This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0069 for infrastructure upgrades at the Lexington-Cooper VA Medical Center in Kentucky. Offerors are to provide drawings, specifically a 19MB file titled "596A4-22-700 Drawings 07 - Electrical.pdf", as well as construction services to upgrade the EHRM systems as outlined in the opportunity named "Y1DA--EHRM Infrastructure Upgrades Construction Lexington-Cooper, KY 596A4-22-700." The type of opportunity is listed as a solicitation. No further details on pricing, response dates, or awardees are included in this document.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELECTRICAL EQUIPMENT
DISCONNECT SWITCHT
NOTE: THE ACTUAL SIZE OF EQUIPMENT IS SHOWN ON THE DRAWINGS AND MAY
DIFFER FROM WHAT IS SHOWN BELOW.
ELECTRICAL DISTRIBUTION EQUIPMENT
TYPE AS INDICATED ON DRAWINGS
TRANSFORMER
FUSED DISCONNECT
SWITCH
MOTOR STARTER
VFD MOTOR STARTER
SPD SURGE PROTECTION DEVICE
M ELECTRICAL METER
START/STOP,
MOMENTARY CONTACT
PUSHBUTTON SWITCH
NOTE 4,5
NOTE 1 NOTE 2
SINK OR
BASIN
FINISHED FLOOR
DEVICE MOUNTING NOTES:
1.
2.
3.
4.
COORDINATE ABOVE COUNTER ("AC") WIRING DEVICES WITH
CASEWORK, COUNTERS AND BACKSPLASH SUCH THAT THE
DEVICES AND RECEPTACLES ARE LOCATED AT +42" AFF OR 6"
ABOVE THE COUNTERTOP OR BACKSPLASH, WHICHEVER IS
HIGHER. WIRING DEVICES IDENTIFIED AS "HZ" SHALL BE
HORIZONTALLY-INSTALLED WITHIN THE BACKSPLASH OR
APPLICABLE MOUNTING MEDIUM AND VERTICALLY-CENTERED.
ALL RECEPTACLES INSTALLED WITHIN 6'-0" OF THE EDGE OF ANY
SINK OF BASIN SHALL HAVE GFI PROTECTION. DO NOT INSTALL
RECEPTACLES WITHIN 12" OF THE EDGE OF A SINK OR BASIN.
COORDINATE WITH THE TELECOMMUNICATIONS DRAWINGS TO
ENSURE THAT A RECEPTACLE IS INSTALLED WITHIN 18"
HORIZONTAL TO ALL SIGNAL AND DATA DEVICE LOCATIONS.
SWITCHES AND OTHER FLUSH WALL-MOUNTED DEVICES SHALL BE
MOUNTED WITHIN 24" OF DOORFRAME. COORDINATE WITH
ARCHITECTURAL DRAWINGS FOR DOORS WITH SIDELITES. WHERE
DEVICES ARE TO BE INSTALLED ON A WALL ADJACENT- AND
PERPENDICULAR- TO THE DOORFRAME, MOUNT THE DEVICE 12"
BEYOND THE DOOR SWING EXTENT. COORDINATE ROUGH-IN
LOCATIONS WITH DIV. 27 AND 28 DEVICES.
NOTE 3
NOTE 6
C L
SEE FIRE ALARM GENERAL NOTES
C L
S T
U
O N
TV
FCR AA
HZM
F
TYPICAL DEVICE MOUNTING HEIGHTS:
A
DSP
FZ
REF
MW
VM
IM
ABOVE COUNTER
SEE "DEVICE MOUNTING NOTES" NOTE 1
DISPOSAL, +24" AFF
FREEZER, +24" AFF
REFRIGERATOR, +24" AFF
MICROWAVE, +6" ABOVE MICROWAVE SHELF
VENDING MACHINE, +24" AFF
ICE MACHINE, +24" AFF
DEVICE BACKBOXES SHOWN
FOR REFERENCE ONLY
5.
6.
COORDINATE MOUNTING LOCATION WITH OTHER TRADES
TO ENSURE A COMMON MOUNTING HEIGHT, UNIFORM
SPACING AND AESTHETICALLY-PLEASING APPEARANCE.
WIRING DEVICES MOUNTING HEIGHT INDICATED IN LEGEND
AND ON THE DRAWINGS SHALL BE THE DISTANCE
MEASURED FROM THE CENTER OF THE DEVICE TO THE
FINISHED FLOOR.
TYPICAL WIRING DEVICE MOUNTING DETAIL (NOT TO SCALE)
1. THE FIRE ALARM CONTENT SHOWN ON THE DRAWINGS REPRESENTS A
SCHEMATIC LAYOUT WITH CERTAIN SPECIFIC REQUIREMENTS IDENTIFIED.
PROVIDE ENGINEERED SHOP DRAWINGS (SIGNED AND SEALED) AND FINAL
INSTALLATION IN COMPLIANCE WITH THESE FIRE ALARM GENERAL NOTES,
THE SCHEMATIC FIRE ALARM CONTENT AND REQUIREMENTS SET FORTH BY
THESE DRAWINGS, AND ANY ADDITIONAL REQUIREMENTS ESTABLISHED BY
CODE, THE AUTHORITIES HAVING JURISDICTION, OR UNFORESEEN
CONDITIONS. FURNISH THESE ENGINEERED FIRE ALARM SHOP DRAWINGS
TO BOTH THE AUTHORITIES HAVING JURISDICTION (AHJ) AND THE
ARCHITECT FOR REVIEW.
2. PROVIDE ENGINEERED FIRE ALARM SHOP DRAWINGS THAT INCLUDE ALL
DEVICES, EQUIPMENT, AND APPURTENANCES AS REQUIRED BY APPLICABLE
CODES OR AS NECESSARY TO FOR A COMPLETE, FUNCTIONAL, FIRE ALARM
SYSTEM INCLUDING INTERFACES WITH OTHER SYSTEMS AS DESCRIBED IN
THE CONSTRUCTION DOCUMENTS.
3. SPECIAL REQUIREMENTS FOR CIRCUIT BREAKERS PROVIDING
OVERCURRENT PROTECTION TO FIRE ALARM SYSTEM CLASS I CIRCUITS:
PROVIDE VISUALLY-DISTINGUISHABLE RED CIRCUIT BREAKERS WITH LOCK-
ON DEVICE AND 'FIRE ALARM SYSTEM' LABEL.
FIRE ALARM SYSTEM
FIRE ALARM
CONTROL PANEL
FIRE ALARM
ANNUNCIATOR PANEL
MANUAL PULL STATION
GENERATOR
ANNUNCIATOR PANEL
HORN
WALL-MOUNTED
HORN/STROBE
WALL-MOUNTED
STROBE
WALL-MOUNTED
HEAT DETECTOR
FIXED TEMPERATURE
HEAT DETECTOR
RATE OF RISE
SMOKE DETECTOR
PHOTOELECTRIC TYPE
FACP
SD
FIRE ALARM BELL
SPRINKLER FLOW SWITCH
SPRINKLER TAMPER SWITCH
SPRINKLER SOLENOID VALVE
PRESSURE SWITCH
DOOR HOLDER
EOL RESISTOR
CONTROL RELAY
ADDRESSABLE
MONITOR MODULE
ADDRESSABLE
SMOKE DAMPER
DUCT-MOUNTED
SMOKE DETECTOR
PHOTOELECTRIC TYPE;
CLEAN AGENT HEAD;
DATA CENTER SMOKE
DETECTOR
FAAP
GAP
F
F
F#
F#
HF
HR
B
FW
FT
FV
FP
DH
FR
FM
SD
DS
F
CA
S
PLAN MARK
EQUIPMENT NUMBER
SHEET NUMBER
LINE TYPE LEGEND
DRAWING REFERENCES
NEW WORK BY THIS CONTRACTOR
(DARK, SOLID LINE)
EXISTING TO REMAIN OR NEW WORK BY OTHERS
(LIGHT, SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK, DASHED LINE, DEMOLITION PLANS)
NORTH ARROW
PLAN DETAIL REFERENCE TITLE
KEYED NOTE DESIGNATION
PLAN MARK
EQUIPMENT NUMBER
EQUIPMENT DESIGNATION REFER TO MEP
SCHEDULE FOR CIRCUITING AND DEVICE
REQUIREMENTS AND FLOOR PLANS FOR
LOCATIONS
ENLARGED PLAN REFERENCE
PLAN MARK
SHEET NUMBER
A101
SIM
AHU
TITLE
SCALE
PLAN
NORTH
TRUE
NORTH
MATCHLINE
1 REVISION TAG
EQUIPMENT
TAG
1. REFER TO THE MEP COORDINATION SCHEDULE SHOWN ON
E6.11 FOR MECHANICAL EQUIPMENT AND PLUMBING
EQUIPMENT REQUIREMENTS. EQUIPMENT TYPE
EQUIPMENT NUMBER
SAMPLE
EQUIPMENT
MEP COORDINATION
AHU
RACEWAYS
CABLE TRAY : TYPE AS NOTED
LADDER TRAY
WIRE IN CONDUIT, CONCEALED
WIRE IN CONDUIT, EXPOSED
CONTINUATION
HANDHOLE MANHOLEHH MH
JUNCTION AND PULL BOXES
PULL BOX
SHADING INDICATES EMERGENCY POWER
JUNCTION BOX : CEILING OR FLOOR MOUNTED. SIZE
PER N.E.C. REQUIREMENTS.
JUNCTION BOX : WALL MOUNTED. SIZE PER N.E.C.
