7.00 $6,300.00 $8.00 $7,200.00

868.04 11,300.000 FT 4 INCH REFLECTORIZED WHITE LINE (EPOXY) $0.70 $7,910.00 $0.95 $10,735.00

868.12 5,400.000 FT 12 INCH REFLECTORIZED WHITE LINE (EPOXY) $7.00 $37,800.00 $6.50 $35,100.00

869.04 9,000.000 FT 4 INCH REFLECTORIZED YELLOW LINE (EPOXY) $0.70 $6,300.00 $0.95 $8,550.00

869.12 200.000 FT 12 INCH REFLECTORIZED YELLOW LINE (EPOXY) $7.00 $1,400.00 $6.50 $1,300.00

874. 54.000 EA STREET NAME SIGN $100.00 $5,400.00 $95.00 $5,130.00

874.45 8.000 EA MISCELLANEOUS SIGNS REMOVED AND RESET $150.00 $1,200.00 $415.00 $3,320.00

874.52 130.000 EA MISCELLANEOUS SIGNS REMOVED AND

DISCARDED

$50.00 $6,500.00 $29.00 $3,770.00

903. 3.000 CY 3000 PSI, 1.5 IN., 470 CEMENT CONCRETE $500.00 $1,500.00 $905.00 $2,715.00

997. 1.000 LS VIBRATION MONITORING $10,000.00 $10,000.00 $29,700.00 $29,700.00

Total : $10,538,515.00 Total : $10,883,766.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 18 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

MACKAY CONST SERVICES INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

100. 1.000 LS SCHEDULE OF OPERATIONS - FIXED PRICE $73500 $73,500.00 $73,500.00

102.2 1.000 LS TREE TRIMMING $25,000.00 $25,000.00

102.511 25.000 EA TREE PROTECTION – ARMORING & PRUNING $430.00 $10,750.00

102.55 40.000 HR ARBORIST $140.00 $5,600.00

103. 3.000 EA TREE REMOVED - DIAMETER UNDER 24 INCHES $3,200.00 $9,600.00

120.1 2,500.000 CY UNCLASSIFIED EXCAVATION $75.00 $187,500.00

141.1 90.000 CY TEST PIT FOR EXPLORATION $200.00 $18,000.00

144. 20.000 CY CLASS B ROCK EXCAVATION $270.00 $5,400.00

145. 1.000 EA DRAINAGE STRUCTURE ABANDONED $1,400.00 $1,400.00

146. 4.000 EA DRAINAGE STRUCTURE REMOVED $1,777.00 $7,108.00

151. 3,455.000 CY GRAVEL BORROW $65.00 $224,575.00

156. 20.000 TON CRUSHED STONE $61.00 $1,220.00

170. 10,000.000 SY FINE GRADING AND COMPACTING $25.00 $250,000.00

201. 12.000 EA CATCH BASIN $7,460.00 $89,520.00

202. 8.000 EA MANHOLE $8,400.00 $67,200.00

204. 4.000 EA GUTTER INLET $3,800.00 $15,200.00

220. 58.000 EA DRAINAGE STRUCTURE ADJUSTED $750.00 $43,500.00

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $2,100.00 $6,300.00

220.5 2.000 EA DRAINAGE STRUCTURE REMODELED $1,800.00 $3,600.00

220.7 26.000 EA SANITARY STRUCTURE ADJUSTED $725.00 $18,850.00

220.8 1.000 EA SANITARY STRUCTURE REMODELED $2,100.00 $2,100.00

222.3 29.000 EA FRAME AND GRATE (OR COVER) MUNICIPAL

STANDARD

$1,280.00 $37,120.00

223.2 9.000 EA FRAME AND GRATE (OR COVER) REMOVED AND

DISCARDED

$70.00 $630.00

227.3 40.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $480.00 $19,200.00

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $19.00 $28,500.00

227.5 1.000 LS CLOSED CIRCUIT TV INSPECTION OF SEWER LINE $35,000.00 $35,000.00

238.10 100.000 FT 10 INCH DUCTILE IRON PIPE $280.00 $28,000.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 19 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

MACKAY CONST SERVICES INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

241.12 550.000 FT 12 INCH REINFORCED CONCRETE PIPE $214.00 $117,700.00

302.06 25.000 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER

GASKET)

