596A4-22-700 Drawings 03 - Arch.pdf

PDF 13 MB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Lexington-Cooper, KY 596A4-22-700
Solicitation number
36C77623B0069
Issued by

About this file

This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0069 for infrastructure upgrades at the Lexington-Cooper VA Medical Center in Kentucky. Specifically, contractors are being sought to perform construction drawings, demolition, and upgrades for the EHRM area of the medical center according to drawing package 596A4-22-700. Proposals are due by the date listed on the solicitation, with the contract to be awarded shortly thereafter. The opportunity is set aside for small businesses.

View the file

Other files

File Type Posted
596A4-22-700 Responses to Tech Questions - 1-25-24.pdf PDF
36C77623B0069 0008.pdf PDF
596A4-22-700 Responses to Tech Questions - 1-22-24.pdf PDF
36C77623B0069 0007.pdf PDF
36C77623B0069 0006.pdf PDF
596A4-22-700 Responses to Tech Questions - 1-18-24.pdf PDF
36C77623B0069 0005.pdf PDF
596A4-22-700 Responses to Tech Questions - 1-12-24.pdf PDF
36C77623B0069 0004.pdf PDF
596A4-22-700 Security Requirements.pdf PDF
DBA Wage Rates - Fayette County - 01-05-24.pdf PDF
596A4-22-700 Smoke Shack.pdf PDF
596A4-22-700 Handrail Submittal.pdf PDF
596A4-22-700 Drawing M-701 - Mechanical Controls.pdf PDF
596A4-22-700 Specification 23 09 23 - DDC for HVAC.pdf PDF
DBA Wage Rates - Fayette County - 12-22-23.pdf PDF
36C77623B0069 0003.pdf PDF
36C77623B0069 0002.pdf PDF
596A4-22-700 Site Visit Sign-in Sheet - 11-28-23.pdf PDF
36C77623B0069 0001.pdf PDF
596A4-22-700 Drawings 01 - General.pdf PDF
596A4-22-700 Drawings 12 - Security.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
596A4-22-700 Drawings 06 - Mechanical.pdf PDF
596A4-22-700 Specifications.pdf PDF
596A4-22-700 Drawings 07 - Electrical.pdf PDF
596A4-22-700 Drawings 05 - Plumbing.pdf PDF
596A4-22-700 Drawings 09 - Tech 2.pdf PDF
596A4-22-700 Drawings 10 - Tech 3.pdf PDF
596A4-22-700 Drawings 04 - Fire Protection.pdf PDF
DBA Wage Rates - Fayette County - 09-08-23.pdf PDF
596A4-22-700 Asbestos Inspection Report.pdf PDF
596A4-22-700 Drawings 11 - Tech 4.pdf PDF
596A4-22-700 Brand Name Justification.pdf PDF
IFB 36C77623B0069.docx DOCX document
596A4-22-700 Drawings 02 - Asbestos.pdf PDF
596A4-22-700 Drawings 08 - Tech 1.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP DN

UP

MECH RM

D-B038

EMERGENCY

GENERATOR

D003

TRANSFORMERS

& SWITCHGEAR

D003A

CORRIDOR

DH001

STAIR

PAS06

STAIR

PAS07

ELECTRICAL

D001

TD

D002

CORRIDOR

DH002

MECH RM

D004

EMS

D005

STOR

D005A

STORAGE

D006

ELEVATOR

S6

ELEVATOR

S7

COMM

EQUIP

RM

D007D

C O

R R

ID

O

R D

H

PAINT

SHOP

D007C

CORRIDOR

DH003 SIGNAL

CLOSET

D008

STORAGE

PA08

PARKING

CORRIDOR

DH004

CARPENTER

SHOP

D007

STORAGE

AREA

PA06

CHIEF

D007A

LOCKSMITH

D007B

CORRIDOR

DH005 CHIEF

ELECTRICI

B014B

M&O

FORM

B013

CORRIDO

BH002

STAIR

PAS08

M

EC

H

AN

IC

AL

B0

F

1 FLOOR PLAN - GROUND FLOOR - AREAS D & PA

SCALE: 1/8" = 1'-0"

AS-203-1A.G

AS-204-1A.G

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-100-1A.G

FLOOR PLAN - GROUND

FLOOR - AREAS D & PA

RAC

1A

KEY PLAN

PA

D

B

A

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

SMOKE BARRIER

SMOKE PARTITION

MOTOR

CYCLE PARKING

WHEEL

CHAIR PARKING

STORAGE

PA08

PARKING

LEVEL A

PA01

STAIRWELL

PAS05

ELEVATOR

PAE04

ELEVATOR

PAE05

ELEVATOR

LOBBY

PA02

STORAGE

PA07

OTHER

SPACE

PAM03

CORRIDO

BH002

STAIR

PAS08

M

EC

H

AN

IC

AL

B0

F C

O R

R

ID

O R

BH

STORAGE

A008

FOOD

STORAG

A006A

STAIRWELL

PAS04

1 FLOOR PLAN - GROUND FLOOR - AREA PA

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-101-1A.G

FLOOR PLAN - GROUND

FLOOR - AREA PA

RAC

1A

KEY PLAN

PA

D

B

A

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

DN

DN

TORAGE

AREA

PA06

CHIEF

D007A

LOCKSMITH

D007B

CORRIDOR

DH005 CHIEF

ELECTRICIAN

B014B

M&O

FORMAN

B013

ELECTRONIC

B014

ELECTRIC

SHOP

B014C

STAFF

TOILET

B015A

OFFICE

B017

STORAGE

FLAMMABLE

B016

STORAGE

GENERAL

B020

WAREHOUSE

B015

MAIL RM

B015B

EMS

EQUIP

B021 SOILED

UTILITY

B022A OFFICE

B022D

OFFICE

B022E

C O

R R

ID

O

R

BH

TOILET

FEMALE

B019

TOILET

MALE

B018

MENS

TOILET

B003

HALL

B004

STORAGE

B009A

SOILED RECEIVING

DECONTAMINATION

AREA

B005

LOGISTICS

BREAKDOWN

B006B

HALL

B006A

ELEC.

