6-Exhibit I Plans and Specs.pdf
PDF 12 MB Posted
- Attached to
- Pine Island Breakwater Project
- Solicitation number
- 2025-23
- Issued by
- Barnwell County, South Carolina
About this file
This is a bid set of contract documents for the Pine Island Breakwater Project located in the Town of Hilton Head, South Carolina, prepared by Foth Infrastructure & Environment, LLC and Olsen Associates, Inc. The project involves constructing a series of six breakwater structures (S1-S6) along the shoreline of Pine Island, with associated beach fill and marine mattress installations. The breakwater structures will be built using stone-filled mattresses of varying sizes, armor stone, and geotextile fabric, with each section ranging from approximately 75-102 feet in length. The project is scheduled for construction in the fall of 2025, with beach fill to be completed by others prior to the main construction phase.
The project documents detail extensive technical specifications for the breakwater construction, including specific requirements for excavation, stone placement, mattress installation, and environmental considerations. The total rock structure quantities include approximately 9,888 tons of armor stone, 1,741 tons of chinking stone, and 32,032 square feet of stone-filled mattresses. The breakwater design incorporates careful consideration of existing site conditions, including tidal marsh, existing wooden walkways, and soft soil conditions. Warning signs will be installed, and the project includes provisions for maintaining existing access points and minimizing disturbance to the surrounding environment. The bid set is dated 08/04/2025 and is marked as a bid set for potential contractors to review and submit proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
COVER
ML 08/04/2025
ZB 08/04/2025
ATLANTIC OCEAN
HILTON HEAD ISLAND
BULL ISLAND
DAUFUSKIE ISLAND
PARRIS
ISLAND
BAY POINT
ISLAND
CALIBOGUE SOUND
PO
R
T R O
YAL SO
U
N D
PINE
ISLAND
PREPARED BY:
FOTH INFRASTRUCTURE &
ENVIRONMENT, LLC. | OLSEN
ASSOCIATES, INC.
2618 HERSCHEL ST
JACKSONVILLE, FL 32204
COA: 4194
PREPARED FOR:
TOWN OF HILTON HEAD ISLAND, SC
BID SET FOR
PINE ISLAND BREAKWATER PROJECT
TOWN OF HILTON HEAD ISLAND, SC
CONTRACT DOCUMENTS
VOLUME II
SHEET INDEX
SHEET SHEET DESCRIPTION
SITE DATA2
LOCATION OF WORK3
COVER
EXISTING CONDITIONS
STAGING & ACCESS INFO
BREAKWATER SECTION LOCATIONS (S1-S3)
BREAKWATER PLAN OF IMPROVEMENT
BREAKWATER SECTIONS (1)
BREAKWATER SECTIONS (2)
MARINE MATTRESS DETAILS
BREAKWATER SECTIONS (3)
BREAKWATER SECTIONS (4)
BREAKWATER SECTION LOCATIONS (S4-S6)
BREAKWATER MATTRESS LAYOUT (S1-S2)
BREAKWATER MATTRESS LAYOUT (S3-S4)
BREAKWATER MATTRESS LAYOUT (S5-S6)
BEACH FILL & EXISTING CONDITIONS (S1-S3)
BEACH FILL & EXISTING CONDITIONS (S4-S6)
AutoCAD SHX Text
DATE: 08/04/2025
AutoCAD SHX Text
IFB NO.: 2025-23
Charleston
Hilton Head Island, SC
SOUTH
CAROLINA
GEORGIA
ATLANTIC OCEAN
I-95
I-26
I-20
I-16
Savannah
US
Jacksonville
Charleston
Wilmington
Tampa
Atlanta
FLORIDA
Hilton Head Island, SC
Atlantic Ocean
GEORGIA
SOUTH
CAROLINA
I-10
I-75
I-16 I-95
I-4
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
SITE DATA
ML 08/04/2025
ZB 08/04/2025
Wind and Wave Data Summary Developed From WIS Hindcast Atlantic Station #366
32.08 N 80.50 W, 15 miles ESE of Forest Beach, Water depth: 52.5ft, (1/2000 - 12/2023)
TIDE DATA - 2025
03 10 17 24 31 07 14 21 28 06 13 20 27 03 10 17 24 01 08 15 22 29 05 12 19 26 03 10 17 24 31 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 04 11 18 25
-6.0
-5.5
-5.0
-4.5
-4.0
-3.5
-3.0
-2.5
-2.0
-1.5
-1.0
-0.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0 W
at er
S ur fa ce
E le va tio n (F
T- N
AV
D
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER
-6.0
-5.5
-5.0
-4.5
-4.0
-3.5
-3.0
-2.5
-2.0
-1.5
-1.0
-0.5
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
5.5
6.0
W at er S ur fa ce E le va tio n
(F T-
N
AV
D
JA
N
FE
B
M
AR AP
R
M
AY JU
N
JU
L
AU
G
SE
P
O C
T
N O
V
D
EC
AV
ER
AG
E
SI
G
N
IF
IC
AN
T W
AV
E
H
EI
G H
T (F
T)
WAVE DATA
JA
N
FE
B
M
AR AP
R
M
AY JU
N
JU
L
AU
G
SE
P
O C
T
N O
V
D
EC
AV
ER
AG
E
W
IN
D S
PE
ED
(K N
O
TS
WIND DATA
NOAA Station #8670870 (Fort Pulaski, GA)
0°
45°
90°
135°
180°
225°
270°
315°
0% 5% 10% 15% 20%
Significant Wave Height (ft) <=2 >2 - 3 >3
0°
45°
90°
135°
180°
225°
270°
315°
0% 5% 10%
Wind Speed (knots) <=10 >10 - 15 >15
MHW (+2.82)
MLW (-3.62)
GENERAL NOTES: 1. ALL ELEVATIONS DEPICTED IN THESE DRAWINGS ARE IN ALL ELEVATIONS DEPICTED IN THESE DRAWINGS ARE IN FEET AND TENTHS AND ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM (NAVD) OF 1988, UNLESS OTHERWISE NOTED. 2. THE INFORMATION DEPICTED ON THESE DRAWINGS REPRESENTS THE RESULTS OF SURVEYS MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED THE INFORMATION DEPICTED ON THESE DRAWINGS REPRESENTS THE RESULTS OF SURVEYS MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS AT THAT TIME. 3. HORIZONTAL CONTROL COORDINATES ARE BASED UPON STANDARD STATE PLANE RECTANGULAR COORDINATE SYSTEM FOR THE STATE OF SOUTH CAROLINA HORIZONTAL CONTROL COORDINATES ARE BASED UPON STANDARD STATE PLANE RECTANGULAR COORDINATE SYSTEM FOR THE STATE OF SOUTH CAROLINA (NAD 1983) AND ARE IN INTERNATIONAL FEET. 4. THE ACCURACY OF THE PHOTOGRAPHY SHOWN BY THESE PLANS IS DEPENDENT UPON SEVERAL FACTORS. THE PHOTOGRAPHY IS SHOWN FOR GENERAL THE ACCURACY OF THE PHOTOGRAPHY SHOWN BY THESE PLANS IS DEPENDENT UPON SEVERAL FACTORS. THE PHOTOGRAPHY IS SHOWN FOR GENERAL INFORMATION ONLY AND THE LOCATION OR STATION OF ANY FEATURE SCALED FROM THESE MAPS MUST BE CONSIDERED APPROXIMATE. 5. BEARINGS ARE RELATED TO GRID NORTH. BEARINGS ARE RELATED TO GRID NORTH. 6. DISTANCES SHOWN ARE GRID DISTANCES.DISTANCES SHOWN ARE GRID DISTANCES.
BEACH CITY ROAD
D
ILLO
N
RO
A
D
TH
E FO
LLY
SEA PINES
SOUTH
FOREST
BEACH
COLIGNY
CIRCLE
NORTH
FOREST
BEACH
PALMETTO DUNES
MARRIOTT
HILTON HEAD ISLAND
SINGLETON BEACH
PORT ROYAL
PLANTATION
WESTIN
HILTON HEAD
PLANTATION
ATLANTIC OCEAN
EBB
FLOOD
US 278 BUSINESS
BRADLEY
BEACH
SOUTH BEACH
FLO
O
D
CALIBOGUE SOUND
BULL ISLAND
PARRIS
ISLAND
BAY POINT
ISLAND
DAUFUSKIE ISLAND
EBB
PO
R T R
O
YAL SO
U N
D
FISH HAUL CREEK
CONSTRUCTION ACCESS
(DOLPHIN HEAD
RECREATION AREA)
BLUFFTON
PINE ISLAND
(PROJECT AREA)
SQUIRE POPE ROAD
30000 6000
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
LOCATION
OF WORK
ML 08/04/2025
ZB 08/04/2025
TO I-9
-23
-22
-20 -19
-18-17
-16
-15
-1
-14
-1
-13
-13
-1
-12
-12
-1
-11
-10
-10
-9
-9
-8
-8
-7
-7
-6
-6
-5
-5
-5
-4
-4
-4
-4
-3.6
-3.6
-3.6
-3.6
-3
-3
-3
-3
-3
-2
-2
-2
-2
-2
-1
-1
-1
-1
-1
-1
-1
2.
2.8
2.82.8
2.
4 4
MLWL (0
5/25)
M
LW
L (
/2 5)
M
HW
L (0
5/
MHWL (05/25)
STA.00+00.0
STA.01+20.3
STA.03+20.4
STA.05+20.4
STA.07+20.4
STA.08+45.7
STA.11+00.0
STA.14+29.7
STA.16+62.5
STA.19+58.9
STA.20+00.0
DOLPHIN HEAD
RECREATION AREA
EBB FLOODPORT ROYAL SOUND
PINE ISLAND
TIDAL MARSH
APPROX. LOCATION
OF EXISTING ROCK
REVETMENT, TYP.
(DO NOT DISTURB)
PRIMARY
CONSTRUCTION
ACCESS AND STAGING
(SEE SHEET 6)
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
EXISTING
CONDITIONS
ML 08/04/2025
ZB 08/04/2025
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
CONSTRUCTION
BASELINE
SOFT SOIL
CONDITIONS
1000 200
SCALE (FT)
EXISTING WOODEN
WALKWAY
(DO NOT DISTURB)
SKULL
CREEK
CONSTRUCTION
BASELINE
STATION, TYP.
P R O J E C T A R E A
SOFT SOIL
CONDITIONS
SOFT SOIL
CONDITIONS
SOFT SOIL
CONDITIONS
BEACH FILL (YELLOW SHADING) TO BE
COMPLETED BY OTHERS IN THE FALL
OF 2025 PRIOR TO CONSTRUCTION
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
-23
-22
-20 -19
-18-17
-16
-15
-1
-14
-1
-13
-13
-1
-12
-12
-1
-11
-10
-10
-9
-9
-8
-8
-7
-7
-6
-6
-5
-5
-5
-4
-4
-4
-4
-3.6
-3.6
-3.6
-3.6
-3
-3
-3
-3
-3
-2
-2
-2
-2
-2
-1
-1
-1
-1
-1
-1
-1
2.
