2-Exhibit B Bid Schedule.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Pine Island Breakwater Project
- Solicitation number
- 2025-23
- Issued by
- Barnwell County, South Carolina
About this file
The document is a Bid Schedule (Exhibit B) for Invitation for Bid (IFB) #2025-23, associated with the Town of Hilton Head Island's shore-stabilization project in South Carolina. The bid schedule outlines nine line items for a coastal infrastructure project, including a town business license, mobilization/demobilization, armor stone, chinking stone, stone-filled marine mattresses in two sizes, geogrid/fabric composite, structure inspection and vibration monitoring, and signage. The project involves approximately 9,870 tons of armor stone, 1,740 tons of chinking stone, 32,032 square feet of Size 1 marine mattresses, 7,722 square feet of Size 2 marine mattresses, and 14,800 square feet of geogrid/fabric composite. The bid indicates that actual quantities may vary by plus or minus 20 percent.
The bid schedule does not provide specific pricing information, as the unit costs are left blank for bidders to complete. No explicit details about set-asides, incumbents, or funding sources are present in this document. The project appears to be a shore stabilization effort, likely addressing coastal erosion or protection infrastructure. The bid format suggests a competitive bidding process where contractors will fill in their proposed unit costs for each line item, with the total project cost to be determined through the bidding process. The document implies a comprehensive coastal engineering project requiring specialized marine construction materials and monitoring services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Bid
| IFB# 2025-23 | |||||
| Item | Estimated Quantity | Units | Unit Cost | Cost | |
| BID | |||||
| 1 | Town Business License | 1 | allowance | $ 25,000 | $ 25,000 |
| 2 | Mobilization/Demobilization | 1 | lump sum | $ | $ |
| 3 | Armor Stone | 9,870 | ton | $ | $ |
| 4 | Chinking Stone | 1,740 | ton | $ | $ |
| 5 | Stone-Filled Marine Mattresses - Size 1 (22'x6.5'x0.5') | 32,032 | sqft | $ | $ |
| 6 | Stone-Filled Marine Mattresses - Size 2 (18'x6.5'x0.5') | 7,722 | sqft | $ | $ |
| 7 | Geogrid / Fabric Composite | 14,800 | sqft | $ | $ |
| 8 | Structure Inspection and Vibration Monitoring | 1 | lump sum | $ | $ |
| 9 | Signage | 1 | lump sum | $ | $ |
| TOTAL |
* Actual quantities to be placed and accepted may vary from Base Bid by +/- 20 percent (%) or less.
File details come from the government source that posted it. Updated .