3-Attachment C - Assumption and Estimates used for Bid Schedule.docx

DOCX document 14 KB Posted

Attached to
Ogden Bay WMA - Pelican Haven Wetland Restoration
Solicitation number
JH27-4
Issued by
Weber County, Hildale City, Utah

About this file

This is an Attachment C assumptions and estimates document prepared by the State of Utah Division of Wildlife Resources for the Pelican Haven Wetland Restoration project at Ogden Bay WMA. The construction contractor will be responsible for supplying all necessary equipment, labor, personnel, and materials to complete the levee restoration work as described in the construction plans and technical specifications. The project involves the construction of a levee at Pelican Haven, calculated to require 5,274 cubic yards of compacted fill material, comprised of 1,405 cubic yards for the footprint and 3,869 cubic yards for the prism. The levee compacted fill is bid on a linear foot basis. A mandatory pre-bid site visit is scheduled for August 4, 2026, at 10:00 am at Ogden Bay WMA Headquarters in Hooper, Utah, and vendors arriving late will be ineligible to bid. All work must be completed by or before September 30, 2026. Award will be made to the lowest cost responsive and responsible vendor based on the combined cost of all ten line items.

The contractor must supply and install all water control structures, pipe and couplers, and gravel surfacing, with no materials to be provided by the owner. The compacted fill quantities provided are estimates calculated as a courtesy, and the contractor is required to verify these quantities independently and adjust bid quantities based on their own evaluation. The selected vendor must guarantee its pricing through project completion. This is an Invitation for Bid (IFB) anticipated to result in a single contract award to the lowest responsive and responsible bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

ASSUMPTIONS AND ESTIMATES USED IN PREPARATION OF UNIT PRICE BID SCHEDULE

Levee Pelican Calculated to Require 5,274 Cubic Yards of Compacted Fill Material Total 1,405 CY (Footprint) and 3,869 CY (Prism) = 5,274 Total Compacted Fill Quantities Have Been Provided as A Courtesy. Contractor Shall Verify to Their Satisfaction and/or Adjust the Bid Quantity Based on Their Independent Evaluation.

Levee Compacted Fill is Bid on a Linear Foot Basis Contractor to Supply and Install All Water Control Structures Contractor to Supply and Install All Pipe and Couplers Contractor to Supply and Install All Gravel Surfacing No Materials Will Be Provided by the Owner