REQUIREMENTS.J
J
P
WIRING DEVICES
RECEPTACLES (NEMA 5-20 R) - UNLESS OTHERWISE INDICATED,
ALL RECEPTACLES ARE TO BE UL LISTED AS HOSPITAL GRADE
RECESSED SIMPLEX GFI RECESSED DUPLEX
RECESSED DUPLEX RECESSED QUAD
OVERHEAD CEILING RECEPTACLE
REFER TO ELECTRICAL NEW WORK PLANS
FOR NEMA CONFIGURATION
RECESSED JBOX
TELEVISION RECEPTACLE
PROVIDE COMPARTMENTALIZED BACKBOX WITH
DUPLEX RECEPTACLE WITHIN ONE OF THE ISOLATED
COMPARTMENTS
DUPLEX CEILING RECEPTACLE
FLUSH-MOUNT WITHIN CEILING. REFER TO
TELECOMMUNICATIONS NEW WORK PLANS FOR
SIGNAL REQUIREMENTS
FLOORBOX
QUAD RECEPTACLE / SIGNAL MULTI-SERVICE FLOORBOX.
REFER TO TELECOMMUNICATIONS NEW WORK PLANS
FOR SIGNAL REQUIREMENTS
OVERHEAD JUNCTION BOX
ELECTRICAL CONNECTION
TV
J
J
E
A AMPERES
AC ALTERNATING CURRENT
ACS ACCESS CONTROL SYSTEM
AIC AMPERES INTERRUPTING CAPACITY
AV AUDIO/VIDEO
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
C CONDUIT
CAT CATEGORY
CATV CABLE TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
CFCI CONTRACTOR FURNISHED, CONTRACTOR INSTALLED
CPP COPPER HORIZONTAL PATCH PANEL
CT CABLE TRAY
CU COPPER
CUH CABINET UNIT HEATER
CO COPIER
CP EMERGENCY CRITICAL POWER
DC DIRECT CURRENT
DEMO REMOVE AS INDICATED
DPST DUAL POLE, SINGLE THROW
DW DISHWASHER
EC EMPTY CONDUIT
EF EXHAUST FAN
EGC EQUIPMENT GROUNDING CONDUCTOR
EIA ELECTRONICS INDUSTRIES ASSOCIATIONS
EMT ELECTRICAL METALLIC TUBING
EOC EMERGENCY OPERATIONS CENTER
EP EMERGENCY POWER
EPO EMERGENCY POWER OFF
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OTHERS
FO FIBER OPTIC
FPD FLAT PANEL DISPLAY
FPP FIBER OPTIC PATCH PANEL
FT FEET OR FOOT
GFI OR GFCI GROUND FAULT CIRCUIT INTERRUPTER
GC GENERAL CONTRACTOR
G OR GND GROUND
GFR GROUND FAULT RELAY
GFP GROUND FAULT PROTECTION
HZ HERTZ
IG ISOLATED GROUND
INV INVERTER
JBOX JUNCTION BOX
K KILO
KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT AMPERES
KWH KILOWATT HOURS
LC LIGHTING CONTACTOR
LPI LIGHTNING PROTECTION INSTITUTE
MAX MAXIMUM
MCB MAIN CIRCUIT BREAKER
MDP MAIN DISTRIBUTION PANEL
MH MANHOLE
MLO MAIN LUGS ONLY
MM MULTIMODE
MTD MOUNTED
MW MICROWAVE
N NEUTRAL CONDUCTOR
N.C. NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURES
ASSOCIATION
NP NORMAL POWER
MA MANUFACTURER'S ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
N.O. NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OFCI OWNER FURNISHED, CONTRACTOR INSTALLED
OFOI OWNER FURNISHED,OWNER INSTALLED
ONT OPTICAL NETWORK TERMINAL
P POLE
PR PAIR
PVC POLYVINYL CHLORIDE
R RELAY
REF REFRIGERATOR
RGS RIGID GALVANIZED STEEL CONDUIT
RN REPLACE WITH NEW
RMC RIGID METAL CONDUIT
SCCR SHORT CIRCUIT CURRENT RATING
SCH SCHEDULE
ShTP SHIELDED TWISTED PAIR
SE SECURITY ELECTRONICS
SM SINGLE MODE
SPD SURGE PROTECTION DEVICE
SPECS CONTRACT SPECIFICATIONS
SPST SINGLE POLE SINGLE THROW
STR STRAND
SWBD SWITCHBOARD
T TRANSFORMER
TC TELECOMMUNICATIONS POWER CRITICAL
TN TELECOMMUNICATIONS POWER NORMAL
TR TELECOMMUNICATIONS ROOM
TYP TYPICAL
UHF ULTRA-HIGH FREQUENCY
UL UNDERWRITERS' LABORATORIES
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
V VOLTS
VA VOLT AMPERES
VFD VARIABLE FREQUENCY DRIVE
VHF VERY HIGH FREQUENCY
VM VENDING MACHINE
W WIRE OR WATT
WP WEATHERPROOF
WR WEATHER-RESISTANT
WPIU WEATHERPROOF WHILE IN USE
XFMR TRANSFORMER
XRL EXISTING TO BE RELOCATED
Z IMPEDANCE
ABBREVIATIONS
HALF-SHADING:
LIFE SAFETY POWER
NO SHADING:
NORMAL POWER
LIGHTING FIXTURES
1. "NL" INDICATES UNSWITCHED LUMINAIRE
2. NOTE THAT THE SIZE AND SHAPE OF FIXTURES AND ASSOCIATED HALF-
SHADING VARY BY FIXTURE TYPE
3. PROVIDE UNSWITCHED HOT CONDUCTOR TO FIXTURES WITH BATTERY
BACK UP, ONBOARD UL 924. REFER TO UL 924 DETAILS FOR ADDITIONAL
REQUIREMENTS.
HALF-SHADING:
CRITICAL POWER
A 1c
UPPER CASE LETTER - FIXTURE MARK
LOWER CASE LETTER - FIXTURE SWITCH LEG
NUMBER - FIXTURE CIRCUIT NUMBER
INDUSTRIAL PENDANT
LED LIGHTING, VARIOUS
LENGTHS
LINE VOLTAGE LIGHTING CONTROLS
AREA CONTROL SCHEME TAG
REFER TO LIGHTING CONTROL SCHEDULE
OCCUPANCY DETECTOR
ASTRONOMICAL TIMER SWITCH
CEILING DUAL TECHNOLOGY OCCUPANCY DETECTION
LIGHTING SENSOR
DIMMER
DT
OD
X
LC0
ROOM NAME
LC#
ROOM TAG
CONTROL SCHEME TAG
SUBSCRIPT LEGEND:
3 : 3-WAY SWITCH
4 : 4-WAY SWITCH
P : PILOT LIGHT SWITCH
C : MOMENTARY CONTACT SWITCH
a, b, ... : LOWERCASE SUBSCRIPT INDICATES SWITCH LEG
OD : WALL OCCUPANCY DETECTION
OR : OVER-RIDE SWITCH
LV : LOW VOLTAGE SWITCH
TOGGLE SWITCH
OD
1. WHERE TWO OR MORE SWITCHES ARE SHOWN ADJACENT TO EACH
OTHER, PROVIDE A COMMON GANG BOX WITH A SINGLE, SEAMLESS
FACEPLATE.
2. PROVIDE NEUTRAL AND UNSWITCHED HOT TO LINE VOLTAGE CONTROL
DEVICE WHEN REQUIRED.
3. SEE LIGHT FIXTURE CONTROL SCHEDULE FOR UL 924 AND UL 1008
REQUIREMENTS. SEE UL 924 AND UL 1008 DETAIL.
LS
D
ELECTRICAL DEMOLITION NOTES
1. REMOVE, CAP AND RELOCATE EQUIPMENT, OUTLETS, CONDUIT, WIRE, ETC.,
AS SHOWN AND SPECIFIED ON DRAWINGS, AND AS MAY BECOME NECESSARY
BECAUSE OF EXISTING FIELD CONDITIONS. VISIBLY EXAMINE ALL EXISTING
WALLS DESIGNATED FOR REMOVAL TO DETERMINE THE CONDUIT AND THE
WIRING THAT WILL REQUIRE CAPPING AND REMOVAL, WHETHER OR NOT
SUCH CONDITIONS ARE INDICATED ON THE DRAWINGS. FAILURE TO VISIT THE
SITE AND TO TAKE ALL EXISTING CONDITIONS INTO ACCOUNT WILL NOT
ALLOW FOR CHANGES TO THE SCOPE OF WORK.
2. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING FIXTURES, EQUIPMENT,
OUTLETS, ETC., TO REMAIN IN USE WHETHER NOTED ON THE PLANS OR NOT.
FIELD VERIFY EXISTING ITEMS TO REMAIN IN USE. RECONNECT RACEWAYS
AND WIRING FOR EXISTING CIRCUITS WHICH MUST BE RE-ROUTED OR WHICH
ARE PARTIALLY ABANDONED TO POWER THE REMAINING OUTLETS ON THE
CIRCUIT.
3. REMOVE ALL UNUSED WIRING AND CABLES BACK TO THEIR SOURCE.
REMOVE ALL UNUSED CONDUIT THAT IS EXPOSED OR ABOVE ACCESSIBLE
CEILINGS WHICH IS AFFECTED BY OR IS IN THE AREA OF THE DEMOLITION
WORK.
4. THE INTENTION OF THE ELECTRICAL DEMOLITION DRAWINGS IS TO
DISCONNECT AND REMOVE ALL ELECTRICAL WORK MADE VOID BY THE SCOPE
OF THE CONSTRUCTION AND ALTERATION. FIELD VERIFY EXACT MATERIAL
QUANTITIES REQUIRED TO BE REMOVED.
