596A4-22-700 Drawings 02 - Asbestos.pdf

PDF 2 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Lexington-Cooper, KY 596A4-22-700
Solicitation number
36C77623B0069
Issued by

About this file

This package includes construction drawings and a federal contract opportunity notice. The drawings depict asbestos abatement work at the Lexington-Cooper VA Medical Center in Lexington, Kentucky for project number 596A4-22-700. Asbestos containing materials including floor mastic, vinyl floor tiles and fire doors will be removed. The contract opportunity is solicitation number 36C77623B0069 for EHRM infrastructure upgrades construction at the Lexington-Cooper VA Medical Center to be awarded by the Department of Veterans Affairs Technology Acquisition Center Austin. The pre-bid documents provide details on the scope and phasing of the asbestos abatement work to be performed pursuant to the overall demolition and construction project.

View the file

Other files

File Type Posted
596A4-22-700 Responses to Tech Questions - 1-25-24.pdf PDF
36C77623B0069 0008.pdf PDF
596A4-22-700 Responses to Tech Questions - 1-22-24.pdf PDF
36C77623B0069 0007.pdf PDF
36C77623B0069 0006.pdf PDF
596A4-22-700 Responses to Tech Questions - 1-18-24.pdf PDF
36C77623B0069 0005.pdf PDF
596A4-22-700 Responses to Tech Questions - 1-12-24.pdf PDF
36C77623B0069 0004.pdf PDF
596A4-22-700 Security Requirements.pdf PDF
DBA Wage Rates - Fayette County - 01-05-24.pdf PDF
596A4-22-700 Smoke Shack.pdf PDF
596A4-22-700 Handrail Submittal.pdf PDF
596A4-22-700 Drawing M-701 - Mechanical Controls.pdf PDF
596A4-22-700 Specification 23 09 23 - DDC for HVAC.pdf PDF
DBA Wage Rates - Fayette County - 12-22-23.pdf PDF
36C77623B0069 0003.pdf PDF
36C77623B0069 0002.pdf PDF
596A4-22-700 Site Visit Sign-in Sheet - 11-28-23.pdf PDF
36C77623B0069 0001.pdf PDF
596A4-22-700 Drawings 01 - General.pdf PDF
596A4-22-700 Drawings 12 - Security.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
596A4-22-700 Drawings 03 - Arch.pdf PDF
596A4-22-700 Drawings 06 - Mechanical.pdf PDF
596A4-22-700 Specifications.pdf PDF
596A4-22-700 Drawings 07 - Electrical.pdf PDF
596A4-22-700 Drawings 05 - Plumbing.pdf PDF
596A4-22-700 Drawings 09 - Tech 2.pdf PDF
596A4-22-700 Drawings 10 - Tech 3.pdf PDF
596A4-22-700 Drawings 04 - Fire Protection.pdf PDF
DBA Wage Rates - Fayette County - 09-08-23.pdf PDF
596A4-22-700 Asbestos Inspection Report.pdf PDF
596A4-22-700 Drawings 11 - Tech 4.pdf PDF
596A4-22-700 Brand Name Justification.pdf PDF
IFB 36C77623B0069.docx DOCX document
596A4-22-700 Drawings 08 - Tech 1.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP DN

MECH RM

D-B038

EMERGENCY

GENERATOR

D003

TRANSFORMERS

& SWITCHGEAR

D003A

CORRIDOR

DH001

STAIR

PAS06

STAIR

PAS07

ELECTRICAL

D001

TD

D002

CORRIDOR

DH002

MECH RM

D004

EMS

D005

STORAGE

D005A

STORAGE

D006

ELEVATOR

S6

ELEVATOR

S7

COMM

EQUIP

RM

D007D

C O

R R

ID

O

R D

H

PAINT

SHOP

D007C

CORRIDOR

DH003 SIGNAL

CLOSET

D008

STORAGE

PA08

PARKING

CORRIDOR

DH004

CARPENTER

SHOP

D007

STORAGE

AREA

PA06

CHIEF

D007A

LOCKSMITH

D007B

1 FLOOR PLAN - GROUND FLOOR - AREAS D & PA

SCALE: 1/8" = 1'-0"

HA-100-1A.G

FLOOR PLAN - GROUND

FLOOR - AREAS D & PA 1A

KEY PLAN

PA

D

B

A

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

ASBESTOS NOTES

GENERAL NOTES:

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL

LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK

AND CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;

PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO

INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND

ABATEMENT WITH THE GENERAL CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.

ASBESTOS NOTES:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS

IDENTIFIED IN THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.

COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL

CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

SUMMARY OF ASBESTOS CONTAINING MATERIALS

KEY NOTE DESCRIPTION FRIABLE QTY HATCHING

1 BLACK FLOOR MASTIC NF 860SF

2 12"X12" VINYL FLOOR TILE NF 80 EA

3 9"X9" VINYL FLOOR TILE NF 450 LF

4 FIRE DOOR Y 3 EACH

C.L. MET05/16/2023

ELECTRICAL

STERILE AND

NON-STERILE

STORAGE

A001A

STERILIZATION

WORK RM

A005C

GAS CYL

STORAGE

B005D

CLEAN

RECEIVING

B007

CORRIDOR

AH003

STORAGE

A008

RETAIL

STORE

A009

C O

R R

ID

O

R

AH

ASST

CHIEF

A012

CLERK

TYPIST

A011

CHIEF

A010

OFFICE

CANTEEN

A007

REFR

WALK IN

A006B

PREFAB

REFRIG

A006C

FOOD

STORAGE

A006A

STAIRWELL

PAS04

KITCHEN

A006

HAC

A006F

AU008 AU007 AU006

CORRIDOR

AH001

STAIR

AS002 STORAGE

A004

CAFETERIA

A004A

FOOD

SERVICING

A006D

SERVING

LINE

A005

SURGICAL

PACK

B045C

MAIN

KITCHEN

B036

EQUIP

STORAGE

AREA

B001

ELECTRIC

CLOSET

BU003

EMS

A001B

DUMB

ELEVATOR

OFFICE

A019

ELEVATOR

LOBBY

A001

OFFICE

ASST

CHIEF

A003

ELEV

AE004

ELEV

AE005

BREAK

RM

A021

EXIST.

ELEVATOR

LOBBY

A000

DISH

WASHING

A020

ELECTRIC

CLOSET

AU004

EMS

A023

CORRIDOR

AH004

DIETICIANS

OFFICE

A025

ASST

CHIEF

A027

DIETICIANS

OFFICE

A025A

SECY

A028

CORRID

AH00

CONFERENCE

M A029

CORRID

BH00

SUPV

OFFICE

B045

BREAK

RM

B045A

ELECTRICA

AU002CORRIDOR

AH004 AU001

ELECTRIC

CLOSET

AU005

EX.

EMS

A004B

EXIST.

STORAGE

A004A

EX.

VCS

OFFICE

A004A

CHIEF

EX.

VCS

OFFICE

A004E

EXIST. LOCKERS

FEMALE A002A

EXIST.

LOUNGE

A002

EXIST. IT

CLOSET

A002C

EX.

ELEV

P3

EX.

ELEV

P2

EX.

ELEV

P1

EXIST. TOILET &

SHOWERS A002B

TELEPHONE

EQUIP RM

A022

TOILET

A024 EMS

A026

LOCKERS

A026B

OT

CLINIC

A044

1 FLOOR PLAN - GROUND FLOOR - AREA A

SCALE: 1/8" = 1'-0"

HA-103-1.G

FLOOR PLAN - GROUND

FLOOR - AREA A 1

KEY PLAN

PA

D

B

A

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

ASBESTOS NOTES

GENERAL NOTES:

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL

LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK

AND CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;

PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO

INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND

ABATEMENT WITH THE GENERAL CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.

ASBESTOS NOTES:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS

IDENTIFIED IN THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.

COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL

CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

SUMMARY OF ASBESTOS CONTAINING MATERIALS

KEY NOTE DESCRIPTION FRIABLE QTY HATCHING

1 BLACK FLOOR MASTIC NF 860SF

2 12"X12" VINYL FLOOR TILE NF 80 EA

3 9"X9" VINYL FLOOR TILE NF 450 LF

4 FIRE DOOR Y 3 EACH

C.L. MET05/16/2023

A-184

S V

A-153

A-185

A-150A

A-184C

AS107

A-152

ST

O

R

AG

E C

9A

EXAM

C130D

IN-VITRO

COUNTING

HIGH/LOW

A-166

STORAGE

DECONTAM

C127EXAM

C130C

OFFICE

C130B

MENTAL

HEALTH

RM

C130A

STAIR

CS104 PASSAGE

CH126

PHYS

WORK

C126C

ON

CALL

C126D

EXAM

C125G

EXAM

C125F

PASSAGE

CH125B

EXAM

C125C

EXAM

C125D

STORAGE

C125E

A-184A A-184B

CORRIDOR

BH106

B14JG

DRESSING

RM

ALCOVE

B146G

CORRID

SUPV

B101D

ELEC

BU102

ELEC

BU103

WAITING

A-150

CORRIDOR

BH101

FILE

RM

A-151A

A-151

BONE

DENSITY

A-159

VACANT

B131

OFFICE

B132A

VIEWING

RM B132

LOUNGE

B133

KITCHEN

B133A

MECH

B133B

STAFF

TOILET

B133A

CORRIDOR

BH102

PHARMACY

WAITING

A-186

C O

R R

ID

O

R

AH

SUPPLY

A-160

BREAK

RM

A-156

READING

RM A-158

EXAM

A-157

MENS

RESTROOM

A-155

WOMENS

RESTROOM

A-154

STORAGE

A-152B

HOT

LAB

A-152A

HOT

LAB

A-152B

PROVIDER

WORK RM

B101L

Restroom

B101EEMS

CLOSET

B104

ELECTRIC

CLOSET

BU101

Restroom B101F

BREAK

RM

B108CONFERENCE

RM B101A

STORAGE

B101B

SOILED

A146

SUPPLY

A147

STAIR

AS102

AS108 AS106

CORRIDOR

AH102

PHARMACY

OFFICE

A-189

OFFICE

NURSE

MGR

A177

PATIENT

ADVOCATE

A102

INPT

PHARMACY

A103

CORRIDOR

A-191

VAULT

A-180

CONFERENCE

RM A174

TECHNICIAN

OFFICE

A-179

C O

R R

ID

O

R A-

PRE-PACK

A-177a

ANTEROOM

A-190

IV

STORAGE

A-190a

CORRIDOR

AH103

MGR

CMOP

A-178

ACOS

AMB

CARE

A-190C

SUPPORT

UNIT

ADMIN

A-190b

ADMIN

ASSIST

A-188

INVESTIGATION

DRUGS SVC

PGME MGR

A164

MED MGMT

SPECIALIST

A-163FORMULARY

MGR

A-165

PHARMACY

OPERATION

MGR

A-166

CLINICAL

PHARMACIST

A-167

JANITOR

A-167A

CORRIDOR

A-162

WOMEN

A-176

MEN

A-175

ASSOCIATE

CHIEF OF

PHARMACY

OFFICE

A-171

CRITICAL

CARE

PHARMACY

SPECIALIST

OFFICE

A-170

PHARMACY

ADAPC

A-169

CHIEF

A-168

Q

MED STAFF

CO-ORDR

A118

CHIEF OF

STAFF

A120

FEMALE

TOILET

A106

QUALITY

MGMT

A109

HEALTH

SYSTEM

SPECIALIST

A119

MALE

TOILET

A107

ST

O

R

AG

E A1

CORRIDOR

AH110

STAFF

TOILET

A105A

DAV

SVC

OFFICE

A105

VFW

SVC

A101

LOBBY

A100

ELEC

A0104

IT

A104

OFFICE

A105B

CORRIDOR

AH101

ELEVATOR

P3

ELEVATOR

P2

ELEVATOR

P1

ELEV

LOBBY

ELEVATOR

S4

ELEVATOR

S5

COPIER/

FAX RM

A145 ELEC

AU104

ELEC

AU-105

BMS

CLOSET

A178

STOCK

RM

A149EMS

A148

SVC

ELEV

LOBBY

1B-1

CORRIDOR

AH101

TOILET

C126A

PHARMACY

STORAGE

A190A

BREAK

RM

A-173

RESIDENTS

A-172

1 FLOOR PLAN - FIRST FLOOR - AREA A

SCALE: 1/8" = 1'-0"

HA-113-1.1

FLOOR PLAN - FIRST FLOOR -

AREA A 1

KEY PLAN

C

E

B

A

D

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

ASBESTOS NOTES

GENERAL NOTES:

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL

LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK

AND CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;

PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO

INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND

ABATEMENT WITH THE GENERAL CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.

ASBESTOS NOTES:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS

IDENTIFIED IN THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.

COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL

CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

SUMMARY OF ASBESTOS CONTAINING MATERIALS

KEY NOTE DESCRIPTION FRIABLE QTY HATCHING

1 BLACK FLOOR MASTIC NF 860SF

2 12"X12" VINYL FLOOR TILE NF 80 EA

3 9"X9" VINYL FLOOR TILE NF 450 LF

4 FIRE DOOR Y 3 EACH

DN

S

S D

W

D

W

C O

R R

ID

O

R C

H

STAIRWELL

CS204

CORRIDOR

BH212

MECH

RM

A273 SOCIAL

WORKER

B247

TOILET

B249

TOILET

B248

SEMI-PRIVATE

RM A257

TOILET

A256A

TOILET

A257A

SHOWER

A269

SEMI-PRIVATE

RM A256

CONFERENCE

RM A255

STOR

A255

VISITOR

WAITING

A254

TOILET

A255A

ECHO

LAB

A249

ECHO

LAB

A250

C O

R R

ID

O

R

AH

1A

STORAGE

A248B CONTROL

RM

A248A

PHONO

CARDIOLOGY

A248 EC

AU205

CORRIDOR

AH211

ELEC

AU206

ELEC

AU207

ELEC

AU208

CCU1

A258

CCU2

A259

CCU3

A260

C O

R R

ID

O

R

AH

NURSES

WORK

RM

A268

NURSE

STATION

A267

NOURISHMENT

CENTER

A267C

EMS

A270

STAIRWELL

AS202

BREAK

A267D

CLEAN

UTILITY

A267A

TOILET

A271B

HEART

STATION

SUPV

OFFICE

A272

NURSE

LOUNGE

A271

NURSE

COORD

OFC

A274

EMS

A252

TOILET

A251

C O

R R

ID

O

R

AH

STRESS

LAB

A266

IT

CLOSET

A265

CORRIDOR

AH209

CCU6

A264

CCU5

A263

CCU4

A262

CARDIAC

PROCEDURE

RM A261

HEART

STATION

A245

HEART

STATION

WORK RM

A244 CONSULT

A241

JANITOR

A240 TOILET

A239

CLEAN

STOR

A238

PREPARATION/

HOLDING

A237

CORRIDOR

AH206

PACEMAKER

A247

CARDIO

CASE

MGR

OFFICE

A276A

C O

R R

ID

O

R

AH

CARDIO

OFFICE

A276

EKG

COMPUTER

A247A

CARDIOLOGY

DOCTOR

OFFICE

A246

EEO

ADMIN

OFFICE

A277

CORRIDOR

AH207

IT

CLOSET

A243

ELEVATOR

P3

ELEVATOR

P2

ELEVATOR

P1

CATH

LAB

OFFICE

A242

EQUIP

RM

A235B

CATH

LAB 1

A235

CATH

STORAGE

A235A

STAFF

OFFICE

A231A

BREAK

RM

A231

CONTROL

A234

STAFF

CORRIDOR

A232

SOILED

LINEN

A229

CLEAN

HOLDING

A230

CATH

STORAGE

A233A

EQUIP

RM

A233B

LOBBY

AH200

ELEVATOR

S5

ELEVATOR

S4

SVC

LOBBY

A201

EQUIP

STOR

A202

WAITING

A205

PHARMACY

A204

STAFF

TOILET

A206A

ELECTRIC

CLOSET

A205A

STAFF

LOCKER

A206

STOR

A203

ELECTRIC

CLOSET

BU201

CLINIC

B

WAITING

B238

MECH

RM

B234

CORRIDOR

AH204

LAB

A207

EC

AU204

TOILET

A207A

ROOM

A209

CORRIDOR

AH202

C

CORRIDOR

C212

CONSULT

B235

WARFARIN

CLINIC

B234

B233BH207

SOILED

UTILITY

A267B

LOCKER

A271A

CLEAN

UTILITY

A202

1 FLOOR PLAN - SECOND FLOOR - AREA A

SCALE: 1/8" = 1'-0"

HA-123-1.2

FLOOR PLAN - SECOND

FLOOR - AREA A

RAC

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

ASBESTOS NOTES

GENERAL NOTES:

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL

LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK

AND CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;

PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO

INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND

ABATEMENT WITH THE GENERAL CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.

ASBESTOS NOTES:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS

IDENTIFIED IN THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.

COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL

CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

SUMMARY OF ASBESTOS CONTAINING MATERIALS

KEY NOTE DESCRIPTION FRIABLE QTY HATCHING

1 BLACK FLOOR MASTIC NF 860SF

2 12"X12" VINYL FLOOR TILE NF 80 EA

3 9"X9" VINYL FLOOR TILE NF 450 LF

4 FIRE DOOR Y 3 EACH

LOCKER

A338A

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

L S

L S

LS

LS

L S

CONTROL

B321A

EEG

TESTING

B321OFFICE

B304RESEARCH

B303

CHIEFS

OFFICE

A303A

CONFERENCE

ROOM

A302B

OFFICE

B301

OFFICE

B322A

EEG

TESTING

B324

CONTROL

B324A

UM

OFFICE

B325A

UM

OFFICE

B325READING

RM B323

EC

BU301

NUEROLOGY

ADMIN

OFFICE

A303

C O

R R

ID

O

R

AH

1 MECH

SHAFT

A304A

CLEAN

A304

SLEEP

DISORDER

RECEPTION

A306

C O

R R

ID

O

R

AH

HOSPICE

CARE

OFFICE

A307

SOILED

A305

NEUROLOGY

ADMIN

OFFICE

A302C

LOBBY

A301

HAS

A308

EC

AU304

EMS

A309

PATIENT RM

A364

PATIENT

TOILET

A364A

PATIENT

TOILET

A365A

PATIENT RM

A365

PATIENT RM

A367 WAITING RM

A369

MED

REVIEW

RM

B302

ELEVATOR

S5

ELEVATOR

S4EC

AU305

EMS

A372

PATIENT

A369A

PATIENT

TOILET

A367ALINEN

SUPPLY

A366

CORRIDOR

AH309

AS302

AU308 AU307 AU306

CLEAN

SUPPLY

A368

BEREAVEMENT

ROOM

A371

PHYSICIANS

OFFICE

A373

NEUROLOGY

TEAM

OFFICE

A350

C O

R R

ID

O

R

AH

7NURSE

STATION

A352

MED RM

A353

NURSE

MANAGER

A355

A355A

SOILED

UTILITY

A358

STAFF

WORK RM

A358A

C O

R R

ID

O

R

AH

PATIENT

TOILET

A-363A

PATIENT RM

A-363

PATIENT

TOILET

A-362A

PATIENT RM

A362

TOILET

A357

CORRIDOR

AH306

NOURISHMENT

A359

PATIENT RM

A361

PATIENT

TOILET

A361A

PATIENT

TOILET

A360A

NURSES

LOUNGE

A360

PATIENT RM

A356

PATIENT

TOILET

A356A

A354A

SOCIAL

WORK

A354 TOILET

A351A

STAFF

NURSING

A351

TOILET

A349A

CORRIDOR

AH306

OFFICE

APU

A348

OFFICE

SOC.

WORK

A349

OFFICE

APU

A347

OFFICE

APU

A346

TOILET

A346A

1 BED

RM

A343

1 BED

RM

A342

1 BED

RM

A340

IT

A345

STORAGE

A344

DOCTOR

A341

DOCTOR

A310

ELEVATOR

AE301

ELEVATOR

AE302

ELEVATOR

AE303

LOBBY

A300

SECURITY

RM

A338 2 BED

RM

A337

CORRI

AH30

SECY

A339

PANTRY

A313

SURGY

TEAM RM

A311

C O

R R

ID

O

R

AH

4 NU

ST

A

TOILE

A315A

2 BED

RM

A315WAITING

AREA

A312

CORRIDOR

AH309

TOILET

A342A

1 FLOOR PLAN - THIRD FLOOR - AREA A

SCALE: 1/8" = 1'-0"

HA-133-1.3

FLOOR PLAN - THIRD FLOOR

- AREA A 1

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

ASBESTOS NOTES

GENERAL NOTES:

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL

LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK

AND CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;

PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO

INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND

ABATEMENT WITH THE GENERAL CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.

ASBESTOS NOTES:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS

IDENTIFIED IN THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.

COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL

CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

SUMMARY OF ASBESTOS CONTAINING MATERIALS

KEY NOTE DESCRIPTION FRIABLE QTY HATCHING

1 BLACK FLOOR MASTIC NF 860SF

2 12"X12" VINYL FLOOR TILE NF 80 EA

3 9"X9" VINYL FLOOR TILE NF 450 LF

4 FIRE DOOR Y 3 EACH

WASHERDRYER

X2

2FLT

2FLT

X2

2FLT

2FLT

OFFICE

B402A

OFFICE

B402B

OFFICE

B402

DIABETES

RESEARCH

OFFICE

B401

ELEC

BU401

TOILET

B424C

LOCKER

RM

B424D

ISOLATION

B424A

OFFICE

B403B

B403A

PROVIDER

OFFICE

A408

TOILET

A408A

C O

R R

ID

O

R

AH

DR.

OFFICE

A405

3 BED

RM

A474

SHOWER

A474A

1 BED

RM

A475

TOILET/

SHOWER

A475A

TOILET

A474B

SHOWER

A473A

3 BED

RM

A473

STAIR

1 BED

RM

A476 RECREATION

A478

STORAGE

A478A

STORAGE

A478B

NUTRITION

A404

STAFF

WORKRM

A482

OFFICE

PSYCHOLOGIST

A486

OFFICE

PSYCHOLOGIST

A487

OFFICE

A488

FEMALE

TOILET

A403

EC

AU405

PSYCHOLOGY

TESTING/

WAITING

A485

EXAMINATION

A484

CORRIDOR

AH411

HAC

A477

TOILET/

SHOWER

A476A

STORAGE

A472

ELEC

AU406

ELEC

AU408

ELEC

AU407

MEDICATIONS

A458A

PSYCHOLOGY

TESTING

A491

3 BED

RM

A470

TOILET

A473B

TOILET

A470B C

O R

R

ID

O R

AH

HYDROTHERAPY

TUB RM

A471

LAUNDRY

A466

STAFF

BREAK RM

A464

RECREATION

THERAPIST

OFFICE

A461

COMMUNICATION

CENTER/ NURSE

STATION

A458

C O

R R

ID

O

R

AH

DAYRM

A456

OFFICE

A452

OFFICE

OPS

MGR

A452A

TOILET

A455A

NURSE

MGT

OFFICE

A454

CORRIDOR

AH408

TOILET

A457B

SHOWER

A457A

1 BED RM

OR

SECLUSION

A457

THERAPEUTIC

SECLUSION

A4551 BED RM

OR

SECLUSION

A459

SHOWER

A459ASHOWER

A462A

STAFF

TOILET

A460

STORAGE

A463A

TOILET

A462B

LINENS

A465

TUB &

TOILET

A467A

1 BED RM

OR

SECLUSION

A462

1 BED RM

OR

SECLUSION

A463

1 BED RM

OR

SECLUSION

A467

GROUP

RM

A468

3 BED

RM

A469

HIMS

OFFICE

A451

RES & MED

STUDENTS

A448 RES & MED

STUDENTS

A445

SECY

A442

OFFICE

CHIEF

A443

CHAPEL

A440

OFFICE/

CHAPLAINS

A439

OFFICE/

WAITING

A435

SOCIAL

WORKER

A446

SOCIAL

WORKER

A447

KITCHENETTE/

COFFEE

A449

STAFF

TOILET

A449A

CORRIDOR

AH407

TELE/DATACLOSET

A450

PSYCHOLOGY

TECHNICIAN

A490

HALL

A489

ELEVATOR

AE403

ELEVATOR

AE402

ELEVATOR

AE401

OFFICE

PHYSICIAN

A436 CHAPEL

OFFICE

A438

ENDO

WAITING

RM A412

LOBBY

A400

ELEVATOR

AE405

ELEVATOR

AE404

C O

R R

ID

O

R

AH

1 LOBBY

A401

TRASH

CHUTE

DUMP

WAITER

A406A

SOILED

A407

CLEAN

A406

C O

R R

ID

O

R

AH

2 MED TEAM

ADMIN

OFFICE

A409

OFFICE

PHYSICIAN

A410

SCOPEWASH

& STORAGE

A413

EC

AU404

PROCEDURE

RM A415

PROCEDURE

RM A414

SU

A4

C O

R R

ID

O

R

AH

TOILET

A469B

1 FLOOR PLAN - FOURTH FLOOR - AREA A

SCALE: 1/8" = 1'-0"

HA-143-1.4

FLOOR PLAN - FOURTH

FLOOR - AREA A 1

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

ASBESTOS NOTES

GENERAL NOTES:

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL

LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK

AND CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;

PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO

INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND

ABATEMENT WITH THE GENERAL CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.

ASBESTOS NOTES:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS

IDENTIFIED IN THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.

COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL

CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

SUMMARY OF ASBESTOS CONTAINING MATERIALS

KEY NOTE DESCRIPTION FRIABLE QTY HATCHING

1 BLACK FLOOR MASTIC NF 860SF

2 12"X12" VINYL FLOOR TILE NF 80 EA

3 9"X9" VINYL FLOOR TILE NF 450 LF

4 FIRE DOOR Y 3 EACH

FILES

PNEUMATIC TUBE

ANEST

OFFICE

B623 C O

R R

ID

O

R C

6B

1 ELEC

B624A

IMPLANT

CO-ORDR

B624

STOR

B601CORRIDOR

C6B6

SOILED

UTILITY

B625

ELEVATOR

ELEVATOR

B625A

VACANT

A604

CORRIDOR

C6A1

A607 OFFICE

A606

CONTROL

A605

A601

ON CALL

BATH

A602

ELEVATOR

AE604

ELEVATOR

AE605

ELEC

B600B

CYLINDER

B600A

CORRIDOR

6A1

C O

R R

ID

O

R C

6A

HDCP

TELE

FAMILY

WAITING

AREA

A657

PUBLIC

TOILET

A657A

LOBBY

A600

ELEVATOR

AE603

ELEVATOR

AE602

ELEVATOR

AE601

TELE/COMM

CLOSET

A627 DICTATION

A628C

RECOVERY

RM A628

SOILED

UTILITY

A625

CLEAN

UTILITY

A626

FROZEN

SECTION

A606

PNEUMATIC

TUBE

STATION

CORRIDOR

CLEAN

LINEN

A628B

PATIENT

A632

PATIENT

A633

PATIENT

A634

PATIENT

A635

CORRIDOR

6A8

PATIENT

A636

PATIENT

A637

C O

R R

ID

O

R 6A

9 CONTROL

CENTER

A638

MED

PREP

A638A

NOURISHMENT

A638B

CLEAN

SUPPLY

A638C

PA

SS

AG

E

6A

CLEAN

LINEN

A652

SOLID

UTILITY

A651

HAC

A656

NURSE

CALL

EQUIP

A655

PATIENT

TOILET

A629

C O

R R

ID

O

R 6A

STRETCHER

STORAGE

A630

ANTHERM

A631A

ISOLATION

PATIENT

A631

STAFF LOUNGE/

CONSULTATION

A653

LOCKERS

A654

PATIENT

A639

PATIENT

A640

PATIENT

A641

PATIENT

A642

PATIENT

A643

6A10

A644

STAIR

AS602

WORK

RM

A650

STAFF

TOILET

A654A

C

LE

AN

LI

N

EN

TOILET

A646

EQUIP

STORAGE

A648

PATIENT

A645

EQUIP

STORAGE

A647

C O

R R

ID

O

R 6A

6A

ON CALL

RM

A603

EC

AU661

OR 1

A608

ANEST

WORKROOM

A624

S

P

O

GEN

A

1 FLOOR PLAN - SIXTH FLOOR - AREA A

SCALE: 1/8" = 1'-0"

HA-161-1.6

FLOOR PLAN - SIXTH FLOOR

- AREA A 1

KEY PLAN

B

A

TRUE

NORTH

PLAN

NORTH

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

05/16/2023

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

ASBESTOS NOTES

GENERAL NOTES:

1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL

LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.

2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK

AND CONTACT THE PROJECT MANAGER AND VPIH.

3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;

PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO

INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.

4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND

ABATEMENT WITH THE GENERAL CONTRACTOR.

5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE

PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.

ASBESTOS NOTES:

1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS

IDENTIFIED IN THE PROJECT AREA.

2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.

COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY

DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.

3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.

FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.

4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL

CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.

ASBESTOS ABATEMENT PHASING:

1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY

OPERATIONS.

SUMMARY OF ASBESTOS CONTAINING MATERIALS

KEY NOTE DESCRIPTION FRIABLE QTY HATCHING

1 BLACK FLOOR MASTIC NF 860SF

2 12"X12" VINYL FLOOR TILE NF 80 EA

3 9"X9" VINYL FLOOR TILE NF 450 LF

4 FIRE DOOR Y 3 EACH

C.L. MET

File details come from the government source that posted it. Updated .