This is an APWA Inclusion Document prepared by the Stansbury Park Service Agency in Utah for the SR-36 Sound Wall Trail project (NS26-166). The Stansbury Park Service Agency is accepting sealed bids for this project with a submission deadline of Wednesday, July 29th, 2026, at 4:00 pm at their office located at 1 Country Club Drive, Suite 1, Stansbury Park, UT 84074. A non-mandatory pre-bid conference will be held on Wednesday, July 15th, 2026, at 3:00 pm at the same location. Prospective bidders may submit questions until July 23, 2026, at 4:00 pm to Shawn Chidester at s.chidester@stansburypark.gov. The specific products or services requested, project overview details, item quantities, contract term, and renewal options are not detailed in the summary information provided.
No additional information regarding pricing terms, set asides, incumbent contractors, funding sources, or other financial requirements is specified in the available documentation. Bidders are advised that this posting is a courtesy advertisement only and that the Division of Purchasing is neither the issuing nor conducting unit for this solicitation. Vendors are responsible for reviewing the complete solicitation documents to ensure compliance with all requirements, and the contract award will not be posted on the Division of Purchasing website but rather communicated directly by the Stansbury Park Service Agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-4. Bid Form.docx | DOCX document | |
| 11-9. Measurement Payment.docx | DOCX document | |
| 7-5. Bid Form (Supplemental).docx | DOCX document | |
| 8-6. Bid Bond .docx | DOCX document | |
| 3-1. Invitation to Bid.docx | DOCX document | |
| 1-SR-36 Sound Wall Trail Full Plans 6.26.26.pdf | ||
| 12-10. Non-Collusion.docx | DOCX document | |
| 2-SR-36 Sound Wall Trail Alternative 250 Trail Section.pdf | ||
| 10-8. Notice to Proceed.docx | DOCX document | |
| 9-7. Form of Agreement .docx | DOCX document | |
| 14-12. General Conditions.docx | DOCX document | |
| 4-2. Table of Contents.docx | DOCX document | |
| 13-11. Change Order .docx | DOCX document | |
| 5-3. Instructions to Bidder.docx | DOCX document | |
| 15-13. Supplementary Conditions.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOCUMENT 01 10 01
AMERICAN PUBLIC WORKS ASSOCIATION
TECHNICAL SPECIFICATIONS
INCLUSION DOCUMENT
The General Conditions, Technical Specification and Standard Plan Documents that shall govern this Project are listed below:
American Public Works (APWA) Manual of Standard Specifications and Manual of Standard Plans 2025 Edition
The American Public Works Association (APWA), Manual of Standard Specifications and Standard Plans (2025 Edition) Documents shall govern this Project as if they were printed and included in their entirety in the Bidding Document. They are made a part of this Project by this reference.
The Divisions listed below are the Divisions that apply to this Project. See the Table of Contents within the Manual for the Appropriate Sections within each Division.
DIVISION 01 – GENERAL REQUIREMENTS
DIVISION 03 – CONCRETE
DIVISION 26 – ELECTRICAL
DIVISION 31 – EARTH WORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
The APWA Manual of Standard Specifications and Plans should be used in the preparation of the Bid for this Project. It is the Bidders responsibility to utilize these Documents and to know and understand them as they apply to this Project and to include in their Bid any costs associated with complying with the provisions provided therein.
It shall be required that these Documents be on site at all times during Construction.
The APWA Manual is available at the following locations which are listed below:
· For Purchase at:
Utah LTAP Center Utah State University 8205 Old Main Hill Logan, Utah 84322-8205 Phone Number (800) 822-8878 or (435) 797-2931
The following Sections of the APWA Manual are included by reference for the construction of the SR-36 Sound Wall Trail Project:
DIVISION 01 GENERAL REQUIREMENTS
| 01 11 00 | Summary of Work |
| 01 32 16 | Progress Schedule |
| 01 43 40 | Resident Superintendent |
| 01 45 00 | Quality Control |
| 01 57 00 | Temporary Controls |
| 01 71 13 | Mobilization and Demobilization |
| 01 74 13 | Progress Cleaning |
| 01 78 50 | Closeout Procedures |
DIVISION 03 CONCRETE
| 03 11 00 | Concrete Forming |
| 03 30 04 | Concrete |
| 03 30 10 | Concrete Placement |
DIVISION 26 ELECTRICAL
26 05 33 Raceway
DIVISION 31 EARTH WORK
| 31 05 13 | Common Fill |
| 31 05 19 | Geotextiles |
| 31 11 00 | Site Clearing |
| 31 23 16 | Excavation |
| 31 37 00 | Riprap or Rock Lining |
| 31 41 00 | Shoring |
DIVISION 32 EXTERIOR IMPROVEMENTS
| 32 01 05 | Information, Regulatory, and Warning Signs |
| 32 11 23 | Aggregate Base Course |
| 32 12 05 | Bituminous Concrete |
| 32 16 13 | Curb and Gutter |
| 32 17 23 | Pavement Markings |
| 32 84 23 | Underground Irrigation Systems |
| 32 91 19 | Landscape Grading |
| 32 92 00 | Turf and Grass |
DIVISION 33 UTILITIES
| 33 05 07 | Polyvinyl Chloride Pipe |
| 33 05 20 | Backfilling Trenches |
| 33 08 00 | Commissioning of Water Utilities |
| 33 11 00 | Water Distribution and Transmission |
| 33 12 16 | Water Valves |
(End of Document) APWA Inclusion Document 01 10 01 - 1