$320.00 $8,000.00

309. 140.000 LB DUCTILE IRON FITTINGS FOR WATER PIPE $18.00 $2,520.00

347.2 100.000 FT 2 INCH COPPER TUBING TYPE K $130.00 $13,000.00

357.06 5.000 EA 6 INCH GATE BOX $3,100.00 $15,500.00

358. 40.000 EA GATE BOX ADJUSTED $360.00 $14,400.00

376. 3.000 EA HYDRANT $9,648.00 $28,944.00

376.3 3.000 EA HYDRANT - REMOVED AND STACKED $3,200.00 $9,600.00

381.01 20.000 EA SERVICE BOX (MUNICIPAL STANDARD) $600.00 $12,000.00

381.3 80.000 EA SERVICE BOX ADJUSTED $370.00 $29,600.00

384. 10.000 EA CURB STOP $1,300.00 $13,000.00

390.01 5.000 EA SPRINKLER SYSTEM REMOVED AND STACKED $1,400.00 $7,000.00

402.1 435.000 TON DENSE GRADED CRUSHED STONE FOR SUB-BASE $70.00 $30,450.00

415.3 31,785.000 SY PAVEMENT MICRO MILLING $7.25 $230,441.25

431. 905.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$163.00 $147,515.00

440. 15,000.000 LB CALCIUM CHLORIDE FOR ROADWAY DUST

CONTROL

$0.79 $11,850.00

443. 30.000 MGL WATER FOR ROADWAY DUST CONTROL $110.00 $3,300.00

450.23 4,000.000 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5) $135.00 $540,000.00

450.32 350.000 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC -

19.0)

$165.00 $57,750.00

450.42 490.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $290.00 $142,100.00

450.52 1,780.000 TON SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5) $145.00 $258,100.00

451. 250.000 TON HMA FOR PATCHING $350.00 $87,500.00

452. 2,490.000 GAL ASPHALT EMULSION FOR TACK COAT $8.00 $19,920.00

453. 12,990.000 FT HMA JOINT SEALANT $2.00 $25,980.00

472. 365.000 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK $350.00 $127,750.00

476. 250.000 SY CEMENT CONCRETE PAVEMENT $120.00 $30,000.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 20 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

MACKAY CONST SERVICES INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

482.5 4,000.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$7.15 $28,600.00

503. 2,600.000 FT GRANITE CURB TYPE VA3 - STRAIGHT $110.00 $286,000.00

503.1 210.000 FT GRANITE CURB TYPE VA3 - CURVED $120.00 $25,200.00

504. 5,930.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $89.00 $527,770.00

504.1 1,070.000 FT GRANITE CURB TYPE VA4 - CURVED $110.00 $117,700.00

509. 1,230.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - STRAIGHT

$93.00 $114,390.00

509.1 725.000 FT GRANITE TRANSITION CURB FOR WHEELCHAIR

RAMPS - CURVED

$114.00 $82,650.00

514. 10.000 EA GRANITE CURB INLET - STRAIGHT $1,200.00 $12,000.00

515. 5.000 EA GRANITE CURB INLET - CURVED $1,600.00 $8,000.00

570.3 100.000 FT HOT MIX ASPHALT CURB TYPE 3 $18.00 $1,800.00

580. 2,780.000 FT CURB REMOVED AND RESET $71.00 $197,380.00

581. 5.000 EA CURB INLET REMOVED AND RESET $800.00 $4,000.00

591. 2.000 EA CURB INLET REMOVED AND STACKED $240.00 $480.00

594. 2,780.000 FT CURB REMOVED AND DISCARDED $10.00 $27,800.00

645.072 150.000 FT 72 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE

POST OPTION)

$162.00 $24,300.00

670. 200.000 FT FENCE REMOVED AND RESET $63.00 $12,600.00

685. 45.000 CY STONE MASONRY WALL IN CEMENT MORTAR $670.00 $30,150.00

697.1 18.000 EA SILT SACK $230.00 $4,140.00

701. 5,400.000 SY CEMENT CONCRETE SIDEWALK $155.00 $837,000.00

701.1 2,500.000 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS $165.00 $412,500.00

701.2 800.000 SY CEMENT CONCRETE WHEELCHAIR RAMP $175.00 $140,000.00

702. 330.000 TON HOT MIX ASPHALT WALK SURFACE $350.00 $115,500.00

705.1 10.000 SY FLAGSTONE WALK REMOVED AND RESET $550.00 $5,500.00

706.1 10.000 SY BRICK WALK REMOVED AND RELAID $480.00 $4,800.00

714. 1.000 EA MONUMENT REMOVED AND RESET $55,000.00 $55,000.00

718.1 1.000 LS FLAGPOLE REMOVED AND RESET $45,000.00 $45,000.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 21 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

MACKAY CONST SERVICES INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

740. 33.000 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE

A)

