596A4-22-700 Drawings 02 - Asbestos.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77623B0069
About this file
This package includes construction drawings and a federal contract opportunity notice. The drawings depict asbestos abatement work at the Lexington-Cooper VA Medical Center in Lexington, Kentucky for project number 596A4-22-700. Asbestos containing materials including floor mastic, vinyl floor tiles and fire doors will be removed. The contract opportunity is solicitation number 36C77623B0069 for EHRM infrastructure upgrades construction at the Lexington-Cooper VA Medical Center to be awarded by the Department of Veterans Affairs Technology Acquisition Center Austin. The pre-bid documents provide details on the scope and phasing of the asbestos abatement work to be performed pursuant to the overall demolition and construction project.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP DN
MECH RM
D-B038
EMERGENCY
GENERATOR
D003
TRANSFORMERS
& SWITCHGEAR
D003A
CORRIDOR
DH001
STAIR
PAS06
STAIR
PAS07
ELECTRICAL
D001
TD
D002
CORRIDOR
DH002
MECH RM
D004
EMS
D005
STORAGE
D005A
STORAGE
D006
ELEVATOR
S6
ELEVATOR
S7
COMM
EQUIP
RM
D007D
C O
R R
ID
O
R D
H
PAINT
SHOP
D007C
CORRIDOR
DH003 SIGNAL
CLOSET
D008
STORAGE
PA08
PARKING
CORRIDOR
DH004
CARPENTER
SHOP
D007
STORAGE
AREA
PA06
CHIEF
D007A
LOCKSMITH
D007B
1 FLOOR PLAN - GROUND FLOOR - AREAS D & PA
SCALE: 1/8" = 1'-0"
HA-100-1A.G
FLOOR PLAN - GROUND
FLOOR - AREAS D & PA 1A
KEY PLAN
PA
D
B
A
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL
LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;
PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO
INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND
ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS
IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.
COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY
DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.
FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.
4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL
CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY
OPERATIONS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 BLACK FLOOR MASTIC NF 860SF
2 12"X12" VINYL FLOOR TILE NF 80 EA
3 9"X9" VINYL FLOOR TILE NF 450 LF
4 FIRE DOOR Y 3 EACH
C.L. MET05/16/2023
ELECTRICAL
STERILE AND
NON-STERILE
STORAGE
A001A
STERILIZATION
WORK RM
A005C
GAS CYL
STORAGE
B005D
CLEAN
RECEIVING
B007
CORRIDOR
AH003
STORAGE
A008
RETAIL
STORE
A009
C O
R R
ID
O
R
AH
ASST
CHIEF
A012
CLERK
TYPIST
A011
CHIEF
A010
OFFICE
CANTEEN
A007
REFR
WALK IN
A006B
PREFAB
REFRIG
A006C
FOOD
STORAGE
A006A
STAIRWELL
PAS04
KITCHEN
A006
HAC
A006F
AU008 AU007 AU006
CORRIDOR
AH001
STAIR
AS002 STORAGE
A004
CAFETERIA
A004A
FOOD
SERVICING
A006D
SERVING
LINE
A005
SURGICAL
PACK
B045C
MAIN
KITCHEN
B036
EQUIP
STORAGE
AREA
B001
ELECTRIC
CLOSET
BU003
EMS
A001B
DUMB
ELEVATOR
OFFICE
A019
ELEVATOR
LOBBY
A001
OFFICE
ASST
CHIEF
A003
ELEV
AE004
ELEV
AE005
BREAK
RM
A021
EXIST.
ELEVATOR
LOBBY
A000
DISH
WASHING
A020
ELECTRIC
CLOSET
AU004
EMS
A023
CORRIDOR
AH004
DIETICIANS
OFFICE
A025
ASST
CHIEF
A027
DIETICIANS
OFFICE
A025A
SECY
A028
CORRID
AH00
CONFERENCE
M A029
CORRID
BH00
SUPV
OFFICE
B045
BREAK
RM
B045A
ELECTRICA
AU002CORRIDOR
AH004 AU001
ELECTRIC
CLOSET
AU005
EX.
EMS
A004B
EXIST.
STORAGE
A004A
EX.
VCS
OFFICE
A004A
CHIEF
EX.
VCS
OFFICE
A004E
EXIST. LOCKERS
FEMALE A002A
EXIST.
LOUNGE
A002
EXIST. IT
CLOSET
A002C
EX.
ELEV
P3
EX.
ELEV
P2
EX.
ELEV
P1
EXIST. TOILET &
SHOWERS A002B
TELEPHONE
EQUIP RM
A022
TOILET
A024 EMS
A026
LOCKERS
A026B
OT
CLINIC
A044
1 FLOOR PLAN - GROUND FLOOR - AREA A
SCALE: 1/8" = 1'-0"
HA-103-1.G
FLOOR PLAN - GROUND
FLOOR - AREA A 1
KEY PLAN
PA
D
B
A
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL
LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;
PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO
INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND
ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS
IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.
COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY
DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.
FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.
4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL
CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY
OPERATIONS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 BLACK FLOOR MASTIC NF 860SF
2 12"X12" VINYL FLOOR TILE NF 80 EA
3 9"X9" VINYL FLOOR TILE NF 450 LF
4 FIRE DOOR Y 3 EACH
C.L. MET05/16/2023
A-184
S V
A-153
A-185
A-150A
A-184C
AS107
A-152
ST
O
R
AG
E C
9A
EXAM
C130D
IN-VITRO
COUNTING
HIGH/LOW
A-166
STORAGE
DECONTAM
C127EXAM
C130C
OFFICE
C130B
MENTAL
HEALTH
RM
C130A
STAIR
CS104 PASSAGE
CH126
PHYS
WORK
C126C
ON
CALL
C126D
EXAM
C125G
EXAM
C125F
PASSAGE
CH125B
EXAM
C125C
EXAM
C125D
STORAGE
C125E
A-184A A-184B
CORRIDOR
BH106
B14JG
DRESSING
RM
ALCOVE
B146G
CORRID
SUPV
B101D
ELEC
BU102
ELEC
BU103
WAITING
A-150
CORRIDOR
BH101
FILE
RM
A-151A
A-151
BONE
DENSITY
A-159
VACANT
B131
OFFICE
B132A
VIEWING
RM B132
LOUNGE
B133
KITCHEN
B133A
MECH
B133B
STAFF
TOILET
B133A
CORRIDOR
BH102
PHARMACY
WAITING
A-186
C O
R R
ID
O
R
AH
SUPPLY
A-160
BREAK
RM
A-156
READING
RM A-158
EXAM
A-157
MENS
RESTROOM
A-155
WOMENS
RESTROOM
A-154
STORAGE
A-152B
HOT
LAB
A-152A
HOT
LAB
A-152B
PROVIDER
WORK RM
B101L
Restroom
B101EEMS
CLOSET
B104
ELECTRIC
CLOSET
BU101
Restroom B101F
BREAK
RM
B108CONFERENCE
RM B101A
STORAGE
B101B
SOILED
A146
SUPPLY
A147
STAIR
AS102
AS108 AS106
CORRIDOR
AH102
PHARMACY
OFFICE
A-189
OFFICE
NURSE
MGR
A177
PATIENT
ADVOCATE
A102
INPT
PHARMACY
A103
CORRIDOR
A-191
VAULT
A-180
CONFERENCE
RM A174
TECHNICIAN
OFFICE
A-179
C O
R R
ID
O
R A-
PRE-PACK
A-177a
ANTEROOM
A-190
IV
STORAGE
A-190a
CORRIDOR
AH103
MGR
CMOP
A-178
ACOS
AMB
CARE
A-190C
SUPPORT
UNIT
ADMIN
A-190b
ADMIN
ASSIST
A-188
INVESTIGATION
DRUGS SVC
PGME MGR
A164
MED MGMT
SPECIALIST
A-163FORMULARY
MGR
A-165
PHARMACY
OPERATION
MGR
A-166
CLINICAL
PHARMACIST
A-167
JANITOR
A-167A
CORRIDOR
A-162
WOMEN
A-176
MEN
A-175
ASSOCIATE
CHIEF OF
PHARMACY
OFFICE
A-171
CRITICAL
CARE
PHARMACY
SPECIALIST
