6-Appendix VI - Cost Price Form North Temple Escalator Design.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- North Temple Escalator Design
- Solicitation number
- 26-04045
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a Cost Price Form prepared for the Utah Transit Authority (UTA) for the North Temple Escalator Design project, a procurement effort to retain a design team for the replacement of escalators at the North Temple Trax and Frontrunner Station in Utah. The form establishes the labor-based cost structure for the design services required, with line items covering nine distinct scope elements: 30 Percent Design and Plans, 60 Percent Design and Plans, Construction Drawings and Specifications, Structural Assessment of Removing or Moving Canopy to Accommodate the Escalator Replacement, Bidding and Construction Support, CMGC Coordination, Project Management, Cost Estimate, and Permit Assistance. All labor hours are to be priced by the responding firm, with unit costs and total costs to be filled in during the bidding process.
The pricing structure incorporates a two-tier cost calculation model: the sum of all labor and materials costs, with a fixed fee of 10 percent applied to the subtotal to generate the final total contract cost. The form was prepared by David Osborn on June 13, 2025, and references the company designation as 26-04045VW. All cost line items are currently shown as zero, indicating this is a template awaiting bid responses from qualified design firms. Bidders are expected to propose hourly rates for each labor category to establish their total project cost for UTA's evaluation and selection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mt Ogden Fueling Design
| Appendix VI - Cost Pricing | Company Name | ||||
| 26-04045VW North Temple Escalator Design | |||||
| Item No. | QTY | U/M | Item Description | Unit Cost | Total Cost |
| 1 | Hr | 30 Percent Design and Plans | $ - 0 |
| 2 | Hr | 60 Percent Design and Plans | $ - 0 |
| 3 | Hr | Construction Drawings and Specifications | $ - 0 |
| 4 | Hr | Structural Assessment of Removing or Moving Canopy to Accommodate the Escalator Replacement | $ - 0 |
| 5 | Hr | Bidding and Construction Support | $ - 0 |
| 6 | Hr | CMGC Coordination | $ - 0 |
| 7 | Hr | Project Management | $ - 0 |
| 8 | Hr | Cost Estimate | $ - 0 |
| 9 | Hr | Permit assistance | $ - 0 |
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| TOTAL | $ - 0 |
| Labor + Materials Total | $ - 0 |
| Fixed Fee (10%) | $ - 0 |
TOTAL COST $ - 0
Prepared By: David Osborn (06/13/25) 1 of &P