11-2025-08-27 Pine Island Strux Pre-Bid Presentation printfriendly.pdf

PDF 5 MB Posted

Attached to
Pine Island Breakwater Project
Solicitation number
2025-23
Issued by
Barnwell County, South Carolina

About this file

The document is a Pre-Bid Conference presentation for the Pine Island Breakwater Project, solicitation IFB #2025-23, issued by the Town of Hilton Head Island, South Carolina. The project involves constructing a series of six breakwater structures (S1-S6) along Pine Island's shoreline in Port Royal Sound, with a pre-bid conference scheduled for August 26, 2025. The planned work includes excavation, foundational treatments, stone placement, and installation of marine mattresses and geogrid/fabric composites. The total estimated quantities include 9,870 tons of armor stone, 1,740 tons of chinking stone, 32,032 square feet of Size 1 marine mattresses, 7,722 square feet of Size 2 marine mattresses, and 14,800 square feet of geogrid/fabric composite. The project will be completed in stages, starting with establishing a staging area at the Dolphin Head Recreation Area, working from the furthest structure (S6) back to the nearest (S1), and concluding with site restoration.

The project has a 10% retainage requirement, and rock quantities will be certified by truck load weigh tickets and verified by survey. Work is limited to Monday through Saturday, with specific hours (7 AM to sunset on weekdays, 8 AM to 5 PM on Saturdays) and no work permitted on Sundays or holidays. Material deliveries are allowed Monday through Friday from 7 AM to 6 PM. The contract will be awarded to the lowest most responsible and responsive bidder, with consideration given to proposed construction schedules, mobilization methods, personnel and equipment commitment, and contractor qualifications. Marine mattresses will be assembled and filled offsite, and all stone must be clean, free of debris, and separated into similar-sized piles at the staging area. The project involves detailed environmental considerations, including vibration monitoring and careful excavation and foundation preparation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Hilton Head Island, SC

PINE ISLAND BREAKWATER

PROJECT

IFB #: 2025-23

Pre-Bid Conference

Town of Hilton Head Island, SC

Hilton Head Plantation

August 26, 2025, 11:00am

Project Overview & Purpose

Gated

Access

Port Royal

Sound

Skull Creek

PINE ISLAND

Marshlands Dolphin

Head Rec

Area

Erosional

Beach

Accretional

Spit

Direction of Sand Transport

Site Overview

Tidal

Range

8-10 FT

Beach Fill to be Completed by

Others Prior to Construction

(Fall 2025)

SOFT SOIL

CONDITIONS

Contract Schedule

Date Event

1.) August 12, 2025 Bid Advertised

2.) August 26, 2025 at 11:00 a.m. Mandatory Pre-bid Conference

3.) September 3, 2025 at 5:00 p.m. Deadline to submit questions

4.) September 11, 2025 at 5:00 p.m. Bid Submittal

5.) September 12, 2025 at 9:30 a.m. Virtual Bid Opening

6.) Within 7 Days of Bid Opening (Goal) Owner issues Notice-of-Award

7.) Within 10 Days of Notice of Award Contractor provides signed Contract, Insurance Documentation and Bonds

8.) Within 30 Days of Receipt of Signed Owner executes Contract and issues

Contract and Bonds Notice-to-Proceed (NTP)

Bid Schedule of Quantities

Estimated

Quantity Units Unit Cost Cost

1 Town Business License 1 allowance 25,000$ 25,000$

2 Mobilization/Demobilization 1 lump sum $ $

3 Armor Stone 9,870 ton $ $

4 Chinking Stone 1,740 ton $ $

5 Stone-Filled Marine Mattresses - Size 1 (22'x6.5'x0.5') 32,032 sqft $ $

6 Stone-Filled Marine Mattresses - Size 2 (18'x6.5'x0.5') 7,722 sqft $ $

7 Geogrid / Fabric Composite 14,800 sqft $ $

8 Structure Inspection and Vibration Monitoring 1 lump sum $ $

9 Signage 1 lump sum $ $

* Actual quantities to be placed and accepted may vary from Base Bid by +/- 20 percent (%) or less.

IFB# 2025-23

TOTAL

Item

BID

Discussion on Stone at End of Presentation

General

• Basis for Award

• Lowest most responsible, responsive bidder

• Proposed construction schedule

• Methods of mobilization/demob

• Personnel and equipment committed

• Qualifications and experience

• Contract Schedule/Town Council Approval-

Execution Process

General

• Permits included with bid documents

• Retainage 10%

• Rock quantities for payment to be certified by truck load weigh tickets

• Rock placement to be verified by survey

• Conduct vibration monitoring and control throughout project

Order of Work

• Establish staging/access area

• Complete furthest structure from access back to nearest (S6 to S1)

• Excavation

• Foundational treatments

• Stone placement

• Backfilling/washing sand into voids

• Install warning sign

• Site Restoration

Operations

• Staging/access: Dolphin Head Rec Area

• Works Days/hours

• M-F: 7 AM to sunset; Sat: 8 AM to 5 PM

• Material/equipment deliveries: M-F: 7 AM to 6 PM

• No work Sundays and Holidays

• Mattresses to be assembled & filled offsite

• Stone clean & free of debris

• Separated into piles of similar size at staging area

Materials

• Armor Stone (discussion at end)

• Marine Mattresses (Tensar BX 1500, or equivalent)

• Size 1: 22’ x 6.5’ x 0.5’

• Size 2: 18’ x 6.5’ x 0.5’

• Geotextile Fabric (US Fabrics US1540, or equivalent)

• Geogrid/Fabric Composite (Tensar GC654050, or equivalent)

• Timber pile warning sign

• Location to be coordinated with Town

Staging/Access

Limits to be field verified

Structure Layout

Size 1

Mattresses

Size 2

Mattresses

Geogrid/Fabric

Composite

Structure Layout

Size 1

Mattresses

Size 2

Mattresses

Geogrid/Fabric

Composite

Warning

Sign

Structure Cross-Sections

Excavation

Limit

Excavation

Limit

All side slopes 2H:1V

Structure Cross-Sections

Marine Mattresses

2’ Extension for

Overlapping

Questions/Discussion

Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17
Slide 18
Slide 19
Slide 20
Slide 21
Slide 22
Slide 23
Slide 24
Slide 25

File details come from the government source that posted it. Updated .