OFFICE
A-170
PHARMACY
ADAPC
A-169
CHIEF
A-168
Q
MED STAFF
CO-ORDR
A118
CHIEF OF
STAFF
A120
FEMALE
TOILET
A106
QUALITY
MGMT
A109
HEALTH
SYSTEM
SPECIALIST
A119
MALE
TOILET
A107
ST
O
R
AG
E A1
CORRIDOR
AH110
STAFF
TOILET
A105A
DAV
SVC
OFFICE
A105
VFW
SVC
A101
LOBBY
A100
ELEC
A0104
IT
A104
OFFICE
A105B
CORRIDOR
AH101
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
ELEV
LOBBY
ELEVATOR
S4
ELEVATOR
S5
COPIER/
FAX RM
A145 ELEC
AU104
ELEC
AU-105
BMS
CLOSET
A178
STOCK
RM
A149EMS
A148
SVC
ELEV
LOBBY
1B-1
CORRIDOR
AH101
TOILET
C126A
PHARMACY
STORAGE
A190A
BREAK
RM
A-173
RESIDENTS
A-172
1 FLOOR PLAN - FIRST FLOOR - AREA A
SCALE: 1/8" = 1'-0"
HA-113-1.1
FLOOR PLAN - FIRST FLOOR -
AREA A 1
KEY PLAN
C
E
B
A
D
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL
LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;
PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO
INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND
ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS
IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.
COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY
DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.
FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.
4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL
CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY
OPERATIONS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 BLACK FLOOR MASTIC NF 860SF
2 12"X12" VINYL FLOOR TILE NF 80 EA
3 9"X9" VINYL FLOOR TILE NF 450 LF
4 FIRE DOOR Y 3 EACH
DN
S
S D
W
D
W
C O
R R
ID
O
R C
H
STAIRWELL
CS204
CORRIDOR
BH212
MECH
RM
A273 SOCIAL
WORKER
B247
TOILET
B249
TOILET
B248
SEMI-PRIVATE
RM A257
TOILET
A256A
TOILET
A257A
SHOWER
A269
SEMI-PRIVATE
RM A256
CONFERENCE
RM A255
STOR
A255
VISITOR
WAITING
A254
TOILET
A255A
ECHO
LAB
A249
ECHO
LAB
A250
C O
R R
ID
O
R
AH
1A
STORAGE
A248B CONTROL
RM
A248A
PHONO
CARDIOLOGY
A248 EC
AU205
CORRIDOR
AH211
ELEC
AU206
ELEC
AU207
ELEC
AU208
CCU1
A258
CCU2
A259
CCU3
A260
C O
R R
ID
O
R
AH
NURSES
WORK
RM
A268
NURSE
STATION
A267
NOURISHMENT
CENTER
A267C
EMS
A270
STAIRWELL
AS202
BREAK
A267D
CLEAN
UTILITY
A267A
TOILET
A271B
HEART
STATION
SUPV
OFFICE
A272
NURSE
LOUNGE
A271
NURSE
COORD
OFC
A274
EMS
A252
TOILET
A251
C O
R R
ID
O
R
AH
STRESS
LAB
A266
IT
CLOSET
A265
CORRIDOR
AH209
CCU6
A264
CCU5
A263
CCU4
A262
CARDIAC
PROCEDURE
RM A261
HEART
STATION
A245
HEART
STATION
WORK RM
A244 CONSULT
A241
JANITOR
A240 TOILET
A239
CLEAN
STOR
A238
PREPARATION/
HOLDING
A237
CORRIDOR
AH206
PACEMAKER
A247
CARDIO
CASE
MGR
OFFICE
A276A
C O
R R
ID
O
R
AH
CARDIO
OFFICE
A276
EKG
COMPUTER
A247A
CARDIOLOGY
DOCTOR
OFFICE
A246
EEO
ADMIN
OFFICE
A277
CORRIDOR
AH207
IT
CLOSET
A243
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
CATH
LAB
OFFICE
A242
EQUIP
RM
A235B
CATH
LAB 1
A235
CATH
STORAGE
A235A
STAFF
OFFICE
A231A
BREAK
RM
A231
CONTROL
A234
STAFF
CORRIDOR
A232
SOILED
LINEN
A229
CLEAN
HOLDING
A230
CATH
STORAGE
A233A
EQUIP
RM
A233B
LOBBY
AH200
ELEVATOR
S5
ELEVATOR
S4
SVC
LOBBY
A201
EQUIP
STOR
A202
WAITING
A205
PHARMACY
A204
STAFF
TOILET
A206A
ELECTRIC
CLOSET
A205A
STAFF
LOCKER
A206
STOR
A203
ELECTRIC
CLOSET
BU201
CLINIC
B
WAITING
B238
MECH
RM
B234
CORRIDOR
AH204
LAB
A207
EC
AU204
TOILET
A207A
ROOM
A209
CORRIDOR
AH202
C
CORRIDOR
C212
CONSULT
B235
WARFARIN
CLINIC
B234
B233BH207
SOILED
UTILITY
A267B
LOCKER
A271A
CLEAN
UTILITY
A202
1 FLOOR PLAN - SECOND FLOOR - AREA A
SCALE: 1/8" = 1'-0"
HA-123-1.2
FLOOR PLAN - SECOND
FLOOR - AREA A
RAC
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL
LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;
PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO
INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND
ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS
IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.
COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY
DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.
FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.
4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL
CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY
OPERATIONS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 BLACK FLOOR MASTIC NF 860SF
2 12"X12" VINYL FLOOR TILE NF 80 EA
3 9"X9" VINYL FLOOR TILE NF 450 LF
4 FIRE DOOR Y 3 EACH
LOCKER
A338A
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
L S
L S
LS
LS
L S
CONTROL
B321A
EEG
TESTING
B321OFFICE
B304RESEARCH
B303
CHIEFS
OFFICE
A303A
CONFERENCE
ROOM
A302B
OFFICE
B301
OFFICE
B322A
EEG
TESTING
B324
CONTROL
B324A
UM
OFFICE
B325A
UM
OFFICE
B325READING
RM B323
EC
BU301
NUEROLOGY
ADMIN
OFFICE
A303
C O
R R
ID
O
R
AH
1 MECH
SHAFT
A304A
CLEAN
A304
SLEEP
DISORDER
RECEPTION
A306
C O
R R
ID
O
R
AH
HOSPICE
CARE
OFFICE
A307
SOILED
A305
NEUROLOGY
ADMIN
OFFICE
A302C
LOBBY
A301
HAS
A308
EC
AU304
EMS
A309
PATIENT RM
A364
PATIENT
TOILET
A364A
PATIENT
TOILET
A365A
PATIENT RM
A365
PATIENT RM
A367 WAITING RM
A369
MED
REVIEW
RM
B302
ELEVATOR
S5
ELEVATOR
S4EC
AU305
EMS
A372
PATIENT
A369A
PATIENT
TOILET
A367ALINEN
SUPPLY
A366
CORRIDOR
AH309
AS302
AU308 AU307 AU306
CLEAN
SUPPLY
A368
BEREAVEMENT
ROOM
A371
PHYSICIANS
OFFICE
A373
NEUROLOGY
TEAM
OFFICE
A350
C O
R R
ID
O
R
AH
7NURSE
STATION
A352
MED RM
A353
NURSE
MANAGER
A355
A355A
SOILED
UTILITY
A358
STAFF
WORK RM
A358A
C O
R R
ID
O
R
AH
PATIENT
TOILET
A-363A
PATIENT RM
A-363
PATIENT
TOILET
A-362A
PATIENT RM
A362
TOILET
A357
CORRIDOR
AH306
NOURISHMENT
A359
PATIENT RM
A361
PATIENT
TOILET
A361A
PATIENT
TOILET
A360A
NURSES
LOUNGE
A360
PATIENT RM
A356
PATIENT
TOILET
A356A
A354A
SOCIAL
WORK
A354 TOILET
A351A
STAFF
NURSING
A351
TOILET
A349A
CORRIDOR
AH306
OFFICE
APU
A348
OFFICE
SOC.
WORK
A349
OFFICE
APU
A347
OFFICE
APU
A346
TOILET
A346A
1 BED
RM
A343
1 BED
RM
A342
1 BED
RM
A340
IT
A345
STORAGE
A344
DOCTOR
A341
DOCTOR
A310
ELEVATOR
AE301
ELEVATOR
AE302
ELEVATOR
AE303
LOBBY
A300
SECURITY
RM
A338 2 BED
RM
A337
CORRI
AH30
SECY
A339
PANTRY
A313
SURGY
TEAM RM
A311
C O
R R
ID
O
R
AH
4 NU
ST
A
TOILE
A315A
2 BED
RM
A315WAITING
AREA
A312
CORRIDOR
AH309
TOILET
A342A
1 FLOOR PLAN - THIRD FLOOR - AREA A
SCALE: 1/8" = 1'-0"
HA-133-1.3
FLOOR PLAN - THIRD FLOOR
- AREA A 1
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL
LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;
PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO
INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND
ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS
IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.
COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY
DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.
FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.
4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL
CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY
OPERATIONS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 BLACK FLOOR MASTIC NF 860SF
2 12"X12" VINYL FLOOR TILE NF 80 EA
3 9"X9" VINYL FLOOR TILE NF 450 LF
4 FIRE DOOR Y 3 EACH
WASHERDRYER
X2
2FLT
2FLT
X2
2FLT
2FLT
OFFICE
B402A
OFFICE
B402B
OFFICE
B402
DIABETES
RESEARCH
OFFICE
B401
ELEC
BU401
TOILET
B424C
LOCKER
RM
B424D
ISOLATION
B424A
OFFICE
B403B
B403A
PROVIDER
OFFICE
A408
TOILET
A408A
C O
R R
ID
O
R
AH
DR.
OFFICE
A405
3 BED
RM
A474
SHOWER
A474A
1 BED
RM
A475
TOILET/
SHOWER
A475A
TOILET
A474B
SHOWER
A473A
3 BED
RM
A473
STAIR
1 BED
RM
A476 RECREATION
A478
STORAGE
A478A
STORAGE
A478B
NUTRITION
A404
STAFF
WORKRM
A482
OFFICE
PSYCHOLOGIST
A486
OFFICE
PSYCHOLOGIST
A487
OFFICE
A488
FEMALE
TOILET
A403
EC
AU405
PSYCHOLOGY
TESTING/
WAITING
A485
EXAMINATION
A484
CORRIDOR
AH411
HAC
A477
TOILET/
SHOWER
A476A
STORAGE
A472
ELEC
AU406
ELEC
AU408
ELEC
AU407
MEDICATIONS
A458A
PSYCHOLOGY
TESTING
A491
3 BED
RM
A470
TOILET
A473B
TOILET
A470B C
O R
R
ID
O R
AH
HYDROTHERAPY
TUB RM
A471
LAUNDRY
A466
STAFF
BREAK RM
A464
RECREATION
THERAPIST
OFFICE
A461
COMMUNICATION
CENTER/ NURSE
STATION
A458
C O
R R
ID
O
R
AH
DAYRM
A456
OFFICE
A452
OFFICE
OPS
MGR
A452A
TOILET
A455A
NURSE
MGT
OFFICE
A454
CORRIDOR
AH408
TOILET
A457B
SHOWER
A457A
1 BED RM
OR
SECLUSION
A457
THERAPEUTIC
SECLUSION
A4551 BED RM
OR
SECLUSION
A459
SHOWER
A459ASHOWER
A462A
STAFF
TOILET
A460
STORAGE
A463A
TOILET
A462B
LINENS
A465
TUB &
TOILET
A467A
1 BED RM
OR
SECLUSION
A462
1 BED RM
OR
SECLUSION
A463
1 BED RM
OR
SECLUSION
A467
GROUP
RM
A468
3 BED
RM
A469
HIMS
OFFICE
A451
RES & MED
STUDENTS
A448 RES & MED
STUDENTS
A445
SECY
A442
OFFICE
CHIEF
A443
CHAPEL
A440
OFFICE/
CHAPLAINS
A439
OFFICE/
WAITING
A435
SOCIAL
WORKER
A446
SOCIAL
WORKER
A447
KITCHENETTE/
COFFEE
A449
STAFF
TOILET
A449A
CORRIDOR
AH407
TELE/DATACLOSET
A450
PSYCHOLOGY
TECHNICIAN
A490
HALL
A489
ELEVATOR
AE403
ELEVATOR
AE402
ELEVATOR
AE401
OFFICE
PHYSICIAN
A436 CHAPEL
OFFICE
A438
ENDO
WAITING
RM A412
LOBBY
A400
ELEVATOR
AE405
ELEVATOR
AE404
C O
R R
ID
O
R
AH
1 LOBBY
A401
TRASH
CHUTE
DUMP
WAITER
A406A
SOILED
A407
CLEAN
A406
C O
R R
ID
O
R
AH
2 MED TEAM
ADMIN
OFFICE
A409
OFFICE
PHYSICIAN
A410
SCOPEWASH
& STORAGE
A413
EC
AU404
PROCEDURE
RM A415
PROCEDURE
RM A414
SU
A4
C O
R R
ID
O
R
AH
TOILET
A469B
1 FLOOR PLAN - FOURTH FLOOR - AREA A
SCALE: 1/8" = 1'-0"
HA-143-1.4
FLOOR PLAN - FOURTH
FLOOR - AREA A 1
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL
LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;
PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO
INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND
ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS
IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.
COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY
DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.
FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.
4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL
CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY
OPERATIONS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 BLACK FLOOR MASTIC NF 860SF
2 12"X12" VINYL FLOOR TILE NF 80 EA
3 9"X9" VINYL FLOOR TILE NF 450 LF
4 FIRE DOOR Y 3 EACH
FILES
PNEUMATIC TUBE
ANEST
OFFICE
B623 C O
R R
ID
O
R C
6B
1 ELEC
B624A
IMPLANT
CO-ORDR
B624
STOR
B601CORRIDOR
C6B6
SOILED
UTILITY
B625
ELEVATOR
ELEVATOR
B625A
VACANT
A604
CORRIDOR
C6A1
A607 OFFICE
A606
CONTROL
A605
A601
ON CALL
BATH
A602
ELEVATOR
AE604
ELEVATOR
AE605
ELEC
B600B
CYLINDER
B600A
CORRIDOR
6A1
C O
R R
ID
O
R C
6A
HDCP
TELE
FAMILY
WAITING
AREA
A657
PUBLIC
TOILET
A657A
LOBBY
A600
ELEVATOR
AE603
ELEVATOR
AE602
ELEVATOR
AE601
TELE/COMM
CLOSET
A627 DICTATION
A628C
RECOVERY
RM A628
SOILED
UTILITY
A625
CLEAN
UTILITY
A626
FROZEN
SECTION
A606
PNEUMATIC
TUBE
STATION
CORRIDOR
CLEAN
LINEN
A628B
PATIENT
A632
PATIENT
A633
PATIENT
A634
PATIENT
A635
CORRIDOR
6A8
PATIENT
A636
PATIENT
A637
C O
R R
ID
O
R 6A
9 CONTROL
CENTER
A638
MED
PREP
A638A
NOURISHMENT
A638B
CLEAN
SUPPLY
A638C
PA
SS
AG
E
6A
CLEAN
LINEN
A652
SOLID
UTILITY
A651
HAC
A656
NURSE
CALL
EQUIP
A655
PATIENT
TOILET
A629
C O
R R
ID
O
R 6A
STRETCHER
STORAGE
A630
ANTHERM
A631A
ISOLATION
PATIENT
A631
STAFF LOUNGE/
CONSULTATION
A653
LOCKERS
A654
PATIENT
A639
PATIENT
A640
PATIENT
A641
PATIENT
A642
PATIENT
A643
6A10
A644
STAIR
AS602
WORK
RM
A650
STAFF
TOILET
A654A
C
LE
AN
LI
N
EN
TOILET
A646
EQUIP
STORAGE
A648
PATIENT
A645
EQUIP
STORAGE
A647
C O
R R
ID
O
R 6A
6A
ON CALL
RM
A603
EC
AU661
OR 1
A608
ANEST
WORKROOM
A624
S
P
O
GEN
A
1 FLOOR PLAN - SIXTH FLOOR - AREA A
SCALE: 1/8" = 1'-0"
HA-161-1.6
FLOOR PLAN - SIXTH FLOOR
- AREA A 1
KEY PLAN
B
A
TRUE
NORTH
PLAN
NORTH
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
05/16/2023
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
ASBESTOS NOTES
GENERAL NOTES:
1. THESE DRAWINGS ARE DIAGRAMMATIC AND FOR GENERAL IDENTIFICATION OF ASBESTOS-CONTAINING MATERIALS (ACM) SUBJECT TO REMOVAL OR DISTURBANCE. THEIR ACCURACY IS NOT GUARANTEED. LOCATIONS AND QUANTITIES SHOWN OF ACM AND LBP TO BE REMOVED ARE REPRESENTATIVE BASED ON RECENT AND PREEXISTING SITE SURVEY INFORMATION. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL MATERIAL
LOCATIONS AND REMOVAL QUANTITIES, AND EXISTING SITE CONDITIONS.
2. ASBESTOS REMOVAL IS BEING PERFORMED PURSUANT TO DEMOLITION OF SUBJECT STRUCTURE. REMOVE AND DISPOSE OF ALL ACM IN ACCORDANCE WITH APPLICABLE REGULATIONS, PROJECT SPECIFICATIONS, AND THE APPROVED ASBESTOS HAZARD ABATEMENT PLAN (AHAP). IF SUSPECT ACMS ARE ENCOUNTERED DURING CONSTRUCTION AND DEMOLITION THAT ARE NOT IDENTIFIED ON THE ASBESTOS ABATEMENT DRAWINGS, STOP WORK
AND CONTACT THE PROJECT MANAGER AND VPIH.
3. ALL WORK IS TO BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS;
PROJECT SPECIFICATIONS, THE APPROVED WORK PLAN, AND ACCEPTED INDUSTRY PRACTICE. WHEN REQUIREMENTS OVERLAP OR CONFLICT, THE MOST STRINGENT REQUIREMENT SHALL APPLY. ALL WORK SHALL BE SUBJECT TO
INSPECTION BY THE OWNER, THE OWNER'S CONSULTANTS, AND REGULATORY PERSONNEL.
4. DEMOLITION OF NON-ACM BUILDING MATERIALS MAY BE REQUIRED TO ACCESS REGULATED MATERIALS, INCLUDING, BUT NOT LIMITED TO, CABINETS, RAISED FLOORING, GYPSUM WALLBOARD, EXPANDED METAL OR WOOD LATH AND PLASTER WALLS AND CEILINGS, WALL FRAMING, CARPET, CERAMIC AND VINYL FLOOR COVERINGS, WOOD, ETC. THE ABATEMENT CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION OF NON-ACM MATERIALS AS NEEDED TO ACCESS REGULATED MATERIALS FOR ABATEMENT, AND FOR COORDINATING THE LIMITS OF DEMOLITION AND
ABATEMENT WITH THE GENERAL CONTRACTOR.
5. ALL COSTS ASSOCIATED WITH EXPLORATORY DEMOLITION AND DEMOLITION OF NON-ACM MATERIALS NEEDED TO ACCOMPLISH ABATEMENT SHALL BE INCLUDED IN THE ABATEMENT CONTRACTOR'S LUMP SUM PRICE FOR THE
PROJECT. NO ADDITIONAL COMPENSATION SHALL BE CONSIDERED FOR THIS WORK.
ASBESTOS NOTES:
1. THE PROJECT AREA WAS RECENTLY SURVEYED FOR ACM. REFER TO THE HAZARDOUS BUILDING MATERIALS INSPECTION REPORT BY AMI ENVIRONMENTAL, DATED 28 NOVEMBER 2022 FOR MORE INFORMATION ABOUT ACMS
IDENTIFIED IN THE PROJECT AREA.
2. CONCEALED ACM PIPE INSULATION (TSI) MAY EXIST WITHIN, WALLS, PIPE CHASES AND ABOVE RIGID CEILINGS.
COORDINATE ACCESS WITH DEMOLITION DRAWINGS AND THE GENERAL CONTRACTOR. SOME EXPLORATORY
DEMOLITION MAY BE REQUIRED TO DETERMINE IF CONCEALED ACM IS PRESENT.
3. ESTABLISH REGULATED AREAS (RA) AND NEGATIVE PRESSURE ENCLOSURES (NPE) AND PERFORM REMOVAL IN ACCORDANCE WITH APPLICABLE SPECIFICATION SECTIONS: SEC 02 82 11 - TRADITIONAL ASBESTOS ABATEMENT.
FINALIZE LIMITS OF REGULATED AREAS, LOCATIONS OF NEGATIVE AIR MACHINES (NAM), PERSONAL DECONTAMINATION FACILITIES (PDF), AND WASTE DECONTAMINATION FACILITIES (WDF) BASED ON SITE CONDITIONS, BEST PRACTICES AND PHASING REQUIREMENTS.
4. ASSUME 50% EFFICIENCY WHEN CALCULATING NAM REQUIREMENTS FOR ACHIEVING FOUR (4) AIR CHANGES PER HOUR AND PROVIDED GREATER THAN -0.02” WCG PRESSURE. CONFIGURE AND PLACE NAMS AS NEEDED TO MAXIMIZE AIR MOVEMENT AND PREVENT DEAD AIR SPACE. COORDINATE NEGATIVE AIR DISCHARGE LOCATIONS WITH GENERAL
CONTRACTOR, OWNER'S REPRESENTATIVE, AND VPIH, IF NEEDED.
ASBESTOS ABATEMENT PHASING:
1. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY WITH THE GENERAL CONTRACTOR, CONTRACTING OFFICER, OWNER OR OWNER'S REPRESENTATIVE, AND/OR THE VPIH TO COORDINATE REMOVAL OF ACM IN ACCORDANCE WITH PROJECT SCHEDULING, SEQUENCING, AND PHASING REQUIREMENTS. SOME AFTER HOURS AND WEEK-END WORK MAY BE REQUIRED. PHASING IS SUBJECT TO CHANGE TO ACCOMMODATE SITE CONDITIONS AND FACILITY
OPERATIONS.
SUMMARY OF ASBESTOS CONTAINING MATERIALS
KEY NOTE DESCRIPTION FRIABLE QTY HATCHING
1 BLACK FLOOR MASTIC NF 860SF
2 12"X12" VINYL FLOOR TILE NF 80 EA
3 9"X9" VINYL FLOOR TILE NF 450 LF
4 FIRE DOOR Y 3 EACH
C.L. MET
File details come from the government source that posted it. Updated .