This document is an Addendum No. 1 to a Request for Proposals (RFP) for the reconstruction of Sea Street in Quincy, Massachusetts, a Federal Aid project with project number STP/TAP-0036(016)X. The addendum transmits changes to the contract documents, including responses to contractor questions, revisions to certain documents, and the deletion of one document. The RFP is to be opened and read on Tuesday, October 3, 2023, at 2:00 PM.

The addendum addresses questions regarding the quantities and thicknesses of certain paving items, as well as providing details on price adjustments for structural steel and reinforcing steel. The price adjustments will be based on variances of 5% or more between base prices and period prices, with positive adjustments paid to the contractor and negative adjustments credited to the Massachusetts Department of Transportation Highway Division.

View the file

Other files

File Type Posted
608707 A2~1.pdf PDF
608707 NTC.pdf PDF
608707 WZS.pdf PDF
608707 SP.pdf PDF
608707 BidResults.pdf PDF
608707 PD.pdf PDF
608707 BidTabs.pdf PDF
608707 MPM.pdf PDF
608707 NoI P2.pdf PDF
608707 OoC.pdf PDF
BIL 608707.txt TXT text file
608707 ACF.pdf PDF
608707 DS.pdf PDF
608707 DBE.pdf PDF
608707 FW.pdf PDF
608707 PUCF.pdf PDF
608707 NoI P1.pdf PDF
608707 MPMA.pdf PDF
BIL 608707 A1.txt TXT text file
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot

September 28, 2023 Proposal No.608707-123872

ADDENDUM NO. 1

To Prospective Bidders and Others on:

QUINCY

Federal Aid Project No. STP/TAP-0036(016)X

Reconstruction of Sea Street

THIS PROPOSAL TO BE

OPENED AND READ ON: TUESDAY, OCTOBER 3, 2023, at 2:00 P.M.

Transmitting changes to the Contract Documents as follows:

RESPONSES TO CONTRACTOR’S QUESTIONS 1 Page

DOCUMENT 00104: Revised page 3

DOCUMENT 00813: Deleted document in its entirety and inserted new document (4 pages)

DOCUMENT A00802: Revised page 3

DOCUMENT B00420: Revised page 7, 8, and 18

PLAN SET: Revised Sheet 19 of 160

Please take note of the above, substitute the revised pages and sheet for the originals, delete document indicated, insert new document in proper order, and acknowledge Addendum No. 1 in your Expedite Proposal file before submitting your bid.

Sincerely, Eric M. Cardone, P.E.

Construction Contracts Engineer

EMC/jmr cc: Thomas Currier, P.E., Project Manager

QUINCY

Federal Aid Project No. STP/TAP-0036(016)X

Reconstruction of Sea Street (608707-123872)

RESPONSES TO CONTRACTOR’S QUESTIONS ADDENDUM NO. 1, SEPTEMBER 28, 2023

NEWPORT CONSTRUCTION CORPORATION email dated September 26, 2023:

Question #1: Item # 450.32 “ SUPERPAVE INTERMEDIATE COURSE – 19.0 (SIC-19.0), on the detail sheets it calls for just two areas to receive this application one for 860 SY and the other for 904 SY @ 2” for a total of about 200 TONS, but the item quantity is 1200 TONS, is this being use elsewhere.

Response #1: See revised pages A00802-3 and B00420-7 and B00420-8.

Question #2: Item # 450.32 “SUPERPAVE LEVELING COURSE – 9.5 (SLC-9.5), to what thickness is this application being applied. No details showing.

Response #2: The thickness of Item 450.32 is variable and based on the difference in elevation between existing grade and proposed grade as shown on the cross sections.

Massachusetts Department Of Transportation Highway Division Proposal No. 608707-123872

00104 - 3

ADDENDUM NO. 1, SEPTEMBER 28, 2023

NOTICE TO CONTRACTORS (Continued)

PRICE ADJUSTMENTS

This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $637.50 per ton, diesel fuel $3.557 per gallon gasoline $3.065 per gallon, Portland cement $181.15 per ton, and Steel Base Price Index 456.8. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments

This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.

MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)

Prospective bidders and interested parties can access this information and more via the internet at

WWW.COMMBUYS.COM.