2.8
2.82.8
2.
4 4
MLWL (0
5/25)
M
LW
L (
/2 5)
M
HW
L (0
5/
MHWL (05/25)
STA.00+00.0
STA.01+20.3
STA.03+20.4
STA.05+20.4
STA.07+20.4
STA.08+45.7
STA.11+00.0
STA.14+29.7
STA.16+62.5
STA.19+58.9
STA.20+00.0
1000 200
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
PLAN OF
IMPROVEMENT
ML 08/04/2025
ZB 08/04/2025
S6 S5
S4 S3S2
S1
EXISTING WOODEN
WALKWAY
(DO NOT DISTURB)
PINE ISLAND
TIDAL MARSH
EBB FLOODPORT ROYAL SOUND
NEW RIP-RAP
BREAKWATER, TYP.
NEW RIP-RAP
SPUR
NEW RIP-RAP
BREAKWATER W/
STEM, TYP.
CONSTRUCTION
BASELINE
BREAKWATERS S4-S6 DETAILS
(SEE SHEET 8)
BREAKWATERS S1-S3 DETAILS
(SEE SHEET 7)
APPROX. LOCATION
OF EXISTING ROCK
REVETMENT, TYP.
(DO NOT DISTURB)
DOLPHIN HEAD
RECREATION
AREA
PRIMARY
CONSTRUCTION
ACCESS AND STAGING
(SEE SHEET 6)
CONSTRUCTION
BASELINE
STATION, TYP. SKULL
CREEK
NEW WARNING SIGN
(SEE SHEET 11)
BEACH FILL (YELLOW SHADING) TO BE
COMPLETED BY OTHERS IN THE FALL
OF 2025 PRIOR TO CONSTRUCTION
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
STA.00+00.0
STA.01+20.3
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
STAGING AND
ACCESS INFO
ML 08/04/2025
ZB 08/04/2025
6 of 18300 60
SCALE (FT)
EBB FLOODPORT ROYAL SOUND
EXISTING WOODEN
WALKWAY
(DO NOT DISTURB)
NEW RIP-RAP
SPUR (S1)
DOLPHIN HEAD
RECREATION AREA
STAGING AND ACCESS
(LIMITS TO BE FIELD VERIFIED)
CONSTRUCTION
BASELINE.
BEACH FILL (YELLOW SHADING)
TO BE COMPLETED BY OTHERS
IN THE FALL OF 2025 PRIOR TO
CONSTRUCTION
APPROX. LOCATION
OF EXISTING ROCK
REVETMENT, TYP.
(DO NOT DISTURB)
CONSTRUCTION
BASELINE
STATION,
TYP.
PRIVATE DRIVEWAY, ACCESS
TO BE MAINTAINED
(NO ACCESS BY CONTRACTOR)
EXISTING
PARKING
BAYS, TYP.
AVOIDANCE OF
TREES REQUIRED
IN
GR
ES
S/
EG
RE
SS
ENTRANCE TO DOLPHIN
HEAD RECREATION AREA
ACCES
S
TO B
EA
CH
EXISTING STAGING AREA (APRIL 2025)
BEACH ACCESS (APRIL 2025)
DO
LPH
IN
H
EAD DR
ACCESS TO
BEACH SHALL
BE AROUND
EXISTING
WALKWAY
APPROX. ROADWAY
LOCATION, TO BE
FIELD DETERMINED
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
STA.00+00.0
STA.01+20.3
STA.03+20.4
STA.05+20.4
STA.07+20.4
46'46'
S1
S1
A'
A
S2'
S2
B'B
C'
C
B'B
S3'
S3
C'
C S3D
S3B
S3C
S3A S2A
S2C
S2B
S2D
208'
54'
208'
54' S1B
S1A
~110'
2:1 2:
2:
2:1
2:1
2:1
2:1
2:1
2:1
2:1
EBB FLOOD
PORT ROYAL SOUND
400 80
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
SECTION
LOCATIONS
(S1-S3)
ML 08/04/2025
ZB 08/04/2025
S3 S2
S1
CONSTRUCTION
BASELINE
CONSTRUCTION
BASELINE
STATION, TYP.
DOLPHIN HEAD
RECREATION AREA
PINE ISLANDTIDAL MARSH
APPROX. LOCATION
OF EXISTING ROCK
REVETMENT, TYP.
(DO NOT DISTURB)
PRIMARY
CONSTRUCTION
ACCESS AND STAGING
(SEE SHEET 6)
EXISTING WOODEN
WALKWAY
(DO NOT DISTURB)
STEM FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 2: 18'X6.5'X0.5')
T-HEAD FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 1: 22'X6.5'X0.5')
LIMIT OF GEOGRID/FABRIC
COMPOSITE, TYP.
(SIZE: 32'X12.5)
SPUR TIE-IN TO
EXISTING ROCK
REVETMENT, TYP.
STEM FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 2: 18'X6.5'X0.5')
TOE OF BREAKWATER
SLOPE, TYP.
LIMIT OF STONE
FILLED MATTRESS,
TYP.
BREAKWATER
CREST, TYP.
BEACH FILL (YELLOW SHADING) TO BE
COMPLETED BY OTHERS IN THE FALL
OF 2025 PRIOR TO CONSTRUCTION
STRUCTURE
CONTROL ID, TYP.
(SEE TABLE)
STRUCTURE SECTIONS
(SEE SHEETS 14-17)
GEOGRID/FABRIC
TO FILL GAP IN
MATTRESSES
GEOGRID/FABRIC
TO FILL GAP IN
MATTRESSES
GEOGRID/FABRIC TO
LAP OVER EXISTING
REVETMENT
SOFT SOIL
CONDITIONS
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
STA.07+20.4
STA.08+45.7
STA.11+00.0
STA.14+29.7
STA.16+62.5
2:1
2:1
2:1
2:1
B'
D'
D E'
E
D'
D F'
F
B
46'
S3'
S3
C'
C
S4A
S5A
S5B
S6A S6B
85'
75'
S4D
S4C
S4B
208'
54'
2:1
2:1
2:1
2:1
EBB FLOOD
PORT ROYAL SOUND
400 80
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
SECTION
LOCATIONS
(S4-S6)
ML 08/04/2025
ZB 08/04/2025
S6
S5
S4
STEM FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 2: 18'X6.5'X0.5')
T-HEAD FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 1: 22'X6.5'X0.5')
LIMIT OF GEOGRID/FABRIC
COMPOSITE, TYP.
(SIZE: 32'X12.5)
CONSTRUCTION
BASELINE
CONSTRUCTION
BASELINE
STATION, TYP.
PINE ISLAND
TIDAL MARSH
LIMIT OF STONE
FILLED MATTRESS,
TYP.
TOE OF BREAKWATER
SLOPE, TYP.
BREAKWATER
CREST, TYP.
BEACH FILL (YELLOW SHADING) TO BE
COMPLETED BY OTHERS IN THE FALL
OF 2025 PRIOR TO CONSTRUCTION
TOE OF BREAKWATER
SLOPE, TYP.
BREAKWATER
CREST, TYP.
STRUCTURE
CONTROL ID, TYP.
(SEE TABLE)
STRUCTURE SECTIONS
(SEE SHEETS 14-17)
GEOGRID/FABRIC TO FILL
GAP IN MATTRESSES
SOFT SOIL
CONDITIONS
NEW WARNING SIGN
(SEE SHEET 11)
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
S1-1A
S1-1F
S1-1D S1-1E
S1-1C
S1-1B
S2-1A
S2-1B
S2-1C
S2-1D
S2-1F
S2-1J S2-1H
S2-1G
S2-2AS2-2D
S2-2B
S2-1K
S2-1E
S2-2C
EBB FLOOD
PORT ROYAL SOUND
200 40
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
MATTRESS
LAYOUT
(S1-S2)
ML 08/04/2025
ZB 08/04/2025
S2
S1
APPROX. LOCATION
OF EXISTING ROCK
REVETMENT, TYP.
(DO NOT DISTURB)
STEM FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 2: 18'X6.5'X0.5')
T-HEAD FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 1: 22'X6.5'X0.5')
LIMIT OF
GEOGRID/FABRIC
COMPOSITE, TYP.
(SIZE: 32'X12.5')
(MIN. 2-FT OVERLAP)
MATTRESS LAYOUT
CONTROL POINT, TYP.
(SEE TABLE)
2,085,420.6E 158,270.5N
2,085,441.1E 158,245.9N
MATTRESS TO BE PLACED ADJACENT
TO EXISTING TOE OF REVETMENT.
LIMIT TO BE FIELD VERIFIED.
2,085,537.2E 158,325.7N
2,085,516.8E 158,350.3N
GEOGRID/FABRIC
PLACED OVER GAP
IN MATTRESSES
(MIN. 2-FT OVERLAP)
GEOGRID/FABRIC TO
LAP OVER EXISTING
REVETMENT
(SIZE: 64'X12.5')
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
S3-1A
S3-1B
S3-1C
S3-1D
S3-1F
S3-1J
S3-1H
S3-1G
S3-2AS3-2D
S3-2B
S3-1K
S3-1E
S4-1A
S4-1B
S4-1C
S4-1D
S4-1F
S4-1J S4-1H
S4-1G
S4-2AS4-2D
S4-2B
S4-2C
S4-1E
S4-1K
S3-2C
EBB FLOOD
PORT ROYAL SOUND
200 40
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
MATTRESS
LAYOUT
(S3-S4)
ML 08/04/2025
ZB 08/04/2025
S4S3
STEM FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 2: 18'X6.5'X0.5')
T-HEAD FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 1: 22'X6.5'X0.5')
STEM FOUNDATION
STONE-FILLED
MATTRESSES
(SIZE 2: 18'X6.5'X0.5')
LIMIT OF
GEOGRID/FABRIC
COMPOSITE, TYP.
(SIZE: 32'X12.5')
(MIN. 2-FT OVERLAP)
MATTRESS LAYOUT
CONTROL POINT, TYP.
(SEE TABLE)
2,085,232.2E 158,507.6N
2,085,252.6E 158,482.9N
2,085,043.0E 158,741.3N
2,085,063.4E 158,716.7N
2,085,348.8E 158,562.8N
2,085,328.3E 158,587.4N
2,085,159.6E 158,796.6N
2,085,139.1E 158,821.2N
GEOGRID/FABRIC
PLACED OVER GAP
IN MATTRESSES
(MIN. 2-FT OVERLAP)
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
STA.11+00.0
STA.14+29.7
S5-1A
S5-1B
S5-1C
S5-1D
S6-1C
S6-1A
S6-1B
S6-1D
S4-1C
EBB FLOOD
PORT ROYAL SOUND
250 50
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
MATTRESS
LAYOUT
(S5-S6)
ML 08/04/2025
ZB 08/04/2025
S6
S5
BREAKWATER FOUNDATION
STONE-FILLED MATTRESSES
(SIZE 1: 22'X6.5'X0.5')
MATTRESS LAYOUT
CONTROL POINT, TYP.
