This is a prevailing wage determination document (General Decision Number CA20260026, effective 05/18/2026) issued by the U.S. Department of Labor for federal construction contracts in San Bernardino County, California. The determination establishes mandatory minimum wage rates and fringe benefits for various construction trades and labor classifications applicable to Building, Heavy and Highway, and Dredging construction projects in the specified geographic area.

The wage determination lists hourly rates and fringe benefit amounts for approximately 50+ trade classifications, including carpenters, electricians, plumbers, ironworkers, heavy equipment operators, laborers, and specialized trades such as asbestos workers, divers, and cement masons. Rates vary significantly by specific job classification and work type; for example, carpenter rates range from $45.37 to $52.37 per hour depending on specialization, while some power equipment operator classifications exceed $70 per hour. The document includes special premium pay provisions for work at military bases (Fort Irwin, Edwards AFB, 29 Palms Marine Base, Vandenberg AFB, and others), with $2.00-$3.00 per hour additional compensation. Additional footnotes specify supplemental pay for hazardous work, tunnel work, and work at elevated heights or with specialized equipment. The determination notes that Executive Order 13706 regarding paid sick leave and Executive Order 13658 minimum wage requirements of $13.65 per hour apply to covered federal contracts. Unlisted classifications may be added after contract award through labor standards procedures, and the document includes detailed wage appeals processes through the Department of Labor's Wage and Hour Division and Administrative Review Board.

View the file

Other files

File Type Posted
A00003 - RFI Responses.pdf PDF
A00002 - RFI Responses.pdf PDF
A00001 - Site Visit Information.pdf PDF
1. Statement of Work.pdf PDF
2. Schedule of Items.docx DOCX document
4.1 Project Specifications - 1N17.pdf PDF
4.2 Project Specifications - 1N02 & 1N05.pdf PDF
4.3 ERFO Map.pdf PDF
7. Contract Administration Information.pdf PDF
4. FP-14 - Standard Specifications.pdf PDF
5. Fire Plan.pdf PDF
127EAW26Q0042 - Tropical Storm Hilary Road Damage.pdf PDF
3. Road Plans - 1N17.pdf PDF
3.1 Road Plans - 1N02 & 1N05.pdf PDF
8. RFI Form.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: CA20260026 05/18/2026

State: California

Construction Types: Building, Heavy and Highway

Counties: California Counties of San Bernardino

Building Construction Projects Dredging Projects-Includes Dredging Projects (does not include hopper dredge work) Heavy Construction Projects (excludes water well drilling) Highway Construction Projects

Modification Number Publication Date 2 01/23/2026 3 05/18/2026

ASBE0005-002 07/01/2024

Rates Fringes

ASBESTOS WORKERS/INSULATOR (INCLUDES THE

APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE

COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF

MECHANICAL SYSTEMS).................................$ 56.32 26.52

FIRE STOP TECHNICIAN (APPLICATION OF FIRESTOPPING

MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN

WALLS, FLOORS, CEILINGS AND CURTAIN WALLS)..........$ 39.94 20.65

ASBE0005-002 09/01/2024

Rates Fringes

ASBESTOS WORKERS/INSULATOR (INCLUDES THE

APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE

COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF

MECHANICAL SYSTEMS).................................$ 56.32 26.52

FIRE STOP TECHNICIAN (APPLICATION OF FIRESTOPPING

MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN

WALLS, FLOORS, CEILINGS AND CURTAIN WALLS)..........$ 39.94 20.65

ASBE0005-004 07/04/2022

Rates Fringes

ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION, WETTING, STRIPPING,

REMOVAL, SCRAPPING, VACUUMING, BAGGING AND

DISPOSING OF ALL INSULATION MATERIALS FROM

MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS

OR NOT).............................................$ 23.52 13.37

BOIL0092-003 01/01/2024

Rates Fringes

BOILERMAKER.........................................$ 51.98 42.11

6/24/26, 12:15 PM SAM.gov https://sam.gov/wage-determination/CA20260026/3 1/28

BRCA0004-011 05/01/2024

Rates Fringes

BRICKLAYER; MARBLE SETTER *THE WAGE SCALE FOR

PREVAILING WAGE PROJECTS PERFORMED IN BLYTHE, CHINA

LAKE, DEATH VALLEY, FORT IRWIN, TWENTY-NINE PALMS,

NEEDLES AND 1-15 CORRIDOR (BARSTOW TO THE NEVADA

STATE LINE) WILL BE THREE DOLLARS ($3.00) ABOVE THE

STANDARD SAN BERNARDINO/RIVERSIDE COUNTY HOURLY

WAGE RATE...........................................$ 45.53 20.29

BRCA0018-004 06/01/2024

Rates Fringes

TILE LAYER..........................................$ 51.82 19.32

TILE FINISHER.......................................$ 37.96 13.77

MARBLE FINISHER.....................................$ 43.38 15.36

BRCA0018-010 09/01/2024

Rates Fringes

TERRAZZO WORKER/SETTER..............................$ 49.62 15.26

TERRAZZO FINISHER...................................$ 42.11 14.67

CARP0213-001 07/01/2025

Rates Fringes

CARPENTER: (7) TABLE POWER SAW OPERATOR

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF

OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN

WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION

WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED

HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST

WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE

FOR BACK FORMS (WHICH WORK IS PERFORMED BY

PILEDRIVERS): $0.13 PER HOUR ADDITIONAL.............$ 52.34 26.18

CARPENTER: (6) SCAFFOLD BUILDER FOOTNOTE: WORK

OF FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS

OR STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL

LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS

DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT

PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE

IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS

(WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER

HOUR ADDITIONAL.....................................$ 45.37 25.43

CARPENTER: (5) SAWFILER FOOTNOTE: WORK OF

FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR

STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL

LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS

DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT

PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE

IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS

(WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER

HOUR ADDITIONAL.....................................$ 52.34 26.18

CARPENTER: (4) PNEUMATIC NAILER, POWER STAPLER

FOOTNOTE: WORK OF FORMING IN THE CONSTRUCTION OF

OPEN CUT SEWERS OR STORM DRAINS, ON OPERATIONS IN

WHICH HORIZONTAL LAGGING IS USED IN CONJUNCTION

WITH STEEL H-BEAMS DRIVEN OR PLACED IN PRE- DRILLED

HOLES, FOR THAT PORTION OF A LAGGED TRENCH AGAINST

WHICH CONCRETE IS POURED, NAMELY, AS A SUBSTITUTE

FOR BACK FORMS (WHICH WORK IS PERFORMED BY

PILEDRIVERS): $0.13 PER HOUR ADDITIONAL.............$ 52.37 26.18

CARPENTER: (3) PILEDRIVERMEN/DERRICK BARGEMAN,

BRIDGE OR DOCK CARPENTER, HEAVY FRAMER, ROCK

BARGEMAN OR SCOWMAN, ROCKSLINGER, SHINGLER

https://sam.gov/wage-determination/CA20260026/3 2/28

(COMMERCIAL) FOOTNOTE: WORK OF FORMING IN THE

CONSTRUCTION OF OPEN CUT SEWERS OR STORM DRAINS, ON

OPERATIONS IN WHICH HORIZONTAL LAGGING IS USED IN

CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR PLACED IN

PRE- DRILLED HOLES, FOR THAT PORTION OF A LAGGED

TRENCH AGAINST WHICH CONCRETE IS POURED, NAMELY, AS

A SUBSTITUTE FOR BACK FORMS (WHICH WORK IS

PERFORMED BY PILEDRIVERS): $0.13 PER HOUR

ADDITIONAL. .......................................$ 52.37 26.18

CARPENTER: (2) MILLWRIGHT FOOTNOTE: WORK OF

FORMING IN THE CONSTRUCTION OF OPEN CUT SEWERS OR

STORM DRAINS, ON OPERATIONS IN WHICH HORIZONTAL

LAGGING IS USED IN CONJUNCTION WITH STEEL H-BEAMS

DRIVEN OR PLACED IN PRE- DRILLED HOLES, FOR THAT

PORTION OF A LAGGED TRENCH AGAINST WHICH CONCRETE

IS POURED, NAMELY, AS A SUBSTITUTE FOR BACK FORMS

(WHICH WORK IS PERFORMED BY PILEDRIVERS): $0.13 PER

HOUR ADDITIONAL.....................................$ 52.24 26.68

CARPENTER: (1) CARPENTER, CABINET INSTALLER,

INSULATION INSTALLER, HARDWOOD FLOOR WORKER AND

ACOUSTICAL INSTALLER FOOTNOTE: WORK OF FORMING

IN THE CONSTRUCTION OF OPEN CUT SEWERS OR STORM

DRAINS, ON OPERATIONS IN WHICH HORIZONTAL LAGGING

IS USED IN CONJUNCTION WITH STEEL H-BEAMS DRIVEN OR

PLACED IN PRE- DRILLED HOLES, FOR THAT PORTION OF A

LAGGED TRENCH AGAINST WHICH CONCRETE IS POURED,

NAMELY, AS A SUBSTITUTE FOR BACK FORMS (WHICH WORK

IS PERFORMED BY PILEDRIVERS): $0.13 PER HOUR

ADDITIONAL..........................................$ 52.24 26.18

CARP0213-002 07/01/2025

Rates Fringes

DIVER: (4) ASSISTANT TENDER AMOUNTS IN ""RATES'

COLUMN ARE PER DAY..................................$ 418.96 26.18

DIVER: (3) TENDER AMOUNTS IN ""RATES' COLUMN ARE

PER DAY.............................................$ 442.96 26.18

DIVER: (2) STANDBY AMOUNTS IN ""RATES' COLUMN ARE

PER DAY.............................................$ 450.96 26.18

DIVER: (1) WET AMOUNTS IN ""RATES' COLUMN ARE PER

DAY.................................................$ 901.92 26.18

CARP0213-004 07/01/2025

Rates Fringes

DRYWALL (STOCKER/SCRAPPER)..........................$ 21.45 11.27

DRYWALL (DRYWALL INSTALLER/LATHER)..................$ 52.24 26.18

CARP0721-001 07/01/2025

Rates Fringes

MODULAR FURNITURE INSTALLER.........................$ 25.00 13.06

ELEC0440-004 12/31/2024

Rates Fringes

COMMUNICATIONS SYSTEM: INSTALLER COMMUNICATIONS

AND SYSTEMS WORK SCOPE OF WORK: INSTALLATION,

TESTING, SERVICE AND MAINTENANCE OF SYSTEMS

UTILIZING THE TRANSMISSION AND/OR TRANSFERENCE OF

VOICE, SOUND, VISION AND DIGITAL FOR COMMERCIAL,

EDUCATIONAL, SECURITY AND ENTERTAINMENT PURPOSES

FOR THE FOLLOWING: TV MONITORING AND SURVEILLANCE,

BACKGROUND-FOREGROUND MUSIC, INTERCOM AND TELEPHONE

INTERCONNECT, INVENTORY CONTROL SYSTEMS, MICROWAVE

https://sam.gov/wage-determination/CA20260026/3 3/28

TRANSMISSION, MULTI-MEDIA, MULTIPLEX, NURSE CALL

SYSTEMS, RADIO PAGE, SCHOOL INTERCOM AND SOUND,

BURGLAR ALARMS, FIRE ALARMS, AND LOW VOLTAGE MASTER

CLOCK SYSTEMS IN COMMERCIAL BUILDINGS.

COMMUNICATION SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE

INTRINSIC TO THE ABOVE LISTED SYSTEMS; INCLUSION OR

EXCLUSION OF TERMINATIONS AND TESTINGS OF

CONDUCTORS DETERMINED BY THEIR FUNCTION; EXCLUDING

ALL OTHER DATA SYSTEMS OR MULTIPLE SYSTEMS WHICH

INCLUDE CONTROL FUNCTION OR POWER SUPPLY; EXCLUDING

INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS,

LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS.

DOES NOT COVER WORK PERFORMED AT CHINA LAKE NAVAL

ORDNANCE TEST STATION...............................$ 45.23 20.47

ELEC0477-002 06/01/2024

Rates Fringes

ELECTRICIAN: CABLE SPLICER: $1.50 PER HOUR ABOVE

ELECTRICIAN RATE. TUNNEL WORK: 10% ABOVE

ELECTRICIAN RATE. ZONE PAY: ZONE A - 80 ROAD

MILES FROM POST OFFICE, 455 ORANGE SHOW LANE, SAN

BERNARDINO, WILL BE A FREE ZONE FOR ALL CONTRACTORS

ZONE B - ANY WORK PERFORMED OUTSIDE ZONE A'S 80

ROAD MILES, SHALL ADD $12.00 PER HOUR TO THE

CURRENT WAGE SCALE..................................$ 53.15 29.07

ELEC1245-001 01/01/2025

Rates Fringes

LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW

YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,

THANKSGIVING DAY AND DAY AFTER THANKSGIVING,

CHRISTMAS DAY.......................................$ 40.76 21.76

LINE CONSTRUCTION: (2) EQUIPMENT SPECIALIST

(OPERATES CRAWLER TRACTORS, COMMERCIAL MOTOR

VEHICLES, BACKHOES, TRENCHERS, CRANES (50 TONS AND

BELOW), OVERHEAD & UNDERGROUND DISTRIBUTION LINE

EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING

DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

VETERANS DAY, THANKSGIVING DAY AND DAY AFTER

THANKSGIVING, CHRISTMAS DAY.........................$ 53.30 22.26

LINE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER

HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL

DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,

THANKSGIVING DAY AND DAY AFTER THANKSGIVING,

CHRISTMAS DAY.......................................$ 70.16 24.71

ELEV0018-001 01/01/2025

Rates Fringes

ELEVATOR MECHANIC FOOTNOTE: A. PAID VACATION:

EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS

VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5

YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF

SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER

THANKSGIVING, AND CHRISTMAS DAY.....................$ 69.43 38.44

ENGI0012-004 08/01/2025

Rates Fringes https://sam.gov/wage-determination/CA20260026/3 4/28

OPERATOR, POWER EQUIPMENT: (6) BARGE MATE

(DREDGING)..........................................$ 61.34 40.95

OPERATOR, POWER EQUIPMENT: (5) FIREMAN-OILER,

DECKHAND, BARGEMAN, LEVEEHAND (DREDGING)............$ 60.73 40.95

OPERATOR, POWER EQUIPMENT: (4) WINCH OPERATOR

(STERN WINCH ON DREDGE) (DREDGING)..................$ 61.27 40.95

OPERATOR, POWER EQUIPMENT: (3) DECKMATE (DREDGING)..$ 61.82 40.95

OPERATOR, POWER EQUIPMENT: (2) DREDGE DOZER

(DREDGING)..........................................$ 61.93 40.95

OPERATOR, POWER EQUIPMENT: (1) LEVERMAN (DREDGING)..$ 67.90 40.95

ENGI0012-024 07/01/2025

Rates Fringes

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 7-

Tunnel mole boring machine operator PREMIUM PAY:

$10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator......................$ 66.91 33.20

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 6-

Heavy Duty Repairman PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional.

Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator............................................$ 66.79 33.20

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 5-

Backhoe operator (up to and including 3/4 yd.);

Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator;

Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator;

Tractor compressor drill combination operator;

Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional.

Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator............................................$ 66.68 33.20

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 4-

https://sam.gov/wage-determination/CA20260026/3 5/28

Bit sharpener; Equipment greaser (grease truck);

Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons) PREMIUM PAY:

$10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator......................$ 66.46 33.20

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 3-

Dinkey locomotive or motorperson (up to and including 10 tons) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional.

Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator............................................$ 66.32 33.20

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 2-

Power-driven jumbo form setter operator PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator......................$ 66.03 33.20

OPERATOR: POWER EQUIPMENT, TUNNEL WORK: GROUP 1-

Skiploader (wheel type up to 3/4 yd. without attachment) PREMIUM PAY: $10.00 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment:

$2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator......$ 65.25 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 13 Crane operator (over 300 tons);

Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)............................$ 70.75 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 12- Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge https://sam.gov/wage-determination/CA20260026/3 6/28 operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 69.75 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 11- Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) ; Tower crane operator and tower gantry

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 68.75 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 10- Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.) PREMIUM PAY: $10.00 PER HOUR SHALL

BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.75 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 9 Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

https://sam.gov/wage-determination/CA20260026/3 7/28

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.75 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 8 Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.) PREMIUM PAY: $10.00 PER HOUR SHALL BE

PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.58 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 7 PEDESTAL CRANE OPERATOR; SHOVEL,

BACKHOE, DRAGLINE, CLAMSHELL OPERATOR (OVER 5 CU.

YDS. MRC); TOWER CRANE REPAIR; TUGGER HOIST

OPERATOR (3 DRUM) PREMIUM PAY: $10.00 PER HOUR

SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK

ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL

RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY

NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE,

MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29

PALMS MARINE BASE AND CAMP PENDLETON WORKERS

REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 66.41 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 6 Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types);

Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc);

Tugger hoist operator PREMIUM PAY: $10.00 PER

HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR

WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE

NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

https://sam.gov/wage-determination/CA20260026/3 8/28

OPERATOR............................................$ 66.29 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 5 HYDRAULIC BOOM TRUCK; STINGER

CRANE (AUSTIN-WESTERN OR SIMILAR TYPE); TUGGER

HOIST OPERATOR (1 DRUM) PREMIUM PAY: $10.00 PER

HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR

WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE

NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 66.18 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 4- Bridge-type unloader and turntable operator; Helicopter hoist operator

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 65.96 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 3- A-frame or winch truck operator; Ross carrier operator (jobsite)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 65.82 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 2- Truck crane oiler PREMIUM PAY:

$10.00 PER HOUR SHALL BE PAID ON ALL POWER

EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY

BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB,

POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO

ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE

YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP

PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK

IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR

ADDITIONAL. COMBINATION MIXER AND COMPRESSOR

OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A

CONCRETE MOBILE MIXER OPERATOR......................$ 65.53 33.20

OPERATOR: POWER EQUIPMENT, CRANES, PILEDRIVING &

HOISTING: GROUP 1- Engineer oiler; Fork lift operator (includes loed, lull or similar types)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

https://sam.gov/wage-determination/CA20260026/3 9/28

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR.

...........................................$ 64.75 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

25- CONCRETE PUMP OPERATOR-TRUCK MOUNTED;

RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL

SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND

SIMILAR TYPE, OVER 50 CU. YDS. STRUCK); SPYDER

EXCAVATOR OPERATOR, WITH ALL ATTACHMENTS

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR. $ 68.08 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

24- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL

SYSTEM (SINGLE ENGINE, OVER 50 YDS. STRUCK);

RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL

SYSTEM (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND

SIMILAR, OVER 25 YDS. AND UP TO 50 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.91 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

23- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL

SYSTEM (SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY

WAGON AND SIMILAR TYPES WITH ANY AND ALL

ATTACHMENTS OVER 25 YDS. AND UP TO AND INCLUDING 50

YDS. STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT

OPERATOR, OPERATING WITH THE TANDEM PUSH-PULL

SYSTEM (MULTIPLE ENGINE, UP TO AND INCLUDING 25

YDS. STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL

BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.79 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

https://sam.gov/wage-determination/CA20260026/3 10/28

22- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH THE TANDEM PUSH-PULL

SYSTEM (SINGLE ENGINE, UP TO AND INCLUDING 25 YDS.

STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE

PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.68 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

21- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND

SIMILAR TYPES IN ANY COMBINATION, EXCLUDING

COMPACTION UNITS - MULTIPLE ENGINE, EUCLID,

CATERPILLAR AND SIMILAR TYPE, OVER 50 CU. YDS.

STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE

PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.58 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

2-0 RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND

SIMILAR TYPES IN ANY COMBINATION, EXCLUDING

COMPACTION UNITS - SINGLE ENGINE, OVER 50 YDS.

STRUCK); RUBBER-TIRED EARTH-MOVING EQUIPMENT

OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY

DUMPS, AND SIMILAR TYPES IN ANY COMBINATION,

EXCLUDING COMPACTION UNITS - MULTIPLE ENGINE,

EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND

UP TO 50 YDS. STRUCK) PREMIUM PAY: $10.00 PER

HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR

WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE

NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 67.41 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

19- ROTEX CONCRETE BELT OPERATOR (OR SIMILAR

TYPES); RUBBER-TIRED EARTH-MOVING EQUIPMENT

OPERATOR, OPERATING IN TANDEM (SCRAPERS, BELLY

DUMPS AND SIMILAR TYPES IN ANY COMBINATION,

EXCLUDING COMPACTION UNITS - SINGLE ENGINE,

CATERPILLAR, EUCLID, ATHEY WAGON AND SIMILAR TYPES

WITH ANY AND ALL ATTACHMENTS OVER 25 YDS.AND UP TO

AND INCLUDING 50 CU. YDS. STRUCK); RUBBER-TIRED

EARTH-MOVING EQUIPMENT OPERATOR, OPERATING IN

TANDEM (SCRAPERS, BELLY DUMPS AND SIMILAR TYPES IN

ANY COMBINATION, EXCLUDING COMPACTION UNITS -

https://sam.gov/wage-determination/CA20260026/3 11/28

MULTIPLE ENGINE, UP TO AND INCLUDING 25 YDS.

STRUCK) PREMIUM PAY: $10.00 PER HOUR SHALL BE

PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 67.29 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

18- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING IN TANDEM (SCRAPERS, BELLY DUMPS AND

SIMILAR TYPES IN ANY COMBINATION, EXCLUDING

COMPACTION UNITS - SINGLE ENGINE, UP TO AND

INCLUDING 25 YDS. STRUCK) PREMIUM PAY: $10.00 PER

HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR

WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE

NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 67.18 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

17- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE

ENGINE, EUCLID, CATERPILLAR AND SIMILAR, OVER 50

CU. YDS. STRUCK); TANDEM TRACTOR OPERATOR

(OPERATING CRAWLER TYPE TRACTORS IN TANDEM - QUAD 9

AND SIMILAR TYPE) PREMIUM PAY: $10.00 PER HOUR

SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK

ON THE FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL

RESERVE, VANDENBERG AFB, POINT ARGUELLO, SEELY

NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE BASE,

MARINE CORP LOGISTICS BASE YERMO, EDWARDS AFB, 29

PALMS MARINE BASE AND CAMP PENDLETON WORKERS

REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 67.08 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

16- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE

ENGINE, OVER 50 YDS. STRUCK); RUBBER-TIRED

EARTH-MOVING EQUIPMENT OPERATOR, OPERATING

EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE ENGINE,

EUCLID, CATERPILLAR AND SIMILAR, OVER 25 YDS. AND

UP TO 50 YDS. STRUCK) PREMIUM PAY: $10.00 PER

HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR

WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE

NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

https://sam.gov/wage-determination/CA20260026/3 12/28

OPERATOR............................................$ 66.91 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

15- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE

ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON AND

SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER 25

YDS. AND UP TO AND INCLUDING 50 YDS. STRUCK);

RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR,

OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (MULTIPLE

ENGINE-UP TO AND INCLUDING 25 YDS. STRUCK) PREMIUM

PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER

EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY

BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB,

POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO

ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE

YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP

PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK

IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR

ADDITIONAL. COMBINATION MIXER AND COMPRESSOR

OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A

CONCRETE MOBILE MIXER OPERATOR......................$ 66.79 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

14- CANAL LINER OPERATOR; CANAL TRIMMER OPERATOR;

REMOTE- CONTROL EARTH-MOVING EQUIPMENT OPERATOR

(OPERATING A SECOND PIECE OF EQUIPMENT: $1.00 PER

HOUR ADDITIONAL); WHEEL EXCAVATOR OPERATOR (OVER

750 CU. YDS.) PREMIUM PAY: $10.00 PER HOUR SHALL

BE PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.71 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

13- RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR

OPERATING EQUIPMENT WITH PUSH-PULL SYSTEM (SINGLE

ENGINE, UP TO AND INCLUDING 25 YDS. STRUCK)

PREMIUM PAY: $10.00 PER HOUR SHALL BE PAID ON ALL

POWER EQUIPMENT OPERATOR WORK ON THE FOLLOWNG

MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.68 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

12- AUTO GRADER OPERATOR; AUTOMATIC SLIP FORM

OPERATOR; DRILLING MACHINE OPERATOR, BUCKET OR

AUGER TYPES (CALWELD, AUGER 200 CA OR SIMILAR TYPES

- WATSON, AUGER 6000 OR SIMILAR TYPES - HUGHES

SUPER DUTY, AUGER 200 OR SIMILAR TYPES - DRILLING

DEPTH OF 175' MAXIMUM); HOE RAM OR SIMILAR WITH

COMPRESSOR; MASS EXCAVATOR OPERATOR LESS THA 750

CU. YARDS; MECHANICAL FINISHING MACHINE OPERATOR;

MOBILE FORM TRAVELER OPERATOR; MOTOR PATROL

OPERATOR (MULTI-ENGINE); PIPE MOBILE MACHINE

OPERATOR; RUBBER-TIRED EARTH- MOVING EQUIPMENT

OPERATOR (MULTIPLE ENGINE, EUCLID, CATERPILLAR AND

https://sam.gov/wage-determination/CA20260026/3 13/28

SIMILAR TYPE, OVER 50 CU. YDS. STRUCK);

RUBBER-TIRED SELF- LOADING SCRAPER OPERATOR

(PADDLE-WHEEL-AUGER TYPE SELF-LOADING - TWO (2) OR

MORE UNITS) PREMIUM PAY: $10.00 PER HOUR SHALL BE

PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.58 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

10- DRILLING MACHINE OPERATOR, BUCKET OR AUGER

TYPES (CALWELD 200 B BUCKET OR SIMILAR TYPES-WATSON

3000 OR 5000 AUGER OR SIMILAR TYPES-TEXOMA 900

AUGER OR SIMILAR TYPES-DRILLING DEPTH OF 105'

MAXIMUM); DUAL DRUM MIXER, DYNAMIC COMPACTOR LDC350

(OR SIMILAR TYPES); MONORAIL LOCOMOTIVE OPERATOR

(DIESEL, GAS OR ELECTRIC); MOTOR PATROL-BLADE

OPERATOR (SINGLE ENGINE); MULTIPLE ENGINE TRACTOR

OPERATOR (EUCLID AND SIMILAR TYPE-EXCEPT QUAD 9

CAT.); RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR

(SINGLE ENGINE, OVER 50 YDS. STRUCK); PNEUMATIC

PIPE RAMMING TOOL AND SIMILAR TYPES; PRESTRESSED

WRAPPING MACHINE OPERATOR; RUBBER-TIRED

EARTH-MOVING EQUIPMENT OPERATOR (SINGLE ENGINE,

OVER 50 YDS. STRUCK); RUBBER TIRED EARTH MOVING

EQUIPMENT OPERATOR (MULTIPLE ENGINE, EUCLID,

CATERPILLAR AND SIMILAR OVER 25 YDS. AND UP TO 50

YDS. STRUCK), TOWER CRANE REPAIRMAN; TRACTOR LOADER

OPERATOR (CRAWLER AND WHEEL TYPE OVER 6-1/2 YDS.);

WOODS MIXER OPERATOR (AND SIMILAR PUGMILL

EQUIPMENT) PREMIUM PAY: $10.00 PER HOUR SHALL BE

PAID ON ALL POWER EQUIPMENT OPERATOR WORK ON THE

FOLLOWNG MILITARY BASES: CHINA LAKE NAVAL RESERVE,

VANDENBERG AFB, POINT ARGUELLO, SEELY NAVAL BASE,

FORT IRWIN, NEBO ANNEX MARINE BASE, MARINE CORP

LOGISTICS BASE YERMO, EDWARDS AFB, 29 PALMS MARINE

BASE AND CAMP PENDLETON WORKERS REQUIRED TO SUIT

UP AND WORK IN A HAZARDOUS MATERIAL ENVIRONMENT:

$2.00 PER HOUR ADDITIONAL. COMBINATION MIXER AND

COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE

CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR......$ 66.41 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

8- ASPHALT OR CONCRETE SPREADING OPERATOR (TAMPING

OR FINISHING); ASPHALT PAVING MACHINE OPERATOR

(BARBER GREENE OR SIMILAR TYPE); ASPHALT-RUBBER

DISTRIBUTION OPERATOR; BACKHOE OPERATOR (UP TO AND

INCLUDING 3/4 YD.), SMALL FORD, CASE OR SIMILAR

TYPES; CABLE BUNDLING MACHINE OPERATOR (EXCLUDING

HANDHELD); CABLE TRENCHING MACHINE OPERATOR (SPIDER

PLOW OR SIMILAR TYPES) CAST-IN-PLACE PIPE LAYING

MACHINE OPERATOR; COMBINATION MIXER AND COMPRESSOR

OPERATOR (GUNITE WORK); COMPACTOR OPERATOR

(SELF-PROPELLED); CONCRETE MIXER OPERATOR (PAVING);

CRUSHING PLANT OPERATOR; DRILL DOCTOR; DRILLING

MACHINE OPERATOR, BUCKET OR AUGER TYPES (CALWELD

150 BUCKET OR SIMILAR TYPES - WATSON 1500, 2000

2500 AUGER OR SIMILAR TYPES - TEXOMA 700, 800 AUGER

OR SIMILAR TYPES - DRILLING DEPTH OF 60' MAXIMUM);

ELEVATING GRADER OPERATOR; GRADE CHECKER; GRADALL

OPERATOR; GROUTING MACHINE OPERATOR; HEAVY-DUTY

https://sam.gov/wage-determination/CA20260026/3 14/28

REPAIRMAN; HEAVY EQUIPMENT ROBOTICS OPERATOR;

KALAMAZOO BALLISTE REGULATOR OR SIMILAR TYPE;

KOLMAN BELT LOADER AND SIMILAR TYPE; LE TOURNEAU

BLOB COMPACTOR OR SIMILAR TYPE; LOADER OPERATOR

(ATHEY, EUCLID, SIERRA AND SIMILAR TYPES); MOBARK

CHIPPER OR SIMILAR; OZZIE PADDER OR SIMILAR TYPES;

P.C. SLOT SAW; PNEUMATIC CONCRETE PLACING MACHINE

OPERATOR (HACKLEY-PRESSWELL OR SIMILAR TYPE);

PUMPCRETE GUN OPERATOR; RCM CEMENTING UNIT

OPERATOR, RAIL/SWITCH GRINDER OPERATOR (HARSCO OR

SIMILAR TYPES) ROCK DRILL OR SIMILAR TYPES;

ROTARY DRILL OPERATOR (EXCLUDING CAISSON TYPE);

RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR

(SINGLE ENGINE, CATERPILLAR, EUCLID, ATHEY WAGON

AND SIMILAR TYPES WITH ANY AND ALL ATTACHMENTS OVER

25 YDS. UP TO AND INCLUDING 50 CU. YDS. STRUCK);

RUBBER-TIRED EARTH-MOVING EQUIPMENT OPERATOR

(MULTIPLE ENGINE UP TO AND INCLUDING 25 YDS.

STRUCK); RUBBER-TIRED SCRAPER OPERATOR

(SELF-LOADING PADDLE WHEEL TYPE-JOHN DEERE, 1040

AND SIMILAR SINGLE UNIT); SELF- PROPELLED CURB AND

GUTTER MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER

OPERATOR (CRAWLER AND WHEEL TYPE OVER 1-1/2 YDS. UP

TO AND INCLUDING 6-1/2 YDS.); SOIL REMEDIATION

PLANT OPERATOR; SURFACE HEATERS AND PLANER

OPERATOR; TRACTOR COMPRESSOR DRILL COMBINATION

OPERATOR; TRACTOR OPERATOR (ANY TYPE LARGER THAN

D-5 - 100 FLYWHEEL H.P. AND OVER, OR

SIMILAR-BULLDOZER, TAMPER, SCRAPER AND PUSH TRACTOR

SINGLE ENGINE); TRACTOR OPERATOR (BOOM

ATTACHMENTS), TRAVELING PIPE WRAPPING, CLEANING AND

BENDNG MACHINE OPERATOR; TRENCHING MACHINE OPERATOR

(OVER 6 FT. DEPTH CAPACITY, MANUFACTURER'S RATING);

TRENCHING MACHINE WITH ROAD MINER ATTACHMENT (OVER

6 FT DEPTH CAPACITY): ULTRA HIGH PRESSURE WATERJET

CUTTING TOOL SYSTEM MECHANIC; WATER PULL

(COMPACTION) OPERATOR PREMIUM PAY: $10.00 PER

HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR

WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE

NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 66.29 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

6- ARTICULATING MATERIAL HAULER; ASPHALT PLANT

ENGINEER; BATCH PLANT OPERATOR; BIT SHARPENER;

CONCRETE JOINT MACHINE OPERATOR (CANAL AND SIMILAR

TYPE); CONCRETE PLANER OPERATOR; DANDY DIGGER; DECK

ENGINE OPERATOR; DERRICKMAN (OILFIELD TYPE);

DRILLING MACHINE OPERATOR, BUCKET OR AUGER TYPES

(CALWELD 100 BUCKET OR SIMILAR TYPES - WATSON 1000

AUGER OR SIMILAR TYPES - TEXOMA 330, 500 OR 600

AUGER OR SIMILAR TYPES - DRILLING DEPTH OF 45'

MAXIMUM); DRILLING MACHINE OPERATOR; HYDROGRAPHIC

SEEDER MACHINE OPERATOR (STRAW, PULP OR SEED),

JACKSON TRACK MAINTAINER, OR SIMILAR TYPE;

KALAMAZOO SWITCH TAMPER, OR SIMILAR TYPE; MACHINE

TOOL OPERATOR; MAGINNIS INTERNAL FULL SLAB

VIBRATOR, MECHANICAL BERM, CURB OR GUTTER(CONCRETE

OR ASPHALT); MECHANICAL FINISHER OPERATOR

https://sam.gov/wage-determination/CA20260026/3 15/28

(CONCRETE, CLARY-JOHNSON-BIDWELL OR SIMILAR); MICRO

TUNNEL SYSTEM (BELOW GROUND); PAVEMENT BREAKER

OPERATOR (TRUCK MOUNTED); ROAD OIL MIXING MACHINE

OPERATOR; ROLLER OPERATOR (ASPHALT OR FINISH),

RUBBER-TIRED EARTH MOVING EQUIPMENT (SINGLE ENGINE,

UP TO AND INCLUDING 25 YDS. STRUCK); SELF-PROPELLED

TAR PIPELINING MACHINE OPERATOR; SKIPLOADER

OPERATOR (CRAWLER AND WHEEL TYPE, OVER 3/4 YD. AND

UP TO AND INCLUDING 1-1/2 YDS.); SLIP FORM PUMP

OPERATOR (POWER DRIVEN HYDRAULIC LIFTING DEVICE FOR

CONCRETE FORMS); TRACTOR OPERATOR-BULLDOZER,

TAMPER-SCRAPER (SINGLE ENGINE, UP TO 100 H.P.

FLYWHEEL AND SIMILAR TYPES, UP TO AND INCLUDING D-5

AND SIMILAR TYPES); TUGGER HOIST OPERATOR (1 DRUM);

ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM

OPERATOR; VACUUM BLASTING MACHINE OPERATOR PREMIUM

PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER

EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY

BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB,

POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO

ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE

YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP

PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK

IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR

ADDITIONAL. COMBINATION MIXER AND COMPRESSOR

OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A

CONCRETE MOBILE MIXER OPERATOR......................$ 66.18 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

4- ASPHALT PLANT FIREMAN; BACKHOE OPERATOR

(MINI-MAX OR SIMILAR TYPE); BORING MACHINE

OPERATOR; BOXMAN OR MIXERMAN (ASPHALT OR CONCRETE);

CHIP SPREADING MACHINE OPERATOR; CONCRETE CLEANING

DECONTAMINATION MACHINE OPERATOR; CONCRETE PUMP

OPERATOR (SMALL PORTABLE);DIRECT PUSH OPERATOR

(GEOPROBE OR SIMILAR TYPES) DRILLING MACHINE

OPERATOR, SMALL AUGER TYPES (TEXOMA SUPER

ECONOMATIC OR SIMILAR TYPES - HUGHES 100 OR 200 OR

SIMILAR TYPES - DRILLING DEPTH OF 30' MAXIMUM);

EQUIPMENT GREASER (GREASE TRUCK); GUARD RAIL POST

DRIVER OPERATOR; HIGHLINE CABLEWAY SIGNALMAN;

HYDRA-HAMMER-AERO STOMPER; MICRO TUNNELING (ABOVE

GROUND TUNNEL); POWER CONCRETE CURING MACHINE

OPERATOR; POWER CONCRETE SAW OPERATOR; POWER-DRIVEN

JUMBO FORM SETTER OPERATOR; POWER SWEEPER OPERATOR;

ROCK WHEEL SAW/TRENCHER; ROLLER OPERATOR

(COMPACTING); SCREED OPERATOR (ASPHALT OR

CONCRETE); TRENCHING MACHINE OPERATOR (UP TO 6

FT.); VACUUM OR MUCH TRUCK PREMIUM PAY: $10.00

PER HOUR SHALL BE PAID ON ALL POWER EQUIPMENT

OPERATOR WORK ON THE FOLLOWNG MILITARY BASES: CHINA

LAKE NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 65.96 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

3- ASPHALT-RUBBER BLEND OPERATOR; BOBCAT OR SIMILAR

TYPE (SKID STEER); EQUIPMENT GREASER (RACK); FORD

FERGUSON (WITH DRAGTYPE ATTACHMENTS); HELICOPTER

RADIOMAN (GROUND); STATIONARY PIPE WRAPPING AND

CLEANING MACHINE OPERATOR PREMIUM PAY: $10.00 PER

https://sam.gov/wage-determination/CA20260026/3 16/28

HOUR SHALL BE PAID ON ALL POWER EQUIPMENT OPERATOR

WORK ON THE FOLLOWNG MILITARY BASES: CHINA LAKE

NAVAL RESERVE, VANDENBERG AFB, POINT ARGUELLO,

SEELY NAVAL BASE, FORT IRWIN, NEBO ANNEX MARINE

BASE, MARINE CORP LOGISTICS BASE YERMO, EDWARDS

AFB, 29 PALMS MARINE BASE AND CAMP PENDLETON

WORKERS REQUIRED TO SUIT UP AND WORK IN A HAZARDOUS

MATERIAL ENVIRONMENT: $2.00 PER HOUR ADDITIONAL.

COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE

WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER

OPERATOR............................................$ 64.67 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

2- ASPHALT-RUBBER PLANT OPERATOR (NURSE TANK

OPERATOR);COIL TUBING RIG OPERATOR, CONCRETE MIXER

OPERATOR-SKIP TYPE; CONVEYOR OPERATOR; FIREMAN;

FORKLIFT OPERATOR (INCLUDES LOED, LULL OR SIMILAR

TYPES OVER 5 TONS; HYDROSTATIC PUMP OPERATOR; OILER

CRUSHER (ASPHALT OR CONCRETE PLANT); PETROMAT

LAYDOWN MACHINE; PJU SIDE DUM JACK; SCREENING AND

CONVEYOR MACHINE OPERATOR (OR SIMILAR TYPES);

SKIPLOADER (WHEEL TYPE UP TO 3/4 YD. WITHOUT

ATTACHMENT); TAR POT FIREMAN; TEMPORARY HEATING

PLANT OPERATOR; TRENCHING MACHINE OILER PREMIUM

PAY: $10.00 PER HOUR SHALL BE PAID ON ALL POWER

EQUIPMENT OPERATOR WORK ON THE FOLLOWNG MILITARY

BASES: CHINA LAKE NAVAL RESERVE, VANDENBERG AFB,

POINT ARGUELLO, SEELY NAVAL BASE, FORT IRWIN, NEBO

ANNEX MARINE BASE, MARINE CORP LOGISTICS BASE

YERMO, EDWARDS AFB, 29 PALMS MARINE BASE AND CAMP

PENDLETON WORKERS REQUIRED TO SUIT UP AND WORK

IN A HAZARDOUS MATERIAL ENVIRONMENT: $2.00 PER HOUR

ADDITIONAL. COMBINATION MIXER AND COMPRESSOR

OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A

CONCRETE MOBILE MIXER OPERATOR......................$ 64.18 33.20

OPERATOR: POWER EQUIPMENT, ALL OTHER WORK: GROUP

1- BARGEMAN; BRAKEMAN; COMPRESSOR OPERATOR; DITCH

WITCH, WITH SEAT OR SIMILAR TYPE EQUIPMENT;

ELEVATOR OPERATOR-INSIDE; ENGINEER OILER; FORKLIFT

OPERATOR (INCLUDES LOED, LULL OR SIMILAR TYPES

UNDER 5 TONS; GENERATOR OPERATOR;…