1-Exhibit A-1 Contractor Statement of Qualification.pdf
PDF 82 KB Posted
- Attached to
- Pine Island Breakwater Project
- Solicitation number
- 2025-23
- Issued by
- Barnwell County, South Carolina
About this file
This document is Exhibit A-1, a Contractor Qualifications Statement for the Pine Island Breakwater Project. The document outlines specific technical qualifications required for potential contractors or subcontractors bidding on the project. Bidders must demonstrate successful completion of at least two projects within the last 20 years, which include: (1) purchasing, transporting, delivering, handling, and placing armor stone over 1-ton per stone in a jetty, groin, or breakwater configuration, and (2) purchasing and/or fabricating, transporting, handling, and placing stone-filled geosynthetic marine mattresses as a shoreline structure foundation in an area with a tide range exceeding 4 feet.
The qualification statement requires bidders to prove their technical capability to handle, maneuver, and place armor and chinking stone according to the project drawings. The document provides a blank form for a bidder or company representative to complete, including fields for the company name, signature, name, and title. No specific pricing, funding sources, or contract terms are detailed in this exhibit, which appears to be focused solely on establishing the technical competence of potential project contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A-1
CONTRACTOR QUALIFICATIONS STATEMENT
Prime, and/or the designated subcontractor(s) for the Pine Island Breakwater
Project, shall demonstrate the successful completion of at least two (2) projects in the last twenty (20) years that consist of (1) the purchase, transport, delivery, handling and placement of armor stone in excess of 1-ton (each stone) in a jetty, groin, or breakwater configuration and (2) the purchase and/or fabrication, transport, handling, and placement of stone-filled geosynthetic marine mattresses as the structure foundation along the intertidal area of a shoreline with a tide range in excess of 4 feet. Prime, and/or the designated subcontractor(s), shall, as part of the bid, demonstrate a technical capability to handle, maneuver, and place armor and chinking stone in a manner and configuration indicated in the Drawings.
Bidder/Company:
Signature:
Name:
Title: ____________________________
File details come from the government source that posted it. Updated .