5. DISCONNECT AND REMOVE ALL EXISTING ELECTRICAL EQUIPMENT, DEVICES,
ASSOCIATED RACEWAYS, SUPPORTING HARDWARE, AND WIRING, WHICH
HAVE BEEN MADE OBSOLETE BY THE WORK OR IS SHOWN DASHED ON THE
ELECTRICAL DEMOLITION DRAWINGS, UNLESS OTHERWISE NOTED.
ALTHOUGH AN ATTEMPT HAS BEEN MADE TO INDICATE ALL OF THIS WORK,
TOTAL ACCURACY IS NOT GUARANTEED. VISIBLY EXAMINE ALL AREAS AND
WALLS AND CEILINGS SCHEDULED FOR REMOVAL TO DETERMINE EXISTING
ELECTRICAL ITEMS TO REMAIN.
6. WHERE THE REMOVAL OF ELECTRICAL EQUIPMENT, CONDUIT, BOXES, AND
SUPPORTING HARDWARE REQUIRES WALL PATCHING AND REFINISHING,
REFER TO ARCHITECTURAL FRONT-END SPECIFICATIONS FOR PATCH AND
FINISH WORK.
7. WHERE BURIED CONDUITS EXTENDING OUT OF A CONCRETE SLAB BECOME
ABANDONED, CUT AND GRIND THE CONDUITS OFF FLUSH WITH TOP OF SLAB
AND PLUG WITH NON-SHRINK WATERPROOF GROUT FILL.
8. TAKE ALL REMOVED MATERIALS FROM THE PROJECT SITE, EXCEPT FOR
THOSE TO BE RELOCATED, STORED, OR TURNED OVER TO THE OWNER.
9. ACCEPTANCE OF CONTRACT MEANS INSTALLER ACCEPTS EXISTING
CONDITIONS.
10. COORDINATE ALL DEMOLITION WORK WITH ALL OTHER TRADES.
11. PROVIDE A BLANK COVER OVER THE OUTLET WHERE A FLUSH DEVICE IS
BEING REMOVED FROM FLOORS AND WALLS THAT ARE TO REMAIN. MATCH
THE COLOR AND MATERIAL TO THE EXISTING REMAINING COVERS IN THE
ROOM OR SPACE.
12. WHEN HAVING TO DISPOSE OF HAZARDOUS MATERIALS INCLUDING REMOVAL
OF FLUORESCENT LIGHT FIXTURES WHERE BALLASTS CONTAIN PCBS AND
LAMPS CONTAIN MERCURY, REFER TO ARCHITECTURAL FRONT-END
SPECIFICATIONS FOR HAZARDOUS MATERIAL DISPOSAL GUIDELINES, AND
COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS.
13. MODIFY EXISTING PANEL DIRECTORIES (OR REPLACE) FOR PANELBOARDS
WHICH HAVE HAD ALTERATIONS TO THE CIRCUITS ORIGINATING THEREIN.
DESCRIBE THE LOAD AND LOCATION. TYPE, DO NOT HAND LETTER NEW
PANELBOARD DIRECTORIES.
ELECTRICAL GENERAL NOTES
1. MAKE ALL INSTALLATIONS IN ACCORDANCE WITH THE ARCHITECTURAL
BARRIERS ACT (ABA).
2. MOUNTING HEIGHTS INDICATED WITHIN PLANS AND SCHEDULES ARE
DIMENSIONED TO THE CENTER LINE OF THE DEVICE, EQUIPMENT,
LUMINAIRE, ETC. UNLESS OTHERWISE NOTED.
3. COORDINATE EXACT EQUIPMENT LOCATIONS WITH OTHER TRADES.
EQUIPMENT LOCATIONS SHOWN ON ELECTRICAL PLANS ARE
DIAGRAMMATICAL ONLY AND MIGHT NOT BE EXACT.
4. CIRCUIT IDENTIFICATION NUMBERS BESIDE ELECTRICAL DEVICES AND
CONNECTION POINTS ON PLANS CORRESPOND TO AN OVERCURRENT
DEVICE IN THE DESIGNATED PANELBOARD. NOTE ALL CIRCUIT NUMBER
CHANGES MADE IN THE FIELD AT EACH ELECTRICAL DEVICE AND
CONNECTION POINT. ALSO CORRECT THE DIRECTORIES AND DEVICE
MARKINGS AT PANELBOARDS, SWITCHBOARDS AND SWITCHGEAR TO
ACCURATELY REFLECT THE AS-BUILT CONDITIONS.
5. INSTALL EMERGENCY AND EXIT LUMINAIRE WIRING IN A SEPARATE
RACEWAY FROM THAT OF ANY NORMAL POWER DEVICE.
6. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILINGS, AND IN
FLOOR SLABS, ETC. UNLESS OTHERWISE INDICATED ON THE PLANS OR IN
THE SPECIFICATIONS. CONDUIT ROUTED IN MECHANICAL ROOMS,
ELECTRICAL ROOMS, AND STORAGE ROOMS WITHOUT CEILINGS MAY BE
ROUTED EXPOSED.
7. COORDINATE VERTICAL CONDUIT ROUTING TO WALL MOUNTED DEVICES
TO ENSURE DEVICES LOCATED WITHIN AN 18-INCH HORIZONTAL
DIMENSION WILL BE CENTER-ALIGNED VERTICALLY.
8. FIELD COORDINATE ALL ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT MOUNTING LOCATIONS TO AVOID ENCROACHMENT OF
OPERATION AND ACCESS TO EQUIPMENT FROM OTHER TRADES.
COORDINATE THE APPROPRIATE MOUNTING LOCATION WITH THE
AFFECTED DISCIPLINES WHEN EQUIPMENT IS SPECIFIED TO BE MOUNTED
ONTO THE SURFACE OF ANOTHER DISCIPLINE'S EQUIPMENT.
9. REPAIR ALL OPENINGS MADE IN EXISTING WALLS, PARTITIONS, ETC TO
ACCOMMODATE WORK OF THIS DISCIPLINE TO MATCH THE SURROUNDING
CONDITIONS, USING WORKERS QUALIFIED IN THE APPROPRIATE TRADE.
APPROPRIATELY GROUT OR SEAL ALL CONDUITS THROUGH WALLS.
10. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS
AND FLOORS MUST HAVE BEEN TESTED AND CERTIFIED AS A SYSTEM PER
ASTM E814 STANDARDS FOR FIRE TESTS OF THROUGH-PENETRATION
FIRESTOPS.
11. PERFORM ALL WELDING ACCORDING TO AMERICAN WELDING SOCIETY
STANDARDS. FURNISH CERTIFICATES QUALIFYING EACH WELDER TO THE
ARCHITECT OR ENGINEER PRIOR TO START OF WORK. THE ARCHITECT
OR ENGINEER RESERVES THE RIGHT TO REQUIRE QUALIFYING
DEMONSTRATION, AT NO ADDITIONAL EXPENSE, OF ANY WELDERS
ASSIGNED TO THE JOB.
12. REPLACE OR REINSTALL ALL PORTIONS OF THE BUILDING (CEILING TILES,
WALLS, ETC) REMOVED TO ACCOMMODATE THE INSTALLATION OF ANY
ELECTRICAL DEVICE, EQUIPMENT, ETC., USING WORKERS QUALIFIED IN
THE APPROPRIATE TRADE.
13. COORDINATE LUMINAIRE LOCATIONS SUCH THAT LUMINAIRES RUN
PARALLEL TO THE FACE OF THE EQUIPMENT AND OVER AISLES BETWEEN
EQUIPMENT IN ALL MECHANICAL AND ELECTRICAL EQUIPMENT AREAS.
INSTALL AT PROPER LOCATIONS AND HEIGHTS TO PROPERLY ILLUMINATE
ALL GAGES, PANELS, ELECTRICAL EQUIPMENT, CONTROLS, VALVES, ETC.
CHAIN HANGING, STEM HANGING, CHANNEL HANGING, ETC. ARE
ACCEPTABLE METHODS.
14. PROVIDE FIRE RATED AND WEATHER SEALANT AS REQUIRED TO SEAL
PENETRATIONS.
15. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL ROUTE NEW CONDUIT
AS HIGH AS POSSIBLE IN CEILING SPACES. COORDINATE ROUTING WITH
EXISTING SYSTEMS AND OWNER.
ELECTRICAL PHASING NOTES
1. PRIOR TO STARTING CONSTRUCTION OF NEW TELECOM ROOM (TR)
ROOMS AND DATA CENTER WORK, CONTRACTOR WILL PARTICIPATE IN
PHASING MEETINGS WITH OWNER AND CONTRACTORS OF OTHER
DISCIPLINES TO DISCUSS MEANS AND METHODS FOR PHASING THE
INSTALLATION OF NEW IT EQUIPMENT AND THE REMOVAL OF OLD
EQUIPMENT AFTER NEW EQUIPMENT IS RUNNING, VERIFIED, AND
CIRCUITS CUT OVER. IT IS IMPORTANT THAT NEW IT EQUIPMENT BE
INSTALLED AND TESTED PRIOR TO REMOVING OLD EQUIPMENT.
2. FOR NEW TELECOM ROOMS (TR’S) AND DATA CENTER, NEW DATA RACKS
WILL BE CONSTRUCTED, POWERED, AND DATA CIRCUITS CUT OVER
PRIOR TO REMOVAL OF EXISTING IT RACKS. NOTE THAT EXISTING AND
NEW RACKS WILL HAVE TO BOTH BE POWERED AT THE SAME TIME FOR
CONSTRUCTION PHASING.
3. FOR DATA CENTER SPACE, EXISTING CONDUITS IN CEILING AND UNDER
FLOOR THAT ARE IDENTIFIED TO BE RELOCATED, VERIFY WHETHER
CONDUITS CONTAIN ACTIVE CIRCUITS AND WHAT LOADS THESE CIRCUITS
FEED. ACTIVE CIRCUITS MUST BE RE-ROUTED AND CUT-OVER TO NEW
PANELS AS REQUIRED. ALL CIRCUITS IDENTIFIED AS ABANDONED OR
UNUSED WILL BE REMOVED TO FREE UP SPACE IN CEILING AND UNDER
FLOOR.
4. POWER OUTAGES WILL BE REQUESTED AND DISCUSSED A MINIMUM OF 4
WEEKS PRIOR TO SCHEDULING THE OUTAGE. EACH OUTAGE AND
METHOD OF PROCEDURE WILL BE DISCUSSED IN DETAIL WITH THE
OWNER AND ALL INVOLVED CONTRACTORS PRIOR TO OUTAGE.
CONTRACTOR SHALL VERIFY WHAT EQUIPMENT OR CIRCUITS WILL BE
IMPACTED IN ORDER THAT ALL PERTINENT STAFF CAN BE NOTIFIED IN
TIMELY MANNER. VERIFY OWNER’S OUTAGE TIMEFRAME CONSTRAINTS
WHEN SCHEDULING OUTAGES.
5. MOST KEY WORK REQUIRING OUTAGES, CUT-OVERS, ETC. WILL BE
PERFORMED DURING PREMIUM TIME, (NIGHTS OR WEEKENDS), WITHIN
DESIGNATED ALLOWABLE TIME-FRAME DICTATED BY THE OWNER.
6. FOR EXISTING ACTIVE CIRCUITS THAT NEED TO BE CUT-OVER TO NEW
PANEL, ENSURE THAT CIRCUITS ARE CUT-OVER PRIOR TO REMOVING OLD
PANEL. EC SHALL VERIFY ALL EXISTING ACTIVE CIRCUITS THAT REQUIRE
NEW FEED.
7. COORDINATE ALL ELECTRICAL WORK AFFECTING IT RACKS IN TR ROOMS
AND DATA CENTER CLOSELY WITH OWNER, CONSTRUCTION MANAGER,
AND CONTRACTORS OF OTHER DISCIPLINES.
CARD READER WITH PIN PAD WALL MOUNT AT +48" A.F.F.
SECURITY ALARM SYSTEMS
ACCESS CONTROL SYSTEMS
SECURITY CAMERA
PUSHBUTTON : +48" A.F.F. OR AS NOTED
KEYSWITCH : WALL MOUNT AT +48" A.F.F.
CARD READER : WALL MOUNT AT +48" A.F.F.
POWER SUPPLYPS
CR
CRP
KS
CAM 360 DEGREE SECURITY CAMERA
REX REQUEST TO EXIT
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
E-000
BKM
ELECTRICAL SYMBOLS AND ABBREVIATIONS
BKM5/16/23
D007 C121 C222
RISERS
RISERS
WALL BEING REMOVED WALL BEING REMOVED
1. FOR EXISTING TR ROOM WALLS SCHEDULED FOR DEMO,
CONTRACTOR SHALL REMOVE ALL DEVICES AS REQUIRED
FOR WALL DEMO. THIS WORK SHALL BE PHASED KEEPING
EXISTING SYSTEMS POWERED AND ACTIVE UNTIL NEW
SYSTEMS ARE UP AND RUNNING. COORDINATE WORK
WITH CONSTRUCTION MANAGER AND OWNER.
2. CONDUIT RISER LOCATIONS SHOWN ARE APPROXIMATE.
KEEP EMERGENCY CRITICAL POWER CONDUITS GROUPED
SEPARATE FROM NORMAL POWER CONDUITS WITH 6-
INCH SEPARATION MINIMUM. PROVIDE OFFSETS /
CONDUIT BENDS AND PULL BOXES TO ROUTE AROUND
OBSTACLES AS REQUIRED. KEEP CONDUITS AS TIGHT TO
WALL AS POSSIBLE. ENSURE THAT CONDUITS DO NOT
COVER UP OR PREVENT ACCESS TO ACTIVE SYSTEMS.
CONFIRM EXACT CONDUIT ROUTING WITH CONSTRUCTION
MANAGER AND OWNER. SEE ENLARGED TR ROOM PLANS
FOR LOCATION OF NEW / RELOCATED DEVICES.
PICTURE REFERENCE GEN NOTES
RISER LOCATION
RISER
LOCATION
RISER LOCATION
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
E-010
BKM
BUILDING 1A PICTURE REFERENCES PAGE 1
BKM5/16/23
1B
2B
1C 3C 5C
2C
4C
3B
4B
NEW PANELS
NEW PANELS
NOT TO SCALE
LEFT WALL
NOT TO SCALE
RIGHT WALL
NOT TO SCALE
DEMO RIGHT
1B
NOT TO SCALE
DEMO MIDDLE
2B
NOT TO SCALE
DEMO LEFT
3B
NOT TO SCALE
WAITING ROOM EXPANSION
4B
NOT TO SCALE
E-10 PIC 7 BACK LEFT DEMO LOW
1C
NOT TO SCALE
E-10 PIC 8 EXPANSION AREA FRONT
2C
NOT TO SCALE
E-10 PIC 9 BACK LEFT DEMO HIGH
3C
NOT TO SCALE
E-10 PIC 10 EXPANSION AREA BACK
4C
NOT TO SCALE
RISER RIGHT WALL, BACK WALL DEMO
5C
13'-5 7/8"
TECH
CLOSET
C580
C333 CU411 C580
RISER
RISERSRISERS
WALLS BEING REMOVED
WALLS BEING REMOVED
RISERS
WALLS BEING REMOVED
1. FOR EXISTING TR ROOM WALLS SCHEDULED FOR DEMO,
CONTRACTOR SHALL REMOVE ALL DEVICES AS REQUIRED
FOR WALL DEMO. THIS WORK SHALL BE PHASED KEEPING
EXISTING SYSTEMS POWERED AND ACTIVE UNTIL NEW
SYSTEMS ARE UP AND RUNNING. COORDINATE WORK
WITH CONSTRUCTION MANAGER AND OWNER.
2. CONDUIT RISER LOCATIONS SHOWN ARE APPROXIMATE.
KEEP EMERGENCY CRITICAL POWER CONDUITS GROUPED
SEPARATE FROM NORMAL POWER CONDUITS WITH 6-
INCH SEPARATION MINIMUM. PROVIDE OFFSETS /
CONDUIT BENDS AND PULL BOXES TO ROUTE AROUND
OBSTACLES AS REQUIRED. KEEP CONDUITS AS TIGHT TO
WALL AS POSSIBLE. ENSURE THAT CONDUITS DO NOT
COVER UP OR PREVENT ACCESS TO ACTIVE SYSTEMS.
CONFIRM EXACT CONDUIT ROUTING WITH CONSTRUCTION
MANAGER AND OWNER. SEE ENLARGED TR ROOM PLANS
FOR LOCATION OF NEW / RELOCATED DEVICES.
PICTURE REFERENCE GEN NOTES
RISER LOCATION
RISER LOCATION
RISER LOCATION
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
E-011
BKM
BUILDING 1A PICTURE REFERENCES PAGE 2
BKM5/16/23
1B
4B
6B 2B
5B
7B
3B 1C 2C
3C
NOT TO SCALE
BACK LEFT DEMO
NOT TO SCALE
RISER LOCATION
NOT TO SCALE
BACK RIGHT DEMO
NOT TO SCALE
EXPANSION
NOT TO SCALE
BACK WALL DEMO HIGH
NOT TO SCALE
LAB EXPANSION 1
1B
NOT TO SCALE
BACK RIGHT DEMO
2B
NOT TO SCALE
LEFT WALL DEMO
3B
NOT TO SCALE
LAB EXPANSION 2
4B
NOT TO SCALE
RISER LOCATION
5B
NOT TO SCALE
BACK LEFT WALL DEMO
6B
NOT TO SCALE
BACK WALL DEMO HIGH
7B
NOT TO SCALE
FRONT WALL DEMO
C1
NOT TO SCALE
RIGHT WALL DEMO
C2
NOT TO SCALE
OUTSIDE WALLS DEMO
C3
FF:VCT
A002C A104 A243
A345
RISER
1. FOR EXISTING TR ROOM WALLS SCHEDULED FOR DEMO,
CONTRACTOR SHALL REMOVE ALL DEVICES AS REQUIRED
FOR WALL DEMO. THIS WORK SHALL BE PHASED KEEPING
EXISTING SYSTEMS POWERED AND ACTIVE UNTIL NEW
SYSTEMS ARE UP AND RUNNING. COORDINATE WORK
WITH CONSTRUCTION MANAGER AND OWNER.
2. CONDUIT RISER LOCATIONS SHOWN ARE APPROXIMATE.
KEEP EMERGENCY CRITICAL POWER CONDUITS GROUPED
SEPARATE FROM NORMAL POWER CONDUITS WITH 6-
INCH SEPARATION MINIMUM. PROVIDE OFFSETS /
CONDUIT BENDS AND PULL BOXES TO ROUTE AROUND
OBSTACLES AS REQUIRED. KEEP CONDUITS AS TIGHT TO
WALL AS POSSIBLE. ENSURE THAT CONDUITS DO NOT
COVER UP OR PREVENT ACCESS TO ACTIVE SYSTEMS.
CONFIRM EXACT CONDUIT ROUTING WITH CONSTRUCTION
MANAGER AND OWNER. SEE ENLARGED TR ROOM PLANS
FOR LOCATION OF NEW / RELOCATED DEVICES.
PICTURE REFERENCE GEN NOTES
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
E-012
BKM
BUILDING 1 PICTURE REFERENCES PAGE 1
BKM5/16/23
1B
RISERS
WALL BEING
REMOVED
RISERS
RISERS
RISERS
RISERS
WALL BEING
REMOVED
RISERS
WALL BEING
REMOVED
RISER
RISER
RISER
RISER
RISER
RISER
NOT TO SCALE
LOCKER ROOM EXPANSION
NOT TO SCALE
RISER 1
NOT TO SCALE
RISER 2
NOT TO SCALE
RIGHT WALL DEMO
NOT TO SCALE
BACK LEFT WALL
1B
NOT TO SCALE
CABLE STORAGE
2B
NOT TO SCALE
RISER LOCATION
3B
2B 3B
NOT TO SCALE
DEMO LEFT LOW
1C
NOT TO SCALE
DEMO LEFT HIGH
2C
NOT TO SCALE
LEFT HIGH CABLES
3C
NOT TO SCALE
EXPANSION AREA
4C
1C 2C
3C
4C
NOT TO SCALE
HIGH BACK WALL
1D
NOT TO SCALE
LEFT WALL DEMO
2D
NOT TO SCALE
LOW BACK WALL
3D
1D 3D
2D
10'-8"
RESTROOM
A580A
DATA/TELE.
AU547
A450 AU547 A627
RISERS
WALL BEING
REMOVED
RISERS WALL BEING
REMOVED
RISERS WALL BEING
REMOVED
RISER
1. FOR EXISTING TR ROOM WALLS SCHEDULED FOR DEMO,
CONTRACTOR SHALL REMOVE ALL DEVICES AS REQUIRED
FOR WALL DEMO. THIS WORK SHALL BE PHASED KEEPING
EXISTING SYSTEMS POWERED AND ACTIVE UNTIL NEW
SYSTEMS ARE UP AND RUNNING. COORDINATE WORK
WITH CONSTRUCTION MANAGER AND OWNER.
2. CONDUIT RISER LOCATIONS SHOWN ARE APPROXIMATE.
KEEP EMERGENCY CRITICAL POWER CONDUITS GROUPED
SEPARATE FROM NORMAL POWER CONDUITS WITH 6-
INCH SEPARATION MINIMUM. PROVIDE OFFSETS /
CONDUIT BENDS AND PULL BOXES TO ROUTE AROUND
OBSTACLES AS REQUIRED. KEEP CONDUITS AS TIGHT TO
WALL AS POSSIBLE. ENSURE THAT CONDUITS DO NOT
COVER UP OR PREVENT ACCESS TO ACTIVE SYSTEMS.
CONFIRM EXACT CONDUIT ROUTING WITH CONSTRUCTION
MANAGER AND OWNER. SEE ENLARGED TR ROOM PLANS
FOR LOCATION OF NEW / RELOCATED DEVICES.
PICTURE REFERENCE GEN NOTES
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
E-013
BKM
BUILDING 1 PICTURE REFERENCES PAGE 2
BKM5/16/23
12 3
RISER
RISER
MOVE EXISTING SECURITY
AND OTHER EQUIPMENT FOR
RISER PLACEMENT
RISER
RISER
DEMO
RISER
NOT TO SCALE
BACK LEFT WALL
NOT TO SCALE
DEMO BACK LEFT
NOT TO SCALE
BACK WALL MIDDLE VIEW
NOT TO SCALE
DEMO LEFT WALL
1B
NOT TO SCALE
RISER TOP
2B
NOT TO SCALE
RISER BOTTOM
3B
1B
2B3B
NOT TO SCALE
DEMO LEFT WALL HIGH
NOT TO SCALE
DEMO LEFT WALL
NOT TO SCALE
DEMO PACU PILLAR
NOT TO SCALE
PACU OVERALL VIEW
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
E-014
BKM
POWER SOURCE AND UPS FEEDERS PICTURE
REFERNCES
BKM5/16/23
ADD BREAKERS
ADD NEW
BREAKER
ADD NEW
BREAKER
UTILIZE
SPARE
BREAKER
NOT TO SCALE
BUILDING 1A UNIT SUB - NORMAL POWER SOURCE
NOT TO SCALE
BUILDING 1 - NORMAL POWER SOURCE, SBB
NOT TO SCALE
UPS FEEDERS FROM A056 ELEC ROOM TO CRAWL SPACE (TOP VIEW)
NOT TO SCALE
BUILDING 1A GENERATOR SWITCHBOARD
NOT TO SCALE
BUILDING 1A - EMERGENCY POWER SOURCE, SBC
NOT TO SCALE
UPS FEEDERS FROM A056 ELEC ROOM RO CRAWL SPACE (BOTTOM VIEW)
NEW
RISERS
RISER LOCATION
RISERS
PULL BOX
TO A056
ELEC ROOM
TO DATA CENTER
ROUTE CONDUITS
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
E-015
BKM
CRAWL SPACE AND OTHER PICTURE
REFERENCES
BKM5/16/23
A002C RISER FROM BELOW
NOT TO SCALE
CRAWL SPACE TUNNEL TO A056 ELECTRICAL ROOM
NOT TO SCALE
CRAWL SPACE - ELEVAATOR P1, P2, P3 (DOOR SIDE)
NOT TO SCALE
CRAWL SPACE - BUILDING 1 CONDUIT RISER ORIGIN POINT - SOUTHWEST CORNER OF ELEV P3
NOT TO SCALE
CONDUIT PENETRATION FROM ABOVE CRAWL
SPACE
5A
NOT TO SCALE
CRAWL SPACE TUNNEL CONDUITS ENTERING DATA CENTER
NOT TO SCALE
CRAWL SPACE- ELECTRICAL PULL BOX UNDER AC UNIT IN ELEC A022
NOT TO SCALE
PARKING GARAGE - BLDG. 1A CONDUIT RISER ORIGIN POINT - NORTHWEST CORNER OF ELEV P4 matt.steineman Snapshot
1 2
NEW RISERS
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
E-016
BKM
MECH ROOM, CRAWL SPACE ACCESS, AND BLDG
1A PARKING GARAGE CEILING PICTURE
REFERENCES
BKM5/16/23
NOT TO SCALE
BUILDING 1 - MECHANICAL ROOM 2 (ACCESS TO CRAWL SPACE)
NOT TO SCALE
BUILDING 1 - MECHANICAL ROOM
ELECTRICAL KEYED NOTES
1. PROVIDE FLOOR-MOUNT UNISTRUT FRAME AND
HARDWARE NECESSARY FOR SECURE MOUNTING OF
NORMAL AND CRITICAL DISTRIBUTION PANELS. LINE-UP
WITH EXISTING MCC; ENSURE THERE IS SUFFICIENT
CLEARANCES FOR EXISTING EQUIPMENT.
2. PROVIDE NEW NORMAL AND CRITICAL POWER
DISTRIBUTION PANELS. SEE POWER PLAN SHEET E102.
3. PROVIDE NORMAL AND CRITICAL POWER FEEDERS ALONG
WALL NEAR FLOOR, THROUGH THIS MECHANICAL ROOM,
AND INTO CRAWL SPACE. SEE POWER PLAN SHEET E102.
4. EXISTING CRAWL SPACE ACCESS HATCH IN MECHANICAL
ROOM 2.
NOT TO SCALE
PARKING GARAGE RISER BACK VIEW
NOT TO SCALE
PARKING GARAGE RISER SIDE VIEW
NOT TO SCALE
PARKING GARAGE RISER FRONT VIEW
EMERGENCY
POWER
PA06B
NORMAL
POWER
PA06A
TR
D007D
MECH RM
D-B038
EMERGENCY
GENERATOR
D003
TRANSFORMERS &
SWITCHGEAR
D003A
CORRIDOR
DH001
STAIR
PAS06
STAIR
PAS07
ELECTRICAL
D001
TD
D002
CORRIDOR
DH002
MECH RM
D004
EMS
D005
STOR
D005A
STORAGE
D006
ELEVATOR
S6
ELEVATOR
S7
C O
R R
ID
O
R D
H
PAINT
SHOP
D007C
CORRIDOR
DH003
SIGNAL
CLOSET
D008
STORAGE
PA08
PARKING
LEVEL A
PA01
CORRIDOR
DH004
CARPENTER
SHOP
D007
STORAGE
AREA
PA06
CHIEF
D007A
LOCKSMITH
D007B
CORRIDOR
DH005
CHIEF
ELECTRICIAN
B014B
M&O
FORMAN
B013
CORRIDOR
BH002
STAIR
PAS08
M E
C H
A N
IC
A
L B
F
UP
UP DN
UP
KEY PLAN
PA
D
B
A
E-400B-1A.G
E-400A-1A.G
E-400C-1A.G
GARAGE DOOR
145 6
PLAN
NORTH
TRUE
NORTH
1. CABLE TRAY - SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY
ROUTES. EC SHALL COORDINATE WITH TECHNOLOGY
CONTRACTOR AND PROVIDE ELECTRICAL WORK IN BASE BID
TO FACILITATE THE INSTALLATION OF CABLE TRAY WORK
INCLUDING: DISCONNECTING POWER AND THE REMOVAL OF
LIGHT FIXTURES AND ELECTRICAL DEVICES IN CEILING, AND
THE RE-ROUTING OF BRANCH CIRCUIT CONDUIT (TO MAKE
ROOM FOR CABLE TRAY). REINSTALL ELECTRICAL DEVICES
AND LIGHT FIXTURES IN CEILING AFTER CABLE TRAY AND
DATA CABLING WORK IS COMPLETE. COORDINATE REQUIRED
ELECTRICAL WORK WITH CONSTRUCTION MANAGER, VA STAFF
AND CABLE TRAY AND DATA CABLING CONTRACTORS.
2. ASBESTOS & HAZARDOUS MATERIAL - WHEN ELECTRICAL
WORK REQUIRES REMOVING CEILING TILES AND WORKING IN
CEILING SPACE, IT IS POSSIBLE TO ENCOUNTER ASBESTOS
AND DEAL WITH HAZARDOUS MATERIAL. REFER TO
ARCHITECTURAL FRONT-END SPECIFICATIONS FOR PROPER
PROCEDURES IN DEALING WITH ASBESTOS AND OTHER
HAZARDOUS MATERIALS. IT IS THE ELECTRICAL
CONTRACTOR'S RESPONSIBILITY TO ALERT THE
CONSTRUCTION MANAGER AND APPROPRIATE VA STAFF IF
THERE IS A POSSIBILITY THAT HAZARDOUS MATERIAL IS
PRESENT IN CEILING WORK SPACE.
3. CORE DRILLING - COORDINATE REQUIRED CORE DRILLING
WORK IN WALLS AND FLOORS WITH VA STAFF AND
CONSTRUCTION MANAGER. ALL NOISY WORK SHALL BE
PERFORMED DURING PREMIUM TIME. REFER TO
ARCHITECTURAL FRONT-END SPECIFICATIONS FOR FURTHER
DETAIL ON PROPER PROCURES FOR CORE-DRILLING AND
NOISY WORK.
4. ALL CONDUIT ROUTES SHOWN ARE DIAGRAMMATIC IN
MATURE. EC SHALL COORDINATE ACTUAL ROUTE AROUND
EXISTING SYSTEMS, PROVIDING BENDS, OFFSETS, PULL
BOXES, EXPANSION JOINTS, AND PROPER SUPPORTS AS
REQUIRED. ROUTE CONDUIT AS HIGH AS POSSIBLE IN CEILING
SPACES AND IN CRAWL SPACE. COORDINATE ROUTES WITH VA
MAINTENANCE TO ENSURE CONDUIT ROUTE IS NOT HINDERING
ACCESSIBILITY AND MAINTAINABILITY TO EXISTING SYSTEMS.
FOR CONDUIT RISERS, PROVIDE STRAIN-RELIEF CABLE RISER
GRIPS TO SUPPORT CONDUCTORS IN RISER CONDUIT AT NO
MORE THAN 100 FOOT INTERVALS PER NEC TABLE 300.19.
KEY ELECTRICAL COORDINATION
GENERAL NOTES
BUILDING 1A GROUND CABLE / 480V
FEEDER LIST
1. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO
NEW ELECTRICAL ROOM PA06A GROUND BAR.
2. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO TR
ROOM D007D GROUND BAR.
3. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO
BUILDING 1A TR ROOMS GROUND RISER.
4. 480V EMERGENCY FEEDER FOR ATS E-POWER FEED (E-POWER
TR RISER) FROM GENERATOR SWITCHBOARD IN BUILDING 1A
GENERATOR ROOM TO ATS-1A-EC IN ELECTRICAL ROOM
PA06B.
5. 480V NORMAL FEEDER FOR ATS N-POWER FEED (E-POWER TR
RISER) FROM BLDG 1A UNIT SUBSTATION DISTRIBUTION (T5
SIDE) TO ATS-1A-EC IN ELECTRICAL ROOM PA06B.
6. 480V NORMAL FEEDER FOR N-POWER TR RISER FROM BLDG 1A
UNIT SUBSTATION DISTRIBUTION (T6 SIDE) TO HNDP-1A IN
ELECTRICAL ROOM PA06A
X
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
E-100-1A.G
BKM
OVERALL GROUND FLOOR PLAN - AREAS D & PA -
ELECTRICAL
BKM5/16/23
1/8" = 1'-0"
OVERALL GROUND FLOOR PLAN - AREAS D & PA - ELECTRICAL
ELECTRICAL KEYED NOTES
1. FROM NEW ELECTRICAL ROOMS, ROUTE MULTIPLE 208/120V TR
ROOM PANEL FEEDERS THROUGH PARKING GARAGE CEILING
TO DESIGNATED RISER LOCATION. REMOVE CEILING TILES AS
NEEDED TO FACILITATE FEEDER INSTALLATION. COORDINATE
WITH OWNER REGARDING METHOD AND PHASING OF
REMOVAL AND REINSTALLATION OF CEILING TILES. ROUTE
CONDUITS AS HIGH AS POSSIBLE SECURED TO STRUCTURE
OVERHEAD. PROVIDE OFFSETS AS NEEDED TO ROUTE ABOVE
EXISTING SYSTEMS. PROVIDE HANGERS AND PULL BOXES AS
REQUIRED. COORDINATE EXACT ROUTE WITH OWNER. SEE
ONE-LINE FOR FURTHER DETAIL.
2. PROVIDE GROUND BUS BAR IN MAIN ELECTRICAL ROOM AS
INDICATED. USE COMPRESSION 2-HOLE LUGS FOR
TERMINATING GROUND CABLES. EXPOSED GROUND SHALL BE
RUN IN PVC CONDUIT, SUPPORT AT 5-FOOT INTERVALS. FOR
GROUND CABLES ROUTED ABOVE PARKING GARAGE CEILING,
PROVIDE PVC CONDUIT RISERS ON WALL SURFACE TO ALLOW
GROUND CABLES TO PENETRATE THROUGH WALL INTO
PARKING GARAGE CEILING SPACE. SEE GROUNDING DETAIL.
3. DIVISION 27 WORK, SEE TECHNOLOGY DRAWINGS FOR
FURTHER DETAILS. PROVIDE GROUND CONDUCTOR FROM
MAIN BUILDING 1A GROUND BAR TO FIRST FLOOR
TELECOMMUNICATION ROOM (TR) SBB GROUND BAR. SEE
GROUNDING DETAIL.
4. ELECTRICAL ROOM GROUND BUS BAR. SEE GROUNDING
DETAIL SHEET. PROVIDE PVC RISERS ON WALL SURFACE FOR
GROUND CABLE PENETRATION ABOVE PARKING GARAGE
CEILING.
5. PROVIDE TRIAD GROUND SYSTEM: (3) NEW 10-FOOT 3/4-INCH
COPPER-CLAD GROUND RODS INSTALLED 10 FEET APART
MINIMUM. ALL CONNECTIONS SHALL BE EXOTHERMIC CAD-
WELD TYPE. LOCATION SHALL BE IN TRIANGULAR GRASS AREA.
COORDINATE WITH OWNER AND OTHER UNDERGROUND
UTILITIES ON-SITE.
TO BUILDING 1A TR ROOM RISERS
(SEE SHEET E101-1A)
SEAL WALL AT GROUND
PENETRATION BELOW GRADE
TRENCH AND BACKFILL.
IF HARD SURFACE, CUT
AND PATCH
MOTOR
CYCLE PARKING
WHEEL
CHAIR PARKING
UP
UP DN
UP
DN
DN
EP
NP
E-400A-1A.G
E-400B-1A.G
BUILDING 1 DATA
CENTER A073
BUILDING 1 NEW
ELECTRICAL ROOMS
A022A & A022B
BUILDING 1
GENERATOR
ROOM B037
BUILDING 1 MAIN
ELECTRICAL
ROOM B037A
E-403B-1.G
E-403E-1.G
E-403A-1.G
CONDUITS ENTER
CRAWL SPACE HERE
E-403G-1.G
E-403H-1.G
E-403C-1.G
AC REFRIGERATION
EQUIP ROOM B038
SVC ROOM
B039
ELECTRICAL
DISTRIBUTION
ROOM B037B
TR B046A
ELECTRICAL
ROOM A056
TR A002C
UPS-A
UPS-B
3 4 5 6
145 6
CRAWL SPACE
BOUNDARY
PLAN
NORTH
TRUE
NORTH
1. CABLE TRAY - SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY
ROUTES. EC SHALL COORDINATE WITH TECHNOLOGY
CONTRACTOR AND PROVIDE ELECTRICAL WORK IN BASE BID
TO FACILITATE THE INSTALLATION OF CABLE TRAY WORK
INCLUDING: DISCONNECTING POWER AND THE REMOVAL OF
LIGHT FIXTURES AND ELECTRICAL DEVICES IN CEILING, AND
THE RE-ROUTING OF BRANCH CIRCUIT CONDUIT (TO MAKE
ROOM FOR CABLE TRAY). REINSTALL ELECTRICAL DEVICES
AND LIGHT FIXTURES IN CEILING AFTER CABLE TRAY AND
DATA CABLING WORK IS COMPLETE. COORDINATE REQUIRED
ELECTRICAL WORK WITH CONSTRUCTION MANAGER, VA STAFF
AND CABLE TRAY AND DATA CABLING CONTRACTORS.
2. ASBESTOS & HAZARDOUS MATERIAL - WHEN ELECTRICAL
WORK REQUIRES REMOVING CEILING TILES AND WORKING IN
CEILING SPACE, IT IS POSSIBLE TO ENCOUNTER ASBESTOS
AND DEAL WITH HAZARDOUS MATERIAL. REFER TO
ARCHITECTURAL FRONT-END SPECIFICATIONS FOR PROPER
PROCEDURES IN DEALING WITH ASBESTOS AND OTHER
HAZARDOUS MATERIALS. IT IS THE ELECTRICAL
CONTRACTOR'S RESPONSIBILITY TO ALERT THE
CONSTRUCTION MANAGER AND APPROPRIATE VA STAFF IF
THERE IS A POSSIBILITY THAT HAZARDOUS MATERIAL IS
PRESENT IN CEILING WORK SPACE.
3. CORE DRILLING - COORDINATE REQUIRED CORE DRILLING
WORK IN WALLS AND FLOORS WITH VA STAFF AND
CONSTRUCTION MANAGER. ALL NOISY WORK SHALL BE
PERFORMED DURING PREMIUM TIME. REFER TO
ARCHITECTURAL FRONT-END SPECIFICATIONS FOR FURTHER
DETAIL ON PROPER PROCURES FOR CORE-DRILLING AND
NOISY WORK.
4. ALL CONDUIT ROUTES SHOWN ARE DIAGRAMMATIC IN
MATURE. EC SHALL COORDINATE ACTUAL ROUTE AROUND
EXISTING SYSTEMS, PROVIDING BENDS, OFFSETS, PULL
BOXES, EXPANSION JOINTS, AND PROPER SUPPORTS AS
REQUIRED. ROUTE CONDUIT AS HIGH AS POSSIBLE IN CEILING
SPACES AND IN CRAWL SPACE. COORDINATE ROUTES WITH VA
MAINTENANCE TO ENSURE CONDUIT ROUTE IS NOT HINDERING
ACCESSIBILITY AND MAINTAINABILITY TO EXISTING SYSTEMS.
FOR CONDUIT RISERS, PROVIDE STRAIN-RELIEF CABLE RISER
GRIPS TO SUPPORT CONDUCTORS IN RISER CONDUIT AT NO
MORE THAN 100 FOOT INTERVALS PER NEC TABLE 300.19.
KEY ELECTRICAL COORDINATION
GENERAL NOTES
BUILDING 1 GROUND CABLE / 480V
FEEDER LIST
1. GREEN INSULATED COPPER STRANDED GROUND CABLE
FROM NEW GROUND BAR IN MAIN ELECTRICAL ROOM B037A
TO DATA CENTER GROUND BAR.
2. GREEN INSULATED COPPER STRANDED GROUND CABLE
FROM NEW GROUND BAR IN MAIN ELECTRICAL ROOM B037A
TO NEW ELECTRICAL ROOM A022A GROUND BAR.
3. 480V CRITICAL FEEDER FOR UPS-A POWER, FROM HCDP1-
EHRM IN MECH ROOM B038 TO UPS-A.
4. 480V CRITICAL FEEDER FOR UPS-A BYPASS POWER, FROM
HCDP1-EHRM IN MECH ROOM B038 TO UPS-A.
5. 480V NORMAL FEEDER FOR UPS-B POWER, FROM HNDP1-
EHRM IN MECH ROOM B038 TO UPS-B.
6. 480V NORMAL FEEDER FOR UPS-B BYPASS POWER, FROM
HNDP1-EHRM IN MECH ROOM B038 TO UPS-B.
7. 480V CRITICAL FEEDER FOR TR POWER, FROM HCDP1-EHRM
IN MECH ROOM B038 TO T-1-EC IN ELECTRICAL ROOM A022B.
8. 480V NORMAL FEEDER FOR TR POWER, FROM HNDP1-EHRM IN
MECH ROOM B038 TO T-1-NP IN ELECTRICAL ROOM A022A.
X
BUILDING 1A GROUND CABLE / 480V
FEEDER LIST
1. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO
NEW ELECTRICAL ROOM PA06A GROUND BAR.
2. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO TR
ROOM D007D GROUND BAR.
3. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO
BUILDING 1A TR ROOMS GROUND RISER.
4. 480V EMERGENCY FEEDER FOR ATS E-POWER FEED (E-POWER
TR RISER) FROM GENERATOR SWITCHBOARD IN BUILDING 1A
GENERATOR ROOM TO ATS-1A-EC IN ELECTRICAL ROOM
PA06B.
5. 480V NORMAL FEEDER FOR ATS N-POWER FEED (E-POWER TR
RISER) FROM BLDG 1A UNIT SUBSTATION DISTRIBUTION (T5
SIDE) TO ATS-1A-EC IN ELECTRICAL ROOM PA06B.
6. 480V NORMAL FEEDER FOR N-POWER TR RISER FROM BLDG 1A
UNIT SUBSTATION DISTRIBUTION (T6 SIDE) TO HNDP-1A IN
ELECTRICAL ROOM PA06A
X
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
E-100
BKM
OVERALL GROUND FLOOR REFERENCE PLAN -
ELECTRICAL
BKM5/16/23
1" = 20'-0"
ELECTRICAL GROUND FLOOR REFERENCE PLAN
BUILDING 1A MAIN
ELECTRICAL ROOM D003A
BUILDING 1A GENERATOR
ROOM D003A
BUILDING 1A NEW
ELECTRICAL ROOMS
PA06A & PA06B
BUILDING 1A BUILDING 1
CRAWL SPACE
BELOW GROUND
FLOORBUILDING 1A TR
RISER LOCATION
BUILDING 1 TR
RISER LOCATION
MOTOR
CYCLE PARKING
WHEEL
CHAIR PARKING
PARKING
LEVEL A
PA01
STAIRWELL
PAS05
ELEVATOR
PAE04
ELEVATOR
PAE05
ELEVATOR
LOBBY
PA02
STORAGE
PA07
OTHER
SPACE
PAM03
C O
R R
ID
O
R B
H
STORAGE
A008
FOOD
STORAGE
A006A
STAIRWELL
PAS04
FROM NDP-1A FROM ECDP-1AFROM D003A
GROUND BAR
EX. SPRINKLER LINES BELOW
EX. DATA CONDUITS
EX. DATA RISERS
EX. DATA 6" CABLE TRAY
NEW TR RISERS
1. CABLE TRAY - SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY
ROUTES. EC SHALL COORDINATE WITH TECHNOLOGY
CONTRACTOR AND PROVIDE ELECTRICAL WORK IN BASE BID
TO FACILITATE THE INSTALLATION OF CABLE TRAY WORK
INCLUDING: DISCONNECTING POWER AND THE REMOVAL OF
LIGHT FIXTURES AND ELECTRICAL DEVICES IN CEILING, AND
THE RE-ROUTING OF BRANCH CIRCUIT CONDUIT (TO MAKE
ROOM FOR CABLE TRAY). REINSTALL ELECTRICAL DEVICES
AND LIGHT FIXTURES IN CEILING AFTER CABLE TRAY AND
DATA CABLING WORK IS COMPLETE. COORDINATE REQUIRED
ELECTRICAL WORK WITH CONSTRUCTION MANAGER, VA STAFF
AND CABLE TRAY AND DATA CABLING CONTRACTORS.
2. ASBESTOS & HAZARDOUS MATERIAL - WHEN ELECTRICAL
WORK REQUIRES REMOVING CEILING TILES AND WORKING IN
CEILING SPACE, IT IS POSSIBLE TO ENCOUNTER ASBESTOS
AND DEAL WITH HAZARDOUS MATERIAL. REFER TO
ARCHITECTURAL FRONT-END SPECIFICATIONS FOR PROPER
PROCEDURES IN DEALING WITH ASBESTOS AND OTHER
HAZARDOUS MATERIALS. IT IS THE ELECTRICAL
CONTRACTOR'S RESPONSIBILITY TO ALERT THE
CONSTRUCTION MANAGER AND APPROPRIATE VA STAFF IF
THERE IS A POSSIBILITY THAT HAZARDOUS MATERIAL IS
PRESENT IN CEILING WORK SPACE.
3. CORE DRILLING - COORDINATE REQUIRED CORE DRILLING
WORK IN WALLS AND FLOORS WITH VA STAFF AND
CONSTRUCTION MANAGER. ALL NOISY WORK SHALL BE
PERFORMED DURING PREMIUM TIME. REFER TO
ARCHITECTURAL FRONT-END SPECIFICATIONS FOR FURTHER
DETAIL ON PROPER PROCURES FOR CORE-DRILLING AND
NOISY WORK.
4. ALL CONDUIT ROUTES SHOWN ARE DIAGRAMMATIC IN
MATURE. EC SHALL COORDINATE ACTUAL ROUTE AROUND
EXISTING SYSTEMS, PROVIDING BENDS, OFFSETS, PULL
BOXES, EXPANSION JOINTS, AND PROPER SUPPORTS AS
REQUIRED. ROUTE CONDUIT AS HIGH AS POSSIBLE IN CEILING
SPACES AND IN CRAWL SPACE. COORDINATE ROUTES WITH VA
MAINTENANCE TO ENSURE CONDUIT ROUTE IS NOT HINDERING
ACCESSIBILITY AND MAINTAINABILITY TO EXISTING SYSTEMS.
FOR CONDUIT RISERS, PROVIDE STRAIN-RELIEF CABLE RISER
GRIPS TO SUPPORT CONDUCTORS IN RISER CONDUIT AT NO
MORE THAN 100 FOOT INTERVALS PER NEC TABLE 300.19.
KEY ELECTRICAL COORDINATION
GENERAL NOTES
BUILDING 1A GROUND CABLE / 480V
FEEDER LIST
1. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO
NEW ELECTRICAL ROOM PA06A GROUND BAR.
2. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO TR
ROOM D007D GROUND BAR.
3. GREEN INSULATED COPPER STANDARD GROUND CABLE FROM
NEW GROUND BAR IN BLDG 1A MAIN ELECTRICAL ROOM TO
BUILDING 1A TR ROOMS GROUND RISER.
4. 480V EMERGENCY FEEDER FOR ATS E-POWER FEED (E-POWER
TR RISER) FROM GENERATOR SWITCHBOARD IN BUILDING 1A
GENERATOR ROOM TO ATS-1A-EC IN ELECTRICAL ROOM
PA06B.
5. 480V NORMAL FEEDER FOR ATS N-POWER FEED (E-POWER TR
RISER) FROM BLDG 1A UNIT SUBSTATION DISTRIBUTION (T5
SIDE) TO ATS-1A-EC IN ELECTRICAL ROOM PA06B.
6. 480V NORMAL FEEDER FOR N-POWER TR RISER FROM BLDG 1A
UNIT SUBSTATION DISTRIBUTION (T6 SIDE) TO HNDP-1A IN
ELECTRICAL ROOM PA06A
X
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
E-101-1A.G
BKM
OVERALL GROUND FLOOR PLAN - AREA PA -
ELECTRICAL
BKM5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
1/8" = 1'-0"
OVERALL GROUND FLOOR PLAN - AREA PA - ELECTRICAL
ELECTRICAL KEYED NOTES
1. FROM NEW ELECTRICAL ROOMS, ROUTE MULTIPLE 208/120V TR
ROOM PANEL FEEDERS THROUGH PARKING GARAGE CEILING
(ABOVE CEILING TILES AND INSULATION) TO DESIGNATED
RISER LOCATION. COORDINATE WITH OWNER REGARDING
METHOD AND PHASING OF REMOVAL AND REINSTALLATION OF
CEILING TILES. ROUTE CONDUITS AS HIGH AS POSSIBLE
SECURED TO STRUCTURE OVERHEAD. PROVIDE OFFSETS AS
NEEDED TO ROUTE ABOVE EXISTING SYSTEMS. PROVIDE
HANGERS AND PULL BOXES AS REQUIRED. COORDINATE
EXACT ROUTE WITH OWNER. SEE ONE-LINE FOR FURTHER
DETAIL.
2. REMOVE AND PUT BACK CEILING TILES IN PARKING GARAGE.
ROUTE AROUND EXISTING SYSTEMS IN CEILING AS REQUIRED
TO ROUTE CONDUITS RISERS ABOVE CEILING. COORDINATE
WITH OWNER.
3. DIVISION 27 WORK, SEE TECHNOLOGY DRAWINGS FOR
FURTHER DETAILS. PROVIDE GREEN INSULATED STRANDED
COPPER GROUND CONDUCTOR FROM MAIN BLDG 1A GROUND
BAR TO FIRST FLOOR TELECOMMUNICATION ROOM (TR) SBB
GROUND BAR AS INDICATED FOR TELECOMMUNICATIONS
GROUND. SEE GROUNDING DETAIL.
4. SEE PICTURE 3 ON SHEET E-016.
5. SEE PICTURE 4 ON SHEET E-016.
6. SEE PICTURE 5 ON SHEET E-016.
TR
B046A
CORRIDOR
DH005
CHIEF
ELECTRICIAN
B014B
M&O
FORMAN
B013
ELECTRONIC
B014
ELECTRIC
SHOP
B014C
STAFF
TOILET
B015A
OFFICE
B017
STORAGE
FLAMMABLE
B016
STORAGE
GENERAL
B020
WAREHOUSE
B015
MAIL RM
B015B
EMS
EQUIP
B021
SOILED
UTILITY
B022A
OFFICE
B022D
OFFICE
B022E
C O
R R
ID
O
R B
H
TOILET
FEMALE
B019
TOILET
MALE
B018
MENS
TOILET
B003
HALL
B004
STORAGE
B009A
SOILED RECEIVING
DECONTAMINATION
AREA
B005
LOGISTICS
BREAKDOWN
B006B
HALL
B006A
ELEC.
B009
ELECTRIC
CLOSET
BU002
CORRIDOR
BH003
UNION
OFFICE
B011A
LOGISTICS
STORAGE
B011
OFFICE
B012A
PROSTHETICS
STORAGE
B015C
MORGUE
B015A
CORRIDOR
BH002
STAIR
PAS08
M E
C H
A N
IC
A
L B
F
AC
PLUMBING
MACH
B012
C O
R R
ID
O
R B
H
BULK
STORAGE
B010
CORRIDOR
OX101
STERILE AND
NON-STERILE
STORAGE
A001A
PREPARATION
STERILIZATION
WORK RM
A005C
GAS CYL
STORAGE
B005D
CLEAN
RECEIVING
B007
CORRIDOR
AH003
STORAGE
A008
RETAIL
STORE
A009
C O
R R
ID
O
R A
H
LOGISTICS SVC
INVENTORY
MGMT
B022
WOMENS
TOILET
B002
CORRIDOR
BH004
OFFICE
B022C
OFFICE
B022B
OFFICE
B022A
C O
R R
ID
O
R B
H
EMERGENCY
GENERATOR
RM B037
C O
R R
ID
O
R B
H
FEMALE
TOILET
B040
MENS
TOILET
B041
EMS
B036C
LINEN B036D
CANTEEN
STORAGE
B036B
MAIN
KITCHEN
B036
ENVIRONMENTAL
MGMT SUPPLY
B045D
SURGICAL
PACK
B045C
STORAGE
B045B
MAIN
KITCHEN
B036
OFFICE
SUPVS
B036F
DAIRY
& EGG
REFRIG
B036G
STORAGE
B035A
OFFICE
B035
STORAGE
& ISSUE
B034
STAIRWELL
BS003
EMS
B005A
MANUAL
CART WASH
B005B
EQUIP
STORAGE
AREA
B001
ELECTRIC
CLOSET
BU003
EMS
A001B
DUMB
ELEVATOR
CORRIDOR
BH006
SUPV
OFFICE
B045
BREAK
RM
B045A
STORAGE
A033
PM&RS
CHIEF'S
OFFICE
A032A
SECY
OFFICE
A032B
RESIDENTS
OFFICE
A032C
HALL
A032
CONFERENCE
RM
A032D
CHARTING
A032E
IT
B046
HAS
B044
TOILET
B044A
EMS
B043
ELECTRIC
CLOSET
B043A
EMS
CHECK IN
B042B
EMS
OFFICE
B042A
HAS
B044B
HAS
B044C
SVC
RM
B039
SECY/
RECEPTIONIST
B-042
OFFICE ASST
CHIEF WORK
RM
B-042C
CORRIDOR
BH004
ELECTRICAL
DISTRIBUTION
RM
B037B
A/C
REFRIGERATION
EQUIP RM
B038
TRANSFORMER
RM
B037A
UP
DN
DN
E-403A-1.G
E-403H-1.G
SEAL WALL AT GROUND CABLE
PENETRATION BELOW GRADE
1 2
3 4 7
5 6 8
ROUTE HIGH
ROUTE UNDER STAIRS
ROUTE LOW
ON WALL
ROUTE THROUGH
WALL INTO CRAWL
SPACE
1. CABLE TRAY - SEE TECHNOLOGY DRAWINGS FOR CABLE TRAY
ROUTES. EC SHALL COORDINATE WITH TECHNOLOGY
CONTRACTOR AND PROVIDE ELECTRICAL WORK IN BASE BID
TO FACILITATE THE INSTALLATION OF CABLE TRAY WORK
INCLUDING: DISCONNECTING POWER AND THE REMOVAL OF
LIGHT FIXTURES AND ELECTRICAL DEVICES IN CEILING, AND
THE RE-ROUTING OF BRANCH CIRCUIT CONDUIT (TO MAKE
ROOM FOR CABLE TRAY). REINSTALL ELECTRICAL DEVICES
AND LIGHT FIXTURES IN CEILING AFTER CABLE TRAY AND
DATA CABLING WORK IS COMPLETE. COORDINATE REQUIRED
ELECTRICAL WORK WITH CONSTRUCTION MANAGER, VA STAFF
AND CABLE TRAY AND DATA CABLING CONTRACTORS.
2. ASBESTOS & HAZARDOUS MATERIAL - WHEN ELECTRICAL
WORK REQUIRES REMOVING CEILING TILES AND WORKING IN
CEILING SPACE, IT IS POSSIBLE TO ENCOUNTER ASBESTOS
AND DEAL WITH HAZARDOUS MATERIAL. REFER TO
ARCHITECTURAL FRONT-END SPECIFICATIONS FOR PROPER
PROCEDURES IN DEALING WITH ASBESTOS AND OTHER
HAZARDOUS MATERIALS. IT IS THE ELECTRICAL
CONTRACTOR'S RESPONSIBILITY TO ALERT THE
CONSTRUCTION MANAGER AND APPROPRIATE VA STAFF IF
THERE IS A POSSIBILITY THAT HAZARDOUS MATERIAL IS
PRESENT IN CEILING WORK SPACE.
3. CORE DRILLING - COORDINATE REQUIRED CORE DRILLING
WORK IN WALLS AND FLOORS WITH VA STAFF AND
CONSTRUCTION MANAGER. ALL NOISY WORK SHALL BE
PERFORMED DURING PREMIUM TIME. REFER TO
ARCHITECTURAL FRONT-END…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .