This is a Schedule of Items and pricing sheet for road reconstruction work related to Tropical Storm Hilary damage repair in San Bernardino County, California, under USDA Forest Service solicitation 127EAW26Q0042. The project encompasses six separate road segments within the Mountaintop District, totaling 0.46 miles of reconstruction work. The work is a Total Small Business Set Aside requiring contractors to submit pricing for all items across all six roads, with one award to be made from this solicitation.

The scope of work includes six distinct road sections (1N02 M.P. 0.1, 1N05 M.P. 0.07, 1N05 M.P. 0.65, 1N05 M.P. 0.79, 1N17 M.P. 0.2, and 1N17 M.P. 0.4) with varying lengths from 0.01 to 0.28 miles. Line items include mobilization, soil erosion and pollution control, clearing and debris removal, roadway excavation and grading, select borrow materials, riprap placement, geotextile installation, aggregate base, road reconditioning, asphalt concrete placement, concrete grout, spillway assemblies, seeding and fertilizing, and other related construction activities. Quantities are estimated and contractors must field-verify to meet all drawing, statement of work, and specification requirements. Quotes must be submitted by email to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than July 23rd, 2026, at 10:00 AM Pacific Time, with Requests for Information due by July 16th, 2026. Payment for bond premiums shall not be in addition to the contract price.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUOTE SUMMARY SHEET

COST

PROJECT DISTRICT

COUNTY

TROPICAL STORM HILARY DAMAGE REPAIR

MOUNTAINTOP SAN BERNARDINO

ROADS

LENGTH

TYPE MILES

1N02 M.P. 0.1

RECONSTRUCTION 0.07

1N05 M.P. 0.07

RECONSTRUCTION 0.28

1N05 M.P. 0.65

RECONSTRUCTION 0.01

1N05 M.P. 0.79

RECONSTRUCTION 0.01

1N17 M.P. 0.2

RECONSTRUCTION 0.06

1N17 M.P. 0.4

RECONSTRUCTION 0.03

Total

CONTRACTOR: DATE:

2023 CA FS TROPICAL STORM HILARY

RECONSTRUCTION
RD 1 OF 6

(1) Road

1N02 M.P. 0.1 District

CONTRACTOR:

MOUNTAINTOP

Length (miles)

0.07 County

UEI #

SAN

BERNARDINO

Pay Item Number

Description

Method Measure.

Units of Measure.

Quantity

Unit Price

Cost

15101
Mobilization
LSQ
L.S.
1
15713
Soil Erosion & Pollution Control
LSQ
L.S.
1
20158
Clearing and Debris Removal
LSQ
L.S.
1
20407
Select borrow, compaction method B, finish

method A

CQ
C.Y.
1350
25102-5
Placed riprap, class 5
CQ
Ton
402
25209
Geotextile, type IV, D
CQ
S.Y.
330
30102
Aggregate Base Class 2
CQ
Ton
527
30318
Road reconditioning, roadbed, compaction

method 3

CQ
Mile
0.07
40607
Asphalt Concrete, CA State DOT, Type A
CQ
Ton
133
60101
Concrete Grout
CQ
C.Y.
45

Road 1N02 M.P. 0.1 Total:

2023 CA FS TROPICAL STORM HILARY

RECONSTRUCTION

RD 2 OF 6

(2) Road

1N05 M.P. 0.07 District

MOUNTAINTOP

0.28 County

SAN

Pay Item Number

Method Measure.
Units of Measure.

Quantity

Unit Price

Cost

15101
Mobilization
LSQ
L.S.
1
15713
Soil Erosion & Pollution Control
LSQ
L.S.
1
20158
Clearing and Debris Removal
LSQ
L.S.
1
20209
Selective clearing
LSQ
L.S.
1
20406
Roadway Excavation
CQ
Mile
0.28
20407
Select borrow, compaction method B, finish

method A

CQ
C.Y.
9200
21201
Linear grading
CQ
Mile
0.28
20426
Grade dips, Rolling
CQ
Each
3

Road 1N05 M.P. 0.07 Total:

BID SHEET

2023 CA FS TROPICAL STORM HILARY

RD 3 OF 6

(3) Road

1N05 M.P. 0.65 District

MOUNTAINTOP

0.01 County

SAN

15101
Mobilization
LSQ
L.S.
1
15713
Soil Erosion & Pollution Control
LSQ
L.S.
1
20158
Clearing and Debris Removal
LSQ
L.S.
1
20407
Select borrow, compaction method B, finish

method A

CQ
C.Y.
139
20426
Grade dips, Rolling
CQ
Each
1
60601
Spillway assembly – 24” Overside Drain and

20’ Flume

CQ
Each
1

Road 1N05 M.P. 0.65 Total:

RD 4 OF 6

(4) Road

1N05 M.P. 0.79 District

MOUNTAINTOP

0.01 County

SAN

15101
Mobilization
LSQ
L.S.
1
15713
Soil Erosion & Pollution Control
LSQ
L.S.
1
20158
Clearing and Debris Removal
LSQ
L.S.
1

20407 Select borrow, compaction method B, finish method A

CQ

C.Y.

20426
Grade dips, Rolling
CQ
Each
1
60601
Spillway assembly – 24” Overside Drain and

20’ Flume

CQ
Each
1

Road 1N05 M.P. 0.79 Total:

2023 CA FS TROPICAL STORM HILARY

RECONSTRUCTION
RD 5 OF 6

(5) Road

1N17 M.P. 0.2 District

MOUNTAINTOP

0.06 County

SAN

Pay Item Number

Units of Measure.

15101
Mobilization
LSQ
L.S.
1
15713
Soil Erosion & Pollution Control
LSQ
L.S.
1
20158
Clearing and Debris Removal
LSQ
L.S.
1
20401
Roadway excavation, compaction method B,

finishing method A

CQ
L.S.
1

Road 1N17 M.P. 0.2 Total:

RD 6 OF 6

(6) Road

1N17 M.P. 0.4 District

MOUNTAINTOP

0.03 County

SAN

Pay Item Number

Description Method Measure.

Units of Measure.

Quantity

Unit Price

Cost

15101
Mobilization
LSQ
L.S.
1
15713
Soil Erosion & Pollution Control
LSQ
L.S.
1
20158
Clearing and Debris Removal
LSQ
L.S.
1
20401
Roadway excavation, compaction method B,

finishing method A

CQ
L.S.
1
20407
Select borrow, compaction method B, finish

method A

CQ
C.Y.
20
21102
Roadway obliteration
LSQ
L.S.
1
30101
Crushed Aggregate base,compaction method

A

CQ
Ton
75
40607
Asphalt Concrete, CA State DOT, Type A
CQ
Ton
43
62528
Seeding, Fertilizing, and Mulching, hydraulic

or dry Method

LSQ
L.S.
1

Road 1N17 M.P. 0.4 Total:

TOTAL QUOTED PRICE:
$_____________________________

SCHEDULE NOTES:

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation, contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID:

File details come from the government source that posted it. Updated .