This document is an Addendum No. 1 to a Request for Proposals (RFP) for the reconstruction of Sea Street in Quincy, Massachusetts, a Federal Aid project with project number STP/TAP-0036(016)X. The addendum transmits changes to the contract documents, including responses to contractor questions, revisions to certain documents, and the deletion of one document. The RFP is to be opened and read on Tuesday, October 3, 2023, at 2:00 PM.
The addendum addresses questions regarding the quantities and thicknesses of certain paving items, as well as providing details on price adjustments for structural steel and reinforcing steel. The price adjustments will be based on variances of 5% or more between base prices and period prices, with positive adjustments paid to the contractor and negative adjustments credited to the Massachusetts Department of Transportation Highway Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 608707 A2~1.pdf | ||
| 608707 NTC.pdf | ||
| 608707 WZS.pdf | ||
| 608707 SP.pdf | ||
| 608707 BidResults.pdf | ||
| 608707 PD.pdf | ||
| 608707 BidTabs.pdf | ||
| 608707 MPM.pdf | ||
| 608707 NoI P2.pdf | ||
| 608707 OoC.pdf | ||
| BIL 608707.txt | TXT text file | |
| 608707 ACF.pdf | ||
| 608707 DS.pdf | ||
| 608707 DBE.pdf | ||
| 608707 FW.pdf | ||
| 608707 PUCF.pdf | ||
| 608707 NoI P1.pdf | ||
| 608707 MPMA.pdf | ||
| BIL 608707 A1.txt | TXT text file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot
September 28, 2023 Proposal No.608707-123872
ADDENDUM NO. 1
To Prospective Bidders and Others on:
QUINCY
Federal Aid Project No. STP/TAP-0036(016)X
Reconstruction of Sea Street
THIS PROPOSAL TO BE
OPENED AND READ ON: TUESDAY, OCTOBER 3, 2023, at 2:00 P.M.
Transmitting changes to the Contract Documents as follows:
RESPONSES TO CONTRACTOR’S QUESTIONS 1 Page
DOCUMENT 00104: Revised page 3
DOCUMENT 00813: Deleted document in its entirety and inserted new document (4 pages)
DOCUMENT A00802: Revised page 3
DOCUMENT B00420: Revised page 7, 8, and 18
PLAN SET: Revised Sheet 19 of 160
Please take note of the above, substitute the revised pages and sheet for the originals, delete document indicated, insert new document in proper order, and acknowledge Addendum No. 1 in your Expedite Proposal file before submitting your bid.
Sincerely, Eric M. Cardone, P.E.
Construction Contracts Engineer
EMC/jmr cc: Thomas Currier, P.E., Project Manager
QUINCY
Federal Aid Project No. STP/TAP-0036(016)X
Reconstruction of Sea Street (608707-123872)
RESPONSES TO CONTRACTOR’S QUESTIONS ADDENDUM NO. 1, SEPTEMBER 28, 2023
NEWPORT CONSTRUCTION CORPORATION email dated September 26, 2023:
Question #1: Item # 450.32 “ SUPERPAVE INTERMEDIATE COURSE – 19.0 (SIC-19.0), on the detail sheets it calls for just two areas to receive this application one for 860 SY and the other for 904 SY @ 2” for a total of about 200 TONS, but the item quantity is 1200 TONS, is this being use elsewhere.
Response #1: See revised pages A00802-3 and B00420-7 and B00420-8.
Question #2: Item # 450.32 “SUPERPAVE LEVELING COURSE – 9.5 (SLC-9.5), to what thickness is this application being applied. No details showing.
Response #2: The thickness of Item 450.32 is variable and based on the difference in elevation between existing grade and proposed grade as shown on the cross sections.
Massachusetts Department Of Transportation Highway Division Proposal No. 608707-123872
00104 - 3
ADDENDUM NO. 1, SEPTEMBER 28, 2023
NOTICE TO CONTRACTORS (Continued)
PRICE ADJUSTMENTS
This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $637.50 per ton, diesel fuel $3.557 per gallon gasoline $3.065 per gallon, Portland cement $181.15 per ton, and Steel Base Price Index 456.8. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments
This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.
MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)
Prospective bidders and interested parties can access this information and more via the internet at
WWW.COMMBUYS.COM.
