596A4-22-700 Drawings 03 - Arch.pdf
PDF 13 MB Posted
- Solicitation number
- 36C77623B0069
About this file
This document provides details on a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals under solicitation number 36C77623B0069 for infrastructure upgrades at the Lexington-Cooper VA Medical Center in Kentucky. Specifically, contractors are being sought to perform construction drawings, demolition, and upgrades for the EHRM area of the medical center according to drawing package 596A4-22-700. Proposals are due by the date listed on the solicitation, with the contract to be awarded shortly thereafter. The opportunity is set aside for small businesses.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP DN
UP
MECH RM
D-B038
EMERGENCY
GENERATOR
D003
TRANSFORMERS
& SWITCHGEAR
D003A
CORRIDOR
DH001
STAIR
PAS06
STAIR
PAS07
ELECTRICAL
D001
TD
D002
CORRIDOR
DH002
MECH RM
D004
EMS
D005
STOR
D005A
STORAGE
D006
ELEVATOR
S6
ELEVATOR
S7
COMM
EQUIP
RM
D007D
C O
R R
ID
O
R D
H
PAINT
SHOP
D007C
CORRIDOR
DH003 SIGNAL
CLOSET
D008
STORAGE
PA08
PARKING
CORRIDOR
DH004
CARPENTER
SHOP
D007
STORAGE
AREA
PA06
CHIEF
D007A
LOCKSMITH
D007B
CORRIDOR
DH005 CHIEF
ELECTRICI
B014B
M&O
FORM
B013
CORRIDO
BH002
STAIR
PAS08
M
EC
H
AN
IC
AL
B0
F
1 FLOOR PLAN - GROUND FLOOR - AREAS D & PA
SCALE: 1/8" = 1'-0"
AS-203-1A.G
AS-204-1A.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-100-1A.G
FLOOR PLAN - GROUND
FLOOR - AREAS D & PA
RAC
1A
KEY PLAN
PA
D
B
A
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
SMOKE PARTITION
MOTOR
CYCLE PARKING
WHEEL
CHAIR PARKING
STORAGE
PA08
PARKING
LEVEL A
PA01
STAIRWELL
PAS05
ELEVATOR
PAE04
ELEVATOR
PAE05
ELEVATOR
LOBBY
PA02
STORAGE
PA07
OTHER
SPACE
PAM03
CORRIDO
BH002
STAIR
PAS08
M
EC
H
AN
IC
AL
B0
F C
O R
R
ID
O R
BH
STORAGE
A008
FOOD
STORAG
A006A
STAIRWELL
PAS04
1 FLOOR PLAN - GROUND FLOOR - AREA PA
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-101-1A.G
FLOOR PLAN - GROUND
FLOOR - AREA PA
RAC
1A
KEY PLAN
PA
D
B
A
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
DN
DN
TORAGE
AREA
PA06
CHIEF
D007A
LOCKSMITH
D007B
CORRIDOR
DH005 CHIEF
ELECTRICIAN
B014B
M&O
FORMAN
B013
ELECTRONIC
B014
ELECTRIC
SHOP
B014C
STAFF
TOILET
B015A
OFFICE
B017
STORAGE
FLAMMABLE
B016
STORAGE
GENERAL
B020
WAREHOUSE
B015
MAIL RM
B015B
EMS
EQUIP
B021 SOILED
UTILITY
B022A OFFICE
B022D
OFFICE
B022E
C O
R R
ID
O
R
BH
TOILET
FEMALE
B019
TOILET
MALE
B018
MENS
TOILET
B003
HALL
B004
STORAGE
B009A
SOILED RECEIVING
DECONTAMINATION
AREA
B005
LOGISTICS
BREAKDOWN
B006B
HALL
B006A
ELEC.
B009
ELECTRIC
CLOSET
BU002
CORRIDOR
BH003
UNION
OFFICE
B011A
LOGISTICS
STORAGE
B011
OFFICE
B012A
PROSTHETICS
STORAGE
B015C
MORGUE
B015A
CORRIDOR
BH002
STAIR
PAS08
M
EC
H
AN
IC
AL
B0
F
AC
PLUMBING
MACH
B012
C O
R R
ID
O
R
BH
BULK
STORAGE
B010
CORRIDOR
OX101
PREPARATION
STERILIZATION
WORK RM
A005C
GAS CYL
STORAGE
B005D
CLEAN
RECEIVING
B007
CORRIDOR
AH003
LOGISTICS SVC
INVENTORY MGMT
B022
WOMENS
TOILET
B002
CORRIDOR
BH004
OFFICE
B022C
OFFICE
B022B
OFFICE
B022A
C O
R R
ID
O
R
BH
EMERGENCY
GENERATOR RM
B037
C O
R R
ID
O
R
BH
FEMALE
TOILET
B040
MENS
TOILET
B041
EMS
B036C
LINEN
B036D
CANTEEN
STORAGE
B036B
MAIN
KITCHEN
B036
ENVIRONMENTAL
MGMT SUPPLY
B045D
SURGICAL
PACK
B045C
STORAGE
B045B
MAIN
KITCHEN
B036
OFFICE
SUPVS
B036F
DAIRY &
EGG
REFRIG
B036G
STORAGE
B035A
OFFICE
B035
STORAGE &
ISSUE
B034
STAIRWELL
BS003
EMS
B005A
MANUAL
CART
WASH
B005B
EQUIP
STORAGE
AREA
B001
ELECTRIC
CLOSET
BU003
EMS
A001B PM&RS
E B
ELECTRIC
CLOSET
B043A
EMS
CHECK IN
B042B
SE
RECEPT
B-0
OFFICE
CHIEF
R B-04
CORRIDOR
BH004
ELECTRICAL
DISTRIBUTION
RM
B037B
TRANSFORMER
RM
B037A
1 FLOOR PLAN - GROUND FLOOR - AREA B
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-102-1.G
FLOOR PLAN - GROUND
FLOOR - AREA B
RAC
KEY PLAN
PA
D
B
A
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
ELECTRICAL
STERILE AND
NON-STERILE
STORAGE
A001A
STERILIZATION
WORK RM
A005C
GAS CYL
STORAGE
B005D
CLEAN
RECEIVING
B007
CORRIDOR
AH003
STORAGE
A008
RETAIL
STORE
A009
C O
R R
ID
O
R
AH
ASST
CHIEF
A012
CLERK
TYPIST
A011
CHIEF
A010
OFFICE
CANTEEN
A007
REFR
WALK IN
A006B
PREFAB
REFRIG
A006C
FOOD
STORAGE
A006A
STAIRWELL
PAS04
KITCHEN
A006
HAC
A006F
AU008 AU007 AU006
CORRIDOR
AH001
STAIR
AS002 STORAGE
A004
CAFETERIA
A004A
FOOD
SERVICING
A006D
SERVING
LINE
A005
SURGICAL
PACK
B045C
MAIN
KITCHEN
B036
EQUIP
STORAGE
AREA
B001
ELECTRIC
CLOSET
BU003
EMS
A001B
DUMB
ELEVATOR
OFFICE
A019
ELEVATOR
LOBBY
A001
OFFICE
ASST
CHIEF
A003
ELEV
AE004
ELEV
AE005
BREAK
RM
A021
ELEVATOR
LOBBY
A000
DISH
WASHING
A020
ELECTRIC
CLOSET
AU004
EMS
A023
CORRIDOR
AH004
DIETICIANS
OFFICE
A025
ASST
CHIEF
A027
DIETICIANS
OFFICE
A025A
SECY
A028
CORRID
AH00
CONFERENCE M
A029
CORRID
BH00
SUPV
OFFICE
B045
BREAK
RM
B045A
ELECTRICA
AU002CORRIDOR
AH004
AU001
ELECTRIC
CLOSET
AU005
EMS
A004B
STORAGE
A004A
VCS
OFFICE
A004A
CHIEF
VCS
OFFICE
A004E
LOCKERS
FEMALE
A002A
LOUNGE
A002
IT