BY: Gina Fiandaca, Secretary and CEO, MassDOT Jonathan L. Gulliver, Administrator, MassDOT Highway Division

SATURDAY, AUGUST 26, 2023

ADDENDUM NO. 1, SEPTEMBER 28, 2023

00813 - 1

DOCUMENT 00813

SPECIAL PROVISIONS

PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL

September 14, 2023

This special provision applies to all projects containing the use of structural steel and/or reinforcing steel as specified elsewhere in the Contract work. It applies to all structural steel and all reinforcing steel, as defined below, on the project. Compliance with this provision is mandatory, i.e., there are no “opt-in” or “opt-out” clauses. Price adjustments will be handled as described below and shall only apply to unfabricated reinforcing steel bars and unfabricated structural steel material, consisting of rolled shapes, plate steel, sheet piling, pipe piles, steel castings and steel forgings.

Price adjustments will be variances between Base Prices and Period Prices. Base Prices and Period Prices are defined below.

Price adjustments will only be made if the variances between Base Prices and Period Prices are 5% or more. A variance can result in the Period Price being either higher or lower than the Base Price. Once the 5% threshold has been achieved, the adjustment will apply to the full variance between the Base Price and the Period Price.

Price adjustments will be calculated by multiplying the number of pounds of unfabricated structural steel material or unfabricated reinforcing steel bars on a project by the index factor calculated as shown below under Example of a Period Price Calculation.

Price adjustments will not include guardrail panels or the costs of shop drawing preparation, handling, fabrication, coatings, transportation, storage, installation, profit, overhead, fuel costs, fuel surcharges, or other such charges not related to the cost of the unfabricated structural steel and unfabricated reinforcing steel.

The weight of steel subject to a price adjustment shall not exceed the final shipping weight of the fabricated part by more than 10%.

Base Prices and Period Prices are defined as follows:

Base Prices of unfabricated structural steel and unfabricated reinforcing steel on a project are fixed prices determined by the Department and found in the table below. While it is the intention of the Department to make this table comprehensive, some of a project’s unfabricated structural steel and/or unfabricated reinforcing steel may be inadvertently omitted. Should this occur, the Contractor shall bring the omission to the Department’s attention so that a contract alteration may be processed that adds the missing steel to the table and its price adjustments to the Contract.

The Base Price Date is the month and year of the most recent finalized period price index at the time that MassDOT opened bids for the project. The Base Price Index for this contract is the Steel PPI listed in the Notice to Contractors.

Period Prices of unfabricated structural steel and unfabricated reinforcing steel on a project are variable prices that have been calculated using the Period Price Date and an index of steel prices to adjust the Base Price.

The Period Price Date is the date the steel was delivered to the fabricator as evidenced by an official bill of lading submitted to the Department containing a description of the shipped materials, weights of the shipped materials and the date of shipment. This date is used to select the Period Price Index.

The index used for the calculation of Period Prices is the U.S. Department of Labor Bureau of Labor Statistics Producer Price Index (PPI) Series ID WPU101702 (Not Seasonally Adjusted, Group: Metals and Metal Products, Item: Semi-finished Steel Mill Products.) As this index is subject to revision for a period of up to four (4) months after its original publication, no price adjustments will be made until the index for the period is finalized, i.e., the index is no longer suffixed with a “(P)”.

00813 - 2

Period Prices are determined as follows:

Period Price = Base Price X Index Factor Index Factor = Period Price Index / Base Price Index

Example of a Period Price Calculation:

Calculate the Period Price for December 2009 using a Base Price from March 2009 of $0.82/Pound for 1,000 Pounds of ASTM A709 (AASHTO M270) Grade A36 Structural Steel Plate.

The Period Price Date is December 2009. From the PPI website*, the Period Price Index = 218.0.

The Base Price Date is March 2009. From the PPI website*, the Base Price Index = 229.4.

Index Factor = Period Price Index / Base Price Index = 218.0 / 229.4 = 0.950 Period Price = Base Price X Index Factor = $0.82/Pound X 0.950 = $0.78/Pound

Since $0.82 - $0.78 = $0.04 is less than 5% of $0.82, no price adjustment is required.

If the $0.04 difference shown above was greater than 5% of the Base Price, then the price adjustment would be 1,000 Pounds X $0.04/Pound = $40.00. Since the Period Price of $0.78/Pound is less than the Base Price of $0.82/Pound, indicating a drop in the price of steel between the bid and the delivery of material, a credit of $40.00 would be owed to MassDOT. When the Period Price is higher than the Base Price, the price adjustment is owed to the Contractor.

* To access the PPI website and obtain a Base Price Index or a Period Price Index, go to http://data.bls.gov/cgi-bin/srgate

End of example.

The Contractor will be paid for unfabricated structural steel and unfabricated reinforcing steel under the respective contract pay items for all components constructed of either structural steel or reinforced Portland cement concrete under their respective Contract Pay Items.

Price adjustments, as herein provided for, will be paid separately as follows:

Structural Steel Pay Item Number 999.449 for positive (+) pay adjustments (payments to the Contractor)

Pay Item Number 999.457 for negative (-) pay adjustments (credits to MassDOT Highway Division)

Reinforcing Steel Pay Item Number 999.466 for positive (+) pay adjustments (payments to the Contractor)

Pay Item Number 999.467 for negative (-) pay adjustments (credits to MassDOT Highway Division)

No price adjustment will be made for price changes after the Contract Completion Date, unless the MassDOT Highway Division has approved an extension of Contract Time for the Contract.

ADDENDUM NO. 1, SEPTEMBER 28, 2023

00813 - 3

TABLE

Price per Steel Type Pound

1 ASTM A615/A615M Grade 60 (AASHTO M31 Grade 60 or 420) Reinforcing Steel $0.71

2 ASTM A27 (AASHTO M103) Steel Castings, H-Pile Points & Pipe Pile Shoes (See Note below.)

$0.97

3 ASTM A668 / A668M (AASHTO M102) Steel Forgings $0.97

4 ASTM A108 (AASHTO M169) Steel Forgings for Shear Studs $1.01

5 ASTM A709/A709M Grade 36 / AASHTO M270M/M270 Grade 36 or 250 Structural Steel Plate

$1.07

6 ASTM A709/A709M Grade 36 / AASHTO M270M/M270 Grade 36 or 250 Structural Steel Shapes

$1.00

7 ASTM A709/A709M Grade 50 / AASHTO M270M/M270 Grade 50 or 345 Structural Steel Plate

$1.07

8 ASTM A709/A709M Grade 50 / AASHTO M270M/M270 Grade 50 or 345 Structural Steel Shapes

$1.00

9 ASTM A709/A709M Grade 50WT / AASHTO M270M/M270 Grade 50WT or 345WT Structural Steel Plate

$1.11

10 ASTM A709/A709M Grade 50WT / AASHTO M270M/M270 Grade 50WT or 345WT Structural Steel Shapes

$1.01

11 ASTM A709/A709M Grade 50W / AASHTO M270M/M270 Grade 50W 345W Structural Steel Plate

$1.11

12 ASTM A709/A709M Grade 50W / AASHTO M270M/M270 Grade 50W or 345W Structural Steel Shapes

$1.01

13 ASTM A709/A709M Grade HPS 50W / AASHTO M270M/M270 Grade HPS 50W or 345W Structural Steel Plate

$1.17

14 ASTM A709/A709M Grade HPS 70W / AASHTO M270M/M270 Grade HPS 70W or 485W Structural Steel Plate

$1.24

15 ASTM A514/A514M-05 Grade HPS 100W / AASHTO M270M/M270 Grade HPS 100W or 690W Structural Steel Plate

$1.90

16 ASTM A992/A992M Grade 50S / AASHTO M270M/M270 Grade 50S or 345S Structural Steel Plate

$1.11

17 ASTM A992/A992M Grade 50S / AASHTO M270M/M270 Grade 50S or 345S Structural Steel Shapes

$1.01

18 ASTM A276 Type 316 Stainless Steel $5.68

19 ASTM A240 Type 316 Stainless Steel $5.68

20 ASTM A148 Grade 80/50 Steel Castings (See Note below.) $1.96

21 ASTM A53 Grade B Structural Steel Pipe $1.25

22 ASTM A500 Grades A, B, 36 & 50 Structural Steel Pipe $1.25

23 ASTM A252, Grades 240 (36 KSI) & 414 (60 KSI) Pipe Pile $0.99

24 ASTM 252, Grade 2 Permanent Steel Casing $0.99

25 ASTM A36 (AASHTO M183) for H-piles, steel supports and sign supports $1.06

26 ASTM A328 / A328M, Grade 50 (AASHTO M202) Steel Sheetpiling $1.87 27 ASTM A572 / A572M, Grade 50 Sheetpiling $1.87 28 ASTM A36/36M, Grade 50 $1.07

29 ASTM A570, Grade 50 $1.06

30 ASTM A572 (AASHTO M223), Grade 50 H-Piles $1.07

31 ASTM A1085 Grade A (50 KSI) Steel Hollow Structural Sections (HSS), heat-treated per ASTM A1085 Supplement S1

$1.25

32 AREA 140 LB Rail and Track Accessories $0.64

NOTE: Steel Castings are generally used only on moveable bridges. Cast iron frames, grates and pipe are not “steel” castings and will not be considered for price adjustments.

END OF DOCUMENT

00813 - 4

THIS PAGE IS INTENTIONALLY LEFT BLANK

Project # 608707 Contract # 123872

Location : QUINCY

Description : Reconstruction of Sea Street

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

381.3 80 SERVICE BOX ADJUSTED

AT _________________________

EACH

384. 10 CURB STOP

AT _________________________

EACH

390.01 5 SPRINKLER SYSTEM REMOVED AND STACKED

AT _________________________

EACH

402.1 435 DENSE GRADED CRUSHED STONE FOR SUB-BASE

AT _________________________

PER TON

415.3 31,785 PAVEMENT MICRO MILLING

AT _________________________

PER SQUARE YARD

431. 905 HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

AT _________________________

PER SQUARE YARD

440. 15,000 CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL

AT _________________________

PER POUND

443. 30 WATER FOR ROADWAY DUST CONTROL

AT _________________________

PER 1000 GALLONS

450.23 4,000 SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5)

AT _________________________

PER TON

CMS104 - Report Run Date: 9/28/2023 10:40 AM Page 6

Proposal No. 608707-123872 ADDENDUM NO. 1, SEPTEMBER 28, 2023

B00420 - 7

Description : Reconstruction of Sea Street

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

450.32 350 SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0)

AT _________________________

PER TON

450.42 490 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)

AT _________________________

PER TON

450.52 1,780 SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5)

AT _________________________

PER TON

451. 250 HMA FOR PATCHING

AT _________________________

PER TON

452. 2,490 ASPHALT EMULSION FOR TACK COAT

AT _________________________

PER GALLON

453. 12,990 HMA JOINT SEALANT

AT _________________________

PER FOOT

472. 365 HOT MIX ASPHALT FOR MISCELLANEOUS WORK

AT _________________________

PER TON

476. 250 CEMENT CONCRETE PAVEMENT

AT _________________________

PER SQUARE YARD

482.5 4,000 SAWCUTTING ASPHALT PAVEMENT FOR BOX WIDENING

AT _________________________

PER FOOT

CMS104 - Report Run Date: 9/28/2023 10:40 AM Page 7

B00420 - 8

Description : Reconstruction of Sea Street

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

997. 1 VIBRATION MONITORING

AT _________________________

LUMP SUM

Total Qty: 275,477

CMS104 - Report Run Date: 9/28/2023 10:40 AM Page 17

B00420 - 18

19 20

15+50

PC

.4

PT +98.72

0+

101+50

PC

.8

PT +03.79

0+

151+20

0+

2+

SEA STREET CONST

SAM

OSET

AVENUE

NARRAGANSETT ROAD

M U

R

PH

Y M

EM

O

R

IA

L D

R

IV

E

PROP

PCR-1

PROP

PCR-2

PROP PCR-6 PROP PCR-8

PROP PCR-7

PROP CEM

CONC SW

AT DWY

PROP HMA

DWY

LIMIT OF WORK

SAWCUT LINE

PROP CEM

CONC SW

AT DWY

PROP HMA

DWY

LIMIT OF WORK

SAWCUT LINE PROP CEM CONC

SW AT DWY

PROP HMA

DWY

LIMIT OF WORK

SAWCUT LINE

PROP CEM

CONC SW

AT DWY

PROP HMA

DWY

LIMIT OF WORK

SAWCUT LINE

PROP CEM CONC

SW AT DWY

PROP HMA DWY

LIMIT OF WORK

SAWCUT LINE

PROP CEM CONC

SW AT DWY

PROP HMA DWY

LIMIT OF WORK

SAWCUT LINE

PROP 8' CEM CONC SW

PROP PVMT MILLING

AND OVERLAY

PROP CEM CONC

SW AT DWY

PROP HMA

DWY

LIMIT OF WORK

SAWCUT LINE

PROP PVMT MILLING

AND OVERLAY

PROP GRAN CURB

TYPE VA4

PROP GRAN CURB

TYPE VA4

LIMIT OF WORK

SAWCUT LINE

MEET EXISTING

LIMIT OF WORK

SAWCUT LINE

MEET EXISTING

LIMIT OF WORK

SAWCUT LINE

MEET EXISTING

ADJ

DMH

ADJ DMH

REMOD DMH

PROP ORNAMENTAL

STREET LIGHT

(TYP)

PROP GRAN CURB

TYPE VA4 (TYP)

ADJ

DMH

REMOVE CB

PROTECT TREE

PROTECT

TREE

PROP CEM

CONC WALK

PROP CEM

CONC WALK

PROP CEM

CONC WALK

PROP CEM CONC

SW AT DWY

PROP HMA DWY

LIMIT OF WORK

SAWCUT LINE

PROP CONC. WALK

RETAIN HEDGE

PROP CEM CONC

SW - WIDTH VARIES

PROP CEM

CONC

WALK

PROP CEM

CONC WALK

PROP BOX

WIDENING >4'

R&D

CURB

PROP GRAN CURB

TYPE VA4

PROP GRAN CURB

TYPE VA4

CONST EASEMENT

LINE

CONST EASEMENT LINE

CONST

EASEMENT LINE

CONST EASEMENT LINE

CONST

EASEMENT

LINE

LIMIT OF WORK

SAWCUT LINE

61'

28'

1927 CITY LAYO

UT LINE

1927 CITY LAYO

UT LINE

1925 CITY LAYOUT LINE

1925 CITY LAYOUT LINE

C

IT

Y

LA

YO

U

T

LI

N E

C

IT

Y

LA

YO

U

T

LI

N E

CBCI-2

CBCI-1

12' - 12" RCP

ABAN

CB

R&R

FLAGSTONE

WALK

R&R BRICK

WALK

PROP

MAST

ARM

REM 4"Ø

TREE

RET WALL

RET FENCE

AND WALL

PROP MAST ARM

PROP LOAM

AND SEED

PERM UTILITY

EASEMENT LINE

PROP CONC

CURB TRANSITION

R&D CURB

R&D CURB

R&S EXIST CURB

PROP GRAN CURB

TYPE VA4

PROP HMA DWY

PROP SAWCUT

LINE (TYP.)

PROTECT

TREE

PROP LOAM

AND SEED

RET CURB

RET

CURB

PROP MAST

ARMPROP DETECTABLE WARNING

PANEL (TYP.)

PROP CEM CONC

SW AT DWY

PROP 5'

HMA SW

PROP LOAM

AND SEED

LIMIT OF WORK

SAWCUT LINE

1925 CITY LAYOUT LINE

1925 CITY LAYOUT LINE

PROP HMA

DWY

LIMIT OF WORK

SAWCUT LINE

PROP LOAM

AND SEED

PROP GRAN CURB

TYPE VA4

PROP CEM CONC

SW - WIDTH VARIES

PROP

LOAM

AND SEED

PROP BOX

WIDENING >4'

PROP BOX

WIDENING

>4'

CONST EASEMENT LINE CONST

EASEMENT LINE

PERM UTILITY

EASEMENT LINE

PROP

MULCH PROP

HMA

CURB

PROP HMA

CURB

RET STATUE

PROP 7' CEM

CONC SW

PROP LOAM

AND SEED

REM BUSHES

PROP LOAM

AND SEED

BEGIN

LAYOUT

ALT

HSD=455'

BEGIN

CURB

END

CURB

PROP LOAM

AND SEED

BOS

PROP HMA DWY

PROP CEM CONC

SW AT DWY

CONST

EASEMENT LINE

PROP LOAM

AND SEED

PROP GRAN CURB

TYPE VA4

BEGIN

LAYOUT

ALT

END LAYOUT

ALT

PROP BOX

WIDENING >4'

PROP HMA

PAVEMENT

LIMIT OF WORK

SAWCUT LINE

PERM HIGHWAY

EASEMENT LINE

PROP LOAM

AND SEED

PROP LOAM

AND SEED

PROP LOAM

AND SEED

R&R

FLAGSTONE

WALK

PROP PCR-4

BEGIN

LAYOUT

ALT

END

LAYOUT

ALT

PROP 4' CLF

ON PROP STONE

MASONRY WALL

PROP

GRAN CURB

TYPE VA4

PROP 5.5' CEM

CONC SW

PROP BOX

WIDENING >4'

SEA STREET

TOS

TOS

RET FENCE RET WALL

PROP BOX

WIDENING <4'

CONST EASEMENT

LINE

BEGIN LAYOUT ALT

END LAYOUT ALT

END LAYOUT ALT

BEGIN LAYOUT ALT

BEGIN LAYOUT

ALT

END LAYOUT ALT

1925 CITY LAYOUT LINE

1925 CITY LAYOUT LINE

PERM HIGHWAY

EASEMENT LINE

PERM HIGHWAY

EASEMENT LINE

PERM HIGHWAY EASEMENT LINE

PERM HIGHWAY EASEMENT LINE

19 20

PC +94.82

15+50

PROJECT BEGIN

STA 16+00

N2920591.7787 E793320.5904 N 60° 12' 34" E 344.82'

PROP

MAST

ARM

PROP

PCR-3

PROP

PCR-5

DWY-1 DWY-2

DW

Y-3

D W

Y-4

DWY-5

DWY-6

DWY-7

DWY-8

DWY-9

DWY-10

REM

CONC

PROP 7' CEM

CONC SW

L=407.53' R=1501.00' Δ=15° 33' 22"

LIMIT OF PROP

GRAN CURB & SW

MEET EXIST

CURB & SW

LIMIT OF PROP

GRAN CURB & SW

MEET EXIST

CURB & SW

LIMIT OF PROP

GRAN CURB & SW

MEET EXIST

CURB & SW

LIMIT OF PROP

GRAN CURB & SW

MEET EXIST

CURB & SW

PROP PCR-54

PROP

PCR-53

LIMIT OF PROP

GRAN CURB & SW

MEET EXIST

CURB & SW

LIMIT OF PROP

GRAN CURB & SW

MEET EXIST

CURB & SW

LIMIT OF PROP GRAN CURB & SW

MEET EXIST CURB & SW

LIMIT OF PROP GRAN CURB & SW

MEET EXIST CURB & SW

PROP CEM

CONC WALK

PROP LOAM

& SEED

PROP CEM

CONC SW

PROP BOX

WIDENING >4'

R&R SHED

FED. AID PROJ. NO. SHEET

NO.

TOTAL

SHEETS

QUINCY

SEA STREET

STATE

MA

PROJECT FILE NO. 608707

STP/TAP-0036(016)X

_H

D (4

7_

_C

O N

ST

).D

W G

-S ep -2

0:

A M

Pl ot te d on

SCALE: 1" = 20'

0 50 100

CONSTRUCTION PLAN

N C

O N

TIN

U

ED

O

N

SH

EET N

O

. 20

HIGHWAY GUARD DETAILS

NONE

TRAFFIC SIGNAL CONDUIT

SEE SHEET 73

WATER SUPPLY ALTERATIONS

NONE

DRAINAGE DETAILS

SEE SHEET 45

FOR PROFILE SEE SHEET 27

9/27/23 LABELED BOX WIDENING AT CHURCH PARKING BAY

DESCRIPTIONDATEREV.

1 ADDENDUM NO.1, SEPTEMBER 28, 2023

Nutt cover letter
contractor questions
00104_3
00813
B00420 7 8 18
SHEET_19printed
2023-09-28T13:57:50-0400
Eric M. Cardone

File details come from the government source that posted it. Updated .