6-Exhibit E_Schedule of Material Submittals Form_04012026_BA.pdf

PDF 178 KB Posted

Attached to
Generator IDIQ Contract
Solicitation number
1164311
Issued by

About this file

This is Exhibit E, a Schedule of Material Submittals template for the BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ contract at the Beltsville Agricultural Research Center (BARC), USDA-ARS in Beltsville, Maryland.

The document provides a structured template for tracking contractor submittals throughout the contract performance period. Seven line items are identified for submission, including: (1) Project Schedule and SWD Maintenance Schedule with Initial Inventory and Inspection Report; (2) Monthly Reports; (3) Project Record Documents; (4) Documentation on Diverting Project Waste to Recycle; (5) Safety Plan; (6) Project O&M Manuals (if required); and (7) Apparatus Inspection and Testing. The template identifies the types of documentation required for each submittal, such as certificates of compliance, shop drawings, samples, manufacturer's recommendations, warranties, catalog/product data, operating instructions, and test reports. The form includes columns for the Contracting Officer Representative (COR) and Contract Administrator to complete, tracking required submission dates, dates received by the COR, return suspense dates, contractor notification dates, approval or disapproval status with submittal numbers, and contractor resubmittal and final approval information. The template contains numbered rows through line 23 for additional submittals as needed. This is a template document designed to be populated with specific project details and dates during contract execution.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ Beltsville Agricultural Research Center (BARC) USDA-ARS, Beltsville, MD

Exhibit E Schedule of Material Submittals

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER:

PROJECT TITLE:

SOLICITATION/CONRTACT NUMBER:

TO BE COMPLETED BY COR TO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NO.

SOW /PWS/

SPECIFICATION NO: ITEM CE

RT

IF

IC

AT

E O

F

CO

M

PL

IA

N

CE

SH

O

P

DR

AW

IN

G S

SA

M

PL

ES

CO

LO

R

SE

LE

CT

IO

N

M

AN

U

FA

CT

U

RE

R'

S

RE

CO

M

M

EN

DA

TI

O N

S

M

AN

U

FA

CT

U

RE

R'

S W

AR

RE

N

TY

CA

TA

LO

G

PR

O

DU

CT

D

AT

A

O

PE

RA

TI

N G

IN

ST

RU

CT

IO

N

S

TE

ST

R

EP

O

RT

S

O

TH

ER

(S

EE

S

PE

CI

FI

CA

TI

O

N

REQUIRED

SUBMISSION

DATE

DATE TO

COR

DATE

CONTRACTING

OFFICER

RECEIVED

RETURN

SUSPENSE DATE

DATE

CONTRACTOR

NOTIFIED

APPROVED

(INSERT

SUBMITTAL

NUMBER)

DISAPPROVED

(INSERT

SUBMITTAL

NUMBER)

CONTRACTOR

RESUBMITTAL FINAL APPROVAL REMARKS

Specification Section 01

32 16.00 20 Project Schedule X

SWD Maintenance Schedule X SWD Initial Inventory and Inspection Report X

Specification Section 01

32 16.00 20 Monthly Reports X

Specification Section 01

78 00 Project Record Documents X X X X X

Specification Section 01

78 00 Documentation on Diverting Project Waste to Recycle

X

Specification Section 01

78 00 Safety Plan

Specification Section 01

78 00 Project O&M Manuals (if required) X

Specification Section 26

20 00 Apparatus Inspection and Testing X X X X X X

BARC EPSS (Generator/ATS/MTS) Maintenance and Repair IDIQ