BY: Gina Fiandaca, Secretary and CEO, MassDOT Jonathan L. Gulliver, Administrator, MassDOT Highway Division
SATURDAY, AUGUST 26, 2023
ADDENDUM NO. 1, SEPTEMBER 28, 2023
00813 - 1
DOCUMENT 00813
SPECIAL PROVISIONS
PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL
September 14, 2023
This special provision applies to all projects containing the use of structural steel and/or reinforcing steel as specified elsewhere in the Contract work. It applies to all structural steel and all reinforcing steel, as defined below, on the project. Compliance with this provision is mandatory, i.e., there are no “opt-in” or “opt-out” clauses. Price adjustments will be handled as described below and shall only apply to unfabricated reinforcing steel bars and unfabricated structural steel material, consisting of rolled shapes, plate steel, sheet piling, pipe piles, steel castings and steel forgings.
Price adjustments will be variances between Base Prices and Period Prices. Base Prices and Period Prices are defined below.
Price adjustments will only be made if the variances between Base Prices and Period Prices are 5% or more. A variance can result in the Period Price being either higher or lower than the Base Price. Once the 5% threshold has been achieved, the adjustment will apply to the full variance between the Base Price and the Period Price.
Price adjustments will be calculated by multiplying the number of pounds of unfabricated structural steel material or unfabricated reinforcing steel bars on a project by the index factor calculated as shown below under Example of a Period Price Calculation.
Price adjustments will not include guardrail panels or the costs of shop drawing preparation, handling, fabrication, coatings, transportation, storage, installation, profit, overhead, fuel costs, fuel surcharges, or other such charges not related to the cost of the unfabricated structural steel and unfabricated reinforcing steel.
The weight of steel subject to a price adjustment shall not exceed the final shipping weight of the fabricated part by more than 10%.
Base Prices and Period Prices are defined as follows:
Base Prices of unfabricated structural steel and unfabricated reinforcing steel on a project are fixed prices determined by the Department and found in the table below. While it is the intention of the Department to make this table comprehensive, some of a project’s unfabricated structural steel and/or unfabricated reinforcing steel may be inadvertently omitted. Should this occur, the Contractor shall bring the omission to the Department’s attention so that a contract alteration may be processed that adds the missing steel to the table and its price adjustments to the Contract.
The Base Price Date is the month and year of the most recent finalized period price index at the time that MassDOT opened bids for the project. The Base Price Index for this contract is the Steel PPI listed in the Notice to Contractors.
Period Prices of unfabricated structural steel and unfabricated reinforcing steel on a project are variable prices that have been calculated using the Period Price Date and an index of steel prices to adjust the Base Price.
The Period Price Date is the date the steel was delivered to the fabricator as evidenced by an official bill of lading submitted to the Department containing a description of the shipped materials, weights of the shipped materials and the date of shipment. This date is used to select the Period Price Index.
The index used for the calculation of Period Prices is the U.S. Department of Labor Bureau of Labor Statistics Producer Price Index (PPI) Series ID WPU101702 (Not Seasonally Adjusted, Group: Metals and Metal Products, Item: Semi-finished Steel Mill Products.) As this index is subject to revision for a period of up to four (4) months after its original publication, no price adjustments will be made until the index for the period is finalized, i.e., the index is no longer suffixed with a “(P)”.
00813 - 2
Period Prices are determined as follows:
Period Price = Base Price X Index Factor Index Factor = Period Price Index / Base Price Index
Example of a Period Price Calculation:
Calculate the Period Price for December 2009 using a Base Price from March 2009 of $0.82/Pound for 1,000 Pounds of ASTM A709 (AASHTO M270) Grade A36 Structural Steel Plate.
The Period Price Date is December 2009. From the PPI website*, the Period Price Index = 218.0.
The Base Price Date is March 2009. From the PPI website*, the Base Price Index = 229.4.
Index Factor = Period Price Index / Base Price Index = 218.0 / 229.4 = 0.950 Period Price = Base Price X Index Factor = $0.82/Pound X 0.950 = $0.78/Pound
Since $0.82 - $0.78 = $0.04 is less than 5% of $0.82, no price adjustment is required.
If the $0.04 difference shown above was greater than 5% of the Base Price, then the price adjustment would be 1,000 Pounds X $0.04/Pound = $40.00. Since the Period Price of $0.78/Pound is less than the Base Price of $0.82/Pound, indicating a drop in the price of steel between the bid and the delivery of material, a credit of $40.00 would be owed to MassDOT. When the Period Price is higher than the Base Price, the price adjustment is owed to the Contractor.
* To access the PPI website and obtain a Base Price Index or a Period Price Index, go to http://data.bls.gov/cgi-bin/srgate
End of example.
The Contractor will be paid for unfabricated structural steel and unfabricated reinforcing steel under the respective contract pay items for all components constructed of either structural steel or reinforced Portland cement concrete under their respective Contract Pay Items.
Price adjustments, as herein provided for, will be paid separately as follows:
Structural Steel Pay Item Number 999.449 for positive (+) pay adjustments (payments to the Contractor)
Pay Item Number 999.457 for negative (-) pay adjustments (credits to MassDOT Highway Division)
Reinforcing Steel Pay Item Number 999.466 for positive (+) pay adjustments (payments to the Contractor)
Pay Item Number 999.467 for negative (-) pay adjustments (credits to MassDOT Highway Division)
No price adjustment will be made for price changes after the Contract Completion Date, unless the MassDOT Highway Division has approved an extension of Contract Time for the Contract.
ADDENDUM NO. 1, SEPTEMBER 28, 2023
00813 - 3
TABLE
Price per Steel Type Pound
1 ASTM A615/A615M Grade 60 (AASHTO M31 Grade 60 or 420) Reinforcing Steel $0.71
2 ASTM A27 (AASHTO M103) Steel Castings, H-Pile Points & Pipe Pile Shoes (See Note below.)
$0.97
3 ASTM A668 / A668M (AASHTO M102) Steel Forgings $0.97
4 ASTM A108 (AASHTO M169) Steel Forgings for Shear Studs $1.01
5 ASTM A709/A709M Grade 36 / AASHTO M270M/M270 Grade 36 or 250 Structural Steel Plate
$1.07
6 ASTM A709/A709M Grade 36 / AASHTO M270M/M270 Grade 36 or 250 Structural Steel Shapes
$1.00
7 ASTM A709/A709M Grade 50 / AASHTO M270M/M270 Grade 50 or 345 Structural Steel Plate
$1.07
8 ASTM A709/A709M Grade 50 / AASHTO M270M/M270 Grade 50 or 345 Structural Steel Shapes
$1.00
9 ASTM A709/A709M Grade 50WT / AASHTO M270M/M270 Grade 50WT or 345WT Structural Steel Plate
$1.11
10 ASTM A709/A709M Grade 50WT / AASHTO M270M/M270 Grade 50WT or 345WT Structural Steel Shapes
$1.01
11 ASTM A709/A709M Grade 50W / AASHTO M270M/M270 Grade 50W 345W Structural Steel Plate
$1.11
12 ASTM A709/A709M Grade 50W / AASHTO M270M/M270 Grade 50W or 345W Structural Steel Shapes
$1.01
13 ASTM A709/A709M Grade HPS 50W / AASHTO M270M/M270 Grade HPS 50W or 345W Structural Steel Plate
$1.17
14 ASTM A709/A709M Grade HPS 70W / AASHTO M270M/M270 Grade HPS 70W or 485W Structural Steel Plate
$1.24
15 ASTM A514/A514M-05 Grade HPS 100W / AASHTO M270M/M270 Grade HPS 100W or 690W Structural Steel Plate
$1.90
16 ASTM A992/A992M Grade 50S / AASHTO M270M/M270 Grade 50S or 345S Structural Steel Plate
$1.11
17 ASTM A992/A992M Grade 50S / AASHTO M270M/M270 Grade 50S or 345S Structural Steel Shapes
$1.01
18 ASTM A276 Type 316 Stainless Steel $5.68
19 ASTM A240 Type 316 Stainless Steel $5.68
20 ASTM A148 Grade 80/50 Steel Castings (See Note below.) $1.96
21 ASTM A53 Grade B Structural Steel Pipe $1.25
22 ASTM A500 Grades A, B, 36 & 50 Structural Steel Pipe $1.25
23 ASTM A252, Grades 240 (36 KSI) & 414 (60 KSI) Pipe Pile $0.99
24 ASTM 252, Grade 2 Permanent Steel Casing $0.99
25 ASTM A36 (AASHTO M183) for H-piles, steel supports and sign supports $1.06
26 ASTM A328 / A328M, Grade 50 (AASHTO M202) Steel Sheetpiling $1.87 27 ASTM A572 / A572M, Grade 50 Sheetpiling $1.87 28 ASTM A36/36M, Grade 50 $1.07
29 ASTM A570, Grade 50 $1.06
30 ASTM A572 (AASHTO M223), Grade 50 H-Piles $1.07
31 ASTM A1085 Grade A (50 KSI) Steel Hollow Structural Sections (HSS), heat-treated per ASTM A1085 Supplement S1
$1.25
32 AREA 140 LB Rail and Track Accessories $0.64
NOTE: Steel Castings are generally used only on moveable bridges. Cast iron frames, grates and pipe are not “steel” castings and will not be considered for price adjustments.
END OF DOCUMENT
00813 - 4
THIS PAGE IS INTENTIONALLY LEFT BLANK
Project # 608707 Contract # 123872
Location : QUINCY
Description : Reconstruction of Sea Street
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
381.3 80 SERVICE BOX ADJUSTED
AT _________________________
EACH
384. 10 CURB STOP
AT _________________________
EACH
390.01 5 SPRINKLER SYSTEM REMOVED AND STACKED
AT _________________________
EACH
402.1 435 DENSE GRADED CRUSHED STONE FOR SUB-BASE
AT _________________________
PER TON
415.3 31,785 PAVEMENT MICRO MILLING
AT _________________________
PER SQUARE YARD
431. 905 HIGH EARLY STRENGTH CEMENT CONCRETE BASE
COURSE
AT _________________________
PER SQUARE YARD
440. 15,000 CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL
AT _________________________
PER POUND
443. 30 WATER FOR ROADWAY DUST CONTROL
AT _________________________
PER 1000 GALLONS
450.23 4,000 SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5)
AT _________________________
PER TON
CMS104 - Report Run Date: 9/28/2023 10:40 AM Page 6
Proposal No. 608707-123872 ADDENDUM NO. 1, SEPTEMBER 28, 2023
B00420 - 7
Description : Reconstruction of Sea Street
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
450.32 350 SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0)
AT _________________________
PER TON
450.42 490 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)
AT _________________________
PER TON
450.52 1,780 SUPERPAVE LEVELING COURSE - 9.5 (SLC - 9.5)
AT _________________________
PER TON
451. 250 HMA FOR PATCHING
AT _________________________
PER TON
452. 2,490 ASPHALT EMULSION FOR TACK COAT
AT _________________________
PER GALLON
453. 12,990 HMA JOINT SEALANT
AT _________________________
PER FOOT
472. 365 HOT MIX ASPHALT FOR MISCELLANEOUS WORK
AT _________________________
PER TON
476. 250 CEMENT CONCRETE PAVEMENT
AT _________________________
PER SQUARE YARD
482.5 4,000 SAWCUTTING ASPHALT PAVEMENT FOR BOX WIDENING
AT _________________________
PER FOOT
CMS104 - Report Run Date: 9/28/2023 10:40 AM Page 7
B00420 - 8
Description : Reconstruction of Sea Street
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
997. 1 VIBRATION MONITORING
AT _________________________
LUMP SUM
Total Qty: 275,477
CMS104 - Report Run Date: 9/28/2023 10:40 AM Page 17
B00420 - 18
19 20
15+50
PC
.4
PT +98.72
0+
101+50
PC
.8
PT +03.79
0+
151+20
0+
2+
SEA STREET CONST
SAM
OSET
AVENUE
NARRAGANSETT ROAD
M U
R
PH
Y M
EM
O
R
IA
L D
R
IV
E
PROP
PCR-1
PROP
PCR-2
PROP PCR-6 PROP PCR-8
PROP PCR-7
PROP CEM
CONC SW
AT DWY
PROP HMA
DWY
LIMIT OF WORK
SAWCUT LINE
PROP CEM
CONC SW
AT DWY
PROP HMA
DWY
LIMIT OF WORK
SAWCUT LINE PROP CEM CONC
SW AT DWY
PROP HMA
DWY
LIMIT OF WORK
SAWCUT LINE
PROP CEM
CONC SW
AT DWY
PROP HMA
DWY
LIMIT OF WORK
SAWCUT LINE
PROP CEM CONC
SW AT DWY
PROP HMA DWY
LIMIT OF WORK
SAWCUT LINE
PROP CEM CONC
SW AT DWY
PROP HMA DWY
LIMIT OF WORK
SAWCUT LINE
PROP 8' CEM CONC SW
PROP PVMT MILLING
AND OVERLAY
PROP CEM CONC
SW AT DWY
PROP HMA
DWY
LIMIT OF WORK
SAWCUT LINE
PROP PVMT MILLING
AND OVERLAY
PROP GRAN CURB
TYPE VA4
PROP GRAN CURB
TYPE VA4
LIMIT OF WORK
SAWCUT LINE
MEET EXISTING
LIMIT OF WORK
SAWCUT LINE
MEET EXISTING
LIMIT OF WORK
SAWCUT LINE
MEET EXISTING
ADJ
DMH
ADJ DMH
REMOD DMH
PROP ORNAMENTAL
STREET LIGHT
(TYP)
PROP GRAN CURB
TYPE VA4 (TYP)
ADJ
DMH
REMOVE CB
PROTECT TREE
PROTECT
TREE
PROP CEM
CONC WALK
PROP CEM
CONC WALK
PROP CEM
CONC WALK
PROP CEM CONC
SW AT DWY
PROP HMA DWY
LIMIT OF WORK
SAWCUT LINE
PROP CONC. WALK
RETAIN HEDGE
PROP CEM CONC
SW - WIDTH VARIES
PROP CEM
CONC
WALK
PROP CEM
CONC WALK
PROP BOX
WIDENING >4'
R&D
CURB
PROP GRAN CURB
TYPE VA4
PROP GRAN CURB
TYPE VA4
CONST EASEMENT
LINE
CONST EASEMENT LINE
CONST
EASEMENT LINE
CONST EASEMENT LINE
CONST
EASEMENT
LINE
LIMIT OF WORK
SAWCUT LINE
61'
28'
1927 CITY LAYO
UT LINE
1927 CITY LAYO
UT LINE
1925 CITY LAYOUT LINE
1925 CITY LAYOUT LINE
C
IT
Y
LA
YO
U
T
LI
N E
C
IT
Y
LA
YO
U
T
LI
N E
CBCI-2
CBCI-1
12' - 12" RCP
ABAN
CB
R&R
FLAGSTONE
WALK
R&R BRICK
WALK
PROP
MAST
ARM
REM 4"Ø
TREE
RET WALL
RET FENCE
AND WALL
PROP MAST ARM
PROP LOAM
AND SEED
PERM UTILITY
EASEMENT LINE
PROP CONC
CURB TRANSITION
R&D CURB
R&D CURB
R&S EXIST CURB
PROP GRAN CURB
TYPE VA4
PROP HMA DWY
PROP SAWCUT
LINE (TYP.)
PROTECT
TREE
PROP LOAM
AND SEED
RET CURB
RET
CURB
PROP MAST
ARMPROP DETECTABLE WARNING
PANEL (TYP.)
PROP CEM CONC
SW AT DWY
PROP 5'
HMA SW
PROP LOAM
AND SEED
LIMIT OF WORK
SAWCUT LINE
1925 CITY LAYOUT LINE
1925 CITY LAYOUT LINE
PROP HMA
DWY
LIMIT OF WORK
SAWCUT LINE
PROP LOAM
AND SEED
PROP GRAN CURB
TYPE VA4
PROP CEM CONC
SW - WIDTH VARIES
PROP
LOAM
AND SEED
PROP BOX
WIDENING >4'
PROP BOX
WIDENING
>4'
CONST EASEMENT LINE CONST
EASEMENT LINE
PERM UTILITY
EASEMENT LINE
PROP
MULCH PROP
HMA
CURB
PROP HMA
CURB
RET STATUE
PROP 7' CEM
CONC SW
PROP LOAM
AND SEED
REM BUSHES
PROP LOAM
AND SEED
BEGIN
LAYOUT
ALT
HSD=455'
BEGIN
CURB
END
CURB
PROP LOAM
AND SEED
BOS
PROP HMA DWY
PROP CEM CONC
SW AT DWY
CONST
EASEMENT LINE
PROP LOAM
AND SEED
PROP GRAN CURB
TYPE VA4
BEGIN
LAYOUT
ALT
END LAYOUT
ALT
PROP BOX
WIDENING >4'
PROP HMA
PAVEMENT
LIMIT OF WORK
SAWCUT LINE
PERM HIGHWAY
EASEMENT LINE
PROP LOAM
AND SEED
PROP LOAM
AND SEED
PROP LOAM
AND SEED
R&R
FLAGSTONE
WALK
PROP PCR-4
BEGIN
LAYOUT
ALT
END
LAYOUT
ALT
PROP 4' CLF
ON PROP STONE
MASONRY WALL
PROP
GRAN CURB
TYPE VA4
PROP 5.5' CEM
CONC SW
PROP BOX
WIDENING >4'
SEA STREET
TOS
TOS
RET FENCE RET WALL
PROP BOX
WIDENING <4'
CONST EASEMENT
LINE
BEGIN LAYOUT ALT
END LAYOUT ALT
END LAYOUT ALT
BEGIN LAYOUT ALT
BEGIN LAYOUT
ALT
END LAYOUT ALT
1925 CITY LAYOUT LINE
1925 CITY LAYOUT LINE
PERM HIGHWAY
EASEMENT LINE
PERM HIGHWAY
EASEMENT LINE
PERM HIGHWAY EASEMENT LINE
PERM HIGHWAY EASEMENT LINE
19 20
PC +94.82
15+50
PROJECT BEGIN
STA 16+00
N2920591.7787 E793320.5904 N 60° 12' 34" E 344.82'
PROP
MAST
ARM
PROP
PCR-3
PROP
PCR-5
DWY-1 DWY-2
DW
Y-3
D W
Y-4
DWY-5
DWY-6
DWY-7
DWY-8
DWY-9
DWY-10
REM
CONC
PROP 7' CEM
CONC SW
L=407.53' R=1501.00' Δ=15° 33' 22"
LIMIT OF PROP
GRAN CURB & SW
MEET EXIST
CURB & SW
LIMIT OF PROP
GRAN CURB & SW
MEET EXIST
CURB & SW
LIMIT OF PROP
GRAN CURB & SW
MEET EXIST
CURB & SW
LIMIT OF PROP
GRAN CURB & SW
MEET EXIST
CURB & SW
PROP PCR-54
PROP
PCR-53
LIMIT OF PROP
GRAN CURB & SW
MEET EXIST
CURB & SW
LIMIT OF PROP
GRAN CURB & SW
MEET EXIST
CURB & SW
LIMIT OF PROP GRAN CURB & SW
MEET EXIST CURB & SW
LIMIT OF PROP GRAN CURB & SW
MEET EXIST CURB & SW
PROP CEM
CONC WALK
PROP LOAM
& SEED
PROP CEM
CONC SW
PROP BOX
WIDENING >4'
R&R SHED
FED. AID PROJ. NO. SHEET
NO.
TOTAL
SHEETS
QUINCY
SEA STREET
STATE
MA
PROJECT FILE NO. 608707
STP/TAP-0036(016)X
_H
D (4
7_
_C
O N
ST
).D
W G
-S ep -2
0:
A M
Pl ot te d on
SCALE: 1" = 20'
0 50 100
CONSTRUCTION PLAN
N C
O N
TIN
U
ED
O
N
SH
EET N
O
. 20
HIGHWAY GUARD DETAILS
NONE
TRAFFIC SIGNAL CONDUIT
SEE SHEET 73
WATER SUPPLY ALTERATIONS
NONE
DRAINAGE DETAILS
SEE SHEET 45
FOR PROFILE SEE SHEET 27
9/27/23 LABELED BOX WIDENING AT CHURCH PARKING BAY
DESCRIPTIONDATEREV.
1 ADDENDUM NO.1, SEPTEMBER 28, 2023
| Nutt cover letter |
| contractor questions |
| 00104_3 |
| 00813 |
| B00420 7 8 18 |
| SHEET_19printed |
| 2023-09-28T13:57:50-0400 | |
| Eric M. Cardone |
File details come from the government source that posted it. Updated .