(SEE TABLE)
DANGER
ROCKS
TIP -10FT
BELOW
EXISTING
GRADE
(MIN)
ELEV. VARIES
36" x 36"
REFLECTIVE
WARNING SIGN
(TYP)
TIMBERGUARD PILE
12" BUTT
(CAP REQUIRED)
ELEV. +10 FT
NAVD
ALL FASTENERS TO BE SS
10" TYP
SEABED
NTS
ONE (1) WARNING
SIGN INSTALLATION
REQUIRED
USCG SPEC
2" ORANGE
REFLECTIVE BORDER
WHITE
DAYBOARD
SINGLE SIGN FACING
PORT ROYAL SOUND
6" LAG SCREW W/ 1-1/2"
WASHER (3 REQ'D)
CAP
JETTED
OR
DRIVEN TIP
BUTT
WARNING SIGN DETAIL
NEW WARNING SIGN
(LOCATION TBD)
CONSTRUCTION
BASELINE
CONSTRUCTION
BASELINE
STATION, TYP.
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
-3
-3
-2
-2
-2
-1
-1
1 2
2.8 2.
SL
O
PE
V:
H
SL
O
PE
1V :1
0H
SEAWARD EDGE
OF BERM (+8')
LANDWARD
LIMIT OF FILL
SEAWARD EDGE
OF BERM (+5.5)
TOE OF FILL
LANDWARD EDGE
OF BERM (+8')
STA.00+00.0
STA.01+20.3
STA.03+20.4
STA.05+20.4
STA.07+20.4
2:1 2:
2:
2:1
2:1
2:1
2:1
2:1
2:1
2:1
PRIMARY
CONSTRUCTION
ACCESS AND STAGING
(SEE SHEET 6)
EXISTING WOODEN
WALKWAY
(DO NOT DISTURB)
EBB FLOOD
PORT ROYAL SOUND
400 80
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BEACH FILL &
EXISTING
CONDITIONS
(S1-S3)
ML 08/04/2025
ZB 08/04/2025
S3S2
S1
CONSTRUCTION
BASELINE
NEW RIP-RAP ROCK
BREAKWATER
W/STEM , TYP.
NEW
RIP-RAP
SPUR
CONSTRUCTION
BASELINE
STATION, TYP.
DOLPHIN HEAD
RECREATION AREA
PINE ISLANDTIDAL MARSH
APPROX. LOCATION
OF EXISTING ROCK
REVETMENT, TYP.
(DO NOT DISTURB)
BEACH FILL (YELLOW SHADING) TO BE
COMPLETED BY OTHERS IN THE FALL
OF 2025 PRIOR TO CONSTRUCTION
GEOGRID/FABRIC TO
LAP OVER EXISTING
REVETMENT
MATTRESS
LIMIT, TYP.
GEOGRID/
FABRIC,
TYP.
+8.0 FT
+8.0 FT
MAY 2025 DEPTH
CONTOURS, TYP.
(FT,NAVD)
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
-14
-13-12-11-10
-9 -8
-7
-6
-5
-4 -3.6
-3
-3
-2
-2
-1
-1
-1
-1
0 0
2.8
2.8
5 5
MHWL (05/25)
SL
O
PE
V:
H
SL
O
PE
1V :1
0H
SEAWARD EDGE
OF BERM (+8')
LANDWARD
LIMIT OF FILL
SEAWARD EDGE
OF BERM (+5.5)
TOE OF FILL
LANDWARD EDGE
OF BERM (+8')
STA.07+20.4
STA.08+45.7
STA.11+00.0
STA.14+29.7
STA.16+62.5
2:1
2:1
2:1
2:1
2:1
2:1
2:1
2:1
EBB FLOOD
PORT ROYAL SOUND
400 80
SCALE (FT)
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BEACH FILL &
EXISTING
CONDITIONS
(S4-S6)
ML 08/04/2025
ZB 08/04/2025
S6
S5
S4
NEW RIP-RAP ROCK
BREAKWATER
W/STEM
NEW RIP-RAP ROCK
BREAKWATER, TYP.
CONSTRUCTION
BASELINE
CONSTRUCTION
BASELINE
STATION, TYP.
PINE ISLAND
TIDAL MARSH
BEACH FILL (YELLOW SHADING) TO BE
COMPLETED BY OTHERS IN THE FALL
OF 2025 PRIOR TO CONSTRUCTION MATTRESS
LIMIT, TYP.
GEOGRID/
FABRIC,
TYP.
+8.0 FT
+8.0 FT
MAY 2025 DEPTH
CONTOURS, TYP.
(FT,NAVD)
NEW WARNING SIGN
(SEE SHEET 11)
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) HORIZONTAL POSITIONS IN SC STATE PLANE (FT, NAD83) 3. DATE OF PHOTOGRAPHY: APRIL 2025. DATE OF PHOTOGRAPHY: APRIL 2025. 4. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 5. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 6. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
DISTANCE ALONG STRUCTURE (FEET)
EL
EV
AT
IO
N (F
EE
T-
N
AV
D
) 10
SECTION S1-S1' (STRUCTURE S1)
3002001000-100
DISTANCE ALONG STRUCTURE (FEET)
SECTION S2-S2' (STRUCTURE S2)
3002001000
MHW = +2.82FT
MLW = -3.62FT
-100
MHW = +2.82FT
MLW = -3.62FT
-50 50 150 250
-50 50 150 250 350
-2
-4
-6
-8
-12
-10
EL
EV
AT
IO
N (F
EE
T-
N
AV
D
) 10
-2
-4
-6
-8
-12
-10
~24.0'
+6.0'
SPUR CREST, TYP.
