Attachment B is a Cost Proposal Fillable Form for the Forty Niners Stadium Management Company LLC's Levi's Stadium On-Call Electrical Maintenance and Repair Services RFP in California. The solicitation seeks to establish a qualified contractor bench for electrical maintenance and repairs to be performed on an as-needed, on-call basis through individual Task Orders. The document provides a detailed pricing template for labor rates across journeyman and apprentice electrical worker levels, with specific categories including Comm & System Installers, Inside Wiremen, Cable Splicers, and Material Handlers at various experience stages.
The pricing form includes provisions for materials and consumables markup, equipment rental markup, and one-time startup costs, with hypothetical cost scenarios demonstrating potential billing structures. In this specific template, a sample total quote is calculated at $2,000, composed of $1,000 for materials and consumables and $1,000 for equipment rentals, both at a 0% markup rate. The form allows contractors to input their specific billable hourly rates for straight-time, overtime, weekday, Saturday, Sunday, and holiday work across different labor classifications, enabling a comprehensive and flexible pricing approach for on-call electrical maintenance services at Levi's Stadium.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Attachment A - On Call Electrical Scope of Services.docx | DOCX document | |
| 7-Attachment B - Cost Proposal On-Call.docx | DOCX document | |
| 3-Attachment D - Exemplar Contract On-Call.DOCX | DOCX document | |
| 2-Attachment F - Customer Reference Form.docx | DOCX document | |
| 1-Attachment E - Integrity Conflict of Interest Guidelines.docx | DOCX document | |
| 9-FY25-0085 On-Call Electrical RFP in PDF.pdf | ||
| 8-FY25-0085 On-Call Electrical RFP.docx | DOCX document | |
| 5-Attachment C - Proposer Certification Form.docx | DOCX document | |
| 4-Attachment G - Labor Compliance Addendum.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attach B Pricing Table
| Levi's Stadium On-Call Electrical RFP | |||||||||
| Attachment B - Pricing Table | |||||||||
| Billable Hourly Rates | |||||||||
| Overtime Hourly Rates | |||||||||
| Straight-Time Weekday | Daily | Saturday | Sunday & Holiday | Total (sum of columns) | |||||
| 1 | Billable Labor Rates: | ||||||||
| Journeyman Level: | |||||||||
| COMM & SYSTEM INSTALLER | |||||||||
| COMM & SYSTEM TECH. | |||||||||
| INSIDE WIREMAN, TECHNICIAN | |||||||||
| CABLE SPLICER | |||||||||
| MATERIAL HANDLER | |||||||||
| MATERIAL HANDLER - FOURTH SIX MONTHS | |||||||||
| MATERIAL HANDLER - THIRD SIX MONTHS | |||||||||
| MATERIAL HANDLER - SECOND SIX MONTHS | |||||||||
| MATERIAL HANDLER - FIRST SIX MONTHS |
Total (Journeyman) Sum of rows above $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Apprentice Level: | ||||||||
| ELECTRICIAN, INSIDE WIREMAN - (5th period) | ||||||||
| ELECTRICIAN, INSIDE WIREMAN - (6th period) | ||||||||
| ELECTRICIAN, INSIDE WIREMAN - (7th period) | ||||||||
| ELECTRICIAN, INSIDE WIREMAN - (8th period) | ||||||||
| ELECTRICIAN, INSIDE WIREMAN - (9th period) | ||||||||
| ELECTRICIAN, INSIDE WIREMAN - (10th period) | ||||||||
| Total (Apprentice) Sum of rows above | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 2 | Materials & Consumables Mark-Up | |||||||
| Hypothetical cost of Materials & Consumables (Actual cost to Contractor) | $ 1,000.00 | |||||||
| Contractor's proposed Mark-Up percentage | 0.00% | |||||||
| Billable cost for Materials & Consumbales (e.g. $1,000 + 10% = $1,100) | $ 1,000.00 | |||||||
| 3 | Equipment Rentals Mark-Up | |||||||
| Hypothetical cost of Equipment Rentals (Actual cost to Contractor) | $ 1,000.00 | |||||||
| Contractor's proposed Mark-Up percentage | 0.00% | |||||||
| Billable cost for Equipment Rentals (e.g. $1,000 + 10% = $1,100) | $ 1,000.00 | |||||||
| 4 | One-Time Start Up Costs | $ - 0 | ||||||
| 5 | Summary of Contractor's pricing | |||||||
| Journeyman Billable Labor Rates (from Total column above) | $ - 0 | |||||||
| Apprentice Billable Labor Rates (from Total Column above) | $ - 0 | |||||||
| Materials & Consumables Billable Costs with Mark-up | $ 1,000.00 | |||||||
| Equipment Rentals Billable Costs with Mark-up | $ 1,000.00 | |||||||
| One-Time Start Up Costs | $ - 0 | |||||||
| TOTAL QUOTE (Sum of five rows above) | $ 2,000.00 |