3-Attachment D - Exemplar Contract On-Call.DOCX
DOCX document 94 KB Posted
- Solicitation number
- RFP-FY25-0085
- Issued by
- Santa Clara County, San Francisco City, California
About this file
This document is an exemplar contract between Forty Niners Stadium Management Company LLC and an unnamed electrical contractor for on-call electrical maintenance and repair services at Levi's Stadium in Santa Clara, California. The contract establishes a framework for electrical maintenance and repair work to be performed on an as-needed basis through individual task orders, with a total contract value not to exceed $250,000 per contract year. The initial contract term is set to expire on a specified date in 2023, with an option to extend for two additional one-year periods. The contractor must hold C-7 Low Voltage Systems and C-10 Electrical Contractor licenses and will be selected through a competitive Request for Proposals process to create a qualified bench of contractors capable of handling a wide range of electrical repairs.
The contract includes comprehensive provisions for compensation, with payment to be made monthly based on itemized statements of completed work. The contractor will be required to provide performance and payment bonds, maintain specific insurance coverage with minimum limits of $2 million for general and automobile liability, and comply with prevailing wage requirements. The contract incorporates strict labor compliance, safety, and regulatory standards, including Department of Industrial Relations registration and workforce regulations. Liquidated damages will be specified in individual task orders, and the contractor must meet high standards of workmanship, with a one-year warranty on all work performed. The solicitation aims to establish a responsive and reliable electrical maintenance resource for Levi's Stadium, with clear mechanisms for task assignment, performance evaluation, and contract management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 10-Attachment A - On Call Electrical Scope of Services.docx | DOCX document | |
| 7-Attachment B - Cost Proposal On-Call.docx | DOCX document | |
| 2-Attachment F - Customer Reference Form.docx | DOCX document | |
| 1-Attachment E - Integrity Conflict of Interest Guidelines.docx | DOCX document | |
| 6-Attachment B - Cost Proposal Fillable Form On-Call.xlsx | XLSX spreadsheet | |
| 9-FY25-0085 On-Call Electrical RFP in PDF.pdf | ||
| 8-FY25-0085 On-Call Electrical RFP.docx | DOCX document | |
| 5-Attachment C - Proposer Certification Form.docx | DOCX document | |
| 4-Attachment G - Labor Compliance Addendum.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
EXEMPLAR CONTRACT
ATTACHMENT D
EXEMPLAR CONTRACT
FORTY NINERS STADIUM MANAGEMENT COMPANY LLC
LEVI’S STADIUM ON-CALL ELECTRICAL MAINTENANCE AND REPAIR CONTRACT
1. PARTIES AND DATE.
This Contract is made and entered into this [***INSERT DAY***] day of [***INSERT MONTH***], [***INSERT YEAR***] by and between the Forty Niners Stadium Management Company LLC, a Delaware limited liability company (“Stadium Manager”) and [***INSERT NAME***], a [***INSERT TYPE OF ENTITY - CORPORATION, PARTNERSHIP, SOLE PROPRIETORSHIP OR OTHER LEGAL ENTITY***] with its principal place of business at [***INSERT ADDRESS***] (“Contractor”). Stadium Manager and Contractor are sometimes individually referred to as “Party” and collectively as “Parties” in this Contract.
| 2. | RECITALS. |
| 2.1 | Stadium Manager. Stadium Manager seeks to contract for services necessary to achieve its purpose. |
| 2.2 | Contractor. Contractor desires to perform and assume responsibility for the provision of certain maintenance and repair services required by the Stadium Manager on the terms and conditions set forth in this Contract and in the task order(s) to be issued pursuant to this Contract and executed by the Stadium Manager and Contractor (“Task Order”). Contractor represents that it is duly licensed and experienced in providing Levi’s Stadium On-Call Stadium Electrical related maintenance and repair services, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of Stadium Manager. The following license classifications are required for this Project: C-7 Low Voltage Systems and C-10 Electrical Contractor. |
| 2.3 | Project. Stadium Manager desires to engage Contractor to render such services for the On-Call Stadium Electrical Maintenance and Repair (“Project”) as set forth in this Contract on an on-call, as-needed basis. There is no guarantee of any of work under this Contract other than what is specified herein or that the not-to-exceed compensation amount set forth herein will be spent. |
| 2.4 | Project Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, a performance bond, a payment bond, and all insurance documentation, as required by the Contract. |
| 3. | TERMS |
| 3.1 | Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto: |
· Scope of Work (Exhibit “A”)
· Plans and Specifications (Exhibit “B”)
· Special Conditions (Exhibit “C”)
· Contractor’s Certificate Regarding Workers’ Compensation (Exhibit “D”)
· Public Works Contractor Registration Certification (Exhibit “E”)
· Payment and Performance Bonds (Exhibit “F”)
· Rate Schedule (Exhibit “G”)
· Sample Task Order Form (Exhibit “H”)
· Addenda
· Change Orders executed by the Stadium Manager
· 2018 Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-9
· Notice Inviting Bids, if any
· Instructions to Bidders, if any
· Contractor’s Bid, if any
| 3.2 | Contractor’s Basic Obligation; Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the Stadium Manager all labor, materials, tools, equipment, services, and incidental and customary work necessary for the Project (hereinafter sometimes referred to as the “Work”). The type of Work to be provided is described in Exhibit “A” attached hereto and incorporated herein by reference and in the individual Task Orders issued by the Stadium Manager. No Work shall be performed unless authorized by this Contract and by a fully executed Task Order in the form attached hereto as Exhibit “H”. All Work shall be subject to, and performed in accordance, with this Contract, any relevant Task Order, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. Special Conditions, if any, relating to the Work are described in Exhibit “C” attached hereto and incorporated herein by this reference. |
| 3.2.1 | Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in writing by a valid change order executed by the Stadium Manager. Should Contractor request a change order due to unforeseen circumstances affecting the performance of the Work, such request shall be made within five (5) business days of the date such circumstances are discovered or shall waive its right to request a change order due to such circumstances. If the Parties cannot agree on any change in price required by such change in the Work, the Stadium Manager may direct the Contractor to proceed with the performance of the change on a time and materials basis. |
| 3.2.2 | Substitutions/“Or Equal”. Pursuant to Public Contract Code Section 3400(b), the Stadium Manager may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.” |
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the Stadium Manager may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the repair schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with Contractor.
The Stadium Manager has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the Stadium Manager in a timely fashion will result in the rejection of the proposed substitution.
Contractor shall bear all of the Stadium Manager’s costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code Section 3400.
| 3.3 | Period of Performance and Liquidated Damages. The term of this Contract shall commence on the date first set forth above and expire on [MONTH DAY, 2023], unless earlier terminated as provided herein. Contractor shall complete the Work within the term of this Contract, and shall meet any other established schedules and deadlines set forth in the Task Order(s). All applicable indemnification provisions of this Contract shall remain in effect following the termination of this Contract. The Parties may, by mutual, written consent, further extend the term of this Contract for two (2) additional one (1) year periods. Pursuant to Government Code Section 53069.85, Contractor shall pay to the Stadium Manager as fixed and liquidated damages a fixed dollar amount per day for each and every calendar day of delay beyond any completion schedule, repair schedule or Project milestones established pursuant to the Contract and any Task Order(s). The daily liquidated damages amount will be determined for each separate Task Order and will be set forth in that Task Order. |
| 3.4 | Standard of Performance; Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including any required business license, and that such licenses and approvals shall be maintained throughout the term of this Contract. Contractor shall perform, at its own cost and expense and without reimbursement from the Stadium Manager, any work necessary to correct errors or omissions which are caused by Contractor’s failure to comply with the standard of care provided for herein. Any employee who is determined by the Stadium Manager to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the Stadium Manager, shall be promptly removed from the Project by Contractor and shall not be re‑employed on the Work. |
| 3.5 | Control and Payment of Subordinates; Contractual Relationship. Stadium Manager retains Contractor on an independent contractor basis and Contractor is not an employee of Stadium Manager. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor’s exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers’ compensation insurance. |
| 3.6 | Stadium Manager’s Basic Obligation. Stadium Manager agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the Stadium Manager shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below-referenced compensation in accordance with compensation provisions set forth in the Contract. |
| 3.7 | Compensation and Payment. |
| 3.7.1 | Amount of Compensation. As consideration for performance of the Work required herein, Contractor shall receive compensation, including authorized reimbursements, for all Work rendered under this Contract at the rates set forth in Exhibit “G” attached hereto and incorporated herein by reference. The maximum compensation for Work to be provided pursuant to each Task Order shall be set forth in the relevant Task Order. The total compensation to be provided under this Contract by Stadium Manager to Contractor, in the aggregate, shall not exceed Two Hundred Fifty Thousand Dollars ($250,000.00) (“Total Contract Price”) per contract year without the written approval of the Stadium Manager. |
| 3.7.2 | Payment of Compensation. Contractor shall submit to Stadium Manager a monthly itemized statement which indicates Work completed by Contractor in a format acceptable to the Stadium Manager. The statement shall describe the amount of Work and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. These statements shall be supported by evidence which is required by this Contract and such other documentation as the Stadium Manager may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. |
| 3.7.3 | Prompt Payment. Stadium Manager shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others. |
3.7.4 Deductions and Withholdings. The Stadium Manager may deduct from each progress payment an amount necessary to protect Stadium Manager from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the Stadium Manager in performing any of Contractor’s obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by Stadium Manager during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the Stadium Manager, incurred by the Stadium Manager for which Contractor is liable under the Contract; and (11) any other sums which the Stadium Manager is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the Stadium Manager to deduct any of these sums from a progress payment shall not constitute a waiver of the Stadium Manager’s right to such sums.
| 3.7.5 | Substitutions for Contract Deductions and Withholdings. In accordance with California Public Contract Code Section 22300, the Stadium Manager will permit the substitution of securities for any monies withheld by the Stadium Manager to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the Stadium Manager, or with a state or federally chartered bank in California as the escrow agent, and thereafter the Stadium Manager shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the Stadium Manager has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the Stadium Manager. |
| 3.7.6 | Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the Stadium Manager, or its designee, at the time of payment. To the extent that title has not previously been vested in the Stadium Manager, or its designee, by reason of payments, full title shall pass to the Stadium Manager, or its designee, at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the Stadium Manager or its designee, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items. |
| 3.7.7 | Labor and Material Releases. Contractor shall furnish Stadium Manager with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by Stadium Manager. |
| 3.78 | Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. Since the Work is being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. Stadium Manager shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and shall post copies at Contractor’s principal place of business and at the project site. Contractor shall defend, indemnify and hold the Indemnified Parties (defined below) free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates. |
| 3.7.9 | Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said Section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law. |
| 3.7.10 | Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day’s work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one‑half (1‑1/2) times the basic rate for that worker. |
| 3.7.11 | Payroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code Section 1776. In the event of noncompliance with the requirements of this Section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this Section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this Section is on Contractor. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code Section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4. |
3.7.12 Contractor and Subcontractor Registration. Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit “E” prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
3.7.13 Labor Compliance; Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor’s performance of Work, including any delay, shall be Contractor’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the Stadium Manager. Contractor shall defend, indemnify and hold the Indemnified Parties (defined below) free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.
| 3.8 | Performance of Work; Jobsite Obligations. |
| 3.8.1 | Water Quality Management and Compliance, if Applicable. |
| 3.8.1.1 | Water Quality Management and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or surface water in the State. | |
| 3.8.1.2 | Compliance with the Statewide Construction General Permit. Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board (“Permit”). It shall be Contractor’s sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity which results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a “living document” that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor’s sole responsibility to update the SWPPP as necessary to address conditions at the project site. | |
| 3.8.1.3 | Other Water Quality Rules Regulations and Policies. Contractor shall comply with the lawful requirements of any applicable municipality, drainage Stadium Manager, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs. | |
| 3.8.1.4 | Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during repair of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom. | |
| 3.8.1.5 | Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the Indemnified Parties (defined below) for any alleged violations. In addition, Stadium Manager may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor’s failure to comply with the Permit. | |
| 3.8.1.6 | Reservation of Right to Defend. Stadium Manager reserves the right to defend any enforcement action brought against the Stadium Manager for Contractor’s failure to comply with the Permit or any other relevant water quality law, regulation, or policy. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the Stadium Manager for the costs (including the Stadium Manager’s attorney’s fees) associated with, any settlement reached between the Stadium Manager and the relevant enforcement entity. | |
| 3.8.1.7 | Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.8.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by Stadium Manager, regarding the requirements of the laws, regulations and policies described in paragraph 3.8.1 as they may relate to the Work provided under this Contract. Upon request, Stadium Manager will provide the Contractor with a list of training programs that meet the requirements of this paragraph. | |
| 3.8.2 | Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site. | |
| 3.8.3 | Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the Stadium Manager in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the Stadium Manager, Contractor shall be solely responsible for all costs arising therefrom. Contractor shall defend, indemnify and hold Indemnified Parties (defined below) free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. | |
| 3.8.4 | Permits and Licenses. Contractor shall be responsible for securing Stadium Manager permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project. | |
| 3.8.5 | Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for Stadium Manager’s review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer. | |
| 3.8.6 | Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify Stadium Manager of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class III disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by Stadium Manager; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, Stadium Manager shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute. | |
| 3.8.7 | Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, Stadium Manager shall compensate Contractor for the costs of: (1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the drawings; and (3) equipment necessarily idled during such work. Contractor shall not be assessed liquidated damages for delay caused by failure of Stadium Manager to provide for removal or relocation of such utility facilities. | |
| 3.8.8 | Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements are broader, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by CARB to include any item of equipment with a fuel-powered engine. Contractor shall indemnify the Indemnified Parties (defined below) against any fines or penalties imposed by CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Contract. | |
| 3.8.9 | State Recycling Mandates. | Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling. |
| 3.9 | Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify Stadium Manager in writing and shall furnish all labor and material releases required by this Contract. Stadium Manager shall thereupon inspect the Work. If the Work is not acceptable to the Stadium Manager, the Stadium Manager shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a reinspection by the Stadium Manager. Once the Work is acceptable to Stadium Manager, Stadium Manager shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which Stadium Manager may be authorized or directed by law to retain. Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code. | |
| 3.10 | Claims; Government Code Claim Compliance. |
3.10.1 Arbitration. All disputes between Contractor and Stadium Manager relating in any way to this Agreement or Services performed under this Agreement (including, but not limited to, claims for breach of contract, tort, discrimination, harassment and any violation of federal or state law, regulation or constitution) (“Arbitrable Claims”) shall be resolved by binding arbitration under the Federal Arbitration Act, in conformity with the procedures of the California Arbitration Act (Cal. Code Civ. Proc. § 1280 et seq., including § 1283.05 and all of the Act’s other mandatory and permissive rights to discovery). In addition to any other requirements imposed by law, the arbitrator selected shall be a retired California Superior Court Judge, or otherwise qualified individual to whom the parties mutually agree, and shall be subject to disqualification on the same grounds as would apply to a judge of such court. All rules of pleading (including the right of demurrer), all rules of discovery, all rules of evidence, all rights to resolution of the dispute by means of motions for summary judgment, judgment on the pleadings and all other dispositive motions, and judgment under Code of Civil Procedure § 631.8 shall apply and be observed. Resolution of the dispute shall be based solely upon the law governing the claims and defenses pleaded, and the arbitrator may not invoke any basis other than such controlling law. The arbitrator shall have the immunity of a judicial officer from civil liability when acting in the capacity of an arbitrator, which immunity supplements any other existing immunity. Likewise, all communications during or in connection with the arbitration proceedings are privileged in accordance with Cal. Civil Code § 47(b). As reasonably required to allow full use and benefit of this agreement’s modifications to the Act’s procedures, the arbitrator shall extend the times set by the Act for the giving of notices and setting of hearings. Awards shall include the arbitrator's written reasoned opinion. The Parties understand and agree to this binding arbitration provision, and both Contractor and Stadium Manager give up their right to trial by jury of any claim they may have against each other.
| 3.11 | Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by Stadium Manager. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the Stadium Manager may terminate this Contract pursuant to Section 3.17.3; provided, however, that the Stadium Manager needs to provide Contractor with only one (1) day advanced written notice. | ||
| 3.12 | Indemnification. | ||
| 3.12.1 | Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the Stadium Manager, the Santa Clara Stadium Authority, the City of Santa Clara, their affiliates, and each of their respective officers, directors, managers, members, partners, owners, employees, agents and authorized volunteers, each tenant and event promoter of Levi’s Stadium, and any mortgagee, bond trustee or other financial institution from time to time holding a line or indenture upon an interest in Levi’s Stadium, and each of them (collectively, the “Indemnified Parties”), free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, “Claims”) in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor’s services, the Project, this Contract or any Task Order, including without limitation the payment of all consequential damages, expert witness fees and attorneys’ fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code Section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the Indemnified Parties or the Indemnified Parties’ agents, servants, or independent contractors who are directly responsible to the Indemnified Parties, or for defects in design furnished by those persons. | ||
| 3.12.2 | Additional Indemnity Obligations. Any defense to be provided by Contractor pursuant to any indemnification provision of this Agreement shall be by counsel approved by Stadium Manager, which approval shall not be unreasonably withheld. To the extent any of the Indemnitees incurs costs or expenses to enforce this indemnification (including attorneys' fees and expenses), Contractor shall reimburse the Indemnitee for such costs and expenses. | ||
| 3.13 | Insurance. | ||
| 3.13.1 | Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the Stadium Manager that it has secured all insurance required under this Section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the Stadium Manager that the subcontractor has secured all insurance required under this Section. Failure to provide and maintain all required insurance shall be grounds for the Stadium Manager to terminate this Contract for cause. | ||
| 3.13.2 | Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage: | ||
| 3.13.2.1 | Minimum Scope of Insurance. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01); (2) Automobile Liability: Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); and (3) Workers’ Compensation and Employer’s Liability: Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contract. | ||
| 3.13.2.2 | Minimum Limits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $2,000,000 per occurrence and $4,000,000 aggregate for bodily injury, personal injury and property damage; (2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage; and (3) Workers’ Compensation and Employer’s Liability: Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease. Defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the parties required to be named as additional insureds pursuant to this Contract. | ||
| 3.13.3 | Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the Stadium Manager to add the following provisions to the insurance policies: | ||
| 3.13.3.1 | General Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 10 01 plus CG20 37 10 01, or endorsements providing the exact same coverage, with respect to the Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it. | ||
| 3.13.3.2 | Automobile Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way. | ||
| 3.13.3.3 | Workers’ Compensation and Employer’s Liability Coverage. The insurer shall agree to waive all rights of subrogation against the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor. | ||
| 3.13.3.4 | All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the Stadium Manager; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers. | ||
| 3.13.3.5 | Contractor’s Equipment Insurance. Contractors Equipment Insurance applying to loss or damage on an “all risk” basis to any equipment, small tools, or other machinery whether owned, leased, rented, borrowed or otherwise in the care, custody and control of the Contractor for use in the performance of Work. The insurer shall agree to waive all rights of subrogation against the Stadium Manager, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy. | ||
| 3.13.4 | Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the Stadium Manager, its officials, employees, agents and authorized volunteers. |