CLOSET
A002C
ELEV
P3
ELEV
P2
ELEV
P1
TOILET &
SHOWERS
A002B
TELEPHONE
EQUIP RM
A022
TOILET
A024 EMS
A026
LOCKERS
A026B
OT
CLINIC
A044
1 FLOOR PLAN - GROUND FLOOR - AREA A
SCALE: 1/8" = 1'-0"
AS-200-1.G
AS-207-1.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
AS-103-1.G
FLOOR PLAN - GROUND
FLOOR - AREA A
RAC
KEY PLAN
PA
D
B
A
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
5/16/23
M
C O
R R
ID
O
R
BH
FEMALE
TOILET
B040
MENS
TOILET
B041
EMS
B036C
LINEN
B036D
EEN
AGE
6B
VIRONMENTAL
GMT SUPPLY
B045D
SURGICAL
PACK
B045C
NFERENCE M
A029
CORRIDOR
BH006
SUPV
OFFICE
B045
STORAGE
A033
PM&RS
CHIEF'S
OFFICE
A032A
SECY
OFFICE
A032B
RESIDENTS
OFFICE
A032C
HALL
A032
CONFERENCE
RM
A032D CHARTING
A032E
IT
B046
HAS
B044
TOILET
B044AEMS
B043
ELECTRIC
CLOSET
B043A
EMS
CHECK IN
B042B
EMS
OFFICE
B042A HAS
B044B
HAS
B044C
SVC RM
B039
SECY/
RECEPTIONIST
B-042
OFFICE ASST
CHIEF WORK
RM
B-042C
CORRIDOR
BH004
ELECTRICAL
DISTRIBUTION
RM
B037B
A/C
REFRIGERATION
EQUIP RM
B038
TRANSFORMER
RM
B037A
1 FLOOR PLAN - GROUND FLOOR - AREA B
SCALE: 1/8" = 1'-0"
ELECTRICAL
CORRIDOR
AH010
EMS
A023
DIETICIANS
OFFICE
A025
ASST
CHIEF
A027
NS SECY
A028
CORRIDOR
AH005
FERENCE M
A029
CORRIDOR
BH006
SUPV
OFFICE
B045
ELECTRICAL
AU003
ELECTRICAL
AU002CORRIDOR
AH004
AU001
TOILET
A024 EMS
A026
LOCKERS
A026B
OT
CLINIC
A044
A026A
TOILET &
SHOWERS
A046
TOILET
FEMALE
A045
C O
R R
ID
O
R
AH
CORRIDOR
AH007
OT
OFFICE
A043
OT
OFFICE
A043A
OFFICE
A070RECEIVING
A071
SVC MGR
A072
CORRIDOR
AH009
OFFICE
A069
DATA
CENTER
A073
PGM MGR
A068
SOFTWARE
APPL
SUPPORT
A067
APPLICATION
SUPPORT
A066
SYSTEMS
MGR
A065
NETWORKING
MGR
A064
PROG MGR
SYST &
NETWORKING
A063ADP
WORKSHOP
A062
STAIRWELL
AS004
TELECOMM
SVCS
A061
TELECOMM
SVCS
A060
SUPPORT
A059
APPLICATION
SUPPORT
A058
APPLICATION
SUPPORT
A057
ELECTRICAL
A056
CONFERENCE
RM
A055
C O
R R
ID
O
R
AH
PGMMING
& INFO
A054
PGMMING
& INFO
A053
PGM
SPECIALISTS
A052
OFFICE
A051
RECEPTION
AREA
A050
TRACTION
A039
PROVIDER
A038
EXAM
A040
EXAM
A041
CORRIDOR
A030A
EXAM/
EMG
A037
WAITING
AREA A042
STAIRWELL
AS001
WAITING
AREA
A036
PHYSICAL
THERAPY
WORK
ROOM
RECEPTION
A030
THERAPY
A034A
THERAPY
A034
PHYSICAL
THERAPY
A035
STORAGE
A033
CHIEF'S
OFFICE
A032A
OFFICE
A032B
HALL
A032
2 FLOOR PLAN - GROUND FLOOR - AREA A
SCALE: 1/8" = 1'-0"
AS-201-1.G
AS-202-1.G
AS-205-1A-G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
AS-104-1.G
FLOOR PLAN - GROUND
FLOOR - AREA B & A
RAC
KEY PLAN
PA
D
B
A
TRUE
NORTH
PLAN
NORTH
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
DN UP
DN
UROLOGY
D113
SURGERY
D140B
BREAK
ROOM
D140
STAFF
TOILET
D112
STAFF
TOILET
D111
PHYSICIAN
CONSULTANT
RM
D140A
STAIR
DS107
EC
DU141
TC
DU142
ELEVATOR
S6
ELEVATOR
S7
MECH
EM113
IT EQUIP
RM
D164
CORRIDOR
EH104
STAFF
RADIOLOGIST
E112
STAFF
RADIOLOGIST
E111
STAFF
RADIOLOGIST
E110
LIBRARY
E109
PROCESSING
E118
CORRIDOR
EH102
SECTION
OFFICE
E108
CHIEF OF
RADIOLOGY
E107
ADMIN
OFFICER
E104
FEMALE
TOILET
E106
RADIOLOGIST
E103MALE
TOILET
E105
CHIEF
TECHNOLOGIST
E102
C O
R R
ID
O
R
EH
3X-RAY
E119
MRI
READING
E130 RM
MRI
RECEPTION
E100
EXAM
D162
EXAM
CONS
D163
EXAM
CONS
D144
CORRIDOR
DH110
STORAGE
D143
CAST RM
D136
EXAM
D145OFFICE
D117
EXAM
D135
EXAM
D119
EXAM
D133
EXAM
D134
C O
R R
ID
O
R D
H
EXAM
D147
C O
R R
ID
O
R D
H
EXAM
D149
EXAM
D132
CLEAN
STOR
D139
PROCEDURE
RM
D115
SUPPLY RM
D137
EXAM
D110EMS
D108
BREAK RM
D107
TOILET
D102C
PATIENT
RM
D102D
SOILED
UTILITY
D109
CONS
D116
CLEAN
SUPPLY
D106
EXAM
D118
DIRTY
SUPPLY
D104
EXAM
D120 C
O R
R
ID
O R
D H
INFUSION / CHEMO
TREATMENT
CH100
EXAM
D103
TOILET
D124A
EXAM
D124
EXAM
D101
EXAM
D121
CORRIDOR
DH107
EXAM
D131
EXAM
D129
EXAM
D123
EXAM
D125
EXAM
D127
EXAM
D128
EXAM
D130
EXAM
D151
EXAM
D148
EXAM
D161
EMS
CLOSET
E114
MRI
E120
COMPUTER
RM
E117
HVAC
MECH/ELEC
EM115
CRYOGEN
STORAG
E116
SUPV
MRI
TECH
E122
TOILET
D165
CORRIDOR
DH112
STAFF
RADIOLOGIST
OFFICE
E124
MRI
READING
E123
PREPARATION
E121
TOILET
E127
STAFF
TOILET
E128A
DRESS
E126
DRESS
E125
STAFF RM
D168
CAST RM
D169
ULTRA
SOUND
D186
CAST RM
D158MED RECORD
D100
WORK RM
D126B
WAITING
CH105C
RECEPTION
D100A
PATIENT
RM
D102A
TOILET
D102B
MENS
CORRIDOR
CH105
RRIDOR
CH104 WAITING
CH104A
RESP
CARE
C114C
TOILET
C114A
BREAK
RM
C114B
PRE-OP
ASSESSMENT
D194
EC
D155
PUBLIC
TOILET
D156
C O
R R
ID
O
R D
PRE-OP
ASSESSMENT
D193
WORK RM
D191
SVC
OFFICE
D156A
SURG
CLINIC
CHECK IN
D157
EXAM
D154A OFFICE
D158
OFFICE
D160A
EXAM
D154
EXAM
D152
EXAM
D160
EXAM
D150
EXAM
D153
TOILET
D166
PROCEDURE
RM
D168A
ORTHO
STORAGE
D169a
PHYSICISTS
OFFICE &
LAB
E128
BREAK/
READING
CH114
DRESSING/
RESTROOM
D193
OFFICE
D185
VASCULAR
LAB
D192
EC
D183A
EXAM
D196
EXAM
D195
CORRIDOR
CH102
SPEC
COLLECT
C114 RAD
STORAGE
D183B
EMS
D189 VASCULAR
LAB
D181
CORRIDOR
CH118
CORRIDOR
CH102A
WAITING
D175
VASCULAR
LAB
D190
WAITING
CH105E
STORAGE
RM E129
OFFICE- CHIEF
VASCULAR LAB
TECH D171
STAIRWELL
DS108
COR
DH
CORRIDOR
DH116A
PATIENT
PREP
D172
LINEN
RM
D173
MECH.