$6,900.00 $227,700.00

748. 1.000 LS MOBILIZATION $365,500.00 $365,500.00

751. 185.000 CY LOAM BORROW $90.00 $16,650.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$10,000.00 $10,000.00

765. 1,310.000 SY SEEDING $4.00 $5,240.00

767.6 145.000 CY AGED PINE BARK MULCH $100.00 $14,500.00

786.441 200.000 EA JUNIPER - JAPANESE GARDEN 18-24 INCH $240.00 $48,000.00

796.753 100.000 EA DAYLILY - 'HAPPY RETURNS' 1 GALLON $180.00 $18,000.00

804.2 10,000.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$88.00 $880,000.00

804.3 5,940.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$108.00 $641,520.00

811.23 5.000 EA ELECTRIC HANDHOLE - SD2.023 $2,200.00 $11,000.00

811.28 50.000 EA ELECTRIC HANDHOLE POLYMER CONCRETE $2,400.00 $120,000.00

811.31 45.000 EA PULL BOX 12 X 12 INCHES - SD2.031 $1,050.00 $47,250.00

812.20 4.000 EA LIGHTING LOAD CENTER FOUNDATION $26,000.00 $104,000.00

812.991 44.000 EA HIGHWAY LIGHTPOLE FOUNDATIONS $5,500.00 $242,000.00

813.71 100.000 EA GROUND ROD 8 FEET LONG $192.00 $19,200.00

813.792 1.000 LS INTERCONNECT CABLE SYSTEM - COPPER WIRE $285,000.00 $285,000.00

813.801 1.000 LS SERVICE CONNECTION (OVERHEAD) LOCATION NO.

$6,800.00 $6,800.00

814. 1.000 LS ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM $215,500.00 $215,500.00

815.1 1.000 LS TRAFFIC CONTROL SIGNAL LOCATION NO. 1 $378,500.00 $378,500.00

816.02 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$225,000.00 $225,000.00

816.03 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$356,000.00 $356,000.00

816.04 1.000 LS TRAFFIC SIGNAL RECONSTRUCTION LOCATION NO.

$275,000.00 $275,000.00

821.111 44.000 EA ORNAMENTAL LIGHT POLE & LUMINAIRE $18,000.00 $792,000.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 22 of 24

Location : QUINCY Contract # : 123872 District : 6 Description : QUINCY- RECONSTRUCTION OF SEA STREET

MACKAY CONST SERVICES INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

823.601 4.000 EA HIGHWAY LIGHTING LOAD CENTER $90,000.00 $360,000.00

823.701 25.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND RESET

$315.00 $7,875.00

823.702 1.000 EA FLOOD LIGHT REMOVED AND RESET $500.00 $500.00

823.711 10.000 EA HIGHWAY LUMINAIRE AND BRACKET REMOVED

AND STACKED

$145.00 $1,450.00

824.211 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 1

$32,000.00 $32,000.00

824.212 1.000 LS RECTANGULAR RAPID FLASHING BEACON (AC

POWER) LOCATION NO. 2

$41,000.00 $41,000.00

824.63 4.000 EA RADAR FEEDBACK SIGN (AC POWERED) $21,000.00 $84,000.00

832. 500.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$15.00 $7,500.00

847.1 75.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$410.00 $30,750.00

848.1 13.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/2 BRKWAY POST

ASSEMBLIES-STEEL

$780.00 $10,140.00

850.41 325.000 HR ROADWAY FLAGGER $75.00 $24,375.00

851.1 240.000 DAY TRAFFIC CONES FOR TRAFFIC MANAGEMENT $1,100.00 $264,000.00

852. 950.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $12.00 $11,400.00

852.11 800.000 FT TEMPORARY PEDESTRIAN BARRICADE $43.00 $34,400.00

852.12 4.000 EA TEMPORARY PEDESTRIAN CURB RAMP $800.00 $3,200.00

853.1 8.000 EA PORTABLE BREAKAWAY BARRICADE TYPE III $163.00 $1,304.00

854.016 73,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH

(PAINTED)

$1.00 $73,200.00

854.036 5,200.000 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE) $2.60 $13,520.00

854.1 250.000 SF PAVEMENT MARKING REMOVAL $5.00 $1,250.00

856. 600.000 DAY ARROW BOARD $16.00 $9,600.00

856.12 30.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $45.00 $1,350.00

859. 27,000.000 DAY REFLECTORIZED DRUM $1.00 $27,000.00

859.1 60.000 DAY REFLECTORIZED DRUMS WITH SEQUENTIAL

FLASHING WARNING LIGHTS

$8.00 $480.00

CMS105 - Report Date: 10/4/2023 7:43 AM Page 23 of 24

Location : QUINCY Contract…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .