6-Attachment B Scope of Work.pdf
PDF 476 KB Posted
- Solicitation number
- JH27-4
- Issued by
- Weber County, Hildale City, Utah
About this file
This is a Construction Scope of Work document issued by the State of Utah Division of Wildlife Resources for the Ogden Bay WMA – Pelican Haven Wetlands Restoration project. The selected construction contractor shall provide all necessary equipment, labor, personnel, and materials to complete work elements described in the construction plan set and technical specifications in accordance with best management practices and industry standards. The scope of work encompasses mobilization of equipment and personnel to the project site, site preparation activities including clearing, grubbing, temporary access road construction, grading, demolition of existing structures, and dewatering as required, and construction activities including installation of precast concrete water control structures and associated piping, implementation of erosion control measures, and execution of earthwork including placement of compacted fill, grading, and backfilling. A mandatory pre-bid site visit is scheduled for August 4, 2026, at 10:00 a.m. at Ogden Bay WMA Headquarters located at 4786 S. 7500 W., Hooper, UT 84315, with vendors arriving late prohibited from bidding or attending. The contract must be completed by or before September 30, 2026, and award will be made to the lowest cost responsive and responsible vendor based on the combined cost of all ten line items.
The State of Utah Division of Purchasing is conducting the procurement with the anticipation of a single contract award. The vendor must guarantee its pricing through project completion. The bid package includes ten line items with the award determination based on the lowest overall combined cost. No pricing terms, set-asides, incumbent information, or specific funding amounts are detailed in the scope of work document provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 5-A - Pelican Haven Wetlands Restoration 100 - All Sheets.pdf | ||
| 2-Att.-A-PO-Terms-and-Conditions (3).docx | DOCX document | |
| 7-703722-1 National Audubon Society TNC Pelican haven.pdf | ||
| 3-Attachment C - Assumption and Estimates used for Bid Schedule.docx | DOCX document | |
| 4-Attachment D - Bond Language.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION SCOPE OF WORK
Ogden Bay WMA - Pelican Haven Wetlands Restoration
Scope of Work and Contractor Responsibilities
The selected Construction Contractor shall provide all necessary equipment, labor, personnel, and specified materials required to properly and successfully complete all work elements described or implied in the construction plan set, technical specifications, and any other documents included in the official bid package. All work shall be performed in accordance with best management practices and established industry standards, ensuring high-quality workmanship throughout the project.
The Contractor shall comply fully with all technical and administrative requirements outlined in the bid documents and associated materials.
The Scope of Work shall include, but is not limited to, the following components:
1. Mobilization
Mobilization shall include the legal and orderly transportation of all required equipment, materials, and personnel to the project site. This includes the provision of all resources necessary to initiate and carry out the construction activities as specified in the construction plans, details, and project documents.
2. Site Preparation
Site preparation shall consist of all tasks necessary to ready the project area for construction activities. This may include, but is not limited to:
Clearing and grubbing Temporary access road construction Grading and contouring Demolition and removal of existing man-made structures or materials Dewatering and soil remediation, as required to support construction activities
3. Construction Activities
Construction shall include, but is not limited to, the following work elements:
Installation of precast concrete water control structures and associated piping Implementation of erosion control measures Execution of required earthwork, including the placement of compacted fill, grading, and backfilling Completion of all additional tasks and components necessary to fulfill the project requirements as outlined in the approved plans, technical details, and specifications