6-Exhibit C.2 Project Descriptions Off Campus.docx

DOCX document 190 KB Posted

Attached to
Activation & Occupancy Planner
Solicitation number
950-09-25-021
Issued by
El Paso County, El Paso City, Texas

About this file

This document is Exhibit C.2 - Project Descriptions for the University Medical Center of El Paso (UMC) 2025 General Obligation Implementation Program. The exhibit details six distinct off-campus healthcare facility expansion and construction projects in El Paso, Texas. These projects include: 1) a Physical Therapy Addition at the East Clinic, 2) a new 50,000 square foot Central Health Clinic & Urgent Care facility at Raynolds Street and Gateway Blvd. West, 3) a 35-exam room Horizon Health Center, 4) a West Side Ambulatory Surgery facility of approximately 30,000 square feet with four operating rooms and two procedure rooms, 5) a 10,000 square foot West Side Emergency Department and Urgent Care, and 6) a 10,000 square foot Horizon Emergency Department with CT, X-Ray, and laboratory capabilities.

The document is part of a Request for Qualifications seeking an Activation and Occupancy Planner to support the UMC 2025 Bond Implementation Projects. The selected firm will work under the direction of the Assistant Administrator of Planning Design and Construction and will be chosen based on providing the best value to UMC through an evaluation process. The project appears to be funded through a general obligation bond, with the intent of expanding and improving medical service capacity across multiple clinic and emergency care sites in the El Paso region. The comprehensive plan demonstrates a strategic approach to healthcare infrastructure development, focusing on expanding examination, urgent care, surgical, and emergency medical capabilities across different locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit C.2 – Project Descriptions – Off Campus University Medical Center of El Paso 2025 UMC General Obligation Implementation Program

1. UMC East Physical Therapy Addition Project Description: Expand East Clinic to include Physical Rehabilitation area similar to UMC West Clinic

2. Central Health Clinic & Urgent Care Project Description: New +/-50,000 SF Out-Patient Clinic similar to UMC East/UMC West which could include approximately 50 Exam Rooms, 15 Urgent Care, Imaging, Pharmacy and Laboratory. Clinic to be located on land currently owned by UMC at the intersection of Raynolds Street and Gateway Blvd. West (I-10).

3. Horizon Health Center Project Description: 35 Exam Room Clinic, 15 Urgent Care, Imaging, Pharmacy and Laboratory (similar in concept to UMC East and UMC West) to be located after land location and acquisition is determined.

4. West Side Ambulatory Surgery Project Description: Approximately 30,000 facility consisting of four Operating Rooms, two Procedure (Endoscopy) Rooms and two future Technology Rooms. Existing UMC West was designed to accommodate expansion as shown below.

5. West Side ED and Urgent Care Project Description: 10,000 SF ED with Treatment, Triage and Urgent Care (Share CT and X-Ray with West Clinic). Project to be designed in conjunction with West Side Ambulatory Surgery.

6. Horizon ED Project Description: 10,000 SF ED with Treatment, Triage and Urgent Care with CT and X-Ray and Lab image1.png