About this file
The document is an Excel-based pricing exhibit (Form C2) for the Florida Department of Transportation's (FDOT) Districtwide Contamination Assessment and Remediation (CAR) Services contract for District Four, covering Broward, Palm Beach, Martin, St. Lucie, and Indian River counties. The exhibit provides a comprehensive rate schedule for labor, equipment, sampling and treatment equipment, drilling services, and on-site recovery and treatment equipment, with detailed hourly rates for personnel ranging from senior engineers and geologists to field technicians and laborers. The contract term runs from September 19, 2025, through September 18, 2028, with technical proposals due by July 9, 2025, at 10:30 AM, following a mandatory pre-proposal conference on June 17, 2025.
The contract has a total maximum budgetary amount of $4,980,000.00, with work assigned through Letters of Authorization (LOA) on an as-needed basis. Pricing is structured with daily, weekly, and monthly rates for various equipment and services, including vehicles, sampling equipment, drilling services, and recovery/treatment equipment. The contract includes Disadvantaged Business Enterprise (DBE) participation requirements and mandates substantial insurance coverage, including $1 million in general liability and $5 million in pollution liability insurance. Unique provisions include financial penalties for non-performance, such as 5% invoice deductions for emergency response delays and $100 per day for missed project timelines, with contractors required to provide 24/7 availability and one-hour emergency response times.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sections 1-8b
| NO. | SECTION 1, DIRECT LABOR & FIELD OPERATIONS | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 1-1 | CAR Senior Engineer P.E. or Geologist P.G. | Hourly | 600 | $ - 0 | |
| 1-2* | CAR Contract Manager | Hourly | 600 | $ - 0 | |
| 1-3 | CAR Certified Industrial Hygienist | Hourly | 250 | $ - 0 | |
| 1-4* | CAR Project Manager | Hourly | 1200 | $ - 0 | |
| 1-5 | CAR Project - Engineer P.E. or Geologist P.G. | Hourly | 350 | $ - 0 | |
| 1-6* | CAR Senior - Geologist / Scientist | Hourly | 6550 | $ - 0 | |
| 1-7* | CAR Project - Geologist / Scientist | Hourly | 6550 | $ - 0 | |
| 1-8* | CAR Staff - Geologist / Scientist | Hourly | 6550 | $ - 0 | |
| 1-9 | CAR Field Health & Safety Officer | Hourly | 350 | $ - 0 | |
| 1-10 | CAR Draft Person/ CADD Tech / GIS Tech | Hourly | 1600 | $ - 0 | |
| 1-11 | CAR Senior Field Technician/Forman | Hourly | 1400 | $ - 0 | |
| 1-12 | CAR Field Equipment Operator | Hourly | 5000 | $ - 0 | |
| 1-13 | CAR Field Technician | Hourly | 1000 | $ - 0 | |
| 1-14 | CAR Laborer II | Hourly | 400 | $ - 0 | |
| 1-15 | CAR Laborer I | Hourly | 900 | ||
| 1-16 | CAR Administrative / Clerical | Hourly | 400 | $ - 0 | |
| SECTION 1, SUBTOTAL | $ - 0 |
| NO. | SECTION 2, EQUIPMENT - VEHICLES | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 2-1 | Automobile | Daily | 400 | Weekly | 30 | Monthly | 5 | $ - 0 | |||
| 2-2 | Pickup Truck/Van (Mid-Size) | Daily | 600 | Weekly | 95 | Monthly | 20 | $ - 0 | |||
| 2-3 | Box Truck - Two ton | Daily | 500 | Weekly | 40 | Monthly | 30 | $ - 0 | |||
| 2-4 | Up to One-ton Truck | Daily | 350 | Weekly | 35 | Monthly | 5 | $ - 0 | |||
| 2-5 | ≥ One Ton to Two-ton Truck | Daily | 500 | Weekly | 70 | Monthly | 5 | $ - 0 | |||
| 2-6 | Emergency Response Truck | Daily | 600 | Weekly | 75 | Monthly | 25 | $ - 0 | |||
| SECTION 2, SUBTOTAL | $ - 0 |
| NO. | SECTION 3, SAMPLING AND TREATMENT EQUIPMENT | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 3-1 | Air Monitoring Pump (Personal) | Daily | 200 | Weekly | 50 | Monthly | 20 | $ - 0 | |||
| 3-2 | Multi-parameter Air Monitor (4 Gas) | Daily | 120 | Weekly | 50 | Monthly | 20 | $ - 0 | |||
| 3-3 | Multi-parameter Water Quality Meter (displays pH, DO, conductivity, ORP, and temperature) | Daily | 90 | Weekly | 25 | Monthly | 25 | $ - 0 | |||
| 3-4 | Handheld GPS Unit | Daily | 80 | Weekly | 50 | Monthly | 25 | $ - 0 | |||
| 3-5 | High Volume Air Sampling Pump | Daily | 40 | Weekly | 10 | Monthly | 15 | $ - 0 | |||
| 3-6 | Metal Detector | Daily | 10 | Weekly | 20 | Monthly | 15 | $ - 0 | |||
| 3-7 | Ground Penetraring Radar (GPR) | Daily | 60 | Weekly | 10 | Monthly | 2 | $ - 0 | |||
| 3-8 | Organic Vapor Analyzer (OVA) / Flame Ionization Detector (FID) | Daily | 250 | Weekly | 150 | Monthly | 60 | $ - 0 | |||
| 3-9 | Peristaltic Pump w/hoses and tubing | Daily | 60 | Weekly | 40 | Monthly | 20 | $ - 0 | |||
| 3-10 | Water Level Probe (can measure product) | Daily | 60 | Weekly | 40 | Monthly | 20 | $ - 0 | |||
| 3-11 | Turbidity Meter | Daily | 60 | Weekly | 40 | Monthly | 25 | $ - 0 | |||
| 3-12 | Portable Photo Ionization Detector (PID) | Daily | 150 | Weekly | 40 | Monthly | 20 | $ - 0 | |||
| 3-13 | Particle Counter Dust Measuring Device (PM 0.3, 0.5, 1.0, 2.5, 5.0 and 10) | Daily | 100 | Weekly | 30 | Monthly | 5 | $ - 0 | |||
| SECTION 3, SUBTOTAL | $ - 0 |
| NO. | SECTION 4, DRILLING | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 4-1 | Permanent PVC 2" Monitoring Well | per foot | 1500 | $ - 0 | |
| 4-2 | Permanent PVC 4" Monitoring Well | per foot | 1000 | $ - 0 | |
| 4-3 | Abandonment of Permanent PVC 2" Monitoring Well | per foot | 1500 | $ - 0 | |
| 4-4 | Abandonment of Permanent PVC 4" Monitoring Well | per foot | 1000 | $ - 0 | |
| 4-5 | Temporary PVC 2" Monitoring Well (including abandonment) | per foot | 2500 | $ - 0 | |
| 4-6 | Flush Mount Manhole Cover for 2" and 4" Monitoring Well (installed) | per well | 450 | $ - 0 | |
| 4-7 | Soil Boring | per foot | 3000 | $ - 0 | |
| 4-8 | Drill Rig Mobilization/Demobilization (one rate to include both Mobilization and Demobilization) | per day | 150 | $ - 0 | |
| 4-9 | Direct Push Technology | half day | 25 | $ - 0 | |
| 4-10 | Direct Push Technology | full day | 150 | $ - 0 | |
| 4-11 | Direct Push Technology | full week | 20 | $ - 0 | |
| 4-12 | Pre-pack Monitoring Well Screen 1" x 5' | Each | 500 | $ - 0 | |
| 4-13 | PVC Monitoring Well Riser 1" x 5' | Each | 300 | $ - 0 | |
| 4-14 | Monitoring Well Installation Permit - First Well | Each | 100 | $ - 0 | |
| 4-15 | Monitoring Well Installation Permit - Each Additional Well | Each | 200 | $ - 0 | |
| 4-16 | Monitoring Well Abandonment Permit - First Well | Each | 100 | $ - 0 | |
| 4-17 | Monitoring Well Abandonment Permit - Each Additional Well | Each | 200 | $ - 0 | |
| SECTION 4, SUBTOTAL | $ - 0 |
| NO. | SECTION 5, ON-SITE RECOVERY AND TREATMENT EQUIPMENT | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 5-1 | Carbon Cell 4000 lb | Daily | 18 | Weekly | 4 | Monthly | 2 | $ - 0 | |||
| 5-2 | Carbon Cell 6000 lb | Daily | 18 | Weekly | 4 | Monthly | 2 | $ - 0 | |||
| 5-3 | Sediment tank/box | Daily | 12 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-4 | Roll-off Box 20 yd | Daily | 16 | Weekly | 4 | Monthly | 2 | $ - 0 | |||
| 5-5 | Roll-off Box 25 yd | Daily | 12 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-6 | Roll-off Box 30 yd | Daily | 12 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-7 | Dewatering Box | Daily | 18 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-8 | Vacuum Box 25 yd | Daily | 20 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-9 | 2000 Gal SS Tank | Daily | 15 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-10 | Mobile Frac Tank Open Top 18k | Daily | 16 | Weekly | 4 | Monthly | 2 | $ - 0 | |||
| 5-11 | Mobile Frac Tank Open Top 21k | Daily | 18 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-12 | Mobile Frac Tank Closed Top 21k | Daily | 18 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-13 | Liquid Phase Carbon Vessel <100 GPM | Daily | 18 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-14 | Liquid Phase Carbon Vessel 100 to <300 GPM | Daily | 18 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-15 | Liquid Phase Carbon Vessel 300 to <600 GPM | Daily | 18 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-16 | Portable Air Stripping Tower <100 GPM | Daily | 16 | Weekly | 4 | Monthly | 2 | $ - 0 | |||
| 5-17 | Portable Air Stripping Tower 100 to <300 GPM | Daily | 16 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-18 | Portable Air Stripping Tower 300 to <600 GPM | Daily | 16 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-19 | Jet Pump (4") | Daily | 80 | Weekly | 20 | Monthly | 5 | $ - 0 | |||
| 5-20 | Jet Pump (6") | Daily | 80 | Weekly | 3 | Monthly | 1 | $ - 0 | |||
| 5-21 | Pool, 10,000 gallon w/ liner | Daily | 5 | Weekly | 5 | Monthly | 1 | $ - 0 | |||
| 5-22 | Pump Scavenger < 1 hp | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-23 | Pump Submersible 2" < 200 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-24 | Pump Submersible 3" Max 400 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-25 | Pump Submersible 4" Max 800 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-26 | Pump Diaphragm 2" < 200 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-27 | Pump Diaphragm 3" Max 260 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-28 | Pump Diaphragm 3" SS < 200 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-29 | Pump Centrifugal Small 1" < 100 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-30 | Pump Centrifugal Small 2" < 200 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-31 | Pump Centrifugal Mid 3" 200 to <320 GPM | Daily | 80 | Weekly | 20 | Monthly | 6 | $ - 0 | |||
| 5-32 | Pump Centrifugal Small 4" Max 500 GPM | Daily | 80 | Weekly | 15 | Monthly | 5 | $ - 0 | |||
| 5-33 | Pump Centrifugal Large 4" Max 1500 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-34 | Pump Trash Small 2" Max 185 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-35 | Pump Trash Small 3" Max 320 GPM | Daily | 40 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-36 | Pump Sludge | Daily | 20 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 5-37 | Lay Flat Discharge Hose 4" x 50' | Daily | 100 | Weekly | 25 | Monthly | 8 | $ - 0 | |||
| 5-38 | Suction Hose 4" x 20' | Daily | 100 | Weekly | 25 | Monthly | 8 | $ - 0 | |||
| SECTION 5, SUBTOTAL | $ - 0 |
| NO. | SECTION 6, CONSTRUCTION / EXCAVATION AND HEAVY EQUIPMENT | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 6-1 | Backhoe, CAT 416 | Daily | 40 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-2 | Backhoe, CAT 426 | Daily | 40 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-3 | Excavator Mini (0 - 6 metric tons; or <13k lbs) | Daily | 35 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-4 | Excavator Mid-Size (6 -10 metric tons; or 13k - 22k lbs) | Daily | 35 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-6 | Jack Hammer (0-90 lb) | Daily | 40 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-7 | Truck (dump, 15CY) | Daily | 450 | Weekly | 60 | Monthly | 19 | $ - 0 | |||
| 6-8 | Truck (vacuum, 3000-gal) | Daily | 90 | Weekly | 7 | Monthly | 4 | $ - 0 | |||
| 6-9 | Truck (water) | Daily | 15 | Weekly | 7 | Monthly | 4 | $ - 0 | |||
| 6-10 | Street Sweeper | Daily | 75 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-11 | Skid-Steer Loader (50 hp; not to exceed 1750 lbs) | Daily | 75 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-12 | Skid-Steer Loader (50 - 70 hp; 1750 - 2200 lbs) | Daily | 75 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-13 | Skid-Steer Loader (70+ hp; more than 2200 lbs) | Daily | 75 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-14 | Loader (Rubber Tire) Small (< 2 cu; 60 - 70 hp; 11k to 13k lbs) | Daily | 38 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-15 | Loader (Rubber Tire) Mid-Size (2 - 7 cu; 98 - 250 hp; 51 to 68k lbs) | Daily | 75 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-16 | Loader (Rubber Tire) Full-Size (> 7.75 cu; > 375 hp; > 68k lbs) | Daily | 38 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-17 | Vibry Roller, 80" wide | Daily | 38 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-18 | Trench Compactor/ tamper | Daily | 80 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-19 | All Terrain Forklift 2-5 ton | Daily | 80 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-20 | Scissor lift | Daily | 50 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| 6-21 | Boom lift | Daily | 80 | Weekly | 38 | Monthly | 19 | $ - 0 | |||
| 6-22 | Cherry Picker | Daily | 50 | Weekly | 19 | Monthly | 9 | $ - 0 | |||
| SECTION 6, SUBTOTAL | $ - 0 |
| NO. | SECTION 7, MISCELLANEOUS - EQUIPMENT | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 7-1 | Barricades | Daily | 75 | Weekly | 15 | Monthly | 5 | $ - 0 | |||
| 7-2 | Barricades, Type I, II | Daily | 75 | Weekly | 15 | Monthly | 5 | $ - 0 | |||
| 7-3 | Barricades, Type III | Daily | 75 | Weekly | 10 | Monthly | 5 | $ - 0 | |||
| 7-4 | Saws-All | Daily | 40 | Weekly | 10 | Monthly | 5 | $ - 0 | |||
| 7-5 | Chain Saw (14" bar) | Daily | 40 | Weekly | 10 | Monthly | 5 | $ - 0 | |||
| 7-6 | Concrete Saw (hand held) | Daily | 40 | Weekly | 2 | Monthly | 1 | $ - 0 | |||
| 7-7 | Concrete Saw (walk behind) | Daily | 40 | Weekly | 2 | Monthly | 1 | $ - 0 | |||
| 7-8 | Cut-off Saw, Hand Held | Daily | 40 | Weekly | 6 | Monthly | 3 | $ - 0 | |||
| 7-9 | Cut-off Saw, Walk Behind | Daily | 40 | Weekly | 6 | Monthly | 3 | $ - 0 | |||
| 7-10 | Directional Arrow Board | Daily | 20 | Weekly | 2 | Monthly | 1 | $ - 0 | |||
| 7-11 | Generator up to 5KW | Daily | 150 | Weekly | 15 | Monthly | 7 | $ - 0 | |||
| 7-12 | Generator ≥ 5KW to 10KW | Daily | 100 | Weekly | 8 | Monthly | 4 | $ - 0 | |||
| 7-13 | Generator ≥ 10KW to 50KW | Daily | 100 | Weekly | 5 | Monthly | 3 | $ - 0 | |||
| 7-14 | Air Compressor, 185 CFM | Daily | 50 | Weekly | 3 | Monthly | 2 | $ - 0 | |||
| 7-15 | Trailer (cargo 16') | Daily | 20 | Weekly | 1 | Monthly | 1 | $ - 0 | |||
| 7-16 | Trailer, Tank ( 500 gallon ) | Daily | 20 | Weekly | 1 | Monthly | 1 | $ - 0 | |||
| 7-17 | Hepa Vacuum | Daily | 10 | Weekly | 1 | Monthly | 1 | $ - 0 | |||
| 7-18 | Traffic Cones | Daily | 3000 | Weekly | 300 | Monthly | 30 | $ - 0 | |||
| 7-19 | Traffic Warning Signs | Daily | 300 | Weekly | 30 | Monthly | 10 | $ - 0 | |||
| 7-20 | Motorized Product Transfer Pump | Daily | 25 | Weekly | 1 | Monthly | 1 | $ - 0 | |||
| 7-21 | Flow Meter | Daily | 25 | Weekly | 1 | Monthly | 1 | $ - 0 | |||
| 7-22 | Emergency Lighting | Daily | 25 | Weekly | 1 | Monthly | 1 | $ - 0 | |||
| 7-23 | Jon Boat, 12 ft to 20 ft | Daily | 100 | Weekly | 15 | Monthly | 1 | $ - 0 | |||
| 7-24 | Concrete Coring Machine | Daily | 100 | Weekly | 15 | Monthly | 1 | $ - 0 | |||
| 7-25 | Survey Instrument Set | Daily | 150 | Weekly | 15 | Monthly | 1 | $ - 0 | |||
| 7-26 | Drum Dolly | Daily | 50 | Weekly | 5 | Monthly | 5 | $ - 0 | |||
| SECTION 7, SUBTOTAL | $ - 0 |
| NO. | SECTION 8, EXPENDABLES | UNIT OF MEASURE | ESTIMATED | X UNIT RATE | = TOTAL |
| 8-1 | Absorbent Boom (4"), Linear ft | linear foot | 250 | $ - 0 | |
| 8-2 | Blades, Cut-off Saw, each | each | 50 | $ - 0 | |
| 8-3 | Disposable Bailer (3 ft), each | each | 5 | $ - 0 | |
| 8-4 | Drum, Steel (closed top), each | each | 10 | $ - 0 | |
| 8-5 | Drum, Steel (open top), each | each | 50 | $ - 0 | |
| 8-6 | Drum, Overpack (poly), each | each | 5 | $ - 0 | |
| 8-7 | Drum, Overpack (steel), each | each | 5 | $ - 0 | |
| 8-8 | Drum, Poly (55 gal), each | each | 5 | $ - 0 | |
| 8-9 | Drum 17H, each | each | 50 | $ - 0 | |
| 8-10 | Drum 17E , each | each | 50 | $ - 0 | |
| 8-11 | Drum 17C, PCB , each | each | 5 | $ - 0 | |
| 8-12 | Drum Tighthead (1A1/Y) , each | each | 5 | $ - 0 | |
| 8-13 | Drum Openhead (1A2/Y) , each | each | 50 | $ - 0 | |
| 8-14 | Dry Ice per pound | pound | 50 | $ - 0 | |
| 8-15 | Hepa Vac Hepa Filter, each | each | 50 | $ - 0 | |
| 8-16 | Marking Paint, each | each | 50 | $ - 0 | |
| 8-17 | Oil Dry per bag | bag | 50 | $ - 0 | |
| 8-18 | Portland Cement per bag | bag | 20 | $ - 0 | |
| 8-19 | Reddy-Mix Concrete per bag | bag | 75 | $ - 0 | |
| 8-20 | Absorbent Roll 30 " - (per ft) | foot | 100 | $ - 0 | |
| 8-21 | Absorbent Pads (100) per bundle | bundle | 10 | $ - 0 | |
| 8-22 | Absorbent Booms (3" X 20' X 4), each | each | 5 | $ - 0 | |
| 8-23 | Absorbent Booms (5" X 20' X 2), each | each | 5 | $ - 0 | |
| 8-24 | Absorbent Socks (3" X 10' X 6), each | each | 5 | $ - 0 | |
| 8-25 | Visquine (roll) 10' x 100' 6 mil, each | each | 10 | $ - 0 | |
| 8-26 | Visquine (roll) 20' x 100' 6 mil, each | each | 10 | $ - 0 | |
| 8-27 | Visquine (roll) 20' x 100' 10 mil, each | each | 10 | $ - 0 | |
| 8-28 | Disposable water filter (metals, particulate etc) | each | 400 | $ - 0 | |
| SECTION 8, SUBTOTAL | $ - 0 |
&"-,Bold"&16Exhibit C2 - Price Proposal Form
&"Arial,Bold"DOT-RFP-26-4001-CO
Sections 9-11
| Section 9, ANALYTICAL | Solid Matrix | Solid Matrix | Liquid Matrix | Liquid Matrix | ||||||||
| No. | Parameter Group | Unit of Measure | ESTIMATED | X Standard Unit Rate | ESTIMATED | X Rush Unit | ||||||
| Rate | ESTIMATED | X Standard Unit Rate | ESTIMATED | X Rush Unit | ||||||||
| Rate | = TOTAL | |||||||||||
| 9-1 | GC/MS-Library Search (up to 20 unknowns) Per Sample | Each | 75 | 5 | 10 | 5 | $ - 0 | |||||
| 9-2 | EPA Method 8021 or 8260 - for Priority Pollutant VOH | Each | 75 | 5 | 10 | 5 | $ - 0 | |||||
| 9-3 | EPA Method 8021 or 8260 -Volatile Aromatics (BTEX & MTBE) | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-4 | EPA Method 8081 - Chlorinated Pesticides | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-5 | EPA Method 8151 - Chlorinated Herbicides | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-6 | EPA Method 8082 - Polychlorinated Biphenyls (PCBs) | Each | 100 | 5 | 10 | 5 | $ - 0 | |||||
| 9-7 | EPA Method 610, 8100, 8270 or 8310 - Polyaromatic Hydrocarbons | Each | 500 | 250 | 500 | 250 | $ - 0 | |||||
| 9-8 | EPA Method 504, 8260 or 8011 - for ethylene dibromide (EDB) | Each | 50 | 5 | 10 | 5 | $ - 0 | |||||
| 9-9 | EPA Method 8260 - Volatile Organics by GC/MS | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-10 | EPA Method 8270 - Semivolatile Organics by GC/MS | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-11 | EPA Method 624/8260 Priority Pollutant List, 40 CFR 423, Appendix A | Each | 50 | 5 | 10 | 5 | $ - 0 | |||||
| 9-12 | EPA Method 625/8270 Priority Pollutant List, 40 CFR 423, Appendix A | Each | 50 | 5 | 10 | 5 | $ - 0 | |||||
| 9-13 | TRPH by FL-PRO | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-14 | TCLP Extraction (per sample) - EPA Methods 1311 | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-15 | SPLP Extraction (per sample) - EPA Methods 1312 | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-16 | SPLP 8 RCRA Metals | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-17 | 8 RCRA Metals | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-18 | TCLP 8 RCRA Metals | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 9-19 | Priority Pollutant Metals- 13 Metals | Each | 25 | 5 | 10 | 5 | $ - 0 | |||||
| 9-20 | TCLP Volatiles - 8260 | Each | 25 | 5 | 10 | 5 | $ - 0 | |||||
| 9-21 | TCLP Semi-Volatiles - EPA Methods 8270 | Each | 25 | 5 | 10 | 5 | $ - 0 | |||||
| 9-22 | TCLP Pesticides - EPA Methods 8081 | Each | 750 | 250 | 500 | 250 | $ - 0 | |||||
| 9-23 | TCLP Herbicides - EPA Methods 8151 | Each | 750 | 250 | 500 | 250 | $ - 0 | |||||
| 9-24 | 62-780 FAC Table B Compunds (Petroleum or Petro Products) | Each | 90 | 50 | 100 | 50 | $ - 0 | |||||
| 9-25 | 62-780 FAC Table B Compunds (Drycleaning Solvent) | Each | 90 | 50 | 100 | 50 | $ - 0 | |||||
| 9-26 | 62-780 FAC Table C Compounds (GAG/KAG) | Each | 90 | 50 | 100 | 50 | $ - 0 | |||||
| 9-27 | 62-780 FAC Table D Compounds (Used Oil only) | Each | 90 | 50 | 100 | 50 | $ - 0 | |||||
| 9-28 | 62-780 FAC Table E Compounds (Other Petroleum) | Each | 90 | 50 | 100 | 50 | $ - 0 | |||||
| SECTION 9, SUBTOTAL | $ - 0 |
| Section 10, ANALYTICAL (METALS) | Solid Matrix | Solid Matrix | Liquid Matrix | Liquid Matrix | ||||||||
| No. | Parameter Group | Unit of Measure | ESTIMATED | X Standard Unit Rate | ESTIMATED | ESTIMATED | X Standard Unit Rate | ESTIMATED | X Rush Unit | |||
| Rate | = TOTAL | |||||||||||
| 10-1 | Aluminum | Each | 30 | 15 | 30 | 15 | $ - 0 | |||||
| 10-2 | Arsenic | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-3 | Barium | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-4 | Beryllium | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-5 | Boron | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-6 | Cadmium | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-7 | Calcium | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-8 | Chromium | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-9 | Chromium (Hexavalent) | Each | 100 | 50 | 100 | 50 | $ - 0 | |||||
| 10-10 | Cobalt | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-11 | Copper | Each | 30 | 15 | 30 | 15 | $ - 0 | |||||
| 10-12 | Iron | Each | 20 | 10 | 20 | 10 | $ - 0 | |||||
| 10-13 | Lead | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-14 | Magnesium | Each | 100 | 50 | 100 | 50 | $ - 0 | |||||
| 10-15 | Manganese | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-16 | Mercury | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-17 | Nickel | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-18 | Potassium | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-19 | Selenium | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-20 | Silver | Each | 400 | 250 | 500 | 250 | $ - 0 | |||||
| 10-21 | Sodium | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 10-22 | Zinc | Each | 80 | 50 | 100 | 50 | $ - 0 | |||||
| SECTION 10, SUBTOTAL | $ - 0 |
| Section 11, ANALYTICAL (OTHER) | Solid Matrix | Solid Matrix | Liquid Matrix | Liquid Matrix | ||||||||
| No. | Parameter Group | Unit of Measure | ESTIMATED | X Standard Unit Rate | ESTIMATED | X Rush Unit | ||||||
| Rate | ESTIMATED | X Standard Unit Rate | ESTIMATED | X Rush Unit | ||||||||
| Rate | = TOTAL | |||||||||||
| 11-1 | Total Solids | Each | 20 | 10 | 20 | 10 | $ - 0 | |||||
| 11-2 | Total Dissolved Solids | Each | 20 | 10 | 20 | 10 | $ - 0 | |||||
| 11-3 | Total Suspended Solids | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 11-4 | pH | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 11-5 | Total Organic Carbon | Each | 20 | 10 | 20 | 10 | $ - 0 | |||||
| 11-6 | Phenols (Total Colormetric) | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 11-7 | Ash Content | Each | 10 | 5 | 10 | 5 | $ - 0 | |||||
| 11-8 | EPA Method TO-18 (air) | Each | 20 | 10 | 20 | 10 | $ - 0 | |||||
| SECTION 11, SUBTOTAL | $ - 0 |
&"Arial,Bold"&16Exhibit C2 - Price Proposal Form
Sections 12-13
| No. | Section 12, TRANSPORTATION & DISPOSAL (T&D) | Unit of Measure | ESTIMATED | X UNIT RATE | = TOTAL |
| 12-1 | T&D - Contaminated Material Non-Liquid/Non-Hazardous | Drum | 50 | $ - 0 | |
| 12-2 | T&D - Contaminated Material Non-Liquid/Non-Hazardous | Ton | 900 | $ - 0 | |
| 12-3 | T&D - Contaminated Liquid/Non-Hazardous | Drum | 50 | $ - 0 | |
| 12-4 | T&D - Contaminated Liquid /Non-Hazardous | Gallon | 9500 | $ - 0 | |
| 12-5 | T&D - Non-Petroleum/Non-Hazardous Solid Waste containing material to a Class I Landfill | Ton | 1500 | $ - 0 | |
| SECTION 12, SUBTOTAL | $ - 0 |
| No. | Section 13, BRIDGE TESTING | Unit of Measure | ESTIMATED | X UNIT RATE | = TOTAL |
| Small Bridges less than 50Ft | |||||
| 13-1 | Concrete Bridge Asbestos Testing (1-4 & 6) | linear Foot | 50 | $ - 0 | |
| 13-2 | Steel Bridge (Asbestos & Heavy Metals) w/1-6 | linear Foot | 50 | $ - 0 | |
| 13-3 | Steel Bridge (Heavy Metals) w/ 1-5 | linear Foot | 50 | $ - 0 | |
| Medium Bridges >50Ft up to <= 200ft | |||||
| 13-4 | Concrete Bridge Asbestos Testing (1-4 & 6) | linear Foot | 150 | $ - 0 | |
| 13-5 | Steel Bridge (Asbestos & Heavy Metals) w/1-6 | linear Foot | 150 | $ - 0 | |
| 13-6 | Steel Bridge (Heavy Metals) w/ 1-5 | linear Foot | 150 | $ - 0 | |
| Medium Bridges >200Ft up to <= 500ft | |||||
| 13-7 | Concrete Bridge Asbestos Testing (1-4 & 6) | linear Foot | 500 | $ - 0 | |
| 13-8 | Steel Bridge (Asbestos & Heavy Metals) w/1-6 | linear Foot | 500 | $ - 0 | |
| 13-9 | Steel Bridge (Heavy Metals) w/ 1-5 | linear Foot | 500 | $ - 0 | |
| Large Bridges > 500Ft to <= 1000ft | |||||
| 13-10 | Concrete Bridge Asbestos Testing (1-4 & 6) | linear Foot | 1200 | $ - 0 | |
| 13-11 | Steel Bridge (Asbestos & Heavy Metals) w/1-6 | linear Foot | 1200 | $ - 0 | |
| 13-12 | Steel Bridge (Heavy Metals) w/ 1-5 | linear Foot | 1200 | $ - 0 | |
| XLarge Bridges > 1000Ft to <= 2000ft | |||||
| 13-13 | Concrete Bridge Asbestos Testing (1-4 & 6) | linear Foot | 2000 | $ - 0 | |
| 13-14 | Steel Bridge (Asbestos & Heavy Metals) w/1-6 | linear Foot | 2000 | $ - 0 | |
| 13-15 | Steel Bridge (Heavy Metals) w/ 1-5 | linear Foot | 2000 | $ - 0 | |
| XXLarge Bridges > 2000Ft | |||||
| 13-16 | Concrete Bridge Asbestos Testing (1-4 & 6) | linear Foot | 3200 | $ - 0 | |
| 13-17 | Steel Bridge (Asbestos & Heavy Metals) w/1-6 | linear Foot | 3200 | $ - 0 | |
| 13-18 | Steel Bridge (Heavy Metals) w/ 1-5 | linear Foot | 3200 | $ - 0 | |
| SECTION 13, SUBTOTAL | $ - 0 |
&"Arial,Bold"&16Exhibit C2 - Price Proposal Form
Summary
| SECTION NO. | CATEGORY | SUBTOTAL OF EACH SECTION |
| SECTION 1 | DIRECT LABOR & FIELD OPERATIONS* | $ - 0 |
| SECTION 2 | EQUIPMENT - VEHICLES* | $ - 0 |
| SECTION 3 | SAMPLING AND TREATMENT EQUIPMENT* | $ - 0 |
| SECTION 4 | DRILLING* | $ - 0 |
| SECTION 5 | ON-SITE RECOVERY AND TREATMENT EQUIPMENT* | $ - 0 |
| SECTION 6 | CONSTRUCTION / EXCAVATION AND HEAVY EQUIPMENT* | $ - 0 |
| SECTION 7 | MISCELLANEOUS - EQUIPMENT* | $ - 0 |
| SECTION 8 | EXPENDABLES* | $ - 0 |
| SECTION 9 | ANALYTICAL* | $ - 0 |
| SECTION 10 | ANALYTICAL (METALS)* | $ - 0 |
| SECTION 11 | ANALYTICAL (OTHER)* | $ - 0 |
| SECTION 12 | TRANSPORTATION & DISPOSAL (T&D) | $ - 0 |
| SECTION 13 | BRIDGE TESTING | $ - 0 |
| GRAND TOTAL - (Proposer's Price) | $ - 0 |
MFMP TRANSACTION FEE: All payments to the Vendor in response to this competitive solicitation WILL be subject to the MFMP Transaction Fee in accordance with the attached Form PUR 1000 General Contract Condition # 14. The Transaction Fee imposed shall be based upon the date of issuance of the payment.
NOTE: In submitting a response, the bidder acknowledges they have read and agree to the solicitation terms and conditions and their submission is made in conformance with those terms and conditions. Execution of this Agreement does not guarantee that the work will be authorized. The Department reserves the right to assign and remove Work Items from the project. The Department will select and assign Work Items after a Vendor is selected, based on the Evaluation Criteria specified in the Request for Proposal, and awarded the Contract. In submitting a response, the bidder acknowledges they have read and agree to the solicitation terms and conditions and their submission is made in conformance with those terms and conditions.
ACKNOWLEDGEMENT: I certify that I have read and agree to abide by all terms and conditions of this solicitation and that I am authorized to sign for the bidder. I certify that the response submitted is made in conformance with all requirements of the solicitation.
Bidder: ______________________________________________________________ Address: _____________________________________________________________ City, State, Zip: _______________________________________________________ Phone #: ___________________________________ Fax #: __________________ E-mail: _____________________________________ FEID# __________________ Authorized Signature: __________________________ Date: _________________ Print/Type: ___________________________________ Title: _________________