6-US DOL WA20260051 Dated 5-18-2026.pdf
PDF 46 KB Posted
- Attached to
- S. DeGoede Well (COW)
- Solicitation number
- 75H7012
About this file
This is a Davis-Bacon Wage Determination document (General Decision Number WA20260051) issued by the U.S. Department of Labor for heavy construction projects in Lewis County, Washington, effective from January 2, 2026 through May 18, 2026 (Modification 1).
The determination establishes prevailing wage rates and fringe benefits for multiple construction classifications required on federally-funded projects in the designated area. Key wage rates include: Millwright ($55.39/hour base + $22.38 fringe), Carpenter - Form Work ($63.98 + $19.13), Electrician ($65.14 + $26.56), Ironworker - Reinforcing & Structural ($57.94 + $34.52), and various Power Equipment Operator classifications ranging from $55.13 to $62.99 base wages plus $27.32 fringe benefits. Laborer classifications span from $40.88 to $52.31 base wages with fringes between $16.72 and $17.01. Cement Mason/Concrete Finisher rates are $54.16 plus $21.27, while Painter rates are $41.24 plus $14.70. Specialized truck driver and equipment operator rates under a 2009 prevailing wage determination range from $14.67 to $29.26 with varying fringe benefits. Zone differentials apply to equipment operators based on distance from established basepoints (Centralia, Olympia, Tacoma), with additional premiums for hazardous waste work up to $2.00 per hour depending on protective equipment requirements. Executive Order requirements for paid sick leave (1 hour per 30 hours worked) and minimum wage thresholds ($13.65/hour through December 2026) are incorporated. Unlisted classifications may be added after award through the labor standards contract clauses process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 75H70126Q00030-A00002.pdf | ||
| Attachment 3 Water Quality Testing Requirements.pdf | ||
| Attachment 2 Pump Test Field Data Recording Form.pdf | ||
| 75H70126Q00030-A00001.pdf | ||
| Attachment 1 Local Well Logs.pdf | ||
| 2-Technical Specifications.pdf | ||
| 1-Statement of Work.docx | DOCX document | |
| B01 75H70126Q00030.pdf | ||
| A11 Pre-Solicitation SAM Notice.pdf | ||
| 4-Site Plan DeGoede.pdf | ||
| 3-Aerial View DeGoede.pdf | ||
| 5-Measurement and Payment.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"General Decision Number: WA20260051 05/18/2026
State: Washington
Construction Types: Heavy
Counties: Washington Counties of Lewis
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
CARP0096-004 06/01/2025
Rates Fringes
MILLWRIGHT..........................................$ 55.39 22.38
CARP0360-005 06/01/2025
Rates Fringes
CARPENTER, INCLUDES FORM WORK.......................$ 63.98 19.13
ELEC0076-005 08/31/2025
Rates Fringes
ELECTRICIAN.........................................$ 65.14 26.56
ENGI0612-014 06/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A
FRAME-10 TONS AND UNDER; FORKLIFT: UNDER 3000 LBS
WITH ATTACHMENTS; BOOM TRUCK 10 TONS AND UNDER
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2
(26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45
RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA,
OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE
MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS
SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED
HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR
COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP
SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE
AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT
SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE
RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C""
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER
HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS
$2.00 PER HOUR......................................$ 55.13 27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3
CRANES-THRU 19 TONS WITH ATTACHMENTS; A-FRAME CRANE
OVER 10 TONS; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15
METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH
ATTACHMENTS; OILER; GRADER-NONFINISHING; BOOM TRUCK
OVER 10 TONS
ZONE DIFFERENTIAL (ADD TO ZONE 1
RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE
3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS:
CENTRALIA, OLYMPIA, TACOMA HANDLING OF
HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT
CLASSIFICATIONS SUBJECT TO WORKING INSIDE A
FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE
ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE
FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF
HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC
HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1
BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN
NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D""
SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR.
H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER
HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS
$1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE
RATE PLUS $2.00 PER HOUR............................$ 58.89 27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES,
20 TONS THRU 44 TONS WITH ATTACHMENTS;
CRANE-OVERHEAD, BRIDGE TYPE-20 TONS THROUGH 44
TONS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC
TONS; LOADER- UNDER 6 YARDS; DRILLING MACHINE;
GRADER-FINISHING
ZONE
DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45
RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS
MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA,
TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS:
PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO
WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS
PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN
ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE
RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS
OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT
SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE
RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C""
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER
HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS
$2.00 PER HOUR......................................$ 59.56 27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA
CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING
JIB WITH ATTACHMENTS)
ZONE DIFFERENTIAL (ADD TO ZONE 1
RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE
3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS:
CENTRALIA, OLYMPIA, TACOMA HANDLING OF
HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT
CLASSIFICATIONS SUBJECT TO WORKING INSIDE A
FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE
ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE
FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF
HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC
HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1
BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN
NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D""
SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR.
H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER
HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS
$1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE
RATE PLUS $2.00 PER HOUR............................$ 62.99 27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES
200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB
WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN
HEIGHT, BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOE:
OVER 90 METRIC TONS
DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45
RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS
MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA,
TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS:
PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO
WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS
PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN
ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE
RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS
OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT
SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE
RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C""
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER
HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS
$2.00 PER HOUR......................................$ 62.12 27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES,
100 TONS THRU 199 TONS, OR 150 FT OF BOOM
(INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD,
BRIDGE TYPE, 100 TONS AND OVER; TOWER CRANE UP TO
175 FT IN HEIGHT BASE TO BOOM; EXCAVATOR/TRACKHOE,
BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS;
LOADERS-8 YARDS AND OVER
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER
45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA,
OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE
MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS
SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED
HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR
COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP
SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE
AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT
SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A
HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH
PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE
RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C""
SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3
CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER
HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS
$2.00 PER HOUR......................................$ 61.22 27.32
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45
TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING
JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE,
45 TONS THRU 99 TONS; DERRICKS ON BUILDING WORK;
EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO
50 METRIC TONS; LOADERS- 6 YARDS TO, BUT NOT
INCLUDING, 8 YARDS
ZONE DIFFERENTIAL (ADD TO
ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00
ZONE 3 (OVER 45 RADIUS MILES) - $1.30
BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA
HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL
IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING
INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER
SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE
WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE
LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE
SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN.
H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE
SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING,
CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER
HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE
PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE
WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A""
SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR...........$ 60.32 27.32
IRON0086-012 07/07/2025
Rates Fringes
IRONWORKER (REINFORCING & STRUCTURAL)...............$ 57.94 34.52
LABO0252-003 06/01/2025
Rates Fringes
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON
TENDER-CEMENT/CONCRETE; GRADE CHECKER
ZONE DIFFERENTIAL (ADD TO
ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT,
SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA,
ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND
BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS
MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE
THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE
RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS
MILES FROM THE RESPECTIVE CITY HALL.................$ 52.31 17.01
LABORER: ZONE 1: GROUP 4 CHIPPING GUNS (OVER 30
LBS); PIPE LAYER
DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00
ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT.
VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA,
CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT.
ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN
25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE
2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM
THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45
RADIUS MILES FROM THE RESPECTIVE CITY HALL..........$ 51.52 16.99
LABORER: ZONE 1: GROUP 3 CHIPPING GUNS (UNDER 30
LBS); GENERAL OR COMMON LABORER
DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00
ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT.
VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA,
CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT.
ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN
25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE
2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM
THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45
RADIUS MILES FROM THE RESPECTIVE CITY HALL..........$ 50.38 16.96
LABORER: ZONE 1: GROUP 2 FLAGGER
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS:
BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.
TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 -
PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE
CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45
RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3
- MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE
CITY HALL...........................................$ 40.88 16.72
PAIN0300-005 07/01/2025
Rates Fringes
PAINTER (BRUSH, ROLLER AND SPRAY)...................$ 41.24 14.70
PLAS0528-004 06/01/2024
Rates Fringes
CEMENT MASON/CONCRETE FINISHER......................$ 54.16 21.27
SUWA2009-042 08/07/2009
Rates Fringes
TRUCK DRIVER: 10 YARD TRUCK........................$ 24.61 8.34
TRUCK DRIVER: WATER TRUCK..........................$ 24.36 8.30
TRUCK DRIVER: DUMP TRUCK...........................$ 22.82 5.86
PIPEFITTER..........................................$ 33.30 6.51
OPERATOR: ROLLER...................................$ 25.25 8.20
OPERATOR: MECHANIC.................................$ 25.00 0.00
OPERATOR: BULLDOZER................................$ 29.26 0.00
LABORER: LANDSCAPE.................................$ 14.67 0.00
FENCE ERECTOR.......................................$ 15.00 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .