6-4. Bid Form.docx
DOCX document 63 KB Posted
- Solicitation number
- NS26-166
- Issued by
- Tooele County, Utah
About this file
This is a bid form document for the Stansbury Park Service Agency located in Stansbury Park, Utah, in connection with project NS26-166 for the SR-36 Sound Wall Trail. Sealed bids will be received at the Service Agency's office (1 Country Club Drive, Suite 1, Stansbury Park, UT 84074) until Wednesday, July 29th, 2026 at 4:00 pm. A non-mandatory pre-bid conference will be held at the same location on Wednesday, July 15th, 2026 at 3:00 pm. Prospective bidders may submit questions to Shawn Chidester at s.chidester@stansburypark.gov until the cutoff date and time of July 23, 2026 at 4:00 pm. The specific details regarding products, services, quantities, pricing structure, contract term, and renewal options are contained within the bid form document itself.
The issuing office is the Stansbury Park Service Agency, and this courtesy posting serves as an advertisement of the procurement opportunity. Award notifications will not be posted on the website posting the solicitation; instead, vendors must contact the designated individual or office as identified in the complete solicitation documents for award information. Vendors are responsible for reviewing the entire solicitation to ensure compliance with all requirements. Additional details regarding pricing terms, funding sources, set-asides, and other salient contract information would be specified in the complete bidding documents and scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16-14. APWA Inclusion Document.docx | DOCX document | |
| 11-9. Measurement Payment.docx | DOCX document | |
| 7-5. Bid Form (Supplemental).docx | DOCX document | |
| 8-6. Bid Bond .docx | DOCX document | |
| 3-1. Invitation to Bid.docx | DOCX document | |
| 1-SR-36 Sound Wall Trail Full Plans 6.26.26.pdf | ||
| 12-10. Non-Collusion.docx | DOCX document | |
| 2-SR-36 Sound Wall Trail Alternative 250 Trail Section.pdf | ||
| 10-8. Notice to Proceed.docx | DOCX document | |
| 9-7. Form of Agreement .docx | DOCX document | |
| 14-12. General Conditions.docx | DOCX document | |
| 4-2. Table of Contents.docx | DOCX document | |
| 13-11. Change Order .docx | DOCX document | |
| 5-3. Instructions to Bidder.docx | DOCX document | |
| 15-13. Supplementary Conditions.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID FORM
STANSBURY PARK SERVICE AGENCY
SR-36 Sound Wall Trail
TABLE OF ARTICLES
Page
| Article 1 – Bid Recipient | 1 |
| Article 2 – Bidder’s Acknowledgements | 1 |
| Article 3 – Bidder’s Representations | 1 |
| Article 4 – Further Representations | 2 |
| Article 5 – Basis of Bid | 2-3 |
| Article 6 – Schedule of Values | 3-13 |
| Article 7 – Time of Completion | 13 |
| Article 8 – Attachments To This Bid | 13 |
| Article 9 – Defined Terms | 13 |
| Article 10 – Bid Submittal | 13-15 |
EJCDC C-410 Suggested Bid Form for Construction Contracts Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
Page i Bid Recipient This Bid is submitted to:
Stansbury Park Service Agency #1 Country Club Dr. Suite 1 Stansbury Park, UT. 84074 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
Bidder’s Acknowledgements Bidder accepts all of the terms and conditions of the Instructions to Bidders. This Bid will remain subject to acceptance for 30 days after the Bid opening or for such a longer period that the Bidder may agree to in writing upon request of the Owner.
Bidder’s Representations In submitting this Bid, Bidder represents that:
Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged.
Addendum No.
Addendum Date
Signature of Bidder
Bidder has visited the Site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.
Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.
Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site.
Bidder has obtained and carefully studied (or accepts the consequences for not doing so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.
Bidder does not consider that any further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.
Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.
Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Engineer is acceptable to Bidder.
The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
Bidder will submit written evidence of its authority to do business in the state where the Project is located not later than the date of its execution of the Agreement.
The contractor understands that weekly phased construction reports will be given to Agency.
Further Representations Bidder further represents that:
This bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation;
Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
Basis of Bid Bidder acknowledges that estimated quantities are not guaranteed and are solely for the comparison of Bids and for the bidder’s convenience in preparing a bid. Quantities shall be verified by the bidder and shall be the responsibility of the bidder. Payment for all work will be based on the lump sum price proposed.
References Document 00 72 00: General Conditions Document 01 10 01: American Public Works Association Technical Specifications
BID SCHEDULE
Based on the quantities provided in the Bid Schedule the BIDDER is to provide a unit price for all labor, materials, equipment, tools, and any necessary incidentals to complete the item.
Payment Procedures, APWA 01 29 00.
Unit Price Amount is to include all work basic to the Contract and necessary to provide the unit complete.
The quantities and units are listed as follows:
BIDDER to provide a Unit Price for each item (unless it is a Lump Sum Item), a Total Amount for each item and a Bid Schedule Total Price both numerically and written form.
The Bidder agrees to furnish all materials, labor, equipment, tools, services, and all necessary incidentals for the completed construction work in the following Bid Schedule for the SR-36 Sound Wall Trail Project as detailed in the Specifications and Drawings for the unit and lump sum prices as described in this Article Section.
SR-36 Sound Wall Trail
| Lump Sum Bid Price = |
| $ |
SR-36 Sound Wall Trail-Alternate Design (Extra 250’ Section)
| Lump Sum Bid Price = |
| $ |
schedule of values Each Bidder is required to complete this section as part of the bid. The schedule of values in this section does not constitute the bid. Any incidental omission of items listed does not warrant a change order. Bidders are responsible to furnish the work in full as indicated in the plans and according to all specifications. The schedule of values shall only be used to evaluate the bids to calculate and determine progress and/or partial payments. Refusal to provide a schedule of values for the work may be considered a non-responsive bid.
All material testing to be done by the CONTRACTOR. The contractor to submit one digital copy and one hard copy to OWNER/OWNER’S REPRESENTATIVE.
SR-36 Sound Wall Trail Schedule of Values
| Item |
| Specification Reference Number |
Classification of Work Quantity Unit Unit Price
Amount
Roadway Improvements
| 1 |
| 01 71 13 |
Mobilization / Demobilization / Cleanup Lump Sum
| 2 |
| 01 57 00 and 31 11 00 |
Site Prep Lump Sum
| 3 |
| 01 43 40 |
ADA / Safety Lump Sum
| 4 |
| 01 74 13 |
Restoration Lump Sum
| 5 |
| 01 32 16 |
Weekly Progress Reports
| 6 |
| 01 78 50 |
Punchlist Completion
| 7 |
| 01 45 00 |
Materials Testing/ Quality Control Lump Sum
Trail Construction
| 8 |
| 32 11 23 |
Road Base (12”) 2,342 Cubic Yards
| 9 |
| 32 12 05, 02741 and 02743 |
Asphalt Mix (3”) Cubic Yards
| 10 |
| 03 11 00, 03 30 04, 03 30 10, and 02752 |
Concrete Sidewalk 1,236
SQ. FT.
| 11 |
| 32 16 13 |
Curb and Gutter Linear Feet
| 12 |
| 32 91 19 and 32 92 00 |
Sod 16,590
SQ. FT.
| 13 |
| 33 05 07 |
1/2” PVC Schedule 40 Irrigation Pipe Linear Feet
| 14 |
| 33 05 07 |
1” PVC Schedule 40 Irrigation Pipe Linear Feet
| 15 |
| 33 05 07 |
1-1/4” PVC Schedule 40 Irrigation Pipe Linear Feet
| 16 |
| 33 05 07 |
1-1/2” PVC Schedule 40 Irrigation Pipe Linear Feet
| 17 |
| 33 05 07 |
2” PVC Schedule 40 Irrigation Pipe Linear Feet
| 18 |
| 33 05 07 |
2-1/2” PVC Schedule 40 Irrigation Pipe Linear Feet
| 19 |
| 33 08 00 |
Rain bird 6504-PC, FC 04 Turf Rotor Pop-Up Sprinkler Head Each
| 20 |
| 33 08 00 |
Rain bird 6504-PC, FC 06 Turf Rotor Pop-Up Sprinkler Head Each
| 21 |
| 33 08 00 |
Rain bird 6504-PC, FC 08 Turf Rotor Pop-Up Sprinkler Head Each
| 22 |
| 33 08 00 |
Rain bird 6504-PC, FC 10 Turf Rotor Pop-Up Sprinkler Head Each
| 23 |
| 33 08 00 |
Rain bird 6504-PC, FC 12 Turf Rotor Pop-Up Sprinkler Head Each
| 24 |
| 33 08 00 |
Rain bird 6504-PC, FC 14 Turf Rotor Pop-Up Sprinkler Head Each
| 25 |
| 33 12 16 |
Rain Bird PEB-PRS-D 1-1/2” Irrigation Valve Each
| 26 |
| 33 12 16 |
Rain Bird PEB-PRS-D 2” Irrigation Valve Each
| 27 |
| 31 23 16 and 33 05 20 |
Utility Trenching Linear Feet
| 28 |
| 33 11 00 |
Rainbird WeatherTrak ET Pro 3 controller
EA
| 29 |
| 26 05 33 |
Electrical Sleeve Linear Feet
| 30 |
| 31 05 19 and 31 37 00 |
Rock Retaining Wall Lump Sum
| 31 |
| 31 41 00 |
Stabilization of Existing Rock Wall Lump Sum
| 32 |
| 31 05 13 |
Earthwork /Drainage Lump Sum
Roadway Improvements
| 33 |
| 32 14 23 |
Pavement Markings Linear Feet
| 34 |
| 32 01 05 |
Signs Each
| 35 |
| 02844 |
F-Shape Barrier Each
TOTAL = $
Written As:
6.03 SR-36 Sound Wall Trail-Alternate Design (Extra 250’ Section) Note: Quantities of the Schedule of values below shows the total quantity of materials needed including the SR-36 Sound Wall Trail and additional materials needed for this alternate design.
Schedule of Values
| Item |
| Specification Reference Number |
Classification of Work Quantity Unit
Unit Price
Amount
Miscellaneous Items
| 36 |
| 01 71 13 |
Mobilization / Demobilization / Cleanup Lump Sum
| 37 |
| 01 57 00 and 31 11 00 |
Site Prep Lump Sum
| 38 |
| 01 43 40 |
ADA / Safety Lump Sum
| 39 |
| 01 74 13 |
Restoration Lump Sum
| 40 |
| 01 32 16 |
Weekly Progress Reports
| 41 |
| 01 78 50 |
Punchlist Completion
| 42 |
| 01 45 00 |
Materials Testing/Quality Control Lump Sum
Trail Construction
| 43 |
| 32 11 23 |
Road Base (12”) 2,471 Cubic Yards
| 44 |
| 32 12 05, 02741 and 02743 |
Asphalt Mix (3”) Cubic Yards
| 45 |
| 03 11 00, 03 30 04, 03 30 10, and 02752 |
Concrete Sidewalk 1,236
SQ. FT.
| 46 |
| 32 16 13 |
Curb and Gutter Linear Feet
| 47 |
| 32 91 19 and 32 92 00 |
Sod 17,550
SQ. FT.
| 48 |
| 33 05 07 |
1” PVC Schedule 40 Irrigation Pipe Linear Feet
| 49 |
| 33 05 07 |
1-1/4” PVC Schedule 40 Irrigation Pipe Linear Feet
| 50 |
| 33 05 07 |
1-1/2” PVC Schedule 40 Irrigation Pipe Linear Feet
| 51 |
| 33 05 07 |
2” PVC Schedule 40 Irrigation Pipe Linear Feet
| 52 |
| 33 05 07 |
2-1/2” PVC Schedule 40 Irrigation Pipe Linear Feet
| 53 |
| 33 08 00 |
Rain bird 6504-PC, FC 04 Turf Rotor Pop-Up Sprinkler Head Each
| 54 |
| 33 08 00 |
Rain bird 6504-PC, FC 06 Turf Rotor Pop-Up Sprinkler Head Each
| 55 |
| 33 08 00 |
Rain bird 6504-PC, FC 08 Turf Rotor Pop-Up Sprinkler Head Each
| 56 |
| 33 08 00 |
Rain bird 6504-PC, FC 10 Turf Rotor Pop-Up Sprinkler Head Each
| 57 |
| 33 08 00 |
Rain bird 6504-PC, FC 12 Turf Rotor Pop-Up Sprinkler Head Each
| 58 |
| 33 08 00 |
Rain bird 6504-PC, FC 14 Turf Rotor Pop-Up Sprinkler Head Each
| 59 |
| 33 12 16 |
Rain Bird PEB-PRS-D 1-1/2” Irrigation Valve Each
| 60 |
| 33 12 16 |
Rain Bird PEB-PRS-D 2” Irrigation Valve Each
| 61 |
| 31 23 16 and 33 05 20 |
Utility Trenching Linear Feet
| 62 |
| 33 11 00 |
Rainbird WeatherTrak ET Pro 3 controller
EA
| 63 |
| 32 84 23 |
Irrigation Sleeve Linear Feet
| 64 |
| 26 05 33 |
Electrical Sleeve Linear Feet
| 65 |
| 31 05 19 and 31 37 00 |
Rock Retaining Wall Lump Sum
| 66 |
| 31 41 00 |
Stabilization of Existing Rock Wall Lump Sum
| 67 |
| 31 05 13 |
Earthwork / Drainage Lump Sum
Roadway Improvements
| 68 |
| 32 17 23 |
Pavement Markings Linear Feet
| 69 |
| 32 01 05 |
Signs Each
| 70 |
| 02844 |
F-Shape Barrier Each
TOTAL = $
Written As:
ABOVE PROPOSALS ARE HEREBY RESPECTFULLY SUBMITTED BY:
| _______________________________________ | ____________________________________________ | ||||
| Contractor | License No. | ||||
| _______________________________________ | ____________________________________________ | ||||
| By | Title | ||||
| ___________________ | _________________ | ____________________________________________ | |||
| Business License No. | Issuing City/County | Expiration Date |
| Business Address | City | State | Zip Code | ||
| ______________________________________ | ____________________________________________ | ||||
| Mobile Telephone | Office Phone |
Email Address
| 6.04 | GENERAL |
| A. Units of measurement are listed above in the price schedule(s). | |
| B. See measurement and payment procedures in APWA Section 01 29 00. | |
| C. ENGINEER will take all measurements and compute all quantities. | |
| D. CONTRACTOR will verify ENGINEER’s measurements and computations. | |
| E. CONTRACTOR will provide all equipment, workers, and survey crews to assist ENGINEER in making | |
| Measurements. | |
| F. The term “Lump Sum” when used as an item of payment will mean complete payment for the work described in the | |
| contract. When a complete structure, portion of work, or unit is specified “Lump Sum” as the unit of measurement, | |
| the unit will include but not be limited to all materials, accessories, tools, protective devices, and all operations and | |
| labor necessary to complete the work as shown on the plans and as specified. |
G. For the applicable described project(s) in paragraph 6.02 & 6.03, the change order fee will be determined by following instructions in C-700 General Conditions, Article 12, paragraph 12.01.C.1 through 12.02.C.2f.
MISCELANEOUS ITEMS
| 6.05 | MOBILIZATION / DEMOBILIZATION / CLEANUP (Bid Item No. 1 and 37) |
| APWA SECTION 01 71 13 |
Bid price covers cost of mobilization, demobilization, installation of temporary facilities, and bringing all necessary construction equipment to site as well as the post construction cleanup.
Payment on a Lump Sum basis.
| 6.06 | SITE PREP (BID Item No. 2 and 38) |
| APWA SECTION 01 57 00 AND 31 11 00 |
A. Bid price covers cost of equipment and manpower for removal of roots, tree debris, clearing the site.
B. Bid price covers cost of equipment for noise control, dust and mud control, surface water control, pollution control, and any erosion control measures.
C. Payment is on a Lump Sum basis.
6.07 ADA / SAFETY (Bid Item No. 3 and 39)
APWA SECTION 01 43 40
A. Bid price covers cost to enforce work site safety plan including protecting ENGINEER’s personnel, the general public, and environment per state or federal laws and regulations.
B. Payment is on a Lump Sum basis.
6.8 RESTORATION (Bid Item No. 4 and 40)
APWA SECTION 01 74 13
A. Bid price covers cost of any cleaning materials and disposal of waste materials, debris, and rubbish. Includes costs associated with cleaning before final inspection.
B. Payment is on a Lump Sum basis.
6.9 WEEKLY PROGRESS REPORTS (Bid Item No. 5 and 41)
APWA SECTION 01 32 16
A. This value is not a direct cost to the contractor.
B. Payment installments will be based on milestones.
C. The Agency will withhold payment installments for the duration of the project if weekly reports are not provided by the end of every week.
6.10 PUNCHLIST COMPLETION (Bid Item No. 6 and 42)
APWA SECTION 01 78 50
A. This value is not a direct cost to the Contractor. Contractor will coordinate with the Agency for a final walkthrough to ensure any outstanding deficiencies (minor or major) are fixed.
B. Final payments will not be dispersed until the final punch list and walkthrough are completed and agreed on between both parties.
6.11 MATERIALS TESTING/QUALITY CONTROL (Bid Item No. 7 and 43)
APWA SECTION 01 45 00
A. Contractor to ensure all materials testing complies with industry standards.
B. Contractor responsible for submittals before and during construction.
C. Submittals to include one digital copy and one physical copy to owner.
D. Bid price covers cost of testing, materials, and submittal documentation.
E. Payment is on a Lump Sum basis.
TRAIL CONSTRUCTION
| 6.12 | ROAD BASE (Bid Item No. 8 and 44) |
| APWA SECTION 32 11 23 |
0. Measured on a cubic yard basis.
0. Bid price covers the cost of the work and materials of:
0. Mix design and testing.
0. Hauling, loading, and transportation of material to site.
0. Placement of concrete mix as directed by OWNER/OWNER’S RESPRESENTATIVE.
C. Payment is on a Per Cubic Yard basis.
| 6.13 | ASPHALT MIX (Bid Item No. 9 and 45) |
| APWA SECTION 32 12 05 AND UDOT SECTION 02741, AND 02743 |
0. Measured on a cubic yard basis.
0. Bid price covers the cost of the work and materials of:
0. Mix design and testing.
0. Hauling, loading, and transportation of the material to site.
0. Placement of concrete mix as directed by OWNER/OWNER’S REPRESENTATIVE.
C. Payment is on a Per Cubic Yard basis.
| 6.14 | CONCRETE SIDEWALK (Bid Item No. 10 and 46) |
| APWA SECTION 03 11 00, 03 30 04, 03 30 10 AND UDOT SECTION 02752 |
0. Bid price covers cost of concrete mix including associated materials, testing, preparation, delivery, placement, protection and repairs.
0. Bid price includes materials, accessories, inspections and quality control for framework, bracings, and stripping form work.
0. Payment on a Per Square Foot basis.
| 6.15 | CURB AND GUTTER (Bid Item No. 11 and 47) |
| APWA SECTION 32 16 13 |
0. Bid price covers cost of concrete mix including associated materials, testing, preparation, delivery, placement, protection and repairs.
0. Bid price includes costs associated with construction equipment as directed by OWNER/OWNER’S REPRESENTATIVE.
0. Payment on a Per Linear Foot basis.
| 6.16 | SOD (Bid Item No. 12 and 48) |
| APWA SECTION 32 91 19, AND 32 92 00 |
0. Bid price covers cost associated with site preparation, protection, layout, backfilling, compaction, and cleaning.
0. Bid price also includes cost of delivery, storage, handling of seed, sod and topsoil.
0. Payment on a Per Square Foot basis.
| 6.17 | PVC PIPE (Bid Item No. 13 through 18 and 48 through 52) |
| APWA SECTION 33 05 07 |
0. Bid price covers cost of pipe material including and couplings, fittings and joints; shipping and handling and storage.
0. Bid price also includes costs associated with delivery, storage, and handling of PVC pipe as directed by OWNER/OWNER’S REPRESENTATIVE.
0. Payment on a Per Linear Foot basis.
| 6.18 | SPRINKLER HEAD (Bid Item No. 19 through 24 and 53 through 58) |
| APWA SECTION 33 08 00 |
0. Bid price covers cost of materials including and couplings, fittings and joints; shipping and handling and storage.
0. Bid price also includes costs associated with delivery, storage, and handling of sprinkler head as directed by OWNER/OWNER’S REPRESENTATIVE.
0. Payment on a Per Each basis.
| 6.19 | IRRIGATION VALVE (Bid Item No. 25, 26, 59, and 60) |
| APWA SECTION 33 12 16 |
0. Bid price covers cost of valve materials including and couplings, fittings and joints; shipping and handling and storage.
0. Bid price also includes costs associated with delivery, storage, and handling of irrigation valve as directed by OWNER/OWNER’S REPRESENTATIVE.
C. Payment on a Per Each basis.
| 6.20 | UTILITY TRENCHING (Bid Item No. 27, and 61) |
| APWA SECTION 31 23 16 AND 33 05 20 |
0. Bid price covers cost of excavation of existing materials and proper disposal.
0. Bid price also includes costs associated with backfill material, delivery, preparation, finishing, and cleaning as directed by OWNER/OWNER’S REPRESENTATIVE.
C. Payment on a Per Linear Feet basis.
| 6.21 | RAINBIRD WEATHERTRAK ET PRO 3 CONTROLLER (Bid Item No. 28, and 62) |
| APWA SECTION 33 11 00 |
0. Bid price covers cost of materials including controller, parts and installation.
0. Bid price also includes costs associated with delivery, storage, and handling of controller as directed by OWNER/OWNER’S REPRESENTATIVE.
C. Payment on a Per Each basis.
| 6.22 | RETAINING WALL (Bid Item No. 30 and 65) |
| APWA SECTION 31 05 19 AND 31 37 00 |
0. Bid price covers cost of site preparation, layout and placement of rock retaining wall ensuring rocks are keyed together and filling irregularities.
0. Bid price also includes costs associated with delivery, storage, and handling of geotextile materials to ensure stabilization of rock wall.
0. Payment on a Lump Sum basis.
| 6.23 | STABILIZATION OF EXISTING ROCK WALL (Bid Item No. 31 and 66) |
| APWA SECTION 31 41 00 |
0. Bid price covers cost of design of protective systems used, materials and preparation, installation and removal of support systems used.
0. Bid price also includes costs associated with stability and protection of existing rock wall.
0. Payment on a Lump Sum basis.
| 6.24 | EARTHWORK (Bid Item No. 32 and 67) |
| APWA SECTION 31 05 13 |
0. Bid price covers cost of common fill material including shipping, quality assurance and acceptance.
0. Payment on a Lump Sum basis.
| 6.25 | IRRIGATION SLEEVE (Bid Item No. 63) |
| APWA SECTION 32 84 23 |
0. Bid price covers cost of materials and accessories including pipes and sleeve
0. Bid price also includes cost of excavation, installation, assembly, backfilling, testing and field quality control.
0. Payment on a Per Linear Foot basis.
| 6.26 | ELECTRICAL SLEEVE (Bid Item No. 29 and 64) |
| APWA SECTION 26 05 33 |
0. Bid price covers cost of conduit, tubing, and accessories including sleeve.
0. Bid price also covers cost of preparation, and installation.
0. Payment on a Per Linear Foot basis.
ROADWAY IMPROVEMENTS
| 6.27 | PAVEMENT MARKINGS (Bid Item No. 33 and 68) |
| APWA SECTION 32 17 23 |
0. Bid price covers cost of installation, of any paint, Pre-Formed thermos-Plastic Markings Per UDOT and MUTCD Standards for heat tape, including all equipment, manpower, materials, tools, any incidentals and cleanup.
0. Payment will be on a Per Linear Foot basis.
| 6.28 | SIGNS (Bid Item No. 34 and 69) |
| APWA SECTION 32 01 05 |
0. Bid price covers cost of materials, colors and format, preparation, installation and workmanship of signs.
0. Payment on a Per Each basis.
6.29 F-SHAPE BARRIER (Bid Item No. 35 and 70)
0. Bid price covers cost of materials, shipping and handling, labor and placement of barriers.
0. Payment on a Per Each basis.
Time of Completion Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 14.07.B of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
Attachments To This Bid The following documents are made a condition of, and required to accompany this Bid:
Section C-410 M, Bid Form Supplemental (Use standard forms per section C-410 M Bid Form Supplemental) Affidavit of Non-Collusion (Use standard form C-420 S) Defined Terms The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions Bid Submittal This Bid submitted by:
If Bidder is:
An Individual
Name (typed or printed):
By: (SEAL) (Individual’s signature)
Doing business as:
A Partnership
Partnership Name: (SEAL)
By:
(Signature of general partner – attach evidence of authority to sign)
Name (typed or printed):
A Corporation
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):
By:
(Signature – attach evidence of authority to sign)
Name (typed or printed):
Title:
(CORPORATE SEAL)
Attest:
(Signature of Corporate Secretary)
Date of Qualification to do business in ________________ [State Where Project is Located] is ____\____\____.
A Joint Venture
Name of Joint Venturer:
First Joint Venturer Name: (SEAL)
By:
(Signature of first joint venture partner – attach evidence of authority to sign)
Name (typed or printed):
Title:
Second Joint Venturer Name: (SEAL)
By:
(Signature of second joint venture partner – attach evidence of authority to sign)
Name (typed or printed):
Title:
(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)
Bidder’s Business address:
Phone: Facsimile:
Submitted on ______________________________, 20_____.
State Contractor License No. ________________. (If applicable)
PAGE INTENTIONALLY LEFT BLANK
EJCDC C-410 Bid Form Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
00410 - 3
File details come from the government source that posted it. Updated .