596A4-22-700 Drawings 05 - Plumbing.pdf
PDF 4 MB Posted
- Solicitation number
- 36C77623B0069
About this file
This solicitation is for construction services for infrastructure upgrades at the Lexington-Cooper VA Medical Center campus in Lexington, Kentucky. The solicitation number is 36C77623B0069 and was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The construction project involves upgrades to plumbing systems across multiple buildings and floors, including demolition and replacement of piping, fixtures, and related components. Response due dates and award dates are not provided. Pricing appears to be fixed price based on the construction drawings and specifications. There are no set-asides or mentions of incumbent contractors. The construction drawings provide details on the scope of plumbing demolition and new work.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMON PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
DIRECTION OF FLOW
BRANCH CONNECTION, BOTTOM
BRANCH CONNECTION, TOP
ELBOW, TURNED DOWN
ELBOW TURNED UP
SHUTOFF VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
PRESSURE GAUGE
UNION
PIPING CAP
RISER DESIGNATION
ABOVE FINISH FLOOR
AUTHORITIES HAVING JURISDICTION
ACCESS PANEL
BOTTOM OF PIPE
DIAMETER
DOWN
EXISTING
FINISHED FLOOR ELEVATION
GALLONS PER HOUR
GALLONS PER MINUTE
HORSEPOWER
INVERT ELEVATION
NORMALLY CLOSED
NOT TO SCALE
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
ROUGH-IN
SHUTOFF VALVE
TOTAL DYNAMIC HEAD
VERIFY IN FIELD
POINT OF DISCONNECT
POINT OF CONNECTION
AFF
AHJ
AP
BOP
DIA
DN
EX OR EXIST
FFE
GPH
GPM
HP
IE OR INV. ELEV
NC
NTS
PSI
RPM
RI
SOV
TDH
VIF
X
PLUMBING SYMBOLS & ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
TRAPPED CONNECTION
STRAINER
BALANCING VALVE
CLEANOUT (CO)
OS & Y GATE VALVE
TEMPERATURE GAUGE
THERMOSTATIC MIXING VALVE
REDUCED PRESSURE BACKFLOW PREVENTER
HOSE BIBB/WALL HYDRANT
ACID VENT PIPING
ACID WASTE PIPING
DOMESTIC COLD WATER PIPING (CW)
DOMESTIC HOT WATER PIPING (HW)
DOMESTIC HOT WATER RETURN PIPING (HWR)
DRAIN PIPING
DEIONIZED WATER PIPING
GREASE VENT PIPING
GREASE WASTE PIPING
NATURAL GAS PIPING
NON-POTABLE WATER PIPING
OVERFLOW STORM PIPING
OIL WASTE PIPING
PUMP DISCHARGE PIPING
REVERSE OSMOSIS PIPING (RO)
SANITARY PIPING
SOFTENED COLD WATER PIPING
SOFTENED HOT WATER PIPING
SUBSOIL DRAINAGE PIPING
STORM PIPING
TEMPERED WATER PIPING
VENT PIPING
WASTE PIPING
FLEXIBLE CONNECTION
FLOOR DRAIN/FLOOR SINK (FD/FS)
CIRCULATION PUMP
AV
AW
D
DI
RO
NP
PD
SSD
ST
OST
TW
S
GW
GV
OW
W
SCW
SHW
G
PROCESS PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
ARGON PIPING
CARBON DIOXIDE PIPING
COMPRESSED AIR PIPING (NON-MEDICAL)
COMPRESSED AIR INTAKE PIPING (NON-MEDICAL)
DENTAL AIR PIPING
DENTAIL AIR INTAKE PIPING
DENTAL VACUUM PIPING
DENTAL VACUUM EXHAUST PIPING
DENTAL SURGICAL VACUUM PIPING
DENTAL SURGICAL VACUUM EXHAUST PIPING
LAB COLD WATER
LAB HOT WATER
LAB GAS PIPING
LAB VACUUM PIPING
MEDICAL AIR PIPING
MEDICAL AIR INTAKE PIPING
MEDICAL VACUUM PIPING
MEDICAL VACUUM EXHAUST PIPING
NITROGEN PIPING
NITROUS OXIDE PIPING
OXYGEN PIPING
WASTE ANESTHETIC GAS DISPOSAL PIPING
EXISTING GAS OUTLET
NEW GAS OUTLET
EXISTING ZONE VALVE DESIGNATION
NEW ZONE VALVE DESIGNATION
EXISTING AREA ALARM DESIGNATION
NEW AREA ALARM DESIGNATION
EXISTING MEDICAL GAS MASTER ALARM DESIGNATION
NEW MEDICAL GAS MASTER ALARM DESIGNATION
AREA ALARM
EMERGENCY SHUT-OFF VALVE
ZONE VALVE
AR
CA
CAI
CO2
DA
DAI
DV
DVE
LG
LV
MA
MAI
MV
MVE
WAGD
OX
N2
N2O
LHW
LCW
AA
ESOV
ZV
DSV
DSVE
GENERAL NOTES
1. DUE TO THE LIMITED SPACE AVAILABLE FOR THE INSTALLATION OF
ALL THE PLUMBING WORK, COORDINATION BETWEEN ALL OTHER
TRADES IS OF UTMOST IMPORTANCE.
2. THIS CONTRACTOR SHALL VISIT THE PROJECT SITE AND VERIFY
LOCATIONS, ELEVATIONS AND SIZES OF ALL UTILITIES AT SITE PRIOR
TO PROCEEDING WITH WORK. EXISTING SYSTEMS AND STRUCTURE
SHALL BE INVESTIGATED FOR BEST POSSIBLE ROUTING OF COLD
WATER, HOT WATER, SANITARY WASTE AND VENT, STORM AND
MEDICAL LABORATORY GAS PIPING.
3. THESE PLANS ARE DIAGRAMMATIC IN NATURE SINCE THE ONLY
AVAILABLE INFORMATION HAS BEEN OBTAINED FROM EXISTING
PLANS, SPECIFICATIONS, AND FIELD SURVEYS. THE EXACT
LOCATION OF PIPING, FIXTURES AND EQUIPMENT MAY DEVIATE
FROM THE LOCATION INDICATED ON THESE DRAWINGS. EXTREME
ACCURACY IS NOT GUARANTEED. THIS CONTRACTOR SHALL BE
PREPARED TO MAKE ALTERATIONS TO NEW AND/OR EXISTING
SERVICES TO FIT JOB CONDITIONS. THIS CONTRACTOR SHALL
FURNISH A COMPLETE CODE COMPLYING SYSTEM. THIS
CONTRACTOR SHALL REPORT, IN WRITING, ANY DISCREPANCIES
WHICH PREVENT THE INSTALLATION OF WORK AS SHOWN.
4. IF THIS CONTRACTOR DOES NOT CLEARLY UNDERSTAND THESE
PLANS OR IS NOT COMPLETELY SURE OF THEIR MEANING, THIS
CONTRACTOR SHOULD OBTAIN THE ENGINEER'S WRITTEN
EXPLANATION AND/OR INTERPRETATION PRIOR TO SUBMITTING
BIDS, SINCE THIS CONTRACTOR WILL BE HELD RIGIDLY TO THE
INTERPRETATION OF THE ENGINEER.
5. IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO REPAIR THE
EXISTING SURFACES TO REMAIN WHERE THEIR WORK HAS BEEN
COMPLETED. REPAIR SHALL INCLUDE, BUT NOT LIMITED TO, ANY
EXISTING WALL, CEILING OR FLOOR THAT IS SCHEDULED TO REMAIN.
REPAIR, PAINTING, AND PATCHING SHALL BE COMPLETED BY AN
APPROPRIATE CONTRACTOR QUALIFIED FOR THIS TYPE OF WORK.
6. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING
DEMOLITION OPERATIONS, THE CONTRACTOR WILL NOTIFY
BUILDING OWNER OF THE HAZARDOUS MATERIAL.
7. TEMPORARY CONNECTION SHALL BE PROVIDED BY RESPECTIVE
PLUMBING AND FIRE PROTECTION CONTRACTORS WHEN EXTENDED
INTERRUPTIONS OF SERVICES AND UTILITIES SUCH AS WATER,
WASTE AND FIRE PROTECTION WHICH SERVE OTHER AREAS ARE
NECESSARY.
8. COORDINATE WITH MAINTENANCE PERSONNEL AS TO SOURCE OF
UTILITIES AND TEMPORARILY DISCONNECT OR SHUT OFF SERVICES
OR UTILITIES AT NEAREST MAIN. TEMPORARY AND ACCESSIBLE
ISOLATION VALVES SHALL BE INSTALLED CLOSE TO THIS POINT OF
WORK.
9. IT IS ESSENTIAL THAT BUILDING OPERATIONS CONTINUE WITH
MINIMAL INTERRUPTIONS. IT IS NECESSARY THAT OPERATION OF
EXISTING SYSTEMS BE INTERFACED WITH AS LITTLE DISRUPTION AS
POSSIBLE EXCEPT IN AREAS VACATED FOR CONSTRUCTION WORK.
WORK WHICH WILL INTERFERE WITH OPERATION OF EXISTING FIRE
SUPPRESSION AND PLUMBING SYSTEMS OR WHICH REQUIRE
DOWNTIME WILL BE SCHEDULED ONLY AFTER CONSULTATION WITH
AND PERMISSION GIVEN BY THE OWNER. ALLOW 10 DAYS PRIOR TO
ANTICIPATED INTERRUPTION OF SYSTEMS. WORK MAY BE REQUIRED
TO BE PERFORMED OUTSIDE NORMAL WORKING HOURS.
10. ARCHITECTURAL, TECHNOLOGY, MECHANICAL, AND ELECTRICAL
DEMOLITION, AND NEW WORK DRAWINGS AND SPECIFICATIONS
SHALL BE READ IN CONJUNCTION WITH THESE DRAWINGS.
11. ALL PIPING HANGERS AND SUPPORTS SHALL BE REMOVED ALONG
WITH PIPING BEING REMOVED.
12. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH
PROJECT'S PHASING SCHEDULE PRIOR TO COMMENCEMENT OF ANY
WORK.
13. USE CAUTION WHEN SAW-CUTTING THROUGH EXISTING CONCRETE
FLOOR OR WALL CONSTRUCTION FOR THE INSTALLATION OF
PLUMBING SYSTEMS TO AVOID CUTTING REBAR AT EDGE OF
OPENING.
14. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY REVISIONS,
TRANSITIONS, OFFSETS, ETC., TO AVOID DUCTWORK, PIPING,
EQUIPMENT OR STRUCTURE NEW OR EXISTING AND TO MAKE A
COMPLETE AND FUNCTIONING SYSTEM.
15. REMOVE ALL PORTIONS OF THE BUILDING (CEILING TILES, WALLS,
SPRINKLER HEADS, SPRINKLER HEAD ESCUTCHEON, ETC.) AS
REQUIRED TO COMPLETE THE SCOPE INDICATED IN THE
CONSTRUCTION DOCUMENTS (SEE ARCHITECTURAL, TECHNOLOGY,
MECHANICAL, ELECTRICAL, AND FIRE PROTECTION DRAWINGS).
REPLACE, REINSTALL, OR COORDINATE REINSTALLATION WITH
OTHER TRADES FOR ALL ITEMS REMOVED TO ACCOMMODATE THE
INSTALLATION/ REMOVALS OF ANY PLUMBING PIPE, FIXTURE,
EQUIPMENT, OR OTHER TRADES WORK, USING WORKERS QUALIFIED
IN THE APPROPRIATE TRADE. REPLACE CEILING TILES DAMAGED
WITH THIS WORK TO MATCH, REPAIR WALLS BACK TO THE ORIGINAL
FINISH.
PLUMBING ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
ADA AMERICANS WITH DISABILITIES ACT
A.F.F. ABOVE FINISH FLOOR
AP ACCESS PANEL
BP BOOSTER PUMP
BT BATHTUB
BTC BRANCH TO CONNECTION
CBV CALIBRATED BALANCING VALVE
CI CAST IRON
CO CLEANOUT
CSS CLINICAL SERVICE SINK
CW COLD WATER
DCVA DOUBLE CHECK VALVE ASSEMBLY
DF DRINKING FOUNTAIN
DI DEINOIZED WATER
DS DOWNSPOUT
DW DISHWASHER
DWH DOMESTIC WATER HEATER
EEW EMERGENCY EYE WASH
ESEW EMERGENCY SHOWER & EYE WASH
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
F.F. FINISH FLOOR ELEVATION
FS FLOOR SINK
G NATURAL GAS
GCO GRADE CLEANOUT
GD GARBAGE DISPOSAL
HB HOSE BIBB
HW HOT WATER
HWR HOT WATER RETURN
HWRP HOT WATER RETURN PUMP
HWST HOT WATER STORAGE TANK
I.E. INVERT ELEVATION
IM ICE MAKER
IW INDIRECT WASTE
LA LAVATORY
MB MOP BASIN
NIC NOT IN CONTRACT
NP NON-POTABLE
OB OUTLET BOX
ORD OVERFLOW ROOF DRAIN
PG PRESSURE GAUGE
PRV PRESURE REDUCING VALVE
RD ROOF DRAIN
RH ROOF HYDRANT
RO REVERSE OSMOSIS
RPZ REDUCED PRESSURE BACKFLOW PREVENTER
S SANITARY
SCW SOFTENED COLD WATER
SH SHOWER
SHW SOFTENED HOT WATER
SK SINK
SOV SHUT OFF VALVE
SP SUMP PUMP
S/S STAINLESS STEEL
SS SANITARY STACK
SSD SUBSOIL DRAINAGE
SSK SHOP SINK
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TW TREATED WATER
UR URINAL
V VENT
VIV VALVE IN VERTICAL
VB VACUUM BREAKER
VS VENT STACK
VTR VENT THRU ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WD WASHER DRAIN
WH WALL HYDRANT
WHA WATER HAMMER ARRESTOR
WM WATER METER
WS WASTE STACK
WSV WASTE STACK VENT
YCO YARD CLEANOUT
YH YARD HYDRANT
PLAN MARK
EQUIPMENT NUMBER
SHEET NUMBER
LINE TYPE LEGEND
DRAWING REFERENCES
NEW WORK BY THIS CONTRACTOR
(DARK, SOLID LINE)
EXISTING TO REMAIN OR NEW WORK BY OTHERS
(LIGHT, SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK, DASHED LINE, DEMOLITION PLANS)
NORTH ARROW
PLAN DETAIL REFERENCE TITLE
KEYED NOTE DESIGNATION
PLAN MARK
EQUIPMENT NUMBER
EQUIPMENT DESIGNATION REFER TO MEP
SCHEDULE FOR CIRCUITING AND DEVICE
REQUIREMENTS AND FLOOR PLANS FOR
LOCATIONS
ENLARGED PLAN REFERENCE
PLAN MARK
SHEET NUMBER
A101
SIM
AHU
TITLE
SCALE
PLAN
NORTH
TRUE
NORTH
MATCHLINE
1 REVISION TAG
CODES AND STANDARDS
1. INTERNATIONAL PLUMBING CODE (LATEST EDITION)
2. VA PLUMBING DESIGN MANUAL.
24 GAUGE GALVANIZED STEEL WITH
SOLDERED SEAMS WATER TIGHT. USE LIQUID
FLUX WITH A ZINC CHLORIDE BASE SIMILAR
TO JOHNSON GALVANIZED STEEL FLUX
PIPE/PIPES
24 GAUGE GALVANIZED STEEL STRAPS
MINIMUM 1" WIDE SPACED EVERY 2'-0"
MINIMUM 6", WIDER EACH SIDE, THAN THE
PIPE OR PIPES THE DRIP PAN IS PROTECTING
STAINLESS STEEL MACHINE
SCREWS SELF TAPPING (TYP.)
PLACE WATER SENSOR IN
CENTER OF DRIP PAN BOTH
DIRECTIONS
NOTE:
IF DUE TO EXISTING CONDITIONS AND DRIP PAN CANNOT BE INSTALLED AS DETAILED SUBMIT POSSIBLE CHANGES TO THE
ENGINEER FOR APPROVAL.
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
PL-000
JDB
PLUMBING SYMBOLS AND ABBREVIATIONS
AJH5/16/23
WS-1 Water Sensor With Audible Alarm, Isolated Dry Contacts, and Capabilty To Connect Sensor Wire. Water sensors and sensor wire provided and installed by the Division 23.
WS-2 Water Sensor With Audible Alarm and Isolated Dry Contacts.
Water sensors and sensor wire provided and installed by the Division 23.
SC-12 Water Sensor Cable. Water sensors and sensor wire provided and installed by the Division 23.