2' MIN, TYP.
EXISTING ROCK
REVETMENT, TYP.
(DO NOT DISTURB)
TOE OF BREAKWATER
SLOPE, TYP. (-1.0)
EXCAVATE TO -1.5', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
STONE-FILLED
MATTRESS
86.0'
GEOGRID/
FABRIC, TYP.
STONE-FILLED
MATTRESS
GEOGRID
FABRIC,
TYP.
+5.0'
+6.0'
TOE OF BREAKWATER
SLOPE, TYP. (-1.5)
BREAKWATER CREST, TYP.
102.0' 10.0' 8.0'
EXCAVATE TO -2.0', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
STEM CREST, TYP.
EXCAVATE TO 0.0'
2' MIN, TYP.
2' MIN, TYP.
15.0'
2' MIN, TYP.
77.0'
VERTICAL EXAGGERATION 5:1
CHINKING STONE.
INTERIOR OF
STRUCTURE ONLY
0.5' THICK
MATTRESS
EXISTING
GRADE
(05/25)
CHINKING STONE.
INTERIOR OF
STRUCTURE ONLY
BEACH FILL, TYP.
BEACH FILL, TYP.
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
SECTIONS
(1)
ML 08/04/2025
ZB 08/04/2025
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 3. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 4. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
DISTANCE ALONG STRUCTURE (FEET)
SECTION S3-S3' (STRUCTURE S3)
3002001000
MHW = +2.82FT
MLW = -3.62FT
-100
DISTANCE ALONG STRUCTURE (FEET)
SECTION S4-S4' (STRUCTURE S4)
3002001000
MHW = +2.82FT
MLW = -3.62FT
-100
-50 50 150 250
-50 50 150 250 350
EL
EV
AT
IO
N (F
EE
T-
N
AV
D
) 10
-2
-4
-6
-8
-12
-10
EL
EV
AT
IO
N (F
EE
T-
N
AV
D
) 10
-2
-4
-6
-8
-12
-10
STONE-FILLED
MATTRESS
GEOGRID
FABRIC,
TYP.
+6.0'
TOE OF BREAKWATER
SLOPE, TYP. (-1.5)
BREAKWATER CREST, TYP.
102.0'
EXCAVATE TO 0.0'
2' MIN, TYP.
2' MIN, TYP.
2' MIN, TYP.
VERTICAL EXAGGERATION 5:1
CHINKING STONE.
INTERIOR OF
STRUCTURE ONLY
0.5' THICK
MATTRESS
EXISTING
GRADE
(05/25)
STONE-FILLED
MATTRESS
GEOGRID
FABRIC,
TYP.
+6.0'
TOE OF BREAKWATER
SLOPE, TYP. (-1.5)
BREAKWATER CREST, TYP.
102.0'
EXCAVATE TO 0.0'
2' MIN, TYP.
2' MIN, TYP.
2' MIN, TYP.
VERTICAL EXAGGERATION 5:1
CHINKING STONE.
INTERIOR OF
STRUCTURE ONLY
0.5' THICK
MATTRESS
EXISTING
GRADE
(05/25)
8.0'
8.0'
EXCAVATE TO -2.0', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
EXCAVATE TO -2.0', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
10.0'15.0' 77.0'
+5.0'
+5.0'
10.0'15.0' 77.0'
STEM CREST, TYP.
STEM CREST, TYP.
BEACH FILL, TYP.
BEACH FILL, TYP.
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
SECTIONS
(2)
ML 08/04/2025
ZB 08/04/2025
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 3. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 4. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
SECTION A-A' (S1)
MHW (+2.82)
SECTION B-B' (S2,S3,S4)
MHW (+2.82)
SECTION C-C' (S2,S3,S4)
1 MHW (+2.82)
SECTION D-D' (S5,S6)
1 MHW (+2.82)
+6.0
BEACH FILL
EXISTING ELEVATION
TO VARY AT TIME OF
CONSTRUCTION
STONE-FILLED
MATTRESS (SIZE 1)
8.0'
TYP
ARMOR STONE
+5.0
BEACH FILL
STONE-FILLED
MATTRESS (SIZE 2)
8.0'
TYP
ARMOR STONE
+6.0
BEACH FILL
STONE-FILLED
MATTRESS (SIZE 1)
8.0'
TYP
ARMOR STONE
+6.0 BEACH FILL
STONE-FILLED
MATTRESS (SIZE 1)
8.0'
TYP
ARMOR STONE
EXISTING GRADE,
VARIES, TYP.
2' MIN, TYP.
2' MIN, TYP.
EXISTING ELEVATION
TO VARY AT TIME OF
CONSTRUCTION, TYP.
EXCAVATE TO -1.5', OR TO
LOWER LIMIT OF SAND.
WHICHEVER OCCURS FIRST.
CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY
MATERIALS.
EXCAVATE TO -2.0', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
EXCAVATE TO -2.0', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
EXCAVATE TO -2.0', OR TO
LOWER LIMIT OF SAND.
WHICHEVER OCCURS FIRST.
CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY
MATERIALS.
EXISTING ELEVATION
TO VARY AT TIME OF
CONSTRUCTION
EXISTING ELEVATION
TO VARY AT TIME OF
CONSTRUCTION
CHINKING STONE. INTERIOR
OF STRUCTURE ONLY, TYP.
CHINKING STONE. INTERIOR
OF STRUCTURE ONLY, TYP.
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
SECTIONS
(3)
ML 08/04/2025
ZB 08/04/2025
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 3. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 4. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
MHW (+2.82)
MHW (+2.82)
SECTION E-E' (S5)
SECTION F-F' (S6)
+6.0
85.0'
BEACH FILL
EXISTING ELEVATION
TO VARY AT TIME OF
CONSTRUCTION
+6.0
75.0'
BEACH FILL
EXISTING ELEVATION
TO VARY AT TIME OF
CONSTRUCTION
STONE-FILLED
MATTRESS (SIZE 1)
STONE-FILLED
MATTRESS (SIZE 1)
EXISTING GRADE,
VARIES (05/25)
EXISTING GRADE,
VARIES (05/25)
2' MIN, TYP.
2' MIN, TYP.
EXCAVATE TO -2.0', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
EXCAVATE TO -2.0', OR TO LOWER
LIMIT OF SAND. WHICHEVER OCCURS
FIRST. CONTRACTOR SHALL NOT
EXCAVATE INTO CLAY MATERIALS.
BREAKWATER CREST
BREAKWATER CREST
CHINKING STONE.
INTERIOR OF
STRUCTURE ONLY
CHINKING STONE.
INTERIOR OF
STRUCTURE ONLY
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
BREAKWATER
SECTIONS
(4)
ML 08/04/2025
ZB 08/04/2025
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. DATE OF SURVEY: MAY 2025. DATE OF SURVEY: MAY 2025. 3. BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR BEACH FILL TO BE CONSTRUCTED BY DREDGING CONTRACTOR UNDER SEPARATE, EXISTING CONTRACT WITH TOWN. 4. FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH FINAL DESIGN PLAN MAY BE ADJUSTED BASED UPON BEACH CONDITIONS AT TIME OF CONSTRUCTION.
GEOGRID LIFTING HOOP
STONE FILL
TRITON BX MARINE MATTRESS
NOT TO SCALE
GEOTEXTILE FABRIC
ATTACHED TO BOTTOM
OF MATTRESS
ALL CUT ENDS OF BRAIDED MATERIAL SHALL BE KNOTTED WITHIN 1/2" TO 2" OF THE END TO
PREVENT UNRAVELING OF BRAID
AT ALL ENDS OF ALL BRAIDED SEAMS THE BRAID SHALL BE SECURELY KNOTTED TO THE
GEOGRID.
AT ALL ENDS OF THE PIECES OF BRAID MATERIAL USED, THE BRAID SHALL BE KNOTTED TO
SPLICE IT TO THE NEXT PIECE OF BRAID, OR TO SECURE IT TO THE GEOGRID. EACH BRAIDED
SEAM SHALL BE CONTINUOUS, WITH SECURELY KNOTTED SPLICES ALLOWED. THE BRAID
SHALL BE SECURELY KNOTTED TO THE GEOGRID AT A SPACING NOT TO EXCEED 6 FT ALONG
ANY SEAM.
THE BRAID SHALL BE STITCHED THROUGH EACH PAIR OF APERTURES ALONG THE SEAM AT
LEAST ONCE, AND THE MINIMUM NUMBER OF STITCHES PER FOOT ALONG THE SEAM SHALL
BE SIX (6). THE SPACING OF STITCHES ALONG EACH SEAM SHALL BE REASONABLY UNIFORM.
ALL KNOTS SHALL BE TIED IN A MANNER TO PREVENT SLIPPING AND CINCHING.
THE WRAPS ALONG THE SEAM SHALL BE SUFFICIENTLY TIGHT TO CLOSE THE GAP BETWEEN
THE ADJACENT PIECES OF GEOGRID BUT SHALL NOT BE OVERTIGHTENED SUCH THAT THE
GEOGRID BINDS ALONG THE SEAM.
BRAID
GEOGRID
NOT TO SCALE
NOTES:
TYPICAL END VIEW OF MARINE MATTRESS
WITH GEOTEXTILE UNDERATTACHMENT
TYPICAL SIDE VIEW OF MARINE MATTRESS
6.5 FT
VARIES, 18-22 FT
BRAIDED SEAMS
METAL FASTENERS 24" O.C.
TO SECURE FABRIC ACROSS
BOTTOM OF THE MATTRESS (TYP)
NOTE:
GEOTEXTILE STRIPS SHALL BE PRE-CUT, POSITIONED AND SECURED TO THE
BOTTOM OF THE MATTRESSES IN THE INITIAL FABRICATION STAGE.
TOP TRIMMED AND
SEAMED TO SIDE AT
TOP CORNER
6" (FILLED)
TOP TRIMMED AND
SEAMED TO SIDE AT
TOP CORNER GEOGRID EXTENSION
WITH GEOTEXTILE
FABRIC ATTACHED
2 FT MIN.
GEOGRID EXTENSION
WITH GEOTEXTILE
FABRIC ATTACHED2 FT, TYP.
METAL FASTENERS 12 IN O.C.
TO SECURE GEOTEXTILE FABRIC
AROUND THE PERIMETER
OF THE MATTRESS/EXTENSION (TYP)
NOT TO SCALE
X X X X X
X X X X X X X X X X X X X X X X X X X X X X
X X X X
2 FT MIN.
INNER
BAFFLES
NOTES:
GEOTEXTILE FABRIC SHALL BE SECURELY ATTACHED TO THE BOTTOM
OF EACH MATTRESS USING METAL FASTENERS ON 12" CENTERS
AROUND THE PERIMETER OF THE MATTRESS AND EXTENSION.
GEOTEXTILE FABRIC SHALL BE SECURELY ATTACHED TO THE BOTTOM
OF EACH MATTRESS USING METAL FASTENERS ON 24" CENTERS ACROSS
THE BOTTOM WIDTH OF THE MATTRESS.
GEOTEXTILE FABRIC SHALL COVER THE BOTTOM OF THE MATTRESS AND
THE 2' GEOGRID EXTENSION.
SEAMS IN THE FABRIC SHALL BE OVERLAPPED BY 9" MINIMUM AND
THERMALLY WELDED TO FORM A SECURE BOND BETWEEN THE
ADJOINED PIECES.
6.5 FT 2 FT
VARIES
18-22 FT
2 FT
X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXXXX X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X
GEOGRID
MARINE MATTRESS
GEOTEXTILE FABRIC
2-FT GEOGRID/
FABRIC
EXTENSION
METAL FASTENERS
12" O.C. AROUND THE
BOTTOM PERIMETER
OF MARINE MATTRESS
GEOGRID MARINE MATTRESS
METAL FASTENERS
24" O.C. ACROSS THE BOTTOM
OF THE MATTRESS
(INTERIOR TO THE PERIMETER
OF MARINE MATTRESS)
GEOGRID/FABRIC EXTENSION
NOT TO SCALE
X X X
ABUT ADJACENT
MATTRESSES
ATOP EXTENSION
THIS PORTION OF GEOGRID/FABRIC EXTENSION TO BE PLACED
ALONG INTERIOR OF STRUCTURE FOOTPRINT (TYP.)
VARIES
6.5 FT
12 FT
VARIES 18-20FT,
EACH ± 5.5"x6.5 FT, AT 2 FT SPACINGS
TO FORM ENDS AND BAFFLES
NOTE: ENDS, SIDES, AND BAFFLES ARE SIZED SLIGHTLY LESS THAN THE 6-INCH NOMINAL THICKNESS
OF THE FILLED MATTRESS, IN ORDER TO ALLOW THE TOP TO BE SEAMED DOWN MORE TAUT
AGAINST THE STONE FILL.
BRAIDED SEAM
(FOR BOX-UP STAGE)
ALL END AND BAFFLE
PIECES SEAMS TO
MAIN PIECE OF GRID
± 6
.5 FT
± 5 .5" (T
YP)
NOT TO SCALE
SPLICE
POINT
DISTANCE APPROX. EQUAL TO MAT LENGTH
TYPICAL TWO-ENDED LIFT
6.5 FT 6 IN
RIGGING
AND STEEL
LIFTING BAR
GEOGRID
LIFTING
HOOP
LIFTING BAR, RIGGING AND HANDLING MUST BE SUITABLE
TO DISTRIBUTE THE LIFTING LOADS UNIFORMLY TO THE
GEOGRID. LIFTING APPARATUS TO BE PROPOSED BY
CONTRACTOR. HANDLING AND LIFTING OF GRID MATERIALS
AND MATTRESSES SHALL BE AVOIDED WHEN THE AMBIENT
TEMPERATURE IS LOWER THAN 5 DEGREES BELOW ZERO,C.
STONE-FILLED COMPARTMENTS SHALL BE FORMED BY USE
OF INTERNAL BAFFLES ACROSS EACH MAT AT A MAXIMUM
SPACING OF APPROXIMATELY 2 FEET.
ALL EXTERIOR SIDES AND INTERIOR BAFFLES AND LIFTING
HOOPS SHALL BE FORMED WITH TENSAR BX150060 GRID, OR
MANUFACTURE'S EQUIVALENT.
SEE THE PROJECT SPECIFICATIONS REGARDING STONE FILL
MATERIALS.
FILLING SHALL BE ACCOMPLISHED SUCH THAT THE
AVERAGE THICKNESS OF EACH MATTRESS DOES NOT
EXCEED 6 INCHES.
NOT TO SCALE
TYPICAL
ONE-ENDED
LIFT
SPREADER BEAM
NOTES:
VARIES
18-22 FT
B R
EA
K
W A
TE
R
P R
O
JE
C T
PI
N
E
IS
LA
N
D
TO
W
N O
F H
IL
TO
N H
EA
D
, S C
PROJECT NO:
CHECKED
DESIGNED
DRAWN
SURVEYED
BY DATE
DATE OF PREPARATION
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
R
EV
IS
IO
N S
SHEET NUMBER
SHEET TITLE:
ISSUANCE:
1 2 3 4 5
PE STAMP (COA 4194)
BID SET
0025H031
MATTRESS
DETAILS
ML 08/04/2025
ZB 08/04/2025
Typical Lock-Stitch Braiding Configuration for Mattress Fabrication Typical Mattress and Geotextile Attachment Details Typical Mattress Lifting Methods
Typical Configuration of Stone Filled Mattress with Lifting Hoop Typical Mattress and Geotextile Attachment Details Typical Marine Mattress Unit After Initial Fabrication
NOTES: 1. ELEVATIONS IN FEET RELATIVE TO NAVD88. ELEVATIONS IN FEET RELATIVE TO NAVD88. 2. HORIZONTAL POSITIONS IN SC STATE PLANE (NAD83, INT'L FEET) HORIZONTAL POSITIONS IN SC STATE PLANE (NAD83, INT'L FEET) 3. DATE OF SURVEY: OCT 2024.DATE OF SURVEY: OCT 2024.
File details come from the government source that posted it. Updated .