SHAFT
B136
STOR
B1
CH
X- B1
EQUIPMENT
D137
CONTROL
RM
D180A
ANGIOGRAPHY
D180
CH
X- B
OFF
B1
TOILET
B134D
CONF
B
TOILET
E101
WAITING
C1-5D
WORK RM
D155
EXAM
D146
CONTROL
D188A
1 FLOOR PLAN - FIRST FLOOR - AREAS D & E
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-110-1A.1
FLOOR PLAN - FIRST FLOOR -
AREAS D & E
RAC
1A
KEY PLAN
C
E
B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
C110
TREATMENT
CH100
D124D101 D125 D127 D128
MED RECORD
D100
WORK RM
D126B
WAITING
CH105C
RECEPTION
D100A
PATIENT
RM
D102A
TOILET
D102B
MENS
TOILET
C109
WOMENS
TOILET
C110A
EMS
C106
EC
C107
TRAVEL
C108
FISCAL
C111
CORRIDOR
CH113
CORRIDOR
CH105
SURGERY
CLINIC
C112B
SURGERY
CLINIC
C112A
SURGERY
CLINIC
C112
E.R.
STAFF
C113B
HAS
C113A CANTEEN
DIRECTOR
OFFICE
C113
CORRIDOR
CH104 WAITING
CH104A
RESP
CARE
C114C
TOI
C114A
E D1
P T
S
CL
CH
D
EXAM
D154A OFFICE
D158
OFFICE
D160A
D153
LAB
D192
EC
D183A
TRIAGE 01
C121B
EV
ID
EN
C
E C
HEALTH
BENEFITS
CENTER
C104C
CUBICLE
C104V4
CUBICLE
C104V3
CUBICLE
C104V2
CUBICLE
C104V1
DECEDENT
AFFAIRS
C104U
OFFICE
C104T
SUPVY
MED
SUPPORT
ASST
C104S
C104V7 C104V6 C104V5 RECEPTION
C104A
PAT
TOILET
C104D
C104V18COPY
C104V19C104V20
PATIENT
SUPPORT
PGM
SPECIALIST
C104R
CHIEF
AMBULATORY
CARE AND
PROCESSING
C104Q
CHIEF
HEALTH
INFO MGMT
C104P
C104V11 C104V12 C104V13
C104V19 C104V17
C104V14
C104V18 C104V16 C104V15
CUBICLE
WORK RM
C104H
BREAK RM
C104G
STAFF
TOILET
C104E
PIV
C107
HOLDING
C105
POLICE
C104 POLICE
C102
ARMORY
C103
ELEVATOR
P5
ELEVATOR
P4
POLICE
C110
LOBBY
CH101
ELEVATOR
P6 IT
C121
EXAM
C132B
EXAM
C132C
PA
SS
AG
E
C H
0B
EXAM/
ISO
C130J
EXAM
C130K TLT
C131
TLT
C128
PASSAGE
CH121
TRIAGE 02
C121A PA
SS
AG
E C
H
1A
TLT
C121D
EKG/LAB
C121C
SUB-WAITING
CH121B
EXAM
D196
EXAM
D195
CORRIDOR
CH102
SPEC
COLLECT
C114
WAITING
CH120
EXIST
WELCOME
DESK
CH101C
VESTIBULE
C1-1AWHEEL CHAIR
STORAGE
101CONFERENCE
RM
C104I
UM/UR UM/
UR MGR
OFFICE
C104J
CHIEF
OFFICE
C104K
ASST CHIEF
HEALTH ADMIN
C104M
ADMIN
ASST
C104N
HEALTH ADMIN
CHIEF OFFICE
C104O
STAFF
WORK
C130
RESUSCITATION 1/
ISO
C130F
ENTRANCE
CH139
VESTIBULE
CH130AEMS
C138OFFICE 3
C140
ER
OFFICE
C141
STAFF
TLT
C142
ER
NURSE
MGR
C143
EMPLOYEE
TRAINING RM
C144
STAIRWELL
CS109
PASSAGE
CH140
CLEAN
UTIL
C137
IT
C136
EXAM/
ISO
C130H
EXAM/
ISO
C130I
PA
SS
AG
E
C H
2A
EXAM
C132D
TLT/SHWR
C134EC
CU100
SOILED
UTIL
C135
ELEVATOR
P7
STAFF /
WORK RM
C133
EXAM
C132A
PASSAGE
CH132
RESUSCITATION
2/
ISO
C130E
ST
O
R
AG
E C
9A
EXAM
C130D
IN-VITRO
COUNTING
HIGH/LOW
A-166
STORAGE
DECONTAM
C127EXAM
C130C
OFFICE
C130B
MENTAL
HEALTH RM
C130A
STAIR
CS104 PASSAGE
CH126
PHYS
WORK
C126C
ON
CALL
C126D
EXAM
C125G
CLEAN
UTILITY
CH125H
NOUR
PREP
C125J
MED
RM
C129
E
CYL
C125I
STAFF
WORK
C125
CART
STORAGE
C125K
SPECIMEN
C124
EMS
C123
PASSAGE
CH125
EXAM
C125F
PASSAGE
CH125B
SOILED
UTIL
C122
RAD
STORAGE
D183B
EMS
D189 VASCULAR
LAB
D181
CORRIDOR
CH102A
PASSAGE
CH125A
EXAM
C125A
EXAM
C125B
EXAM
C125C
EXAM
C125D
STORAGE
C125E
A-18
WAITING
D175
WAITING
CH105E
VAULT
A-180
T
WAITING
C1-5D
WORK RM
D155
TOILET
C126A
PHARMACY
STORAGE
A190A
1 FLOOR PLAN - FIRST FLOOR - AREA C
SCALE: 1/8" = 1'-0"
AS-210-1A.1
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-111-1A.1
FLOOR PLAN - FIRST FLOOR
- AREA C
RAC
1A
KEY PLAN
C
E
B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
S V
DN UP
RADIOLOGIST
E103
CHIEF
TECHNOLOGIST
E102
MRI
READING
E130 RM
PASSAGE
CH125
SCULAR
LAB
D181
CORRIDOR
CH118
OR
2A
AGE
25A
EXAM
C125A
EXAM
C125B
EXAM
C125C
EXAM
C125D
WAITING
D175
OFFICE- CHIEF
VASCULAR LAB
TECH D171
STAIRWELL
DS108
CORRIDOR
DH116
CORRIDOR
DH116A
T
LINEN
RM
D173
MECH.
SHAFT
B136
STORAGE
B135
CHEST
X-RAY
B134A
EQUIPMENT
D137
CONTROL
RM
D180A
IOGRAPHY
D180
CHEST
X-RAY
B134
OFFICE
B134B
TOILET
B134D
EL
EC
B1
C
RADIOGRAPHIC
AND
FLUOROSCOPIC
B139
C O
R R
ID
O
R
BH
CONFERENCE
B138
CORRIDOR
TOILET
E101
DRESSING
B139A
TOILET
B139B
BU106
ELEC
B140A
X-RAY
B137
TOILET
B137B
DRESSING
B137A
RADIOLOGY
WAITING
BH103
STORAGE
B147B
RADIO/
FLOUR
B140
CORRIDOR
BH104
VACANT
B141
CONTROL
RM B140A
RADIOLOGY
SVC SUPPLY
RM
B148
FILM
PROCESSING
AREA B147
OUTPATIENT
READING RM
B147A
INPATIENT
HOLDING
BAY 3
B146E
RADIOGRAPHIC
B143
RADIOGRAPHIC
AND
FLUOROSCOPIC
B142
CORRIDOR
BH105
CT SCAN 1
B152
CONTROL
RM
B152A
SCANNER
RM
B153
UPS
RM
DOSE
B122A
DOSE
B122B
HOT LAB
B122C
TOILET
B122D
HALL
WAY
B122A
CORRIDOR
BH108
CLINICAL
REVIEW
COS SVC
OFFICE
B129F
UTILIZATION
MGMT
B129E
CLINICAL
CHEMIST
B103
SUPV
LAB
B104
ELEC
INPATIENT
HOLDING
BAY 3
B146D
INPATIENT
HOLDING
BAY 3
B146C
INPATIENT
OBSEVATION
B146B
RECEPTION
B146B
RADIOLOGY
LOBBY
D175A
CORRIDOR
BH106
RADIOLOGY
STORAGE
B146F
X-RAY
DIAGNOSTIC
B144 RM
DRESSING
RM B146H
DRESSING
RM
B14JG
DRESSING
RM ALCOVE
B146G
D R
ES
SI
N G
R M
B1
A
FEMALE
TOILET
B127
MALE
TOILET
B126
M
EC
H B1
BIO
MED
ENGG
B125
CORRIDOR
BH107
STAIR
BS103
PATIENT
FLOW
COMMAND
CTR
B129C
PGM
MGR
B129D
CLINICAL
HOUSE
SUPV
B129C
LAB MGR/
CHIEF MED
TECH
B105
BLOOD
BANK MED
DIRECTOR
B106TRANSFER
OFFICE
B129B
BREAK
RM
B129A
OFFICE
B101K LINE
ITEM
MGR
OFFICE
B107
STORAGE
STORAGE
B101J
OFFICE
B101I
CORRIDOR
SUPV
B101D
EL
EC
BU
EL
EC
BU
WAITING
A-150
CORRIDOR
BH101
ILE
RM
151A
BONE
DENSITY
A-159
VACANT
B131
OFFICE
B132A
VIEWING
RM B132
LOUNGE
B133
KITCHEN
B133A
MECH
B133B
STAFF
TOILET
B133A
CORRIDOR
BH102
GE
B
A
PROVIDER
WORK RM
B101L
Restroom
B101EEMS
CLOSET
B104
ELECTRIC
CLOSET
BU101
Restroom B101F
STORAGE
B101C
BREAK
RM
B101G
STORAGE
B101H
SURGICAL
PATHOLOGY
B107A
BREAK
RM
B108CONFERENCE
RM
B101A
ST
O
R
AG
E B1
B
SOILED
A146
SUPPLY
A147
SVC ELEV
LOBBY
1B-1
CORRIDOR
AH101
PATHOLO
B10
CLINICAL
MICROBIOLOGIST
B121
CONF
CL
S B
CONTROL
D188A
1 FLOOR PLAN - FIRST FLOOR - AREA B
SCALE: 1/8" = 1'-0"
AS-212-1A.1
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-112-1.1
FLOOR PLAN - FIRST FLOOR -
AREA B
RAC
KEY PLAN
C
E
B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
A-184
V
A-153
A-185
A-150A
A-184C
AS107
A-152
ST
O
R
AG
E C
9A
EXAM
C130D
IN-VITRO
COUNTING
HIGH/LOW
A-166
STORAGE
DECONTAM
C127EXAM
C130C
OFFICE
C130B
MENTAL
HEALTH RM
C130A
STAIR
CS104 PASSAGE
CH126
PHYS
WORK
C126C
ON
CALL
C126D
EXAM
C125G
EXAM
C125F
PASSAGE
CH125B
EXAM
C125C
EXAM
C125D
STORAGE
C125E
A-184A A-184B
CORRIDOR
BH106
B14JG
DRESSING
RM ALCOVE
B146G
CORRID
SUPV
B101D
EL
EC
BU
EL
E
BU
WAITING
A-150
CORRIDOR
BH101
FILE
RM
A-151A
A-151
BONE
DENSITY
A-159
VACANT
B131
OFFICE
B132A
VIEWING
RM B132
LOUNGE
B133
KITCHEN
B133A
MECH
B133B
STAFF
TOILET
B133A
CORRIDOR
BH102
PHARMACY
WAITING
A-186
C O
R R
ID
O
R
AH
SUPPLY
A-160
BREAK
RM
A-156
READING
RM A-158
EXAM
A-157
MENS
RESTROOM
A-155
WOMENS
RESTROOM
A-154
STORAGE
A-152B
HOT
LAB
A-152A
HOT
LAB
A-152B
PROVIDER
WORK RM
B101L
Restroom
B101EEMS
CLOSET
B104
ELECTRIC
CLOSET
BU101
Restroom B101F
BREAK
RM
B108CONFERENCE
RM
B101A
ST
O
R
AG
E B1
B
SOILED
A146
SUPPLY
A147
STAIR
AS102
AS108 AS106
CORRIDOR
AH102
PHARMACY
OFFICE
A-189
OFFICE
NURSE
MGR
A177
PATIENT
ADVOCATE
A102
INPT
PHARMACY
A103
CORRIDOR
A-191
VAULT
A-180
CONFERENCE
RM
A174
TECHNICIAN
OFFICE
A-179
C O
R R
ID
O
R A-
PRE-PACK
A-177a
ANTEROOM
A-190
IV
STORAGE
A-190a
CORRIDOR
AH103
MGR
CMOP
A-178
ACOS
AMB
CARE
A-190C
SUPPORT
UNIT ADMIN
A-190b
ADMIN
ASSIST
A-188
INVESTIGATION
DRUGS SVC
PGME MGR
A164
MED MGMT
SPECIALIST
A-163FORMULARY
MGR
A-165
PHARMACY
OPERATION
MGR
A-166
CLINICAL
PHARMACIST
A-167
JANITOR
A-167A
CORRIDOR
A-162
WOMEN
A-176
MEN
A-175
ASSOCIATE
CHIEF OF
PHARMACY
OFFICE
A-171
CRITICAL
CARE
PHARMACY
SPECIALIST
OFFICE
A-170
PHARMACY
ADAPC
A-169
CHIEF
A-168
QU
M A
MED STAFF
CO-ORDR
A118
CHIEF OF
STAFF
A120
FEMALE
TOILET
A106
QUALITY
MGMT
A109
HEALTH
SYSTEM
SPECIALIST
A119
MALE
TOILET
A107
ST
O
R
AG
E A1
CORRIDOR
AH110
STAFF
TOILET
A105A
DAV
SVC
OFFICE
A105
VFW
SVC
A101
LOBBY
A100
IT
A104
OFFICE
A105B
CORRIDOR
AH101
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
ELEV
LOBBY
ELEVATOR
S4
ELEVATOR
S5
COPIER/
FAX RM
A145 ELEC
AU104
ELEC
AU-105
BMS
CLOSET
A178
STOCK
RM
A149EMS
A148
SVC ELEV
LOBBY
1B-1
CORRIDOR
AH101
TOILET
C126A
PHARMACY
STORAGE
A190A
BREAK
RM
A-173
RESIDENTS
A-172
ELEC
A0104
1 FLOOR PLAN - FIRST FLOOR - AREA A
SCALE: 1/8" = 1'-0"
AS-211-1.1
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
AS-113-1.1
FLOOR PLAN - FIRST FLOOR -
AREA A
RAC
KEY PLAN
C
E
B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
B TOILET
B122D
CLINICAL
CHEMIST
B103
SUPV
LAB
B104
LAB MGR/
CHIEF MED
TECH
B105
BLOOD
BANK MED
DIRECTOR
B106
LINE
ITEM
MGR
OFFICE
B107
SURGICAL
PATHOLOGY
B107A
BREAK
RM
B108
STOCK
SPECIMEN
STORAGE
A140
ASSOCIATE
DIRECTOR
FOR PATIENT
CARE SVC
A131
ADMIN
OFCR
A133A
ASSOCIATE
NURSE
EXECUTIVE
A132
TIMEKEEPER
A135CORRIDOR
AH106
DIRECTOR
SRL
A140A
REF
B109
HISTOLOGY
PROCESSING
B110
QUALITY
MGMT
A136
QUALITY
MGMT
OFFICE
A137
QUALITY
MGMT
A137A
PCR 2
A139B
PCR 1
A139A
SRL
OFFICE
A138
PCR 3
A139C
IFA
SCOPE
A139D
SRL
TESTING
B111
PATHOLOGY LAB
B102
ELEC
BU102
MICROBIOLOGY
LAB
B114
LAB
B114B
PROCESSING
B114A
SEROLOGY
LAB
A139
SUPV
SEROLOGY
LAB
B111A
STERILIZER
B113A
BCE
CO-ORDR
B112
LAB
INFO
MGR
B113B
GLASS
WASH
B113
CLINICAL
MICROBIOLOGIST
B121
CONFERENCE
CLASS &
STUDY
B-120
CORRIDOR
BH109
CHIEF
PATHOLOGIST
B119
CHIEF
PATHOLOGY
SVC
B118
PATHOLOGIST
B117
ANCILLARY
TESTING
COORD
B116
PATHOLOGY
B115
MEDIA
PREPARATION
B114D
PCR
RM
B114C
GEMBA
1 FLOOR PLAN - FIRST FLOOR - AREA B
SCALE: 1/8" = 1'-0"
B108
DIRECTOR
OFFICE A125
TOILET
A125A
ADMIN
ASST TO
DIRECTOR
A126
FACILITY
PLANNER
OFFICE
A115
ASSOCIATE
NURSE
EXECUTIVE
OFFICE
A127
C O
R R
ID
O
R
AH
8CHIEF OF
REVENUE &
RESOURCES
ANALYSIS
SECY
A114
QUALITY
PERFORMANCE
& PATIENT
SAFETY ADMIN
OFFICE
A113
QUALITY
MGMT
DIRECTOR
A128
PUBLIC
AFFAIRS
A129
ASSOCIATE
NURSE
EXECUTIVE
A130
RECEPTIONIST
A133
CORRIDOR
AH107
COPY
RM
A134FEMALE
TOILET
A141
MALE
TOILET
A142
ELEC
AU101
ELEC
AU102
ELEC
AU103
STAIR
AS101
SVC
A-112PGM
ANALYST
A111
CORRIDOR
AH105
QUALITY
MGMT
A110
MED STAFF
CO-ORDR
A118
EX ASST
COS
OFFICE
A117
CHIEF OF
STAFF
A120
SECY
OFFICE
A121
DEPUTY
CHIEF
A121A
BREAK
RM
A122
CORRIDOR
AH109
ASSOCIATE
DIRECTOR
A123
SEC
OFFICE
A124
CONFERENCE
RM A116
FEMALE
TOILET
A106
QUALITY
MGMT
A109
HEALTH
SYSTEM
SPECIALIST
A119
MALE
TOILET
A107
CORRIDOR
AH110
VFW
SVC
A101
ELEC
AU104
STOCK
RM
A149EMS
A148
SPECIMEN
TOILET
A140B
STORAGE
A140
ASSOCIATE
DIRECTOR
FOR PATIENT
CARE SVC
A131
ADMIN
OFCR
A133A
ASSOCIATE
NURSE
EXECUTIVE
A132
TIMEKEEPER
A135CORRIDOR
AH106
DIRECTOR
SRL
A140A
REF
B109
A136
GEMBA
A143
2 FLOOR PLAN - FIRST FLOOR - AREA A
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-114-1.1
FLOOR PLAN - FIRST FLOOR -
AREAS B & A
RAC
KEY PLAN
C
E
B
A
D
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
UP
UPDN
UP
UP
ROOF OF
GROUND FLOOR
BELOW
ROOF OF FIRST
FLOOR BELOW
ACOS
OFF
D208
LEARNING
OFFICER
OFFICE
D207
LEARNING
RESOURCE
CENTER
OFFICE
D203A
CLASSROOM
D206
COMPUTER
TRAINING
D205
STORAGE
D205A
CORRID
OR
C22
STORAGE
D201B
TRAINING
INSTRUCT.
LPIS
FACILITY
CO-ORD.
OFFICE
D204
LRC
OFFICE
D203
C O
R R
ID
O
R D
H
FEM
TOILET
D202
STAGE
AUDITORIUM
D201
PROJ
D201A
ST
O
R
AG
E
VE
ST
IB
U
LE
D
H
CONTROL
RM
C205
PREPARATION/
WORK AREA
C206
LIBRARY
C209
EC
CU208
CORRIDOR
CH206
STORAGE
C210
LIBRARY
RECEPTION
C211D
MENS
TOILET
D200
R
SIM CTR
TRAINING
RM
C203C
CLERICAL
REC
D209
WAITING
DH224A
CORRIDOR
DH224
AUDIOLOGY
CO-ORDR
D225
TOILET
D211
AUDIOLOGY
D210
STORAGE
D212
VOICE
LABORATORY
D213
CONTROL
D224A
SOUND
SUITE (VV)
D224
TRAINEES
D214
SP
PATH
D215
C O
R R
ID
O
R D
H
5 AUDIOLOGY
EXTERN
D216
C O
R R
ID
O
R D
H
CONTROL
D223A
SOUND
SUITE (VV)
D223
AUDIO
D217
TREATMENT
RM
D218
AUDIO
D219
AMPUTEE
PGM
OFFICE
D222
CORRIDOR
DH227
PM&R
CO-ORDR
D220
OFFICE
D221A
EXAM
D221
ROTARY
CHAIR
D221B C
O R
R
ID
O R
D H
STAFF
TOILET
D227 C
O R
R
ID
O R
D H
STAFF
TOILET
D226
EMS
D228 STAIRWELL
DS207
EC
DU229
EC
DU230
CORRIDOR
DH228
CORRIDOR
DH230
ELEVATOR
S6
ELEVATOR
S7
IT
D231
C O
R R
ID
O
R D
H
STAIRWELL
DS208
INDUSTRIAL
HYGIENIST
OFFICE
D235
SUPV
BIO MED
OFFICE
D234
SEC/WAIT
D230
REPAIR AND
DEVELOPMENT
D232
STORAGE
D232A
MECH
SHAFT
DU201
STORAGE
D232D
CORRIDOR
C234
OFFICE
RM
D238
WORK
RM
D237
MECH
SHAFT
DU202
CORRIDOR
DH233
ORAL
SURGY
C235
ORAL
SURGY
C238
RECOVERY
C239
LOCKER
RM
C241 TOILET
CORRIDOR
CH218
OPERATORY
C261
DENTAL
LAB
C260
PROSTHETICS
LAB
C259
SOLID
S
R
STORAGE
D236
1 FLOOR PLAN - SECOND FLOOR - AREA D
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-120-1A.2
FLOOR PLAN - SECOND
FLOOR - AREA D
RAC
1A
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
UP
DN
CARD CATALOGRE
FE
RE
NC
E
UP
STAGE
AUDITORIUM
D201
PROJ
D201A
ST
O
R
AG
E
VE
ST
IB
U
LE
D
H
CONTROL
RM
C205
PREPARATION/
WORK AREA
C206
LIBRARY
C209
EC
CU208
CORRIDOR
CH206
STORAGE
C210
LIBRARY
RECEPTION
C211D
MENS
TOILET
D200
TELEMEDICINE
DISTANCE
LEARNING A
C204
VISUAL
INFO
OFFICE
C207
ST
O
R
AG
E C
H
OFFICE
C211B
CONFERENCE
C211A
CORRIDOR
CH204
OFFICE
C288 EXAM
RM
C289
EXAM
RM
C290
EXAM
RM
C293
EXAM
RM
C294
TECH
WORK
AREA
C297
WOMENS
TOILET
C213
MENS
TOILET
C212
SCREENING
C271
SCREENING
C272
OPTICAL
SCREENING
C273
CORRIDOR
CH203
INFO
C201
LOBBY
CH201
VIST
COORD
C287
VISIT DOC
OFFICE
C286
EXAM
RM
C291
EXAM
RM
C292
EXAM
RM
C295
EXAM
RM
C296
RECEPTION
C270A
RECEPTION
WORKSPACE
C270B
C O
R R
ID
O
R
CLINIC
DIRECTOR
C274
VISUAL
FIELD
C276
SPECIAL
TESTING
C277
YAG
LASER
C280
ARGON
LASER
C281
SOILED
SPD
C285A
CLEAN
SPD
C285
CASE
MGR
C284
WORK AREA /
KITCHENETTE
C283
CLIN DIR
OFFICE
C282
PROCEDURE
RM
C279
PHOTO
RM
C278
OPTICAL
SHOP
C275
WAITING RM
C270
STAIRWELL
CS209
EC
CU200
ELEVATOR
(FUTURE)
CE208
ELEVATOR
P7
ELEVATOR
P6
OFFICE
CHIEF
C223D
WORK
AREA/STORAGE
C223E
C223FTOILET
C223C
IT
C-222
RECORDS
C225
SUPER
OFFICE
C226A
WAITING
EMS
C224
RECEPTION
C223
STAFF
DEVELOP.
SPECIALIST
OFFICE
C203E
STAFF DEV
SPECIALIST
OFFICE
C203A
PATIENT
SAFETY
FELLOWS
OFFICE
C203B
C O
R R
ID
O
R C
H
SIM CTR
TRAINING
RM
C203C
LIBRARY
C203
MULTI
PURPOSE
C203D
CLERICAL
REC
D209
WAITING
DH224A
CORRIDOR
DH224
AUDIOLOGY
CO-ORDR
D225
TOILET
D211
AUDIOLOGY
D210
CONTROL
D224A
SOUND
SUITE (VV)
D224
MECH
SHAFT
DU201
STORAGE
D232D
MECH
SHAFT
DU202
CORRIDOR
DH233
ORAL
SURGY
C235
ORAL
SURGY
C238
RECOVERY
C239
LOCKER
RM
C241 TOILET
CORRIDOR
CH218
OPERATORY
C261
DENTAL
LAB
C260
PROSTHETICS
LAB
C259
SOLID
C258
OPERATORY
C256
OPERATORY
C254
DENTISTS
OFFICE
C252
C O
R R
ID
O
R C
H
EC
C257
GENERAL
C255
GENERAL
C253SUPPLY
C248
GENERAL
C245
TREATMENT
OPERATORY
C243
C O
R R
ID
O
R C
H
OFFICE
C242
X-RAY
C244
X-RAY
C246
TOILET
C227
STOR
C228
CHIEF
OFFICE
C233
INSTRUMENT
STORAGE
C240
C O
R R
ID
O
R C
H
OFFICE
RM
C234
STORAGE
C236
STORAGE
C237
C O
R R
ID
O
R C
H
CONFERENCE
RM
C232
EMS
C231
CORRIDOR
CH214
DATA
ENTRY
C251
HYGIENE
OPERATOR
C250
HYGIENE
OPERATOR
C249
EXAM
OPERATOR
C247
WAITING
C229B
STOR
C229A
SECY/
CLERICAL
C229
OFFICE
C230
CORRIDOR
CH212
C O
R R
ID
O
R C
H
STAIRWELL
CS204
WAITING
C223A
STORAGE
C223B
1 FLOOR PLAN - SECOND FLOOR - AREA C
SCALE: 1/8" = 1'-0"
AS-220-1A.2
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-121-1A.2
FLOOR PLAN - SECOND
FLOOR - AREA C
RAC
1A
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
UPDN
S
S D
W
D
W
E
PROSTHETICS
LAB
C259
SOLID
C258
OPERATORY
C256
OPERATORY
C254
DENTISTS
OFFICE
C252
C O
R R
ID
O
R C
H
DATA
ENTRY
C251
E
OR
C O
R R
ID
O
R C
H
STAIRWELL
CS204
STORAGE
CH2-12A
CORRIDOR
BH212
MECH
RM
A273 SOCIAL
WORKER
B247
TOILET
B249
TOILET
B248
SEMI-PRIVATE
RM
TOILET
A256A
TOILET
SEMI-PRIVATE
RM
CONFERENCE
RM
STOR
A255
TOILET
A255A
ECHO
LAB
A249
D O
R 1A
STORAGE
A248B
EQUIP
STOR
A202 PHARMACY
A204
STAFF
TOILET
A206A
ELECTRIC
CLOSET
A205A
STAFF
LOCKER
A206
STOR
A203
ELECTRIC
CLOSET
BU201
CLINIC B
WAITING
B238
MECH
RM
B234
CORRIDOR
AH204
LAB GROUP
CLINIC RM
CORRIDOR
C212
ENTRY
B200
CLINIC A
WAITING
AREA
B201VENDING
RM
B250
CONSULT
B235
WARFARIN
CLINIC
B234
NURSE
MGR
OFFICE
B233
CORRIDOR
BH207
COPY
RM
B236
EXAM
B232
RECEPTION/
BUSINESS
B237
CHECK
OUT
B237A
EXAM
B231
CORRIDOR
BH206
WORK
RM
B239
RECEPTION/
BUSINESS
B202
CHECK
OUT
B202A
CORRIDOR
BH201
EXAM
B207
STOR
B203
EL
EC
BU
STAIRWELL
BS203
EXAM
B242
PATIENT
TOILET
B244A
PATIENT
TOILET
B243
EXAM
B229
EXAM
B230
SOILED
HOLDINGS
B245
PROCEDURE
B244 C
O R
R
ID
O R
BH
EXAM
B228
EXAM
B227
EXAM
B226
EXAM
B225
EXAM
B224
STAFF
CORRIDOR
BH203
C O
R R
ID
O
R C
2B
4PATIENT
TOILET
B206
STAFF
TOILET
B205HAC
B204
EXAM
B208
EXAM
B209
EXAM
B210
EXAM
B211
PATIENT
CARE
B217
PHYSICIAN
WORK RM
B218
PHYSICIAN
WORK RM
B219
NURSE
WORK
RM
B220
CORRIDOR
BH202EXAM
B212
EXAM
B213
EXAM
B214
EXAM
B215
EXAM
B216
SUPPLY
B221
TREATMENT
B222
EXAM
B223
WC
STORAGE
A211A
PATIENT
TOILET
A213
CLINIC
WAITI
A211
TORAGE
D236
CLEAN
UTILITY
A202
1 FLOOR PLAN - SECOND FLOOR - AREA B
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-122-1.2
FLOOR PLAN - SECOND
FLOOR - AREA B
RAC
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
S D
W
D
W
C O
R R
ID
O
R C
H
STAIRWELL
CS204
CORRIDOR
BH212
MECH
RM
A273 SOCIAL
WORKER
B247
TOILET
B249
TOILET
B248
SEMI-PRIVATE
RM
A257
TOILET
A256A
TOILET
A257A
SHOWER
A269
SEMI-PRIVATE
RM
A256
CONFERENCE
RM
A255
STOR
A255
VISITOR
WAITING
A254
TOILET
A255A
ECHO
LAB
A249
ECHO
LAB
A250
C O
R R
ID
O
R
AH
1A
STORAGE
A248B CONTROL
RM
A248A
PHONO
CARDIOLOGY
A248 EC
AU205
CORRIDOR
AH211
ELEC
AU206
ELEC
AU207
ELEC
AU208
CCU1
A258
CCU2
A259
CCU3
A260
C O
R R
ID
O
R
AH
NURSES
WORK
RM
A268
NURSE
STATION
A267
NOURISHMENT
CENTER
A267C
EMS
A270
STAIRWELL
AS202
BREAK
A267D
CLEAN
UTILITY
A267A
TOILET
A271B
HEART
STATION
SUPV
OFFICE
A272
NURSE
LOUNGE
A271
NURSE
COORD
OFC
A274
EMS
A252
TOILET
A251
C O
R R
ID
O
R
AH
STRESS
LAB
A266
IT
CLOSET
A265
CORRIDOR
AH209
CCU6
A264
CCU5
A263
CCU4
A262
CARDIAC
PROCEDURE
RM
A261
HEART
STATION
A245
HEART
STATION
WORK RM
A244 CONSULT
A241
JANITOR
A240
TOILET
A239
CLEAN
STOR
A238
PREPARATION/
HOLDING
A237
CORRIDOR
AH206
PACEMAKER
A247
CARDIO
CASE
MGR
OFFICE
A276A
C O
R R
ID
O
R
AH
CARDIO
OFFICE
A276
EKG
COMPUTER
A247A
CARDIOLOGY
PROVIDER
A246
EEO
ADMIN
OFFICE
A277
CORRIDOR
AH207
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
CATH
LAB
OFFICE
A242
EQUIP
RM
A235B
CATH
LAB 1
A235
CATH
STORAGE
A235A
STAFF
OFFICE
A231A
BREAK
RM
A231
CONTROL
A234
STAFF
CORRIDOR
A232
SOILED
LINEN
A229
CLEAN
HOLDING
A230
CATH
STORAGE
A233A
EQUIP
RM
A233B
LOBBY
AH200
ELEVATOR
S5
ELEVATOR
S4
SVC
LOBBY
A201
EQUIP
STOR
A202
WAITING
A205
PHARMACY
A204
STAFF
TOILET
A206A
ELECTRIC
CLOSET
A205A
STAFF
LOCKER
A206
STOR
A203
ELECTRIC
CLOSET
BU201
CLINIC B
WAITING
B238
MECH
RM
B234
CORRIDOR
AH204
LAB
A207
EC
AU204
TOILET
A207A
ROOM
A209
CORRIDOR
AH202
G
CLI
A
CORRIDOR
C212
CONSULT
B235
WARFARIN
CLINIC
B234
B233BH207
SOILED
UTILITY
A267B
LOCKER
A271A
CLEAN
UTILITY
A202
OIT
CLOSET
A243
1 FLOOR PLAN - SECOND FLOOR - AREA A
SCALE: 1/8" = 1'-0"
AS-221-1.2
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-123-1.2
FLOOR PLAN - SECOND
FLOOR - AREA A
RAC
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
PREPARATION/
HOLDING
A237
CORRIDOR
AH206
BREAK
RM
A231
CONTROL
A234
STAFF
CORRIDOR
A232
SOILED
LINEN
A229
CLEAN
HOLDING
A230
CATH
STORAGE
A233A
EQUIP
RM
A233B
CATH
LAB 2
A233
MECH
RM
B234
CORRIDOR
AH204
ET
A
ROOM
A209
CORRIDOR
AH202
ELEC
AU201
ELEC
AU202
ELEC
AU203
GROUP
CLINIC RM
A210
WC
STORAGE
A211A
PATIENT
TOILET
A213
EMS
A212
CLINIC C
WAITING
A211
EXAMINATION
A215
EXAMINATION