B009

ELECTRIC

CLOSET

BU002

CORRIDOR

BH003

UNION

OFFICE

B011A

LOGISTICS

STORAGE

B011

OFFICE

B012A

PROSTHETICS

STORAGE

B015C

MORGUE

B015A

CORRIDOR

BH002

STAIR

PAS08

M

EC

H

AN

IC

AL

B0

F

AC

PLUMBING

MACH

B012

C O

R R

ID

O

R

BH

BULK

STORAGE

B010

CORRIDOR

OX101

PREPARATION

STERILIZATION

WORK RM

A005C

GAS CYL

STORAGE

B005D

CLEAN

RECEIVING

B007

CORRIDOR

AH003

LOGISTICS SVC

INVENTORY MGMT

B022

WOMENS

TOILET

B002

CORRIDOR

BH004

OFFICE

B022C

OFFICE

B022B

OFFICE

B022A

C O

R R

ID

O

R

BH

EMERGENCY

GENERATOR RM

B037

C O

R R

ID

O

R

BH

FEMALE

TOILET

B040

MENS

TOILET

B041

EMS

B036C

LINEN

B036D

CANTEEN

STORAGE

B036B

MAIN

KITCHEN

B036

ENVIRONMENTAL

MGMT SUPPLY

B045D

SURGICAL

PACK

B045C

STORAGE

B045B

MAIN

KITCHEN

B036

OFFICE

SUPVS

B036F

DAIRY &

EGG

REFRIG

B036G

STORAGE

B035A

OFFICE

B035

STORAGE &

ISSUE

B034

STAIRWELL

BS003

EMS

B005A

MANUAL

CART

WASH

B005B

EQUIP

STORAGE

AREA

B001

ELECTRIC

CLOSET

BU003

EMS

A001B PM&RS

E B

ELECTRIC

CLOSET

B043A

EMS

CHECK IN

B042B

SE

RECEPT

B-0

OFFICE

CHIEF

R B-04

CORRIDOR

BH004

ELECTRICAL

DISTRIBUTION

RM

B037B

TRANSFORMER

RM

B037A

1 FLOOR PLAN - GROUND FLOOR - AREA B

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-102-1.G

FLOOR PLAN - GROUND

FLOOR - AREA B

RAC

KEY PLAN

PA

D

B

A

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

ELECTRICAL

STERILE AND

NON-STERILE

STORAGE

A001A

STERILIZATION

WORK RM

A005C

GAS CYL

STORAGE

B005D

CLEAN

RECEIVING

B007

CORRIDOR

AH003

STORAGE

A008

RETAIL

STORE

A009

C O

R R

ID

O

R

AH

ASST

CHIEF

A012

CLERK

TYPIST

A011

CHIEF

A010

OFFICE

CANTEEN

A007

REFR

WALK IN

A006B

PREFAB

REFRIG

A006C

FOOD

STORAGE

A006A

STAIRWELL

PAS04

KITCHEN

A006

HAC

A006F

AU008 AU007 AU006

CORRIDOR

AH001

STAIR

AS002 STORAGE

A004

CAFETERIA

A004A

FOOD

SERVICING

A006D

SERVING

LINE

A005

SURGICAL

PACK

B045C

MAIN

KITCHEN

B036

EQUIP

STORAGE

AREA

B001

ELECTRIC

CLOSET

BU003

EMS

A001B

DUMB

ELEVATOR

OFFICE

A019

ELEVATOR

LOBBY

A001

OFFICE

ASST

CHIEF

A003

ELEV

AE004

ELEV

AE005

BREAK

RM

A021

ELEVATOR

LOBBY

A000

DISH

WASHING

A020

ELECTRIC

CLOSET

AU004

EMS

A023

CORRIDOR

AH004

DIETICIANS

OFFICE

A025

ASST

CHIEF

A027

DIETICIANS

OFFICE

A025A

SECY

A028

CORRID

AH00

CONFERENCE M

A029

CORRID

BH00

SUPV

OFFICE

B045

BREAK

RM

B045A

ELECTRICA

AU002CORRIDOR

AH004

AU001

ELECTRIC

CLOSET

AU005

EMS

A004B

STORAGE

A004A

VCS

OFFICE

A004A

CHIEF

VCS

OFFICE

A004E

LOCKERS

FEMALE

A002A

LOUNGE

A002

IT

CLOSET

A002C

ELEV

P3

ELEV

P2

ELEV

P1

TOILET &

SHOWERS

A002B

TELEPHONE

EQUIP RM

A022

TOILET

A024 EMS

A026

LOCKERS

A026B

OT

CLINIC

A044

1 FLOOR PLAN - GROUND FLOOR - AREA A

SCALE: 1/8" = 1'-0"

AS-200-1.G

AS-207-1.G

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

AS-103-1.G

FLOOR PLAN - GROUND

FLOOR - AREA A

RAC

KEY PLAN

PA

D

B

A

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

SMOKE BARRIER

5/16/23

M

C O

R R

ID

O

R

BH

FEMALE

TOILET

B040

MENS

TOILET

B041

EMS

B036C

LINEN

B036D

EEN

AGE

6B

VIRONMENTAL

GMT SUPPLY

B045D

SURGICAL

PACK

B045C

NFERENCE M

A029

CORRIDOR

BH006

SUPV

OFFICE

B045

STORAGE

A033

PM&RS

CHIEF'S

OFFICE

A032A

SECY

OFFICE

A032B

RESIDENTS

OFFICE

A032C

HALL

A032

CONFERENCE

RM

A032D CHARTING

A032E

IT

B046

HAS

B044

TOILET

B044AEMS

B043

ELECTRIC

CLOSET

B043A

EMS

CHECK IN

B042B

EMS

OFFICE

B042A HAS

B044B

HAS

B044C

SVC RM

B039

SECY/

RECEPTIONIST

B-042

OFFICE ASST

CHIEF WORK

RM

B-042C

CORRIDOR

BH004

ELECTRICAL

DISTRIBUTION

RM

B037B

A/C

REFRIGERATION

EQUIP RM

B038

TRANSFORMER

RM

B037A

1 FLOOR PLAN - GROUND FLOOR - AREA B

SCALE: 1/8" = 1'-0"

ELECTRICAL

CORRIDOR

AH010

EMS

A023

DIETICIANS

OFFICE

A025

ASST

CHIEF

A027

NS SECY

A028

CORRIDOR

AH005

FERENCE M

A029

CORRIDOR

BH006

SUPV

OFFICE

B045

ELECTRICAL

AU003

ELECTRICAL

AU002CORRIDOR

AH004

AU001

TOILET

A024 EMS

A026

LOCKERS

A026B

OT

CLINIC

A044

A026A

TOILET &

SHOWERS

A046

TOILET

FEMALE

A045

C O

R R

ID

O

R

AH

CORRIDOR

AH007

OT

OFFICE

A043

OT

OFFICE

A043A

OFFICE

A070RECEIVING

A071

SVC MGR

A072

CORRIDOR

AH009

OFFICE

A069

DATA

CENTER

A073

PGM MGR

A068

SOFTWARE

APPL

SUPPORT

A067

APPLICATION

SUPPORT

A066

SYSTEMS

MGR

A065

NETWORKING

MGR

A064

PROG MGR

SYST &

NETWORKING

A063ADP

WORKSHOP

A062

STAIRWELL

AS004

TELECOMM

SVCS

A061

TELECOMM

SVCS

A060

SUPPORT

A059

APPLICATION

SUPPORT

A058

APPLICATION

SUPPORT

A057

ELECTRICAL

A056

CONFERENCE

RM

A055

C O

R R

ID

O

R

AH

PGMMING

& INFO

A054

PGMMING

& INFO

A053

PGM

SPECIALISTS

A052

OFFICE

A051

RECEPTION

AREA

A050

TRACTION

A039

PROVIDER

A038

EXAM

A040

EXAM

A041

CORRIDOR

A030A

EXAM/

EMG

A037

WAITING

AREA A042

STAIRWELL

AS001

WAITING

AREA

A036

PHYSICAL

THERAPY

WORK

ROOM

RECEPTION

A030

THERAPY

A034A

THERAPY

A034

PHYSICAL

THERAPY

A035

STORAGE

A033

CHIEF'S

OFFICE

A032A

OFFICE

A032B

HALL

A032

2 FLOOR PLAN - GROUND FLOOR - AREA A

SCALE: 1/8" = 1'-0"

AS-201-1.G

AS-202-1.G

AS-205-1A-G

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

AS-104-1.G

FLOOR PLAN - GROUND

FLOOR - AREA B & A

RAC

KEY PLAN

PA

D

B

A

TRUE

NORTH

PLAN

NORTH

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

SMOKE BARRIER

DN UP

DN

UROLOGY

D113

SURGERY

D140B

BREAK

ROOM

D140

STAFF

TOILET

D112

STAFF

TOILET

D111

PHYSICIAN

CONSULTANT

RM

D140A

STAIR

DS107

EC

DU141

TC

DU142

ELEVATOR

S6

ELEVATOR

S7

MECH

EM113

IT EQUIP

RM

D164

CORRIDOR

EH104

STAFF

RADIOLOGIST

E112

STAFF

RADIOLOGIST

E111

STAFF

RADIOLOGIST

E110

LIBRARY

E109

PROCESSING

E118

CORRIDOR

EH102

SECTION

OFFICE

E108

CHIEF OF

RADIOLOGY

E107

ADMIN

OFFICER

E104

FEMALE

TOILET

E106

RADIOLOGIST

E103MALE

TOILET

E105

CHIEF

TECHNOLOGIST

E102

C O

R R

ID

O

R

EH

3X-RAY

E119

MRI

READING

E130 RM

MRI

RECEPTION

E100

EXAM

D162

EXAM

CONS

D163

EXAM

CONS

D144

CORRIDOR

DH110

STORAGE

D143

CAST RM

D136

EXAM

D145OFFICE

D117

EXAM

D135

EXAM

D119

EXAM

D133

EXAM

D134

C O

R R

ID

O

R D

H

EXAM

D147

C O

R R

ID

O

R D

H

EXAM

D149

EXAM

D132

CLEAN

STOR

D139

PROCEDURE

RM

D115

SUPPLY RM

D137

EXAM

D110EMS

D108

BREAK RM

D107

TOILET

D102C

PATIENT

RM

D102D

SOILED

UTILITY

D109

CONS

D116

CLEAN

SUPPLY

D106

EXAM

D118

DIRTY

SUPPLY

D104

EXAM

D120 C

O R

R

ID

O R

D H

INFUSION / CHEMO

TREATMENT

CH100

EXAM

D103

TOILET

D124A

EXAM

D124

EXAM

D101

EXAM

D121

CORRIDOR

DH107

EXAM

D131

EXAM

D129

EXAM

D123

EXAM

D125

EXAM

D127

EXAM

D128

EXAM

D130

EXAM

D151

EXAM

D148

EXAM

D161

EMS

CLOSET

E114

MRI

E120

COMPUTER

RM

E117

HVAC

MECH/ELEC

EM115

CRYOGEN

STORAG

E116

SUPV

MRI

TECH

E122

TOILET

D165

CORRIDOR

DH112

STAFF

RADIOLOGIST

OFFICE

E124

MRI

READING

E123

PREPARATION

E121

TOILET

E127

STAFF

TOILET

E128A

DRESS

E126

DRESS

E125

STAFF RM

D168

CAST RM

D169

ULTRA

SOUND

D186

CAST RM

D158MED RECORD

D100

WORK RM

D126B

WAITING

CH105C

RECEPTION

D100A

PATIENT

RM

D102A

TOILET

D102B

MENS

CORRIDOR

CH105

RRIDOR

CH104 WAITING

CH104A

RESP

CARE

C114C

TOILET

C114A

BREAK

RM

C114B

PRE-OP

ASSESSMENT

D194

EC

D155

PUBLIC

TOILET

D156

C O

R R

ID

O

R D

PRE-OP

ASSESSMENT

D193

WORK RM

D191

SVC

OFFICE

D156A

SURG

CLINIC

CHECK IN

D157

EXAM

D154A OFFICE

D158

OFFICE

D160A

EXAM

D154

EXAM

D152

EXAM

D160

EXAM

D150

EXAM

D153

TOILET

D166

PROCEDURE

RM

D168A

ORTHO

STORAGE

D169a

PHYSICISTS

OFFICE &

LAB

E128

BREAK/

READING

CH114

DRESSING/

RESTROOM

D193

OFFICE

D185

VASCULAR

LAB

D192

EC

D183A

EXAM

D196

EXAM

D195

CORRIDOR

CH102

SPEC

COLLECT

C114 RAD

STORAGE

D183B

EMS

D189 VASCULAR

LAB

D181

CORRIDOR

CH118

CORRIDOR

CH102A

WAITING

D175

VASCULAR

LAB

D190

WAITING

CH105E

STORAGE

RM E129

OFFICE- CHIEF

VASCULAR LAB

TECH D171

STAIRWELL

DS108

COR

DH

CORRIDOR

DH116A

PATIENT

PREP

D172

LINEN

RM

D173

MECH.

SHAFT

B136

STOR

B1

CH

X- B1

EQUIPMENT

D137

CONTROL

RM

D180A

ANGIOGRAPHY

D180

CH

X- B

OFF

B1

TOILET

B134D

CONF

B

TOILET

E101

WAITING

C1-5D

WORK RM

D155

EXAM

D146

CONTROL

D188A

1 FLOOR PLAN - FIRST FLOOR - AREAS D & E

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-110-1A.1

FLOOR PLAN - FIRST FLOOR -

AREAS D & E

RAC

1A

KEY PLAN

C

E

B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

C110

TREATMENT

CH100

D124D101 D125 D127 D128

MED RECORD

D100

WORK RM

D126B

WAITING

CH105C

RECEPTION

D100A

PATIENT

RM

D102A

TOILET

D102B

MENS

TOILET

C109

WOMENS

TOILET

C110A

EMS

C106

EC

C107

TRAVEL

C108

FISCAL

C111

CORRIDOR

CH113

CORRIDOR

CH105

SURGERY

CLINIC

C112B

SURGERY

CLINIC

C112A

SURGERY

CLINIC

C112

E.R.

STAFF

C113B

HAS

C113A CANTEEN

DIRECTOR

OFFICE

C113

CORRIDOR

CH104 WAITING

CH104A

RESP

CARE

C114C

TOI

C114A

E D1

P T

S

CL

CH

D

EXAM

D154A OFFICE

D158

OFFICE

D160A

D153

LAB

D192

EC

D183A

TRIAGE 01

C121B

EV

ID

EN

C

E C

HEALTH

BENEFITS

CENTER

C104C

CUBICLE

C104V4

CUBICLE

C104V3

CUBICLE

C104V2

CUBICLE

C104V1

DECEDENT

AFFAIRS

C104U

OFFICE

C104T

SUPVY

MED

SUPPORT

ASST

C104S

C104V7 C104V6 C104V5 RECEPTION

C104A

PAT

TOILET

C104D

C104V18COPY

C104V19C104V20

PATIENT

SUPPORT

PGM

SPECIALIST

C104R

CHIEF

AMBULATORY

CARE AND

PROCESSING

C104Q

CHIEF

HEALTH

INFO MGMT

C104P

C104V11 C104V12 C104V13

C104V19 C104V17

C104V14

C104V18 C104V16 C104V15

CUBICLE

WORK RM

C104H

BREAK RM

C104G

STAFF

TOILET

C104E

PIV

C107

HOLDING

C105

POLICE

C104 POLICE

C102

ARMORY

C103

ELEVATOR

P5

ELEVATOR

P4

POLICE

C110

LOBBY

CH101

ELEVATOR

P6 IT

C121

EXAM

C132B

EXAM

C132C

PA

SS

AG

E

C H

0B

EXAM/

ISO

C130J

EXAM

C130K TLT

C131

TLT

C128

PASSAGE

CH121

TRIAGE 02

C121A PA

SS

AG

E C

H

1A

TLT

C121D

EKG/LAB

C121C

SUB-WAITING

CH121B

EXAM

D196

EXAM

D195

CORRIDOR

CH102

SPEC

COLLECT

C114

WAITING

CH120

EXIST

WELCOME

DESK

CH101C

VESTIBULE

C1-1AWHEEL CHAIR

STORAGE

101CONFERENCE

RM

C104I

UM/UR UM/

UR MGR

OFFICE

C104J

CHIEF

OFFICE

C104K

ASST CHIEF

HEALTH ADMIN

C104M

ADMIN

ASST

C104N

HEALTH ADMIN

CHIEF OFFICE

C104O

STAFF

WORK

C130

RESUSCITATION 1/

ISO

C130F

ENTRANCE

CH139

VESTIBULE

CH130AEMS

C138OFFICE 3

C140

ER

OFFICE

C141

STAFF

TLT

C142

ER

NURSE

MGR

C143

EMPLOYEE

TRAINING RM

C144

STAIRWELL

CS109

PASSAGE

CH140

CLEAN

UTIL

C137

IT

C136

EXAM/

ISO

C130H

EXAM/

ISO

C130I

PA

SS

AG

E

C H

2A

EXAM

C132D

TLT/SHWR

C134EC

CU100

SOILED

UTIL

C135

ELEVATOR

P7

STAFF /

WORK RM

C133

EXAM

C132A

PASSAGE

CH132

RESUSCITATION

2/

ISO

C130E

ST

O

R

AG

E C

9A

EXAM

C130D

IN-VITRO

COUNTING

HIGH/LOW

A-166

STORAGE

DECONTAM

C127EXAM

C130C

OFFICE

C130B

MENTAL

HEALTH RM

C130A

STAIR

CS104 PASSAGE

CH126

PHYS

WORK

C126C

ON

CALL

C126D

EXAM

C125G

CLEAN

UTILITY

CH125H

NOUR

PREP

C125J

MED

RM

C129

E

CYL

C125I

STAFF

WORK

C125

CART

STORAGE

C125K

SPECIMEN

C124

EMS

C123

PASSAGE

CH125

EXAM

C125F

PASSAGE

CH125B

SOILED

UTIL

C122

RAD

STORAGE

D183B

EMS

D189 VASCULAR

LAB

D181

CORRIDOR

CH102A

PASSAGE

CH125A

EXAM

C125A

EXAM

C125B

EXAM

C125C

EXAM

C125D

STORAGE

C125E

A-18

WAITING

D175

WAITING

CH105E

VAULT

A-180

T

WAITING

C1-5D

WORK RM

D155

TOILET

C126A

PHARMACY

STORAGE

A190A

1 FLOOR PLAN - FIRST FLOOR - AREA C

SCALE: 1/8" = 1'-0"

AS-210-1A.1

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-111-1A.1

FLOOR PLAN - FIRST FLOOR

- AREA C

RAC

1A

KEY PLAN

C

E

B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

S V

DN UP

RADIOLOGIST

E103

CHIEF

TECHNOLOGIST

E102

MRI

READING

E130 RM

PASSAGE

CH125

SCULAR

LAB

D181

CORRIDOR

CH118

OR

2A

AGE

25A

EXAM

C125A

EXAM

C125B

EXAM

C125C

EXAM

C125D

WAITING

D175

OFFICE- CHIEF

VASCULAR LAB

TECH D171

STAIRWELL

DS108

CORRIDOR

DH116

CORRIDOR

DH116A

T

LINEN

RM

D173

MECH.

SHAFT

B136

STORAGE

B135

CHEST

X-RAY

B134A

EQUIPMENT

D137

CONTROL

RM

D180A

IOGRAPHY

D180

CHEST

X-RAY

B134

OFFICE

B134B

TOILET

B134D

EL

EC

B1

C

RADIOGRAPHIC

AND

FLUOROSCOPIC

B139

C O

R R

ID

O

R

BH

CONFERENCE

B138

CORRIDOR

TOILET

E101

DRESSING

B139A

TOILET

B139B

BU106

ELEC

B140A

X-RAY

B137

TOILET

B137B

DRESSING

B137A

RADIOLOGY

WAITING

BH103

STORAGE

B147B

RADIO/

FLOUR

B140

CORRIDOR

BH104

VACANT

B141

CONTROL

RM B140A

RADIOLOGY

SVC SUPPLY

RM

B148

FILM

PROCESSING

AREA B147

OUTPATIENT

READING RM

B147A

INPATIENT

HOLDING

BAY 3

B146E

RADIOGRAPHIC

B143

RADIOGRAPHIC

AND

FLUOROSCOPIC

B142

CORRIDOR

BH105

CT SCAN 1

B152

CONTROL

RM

B152A

SCANNER

RM

B153

UPS

RM

DOSE

B122A

DOSE

B122B

HOT LAB

B122C

TOILET

B122D

HALL

WAY

B122A

CORRIDOR

BH108

CLINICAL

REVIEW

COS SVC

OFFICE

B129F

UTILIZATION

MGMT

B129E

CLINICAL

CHEMIST

B103

SUPV

LAB

B104

ELEC

INPATIENT

HOLDING

BAY 3

B146D

INPATIENT

HOLDING

BAY 3

B146C

INPATIENT

OBSEVATION

B146B

RECEPTION

B146B

RADIOLOGY

LOBBY

D175A

CORRIDOR

BH106

RADIOLOGY

STORAGE

B146F

X-RAY

DIAGNOSTIC

B144 RM

DRESSING

RM B146H

DRESSING

RM

B14JG

DRESSING

RM ALCOVE

B146G

D R

ES

SI

N G

R M

B1

A

FEMALE

TOILET

B127

MALE

TOILET

B126

M

EC

H B1

BIO

MED

ENGG

B125

CORRIDOR

BH107

STAIR

BS103

PATIENT

FLOW

COMMAND

CTR

B129C

PGM

MGR

B129D

CLINICAL

HOUSE

SUPV

B129C

LAB MGR/

CHIEF MED

TECH

B105

BLOOD

BANK MED

DIRECTOR

B106TRANSFER

OFFICE

B129B

BREAK

RM

B129A

OFFICE

B101K LINE

ITEM

MGR

OFFICE

B107

STORAGE

STORAGE

B101J

OFFICE

B101I

CORRIDOR

SUPV

B101D

EL

EC

BU

EL

EC

BU

WAITING

A-150

CORRIDOR

BH101

ILE

RM

151A

BONE

DENSITY

A-159

VACANT

B131

OFFICE

B132A

VIEWING

RM B132

LOUNGE

B133

KITCHEN

B133A

MECH

B133B

STAFF

TOILET

B133A

CORRIDOR

BH102

GE

B

A

PROVIDER

WORK RM

B101L

Restroom

B101EEMS

CLOSET

B104

ELECTRIC

CLOSET

BU101

Restroom B101F

STORAGE

B101C

BREAK

RM

B101G

STORAGE

B101H

SURGICAL

PATHOLOGY

B107A

BREAK

RM

B108CONFERENCE

RM

B101A

ST

O

R

AG

E B1

B

SOILED

A146

SUPPLY

A147

SVC ELEV

LOBBY

1B-1

CORRIDOR

AH101

PATHOLO

B10

CLINICAL

MICROBIOLOGIST

B121

CONF

CL

S B

CONTROL

D188A

1 FLOOR PLAN - FIRST FLOOR - AREA B

SCALE: 1/8" = 1'-0"

AS-212-1A.1

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-112-1.1

FLOOR PLAN - FIRST FLOOR -

AREA B

RAC

KEY PLAN

C

E

B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

A-184

V

A-153

A-185

A-150A

A-184C

AS107

A-152

ST

O

R

AG

E C

9A

EXAM

C130D

IN-VITRO

COUNTING

HIGH/LOW

A-166

STORAGE

DECONTAM

C127EXAM

C130C

OFFICE

C130B

MENTAL

HEALTH RM

C130A

STAIR

CS104 PASSAGE

CH126

PHYS

WORK

C126C

ON

CALL

C126D

EXAM

C125G

EXAM

C125F

PASSAGE

CH125B

EXAM

C125C

EXAM

C125D

STORAGE

C125E

A-184A A-184B

CORRIDOR

BH106

B14JG

DRESSING

RM ALCOVE

B146G

CORRID

SUPV

B101D

EL

EC

BU

EL

E

BU

WAITING

A-150

CORRIDOR

BH101

FILE

RM

A-151A

A-151

BONE

DENSITY

A-159

VACANT

B131

OFFICE

B132A

VIEWING

RM B132

LOUNGE

B133

KITCHEN

B133A

MECH

B133B

STAFF

TOILET

B133A

CORRIDOR

BH102

PHARMACY

WAITING

A-186

C O

R R

ID

O

R

AH

SUPPLY

A-160

BREAK

RM

A-156

READING

RM A-158

EXAM

A-157

MENS

RESTROOM

A-155

WOMENS

RESTROOM

A-154

STORAGE

A-152B

HOT

LAB

A-152A

HOT

LAB

A-152B

PROVIDER

WORK RM

B101L

Restroom

B101EEMS

CLOSET

B104

ELECTRIC

CLOSET

BU101

Restroom B101F

BREAK

RM

B108CONFERENCE

RM

B101A

ST

O

R

AG

E B1

B

SOILED

A146

SUPPLY

A147

STAIR

AS102

AS108 AS106

CORRIDOR

AH102

PHARMACY

OFFICE

A-189

OFFICE

NURSE

MGR

A177

PATIENT

ADVOCATE

A102

INPT

PHARMACY

A103

CORRIDOR

A-191

VAULT

A-180

CONFERENCE

RM

A174

TECHNICIAN

OFFICE

A-179

C O

R R

ID

O

R A-

PRE-PACK

A-177a

ANTEROOM

A-190

IV

STORAGE

A-190a

CORRIDOR

AH103

MGR

CMOP

A-178

ACOS

AMB

CARE

A-190C

SUPPORT

UNIT ADMIN

A-190b

ADMIN

ASSIST

A-188

INVESTIGATION

DRUGS SVC

PGME MGR

A164

MED MGMT

SPECIALIST

A-163FORMULARY

MGR

A-165

PHARMACY

OPERATION

MGR

A-166

CLINICAL

PHARMACIST

A-167

JANITOR

A-167A

CORRIDOR

A-162

WOMEN

A-176

MEN

A-175

ASSOCIATE

CHIEF OF

PHARMACY

OFFICE

A-171

CRITICAL

CARE

PHARMACY

SPECIALIST

OFFICE

A-170

PHARMACY

ADAPC

A-169

CHIEF

A-168

QU

M A

MED STAFF

CO-ORDR

A118

CHIEF OF

STAFF

A120

FEMALE

TOILET

A106

QUALITY

MGMT

A109

HEALTH

SYSTEM

SPECIALIST

A119

MALE

TOILET

A107

ST

O

R

AG

E A1

CORRIDOR

AH110

STAFF

TOILET

A105A

DAV

SVC

OFFICE

A105

VFW

SVC

A101

LOBBY

A100

IT

A104

OFFICE

A105B

CORRIDOR

AH101

ELEVATOR

P3

ELEVATOR

P2

ELEVATOR

P1

ELEV

LOBBY

ELEVATOR

S4

ELEVATOR

S5

COPIER/

FAX RM

A145 ELEC

AU104

ELEC

AU-105

BMS

CLOSET

A178

STOCK

RM

A149EMS

A148

SVC ELEV

LOBBY

1B-1

CORRIDOR

AH101

TOILET

C126A

PHARMACY

STORAGE

A190A

BREAK

RM

A-173

RESIDENTS

A-172

ELEC

A0104

1 FLOOR PLAN - FIRST FLOOR - AREA A

SCALE: 1/8" = 1'-0"

AS-211-1.1

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

AS-113-1.1

FLOOR PLAN - FIRST FLOOR -

AREA A

RAC

KEY PLAN

C

E

B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

SMOKE BARRIER

B TOILET

B122D

CLINICAL

CHEMIST

B103

SUPV

LAB

B104

LAB MGR/

CHIEF MED

TECH

B105

BLOOD

BANK MED

DIRECTOR

B106

LINE

ITEM

MGR

OFFICE

B107

SURGICAL

PATHOLOGY

B107A

BREAK

RM

B108

STOCK

SPECIMEN

STORAGE

A140

ASSOCIATE

DIRECTOR

FOR PATIENT

CARE SVC

A131

ADMIN

OFCR

A133A

ASSOCIATE

NURSE

EXECUTIVE

A132

TIMEKEEPER

A135CORRIDOR

AH106

DIRECTOR

SRL

A140A

REF

B109

HISTOLOGY

PROCESSING

B110

QUALITY

MGMT

A136

QUALITY

MGMT

OFFICE

A137

QUALITY

MGMT

A137A

PCR 2

A139B

PCR 1

A139A

SRL

OFFICE

A138

PCR 3

A139C

IFA

SCOPE

A139D

SRL

TESTING

B111

PATHOLOGY LAB

B102

ELEC

BU102

MICROBIOLOGY

LAB

B114

LAB

B114B

PROCESSING

B114A

SEROLOGY

LAB

A139

SUPV

SEROLOGY

LAB

B111A

STERILIZER

B113A

BCE

CO-ORDR

B112

LAB

INFO

MGR

B113B

GLASS

WASH

B113

CLINICAL

MICROBIOLOGIST

B121

CONFERENCE

CLASS &

STUDY

B-120

CORRIDOR

BH109

CHIEF

PATHOLOGIST

B119

CHIEF

PATHOLOGY

SVC

B118

PATHOLOGIST

B117

ANCILLARY

TESTING

COORD

B116

PATHOLOGY

B115

MEDIA

PREPARATION

B114D

PCR

RM

B114C

GEMBA

1 FLOOR PLAN - FIRST FLOOR - AREA B

SCALE: 1/8" = 1'-0"

B108

DIRECTOR

OFFICE A125

TOILET

A125A

ADMIN

ASST TO

DIRECTOR

A126

FACILITY

PLANNER

OFFICE

A115

ASSOCIATE

NURSE

EXECUTIVE

OFFICE

A127

C O

R R

ID

O

R

AH

8CHIEF OF

REVENUE &

RESOURCES

ANALYSIS

SECY

A114

QUALITY

PERFORMANCE

& PATIENT

SAFETY ADMIN

OFFICE

A113

QUALITY

MGMT

DIRECTOR

A128

PUBLIC

AFFAIRS

A129

ASSOCIATE

NURSE

EXECUTIVE

A130

RECEPTIONIST

A133

CORRIDOR

AH107

COPY

RM

A134FEMALE

TOILET

A141

MALE

TOILET

A142

ELEC

AU101

ELEC

AU102

ELEC

AU103

STAIR

AS101

SVC

A-112PGM

ANALYST

A111

CORRIDOR

AH105

QUALITY

MGMT

A110

MED STAFF

CO-ORDR

A118

EX ASST

COS

OFFICE

A117

CHIEF OF

STAFF

A120

SECY

OFFICE

A121

DEPUTY

CHIEF

A121A

BREAK

RM

A122

CORRIDOR

AH109

ASSOCIATE

DIRECTOR

A123

SEC

OFFICE

A124

CONFERENCE

RM A116

FEMALE

TOILET

A106

QUALITY

MGMT

A109

HEALTH

SYSTEM

SPECIALIST

A119

MALE

TOILET

A107

CORRIDOR

AH110

VFW

SVC

A101

ELEC

AU104

STOCK

RM

A149EMS

A148

SPECIMEN

TOILET

A140B

STORAGE

A140

ASSOCIATE

DIRECTOR

FOR PATIENT

CARE SVC

A131

ADMIN

OFCR

A133A

ASSOCIATE

NURSE

EXECUTIVE

A132

TIMEKEEPER

A135CORRIDOR

AH106

DIRECTOR

SRL

A140A

REF

B109

A136

GEMBA

A143

2 FLOOR PLAN - FIRST FLOOR - AREA A

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-114-1.1

FLOOR PLAN - FIRST FLOOR -

AREAS B & A

RAC

KEY PLAN

C

E

B

A

D

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

UP

UPDN

UP

UP

ROOF OF

GROUND FLOOR

BELOW

ROOF OF FIRST

FLOOR BELOW

ACOS

OFF

D208

LEARNING

OFFICER

OFFICE

D207

LEARNING

RESOURCE

CENTER

OFFICE

D203A

CLASSROOM

D206

COMPUTER

TRAINING

D205

STORAGE

D205A

CORRID

OR

C22

STORAGE

D201B

TRAINING

INSTRUCT.

LPIS

FACILITY

CO-ORD.

OFFICE

D204

LRC

OFFICE

D203

C O

R R

ID

O

R D

H

FEM

TOILET

D202

STAGE

AUDITORIUM

D201

PROJ

D201A

ST

O

R

AG

E

VE

ST

IB

U

LE

D

H

CONTROL

RM

C205

PREPARATION/

WORK AREA

C206

LIBRARY

C209

EC

CU208

CORRIDOR

CH206

STORAGE

C210

LIBRARY

RECEPTION

C211D

MENS

TOILET

D200

R

SIM CTR

TRAINING

RM

C203C

CLERICAL

REC

D209

WAITING

DH224A

CORRIDOR

DH224

AUDIOLOGY

CO-ORDR

D225

TOILET

D211

AUDIOLOGY

D210

STORAGE

D212

VOICE

LABORATORY

D213

CONTROL

D224A

SOUND

SUITE (VV)

D224

TRAINEES

D214

SP

PATH

D215

C O

R R

ID

O

R D

H

5 AUDIOLOGY

EXTERN

D216

C O

R R

ID

O

R D

H

CONTROL

D223A

SOUND

SUITE (VV)

D223

AUDIO

D217

TREATMENT

RM

D218

AUDIO

D219

AMPUTEE

PGM

OFFICE

D222

CORRIDOR

DH227

PM&R

CO-ORDR

D220

OFFICE

D221A

EXAM

D221

ROTARY

CHAIR

D221B C

O R

R

ID

O R

D H

STAFF

TOILET

D227 C

O R

R

ID

O R

D H

STAFF

TOILET

D226

EMS

D228 STAIRWELL

DS207

EC

DU229

EC

DU230

CORRIDOR

DH228

CORRIDOR

DH230

ELEVATOR

S6

ELEVATOR

S7

IT

D231

C O

R R

ID

O

R D

H

STAIRWELL

DS208

INDUSTRIAL

HYGIENIST

OFFICE

D235

SUPV

BIO MED

OFFICE

D234

SEC/WAIT

D230

REPAIR AND

DEVELOPMENT

D232

STORAGE

D232A

MECH

SHAFT

DU201

STORAGE

D232D

CORRIDOR

C234

OFFICE

RM

D238

WORK

RM

D237

MECH

SHAFT

DU202

CORRIDOR

DH233

ORAL

SURGY

C235

ORAL

SURGY

C238

RECOVERY

C239

LOCKER

RM

C241 TOILET

CORRIDOR

CH218

OPERATORY

C261

DENTAL

LAB

C260

PROSTHETICS

LAB

C259

SOLID

S

R

STORAGE

D236

1 FLOOR PLAN - SECOND FLOOR - AREA D

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-120-1A.2

FLOOR PLAN - SECOND

FLOOR - AREA D

RAC

1A

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

UP

DN

CARD CATALOGRE

FE

RE

NC

E

UP

STAGE

AUDITORIUM

D201

PROJ

D201A

ST

O

R

AG

E

VE

ST

IB

U

LE

D

H

CONTROL

RM

C205

PREPARATION/

WORK AREA

C206

LIBRARY

C209

EC

CU208

CORRIDOR

CH206

STORAGE

C210

LIBRARY

RECEPTION

C211D

MENS

TOILET

D200

TELEMEDICINE

DISTANCE

LEARNING A

C204

VISUAL

INFO

OFFICE

C207

ST

O

R

AG

E C

H

OFFICE

C211B

CONFERENCE

C211A

CORRIDOR

CH204

OFFICE

C288 EXAM

RM

C289

EXAM

RM

C290

EXAM

RM

C293

EXAM

RM

C294

TECH

WORK

AREA

C297

WOMENS

TOILET

C213

MENS

TOILET

C212

SCREENING

C271

SCREENING

C272

OPTICAL

SCREENING

C273

CORRIDOR

CH203

INFO

C201

LOBBY

CH201

VIST

COORD

C287

VISIT DOC

OFFICE

C286

EXAM

RM

C291

EXAM

RM

C292

EXAM

RM

C295

EXAM

RM

C296

RECEPTION

C270A

RECEPTION

WORKSPACE

C270B

C O

R R

ID

O

R

CLINIC

DIRECTOR

C274

VISUAL

FIELD

C276

SPECIAL

TESTING

C277

YAG

LASER

C280

ARGON

LASER

C281

SOILED

SPD

C285A

CLEAN

SPD

C285

CASE

MGR

C284

WORK AREA /

KITCHENETTE

C283

CLIN DIR

OFFICE

C282

PROCEDURE

RM

C279

PHOTO

RM

C278

OPTICAL

SHOP

C275

WAITING RM

C270

STAIRWELL

CS209

EC

CU200

ELEVATOR

(FUTURE)

CE208

ELEVATOR

P7

ELEVATOR

P6

OFFICE

CHIEF

C223D

WORK

AREA/STORAGE

C223E

MAIL

C223FTOILET

C223C

IT

C-222

RECORDS

C225

SUPER

OFFICE

C226A

WAITING

EMS

C224

RECEPTION

C223

STAFF

DEVELOP.

SPECIALIST

OFFICE

C203E

STAFF DEV

SPECIALIST

OFFICE

C203A

PATIENT

SAFETY

FELLOWS

OFFICE

C203B

C O

R R

ID

O

R C

H

SIM CTR

TRAINING

RM

C203C

LIBRARY

C203

MULTI

PURPOSE

C203D

CLERICAL

REC

D209

WAITING

DH224A

CORRIDOR

DH224

AUDIOLOGY

CO-ORDR

D225

TOILET

D211

AUDIOLOGY

D210

CONTROL

D224A

SOUND

SUITE (VV)

D224

MECH

SHAFT

DU201

STORAGE

D232D

MECH

SHAFT

DU202

CORRIDOR

DH233

ORAL

SURGY

C235

ORAL

SURGY

C238

RECOVERY

C239

LOCKER

RM

C241 TOILET

CORRIDOR

CH218

OPERATORY

C261

DENTAL

LAB

C260

PROSTHETICS

LAB

C259

SOLID

C258

OPERATORY

C256

OPERATORY

C254

DENTISTS

OFFICE

C252

C O

R R

ID

O

R C

H

EC

C257

GENERAL

C255

GENERAL

C253SUPPLY

C248

GENERAL

C245

TREATMENT

OPERATORY

C243

C O

R R

ID

O

R C

H

OFFICE

C242

X-RAY

C244

X-RAY

C246

TOILET

C227

STOR

C228

CHIEF

OFFICE

C233

INSTRUMENT

STORAGE

C240

C O

R R

ID

O

R C

H

OFFICE

RM

C234

STORAGE

C236

STORAGE

C237

C O

R R

ID

O

R C

H

CONFERENCE

RM

C232

EMS

C231

CORRIDOR

CH214

DATA

ENTRY

C251

HYGIENE

OPERATOR

C250

HYGIENE

OPERATOR

C249

EXAM

OPERATOR

C247

WAITING

C229B

STOR

C229A

SECY/

CLERICAL

C229

OFFICE

C230

CORRIDOR

CH212

C O

R R

ID

O

R C

H

STAIRWELL

CS204

WAITING

C223A

STORAGE

C223B

1 FLOOR PLAN - SECOND FLOOR - AREA C

SCALE: 1/8" = 1'-0"

AS-220-1A.2

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-121-1A.2

FLOOR PLAN - SECOND

FLOOR - AREA C

RAC

1A

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

UPDN

S

S D

W

D

W

E

PROSTHETICS

LAB

C259

SOLID

C258

OPERATORY

C256

OPERATORY

C254

DENTISTS

OFFICE

C252

C O

R R

ID

O

R C

H

DATA

ENTRY

C251

E

OR

C O

R R

ID

O

R C

H

STAIRWELL

CS204

STORAGE

CH2-12A

CORRIDOR

BH212

MECH

RM

A273 SOCIAL

WORKER

B247

TOILET

B249

TOILET

B248

SEMI-PRIVATE

RM

TOILET

A256A

TOILET

SEMI-PRIVATE

RM

CONFERENCE

RM

STOR

A255

TOILET

A255A

ECHO

LAB

A249

D O

R 1A

STORAGE

A248B

EQUIP

STOR

A202 PHARMACY

A204

STAFF

TOILET

A206A

ELECTRIC

CLOSET

A205A

STAFF

LOCKER

A206

STOR

A203

ELECTRIC

CLOSET

BU201

CLINIC B

WAITING

B238

MECH

RM

B234

CORRIDOR

AH204

LAB GROUP

CLINIC RM

CORRIDOR

C212

ENTRY

B200

CLINIC A

WAITING

AREA

B201VENDING

RM

B250

CONSULT

B235

WARFARIN

CLINIC

B234

NURSE

MGR

OFFICE

B233

CORRIDOR

BH207

COPY

RM

B236

EXAM

B232

RECEPTION/

BUSINESS

B237

CHECK

OUT

B237A

EXAM

B231

CORRIDOR

BH206

WORK

RM

B239

RECEPTION/

BUSINESS

B202

CHECK

OUT

B202A

CORRIDOR

BH201

EXAM

B207

STOR

B203

EL

EC

BU

STAIRWELL

BS203

EXAM

B242

PATIENT

TOILET

B244A

PATIENT

TOILET

B243

EXAM

B229

EXAM

B230

SOILED

HOLDINGS

B245

PROCEDURE

B244 C

O R

R

ID

O R

BH

EXAM

B228

EXAM

B227

EXAM

B226

EXAM

B225

EXAM

B224

STAFF

CORRIDOR

BH203

C O

R R

ID

O

R C

2B

4PATIENT

TOILET

B206

STAFF

TOILET

B205HAC

B204

EXAM

B208

EXAM

B209

EXAM

B210

EXAM

B211

PATIENT

CARE

B217

PHYSICIAN

WORK RM

B218

PHYSICIAN

WORK RM

B219

NURSE

WORK

RM

B220

CORRIDOR

BH202EXAM

B212

EXAM

B213

EXAM

B214

EXAM

B215

EXAM

B216

SUPPLY

B221

TREATMENT

B222

EXAM

B223

WC

STORAGE

A211A

PATIENT

TOILET

A213

CLINIC

WAITI

A211

TORAGE

D236

CLEAN

UTILITY

A202

1 FLOOR PLAN - SECOND FLOOR - AREA B

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-122-1.2

FLOOR PLAN - SECOND

FLOOR - AREA B

RAC

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

S D

W

D

W

C O

R R

ID

O

R C

H

STAIRWELL

CS204

CORRIDOR

BH212

MECH

RM

A273 SOCIAL

WORKER

B247

TOILET

B249

TOILET

B248

SEMI-PRIVATE

RM

A257

TOILET

A256A

TOILET

A257A

SHOWER

A269

SEMI-PRIVATE

RM

A256

CONFERENCE

RM

A255

STOR

A255

VISITOR

WAITING

A254

TOILET

A255A

ECHO

LAB

A249

ECHO

LAB

A250

C O

R R

ID

O

R

AH

1A

STORAGE

A248B CONTROL

RM

A248A

PHONO

CARDIOLOGY

A248 EC

AU205

CORRIDOR

AH211

ELEC

AU206

ELEC

AU207

ELEC

AU208

CCU1

A258

CCU2

A259

CCU3

A260

C O

R R

ID

O

R

AH

NURSES

WORK

RM

A268

NURSE

STATION

A267

NOURISHMENT

CENTER

A267C

EMS

A270

STAIRWELL

AS202

BREAK

A267D

CLEAN

UTILITY

A267A

TOILET

A271B

HEART

STATION

SUPV

OFFICE

A272

NURSE

LOUNGE

A271

NURSE

COORD

OFC

A274

EMS

A252

TOILET

A251

C O

R R

ID

O

R

AH

STRESS

LAB

A266

IT

CLOSET

A265

CORRIDOR

AH209

CCU6

A264

CCU5

A263

CCU4

A262

CARDIAC

PROCEDURE

RM

A261

HEART

STATION

A245

HEART

STATION

WORK RM

A244 CONSULT

A241

JANITOR

A240

TOILET

A239

CLEAN

STOR

A238

PREPARATION/

HOLDING

A237

CORRIDOR

AH206

PACEMAKER

A247

CARDIO

CASE

MGR

OFFICE

A276A

C O

R R

ID

O

R

AH

CARDIO

OFFICE

A276

EKG

COMPUTER

A247A

CARDIOLOGY

PROVIDER

A246

EEO

ADMIN

OFFICE

A277

CORRIDOR

AH207

ELEVATOR

P3

ELEVATOR

P2

ELEVATOR

P1

CATH

LAB

OFFICE

A242

EQUIP

RM

A235B

CATH

LAB 1

A235

CATH

STORAGE

A235A

STAFF

OFFICE

A231A

BREAK

RM

A231

CONTROL

A234

STAFF

CORRIDOR

A232

SOILED

LINEN

A229

CLEAN

HOLDING

A230

CATH

STORAGE

A233A

EQUIP

RM

A233B

LOBBY

AH200

ELEVATOR

S5

ELEVATOR

S4

SVC

LOBBY

A201

EQUIP

STOR

A202

WAITING

A205

PHARMACY

A204

STAFF

TOILET

A206A

ELECTRIC

CLOSET

A205A

STAFF

LOCKER

A206

STOR

A203

ELECTRIC

CLOSET

BU201

CLINIC B

WAITING

B238

MECH

RM

B234

CORRIDOR

AH204

LAB

A207

EC

AU204

TOILET

A207A

ROOM

A209

CORRIDOR

AH202

G

CLI

A

CORRIDOR

C212

CONSULT

B235

WARFARIN

CLINIC

B234

B233BH207

SOILED

UTILITY

A267B

LOCKER

A271A

CLEAN

UTILITY

A202

OIT

CLOSET

A243

1 FLOOR PLAN - SECOND FLOOR - AREA A

SCALE: 1/8" = 1'-0"

AS-221-1.2

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-123-1.2

FLOOR PLAN - SECOND

FLOOR - AREA A

RAC

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

PREPARATION/

HOLDING

A237

CORRIDOR

AH206

BREAK

RM

A231

CONTROL

A234

STAFF

CORRIDOR

A232

SOILED

LINEN

A229

CLEAN

HOLDING

A230

CATH

STORAGE

A233A

EQUIP

RM

A233B

CATH

LAB 2

A233

MECH

RM

B234

CORRIDOR

AH204

ET

A

ROOM

A209

CORRIDOR

AH202

ELEC

AU201

ELEC

AU202

ELEC

AU203

GROUP

CLINIC RM

A210

WC

STORAGE

A211A

PATIENT

TOILET

A213

EMS

A212

CLINIC C

WAITING

A211

EXAMINATION

A215

EXAMINATION

A216

EXAMINATION

A217

PHYSICIAN

WORK RM

A222

PATIENT CARE STAFF

WORKROOM

A227

C O

R R

ID

O

R

AH

STRETCHER

STORAGE

STAFF

TOILET

A228

FILE

A214A

RECEPTION/

BUSINESS

A214

STAIRWELL

AS201

CLEAN

UTILITY

A226

C O

R R

ID

O

R

AH

CONSULT

A225

CORRIDOR

AH206A

READING/

VIEWING

A236

BREAK

RM

A224

PROCEDURE

A223

PATIENT

TOILET

A223A

SOILED

HOLDING

A223B

EXAMINATION/

TREATMENT

A221

EXAMINATION

A220

EXAMINATION

A219

EXAMINATION

A218

1 FLOOR PLAN - SECOND FLOOR - AREA A

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-124-1.2

FLOOR PLAN - SECOND

FLOOR - AREA A

RAC

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

GENERAL

LAB

D311

STAIR

DS307 ELEVATOR

DE306

ELEVATOR

DE307

COMM

EQUIP RM

D314

EC

DU312

TC

DU313

CORRIDOR

DH314

CORRIDOR

DH315

GAS

STORAGE

D315

CHEMISTRY

LAB

D316

CHEMISTRY

LAB

D309

CORRIDOR

DH313

WASH AND

STERILIZ

D306

GENERAL

LAB

D310

INSTRUMENTS

D307

CHEMISTRY

LAB

D305

FREEZER

D308

INSTRUMENTS

D317

CHEMISTRY

LAB

D318CORRIDOR

DH311

FREEZER

D320

GENERAL

LAB

D319

C O

R R

ID

O

R D

H

0 CHEMICAL

STORAGE

D321 GENERAL

LAB

D322

CORRIDOR

CH312

CHEMISTRY

LAB

C318

GENERAL

LAB

D323A

GENERAL

LAB

D301B

GENERAL

LAB

D303

CHEMISTRY

LAB

D302

HAC

D304

CHEMISTRY

LAB

D300

ME

CHEMISTRY

LAB

C319

EC

CU320

GENERAL

LAB

C317

GENERAL

LAB

C315

EC

CU316

GENERAL

LAB

D301A

GENERAL

LAB

D323B

1 FLOOR PLAN - THIRD FLOOR - AREA D

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-130-1A.3

FLOOR PLAN - THIRD FLOOR

- AREA D

RAC

1A

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

ROOF OF SECOND FLOOR

ROOF OF SECOND FLOOR

ROOF OF SECOND FLOOR BELOW

CHEMISTRY

LAB

D316

CHEMISTRY

LAB

D318IDOR

FREEZER

D320

CHEMICAL

STORAGE

D321 GENERAL

LAB

D322

CORRIDOR

CH312

CHEMISTRY

LAB

C318

GENERAL

LAB

D323A

GENERAL

LAB

D301B

CHEMISTRY

LAB

D300

MECHANICAL

SHAFT

CU301

CHEMISTRY

LAB

C319

EC

CU320

GENERAL

LAB

C317

GENERAL

LAB

C315

EC

CU316

GENERAL

LAB

D301A

GENERAL

LAB

D323B

CHEMISTRY

LAB

C314

CHEMISTRY

LAB

C312

CHEMISTRY

LAB

C310

C O

R R

ID

O

R C

H

WOMENS

STAFF

TOILET

C313

GENERAL

LAB

C311B

GENERAL

LAB

C311A

RESERCH

C304

GENERAL

LAB

C323B

GENERAL

LAB

C323A

MENS

STAFF

TOILET

C321

CORRIDOR

CH308

CHEMISTRY

LAB

C322

DARK

RM

C324

WALK-IN

REFR

C325

CORRIDOR

CH305

INSTRUMENTS

C326

CHEMISTRY

LAB

C327

OFFICE

C309

OFFICE

C304B

OFFICE

C304C

ELEVATOR

P6

TR

C333

LAB

C332

ELEVATOR

P7

LOBBY

CH301

TOILET

C304DOFFICE

C304A

OFFICE

C308

LOBBY

CH303

CMPR

PROGMR

C307

OFC

INVESTGR

C306

OFC

INVESTGR

C305

OFC

INVESTGR

C303

OFC

INVESTGR

C302

OFC

INVESTGR

C301

EC

CU300

STAIR

CS309

CORRIDOR

CH306

STAFF

LOUNGE

C331

WASTE

STORAGE

C330A

EQUIP AND

GENERAL

STORAGE

C330A

BIO-MED

ENG

C330

MECH RM

CM328

MECHANICAL

SHAFT

CU302

STAIR

DS308

ELEVATOR

(FUTURE)

CE308

1 FLOOR PLAN - THIRD FLOOR - AREA C

SCALE: 1/8" = 1'-0"

AS-230-1A.3

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

AS-131-1A.3

FLOOR PLAN - THIRD FLOOR

- AREA C

RAC

1A

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

SMOKE BARRIER

CHIEF

B312A

PROVIDER

OFFICE

B312B

PROVIDER

OFFICE

B312C

B312G B312E

CHIEF

RESP

THERAPY

B314A

R

ES

PI

R

AT

O

R Y

B3

SECY

RESP

THERAPY

B314

CARDIOLOGY

PROVIDER

OFFICE

B312HRESPIRATORY

B312F

PROVIDER

OFFICE

312D

CARDIOLOGY

OFFICE

B312

PULM

ADMIN

OFFICE

B311B

PULM

ADMIN

OFFICE

B311

CORRIDOR

BH302

NEGATIVE

PRESSURE

PENTAMIDINE

TREATMENT

B316

CODING

B317

CODING

B315

RESPIRATORY

B310

PULM ADMIN

OFFICE/

PROVIDER

OFFICE

B311A

WORK RM

B-309

EQUIP RM

B318

PULM

FUNCTION

CLERK

B-308B

PULM

FUNCTION

WAITING

B-308

EL

EC

BU

CLEANUP/

REPAIR

TESTING

B319A

CODING

B319

OFFICE

B319B

CORRIDOR

BH301

PULM

FUNCTION

LAB

B308A

TOILET

B307RESEARCH

B305 TOILET

B306

OFFICE

B322

CORRIDOR

BH303

EEG

TESTING

B320

CONTROL

B321A

EEG

TESTING

B321OFFICE

B304RESEARCH

B303

CHIEFS

OFFICE

A303A

CONFERENCE

ROOM

A302B

OFFICE

B301

OFFICE

B322A

EEG

TESTING

B324

CONTROL

B324A

UM

OFFICE

B325A

UM

OFFICE

B325

READING

RM

B323

EC

BU301

NUEROLOGY

ADMIN OFFICE

A303

R

ID

O R

H

1 MECH

SHAFT

CLEAN

A304

SLEEP

DISORDER

RECEPTION

A306

R

ID

O R

EL

EC

BU

2 STAIR

AS303

OFFICE

B322B

1 FLOOR PLAN - THIRD FLOOR - AREA B

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-132-1.3

FLOOR PLAN - THIRD FLOOR

- AREA B

RAC

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

LOCKER

A338A

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

L S

L S

LS

LS

L S

CONTROL

B321A

EEG

TESTING

B321OFFICE

B304RESEARCH

B303

CHIEFS

OFFICE

A303A

CONFERENCE

ROOM

A302B

OFFICE

B301

OFFICE

B322A

EEG

TESTING

B324

CONTROL

B324A

UM

OFFICE

B325A

UM

OFFICE

B325

READING

RM

B323

EC

BU301

NUEROLOGY

ADMIN OFFICE

A303

C O

R R

ID

O

R

AH

1 MECH

SHAFT

A304A

CLEAN

A304

SLEEP

DISORDER

RECEPTION

A306

C O

R R

ID

O

R

AH

HOSPICE CARE

OFFICE

A307

SOILED

A305

NEUROLOGY

ADMIN OFFICE

A302C

LOBBY

A301

HAS

A308

EC

AU304

EMS

A309

PATIENT RM

A364

PATIENT

TOILET

A364A

PATIENT

TOILET

A365A

PATIENT RM

A365

PATIENT RM

A367 WAITING RM

A369

MED R

VIEW RM

B302

ELEVATOR

S5

ELEVATOR

S4EC

AU305

EMS

A372

PATIENT

A369A

PATIENT

TOILET

A367ALINEN

SUPPLY

A366

CORRIDOR

AH309

AS302

AU308 AU307 AU306

CLEAN

SUPPLY

A368

BEREAVEMENT

ROOM

A371

PHYSICIANS

OFFICE

A373

NEUROLOGY

TEAM OFFICE

A350 C

O R

R

ID

O R

AH

7NURSE

STATION

A352

MED RM

A353

NURSE

MANAGER

A355

A355A

SOILED

UTILITY

A358

STAFF

WORK RM

A358A

C O

R R

ID

O

R

AH

PATIENT

TOILET

A-363A

PATIENT RM

A-363

PATIENT

TOILET

A-362A

PATIENT RM

A362

TOILET

A357

CORRIDOR

AH306

NOURISHMENT

A359

PATIENT RM

A361

PATIENT

TOILET

A361A

PATIENT

TOILET

A360A

NURSES

LOUNGE

A360

PATIENT RM

A356

PATIENT

TOILET

A356A

A354A

SOCIAL

WORK

A354 TOILET

A351A

STAFF

NURSING

A351

TOILET

A349A

CORRIDOR

AH306

OFFICE

APU

A348

OFFICE SOC.

WORK

A349

OFFICE

APU

A347

OFFICE

APU

A346

TOILET

A346A

1 BED

RM

A343

1 BED

RM

A342

1 BED

RM

A340

IT

A345

STORAGE

A344

DOCTOR

A341

DOCTOR

A310

ELEVATOR

AE301

ELEVATOR

AE302

ELEVATOR

AE303

LOBBY

A300

SECURITY

RM

A338 2 BED

RM

A337

CORRI

AH30

SECY

A339

PANTRY

A313

SURGY

TEAM RM

A311

C O

R R

ID

O

R

AH

4 NU

ST

A

TOILE

A315A

2 BED

RM

A315WAITING

AREA

A312

CORRIDOR

AH309

TOILET

A342A

1 FLOOR PLAN - THIRD FLOOR - AREA A

SCALE: 1/8" = 1'-0"

AS-231-1.3

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-133-1.3

FLOOR PLAN - THIRD FLOOR

- AREA A

RAC

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

A338A

ECEPTION

A306

SPICE CARE

OFFICE

A307

AS

C

EMS

A309

1 BED

RM

A340

R

TOR

SECURITY

RM

A338 2 BED

RM

A337

2 BED

RM

A336

4 BED

RM

A332

TOILET

A328A

1 BED

RM

A329

1 BED

RM

A328

4 BED

RM

A327

TOILET

A329A

STORAGE

A330TOILET

A332A

TOILET

A334

TOILET

A336A

TOILET

A327A

WORK RM

A326

4 BED

RM

A324

TOILET

A324A

TOILET

A326AC

O R

R

ID

O R

AH

SMALL

EQUIP RM

A325A

PATIENT

SHOWER

A325SPD

A331

EXAM

A333

DOCTOR

A335

CORRIDOR

AH306

SECY

A339

PANTRY

A313

SURGY

TEAM RM

A311

C O

R R

ID

O

R

AH

4 NURSES

STATION

A314

MED RM

A317 STAIR

AS301

ELEC

AU301

ELEC

AU302

ELEC

AU303

TOILET

A315A CORRIDOR

AH303

TOILET

A318A

EMS

A319

TOILET

A320

TOILET

A321A

TOILET

A323A

4 BED

RM

A323

1 BED

RM

A322

TOILET

A322A

1 BED

RM

A321

4 BED

RM

A318

2 BED

RM

A316

2 BED

RM

A315WAITING

AREA

A312

1 FLOOR PLAN - THIRD FLOOR - AREA A

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-134-1.3

FLOOR PLAN - THIRD FLOOR

- AREA A

RAC

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

ROOF OF SECOND FLOOR

STAIR

DS407 ELEVATOR

DE406

ELEVATOR

DE407

C O

M M

U N

IC

AT

IO

N

S

EQ

U

IP

R M

D

TC

DU425

EC

DU424

QUARANTINE

D422

RECEIVING

D421

CORRIDOR

DH417

CORRIDOR

DH418

WASTE

D439

NECROPSY

D426

ANIMAL

HOLDING

D420

IP LAB

D419B

ANIMAL

D418

HAC

D423

ANIMAL

D428

DIAG &

TRTMT

D427AIR

LOCK

D419

INFECTIOUS

WARD

D419A INST STOR

D429

PRO LAB

D431

ANIMAL

D430

ANIMAL

D416

ANIMAL

D417

ANIMAL

D415

C O

R R

ID

O

R D

H

SCRUB

D414

SURGICAL

WORKRM

D415A

KITCHEN

D432

FREEZE

D432A

STO &

FEED

D433OPERATING RM

D412A

ANIMAL

D413

CORRIDOR

DH414M

TOILET

D411

F

TOILET

D410

PRE-OP

D412

POST-OP

D434

CAGE WASH

D437

PRO LAB

D408

EC

D

U

LOUNGE

D407

STOR

A406

ANIMAL

D406

STOR

RM

D405

CORRIDOR

DH412

ANIMAL

D435 AIR

LOCK

CH410

CLEAN

STORAGE

D436

ANIMAL RM

D404

C O

R R

ID

O

R C

H

LAB

C409A

LAB

C409B

CORRIDOR

CH408

ANIMAL RM

D402

HAC

C407

STOR

D400

TOILET

C406

AIR

LOCK

CH405

ROOF

ACCESS

CORRIDOR

C4-6

BREAK

RM

D401

C O

R R

ID

O

R C

H

OFFICE

D403

ELEVATOR

CE406

MECH

C

ANIMAL

HOLDING RM

D438

TR

CU411

1 FLOOR PLAN - FOURTH FLOOR - AREA D

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-140-1A.4

FLOOR PLAN - FOURTH

FLOOR - AREA D

RAC

1A

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

ROOF OF SECOND FLOOR

ROOF OF SECOND FLOOR

ROOF OF SECOND FLOOR BELOW

CAGE WASH

D437

R

MAL

35 AIR

LOCK

CH410

CLEAN

STORAGE

D436

D404

C O

R R

ID

O

R C

H

LAB

C409A

LAB

C409B

CORRIDOR

CH408

ANIMAL RM

D402

HAC

C407

STOR

D400

TOILET

C406

AIR

LOCK

CH405

ROOF

ACCESS

CORRIDOR

C4-6

BREAK

RM

D401

C O C

OFFICE

D403

CLERKS

C405

WORK RM

C404

C O

R R

ID

O

R C

H

CORRIDOR

CH403

CONFERENCE

C402 LOBBY

CH401

ELEVATOR

CE406

ELEVATOR

CE407

LAB

C410

ASSOC

COS

C403A

SEC

C403

ASSIST

ASSOC

TO COS

C403B

REPRO/COPY

C401 CORRIDOR

CH402

EC

CU400

STAIRWELL

CS409

ELEVATOR

(FUTURE)

CE408

MECH SHAFT

CU401

CM408

STAIR

DS408

ANIMAL

HOLDING RM

D438

TR

CU411

1 FLOOR PLAN - FOURTH FLOOR - AREA C

SCALE: 1/8" = 1'-0"

AS-240-1A.4

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

569A4-22-700

5/16/23

100% CONSTRUCTION

DOCUMENTS

LEXINGTON-COOPER EHRM

INFRASTRUCTURE DESIGN

1101 VETERANS DRIVE

LEXINGTON, KY 40502

5/16/23 JY

AS-141-1A.4

FLOOR PLAN - FOURTH

FLOOR - AREA C

RAC

1A

KEY PLAN

C B

A

D

TRUE

NORTH

PLAN

NORTH

GENERAL NOTES - OVERALL PLAN

1. REFERENCE MEP AND TECHNOLOGY DRAWINGS

FOR ROOMS NOT IDENTIFIED HERE REQUIRING

WORK SCOPE OTHER THAN ARCHITECTURAL.

LEGEND

BUILDING SEPARATION

SMOKE RESISTIVE CORIDOR

WALL

AREA NOT IN SCOPE

ABATEMENT AREAS

HORIZONTAL EXIT

3-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

1-HOUR FIRE BARRIER

30 MINUTE FIRE BARRIER

OFFICE

SECTION

CHIEF

B414

PHYSICIAN

OFFICE

B415B

PHYSICIAN

OFFICE

B415C

PHYSICIAN

OFFICE

B418B

PGM

ASST

B418A

PHYSICIAN

OFFICE

B419

RENAL

SECTION

B418

PHYSICIAN

OFFICE

B418C

CONFERENCE

RM

B416

PHYSICIAN

OFFICE

B415D

SECY

B415

PHYSICIAN

OFFICE

B415A

PHYSICIAN

OFFICE

B413

PHYSICIAN

OFFICE

B412B

PHYSICIAN

OFFICE

B412A

SECTION

SECY

B412

ELEC

B414

CORRIDOR

BH402

STOR

B417A STOR

B417

HAC

B421 STORAGE

B422

NURSE

MGR

B420

ST…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .