2. Schedule of Items.docx
DOCX document 50 KB Posted
- Solicitation number
- 127EAW26Q0042
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Schedule of Items and pricing sheet for road reconstruction work related to Tropical Storm Hilary damage repair in San Bernardino County, California, under USDA Forest Service solicitation 127EAW26Q0042. The project encompasses six separate road segments within the Mountaintop District, totaling 0.46 miles of reconstruction work. The work is a Total Small Business Set Aside requiring contractors to submit pricing for all items across all six roads, with one award to be made from this solicitation.
The scope of work includes six distinct road sections (1N02 M.P. 0.1, 1N05 M.P. 0.07, 1N05 M.P. 0.65, 1N05 M.P. 0.79, 1N17 M.P. 0.2, and 1N17 M.P. 0.4) with varying lengths from 0.01 to 0.28 miles. Line items include mobilization, soil erosion and pollution control, clearing and debris removal, roadway excavation and grading, select borrow materials, riprap placement, geotextile installation, aggregate base, road reconditioning, asphalt concrete placement, concrete grout, spillway assemblies, seeding and fertilizing, and other related construction activities. Quantities are estimated and contractors must field-verify to meet all drawing, statement of work, and specification requirements. Quotes must be submitted by email to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than July 23rd, 2026, at 10:00 AM Pacific Time, with Requests for Information due by July 16th, 2026. Payment for bond premiums shall not be in addition to the contract price.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUOTE SUMMARY SHEET
COST
PROJECT DISTRICT
COUNTY
TROPICAL STORM HILARY DAMAGE REPAIR
MOUNTAINTOP SAN BERNARDINO
ROADS
LENGTH
TYPE MILES
1N02 M.P. 0.1
RECONSTRUCTION 0.07
1N05 M.P. 0.07
RECONSTRUCTION 0.28
1N05 M.P. 0.65
RECONSTRUCTION 0.01
1N05 M.P. 0.79
RECONSTRUCTION 0.01
1N17 M.P. 0.2
RECONSTRUCTION 0.06
1N17 M.P. 0.4
RECONSTRUCTION 0.03
Total
CONTRACTOR: DATE:
2023 CA FS TROPICAL STORM HILARY
| RECONSTRUCTION |
| RD 1 OF 6 |
(1) Road
1N02 M.P. 0.1 District
CONTRACTOR:
MOUNTAINTOP
Length (miles)
0.07 County
UEI #
SAN
BERNARDINO
Pay Item Number
Description
Method Measure.
Units of Measure.
Quantity
Unit Price
Cost
| 15101 |
| Mobilization |
| LSQ |
| L.S. |
| 1 |
| 15713 |
| Soil Erosion & Pollution Control |
| LSQ |
| L.S. |
| 1 |
| 20158 |
| Clearing and Debris Removal |
| LSQ |
| L.S. |
| 1 |
| 20407 |
| Select borrow, compaction method B, finish |
method A
| CQ |
| C.Y. |
| 1350 |
| 25102-5 |
| Placed riprap, class 5 |
| CQ |
| Ton |
| 402 |
| 25209 |
| Geotextile, type IV, D |
| CQ |
| S.Y. |
| 330 |
| 30102 |
| Aggregate Base Class 2 |
| CQ |
| Ton |
| 527 |
| 30318 |
| Road reconditioning, roadbed, compaction |
method 3
| CQ |
| Mile |
| 0.07 |
| 40607 |
| Asphalt Concrete, CA State DOT, Type A |
| CQ |
| Ton |
| 133 |
| 60101 |
| Concrete Grout |
| CQ |
| C.Y. |
| 45 |
Road 1N02 M.P. 0.1 Total:
2023 CA FS TROPICAL STORM HILARY
RECONSTRUCTION
RD 2 OF 6
(2) Road
1N05 M.P. 0.07 District
MOUNTAINTOP
0.28 County
SAN
Pay Item Number
| Method Measure. |
| Units of Measure. |
Quantity
Unit Price
Cost
| 15101 |
| Mobilization |
| LSQ |
| L.S. |
| 1 |
| 15713 |
| Soil Erosion & Pollution Control |
| LSQ |
| L.S. |
| 1 |
| 20158 |
| Clearing and Debris Removal |
| LSQ |
| L.S. |
| 1 |
| 20209 |
| Selective clearing |
| LSQ |
| L.S. |
| 1 |
| 20406 |
| Roadway Excavation |
| CQ |
| Mile |
| 0.28 |
| 20407 |
| Select borrow, compaction method B, finish |
method A
| CQ |
| C.Y. |
| 9200 |
| 21201 |
| Linear grading |
| CQ |
| Mile |
| 0.28 |
| 20426 |
| Grade dips, Rolling |
| CQ |
| Each |
| 3 |
Road 1N05 M.P. 0.07 Total:
BID SHEET
2023 CA FS TROPICAL STORM HILARY
RD 3 OF 6
(3) Road
1N05 M.P. 0.65 District
MOUNTAINTOP
0.01 County
SAN
| 15101 |
| Mobilization |
| LSQ |
| L.S. |
| 1 |
| 15713 |
| Soil Erosion & Pollution Control |
| LSQ |
| L.S. |
| 1 |
| 20158 |
| Clearing and Debris Removal |
| LSQ |
| L.S. |
| 1 |
| 20407 |
| Select borrow, compaction method B, finish |
method A
| CQ |
| C.Y. |
| 139 |
| 20426 |
| Grade dips, Rolling |
| CQ |
| Each |
| 1 |
| 60601 |
| Spillway assembly – 24” Overside Drain and |
20’ Flume
| CQ |
| Each |
| 1 |
Road 1N05 M.P. 0.65 Total:
RD 4 OF 6
(4) Road
1N05 M.P. 0.79 District
MOUNTAINTOP
0.01 County
SAN
| 15101 |
| Mobilization |
| LSQ |
| L.S. |
| 1 |
| 15713 |
| Soil Erosion & Pollution Control |
| LSQ |
| L.S. |
| 1 |
| 20158 |
| Clearing and Debris Removal |
| LSQ |
| L.S. |
| 1 |
20407 Select borrow, compaction method B, finish method A
CQ
C.Y.
| 20426 |
| Grade dips, Rolling |
| CQ |
| Each |
| 1 |
| 60601 |
| Spillway assembly – 24” Overside Drain and |
20’ Flume
| CQ |
| Each |
| 1 |
Road 1N05 M.P. 0.79 Total:
2023 CA FS TROPICAL STORM HILARY
| RECONSTRUCTION |
| RD 5 OF 6 |
(5) Road
1N17 M.P. 0.2 District
MOUNTAINTOP
0.06 County
SAN
Pay Item Number
Units of Measure.
| 15101 |
| Mobilization |
| LSQ |
| L.S. |
| 1 |
| 15713 |
| Soil Erosion & Pollution Control |
| LSQ |
| L.S. |
| 1 |
| 20158 |
| Clearing and Debris Removal |
| LSQ |
| L.S. |
| 1 |
| 20401 |
| Roadway excavation, compaction method B, |
finishing method A
| CQ |
| L.S. |
| 1 |
Road 1N17 M.P. 0.2 Total:
RD 6 OF 6
(6) Road
1N17 M.P. 0.4 District
MOUNTAINTOP
0.03 County
SAN
Pay Item Number
Description Method Measure.
Units of Measure.
Quantity
Unit Price
Cost
| 15101 |
| Mobilization |
| LSQ |
| L.S. |
| 1 |
| 15713 |
| Soil Erosion & Pollution Control |
| LSQ |
| L.S. |
| 1 |
| 20158 |
| Clearing and Debris Removal |
| LSQ |
| L.S. |
| 1 |
| 20401 |
| Roadway excavation, compaction method B, |
finishing method A
| CQ |
| L.S. |
| 1 |
| 20407 |
| Select borrow, compaction method B, finish |
method A
| CQ |
| C.Y. |
| 20 |
| 21102 |
| Roadway obliteration |
| LSQ |
| L.S. |
| 1 |
| 30101 |
| Crushed Aggregate base,compaction method |
A
| CQ |
| Ton |
| 75 |
| 40607 |
| Asphalt Concrete, CA State DOT, Type A |
| CQ |
| Ton |
| 43 |
| 62528 |
| Seeding, Fertilizing, and Mulching, hydraulic |
or dry Method
| LSQ |
| L.S. |
| 1 |
Road 1N17 M.P. 0.4 Total:
| TOTAL QUOTED PRICE: |
| $_____________________________ |
SCHEDULE NOTES:
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* One award will be made from this solicitation, contractors must submit pricing for all items.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.