A216
EXAMINATION
A217
PHYSICIAN
WORK RM
A222
PATIENT CARE STAFF
WORKROOM
A227
C O
R R
ID
O
R
AH
STRETCHER
STORAGE
STAFF
TOILET
A228
FILE
A214A
RECEPTION/
BUSINESS
A214
STAIRWELL
AS201
CLEAN
UTILITY
A226
C O
R R
ID
O
R
AH
CONSULT
A225
CORRIDOR
AH206A
READING/
VIEWING
A236
BREAK
RM
A224
PROCEDURE
A223
PATIENT
TOILET
A223A
SOILED
HOLDING
A223B
EXAMINATION/
TREATMENT
A221
EXAMINATION
A220
EXAMINATION
A219
EXAMINATION
A218
1 FLOOR PLAN - SECOND FLOOR - AREA A
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-124-1.2
FLOOR PLAN - SECOND
FLOOR - AREA A
RAC
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
GENERAL
LAB
D311
STAIR
DS307 ELEVATOR
DE306
ELEVATOR
DE307
COMM
EQUIP RM
D314
EC
DU312
TC
DU313
CORRIDOR
DH314
CORRIDOR
DH315
GAS
STORAGE
D315
CHEMISTRY
LAB
D316
CHEMISTRY
LAB
D309
CORRIDOR
DH313
WASH AND
STERILIZ
D306
GENERAL
LAB
D310
INSTRUMENTS
D307
CHEMISTRY
LAB
D305
FREEZER
D308
INSTRUMENTS
D317
CHEMISTRY
LAB
D318CORRIDOR
DH311
FREEZER
D320
GENERAL
LAB
D319
C O
R R
ID
O
R D
H
0 CHEMICAL
STORAGE
D321 GENERAL
LAB
D322
CORRIDOR
CH312
CHEMISTRY
LAB
C318
GENERAL
LAB
D323A
GENERAL
LAB
D301B
GENERAL
LAB
D303
CHEMISTRY
LAB
D302
HAC
D304
CHEMISTRY
LAB
D300
ME
CHEMISTRY
LAB
C319
EC
CU320
GENERAL
LAB
C317
GENERAL
LAB
C315
EC
CU316
GENERAL
LAB
D301A
GENERAL
LAB
D323B
1 FLOOR PLAN - THIRD FLOOR - AREA D
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-130-1A.3
FLOOR PLAN - THIRD FLOOR
- AREA D
RAC
1A
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
ROOF OF SECOND FLOOR
ROOF OF SECOND FLOOR
ROOF OF SECOND FLOOR BELOW
CHEMISTRY
LAB
D316
CHEMISTRY
LAB
D318IDOR
FREEZER
D320
CHEMICAL
STORAGE
D321 GENERAL
LAB
D322
CORRIDOR
CH312
CHEMISTRY
LAB
C318
GENERAL
LAB
D323A
GENERAL
LAB
D301B
CHEMISTRY
LAB
D300
MECHANICAL
SHAFT
CU301
CHEMISTRY
LAB
C319
EC
CU320
GENERAL
LAB
C317
GENERAL
LAB
C315
EC
CU316
GENERAL
LAB
D301A
GENERAL
LAB
D323B
CHEMISTRY
LAB
C314
CHEMISTRY
LAB
C312
CHEMISTRY
LAB
C310
C O
R R
ID
O
R C
H
WOMENS
STAFF
TOILET
C313
GENERAL
LAB
C311B
GENERAL
LAB
C311A
RESERCH
C304
GENERAL
LAB
C323B
GENERAL
LAB
C323A
MENS
STAFF
TOILET
C321
CORRIDOR
CH308
CHEMISTRY
LAB
C322
DARK
RM
C324
WALK-IN
REFR
C325
CORRIDOR
CH305
INSTRUMENTS
C326
CHEMISTRY
LAB
C327
OFFICE
C309
OFFICE
C304B
OFFICE
C304C
ELEVATOR
P6
TR
C333
LAB
C332
ELEVATOR
P7
LOBBY
CH301
TOILET
C304DOFFICE
C304A
OFFICE
C308
LOBBY
CH303
CMPR
PROGMR
C307
OFC
INVESTGR
C306
OFC
INVESTGR
C305
OFC
INVESTGR
C303
OFC
INVESTGR
C302
OFC
INVESTGR
C301
EC
CU300
STAIR
CS309
CORRIDOR
CH306
STAFF
LOUNGE
C331
WASTE
STORAGE
C330A
EQUIP AND
GENERAL
STORAGE
C330A
BIO-MED
ENG
C330
MECH RM
CM328
MECHANICAL
SHAFT
CU302
STAIR
DS308
ELEVATOR
(FUTURE)
CE308
1 FLOOR PLAN - THIRD FLOOR - AREA C
SCALE: 1/8" = 1'-0"
AS-230-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
AS-131-1A.3
FLOOR PLAN - THIRD FLOOR
- AREA C
RAC
1A
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
SMOKE BARRIER
CHIEF
B312A
PROVIDER
OFFICE
B312B
PROVIDER
OFFICE
B312C
B312G B312E
CHIEF
RESP
THERAPY
B314A
R
ES
PI
R
AT
O
R Y
B3
SECY
RESP
THERAPY
B314
CARDIOLOGY
PROVIDER
OFFICE
B312HRESPIRATORY
B312F
PROVIDER
OFFICE
312D
CARDIOLOGY
OFFICE
B312
PULM
ADMIN
OFFICE
B311B
PULM
ADMIN
OFFICE
B311
CORRIDOR
BH302
NEGATIVE
PRESSURE
PENTAMIDINE
TREATMENT
B316
CODING
B317
CODING
B315
RESPIRATORY
B310
PULM ADMIN
OFFICE/
PROVIDER
OFFICE
B311A
WORK RM
B-309
EQUIP RM
B318
PULM
FUNCTION
CLERK
B-308B
PULM
FUNCTION
WAITING
B-308
EL
EC
BU
CLEANUP/
REPAIR
TESTING
B319A
CODING
B319
OFFICE
B319B
CORRIDOR
BH301
PULM
FUNCTION
LAB
B308A
TOILET
B307RESEARCH
B305 TOILET
B306
OFFICE
B322
CORRIDOR
BH303
EEG
TESTING
B320
CONTROL
B321A
EEG
TESTING
B321OFFICE
B304RESEARCH
B303
CHIEFS
OFFICE
A303A
CONFERENCE
ROOM
A302B
OFFICE
B301
OFFICE
B322A
EEG
TESTING
B324
CONTROL
B324A
UM
OFFICE
B325A
UM
OFFICE
B325
READING
RM
B323
EC
BU301
NUEROLOGY
ADMIN OFFICE
A303
R
ID
O R
H
1 MECH
SHAFT
CLEAN
A304
SLEEP
DISORDER
RECEPTION
A306
R
ID
O R
EL
EC
BU
2 STAIR
AS303
OFFICE
B322B
1 FLOOR PLAN - THIRD FLOOR - AREA B
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-132-1.3
FLOOR PLAN - THIRD FLOOR
- AREA B
RAC
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
LOCKER
A338A
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
L S
L S
LS
LS
L S
CONTROL
B321A
EEG
TESTING
B321OFFICE
B304RESEARCH
B303
CHIEFS
OFFICE
A303A
CONFERENCE
ROOM
A302B
OFFICE
B301
OFFICE
B322A
EEG
TESTING
B324
CONTROL
B324A
UM
OFFICE
B325A
UM
OFFICE
B325
READING
RM
B323
EC
BU301
NUEROLOGY
ADMIN OFFICE
A303
C O
R R
ID
O
R
AH
1 MECH
SHAFT
A304A
CLEAN
A304
SLEEP
DISORDER
RECEPTION
A306
C O
R R
ID
O
R
AH
HOSPICE CARE
OFFICE
A307
SOILED
A305
NEUROLOGY
ADMIN OFFICE
A302C
LOBBY
A301
HAS
A308
EC
AU304
EMS
A309
PATIENT RM
A364
PATIENT
TOILET
A364A
PATIENT
TOILET
A365A
PATIENT RM
A365
PATIENT RM
A367 WAITING RM
A369
MED R
VIEW RM
B302
ELEVATOR
S5
ELEVATOR
S4EC
AU305
EMS
A372
PATIENT
A369A
PATIENT
TOILET
A367ALINEN
SUPPLY
A366
CORRIDOR
AH309
AS302
AU308 AU307 AU306
CLEAN
SUPPLY
A368
BEREAVEMENT
ROOM
A371
PHYSICIANS
OFFICE
A373
NEUROLOGY
TEAM OFFICE
A350 C
O R
R
ID
O R
AH
7NURSE
STATION
A352
MED RM
A353
NURSE
MANAGER
A355
A355A
SOILED
UTILITY
A358
STAFF
WORK RM
A358A
C O
R R
ID
O
R
AH
PATIENT
TOILET
A-363A
PATIENT RM
A-363
PATIENT
TOILET
A-362A
PATIENT RM
A362
TOILET
A357
CORRIDOR
AH306
NOURISHMENT
A359
PATIENT RM
A361
PATIENT
TOILET
A361A
PATIENT
TOILET
A360A
NURSES
LOUNGE
A360
PATIENT RM
A356
PATIENT
TOILET
A356A
A354A
SOCIAL
WORK
A354 TOILET
A351A
STAFF
NURSING
A351
TOILET
A349A
CORRIDOR
AH306
OFFICE
APU
A348
OFFICE SOC.
WORK
A349
OFFICE
APU
A347
OFFICE
APU
A346
TOILET
A346A
1 BED
RM
A343
1 BED
RM
A342
1 BED
RM
A340
IT
A345
STORAGE
A344
DOCTOR
A341
DOCTOR
A310
ELEVATOR
AE301
ELEVATOR
AE302
ELEVATOR
AE303
LOBBY
A300
SECURITY
RM
A338 2 BED
RM
A337
CORRI
AH30
SECY
A339
PANTRY
A313
SURGY
TEAM RM
A311
C O
R R
ID
O
R
AH
4 NU
ST
A
TOILE
A315A
2 BED
RM
A315WAITING
AREA
A312
CORRIDOR
AH309
TOILET
A342A
1 FLOOR PLAN - THIRD FLOOR - AREA A
SCALE: 1/8" = 1'-0"
AS-231-1.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-133-1.3
FLOOR PLAN - THIRD FLOOR
- AREA A
RAC
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
A338A
ECEPTION
A306
SPICE CARE
OFFICE
A307
AS
C
EMS
A309
1 BED
RM
A340
R
TOR
SECURITY
RM
A338 2 BED
RM
A337
2 BED
RM
A336
4 BED
RM
A332
TOILET
A328A
1 BED
RM
A329
1 BED
RM
A328
4 BED
RM
A327
TOILET
A329A
STORAGE
A330TOILET
A332A
TOILET
A334
TOILET
A336A
TOILET
A327A
WORK RM
A326
4 BED
RM
A324
TOILET
A324A
TOILET
A326AC
O R
R
ID
O R
AH
SMALL
EQUIP RM
A325A
PATIENT
SHOWER
A325SPD
A331
EXAM
A333
DOCTOR
A335
CORRIDOR
AH306
SECY
A339
PANTRY
A313
SURGY
TEAM RM
A311
C O
R R
ID
O
R
AH
4 NURSES
STATION
A314
MED RM
A317 STAIR
AS301
ELEC
AU301
ELEC
AU302
ELEC
AU303
TOILET
A315A CORRIDOR
AH303
TOILET
A318A
EMS
A319
TOILET
A320
TOILET
A321A
TOILET
A323A
4 BED
RM
A323
1 BED
RM
A322
TOILET
A322A
1 BED
RM
A321
4 BED
RM
A318
2 BED
RM
A316
2 BED
RM
A315WAITING
AREA
A312
1 FLOOR PLAN - THIRD FLOOR - AREA A
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-134-1.3
FLOOR PLAN - THIRD FLOOR
- AREA A
RAC
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
ROOF OF SECOND FLOOR
STAIR
DS407 ELEVATOR
DE406
ELEVATOR
DE407
C O
M M
U N
IC
AT
IO
N
S
EQ
U
IP
R M
D
TC
DU425
EC
DU424
QUARANTINE
D422
RECEIVING
D421
CORRIDOR
DH417
CORRIDOR
DH418
WASTE
D439
NECROPSY
D426
ANIMAL
HOLDING
D420
IP LAB
D419B
ANIMAL
D418
HAC
D423
ANIMAL
D428
DIAG &
TRTMT
D427AIR
LOCK
D419
INFECTIOUS
WARD
D419A INST STOR
D429
PRO LAB
D431
ANIMAL
D430
ANIMAL
D416
ANIMAL
D417
ANIMAL
D415
C O
R R
ID
O
R D
H
SCRUB
D414
SURGICAL
WORKRM
D415A
KITCHEN
D432
FREEZE
D432A
STO &
FEED
D433OPERATING RM
D412A
ANIMAL
D413
CORRIDOR
DH414M
TOILET
D411
F
TOILET
D410
PRE-OP
D412
POST-OP
D434
CAGE WASH
D437
PRO LAB
D408
EC
D
U
LOUNGE
D407
STOR
A406
ANIMAL
D406
STOR
RM
D405
CORRIDOR
DH412
ANIMAL
D435 AIR
LOCK
CH410
CLEAN
STORAGE
D436
ANIMAL RM
D404
C O
R R
ID
O
R C
H
LAB
C409A
LAB
C409B
CORRIDOR
CH408
ANIMAL RM
D402
HAC
C407
STOR
D400
TOILET
C406
AIR
LOCK
CH405
ROOF
ACCESS
CORRIDOR
C4-6
BREAK
RM
D401
C O
R R
ID
O
R C
H
OFFICE
D403
ELEVATOR
CE406
MECH
C
ANIMAL
HOLDING RM
D438
TR
CU411
1 FLOOR PLAN - FOURTH FLOOR - AREA D
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-140-1A.4
FLOOR PLAN - FOURTH
FLOOR - AREA D
RAC
1A
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
ROOF OF SECOND FLOOR
ROOF OF SECOND FLOOR
ROOF OF SECOND FLOOR BELOW
CAGE WASH
D437
R
MAL
35 AIR
LOCK
CH410
CLEAN
STORAGE
D436
D404
C O
R R
ID
O
R C
H
LAB
C409A
LAB
C409B
CORRIDOR
CH408
ANIMAL RM
D402
HAC
C407
STOR
D400
TOILET
C406
AIR
LOCK
CH405
ROOF
ACCESS
CORRIDOR
C4-6
BREAK
RM
D401
C O C
OFFICE
D403
CLERKS
C405
WORK RM
C404
C O
R R
ID
O
R C
H
CORRIDOR
CH403
CONFERENCE
C402 LOBBY
CH401
ELEVATOR
CE406
ELEVATOR
CE407
LAB
C410
ASSOC
COS
C403A
SEC
C403
ASSIST
ASSOC
TO COS
C403B
REPRO/COPY
C401 CORRIDOR
CH402
EC
CU400
STAIRWELL
CS409
ELEVATOR
(FUTURE)
CE408
MECH SHAFT
CU401
CM408
STAIR
DS408
ANIMAL
HOLDING RM
D438
TR
CU411
1 FLOOR PLAN - FOURTH FLOOR - AREA C
SCALE: 1/8" = 1'-0"
AS-240-1A.4
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project Title
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
PhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANTRevisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700
5/16/23
100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
5/16/23 JY
AS-141-1A.4
FLOOR PLAN - FOURTH
FLOOR - AREA C
RAC
1A
KEY PLAN
C B
A
D
TRUE
NORTH
PLAN
NORTH
GENERAL NOTES - OVERALL PLAN
1. REFERENCE MEP AND TECHNOLOGY DRAWINGS
FOR ROOMS NOT IDENTIFIED HERE REQUIRING
WORK SCOPE OTHER THAN ARCHITECTURAL.
LEGEND
BUILDING SEPARATION
SMOKE RESISTIVE CORIDOR
WALL
AREA NOT IN SCOPE
ABATEMENT AREAS
HORIZONTAL EXIT
3-HOUR FIRE BARRIER
2-HOUR FIRE BARRIER
1-HOUR FIRE BARRIER
30 MINUTE FIRE BARRIER
OFFICE
SECTION
CHIEF
B414
PHYSICIAN
OFFICE
B415B
PHYSICIAN
OFFICE
B415C
PHYSICIAN
OFFICE
B418B
PGM
ASST
B418A
PHYSICIAN
OFFICE
B419
RENAL
SECTION
B418
PHYSICIAN
OFFICE
B418C
CONFERENCE
RM
B416
PHYSICIAN
OFFICE
B415D
SECY
B415
PHYSICIAN
OFFICE
B415A
PHYSICIAN
OFFICE
B413
PHYSICIAN
OFFICE
B412B
PHYSICIAN
OFFICE
B412A
SECTION
SECY
B412
ELEC
B414
CORRIDOR
BH402
STOR
B417A STOR
B417
HAC
B421 STORAGE
B422
NURSE
MGR
B420
ST…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .