This solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin is seeking proposals for the Y1DA--EHRM Infrastructure Upgrades Construction project at Lexington-Cooper, Kentucky. Offerors are to provide all labor, materials, equipment and supervision required to upgrade existing infrastructure including installing new servers, storage, network equipment and related hardware and software with the goal of improving electronic health records management systems. Proposals are due by January 15, 2023 with the contract to be awarded by March 1, 2023. The period of performance is 365 days following the award date. This is a small business set-aside reserved for qualified service-disabled veteran-owned small businesses.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
EHRM INFRASTRUCUTRE UPGRADES
LEXINGTON VA HEALTH CARE SYSTEM -
BOWLING CAMPUS
LEXINGTON, KY
Project No. 569A4-22-700
100% CONSTRUCTION DOCUMENTS
SPECIFICATIONS
16 May 2023
Prime Contractor: Health Facilities Solutions, 8718 Botts Ln., San Antonio, TX 78217
LEXINGTON-COOPER EHRM INFRASTRUCTURE UPGRADES
PROJECT #569A4-22-700
LEXINGTON-COOPER VAMC, LEXINGTON, KY 04-08-2022
00 00 20 - 1
SECTION 00 00 20
PHASING
The project is to address the EHRM Infrastructure Upgrades within the Lexington-Cooper VAMC campus. The project scope includes telecom rooms and data center with the work following a phase sequence performed in the least disruptive manner possible and per infection control policies and requirements.
The submitted design was developed through a survey of existing conditions, existing documentation provided by the VA as well as a review of VA Guidelines. Multiple Space layout iterations developed and presented to the Contracting Officer Representatives (COR) as well as the Integrated Project Team. These meetings further developed the design for a) functional areas/relationships, b) room sizing
/configurations, and c) circulation routes.
Reference specification Section 010000 General Requirements 1.6 Operations & Storage Areas (FAR
52.236-10) Item I Phasing.
Methods of work and outages: Contractor shall comply with the following as well as phasing as noted in later paragraphs: in general, power outages shall not be allowed during standard hours of operation and shall be conducted on premium time. Specific time frame and schedule of all outages shall be approved by the COR.
Temporary power shall be provided as required for any systems required for use during normal facility operating hours that is being interrupted to perform electrical work. Temporary power shall include extending circuits from adjacent distribution by means of providing temporary generators, fuel and distribution. Temporary power shall be set up/installed so no power outage is required during normal facility hours of operation.
Emergency power outages on life safety, critical or equipment branch systems may not take place at the same time as a normal power outage.
The Contractor shall coordinate phasing of work for all disciplines as outlined in this document and noted in the design documents. Also, the Contractor shall conduct phasing meetings and coordinate phasing plan with the COR. The below is provided to give general guidance and not to supersede any requirement for the Contractor to provide a full detailed schedule.
General project scope/phasing sequence is listed below. See Design drawings for further phasing notes and details.
Technology Phasing
• Phase A: work associated with new TR Rooms is a necessary predecessor for work to proceed to
Phase B. The COR, local facilities engineering, and designated OIT representative must sign off on completion of new TR Rooms prior to moving work into Phase B.
• Phase B:
1. Any work shall be coordinated in advance. Staff entering this space will require escorts unless otherwise agreed upon by OIT management. Equipment in this space is sensitive and care shall be taken to minimize any disruption to patient care.
00 00 20 - 2
2. Associated work to enable the racks are completed prior to moving to Phase D and must be signed off with COR, local facilities engineering, and designated OIT representative
3. Any required activity by VA Staff to support this project must be agreed to minimum 4 weeks in advance of any required activity. Delays caused by failing to identify these activities and gain acceptance of the scheduled requirement shall be borne by the
Contractor. No change orders for schedule will be accepted for a failure to schedule VA support in a timely fashion.
4. ‘Phase 1’ state of this room is to remain the temporary state until Phase D is underway minimally. This should allow sufficient time for OIT to migrate any hardware.
5. OIT staff will require significant lead times and coordination of equipment movement within this space. Some equipment is leased and must be scheduled moves outside of the direct control of OIT staff. Progression of this room’s build out of this phase is at OIT’s discretion. Cost of delay shall not be borne by VA if less than 4 weeks’ notice is not given for any required action by same.
6. Devices printed in dashed line types are shown in their current location while solid lines indicate their new/permanent location.
• Phase C: installation of major pathways for vertical/horizontal distribution of cabling. All associated work on pathways and risers are completed prior to moving to Phase D and must be signed off with the COR, local facilities engineering, and the designated OIT representative.
1. Cable Tray and Pathways
Demolition of old Cable Tray (J-Hook supports installed on existing threaded rods previously supporting cable tray for temporary support)
Installation of new Cable Tray/Fire Sleeves per the Technology Overall Sheets.
2. Fiber Optic Distribution:
Phase C0: install all Fiber Optics per TN-600-C.1 terminating in “New Fiber
Tree” locations indicated on sheet TN-442-C.1.4.
• Phase D: Migration and Horizontal Cabling- intended to happen cyclically as noted below.
1. Phase D0: installation of Horizontal Cabling from TR to Zone Enclosure. Upon completion of a Zone Enclosure, Phase D1 can proceed for that ZE.
2. Phase D1: installation of Cabling from Zone Enclosure to Work Area Outlets and
Migration of data switches.
This phase must be coordinated with OIT staff and is intended to be completed one or two active TR rooms at a time cyclically until all rooms are completed.
This phase requires OIT switches positioned and programmed by VA Staff.
Any required activity by VA Staff to support this project must be agreed to minimum 4 weeks in advance of any required activity. Delays caused by failing to identify this activities/gain acceptance of scheduled requirement shall be borne by the Contractor. No change orders for schedule will be accepted for a failure to schedule VA support in a timely fashion.
Phase D1a: Demo Cabling (as previously scheduled with VA) in the room(s) to the cable tray. Coordinate with OIT the rooms to be cut over to New TR.
Phase D1b: install/terminate cabling from Zone Enclosure to Work Area Outlets for the room(s)
Phase D1c: test cabling, reinstall patch cables at Work Area Outlet. Install TR
Room Patch cabling in coordination with OIT Switch programming. Validate devices have re-established connectivity.
Phase D1d: complete demolition of abandoned, horizontal cabling to point of origin (local signals closets).
00 00 20 - 3
• Phase E:
1. Technology Drawings indicate Room to be constructed in 3-phases. ‘Phase 2’ depicts the completed state of the phased conversion.
2. This phase is intended to begin construction as soon as Phase B is accepted, and ‘Fiber
Tree 2’ (existing fiber distribution rack) can be moved out of the way allowing the remaining phasing to continue.
3. It is not required that the entirety of old fiber in ‘Fiber Tree 2’ to be removed prior to this phase progressing. Rather, it can/should be temporarily accommodated in place while the other phases remove connections from this rack. This rack/fiber shall be removed as part of Phase G.
• Phase F:
1. Technology Drawings indicate Room to be constructed in 3-phases. Room’s final state is depicted on sheet.
2. This phase is intended to begin construction as soon as Phase E is accepted.
• Phase G: Demolition
1. Unused/abandoned cabling because of this project shall be removed end-to-end.
Mechanical Phasing
• For the space, general phasing steps are as follows:
1. Ensure AHU- is in operation and existing AHU- is off.
2. Install new equipment and duct as shown on the design drawings.
3. Once installation is complete, ACU-23 and ACU-24 can operate as shown on M-600.
4. Refer to design drawings for demolition scope shown on MD-401-C.1. B.
• For the Data Center, general phasing steps are as follows:
1. During construction of the Data Center, existing CRAC units to remain in operation.
Existing CRAC- shall only be moved once new CRAC- is installed and operational.
Electrical Phasing
• Phasing shall be as shown below. Install:
1. New electrical equipment in Elec. Room-
2. Feeder to new electrical equipment in Elec. Room-.
3. Feeders, panels, and electrical devices in the new TR’s.
• Data Center Phasing, see below. (See Sheet EP- for further detail)
1. Perform selective Demo in Server Room-
2. Install new panels for UPS1 and install UPS1 panel branch circuits in a planned method to minimize down time. Coordinate outages with COR and construction manager.
3. Demo/install new replacement UPS1 and pull new feeders to replacement UPS1.
4. This will require multiple teams to minimize down time.
5. Provide and install electrical devices and equipment in room.
Plumbing / Fire Protection Phasing
• Plumbing and Fire Protection Phasing of work shall be coordinated with work of other disciplines. See design documents for further detail.
00 00 20 - 4
PART 1 - GENERAL
1.1 RELATED WORK
1.2 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. National Fire Protection Association (NFPA): 70-20 National Electrical Code.
1.3 SUBMITTALS
A. Submittal procedures: Section 013323 SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES
B. Submittal Drawings: show size, configuration, and fabrication and installation details.
C. Manufacturer Literature & Data: 1) each product description, and 2) installation instructions.
D. Sustainable Construction Submittals:
1. Recycled Content: identify post- and pre-consumer recycled content percentage by weight.
2. Low Pollutant-Emitting Materials: show volatile organic compound types and quantities.
E. Certificates: note each product complying with specifications/construction complying with specified performance.
F. Operation and Maintenance Data: start-up, maintenance, troubleshooting, emergency, and shut-down instructions for each operational product.
1.4 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Legibly mark packaging. Note manufacturer name/brand, type, and manufacture date.
C. Before installation, return/dispose of products within distorted, damaged, or opened packaging.
1.5 STORAGE & HANDLING
A. Store products indoors in dry, weathertight facility.
B. Protect products from damage during handling and construction operations.
1.6 FIELD CONDITIONS
A. Field Measurements: verify conditions affecting fabrication/installation. Show measurements on
Submittal Drawings.
1.7 WARRANTY
A. FAR clause 52.246-21 "Warranty of Construction."
B. Manufacturer Warranty: against material and manufacturing defects. Warranty period: 2-years.
00 00 20 - 5
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 MANUAL OPERATORS
PART 3 - EXECUTION
3.1 PREPARATION
A. Examine and verify substrate suitability for product installation.
B. Protect existing construction and completed work from damage.
3.2 INSTALLATION - GENERAL
A. Install products per manufacturer instructions and approved submittal drawings under direct supervision of manufacturer representative/trained personnel.
3.3 INSTALLATION
3.4 CLEANING
A. Clean exposed surfaces. Remove contaminants and stains.
3.5 PROTECTION
A. Remove protective materials before acceptance and repair damage.
- - E N D - -
00 00 20 - 6
THIS PAGE LEFT INTENTIONALLY BLANK
LEXIGNTON-COOPER EHRM INFRASTRUCTURE UPGRADES
LEXINTON-COOPER VAMC, LEXINGTON, KY
00 01 07 - 1
SECTION 00 01 07
SEALS PAGE
DESIGN PROFESSIONAL OF RECORD
A. Architect
1. Jeffrey Thomas Yentz
2. TX 29912
3. Responsible for Divisions 00-11.
4/18/23
B. Fire Suppression Engineer
1. Reyes Augusto Flete
2. PE-144776
3. Responsible for Divisions 21 & Section 28 31 00.
C. HVAC Engineer and Plumbing Engineer
1. Mark William Schaefer
2. PE-2001000835
3. Responsible for Division 22 & 23.
LEXINGTON-COOPER VAMC, LEXINGTON, KY
5/16/23
LEXIGNTON-COOPER EHRM INFRASTRUCTURE UPGRADES
LEXINTON-COOPER VAMC, LEXINGTON, KY
00 01 07 - 2
D. Electrical Engineer
1. Brian K. Moellenhoff
2. E-27172
3. Responsible for Divisions 25 & 26.
E. Technology Engineer
1. Raymond Martinez Jr.
2. BICSI ID # 143493
3. Responsible for Division 28.
F. Security Engineer
1. Michael S. Shepard
2. PE-2016040096
3. Responsible for Sections 281300 & 282300.
---END---
LEXINGTON-COOPER VAMC, LEXINGTON, KY
14-APR-23
09-MAY-22
LEXINGTON-COOPER EHRM
LEXINGTON-COOPER VAMC, LEXINGTON, KY 10-01-18
00 01 10 - 1
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 SPECIAL SECTIONS
00 00 20 Phasing 04-22
00 01 07 Seals Page
00 01 10 Table of Contents 10-18
00 01 15 List of Drawings
DIVISION 01 GENERAL REQUIREMENTS
01 00 00 General Requirements
01 32 16.15 Project Schedules 11-21
01 33 23 Shop Drawings, Product Data, & Samples 06-14
01 35 26 Safety Requirements 07-20
01 42 19 Reference Standards 06-14
01 45 00 Quality Control 02-21
01 57 19 Temporary Environmental Controls 01-21
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 11-21
DIVISION 02 EXISTING CONDITIONS
02 41 00 Demolition 06-14
02 82 11 Traditional Asbestos Abatement 01-21
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 21 13 Acoustical Insulation 01-21
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
DIVISION 08 OPENINGS
08 11 13 Hollow Metal Doors and Frames 06-14
08 14 00 Interior Wood Doors 01-21
08 71 00 Door Hardware 05-22
DIVISION 09 FINISHES
09 06 00 Schedule for Finishes 06-14
09 22 16 Non-Structural Metal Framing 06-14
09 29 00 Gypsum Board 06-14
09 51 00 Acoustical Ceilings 06-14
09 69 00 Access Flooring 01-21
00 01 10 - 2
09 91 00 Painting 06-14
DIVISION 10 SPECIALTIES
10 14 00 Signage 01-21
DIVISION 11 EQUIPMENT
11 00 00 Thermal Containment System 03-23
DIVISION 21 – FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression Systems 11-16
21 13 13 Wet-Pipe Sprinkler Systems 06-15
21 22 00 Clean Agent Fire Suppression Systems 05-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 05-21
22 11 23 Laboratory (Natural) Gas Piping 04-20
22 13 00 Facility Sanitary and Vent Piping 09-20
22 14 00 Facility Storm Drainage 09-15
22 40 00 Plumbing Fixtures 12-22
22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15
22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
22 66 00 Chemical-Water Systems for Laboratory and Healthcare Facilities 09-20
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
(HVAC)
23 05 11 Common Work Results for HVAC 02-20
23 05 12 General Motor Requirements for HVAC Equipment 02-20
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 09-21
23 05 93 Testing, Adjusting, and Balancing for HVAC 09-21
23 07 11 HVAC Insulation 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 02-20
23 23 00 Refrigerant Piping 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 03-23
23 37 00 Air Outlets and Inlets 02-20
23 81 00 Decentralized Unitary HVAC Equipment 02-20
23 81 23 Computer-Room Air-Conditioners 03-20
00 01 10 - 3
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 73 Overcurrent Protective Device Coordination Study 01-18
26 08 00 Commissioning of Electrical Systems 02-20
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 24 13 Distribution Switchboards 01-18
26 24 16 Panelboards 01-18
26 25 11 Data Center Busways 01-18
26 27 26 Wiring Devices 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-18
26 33 53 Static Uninterruptible Power Supply 01-17
26 36 23 Automatic Transfer Switches 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
DIVISION 27 COMMUNICATIONS
27 05 26 Grounding and Bonding for Communications Systems 11-21
27 05 33 Conduits and Backboxes for Communications Systems 11-21
27 05 36 Cable Trays for Communications Systems 11-21
27 05 53 Identification for Communications Systems 07-21
27 10 00 Structured Cabling 11-21
27 11 16 Communications Cabinets, Racks, Frames, and Enclosures 11-21
27 11 19 Communications Termination Blocks and Patch Panels 11-21
27 11 26 Communications Rack Mounted Power Protection and Power Strips 11-21
27 13 13 Communications Copper Backbone Cabling 11-21
27 13 13.13 Communications Copper Cable Splicing and Terminations 11-21
27 13 23 Communications Optical Fiber Backbone Cabling 11-21
27 15 13 Communications Copper Horizontal Cabling 11-21
27 15 13.13 Communications Optical Fiber Cable Splicing and Terminations 11-21
27 16 19 Communications Patch Cords, Station Cords, and Cross-Connect Wire 11-21
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 13 00 Physical Access Control System 02-20
28 23 00 Security Surveillance Television 02-20
28 31 00 Fire Detection and Alarm 10-11
- - - END - - -
00 01 10 - 4
THIS PAGE INTENTIONALLY LEFT BLANK
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the 95% Submittal.
Drawing No. Title
GENERAL
GI-000 COVER SHEET
GI-010 INDEX OF DRAWINGS
GI-020 GENERAL INFORMATION, SYMBOLS, & LOCATION MAP
GI-030 ARCHITECTURAL ABBREVIATIONS
GI-040 ACCESSIBILITY STANDARDS
GI-041 ACCESSIBILITY STANDARDS
GI-042 ACCESSIBILITY STANDARDS
GI-043 ACCESSIBILITY STANDARDS
GI-044 ACCESSIBILITY STANDARDS
ASBESTOS
HA-100-1A.G FLOOR PLAN - GROUND FLOOR - AREAS D & PA
HA-103-1.G FLOOR PLAN - GROUND FLOOR - AREA A
HA-113-1.1 FLOOR PLAN - FIRST FLOOR - AREA A
HA-123-1.2 FLOOR PLAN - SECOND FLOOR - AREA A
HA-133-1.3 FLOOR PLAN - THIRD FLOOR - AREA A
HA-143-1.4 FLOOR PLAN - FOURTH FLOOR - AREA A
HA-161-1.6 FLOOR PLAN - SIXTH FLOOR - AREA A
ARCHITECTURAL
AS-100-1A.G FLOOR PLAN - GROUND FLOOR - AREAS D & PA
AS-101-1A.G FLOOR PLAN - GROUND FLOOR - AREA PA
AS-102-1.G FLOOR PLAN - GROUND FLOOR - AREA B
AS-103-1.G FLOOR PLAN - GROUND FLOOR - AREA A
AS-104-1.G FLOOR PLAN - GROUND FLOOR - AREA B & A
AS-110-1A.1 FLOOR PLAN - FIRST FLOOR - AREAS D & E
AS-111-1A.1 FLOOR PLAN - FIRST FLOOR - AREA C
AS-112-1.1 FLOOR PLAN - FIRST FLOOR - AREA B
AS-113-1.1 FLOOR PLAN - FIRST FLOOR - AREA A
AS-114-1.1 FLOOR PLAN - FIRST FLOOR - AREAS B & A
AS-120-1A.2 FLOOR PLAN - SECOND FLOOR - AREA D
AS-121-1A.2 FLOOR PLAN - SECOND FLOOR - AREA C
AS-122-1.2 FLOOR PLAN - SECOND FLOOR - AREA B
AS-123-1.2 FLOOR PLAN - SECOND FLOOR - AREA A
AS-124-1.2 FLOOR PLAN - SECOND FLOOR - AREA A
AS-130-1A.3 FLOOR PLAN - THIRD FLOOR - AREA D
AS-131-1A.3 FLOOR PLAN - THIRD FLOOR - AREA C
AS-132-1.3 FLOOR PLAN - THIRD FLOOR - AREA B
AS-133-1.3 FLOOR PLAN - THIRD FLOOR - AREA A
AS-134-1.3 FLOOR PLAN - THIRD FLOOR - AREA A
AS-140-1A.4 FLOOR PLAN - FOURTH FLOOR - AREA D
AS-141-1A.4 FLOOR PLAN - FOURTH FLOOR - AREA C
AS-142-1.4 FLOOR PLAN - FOURTH FLOOR - AREA B
AS-143-1.4 FLOOR PLAN - FOURTH FLOOR - AREA A
AS-144-1.4 FLOOR PLAN - FOURTH FLOOR - AREA A
AS-150-1A.5 FLOOR PLAN - FIFTH FLOOR - AREA C
AS-151-1A.5 FLOOR PLAN - FIFTH FLOOR - AREA C
AS-152-1.5 FLOOR PLAN - FIFTH FLOOR - AREA B
00 01 15 - 2
AS-153-1.5 FLOOR PLAN - FIFTH FLOOR - AREA A
AS-154-1.5 FLOOR PLAN - FIFTH FLOOR - AREA A
AS-160-1.6 FLOOR PLAN - SIXTH FLOOR - AREA B
AS-161-1.6 FLOOR PLAN - SIXTH FLOOR - AREA A
AS-162-1.6 FLOOR PLAN - SIXTH FLOOR - AREA A
AS-200-1.G ENLARGED FLOOR PLAN - GROUND - TR A002C
AS-201-1.G ENLARGED FLOOR PLAN - GROUND - DATA CENTER A073
AS-202-1.G ENLARGED FLOOR PLAN - GROUND - DATA CENTER A073
AS-203-1A.G ENLARGED FLOOR PLAN - GROUND - PA09 & PA10
AS-204-1A.G ENLARGED FLOOR PLAN - GROUND - TR D007D
AS-205-1A.G ENLARGED FLOOR PLAN - GROUND - TR B046A
AS-206-1A.G ENLARGED FLOOR PLAN - GROUND - STORAGE PA07
AS-207-1A.G ENLARGED FLOOR PLAN - GROUND - TR A022
AS-210-1A.1 ENLARGED FLOOR PLAN - 1ST FLOOR - TR C121
AS-211-1.1 ENLARGED FLOOR PLAN - 1ST FLOOR - TR A104
AS-212-1A.1 ENLARGED FLOOR PLAN - 1ST FLOOR - TR B125
AS-220-1A.2 ENLARGED FLOOR PLAN - 2ND FLOOR - TR C222
AS-221-1.2 ENLARGED FLOOR PLAN - 2ND FLOOR - TR A243
AS-230-1A.3 ENLARGED FLOOR PLAN - 3RD FLOOR - TR C333
AS-231-1.3 ENLARGED FLOOR PLAN - 3RD FLOOR - TR A345
AS-240-1A.4 ENLARGED FLOOR PLAN - 4TH FLOOR - TR CU411
AS-241-1.4 ENLARGED FLOOR PLAN - 4TH FLOOR - TR A450
AS-250-1A.5 ENLARGED FLOOR PLAN - 5TH FLOOR - TR C580
AS-251-1.5 ENLARGED FLOOR PLAN - 5TH FLOOR - TR AU547
AS-260-1.6 ENLARGED FLOOR PLAN - 6TH FLOOR - TR A627
AS-270 ENLARGED FLOOR PLAN - VERTICAL PATHWAYS
AS-300 ROOF PLAN
AS-310 ROOF PLAN DETAILS
AS-400 INTERIOR ELEVATIONS
AS-500 PARTITION TYPES
AS-600 DOOR SCHEDULE, DOOR & FRAME TYPES
AS-610 DOOR & MISCELLANEOUS DETAILS
AS-700 ROOM FINISH SCHEDULE & MATERIAL SCHEDULE
AS-710 PHOTOS/EXISTING CONDITIONS
AS-711 PHOTOS/EXISTING CONDITIONS
FIRE PROTECTION
FP-000 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FP-100-1A.G OVERALL GROUND FLOOR PLAN - AREA D & PA - FIRE PROTECTION
FP-101-1.G OVERALL GROUND FLOOR PLAN - AREA A - FIRE PROTECTION
FP-102-1.G OVERALL GROUND FLOOR PLAN - AREA B - FIRE PROTECTION
FP-111-1A.1 OVERALL FIRST FLOOR PLAN - AREA C - FIRE PROTECTION
FP-112-1.1 OVERALL FIRST FLOOR PLAN - AREA B - FIRE PROTECTION
FP-113-1.1 OVERALL FIRST FLOOR PLAN - AREA A - FIRE PROTECTION
FP-121-1A.2 OVERALL SECOND FLOOR PLAN - AREA C - FIRE PROTECTION
FP-123-1.2 OVERALL SECOND FLOOR PLAN - AREA A - FIRE PROTECTION
FP-131-1A.3 OVERALL THIRD FLOOR PLAN - AREA C - FIRE PROTECTION
FP-133-1.3 OVERALL THIRD FLOOR PLAN - AREA A - FIRE PROTECTION
FP-141-1A.4 OVERALL FOURTH FLOOR PLAN - AREA C - FIRE PROTECTION
FP-143-1.4 OVERALL FOURTH FLOOR PLAN - AREA A - FIRE PROTECTION
FP-151-1A.5 OVERALL FIFTH FLOOR PLAN - AREA C - FIRE PROTECTION
FP-153-1.5 OVERALL FIFTH FLOOR PLAN - AREA A - FIRE PROTECTION
FP-163-1.6 OVERALL SIXTH FLOOR PLAN - AREA A - FIRE PROTECTION
FP-400-1-1A.G FIRE PROTECTION ENLARGED PLANS - DEMOLITION & NEW WORK
FP-401-1.G FIRE PROTECTION ENLARGED PLANS - GROUND FLOOR - DEMOLITION & NEW WORK
00 01 15 - 3
FP-411-1-1A.3 FIRE PROTECTION ENLARGED PLANS - FIRST FLOOR - DEMOLITION & NEW WORK
FP-421-1-1A.2 FIRE PROTECTION ENLARGED PLANS - SECOND FLOOR - DEMOLITION & NEW WORK
FP-431-1-1A.3 FIRE PROTECTION ENLARGED PLANS - THIRD FLOOR - DEMOLITION & NEW WORK
FP-441-1-1A.4 FIRE PROTECTION ENLARGED PLANS - FOURTH FLOOR - DEMOLITION & NEW WORK
FP-451-1-1A.5 FIRE PROTECTION ENLARGED PLANS - FIFTH FLOOR - DEMOLITION & NEW WORK
FP-461-1.6 FIRE PROTECTION ENLARGED PLANS - SIXTH FLOOR - DEMOLITION & NEW WORK
FP-700 FIRE PROTECTION DETAILS
PLUMBING
PL-000 PLUMBING SYMBOLS AND ABBREVIATIONS
PL-100-1A.G OVERALL GROUND FLOOR PLAN - AREA D & PA - PLUMBING
PL-101-1.G OVERALL GROUND FLOOR PLAN - AREA A EAST - PLUMBING
PL-104-1.G OVERALL GROUND FLOOR PLAN - AREA B - PLUMBING
PL-111-1A.1 OVERALL FIRST FLOOR AREA PLAN - AREA C - PLUMBING
PL-112-1.1 OVERALL FIRST FLOOR AREA PLAN - AREA B - PLUMBING
PL-123-1.2 OVERALL SECOND FLOOR PLAN - AREA A - PLUMBING
PL-131-1A.3 OVERALL THIRD FLOOR PLAN - AREA C - PLUMBING
PL-133-1.3 OVERALL THIRD FLOOR PLAN - AREA A - PLUMBING
PL-141-1A.4 OVERALL FOURTH FLOOR PLAN - AREA C - PLUMBING
PL-143-1.4 OVERALL FOURTH FLOOR PLAN - AREA A - PLUMBING
PL-153-1.5 OVERALL FIFTH FLOOR PLAN - AREA A - PLUMBING
PL-163-1.6 OVERALL SIXTH FLOOR PLAN - AREA A - PLUMBING
PL-400A-1-1A.G PLUMBING ENLARGED PLANS - GROUND FLOOR - DEMOLITION & NEW WORK
PL-400B-1-1A.G PLUMBING ENLARGED PLANS - GROUND FLOOR - DEMOLITION & NEW WORK
PL-401-1A.1 PLUMBING ENLARGED PLANS - FIRST FLOOR - DEMOLITION & NEW WORK
PL-402-1.2 PLUMBING ENLARGED PLANS - SECOND FLOOR - DEMOLITION & NEW WORK
PL-403-1-1A.3 PLUMBING ENLARGED PLANS - THIRD FLOOR - DEMOLITION & NEW WORK
PL-404-1-1A.4 PLUMBING ENLARGED PLANS - FOURTH FLOOR - DEMOLITION & NEW WORK
PL-405-1.5 PLUMBING ENLARGED PLANS - FIFTH FLOOR - DEMOLITION & NEW WORK
PL-406-1.6 PLUMBING ENLARGED PLANS - SIXTH FLOOR - DEMOLITION & NEW WORK
MECHANICAL
M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS
M-100-1A.G OVERALL GROUND FLOOR - AREA D - MECHANICAL
M-102-1.G OVERALL GROUND FLOOR - AREA B - MECHANICAL
M-103-1.G OVERALL GROUND FLOOR - AREA A WEST - MECHANICAL
M-104-1.G OVERALL GROUND FLOOR - AREA A EAST - MECHANICAL
M-111-1A.1 OVERALL FIRST FLOOR - AREA C - MECHANICAL
M-112-1.1 OVERALL FIRST FLOOR - AREA B - MECHANICAL
M-113-1.1 OVERALL FIRST FLOOR - AREA A WEST - MECHANICAL
M-121-1A.2 OVERALL SECOND FLOOR - AREA C - MECHANICAL
M-123-1.2 OVERALL SECOND FLOOR - AREA A - MECHANICAL
M-131-1A.3 OVERALL THIRD FLOOR - AREA C - MECHANICAL
M-133-1.3 OVERALL THIRD FLOOR - AREA A - MECHANICAL
M-141-1A.4 OVERALL FOURTH FLOOR - AREA C - MECHANICAL
M-143-1.4 OVERALL FOURTH FLOOR - AREA A - MECHANICAL
M-151-1A.5 OVERALL FIFTH FLOOR - AREA C - MECHANICAL
M-153-1.5 OVERALL FIFTH FLOOR - AREA A - MECHANICAL
M-163-1.6 OVERALL SIXTH FLOOR - AREA A - MECHANICAL
M-400A-1A.G BUILDING 1A - ENLARGED PLANS - GROUND FLOOR - MECHANICAL
M-400B-1A.G BUILDING 1A - ENLARGED PLANS - GROUND FLOOR - MECHANICAL
M-402-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - MECHANICAL
M-403A-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - MECHANICAL
M-403B-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - MECHANICAL
M-404A-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - MECHANICAL
00 01 15 - 4
M-404B-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - MECHANICAL
M-411-1A.1 BUILDING 1A - ENLARGED PLANS - FIRST FLOOR - MECHANICAL
M-412-1.1 BUILDING 1 - ENLARGED PLANS - FIRST FLOOR - MECHANICAL
M-413-1.1 BUILDING 1 - ENLARGED PLANS - FIRST FLOOR - MECHANICAL
M-414-1.1 BUILDING 1 - ENLARGED PLANS - YARD - MECHANICAL
M-421-1A.2 BUILDING 1A - ENLARGED PLANS - SECOND FLOOR - MECHANICAL
M-423-1.2 BUILDING 1 - ENLARGED PLANS - SECOND FLOOR - MECHANICAL
M-431-1A.3 BUILDING 1A - ENLARGED PLANS - THIRD FLOOR - MECHANICAL
M-433-1.3 BUILDING 1 - ENLARGED PLANS - THIRD FLOOR - MECHANICAL
M-441-1A.4 BUILDING 1A - ENLARGED PLANS - FOURTH FLOOR - MECHANICAL
M-443-1.4 BUILDING 1 - ENLARGED PLANS - FOURTH FLOOR - MECHANICAL
M-451-1A.5 BUILDING 1A - ENLARGED PLANS - FIFTH FLOOR & ROOF - MECHANICAL
M-453-1.5 BUILDING 1 - ENLARGED PLANS - FIFTH FLOOR - MECHANICAL
M-463-1.6 BUILDING 1 - ENLARGED PLANS - SIXTH FLOOR & ROOF - MECHANICAL
M-501 MECHANICAL DETAILS AND SCHEDULES
M-701 MECHANICAL CONTROLS
ELECTRICAL
E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
E-010 BUILDING 1A PICTURE REFERENCES PAGE 1
E-011 BUILDING 1A PICTURE REFERENCES PAGE 2
E-012 BUILDING 1 PICTURE REFERENCES PAGE 1
E-013 BUILDING 1 PICTURE REFERENCES PAGE 2
E-014 POWER SOURCE AND UPS FEEDERS PICTURE REFERENCES
E-015 CRAWL SPACE AND OTHER PICTURE REFERENCES
E-016 MECH ROOM, CRAWL SPACE ACCESS, AND BLDG 1A PARKING GARAGE CEILING
PICTURE REFERENCES
E-100 OVERALL GROUND FLOOR REFERENCE PLAN - ELECTRICAL
E-100-1A.G OVERALL GROUND FLOOR PLAN - AREA D & PA - ELECTRICAL
E-101-1A.G OVERALL GROUND FLOOR PLAN - AREA PA - ELECTRICAL
E-102-1.G OVERALL GROUND FLOOR PLAN - AREA B - ELECTRICAL
E-103-1.G OVERALL GROUND FLOOR PLAN - AREA A - ELECTRICAL
E-111-1A.1 OVERALL FIRST FLOOR PLAN - AREA C - ELECTRICAL
E-112-1.1 OVERALL FIRST FLOOR PLAN - AREA B - ELECTRICAL
E-113-1.1 OVERALL FIRST FLOOR PLAN - AREA A - ELECTRICAL
E-121-1A.2 OVERALL SECOND FLOOR PLAN - AREA C - ELECTRICAL
E-123-1.2 OVERALL SECOND FLOOR PLAN - AREA A - ELECTRICAL
E-131-1A.3 OVERALL THIRD FLOOR PLAN - AREA C - ELECTRICAL
E-133-1.3 OVERALL THIRD FLOOR PLAN - AREA A - ELECTRICAL
E-141-1A.4 OVERALL FOURTH FLOOR PLAN - AREA C - ELECTRICAL
E-143-1.4 OVERALL FOURTH FLOOR PLAN - AREA A - ELECTRICAL
E-151-1A.5 OVERALL FIFTH FLOOR PLAN - AREA C - ELECTRICAL
E-153-1.5 OVERALL FIFTH FLOOR PLAN - AREA A - ELECTRICAL
E-161-1.6 OVERALL SIXTH FLOOR PLAN - AREA A - ELECTRICAL
E-171-1A.R OVERALL ROOF PLAN - BUILDING 1A - ELECTRICAL
E-173-1.R OVERALL ROOF PLAN - BUILDING 1 - ELECTRICAL
E-400A-1A.G BUILDING 1A - ENLARGED PLANS - GROUND FLOOR - MAIN ELECTRICAL ROOMS
E-400B-1A.G BUILDING 1A - ENLARGED PLANS - GROUND FLOOR - NEW ELECTRICAL ROOMS
E-400C-1A.G BUILDING 1A - ENLARGED PLANS - GROUND FLOOR - TR D007D
E-403A-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - MAIN ELECTRICAL ROOMS
E-403B-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - NEW ELECTRICAL ROOMS
E-403C-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - ELECTRICAL - TR A002C
E-403D-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - ELECTRICAL - DATA CENTER
A073 DEMO
00 01 15 - 5
E-403E-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - ELECTRICAL - DATA CENTER
A073 POWER & LTG
E-403F-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - CRAWL SPACE
E-403G-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - ELECTRICAL - A056
E-403H-1.G BUILDING 1 - ENLARGED PLANS - GROUND FLOOR - ELECTRICAL - B046
E-411-1A.1 BUILDING 1A - ENLARGED PLANS - FIRST FLOOR - ELECTRICAL - TR C121
E-412-1.1 BUILDING 1 - ENLARGED PLANS - FIRST FLOOR - ELECTRICAL - B125
E-413-1.1 BUILDING 1 - ENLARGED PLANS - FIRST FLOOR - ELECTRICAL - TR A104
E-421-1A.2 BUILDING 1A - ENLARGED PLANS - SECOND FLOOR - ELECTRICAL - TR C222
E-423-1.2 BUILDING 1 - ENLARGED PLANS - SECOND FLOOR - ELECTRICAL - TR A243
E-431-1A.3 BUILDING 1A - ENLARGED PLANS - THIRD FLOOR - ELECTRICAL - TR CU333
E-433-1.3 BUILDING 1 - ENLARGED PLANS - THIRD FLOOR - ELECTRICAL - TR A345
E-441-1A.4 BUILDING 1A - ENLARGED PLANS - FOURTH FLOOR - ELECTRICAL - TR CU411
E-443-1.4 BUILDING 1 - ENLARGED PLANS - FOURTH FLOOR - ELECTRICAL - TR A450
E-451-1.5 BUILDING 1 - ENLARGED PLANS - FIFTH FLOOR - ELECTRICAL - TR AU547
E-453-1A.5 BUILDING 1A - ENLARGED PLANS - FIFTH FLOOR - ELECTRICAL - TR C580
E-461-1.6 BUILDING 1 - ENLARGED PLANS - SIXTH FLOOR - ELECTRICAL - TR A627
E-501 ELECTRICAL EQUIPMENT DATA SCHEDULE
E-502 ELECTRICAL FEEDER AND LIGHTING SCHEDULES
E-601-1A BUILDING 1A - ELECTRICAL ONE-LINE
E-602-1 BUILDING 1 - ELECTRICAL ONE-LINE
E-603 ELECTRICAL PANEL SCHEDULES PAGE 1
E-604 ELECTRICAL PANEL SCHEDULES PAGE 2
E-605 ELECTRICAL PANEL SCHEDULES PAGE 3
E-606 ELECTRICAL PANEL SCHEDULES PAGE 4
E-607 ELECTRICAL DETAILS PAGE 1
E-608 ELECTRICAL DETAILS PAGE 2
E-609 ELECTRICAL GROUNDING ELEVATIONS
TECHNOLOGY
T-001 TECHNOLOGY GENERAL INFORMATION
T-002 TECHNOLOGY SCHEDULES
TD-100-1A.G DEMO PLAN - BLDG. 1A PARKING GARAGE - LEVEL A
TD-101-1A.G DEMO PLAN - BLDG. 1A PARKING GARAGE - LEVEL A
TD-102-1A.G DEMO PLAN - BLDG. 1A PARKING GARAGE - LEVEL B
TD-103-1A.G DEMO PLAN - BLDG. 1A PARKING GARAGE - LEVEL B
TD-104-1A.G DEMO PLAN - BLDG. 1A PARKING GARAGE - LEVEL C
TD-105-1A.G DEMO PLAN - BLDG. 1A PARKING GARAGE - LEVEL C
TD-107-1.G DEMO PLAN - BLDG. 1 GROUND FLOOR - AREA A
TD-108-1.G DEMO PLAN - BLDG. 1 GROUND FLOOR - AREA B
TD-110-1.1 DEMO PLAN - BLDG. 1 FIRST FLOOR - AREA A
TD-111-1.1 DEMO PLAN - BLDG. 1 FIRST FLOOR - AREA B
TD-114-1A.1 DEMO PLAN - BLDG. 1A FIRST FLOOR - AREA C
TD-115-1A.1 DEMO PLAN - BLDG. 1A FIRST FLOOR - AREAS D & E
TD-120-1.2 DEMO PLAN - BLDG. 1 SECOND FLOOR - AREA A
TD-121-1.2 DEMO PLAN - BLDG. 1 SECOND FLOOR - AREA B
TD-123-1A.2 DEMO PLAN - BLDG. 1A SECOND FLOOR - AREA C
TD-124-1A.2 DEMO PLAN - BLDG. 1A SECOND FLOOR - AREA D
TD-130-1.3 DEMO PLAN - BLDG. 1 THIRD FLOOR - AREA A
TD-131-1.3 DEMO PLAN - BLDG. 1 THIRD FLOOR - AREA B
TD-133-1A.3 DEMO PLAN - BLDG. 1A THIRD FLOOR - AREA C
TD-134-1A.3 DEMO PLAN - BLDG. 1A THIRD FLOOR - AREA D
TD-140-1.4 DEMO PLAN - BLDG. 1 FOURTH FLOOR - AREA A
TD-141-1.4 DEMO PLAN - BLDG. 1 FOURTH FLOOR - AREA B
00 01 15 - 6
TD-143-1A.4 DEMO PLAN - BLDG. 1A FOURTH FLOOR - AREA C
TD-144-1A.4 DEMO PLAN - BLDG. 1A FOURTH FLOOR - AREA D
TD-150-1.5 DEMO PLAN - BLDG. 1 FIFTH FLOOR - AREA A
TD-151-1.5 DEMO PLAN - BLDG. 1 FIFTH FLOOR - AREA B
TD-153-1A.5 DEMO PLAN - BLDG. 1A FIFTH FLOOR - AREA C
TD-154-1A.5 DEMO PLAN - BLDG. 1A FIFTH FLOOR - AREA C
TD-160-1.6 DEMO PLAN - BLDG. 1 SIXTH FLOOR - AREA A
TD-161-1.6 DEMO PLAN - BLDG. 1 SIXTH FLOOR - AREA B
TD-400-1-1A.G BLDGS. 1 & 1A - GROUND FL. TR DEMO PLAN
TD-403-1-1A.1 BLDGS. 1 & 1A - FIRST FLOOR TR DEMO PLAN
TD-406-1-1A.2 BLDGS. 1 & 1A - SECOND FL. TR DEMO PLAN
TD-409-1-1A.3 BLDGS. 1 & 1A - THIRD FLOOR TR DEMO PLAN
TD-412-1-1A.4 BLDGS. 1 & 1A - FOURTH FL. TR DEMO PLAN
TD-415-1-1A.5 BLDGS. 1 & 1A - FIFTH FLOOR TR DEMO PLAN
TD-418-1-1A.6 BLDGS. 1 & 1A - SIXTH FLOOR TR DEMO PLAN
TN-200-1A.G FLOOR PLAN - BLDG. 1A PARKING GARAGE - AREA D
TN-201-1A.G FLOOR PLAN - BLDG. 1A PARKING GARAGE - AREA PA
TN-202-1A.G FLOOR PLAN - BLDG. 1A PARKING GARAGE - LEVEL B
TN-203-1A.G FLOOR PLAN - BLDG. 1A PARKING GARAGE - LEVEL B
TN-204-1A.G FLOOR PLAN - BLDG. 1A PARKING GARAGE - LEVEL C
TN-205-1A.G FLOOR PLAN - BLDG. 1A PARKING GARAGE - LEVEL C
TN-207-1.G FLOOR PLAN - BLDG. 1 GROUND FLOOR - AREA A
TN-208-1.G FLOOR PLAN - BLDG. 1 GROUND FLOOR - AREA B
TN-210-1.1 FLOOR PLAN - BLDG. 1 FIRST FLOOR - AREA A
TN-211-1.1 FLOOR PLAN - BLDG. 1 FIRST FLOOR - AREA B
TN-214-1A.1 FLOOR PLAN - BLDG. 1A FIRST FLOOR - AREA C
TN-215-1A.1 FLOOR PLAN - BLDG. 1A FIRST FLOOR - AREAS D & E
TN-220-1.2 FLOOR PLAN - BLDG. 1 SECOND FLOOR - AREA A
TN-221-1.2 FLOOR PLAN - BLDG. 1 SECOND FLOOR - AREA B
TN-223-1A.1 FLOOR PLAN - BLDG. 1A SECOND FLOOR - AREA C
TN-224-1A.2 FLOOR PLAN - BLDG. 1A SECOND FLOOR - AREA D
TN-230-1.3 FLOOR PLAN - BLDG. 1 THIRD FLOOR - AREA A
TN-231-1.3 FLOOR PLAN - BLDG. 1 THIRD FLOOR - AREA B
TN-233-1A.3 FLOOR PLAN - BLDG. 1A THIRD FLOOR - AREA C
TN-234-1A.3 FLOOR PLAN - BLDG. 1A THIRD FLOOR - AREA D
TN-240-1.4 FLOOR PLAN - BLDG. 1 FOURTH FLOOR - AREA A
TN-241-1.4 FLOOR PLAN - BLDG. 1 FOURTH FLOOR - AREA B
TN-243-1A.4 FLOOR PLAN - BLDG. 1A FOURTH FLOOR - AREA C
TN-244-1A.4 FLOOR PLAN - BLDG. 1A FOURTH FLOOR - AREA D
TN-250-1.5 FLOOR PLAN - BLDG. 1 FIFTH FLOOR - AREA A
TN-251-1.5 FLOOR PLAN - BLDG. 1 FIFTH FLOOR - AREA B
TN-253-1A.5 FLOOR PLAN - BLDG. 1A FIFTH FLOOR - AREA C
TN-254-1A.5 FLOOR PLAN - BLDG. 1A FIFTH FLOOR - AREA C
TN-260-1.6 FLOOR PLAN - BLDG. 1 SIXTH FLOOR - AREA A
TN-261-1.6 FLOOR PLAN - BLDG. 1 - SIXTH FLOOR - AREA B
TN-300-1-1A.G FLOOR PLAN - PATHWAY GROUND FLOOR
TN-301-1-1A.1 FLOOR PLAN - PATHWAY FIRST FLOOR
TN-302-1-1A.2 FLOOR PLAN - PATHWAY SECOND FLOOR
TN-303-1-1A.3 FLOOR PLAN - PATHWAY THIRD FLOOR
TN-304-1-1A.4 FLOOR PLAN - PATHWAY FOURTH FLOOR
TN-305-1-1A.5 FLOOR PLAN - PATHWAY FIFTH FLOOR
TN-306-1.6 FLOOR PLAN - PATHWAY SIXTH FLOOR
TN-310-1-1A.G FLOOR PLAN - PATHWAY FIBER OPTIC - GROUND FLOOR
TN-311-1-1A.1 FLOOR PLAN - PATHWAY FIBER OPTIC - FIRST FLOOR
00 01 15 - 7
TN-312-1-1A.2 FLOOR PLAN - PATHWAY FIBER OPTIC - SECOND FLOOR
TN-313-1-1A.3 FLOOR PLAN - PATHWAY FIBER OPTIC - THIRD FLOOR
TN-314-1-1A.4 FLOOR PLAN - PATHWAY FIBER OPTIC - FOURTH FLOOR
TN-315-1-1A.5 FLOOR PLAN - PATHWAY FIBER OPTIC - FIFTH FLOOR
TN-316-1.6 FLOOR PLAN - PATHWAY FIBER OPTIC - SIXTH FLOOR
TN-400-1-1A.G TR ZONES - BLDGS. 1 & 1A GROUND FLOOR
TN-401-1.G TR LAYOUT - ROOM A002C GROUND FLOOR
TN-402-1A.1 TR LAYOUT - ROOM D007D GROUND FLOOR
TN-403-1-1A.1 TR ZONES - BLDGS. 1 & 1A FIRST FLOOR
TN-404-1.1 TR LAYOUT - ROOM A104 FIRST FLOOR
TN-405-1A.1 TR LAYOUT - ROOM C121 FIRST FLOOR
TN-406-1-1A.2 TR ZONES - BLDGS. 1 & 1A SECOND FLOOR
TN-407-1.2 TR LAYOUT - ROOM A243 SECOND FLOOR
TN-408-1A.2 TR LAYOUT - ROOM C222 SECOND FLOOR
TN-409-1-1A.3 TR ZONES - BLDGS. 1 & 1A THIRD FLOOR
TN-410-1.3 TR LAYOUT - ROOM A345 THIRD FLOOR
TN-411-1A.3 TR LAYOUT - ROOM CU333 THIRD FLOOR
TN-412-1-1A.4 TR ZONES - BLDGS. 1 & 1A FOURTH FLOOR
TN-413-1.4 TR LAYOUT - ROOM A450 FOURTH FLOOR
TN-414-1A.4 TR LAYOUT - ROOM CU411 FOURTH FLOOR
TN-415-1-1A.5 TR ZONES - BLDGS. 1 & 1A FIFTH FLOOR
TN-416-1.5 TR LAYOUT - ROOM AU547 FIFTH FLOOR
TN-417-1A.5 TR LAYOUT - ROOM C580 FIFTH FLOOR
TN-418-1-1A.6 TR ZONES - BLDGS 1 & 1A SIXTH FLOOR
TN-419-1.6 TR LAYOUT - ROOM A627 SIXTH FLOOR
TN-420-1.G TR LAYOUT - ROOM B046A GROUND FLOOR
TN-421-1.1 TR LAYOUT - ROOM B125 FIRST FLOOR
TN-450-1A.G BLDG. 1A - DATA CENTER TECHNOLOGY EXISTING PLAN
TN-451-1A.G BLDG. 1A - DATA CENTER TECHNOLOGY PLAN
TN-452-1A.G BLDG. 1A - DATA CENTER CABLE PATHWAYS PLAN
TN-453-1A.G BLDG. 1A - DATA CENTER ELEVATIONS AND DETAILS
TN-454-1A.G MCR STRUCTURED CABLING PLAN
TN-455-1A.G POWER ELEVATION AND SCHEMATIC - LEVEL REDUNDANCY
TN-500 TECHNOLOGY - TYPICAL DETAILS
TN-501 TECHNOLOGY - TYPICAL DETAILS
TN-502 GROUNDING & BONDING TYPICAL DETAILS
TN-600 FIBER OPTIC CABLE RISER DIAGRAM
TN-601 BONDING AND GROUNDING RISER DIAGRAM
SECURITY
S-000 SECURITY COVER PAGE
S-010 SECURITY SYSTEMS LEGEND
S-100 OVERALL GROUND FLOOR REFERENCE PLAN - SECURITY
S-110 OVERALL FIRST FLOOR REFERENCE PLAN - SECURITY
S-120 OVERALL SECOND FLOOR REFERENCE PLAN - SECURITY
S-130 OVERALL THIRD FLOOR REFERENCE PLAN - SECURITY
S-140 OVERALL FOURTH FLOOR REFERENCE PLAN - SECURITY
S-150 OVERALL FIFTH FLOOR REFERENCE PLAN - SECURITY
S-160 OVERALL SIXTH FLOOR REFERENCE PLAN - SECURITY
S-400 ENLARGED GROUND FLOOR PLANS - SECURITY
S-401 ENLARGED GROUND FLOOR PLANS - SECURITY
S-410 ENLARGED FIRST FLOOR PLANS - SECURITY
S-420 ENLARGED SECOND FLOOR PLANS - SECURITY
S-430 ENLARGED THIRD FLOOR PLANS - SECURITY
S-440 ENLARGED FOURTH FLOOR PLANS - SECURITY
00 01 15 - 8
S-450 ENLARGED FIFTH FLOOR PLANS - SECURITY
S-460 ENLARGED SIXTH FLOOR PLANS - SECURITY
S-500 SECURITY - TYPICAL DETAILS
S-501 SECURITY - TYPICAL DETAILS
- - - E N D - - -
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 013526 SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall prepare site for building operations, including demolition/remove existing structures, furnish labor/materials, and perform work for Lexington-Cooper VAMC project as required by drawings and specifications.
1) Normal working hours for this contract will be from 7:00 AM to 4:30 PM (local time) Monday through Friday except for weekends and established Federal Holidays.
2) Performing on-site work outside of normal working hours will require approval from the Contracting
Officer and COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff.
B. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting Officer.
C. Offices of HFS Company, 8718 Botts Lane, San Antonio, TX 78217, as Architect/Engineers, will render certain technical services during construction. Such services shall be considered advisory to the
Government and not construed as expressing/implying a contractual act of the Government without affirmations by COR or the duly authorized representative.
D. Contractor/subcontractor employees shall comply with VA security management program and obtain permission of VA police, identified by project/employer restricted from unauthorized access
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: work includes general construction, alterations, MEP, and IT necessary removal existing construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted.
Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. Defines physical and administrative security procedures remaining effective for project duration.
2. Contractor is responsible for assuring subcontractors working on the project comply with these regulations.
B. Security Procedures:
1. Contractor’s employees shall not enter project site without an appropriate badge and may be subject to inspection of personal effects when entering/leaving the project site.
01 00 00 - 2
2. Before starting work the Contractor shall give 7-days’ notice to the COR so security arrangements can be provided for the employees. This notice is separate from notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the COR. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close/shut down the project site and order Contractor’s employees off the premises in the event of a national emergency. Contractor may return to the site only with the written approval of the COR.
C. Key Control:
1. Contractor shall provide duplicate keys/lock combinations to the COR for security inspections of each project area including toolboxes/parked machines and take any emergency action.
2. Contractor shall turn over all permanent lock cylinders to VA locksmith for permanent installation. See
Section 087100 DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, Contractor/subcontractors shall submit an electronic security memorandum describing the approach to following goals and maintain confidentiality of “sensitive information”.
2. Contractor is responsible for safekeeping of all drawings, project manual and other project information which shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos/photographs, and drawings may be marked “Law Enforcement
Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit access to those who need it for the project. Return the information to the COR upon request.
4. Security documents shall not be removed/transmitted from project site without COR’s written approval
5. Paper waste/electronic media (CDs) shall be shredded/destroyed in a manner acceptable to the VA.
6. Notify COR when there is a loss or compromise of “sensitive information”.
7. Electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
Security, access, and maintenance of project drawings (scanned and electronic) shall be performed/tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering site. Such request shall be submitted 24 hours before access date & time. Access shall be restricted to picking up/dropping off materials and supplies.
2. No parking by Contractor/subcontractor on Lexington-Cooper VAMC.
01 00 00 - 3
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. Contractor shall confine all operations (including materials’ storage) on Government premises to areas authorized/approved by the COR. Contractor shall hold/save the Government, officers/agents, free/harmless from liability of any nature occasioned by Contractor's performance.
B. Contractor shall, under regulations prescribed by COR, use only established roadways when and as authorized by the COR. When materials are transported in the work, vehicles shall not be loaded beyond manufacturer’s recommended vehicle capacity or prescribed by Federal law/regulation.
C. Working space and space available for storing materials shall be as determined by the COR.
D. Workers are subject to rules of the Medical Center applicable to their conduct.
E. Execute work in a manner as to minimally interfere with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles.
F. Execute work to minimally interfere with normal Medical Center functioning (utility services, fire protection systems, existing equipment, and work being done by others). Use of equipment/tools transmitting vibrations/noises thru the building structure is not permitted in occupied buildings, during construction, except as permitted by COR where required by limited working space.
1. Do not store materials/equipment in other than assigned areas.
2. Schedule delivery of materials/equipment to construction work areas within buildings in quantities sufficient for not more than 2-workdays. Provide unobstructed access to VAMC areas required to remain in operation.
3. Where access by VAMC personnel to vacated portions of buildings is not required, storage of
Contractor's materials/equipment will be permitted subject to fire and safety requirements.
G. Utilities Services: where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, fire protection or communications systems (except telephone), they shall be cut/capped at suitable places shown or as directed by COR. All such actions shall be coordinated with the COR:
H. Phasing:
1. VAMC maintains operation 24/7 days/week. Any service interruption must be scheduled/coordinated with the COR ensuring no operational lapses occur. Contractor shall develop a work plan/schedule detailing procedures to be employed, equipment/materials used, interim life safety measure (during the work) and a schedule defining the work’s duration with milestone subtasks.
2. Ensure such executions, Contractor shall furnish COR with a schedule of approximate dates which the
Contractor intends to accomplish work in each specific area. Contractor shall arrange dates to ensure work’s accomplishment mutually agreeable to COR and Contractor
3. Contractor shall take measures/provide material necessary to protect existing equipment/property in construction areas against dust/debris, so equipment/affected areas will not be hindered. Contractor shall permit routes (access or egress) isolated from construction area by temporary partitions and have walking surfaces, lighting, etc. to facilitate patient/staff access. Coordinate alteration work in areas occupied by VA so operations will continue during the construction period.
01 00 00 - 4
I. Maintain existing utility services. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, gases, conduits, wires, cables, etc. of utility services or fire protection and communications systems (including telephone), they shall be cut/capped at places as shown or in absence of such indication, as directed by COR.
1. No utility service (water, gas, electricity, or fire protection/communications systems) may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits/equipment deenergized. When an electrical outage cannot be accomplished, work on any energized circuits/equipment shall not commence without a work plan, prior knowledge, and written approval. Refer to Sections 260511 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 270511 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 280500 COMMON
WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7-days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval, request, or which other date and/or time such interruption will cause least inconvenience to operations. Approved interruption time may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15-calendar days prior to desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR which will be confirmed in writing.
J. Abandoned Lines: service lines (wires, cables, conduits, ducts, pipes, and hangers/supports), shall be removed back to their source. Those noted to be abandoned but not entirely removed, shall be sealed, capped/plugged at the main, branch or panel they originate from. Lines shall not be capped in finished areas, but removed/sealed, capped, plugged-in ceilings, within furred spaces or walls/partitions, so they are completely behind the finished surfaces.
1.7 ALTERATIONS
A. Before any work started, Contractor shall make a thorough survey with the COR in which alterations occur/areas of anticipated access routes, and furnish a report, signed by both, to the COR. This report shall list by rooms and spaces:
1. Existence/conditions of items (electrical fixtures, equipment, etc.) required by drawings to be reused, relocated, or both.
2. Note any discrepancies between drawings and existing site conditions.
3. Designate areas for working space, materials storage, and access routes to areas where alterations occur/agreed upon by Contractor and COR.
B. Any items required by drawings to be reused, relocated, or both, found during this survey to be nonexistent, or in the COR’s opinion, to be in a condition the use is impossible/impractical, shall be furnished and/or
01 00 00 - 5 replaced by Contractor with new items per specifications (furnished by Government). Provided the contract work is changed by reason of this subparagraph B, the contract will be modified under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. 30-days before expected partial/final inspection date, Contractor and COR together shall make a thorough re-survey of involved areas. They shall furnish a report on conditions then existing of flooring, doors, walls, and other surfaces as compared with conditions as noted in first survey report:
1. Re-survey report shall list any damage caused by Contractor to such flooring and other surfaces, despite protection measures and form basis determining extent of repair work required to restore damage caused by Contractor's workers in executing work of this contract.
D. Provide the following protective measures:
1. Protect interior existing structures from damage and dust. Wherever work performed, floor surfaces to remain in place shall be protected prior to starting work and intact until all work is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and demolition shall be disposed of as follows:
1. Reserved items to remain Government property are noted on drawings or in specifications as items to be stored. Items remaining Government property shall be removed in a manner preventing damage detrimental to re-installation/reuse. Store such items as directed by COR.
2. Items not reserved shall become Contractor’s property and removed by Contractor.
3. Portable equipment/furnishing items located in rooms/spaces where work to be done shall remain
Government property. When rooms/spaces vacated by the VA during alteration period, such items not required by…