MISCELLANEOUS PLUMBING ITEMS
NOT TO SCALE
DRIP PAN DETAIL
COMM
EQUIP RM
D007D
EMERGENCY
POWER
PA06B
NORMAL
POWER
PA06A
TR
D007D
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:WOOD
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCT
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT FF:CONCRETE
FF:CERAMIC TILE FF:VCT
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCT
FF:CONCRETE
FF:VCT
MECH RM
D-B038
EMERGENCY
GENERATOR
D003
TRANSFORMERS &
SWITCHGEAR
D003A
CORRIDOR
DH001
STAIR
PAS06
STAIR
PAS07
ELECTRICAL
D001
TD
D002
CORRIDOR
DH002
MECH RM
D004
EMS
D005
STOR
D005A
STORAGE
D006
ELEVATOR
S6
ELEVATOR
S7
C O
R R
ID
O
R D
H
PAINT
SHOP
D007C
CORRIDOR
DH003
SIGNAL
CLOSET
D008
STORAGE
PA08
PARKING
LEVEL A
PA01
CORRIDOR
DH004
CARPENTER
SHOP
D007
STORAGE
AREA
PA06
CHIEF
D007A
LOCKSMITH
D007B
CORRIDOR
DH005
CHIEF
ELECTRICIAN
B014B
M&O
FORMAN
B013
CORRIDOR
BH002
STAIR
PAS08
M E
C H
A N
IC
A
L B
F
UP
UP DN
UP
# SF
# SF
# SF
PL-400A-1-1A.G
PL-400B-1-1A.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-100-1A.G
JDB
OVERALL GROUND FLOOR PLAN - AREA D & PA -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
PLUMBING GROUND FLOOR AREA D - NEW WORK
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
SVC MGR
A072
DATA
CENTER
A073
ELECTRICAL
CORRIDOR
AH010
DIETICIANS
OFFICE
A025
ASST
CHIEF
A027
DIETICIANS
OFFICE
A025A
SECY
A028
CORRIDOR
AH005
CONFERENCE M
A029
CORRIDOR
BH006
ELECTRICAL
AU003
ELECTRICAL
AU002
CORRIDOR
AH004
AU001
TOILET
A024
EMS
A026
LOCKERS
A026B
OT
CLINIC
A044
A026A
TOILET &
SHOWERS
A046
TOILET
FEMALE
A045
C O
R R
ID
O
R A
H
CORRIDOR
AH007
OT
OFFICE
A043
OT
OFFICE
A043A
OFFICE
A070RECEIVING
A071
CORRIDOR
AH009
OFFICE
A069
PGM MGR
A068
SOFTWARE
APPL
SUPPORT
A067
APPLICATION
SUPPORT
A066
SYSTEMS
MGR
A065
NETWORKING
MGR
A064
PROG MGR
SYST &
NETWORKING
A063
ADP
WORKSHOP
A062
STAIRWELL
AS004
TELECOMM
SVCS
A061
TELECOMM
SVCS
A060
SUPPORT
A059
APPLICATION
SUPPORT
A058
APPLICATION
SUPPORT
A057
ELECTRICAL
A056
CONFERENCE
RM
A055
C O
R R
ID
O
R A
H
PGMMING
& INFO
A054
PGMMING
& INFO
A053
PGM
SPECIALISTS
A052
OFFICE
A051
RECEPTION
AREA
A050
TRACTION
A039
PROVIDER
A038
EXAM
A040
EXAM
A041
CORRIDOR
A030A
EXAM/
EMG
A037
WAITING
AREA A042
STAIRWELL
AS001
WAITING
AREA
A036
PHYSICAL
THERAPY
WORK
ROOM
RECEPTION
A030
THERAPY
A034A
THERAPY
A034
PHYSICAL
THERAPY
A035
STORAGE
A033
PL-400B-1-1A.G
PL-400A-1-1A.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-101-1.G
JDB
OVERALL GROUND FLOOR PLAN - AREA A EAST -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
PLUMBING GROUND FLOOR AREA A - NEW WORK
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
TR
B046A
EMERGENCY
GENERATOR
RM B037
C O
R R
ID
O
R B
H
FEMALE
TOILET
B040
MENS
TOILET
B041
EMS
B036C
LINEN B036D
CANTEEN
STORAGE
B036B
KITCHEN
ENVIRONMENTAL
MGMT SUPPLY
B045D
SURGICAL
PACK
B045C
STORAGE
B045B
CORRIDOR
BH006
SUPV
OFFICE
B045
BREAK
RM
B045A
PM&RS
CHIEF'S
OFFICE
A032A
SECY
OFFICE
A032B
RESIDENTS
OFFICE
A032C
HALL
A032
CONFERENCE
RM
A032D
CHARTING
A032E
IT
B046
HAS
B044
TOILET
B044A
EMS
B043
ELECTRIC
CLOSET
B043A
EMS
CHECK IN
B042B
EMS
OFFICE
B042A
HAS
B044B
HAS
B044C
SVC
RM
B039
SECY/
RECEPTIONIST
B-042
OFFICE ASST
CHIEF WORK
RM
B-042C
CORRIDOR
BH004
ELECTRICAL
DISTRIBUTION
RM
B037B
A/C
REFRIGERATION
EQUIP RM
B038
TRANSFORMER
RM
B037A
DN
DN
# SF
PL-400A-1-1A.G
PL-400B-1-1A.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-104-1.G
JDB
OVERALL GROUND FLOOR PLAN AREA B -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
PLUMBING GROUND FLOOR AREA B - NEW WORK
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
C121
C121
WAITING
C1-5D
WORK RM
D155
A-184
A-184C
C110
TREATMENT
CH100
D168
CAST RM
D158
MED
RECORD
D100
WORK
RM D126B
WAITING
CH105C
RECEPTION
D100A
PATIENT
RM
D102A
TOILET
D102B
MENS
TOILET
C109
WOMENS
TOILET
C110A
EMS
C106
EC
C107
TRAVEL
C108
FISCAL
C111
CORRIDOR
CH113
CORRIDOR
CH105
SURGERY
CLINIC
C112B
SURGERY
CLINIC
C112A
SURGERY
CLINIC
C112
E.R.
STAFF
C113B
HAS
C113A CANTEEN
DIRECTOR
OFFICE
C113
CORRIDOR
CH104
WAITING
CH104A
RESP
CARE
C114C
TOILET
C114A
BREAK
RM
C114B
PRE-OP
ASSESSMENT
D194
EC
D155
PUBLIC
TOILET
D156
C O
R R
ID
O
R D
PRE-OP
ASSESSMENT
D193
WORK RM
D191
SVC
OFFICE
D156A
SURG
CLINIC
CHECK IN
D157
EXAM
D154A OFFICE
D158
OFFICE
D160A BREAK/
READING
CH114
DRESSING/
RESTROOM
D193
OFFICE
D185
VASCULAR
LAB
D192
EC
D183A
TRIAGE
01 C121B
E V
ID
E
N C
E C
HEALTH
BENEFITS
CENTER
C104C
CUBICLE
C104V4
CUBICLE
C104V3
CUBICLE
C104V2
CUBICLE
C104V1
DECEDENT
AFFAIRS
C104U
OFFICE
C104T
SUPVY
MED
SUPPORT
ASST
C104S
C104V7 C104V6
C104V5 RECEPTION
C104A
PAT
TOILET
C104D
C104V18
COPY
C104V19C104V20
PATIENT
SUPPORT
PGM
SPECIALIST
C104R
CHIEF
AMBULATORY
CARE AND
PROCESSING
C104Q
CHIEF
HEALTH
INFO MGMT
C104P
C104V11 C104V12 C104V13
C104V19 C104V17
C104V14
C104V18 C104V16 C104V15
CUBICLE
WORK RM
C104H
BREAK RM
C104G
STAFF
TOILET
C104E
PIV
C107
HOLDING
C105
POLICE
C104 POLICE
C102
ARMORY
C103
ELEVATOR
P5
ELEVATOR
P4
POLICE
C110
LOBBY
CH101
ELEVATOR
P6
EXAM
C132B
EXAM
C132C
P A
S S
A G
E C
H B
EXAM/
ISO
C130J
EXAM
C130K TLT
C131
TLT
C128
PASSAGE
CH121
TRIAGE
02 C121A
P A
S S
A G
E C
H A
TLT
C121D
EKG/LAB
C121C
SUB-WAITING
CH121B
EXAM
D196
EXAM
D195
CORRIDOR
CH102
SPEC
COLLECT
C114
WAITING
CH120
EXIST
WELCOME
DESK
CH101C
VESTIBULE
C1-1A
WHEEL
CHAIR
STORAGE
CONFERENCE
RM
C104I
UM/UR UM/
UR MGR
OFFICE
C104J
CHIEF
OFFICE
C104K
ASST CHIEF
HEALTH ADMIN
C104M
ADMIN
ASST
C104N
HEALTH ADMIN
CHIEF OFFICE
C104O
STAFF
WORK
C130
RESUSCITATION 1/
ISO
C130F
ENTRANCE
CH139
VESTIBULE
CH130AEMS
C138OFFICE 3
C140
ER
OFFICE
C141
STAFF
TLT
C142
ER
NURSE
MGR
C143
EMPLOYEE
TRAINING RM
C144
STAIRWELL
CS109
PASSAGE
CH140
CLEAN
UTIL
C137
IT
C136
EXAM/
ISO
C130H
EXAM/
ISO
C130I
P A
S S
A G
E C
H A
EXAM
C132D
TLT/SHWR
C134
EC
CU100
SOILED
UTIL
C135
ELEVATOR
P7
STAFF /
WORK
RM C133
EXAM
C132A
PASSAGE
CH132
RESUSCITATION
2/
ISO
C130E
S T
O R
A G
E C
A
EXAM
C130D
IN-VITRO
COUNTING
HIGH/LOW
A-166
STORAGE
DECONTAM
C127EXAM
C130C
OFFICE
C130B
MENTAL
HEALTH RM
C130A
STAIR
CS104 PASSAGE
CH126
PHYS
WORK
C126C
ON
CALL
C126D
EXAM
C125G
CLEAN
UTILITY
CH125H
NOUR
PREP
C125J
MED
RM
C129
E
CYL
C125I
STAFF
WORK
C125
CART
STORAGE
C125K
SPECIMEN
C124
EMS
C123
PASSAGE
CH125
EXAM
C125F
PASSAGE
CH125B
SOILED
UTIL
C122
RAD
STORAGE
D183B
EMS D189
VASCULAR
LAB
D181
CORRIDOR
CH118
CORRIDOR
CH102A
PASSAGE
CH125A
EXAM
C125A
EXAM
C125B
EXAM
C125C
EXAM
C125D
STORAGE
C125E
A-184A A-184B
WAITING
D175
VASCULAR
LAB
D190
WAITING
CH105E
LINEN
RM
D173
B136
CHEST
X-RAY
B134A
EQUIPMENT
D137
CONTROL
RM
D180A
ANGIOGRAPHY
D180
CHEST
X-RAY
B134
OFFICE
B134B
TOILET
B134D
E L E
C B
C
TOILET
B137B
DRESSING
B137A
RADIOLOGY
WAITING
BH103
STORAGE
B147B
RECEPTION
B146B
RADIOLOGY
LOBBY
D175A
MECH
B133B
STAFF
TOILET
B133A
CORRIDOR
BH102
PHARMACY
WAITING
A-186
TOILET
C126A
CONTROL
D188A
# SF
PL-401-1A.1
PL-401-1A.1
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
PL-111-1A.1
JDB
OVERALL FIRST FLOOR AREA PAN - AREA C -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL FIRST FLOOR PLAN - AREA C - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
E
B
A
D
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
B125
B125
EXIST.
DRESS. RM.
B150A
S V
A-185
A-150A
A-184C
A-152
TECHNOLOGIST
EXAM
C125G
CLEAN
UTILITY
CH125H
NOUR
PREP
C125J
E
CYL
C125I
STAFF
WORK
C125
PASSAGE
CH125
EXAM
C125F
PASSAGE
CH125B
EXAM
C125A
EXAM
C125B
EXAM
C125C
EXAM
C125D
STORAGE
C125E
A-184A A-184B
WAITING
D175
OFFICE- CHIEF
VASCULAR
LAB TECH D171
STAIRWELL
DS108
CORRIDOR
DH116
CORRIDOR
DH116A
LINEN
RM
D173
MECH.
SHAFT
B136
STORAGE
B135
CHEST
X-RAY
B134A
EQUIPMENT
D137
CONTROL
RM
D180A
CHEST
X-RAY
B134
OFFICE
B134B
TOILET
B134D
E L E
C B
C
RADIOGRAPHIC
AND
FLUOROSCOPIC
B139
C O
R R
ID
O
R B
H
CONFERENCE
B138
CORRIDOR
TOILET
E101
DRESSING
B139A
TOILET
B139B
BU106
ELEC
B140A
X-RAY
B137
TOILET
B137B
DRESSING
B137A
RADIOLOGY
WAITING
BH103
STORAGE
B147B
RADIO/
FLOUR
B140
CORRIDOR
BH104
VACANT
B141
CONTROL
RM B140A
RADIOLOGY
SVC SUPPLY
RM
B148
FILM
PROCESSING
AREA B147
OUTPATIENT
READING RM
B147A
INPATIENT
HOLDING
BAY 3
B146E
RADIOGRAPHIC
B143
RADIOGRAPHIC
AND
FLUOROSCOPIC
B142
CORRIDOR
BH105
CT SCAN
B152
CONTROL
RM
B152A
SCANNER
RM
B153
UPS
RM
DOSE
B122A
DOSE
B122B
HOT LAB
B122C
TOILET
B122D
HALL
WAY
B122A
CORRIDOR
BH108
CLINICAL
REVIEW
COS SVC
OFFICE
B129F
UTILIZATION
MGMT
B129E
CLINICAL
CHEMIST
B103
SUPV
LAB
B104
ELEC
INPATIENT
HOLDING
BAY 3
B146D
INPATIENT
HOLDING
BAY 3
B146C
INPATIENT
OBSEVATION
B146B
RECEPTION
B146B
RADIOLOGY
LOBBY
D175A
CORRIDOR
BH106
RADIOLOGY
STORAGE
B146F
X-RAY
DIAGNOSTIC
B144 RM
DRESSING
RM B146H
DRESSING
RM
B14JG
DRESSING
RM ALCOVE
B146G
FEMALE
TOILET
B127
MALE
TOILET
B126
M E
C H
B
CORRIDOR
BH107
STAIR
BS103
PATIENT
FLOW
COMMAND
CTR
B129C
PGM
MGR
B129D
CLINICAL
HOUSE
SUPV
B129C
LAB MGR/
CHIEF MED
TECH
B105
BLOOD
BANK
MED
DIRECTOR
B106TRANSFER
OFFICE
B129B
BREAK
RM
B129A
OFFICE
B101K LINE
ITEM
MGR
OFFICE
B107
STORAGE
STORAGE
B101J
OFFICE
B101I
CORRIDOR
SUPV
B101D
E L E
C B
U
E L E
C B
U
WAITING
A-150
CORRIDOR
BH101
FILE
RM
A-151A
A-151
BONE
DENSITY
A-159
VACANT
B131
OFFICE
B132A
VIEWING
RM B132
LOUNGE
B133
KITCHEN
B133A
MECH
B133B
STAFF
TOILET
B133A
CORRIDOR
BH102
PHARMACY
WAITING
A-186
C O
R R
ID
O
R A
H
SUPPLY
A-160
BREAK
RM
A-156
READING
RM A-158
EXAM
A-157
MENS
RESTROOM
A-155
WOMENS
RESTROOM
STORAGE
A-152B
HOT
LAB
A-152A
HOT
LAB
A-152B
PROVIDER
WORK RM
B101L
Restroom
B101EEMS
CLOSET
B104
ELECTRIC
CLOSET
BU101
Restroom B101F
STORAGE
B101C
BREAK
RM
B101G
STORAGE
B101H
SURGICAL
PATHOLOGY
B107A
BREAK
RM
B108CONFERENCE
RM
B101A
S T
O R
A G
E B
B
SOILED SUPPLY
CLINICAL
MICROBIOLOGIST
B121
DN UP
# SF# SF
PL-401-1A.1
PL-401-1A.1
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-112-1.1
JDB
OVERALL FIRST FLOOR AREA PLAN - AREA B -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL FIRST FLOOR PLAN - AREA B - PLUMBING
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
E
B
A
D
A243
A243
PNEUMATIC TUBE
FF:VCTFF:VCT
FF:VCT
FF:CONCRETE
FF:VCT FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CERAMIC TILE
S
S D
W
D
W
C H
STAIRWELL
CS204
CORRIDOR
BH212
MECH
RM
A273 SOCIAL
WORKER
B247
TOILET
B249
TOILET
B248
SEMI-PRIVATE
RM
A257
TOILET
A256A
TOILET
A257A
SHOWER
A269
SEMI-PRIVATE
RM
A256
CONFERENCE
RM
A255
STOR
A255
VISITOR
WAITING
A254
TOILET
A255A
ECHO
LAB
A249
ECHO
LAB
A250
C O
R R
ID
O
R A
H A
STORAGE
A248B
CONTROL
RM
A248A
PHONO
CARDIOLOGY
A248 EC
AU205
CORRIDOR
AH211
ELEC
AU206
ELEC
AU207
ELEC
AU208
CCU1
A258
CCU2
A259
CCU3
A260
C O
R R
ID
O
R A
H
NURSES
WORK
RM
A268
NURSE
STATION
A267
NOURISHMENT
CENTER
A267C
EMS
A270
STAIRWELL
AS202
BREAK
A267D
CLEAN
UTILITY
A267A
TOILET
A271B
HEART
STATION
SUPV
OFFICE
A272
NURSE
LOUNGE
A271
NURSE
COORD
OFC
A274
EMS
A252
TOILET
A251
C O
R R
ID
O
R A
H
STRESS
LAB
A266
IT
CLOSET
A265
CORRIDOR
AH209
CCU6
A264
CCU5
A263
CCU4
A262
CARDIAC
PROCEDURE
RM
A261
HEART
STATION
A245
HEART
STATION
WORK RM
A244
CONSULT
A241
JANITOR
A240
TOILET
A239
CLEAN
STOR
A238
PREPARATION/
HOLDING
A237
CORRIDOR
AH206
PACEMAKER
A247
CARDIO
CASE
MGR
OFFICE
A276A
C O
R R
ID
O
R A
H
CARDIO
OFFICE
A276
EKG
COMPUTER
A247A
EEO
ADMIN
OFFICE
A277
CORRIDOR
AH207
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
CATH
LAB
OFFICE
A242
EQUIP
RM
A235B
CATH
LAB 1
A235
CATH
STORAGE
A235A
STAFF
OFFICE
A231A
BREAK
RM
A231
CONTROL
A234
STAFF
CORRIDOR
A232
SOILED
LINEN
A229
CLEAN
HOLDING
A230
CATH
STORAGE
A233A
EQUIP
RM
A233B
CATH
LAB 2
A233
LOBBY
AH200
ELEVATOR
S5
ELEVATOR
S4
SVC
LOBBY
A201
EQUIP
STOR
A202
WAITING
A205
PHARMACY
A204
STAFF
TOILET
A206A
ELECTRIC
CLOSET
A205A
STAFF
LOCKER
A206
STOR
A203
ELECTRIC
CLOSET
BU201
CLINIC B
WAITING
B238
MECH
RM
B234
CORRIDOR
AH204
LAB
A207
EC
AU204
TOILET
A207A
ROOM
A209
CORRIDOR
AH202
ELEC
AU201
ELEC
AU202
ELEC
AU203
GROUP
CLINIC RM
A210
CORRIDOR
C212
CONSULT
B235
WARFARIN
CLINIC
B234
WC
STORAGE
A211A
PATIENT
TOILET
A213
EMS
A212
CLINIC C
WAITING
A211
EXAMINATION
A215
EXAMINATION
A216
EXAMINATION
A217
PHYSICIAN
WORK RM
A222
PATIENT CARE STAFF
WORKROOM
A227
C O
R R
ID
O
R A
H
STRETCHER
STORAGE
STAFF
TOILET
A228
FILE
A214A
RECEPTION/
BUSINESS
A214
STAIRWELL
AS201
CLEAN
UTILITY
A226
C O
R R
ID
O
R A
H
CONSULT
A225
CORRIDOR
AH206A
READING/
VIEWING
A236
BREAK
RM
A224
PROCEDURE
A223
PATIENT
TOILET
A223A
SOILED
HOLDING
A223B
EXAMINATION/
TREATMENT
A221
EXAMINATION
A220
EXAMINATION
A219
EXAMINATION
A218
SOILED
UTILITY
A267B
LOCKER
A271A
CLEAN
UTILITY
A202
DN
# SF
PL-402-1.2
PL-402-1.2
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-123-1.2
JDB
OVERALL SECOND FLOOR PLAN - AREA A -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL SECOND FLOOR PLAN - AREA A - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
B
A
D
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
C333
C333
C O
R R
ID
O
R D
H
0 CHEMICAL
STORAGE
D321 GENERAL
LAB
D322
CORRIDOR
CH312
CHEMISTRY
LAB
C318
GENERAL
LAB
D323A
GENERAL
LAB
D301B
GENERAL
LAB
D303
CHEMISTRY
LAB
D302
D304
CHEMISTRY
LAB
D300
MECHANICAL
SHAFT
CU301
CHEMISTRY
LAB
C319
EC
CU320
GENERAL
LAB
C317
GENERAL
LAB
C315
EC
CU316
GENERAL
LAB
D301A
GENERAL
LAB
D323B
CHEMISTRY
LAB
C314
CHEMISTRY
LAB
C312
CHEMISTRY
LAB
C310
C O
R R
ID
O
R C
H
WOMENS
STAFF
TOILET
C313
GENERAL
LAB
C311B
GENERAL
LAB
C311A
RESERCH
C304
GENERAL
LAB
C323B
GENERAL
LAB
C323A
MENS
STAFF
TOILET
C321
CORRIDOR
CH308
CHEMISTRY
LAB
C322
DARK
RM
C324
WALK-IN
REFR
C325
CORRIDOR
CH305
INSTRUMENTS
C326
CHEMISTRY
LAB
C327
OFFICE
C309
OFFICE
C304B
OFFICE
C304C
ELEVATOR
P6
LAB
C332
ELEVATOR
P7
LOBBY
CH301
TOILET
C304DOFFICE
C304A
OFFICE
C308
LOBBY
CH303
CMPR
PROGMR
C307
OFC
INVESTGR
C306
OFC
INVESTGR
C305
OFC
INVESTGR
C303
OFC
INVESTGR
C302
OFC
INVESTGR
C301
EC
CU300
STAIR
CS309
CORRIDOR
CH306
STAFF
LOUNGE
C331
WASTE
STORAGE
C330A
EQUIP AND
GENERAL
STORAGE
C330A
BIO-MED
ENG
C330
MECH RM
CM328
MECHANICAL
SHAFT
CU302
ELEVATOR
(FUTURE)
CE308
DN
PL-403-1-1A.3
PL-403-1-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
PL-131-1A.3
JDB
OVERALL THIRD FLOOR PLAN - AREA C -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL THIRD FLOOR PLAN - AREA C - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
L S
L S
LS
LS
L S
A345
TR
A345
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
A338A
B323
BU301
NUEROLOGY
ADMIN OFFICE
A303
C O
R R
ID
O
R A
H
1 MECH
SHAFT
A304A
CLEAN
A304
SLEEP
DISORDER
RECEPTION
A306
C O
R R
ID
O
R A
H
HOSPICE CARE
OFFICE
A307
SOILED
A305
NEUROLOGY
ADMIN OFFICE
A302C
LOBBY
A301
HAS
A308
EC
AU304
EMS
A309
PATIENT RM
A364
PATIENT
TOILET
A364A
PATIENT
TOILET
A365A
PATIENT RM
A365
PATIENT RM
A367
WAITING RM
A369
MED R
VIEW RM
B302
ELEVATOR
S5
ELEVATOR
S4EC
AU305
EMS
A372
PATIENT
A369A
PATIENT
TOILET
A367ALINEN
SUPPLY
A366
CORRIDOR
AH309
AS302
AU308 AU307 AU306
CLEAN
SUPPLY
A368
BEREAVEMENT
ROOM
A371
PHYSICIANS
OFFICE
A373
NEUROLOGY
TEAM OFFICE
A350
C O
R R
ID
O
R A
H
7NURSE
STATION
A352
MED RM
A353
NURSE
MANAGER
A355
A355A
SOILED
UTILITY
A358
STAFF
WORK RM
A358A
C O
R R
ID
O
R A
H
PATIENT
TOILET
A-363A
PATIENT RM
A-363
PATIENT
TOILET
A-362A
PATIENT
RM A362
TOILET
A357
CORRIDOR
AH306
NOURISHMENT
A359
PATIENT
RM A361
PATIENT
TOILET
A361A
PATIENT
TOILET
A360A
NURSES
LOUNGE
A360
PATIENT
RM A356
PATIENT
TOILET
A356A
A354A
SOCIAL
WORK
A354 TOILET
A351A
STAFF
NURSING
A351
TOILET
A349A
CORRIDOR
AH306
OFFICE
SOC. WORK
A349
OFFICE
APU
A347
OFFICE
APU
A346
TOILET
A346A
1 BED
RM
A343
1 BED
RM
A342
1 BED
RM
A340
STORAGE
A344
DOCTOR
A341
DOCTOR
A310
ELEVATOR
AE301
ELEVATOR
AE302
ELEVATOR
AE303
LOBBY
A300
SECURITY
RM
A338 2 BED
RM
A337
2 BED
RM
A336
4 BED
RM
A332
TOILET
A328A
1 BED
RM
A329
1 BED
RM
A328
4 BED
RM
A327
TOILET
A329A
STORAGE
A330
TOILET
A332A
TOILET
A334
TOILET
A336A
TOILET
A327A
WORK RM
A326
4 BED
RM
A324
TOILET
A324A
TOILET
A326A
C O
R R
ID
O
R A
H
SMALL
EQUIP RM
A325A
PATIENT
SHOWER
A325SPD
A331
EXAM
A333
DOCTOR
A335
CORRIDOR
AH306
SECY
A339
PANTRY
A313
SURGY
TEAM RM
A311
C O
R R
ID
O
R A
H
4 NURSES
STATION
A314
MED RM
A317 STAIR
AS301
ELEC
AU301
ELEC
AU302
ELEC
AU303
TOILET
A315A CORRIDOR
AH303
TOILET
A318A
EMS
A319
TOILET
A320
TOILET
A321A
TOILET
A323A
4 BED
RM
A323
1 BED
RM
A322
TOILET
A322A
1 BED
RM
A321
4 BED
RM
A318
2 BED
RM
A316
2 BED
RM
A315
WAITING
AREA
A312
CORRIDOR
AH309
TOILET
A342A
# SF
PL-403-1-1A.3
PL-403-1-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-133-1.3
JDB
OVERALL THIRD FLOOR PLAN - AREA A -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL THIRD FLOOR PLAN - AREA A - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C B
A
D
1. THIS PLAN SHOWN FOR REFERENCE ONLY. NO
DEMOLITION OR NEW PLUMBING WORK OCCURS
WITHIN THIS AREA.
CU411
CU411
EXIST.
TELECOM
CU411
ROOF OF SECOND FLOOR
ANIMAL
D415
C O
R R
ID
O
R D
H
SCRUB
D414
WORKRM
D415A
FREEZE
D432A
STO &
FEED
D433
OPERATING RM
D412A
ANIMAL
D413
CORRIDOR
DH414
M
TOILET
D411
F
TOILET
D410
PRE-OP
D412
POST-OP
D434
CAGE WASH
D437
PRO LAB
D408
E C
D U
LOUNGE
D407
STOR
A406
ANIMAL
D406
STOR
RM
D405
CORRIDOR
DH412
ANIMAL
D435
AIR
LOCK
CH410
CLEAN
STORAGE
D436
ANIMAL RM
D404
C O
R R
ID
O
R C
H
LAB
C409A
LAB
C409B
CORRIDOR
CH408
ANIMAL RM
D402
HAC
C407
STOR
D400
TOILET
C406
AIR
LOCK
CH405
ROOF
ACCESS
CORRIDOR
C4-6
BREAK
RM
D401
C O
R R
ID
O
R C
H
OFFICE
D403
CLERKS
C405
WORK RM
C404
C O
R R
ID
O
R C
H
CORRIDOR
CH403
CONFERENCE
C402 LOBBY
CH401
ELEVATOR
CE406
ELEVATOR
CE407
LAB
C410
ASSOC
COS
C403A
SEC
C403
ASSIST
ASSOC
TO COS
C403B
REPRO/COPY
C401
CORRIDOR
CH402
EC
CU400
STAIRWELL
CS409
ELEVATOR
(FUTURE)
CE408
MECH SHAFT
CU401
CM408
DN
# SF
PL-404-1-1A.4
PL-404-1-1A.4
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-141-1A.4
JDB
OVERALL FOURTH FLOOR PLAN - AREA C -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL FOURTH FLOOR PLAN - AREA C - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
X
2FLT
2FLT
X
2FLT
2FLT
A450
TR
A450
WASHERDRYER
A408
DR.
OFFICE
A405
3 BED RM
A474
SHOWER
A474A
1 BED RM
A475
TOILET/
SHOWER
A475A
TOILET
A474B
SHOWER
A473A
3 BED RM
A473
STAIR
1 BED RM
A476 RECREATION
A478
STORAGE
A478A
STORAGE
A478B
NUTRITION
A404
STAFF
WORKRM
A482
OFFICE
PSYCHOLOGIST
A486
OFFICE
PSYCHOLOGIST
A487
OFFICE
A488
FEMALE
TOILET
A403
EC
AU405
PSYCHOLOGY
TESTING/
WAITING
A485
EXAMINATION
A484
CORRIDOR
AH411
HAC
A477
TOILET/
SHOWER
A476A
STORAGE
A472
ELEC
AU406
ELEC
AU408
ELEC
AU407
MEDICATIONS
A458A
PSYCHOLOGY
TESTING
A491
3 BED RM
A470
TOILET
A473B
TOILET
A470B
C O
R R
ID
O
R A
H
HYDROTHERAPY
TUB RM
A471
LAUNDRY
A466
STAFF
BREAK RM
A464
RECREATION
THERAPIST
OFFICE
A461
COMMUNICATION
CENTER/ NURSE
STATION
A458
C O
R R
ID
O
R A
H
DAYRM
A456
OFFICE
A452
OFFICE OPS
MGR
A452A
NURSE MGT
OFFICE
A454
CORRIDOR
AH408
TOILET
A457B
SHOWER
A457A
1 BED RM
OR
SECLUSION
A457
THERAPEUTIC
SECLUSION
A4551 BED RM
OR
SECLUSION
A459
SHOWER
A459A
SHOWER
A462A
STAFF
TOILET
A460
STORAGE
A463A
TOILET
A462B
LINENS
A465
TUB &
TOILET
A467A
1 BED RM
OR
SECLUSION
A462
1 BED RM
OR
SECLUSION
A463
1 BED RM
OR
SECLUSION
A467
GROUP RM
A468
3 BED RM
A469
HIMS
OFFICE
A451
RES & MED
STUDENTS
A448 RES & MED
STUDENTS
A445
SECY
A442
OFFICE
CHIEF
A443
CHAPEL
A440
OFFICE/
CHAPLAINS
A439
OFFICE/
WAITING
A435
SOCIAL
WORKER
A446
SOCIAL
WORKER
A447
KITCHENETTE/
COFFEE
A449
STAFF
TOILET
A449A
CORRIDOR
AH407
HALL
A489
ELEVATOR
AE403
ELEVATOR
AE402
ELEVATOR
AE401
OFFICE
PHYSICIAN
A436 CHAPEL
OFFICE
A438
ENDO
WAITING RM
A412
C O
R R
ID
O
R A
H
LOBBY
A400
ELEVATOR
AE405
ELEVATOR
AE404
C O
R R
ID
O
R A
H
1 LOBBY A401
TRASH
CHUTE
DUMP
WAITER
A406A
SOILED
A407
CLEAN
A406
C O
R R
ID
O
R A
H
MED TEAM
ADMIN
OFFICE
A409
OFFICE
PHYSICIAN
A410
SCOPEWASH &
STORAGE
A413
EC
AU404
PROCEDURE RM
A415
PROCEDURE RM
A414
SUPPLY
A411B
TOILET
A411C
SCOPEWASH
A417
TOILET &
SHOWER
A418
FILM
PROC
A419
RECOVERY
A411
WC
STORAGE
A411A
CORRIDOR
AH403
ELEC
AU401
ELEC
AU402
ELEC
AU403
STAIR
AS401
FLUOROSCOPY
A420
GASTROENTEROLOGY
FELLOW OFFICE
A422A
PHYSICIANS
OFFICE
A422BSTAFF
LOUNGE
A421 SECY
A422
ENDOSCOPY
A422E
GI
SERVICES
A422C
PHYSICIANS
OFFICE
A422DTOILET
A423AC
O
R R
ID
O
R
PATIENT
WAITING
A423
REST
RM
A424
TOILET
A425A
STOR
SLEEP
RM
A425B
SLEEP
RM
A425C
MEDICINE
SVC ON
CALL RM
A425D
MEDICINE
SVC ON
CALL RM
A425E
MEDICINE
SVC ON
CALL RM
A425F
MOD ON
CALL RM
A425G
ADMIN
OFFICE
A429B
BUSINESS
MGR
OFFICE
A429A
CHIEF
OFFICE
A432
HAC
A430
SECRETARIES
A429 NEUROLOGY
ON CALL RM
A425H
TV
WATCH
AREA
A425
SURGY
ON
CALL
RM
A426
OFFICE
A427A
MAIL &
COPY RM
A427
MED
SVC
OFFICE
A431
C O
R R
ID
O
R A
H
TOILET
A469B
STOR
A422E
TOILET
A455A
# SF
PL-404-1-1A.4
PL-404-1-1A.4
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-143-1.4
JDB
OVERALL FOURTH FLOOR PLAN - AREA A -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL FOURTH FLOOR PLAN - AREA A - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
B
A
D
1. THIS PLAN SHOWN FOR REFERENCE ONLY. NO
DEMOLITION OR NEW PLUMBING WORK OCCURS
WITHIN THIS AREA.
AU547
RESTROOM
A580A
DATA/TELE.
AU547
TR
AU547
TOILET
ROOM
A580A
FF:VCT
FF:WOOD
FF:VINYL SHEET
FF:WOOD
SURGICAL
SERVICE
B502A
H A C A505
SURGICAL
SERVICE
A504
PATIENT
BATH
A577A
SAFETY/
BARIATRIC/
CENSUS ADPT
A577
PATIENT
RM
A576
EMS
A514
CONSULT/
CHAPEL
A579
WAITING/
VEND
A580
SOIL
HOLD
A578
ELEC
AU505
PATIENT
BATH
A576A
PATIENT
RM
A573
PATIENT
BATH
A573A
CORRIDOR
A500F
NURSE
STATION
A574
STAIR
S2
ELEC
AU508
SYSTEMS
AU507
SYSTEMS
AU506
PATIENT
BATH
A572A
PATIENT
RM
A572
PATIENT
BATH
A571A
ELEC
AU510
PATIENT
RM
A571
STORAGE
A569PATIENT
BATH
A568A
PATIENT
RM
A568
PATIENT
RM
A567 PATIENT
BATH
A567A
PATIENT
RM
A566 PATIENT
BATH
A566A
CLEAN
SUPPLY
A575
NURSE
STATION
A556
PASSAGE
A555
HAC
A552
PATIENT
RM
A553
PATIENT
BATH
A553A
PATIENT
RM
A557
PATIENT
BATH
A557A
MEDICATION
RM
A558
CORRIDOR
A500D
PATIENT
BATH
A559A
PATIENT
RM
A559
PATIENT
BATH
A561A
N O
U R
IS
H
M E
N T
A
NURSE
STATION
A570
C O
R R
ID
O
R A
E
PATIENT
BATH
A565APATIENT
RM
A565
PATIENT
BATH
A564APATIENT
RM
A564
PATIENT
RM
A563 PATIENT
BATH
A563A
STAFF
RESTROOM
A562
PATIENT
RM
A561
NEG ISOLATION
PATIENT
RM
A551
PATIENT
BATH
A551A
PATIENT
BATH
A548A
ANTE RM
A549
NEG ISOLATION
PATIENT RM
A548
EQUIP
A550
ELEVATOR
AE503
ELEVATOR
AE502
ELEVATOR
AE501
MED GAS
STORAGE
A545
CORRIDOR
A500C
NEG ISOLATION
PATIENT RM
A546
PATIENT
BATH
A546A
PATIENT
BATH
A540A
ANTE RM
A544
T E
L E
M E
T R
Y A
R E
C E
P T
IO
N
A
TELEMETRY
EQUIP
A543
STORAGE
A541
NEG
ISOLATION
PATIENT
A540 RM
PATIENT RM
A538
PATIENT
BATH
A538A
SOIL
HOLD
A539
PASSAGE
A516
PATIENT
BATH
A534A
PATIENT RM
A534
PATIENT
BATH
A532A
PATIENT RM
A532
PATIENT
BATH
A531A
PATIENT RM
A531
STAFF
RESTROOM
A529
PATIENT
BATH
A528A
PATIENT RM
A528
PATIENT RM
A527
PATIENT
BATH
A527A
PATIENT RM
A526
PATIENT
BATH
A526A
N O
U R
IS
H
M E
N T
A
MEDICATION RM
A533
NURSE
STATION
A535
CLEAN
SUPPLY
A536
NURSE
STATION
A518
SYSTEMS
AU501
SYSTEMS
AU502
ELEC
AU503
STAIR
S1
NURSE
STATION
A520
C O
R R
ID
O
R A
B
PATIENT RM
A525
PATIENT RM
A524
PATIENT
BATH
A524A
PATIENT
BATH
A523A
ELEC
AU509CORRIDOR
A500A
PATIENT
BATH
A515A
PATIENT RM
A517
PATIENT
BATH
A517A PATIENT
BATH
A519A
PATIENT RM
A519
PATIENT RM
A521
PATIENT
BATH
A521A
PATIENT RM
A523SAFETY/
BARIATRIC/
CENSUS
ADAPT
A513
PATIENT RM
A515
ELEC
AU504
PATIENT
BATH
A513A
ELEVATOR
AE505
ELEVATOR
AE504
LOBBY
A501
ELEVATOR
LOBBY
A500
SOILED
A507
OFFICE A508
OFFICE
A509
VOLUNTEER
SERVICES
STORAGE
A506
PL-405-1.5
PL-405-1.5
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-153-1.5
JDB
OVERALL FIFTH FLOOR - AREA A - PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL FIFTH FLOOR PLAN - AREA A - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C B
A
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
A627
A627
FILES
PNEUMATIC TUBE
SOILED
UTILITY
B625
ELEVATOR
ELEVATOR
B625A
VACANT
A604
CORRIDOR
C6A1
A607
OFFICE
A606
CONTROL
A605
A601
ON CALL
BATH
A602
ELEVATOR
AE604
ELEVATOR
AE605
ELEC
B600B
CYLINDER
B600A
CORRIDOR
6A1
C O
R R
ID
O
R C
A
HDCP
TELE
FAMILY WAITING
AREA
A657
PUBLIC
TOILET
A657A
LOBBY
A600
ELEVATOR
AE603
ELEVATOR
AE602
ELEVATOR
AE601
DICTATION
A628C
RECOVERY
ROOM
SOILED
UTILITY
A625
CLEAN
UTILITY
A626
FROZEN
SECTION
A606
PNEUMATIC
TUBE
STATION
CORRIDOR
CLEAN
LINEN
A628B
PATIENT
A632
PATIENT
A633
PATIENT
A634
PATIENT
A635
CORRIDOR
6A8
PATIENT
A636
PATIENT
A637
C O
R R
ID
O
R A
CONTROL
CENTER
A638
MED
PREP
A638A
NOURISHMENT
A638B
CLEAN
SUPPLY
A638C
P A
S S
A G
E A
CLEAN
LINEN
A652
SOLID
UTILITY
A651
HAC
A656
NURSE
CALL EQUIP
A655
PATIENT
TOILET
A629
CORRIDOR
6A6
STRETCHER
STORAGE
A630
ANTHERM
A631A
ISOLATION
PATIENT
A631
STAFF LOUNGE/
CONSULTATION
A653
LOCKERS
A654
PATIENT
A639
PATIENT
A640
PATIENT
A641
PATIENT
A642
PATIENT
A643
6A10
A644
STAIR
AS602
WORK RM
A650
STAFF
TOILET
A654A
C L E
A N
L
IN
E N
TOILET
A646 EQUIP
STORAGE
A648
PATIENT
A645
EQUIP
STORAGE
A647
C O
R R
ID
O
R A
A
ON CALL
RM
A603
EC
AU661
EQUIP
A610A
OR 2
A610
OR 3
A611
SCRUB
A612
EQUIP
A611A
HAC
A613
STAIR
AS601
ELEC
SUB
STERILE
A609
OR 1
A608
ANEST
WORKROOM
A624
STERILIZERS
A607
PROCESSING
A623
SOILED
UTILITY
A621
CLEAN
LINEN
A619
EQUIP
A618 SCRUB
A614
CORRIDOR
6A3
CLEAN
STORAGE
A616
CORRIDOR
6A4
SCRUB
A620
OR 6 GENERAL OR
A622
EQUIP
STORAGE
A622A
OR 5
A617
OR 4
A615
PL-406-1.6
PL-406-1.6
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-163-1.6
JDB
OVERALL SIXTH FLOOR PLAN - AREA A -
PLUMBING
AJH5/16/23
1/8" = 1'-0"
OVERALL SIXTH FLOOR PLAN - AREA A - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
B
A
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
CORRIDOR
AH010
OFFICE
A070RECEIVING
A071
CORRIDOR
AH009
OFFICE
A069
PGM MGR
A068
SOFTWARE
APPL
SUPPORT
A067
APPLICATION
SUPPORT
A066
SYSTEMS
MGR
A065
NETWORKING
MGR
A064
PROG MGR
SYST &
NETWORKING
A063
ADP
WORKSHOP
A062
STAIRWELL
AS004
TELECOMM
SVCS
A061
TELECOMM
SVCS
A060
SUPPORT
A059
APPLICATION
SUPPORT
A058
APPLICATION
SUPPORT
A057
ELECTRICAL
A056
CONFERENCE
RM
A055
C O
R R
ID
O
R A
H
PGMMING
& INFO
A054
PGMMING
& INFO
A053
PGM
SPECIALISTS
A052
OFFICE
A051
FF:VCT
FF:CERAMIC TILE
STORAGE AREA
PA06
EXIST. 4" WASTE AND
VENT PIPES TO REMAIN
DATA CENTER
A073
CRAC UNIT TO BE
DISCONNECTED
AND REMOVED BY
THE MECHANICAL
CONTRACTOR
1/2"
BELOW RAISED
FLOOR
LOCATED
ABOVE LAY-IN CEILING
PIPE DROP TO BELOW SLAB
PIPING BELOW SLAB
EXISTING
FLOOR DRAIN
TO REMAIN
LOCATED BELOW
RAISED FLOOR
1/2"
CAP
REMOVE 3/4"CW
REMOVE 3/4"CW
LOCATED ABOVE
LAY-IN CEILING
CRAC UNIT TO BE
DISCONNECTED
AND REMOVED BY
THE MECHANICAL
CONTRACTOR
CRAC UNIT TO BE
DISCONNECTED
AND REMOVED BY
THE MECHANICAL
CONTRACTOR
REMOVE 1/2"CW
REMOVE 3/4"CW
LOCATED
ABOVE LAY-IN CEILING
REMOVE 3/4"CW
TUNNEL
OUTLINE
IT
B046
S
EX SANITARY TO REMAIN
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
PL-400A-1-1A.G
JDB
PLUMBING ENLARGED PLANS - GROUND FLOOR -
DEMOLITION & NEW WORK
AJH5/16/23
1/4" = 1'-0"
ENLARGED GROUND FLOOR AREA D STORAGE AREA PA06 DEMOLITION PLAN
1/4" = 1'-0"
ENLARGED GROUND FLOOR AREA A DATA CENTER - DEMOLITION
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
1/4" = 1'-0"
ENLARGED GROUND FLOOR AREA B TR B046 - DEMOLITION
1. COORDINATE PLUMBING WORK WITH PHASING SHOWN
ON TECHNOLOGY SHEET TN-451-1A-G.
AH010
OFFICE
A070RECEIVING
A071
CORRIDOR
AH009
OFFICE
A069
PGM MGR
A068
SOFTWARE
APPL
SUPPORT
A067
APPLICATION
SUPPORT
A066
SYSTEMS
MGR
A065
NETWORKING
MGR
A064
PROG MGR
SYST &
NETWORKING
A063
ADP
WORKSHOP
A062
STAIRWELL
AS004
TELECOMM
SVCS
A061
TELECOMM
SVCS
A060
SUPPORT
A059
APPLICATION
SUPPORT
A058
APPLICATION
SUPPORT
A057
ELECTRICAL
A056
CONFERENCE
RM
A055
C O
R R
ID
O
R A
H
PGMMING
& INFO
A054
PGMMING
& INFO
A053
PGM
SPECIALISTS
A052
OFFICE
A051
FF:VCT
FF:CERAMIC TILE
NORMAL POWER
PA06A
EMERGENCY
POWER
PA06B
EXIST. 4" WASTE AND
VENT PIPES TO REMAIN
PROVIDE DRIP PAN WITH
WS-2 WATER SENSOR
DATA CENTER
A073
CRAC UNIT ON RAISED FLOOR
INSTALLED BY THE MECHANICAL
CONTRACTOR(MC). PLUMBING
CONTRACTOR TO PROVIDE COLD
WATER, FINAL CONNECTION OF COLD
WATER BY THE MC.
CRAC UNIT ON RAISED
FLOOR INSTALLED BY THE
MECHANICAL CONTRACTOR
(MC). FINAL CONNECTION OF
WATER BY THE MC.
EX 3/4"
SC-12
SC-12
SC-12
SC-12
WS-1 WS-1 WS-1
WS-1WS-1 SC-12SC-12 SC-12SC-12
3/4"
1/2"
1/2"
CRAC UNIT ON RAISED FLOOR
INSTALLED BY THE
MECHANICAL CONTRACTOR
(MC). FINAL CONNECTION OF
WATER BY THE MC.
PIPING BELOW RAISED FLOOR
TR
B046A
E X
S
PROVIDE DRIP PAN WITH
WS-2 WATER SENSOR
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
PL-400B-1-1A.G
JDB
PLUMBING ENLARGED PLANS - GROUND FLOOR -
DEMOLITION & NEW WORK
AJH5/16/23
1/4" = 1'-0"
ENLARGED GROUND FLOOR AREA D PA06A/PA06B PLUMBING NEW WORK PLAN
1/4" = 1'-0"
ENLARGED GROUND FLOOR AREA A DATA CENTER - NEW WORK
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
1. COORDINATE PLUMBING WORK WITH PHASING SHOWN
ON TECHNOLOGY SHEET TN-451-1A-G.
GENERAL SHEET NOTES
1/4" = 1'-0"
ENLARGED GROUND FLOOR AREA B TR B046A - NEW WORK
EX 4"
W
IT
C121
WAITING
C120
EX 2"
EXISTING
TO REMAIN
EXISTING
TO REMAIN
W
EX 4" EX 2"
TR
C121
WAITING
CH120
PROVIDE DRIP PAN
AND WATER SENSOR
(WS-2)
BIO MED
B125
S
EX S TO REMAIN
EX V TO REMAIN
EX CW & HW
TO REMAIN
EX CW & HW
TO REMAIN
DRESS
B150A
TR
B125
EX S
CAP
CAP
EX 4"
EX V
EX CW & HW
EX CW & HW
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
PL-401-1A.1
JDB
PLUMBING ENLARGED PLANS - FIRST FLOOR -
DEMOLITION & NEW WORK
AJH5/16/23
1/4" = 1'-0"
ENLARGED TR C121
PLAN - DEMOLITION
1/4" = 1'-0"
ENLARGED TR C121
PLAN - NEW WORK
1/4" = 1'-0"
ENLARGED TR B125 PLAN - DEMOLITION
1/4" = 1'-0"
ENLARGED TR B125 PLAN - DEMOLITION
1. REMOVE PLUMBING FIXTURE & CAP SANITARY PIPING IN
WALL. REMOVE WATER PIPING BACK AS SHOWN AND
CAP PIPING.
2. PROVIDE DRIP PAN WITH WS-2 WATER SENSOR.
SHEET KEY NOTES#
FF:VCT FF:VCT
EX CAPPED CW, HW,
HWR & WASTE TO BE
BACK TO OUTSIDE OF
NEW TR A243 AND CAPPED
EX TO
REMAIN
CARDIOLOGY
PROVIDER
A246
OIT CLOSET
A243
ELEV.
P3
ELEV.
P2
LG
L G
EX 4" W
EX CAPPED CW, HW,
HWR & WASTE
TR
A243
CORRIDOR
AH207
ELEV.
P3
ELEV.
P2
EX TO
REMAIN
LG
L G
PROVIDE DRIP PAN
AND WATER SENSOR
(WS-2)
EX 4" W
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
PL-402-1.2
JDB
PLUMBING ENLARGED PLANS - SECOND FLOOR -
DEMOLITION & NEW WORK
AJH5/16/23
1/4" = 1'-0"
ENLARGED SECOND FLOOR AREA A PLAN - DEMOLITION
1/4" = 1'-0"
ENLARGED SECOND FLOOR AREA A PLAN - NEW WORK
AH306
STORAGE
AE302AE303
CORRIDOR
AH306
STORAGE
AE302AE303
LAB
C332
TR
C333
A W
EX 1/2"CA
EX 1/2"CA DROP TO
BE REMOVED
C A
EX AV
EX 2"
EX 1/2" LA
EX 4"
A W
TR
C333
LAB
C332
PROVIDE DRIP PAN
AND WATER SENSOR
(WS-2)
PROVIDE CHICAGO
FAUCET 937 AIR NEEDLE
VALVE WITH CHICAGO
FAUCET 986 WALL FLANGE
EX AV
EX 3"S-UP
3/4"
TR
A345
PROVIDE DRIP PAN &
WATER SENSOR (WS-2)
LG
L G
S EX 3"S-UP
3/4"
TR
A345
EXISTING 3"S TO REMAIN
LG
L G
S
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
PL-403-1-1A.3
JDB
PLUMBING ENLARGED PLANS - THIRD FLOOR -
DEMOLITION & NEW WORK
AJH5/16/23
1/4" = 1'-0"
ENLARGED THIRD FLOOR AREA C PLAN - DEMOLITION
1/4" = 1'-0"
ENLARGED THIRD FLOOR AREA C PLAN - NEW WORK
1/4" = 1'-0"
ENLARGED THIRD FLOOR AREA A PLAN - NEW WORK
1/4" = 1'-0"
ENLARGED THIRD FLOOR AREA A PLAN - DEMOLITION
CH408
ELEVATOR
CE406
ELEVATOR
CE407
CORRIDOR
CH408
ELEVATOR
CE406
ELEVATOR
CE407
EXISTING CW, HW, AIR, LG
AND LAB VAC TO BE
RELOCATED
FOR NEW WALL
TR
CU411
AV
L V
L A
H W
C W
1/2"
L G
3/4"
1/2"
3/4"
EX 2"
EX 2"
RELOCATED CW,
HW, AIR, LAB VAC, AND LG
2"
2"
TR
CU411
EXISTING
TO REMAIN
L A
L V
AV
L G
TELE/DATA
CLOSET
A450
PSYCHOLOGY
TECHNICIAN
A490
STAFF TOILET
A449A
ELEV.
AE403
LG
LV
LA
3/4"
3/4"
3/4"
3/4"
3/4"
EX 3/4" CW
EX 3/4" HW
EX 2"V
EX 4W" REMOVE WASTE FROM
WATER CLOSET ABOVE
AND CAP
EX 2"VEX 2" CAPPED
VENT
EX 3/4"
EX 3/4"
EX 3/4"
EX 3/4"
EX 3/4"
EX 3/4" CW
EX 3/4" HW
ELEV.
AE403
TR
A450
STAFF TOILET
A449A
PROVIDE DRIP PAN
AND WATER SENSOR
(WS-2)
CONTINUE DRIP PAN
UNDER ALL WATER
PIPING
LG
LV
LA
EX 2"V
EX 2" CAPPED
VENT
EX 4W"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
PL-404-1-1A.4
JDB
PLUMBING ENLARGED PLANS - FOURTH FLOOR -
DEMOLITION & NEW WORK
AJH5/16/23
1/4" = 1'-0"
ENLARGED FOURTH FLOOR PLAN
AREA C - DEMOLITION
1/4" = 1'-0"
ENLARGED PLUMBING FOURTH FLOOR
PLAN AREA C - NEW WORK
1/4" = 1'-0"
ENLARGED PLUMBING FOURTH FLOOR PLAN -
AREA A - DEMOLITION
1/4" = 1'-0"
ENLARGED PLUMBING FOURTH FLOOR PLAN AREA A - NEW WORK
DATA/TELE.
AU547
FF:VCT
FF:WOOD
WAITING/
VEND
A580
SOIL
HOLD
A578
HAC
A552
EQUIP
A550
DATA/TELE.
AU547
FF:VCT
FF:WOOD
WAITING/
VEND
A580
SOIL
HOLD
A578
HAC
A552
EQUIP
A550
EX 1"
EX WC
EX LAV1
RESTROOM
A580A
DATA/TELE.
AU547
LG
SEX 4"W
TO REMAIN
REMOVE COLD WATER PIPING
AND CAP AT ACTIVE MAIN
EX 1"HW
HOT WATER AND
HOT WATER RETURN
TO REMAIN
EX LAB GAS
TO REMAIN
CAP
C W
TR
AU547
EX 4"
EX 1"
EX LAB GAS
TO REMAIN
LG
L G
S
PROVIDE DRIP PAN
AND WATER SENSOR
(WS-2)
TOILET ROOM
A580A
2" 1"
1 1/4"
4"
S
4"S IN 4TH
FLOOR CEILING
CONNECT NEW 2"
VENT TO EXISTING
VENT FROM
CLINICAL SERVICE
AND HAND SINK
EX CW
CONNECT NEW SANITARY TO
EXISTING SANITARY FROM
CLINIC SERVICE SINK ABOVE
WC-1
P-414
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .