596A4-22-700 Drawings 04 - Fire Protection.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77623B0069
About this file
This solicitation is for an infrastructure upgrades construction project at the Lexington-Cooper campus of the Department of Veterans Affairs in Lexington, Kentucky. The scope of work includes upgrades to the electrical, mechanical, and fire protection systems across multiple buildings. The solicitation number is 36C77623B0069 and responses are due by June 30, 2023. The period of performance is 720 calendar days. The place of performance is the Lexington-Cooper campus. The total estimated value is $69 million. The solicitation is unrestricted and available to small businesses.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMON PIPING SYMBOLS &
ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
DIRECTION OF FLOW
BRANCH CONNECTION, BOTTOM
BRANCH CONNECTION, TOP
ELBOW, TURNED DOWN
ELBOW TURNED UP
SHUTOFF VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
PRESSURE GAUGE
UNION
PIPING CAP
RISER DESIGNATION
ABOVE FINISH FLOOR
AUTHORITIES HAVING JURISDICTION
ACCESS PANEL
BOTTOM OF PIPE
DIAMETER
DOWN
EXISTING
FINISHED FLOOR ELEVATION
GALLONS PER HOUR
GALLONS PER MINUTE
HORSEPOWER
INVERT ELEVATION
NORMALLY CLOSED
NOT TO SCALE
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
ROUGH-IN
SHUTOFF VALVE
TOTAL DYNAMIC HEAD
VERIFY IN FIELD
POINT OF DISCONNECT
POINT OF CONNECTION
AFF
AHJ
AP
BOP
DIA
DN
EX OR EXIST
FFE
GPH
GPM
HP
IE OR INV. ELEV
NC
NTS
PSI
RPM
RI
SOV
TDH
VIF
X
PLAN MARK
EQUIPMENT NUMBER
SHEET NUMBER
LINE TYPE LEGEND
DRAWING REFERENCES
NEW WORK BY THIS CONTRACTOR
(DARK, SOLID LINE)
EXISTING TO REMAIN OR NEW WORK BY OTHERS
(LIGHT, SOLID LINE)
EXISTING TO BE REMOVED BY THIS CONTRACTOR
(DARK, DASHED LINE, DEMOLITION PLANS)
NORTH ARROW
PLAN DETAIL REFERENCE TITLE
KEYED NOTE DESIGNATION
PLAN MARK
EQUIPMENT NUMBER
EQUIPMENT DESIGNATION REFER TO MEP
SCHEDULE FOR CIRCUITING AND DEVICE
REQUIREMENTS AND FLOOR PLANS FOR
LOCATIONS
ENLARGED PLAN REFERENCE
PLAN MARK
SHEET NUMBER
A101
SIM
AHU
TITLE
SCALE
PLAN
NORTH
TRUE
NORTH
MATCHLINE
1 REVISION TAG
FIRE PROTECTION GENERAL NOTES
1. ALL WORK SHALL BE PERFORMED, INSTALLED, AND TESTED IN COMPLIANCE WITH THE CODES AND AMENDMENTS ADOPTED BY THE INSPECTION AUTHORITY. NOTHING IN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK
NOT CONFORMING TO THESE CODES OR OTHERS APPLICABLE TO THIS PROJECT:
A. VA FIRE PROTECTION DESIGN MANUAL VERSION 8
B. 2018 - INTERNATIONAL BUILDING CODE (IBC)
C. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
D. NATIONAL FIRE PROTECTION ASSOCIATION EDITIONS LISTED IN THE IBC OR MOST CURRENT EDITIONS OF
THE FOLLOWING
a. NFPA 13
b. NFPA 2001
c. NFPA 75
2. THE WORK CONSISTS OF FURNISHING ALL LABOR AND MATERIALS NECESSARY TO INSTALL, COMPLETE AND READY CONTINUOUS OPERATION, THE FIRE PROTECTION SYSTEMS, APPARATUS AND EQUIPMENT FOR THIS PROJECT, AS SHOWN REQUIRED BY THE CONTRACT DOCUMNETS, PLUS AS REQUIRED BY NFPA 13.
3. THE CONTRACTOR SHALL INCLUDE IN THEIR BID, A FULLY CODE COMPLIANT AND COORDINATED SPRINKLER SYSTEM. PROJECT SHALL BE DESIGNED, CONSTRUCTED, AND TESTED PER THE NFPA STANDARDS AND VA FIRE
PROTECTION DESIGN MANUAL VERSION 8 REQUIREMENTS.
4. ALL SYSTEMS, EQUIPMENT, AND MATERIALS ARE TO BE INSTALLED IN A NEAT WORKMAN LIKE MANNER, WORK NOT
DONE SO SHALL BE REMOVED AND REINSTALLED SATISFACTORILY.
5. THE FIRE PROTECTION BID IS A DESIGN/BUILD CONTRACT. BEFORE SUBMITTING THE BID, THE CONTRACTOR SHALL VISIT THE SITE AND BECOME THOROUGHLY FAMILIAR WITH ALL EXISTING CONDITIONS AND VERIFY LOCATIONS, ELEVATIONS, AND SIZES OF ALL UTILITIES AT SITE PRIOR TO PROCEEDING WITH WORK. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY ASSUMPTIONS, OMISSIONS, OR ERRORS MADE AS A RESULT OF THE FAILURE TO BECOME FULLY FAMILIAR WITH EXISTING CONDITIONS. EXISTING SYSTEMS AND STRUCTURE SHALL BE
INVESTIGATED FOR BEST POSSIBLE ROUTING OF FIRE PROTECTION PIPING.
6. WHEN PLACING NEW SPRINKLERS AND ROUTING NEW SPRINKLER PIPING, CONTRACTOR SHALL VERIFY LOCATIONS OF POTENTIAL OBSTRUCTIONS FROM MECHANICAL EQUIPMENT AND ARCHITECTURAL FEATURES PRIOR TO BID
AND PRICE ACCORDINGLY TO MAKE ALLOWANCES IN BID.
7. SUBMIT ACCURATE AS-BUILT DRAWINGS TO THE ENGINEER AND OWNER.
8. IF THIS CONTRACTOR DOES NOT CLEARLY UNDERSTAND THESE PLANS OR IS NOT COMPLETELY SURE OF THEIR MEANING, THIS CONTRACTOR SHOULD OBTAIN THE ENGINEER’S WRITTEN EXPLANATION AND/OR INTERPRETATION PRIOR TO SUBMITTING BIDS, SINCE THIS CONTRACTOR WILL BE HELD RIGIDLY TO THE INTERPRETATION OF THE
ENGINEER.
9. THESE PLANS ARE DIAGRAMMATIC IN NATURE SINCE THE ONLY AVAILABLE INFORMATION HAS BEEN OBTAINED FROM EXISTING PLANS, SPECIFICATIONS, AND FILED SURVEYS. THE EXACT LOCATION OF PIPING AND EQUIPMENT MAY DEVIATE FROM THE LOCATION INDICATED BY THESE DRAWINGS. EXTREME ACCURACY IS NOT GUARANTEED.
THIS CONTRACTOR SHALL BE PREPARED TO MAKE ALTERATIONS TO NEW AND/OR EXISTING SERVICES TO FIT JOB CONDITIONS. THIS CONTRACTOR SHALL REPORT, IN WRITING, ANY DISCREPANCIES WHICH PREVENT THE
INSTALLATION OF WORK AS SHOWN.
10. IT IS ASSUMED THAT AREAS OUTSIDE THE SCOPE OF WORK ARE TESTED, MAINTAINED, AND MEET THE CODE
REQUIREMENTS WHEN IT WAS INSTALLED.
11. THE SPRINKLER CONTRACTOR PRIOR TO TIME OF BID SHALL EVALUATE THE SITE AND VERIFY ALL SPRINKLER PIPING AND EQUIPMENT THAT IS EXISTING TO REMAIN WITHIN OR SERVING THE SCOPE OF WORK, IS IN GOOD
WORKING CONDITION.
12. FURNISH AND INSTALL TAMPER SWITCHES ON ALL INDICATING VALVES AND FLOW SWITCHES PER NFPA 13
REQUIREMENTS AND PER THE DESIGN DOCUMENTS BY THE CONTRACTOR.
13. THE CONTRACTOR SHALL FURNISH DRAIN VALVES AND INSPECTOR’S TEST CONNECTIONS AS REQUIRED BY NFPA
13 REQUIREMENTS.
14. ALL OPENINGS THROUGH FIRE RATED FLOORS, WALLS, OR PARTITIONS SHALL BE FIRE STOPPED WITH UL RATED ASSEMBLIES OF EQUAL OR GREATER FIRE RATING. REFER TO FIRE STOPPING NOTES FOR ADDITIONAL
INFORMATION.
15. COORDINATE WITH STRUCTURAL ENGINEER WHEN SAW-CUTTING THROUGH CONCRETE FLOOR OR WALL CONSTRUCTION. LEAVE SUFFICIENT REBAR EXPOSED TO TIE NEW REINFORCING REPLACEMENT CONCRETE
AND/OR OTHER STRUCTURAL ATTACHMENTS FOR NEW CONSTRUCTION.
16. VALVES, TAMPER SWITCHES, OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED ABOVE A HARD CEILING, UNLESS PROVIDED WITH EQUIVALENTLY RATED ACCESS AND SIGNAGE MEETING NFPA 13
REQUIREMENTS.
17. SPRINKLERS SHALL BE LOCATED IN THE CENTER OF CEILING TILES, COORDINATE FINAL LAYOUT WITH ARCHITECT, AND OTHER DISCIPLINES.
18. EXTENDED COVERAGE SPRINKLERS ARE NOT PERMITTED. CONTRACTOR SHALL VERIFY ADDITIONAL PRESSURE
REQUIREMENTS IF THIS TYPE IS SELECTED.
19. THE SPRINKLER CONTRACTOR SHALL OBTAIN AND UTILIZE THE ARCHITECTURAL REFLECTED CEILING PLAN FOR THE LOCATING OF SPRINKLER HEADS. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR CEILING DEVICE
LOCATIONS AND THE SPECIFICATIONS FOR COORDINATION DRAWING REQUIREMENTS.
20. PIPING SHALL BE INSTALLED ABOVE FINISHED CEILING ELEVATION TO ALLOW FOR SUITABLE ACCESS ABOVE
CEILING.
21. INSTALL NO PIPING IN A LOCATION OR MANNER WHICH WILL ALLOW FREEZING.
22. COORDINATE PIPE ROUTING NEAR ELECTRICAL EQUIPMENT PER NFPA 70. PIPING IS NOT TO BE ROUTED ABOVE ELECTRICAL PANELS, TRANSFORMERS, COMPUTER RACKS ETC. FIELD VERIFY AND COORDINATE WITH ELECTRICAL CONTRACTOR ALL EXISTING AND NEW ELECTRICAL LOCATIONS PRIOR TO DESIGN OF THE FIRE
PROTECTION PLANS.
23. ROUTING OF SPRINKLER MAINS, BRANCHLINES, AND HEADS SHALL BE THOROUGHLY COORDINATED WITH ALL OTHER DISCIPLINES AND BUILDING STRUCTURE PRIOR TO SUBMISSION OF COORDINATED SHOP DRAWINGS. THIS IS OF THE UTMOST IMPORTANCE ESPECIALLY WHERE SPACE IS LIMITED. FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR COORDINATING, PREPARING, AND SUBMITTING COORDINATION DRAWINGS FOR
APPROVAL/REVIEW.
24. ADVISE THE ENGINEERS OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST 10 DAYS PRIOR TO BID DATE, TO
ALLOW CLARIFICATION BY WRITTEN ADDENDUM.
25. IF SEISMIC BRACING IS REQUIRED, FIRE PROTECTION CONTRACTOR SHALL FURNISH AND INSTALL ALL END OF
BRANCH LINE RESTRAINTS PER NFPA 13 SECTION.
26. WHEN WORK REQUIRES TEMPORARY INTERRUPTIONS OF FIRE PROTECTION SERVICES OR UTILITIES THE
FOLLOWING ACTIONS WILL BE TAKEN:
A. COORDINATION WITH MAINTENANCE PERSONNEL TO SHUT OF SERVICES AT NEAREST MAIN.
B. PROVIDE TEMPORARY AND ACCESSIBLE ISOLATION VALVES CLOSE TO THE POINT OF WORK.
C. ENSURE BUILDING OPERATIONS CONTINUE WITH MINIMAL INTERRUPTIONS AND OPERATION OF EXISTING
SYSTEMS BE INTERFACED WITH AS LITTLE DISRUPTION AS POSSIBLE EXCEPT IN VACATED AREAS.
D. WORK INTERFERING WITH OPERATION OF DOWNTIME WILL BE SCHEDULED AFTER CONSULTATION WITH
AND PERMISSION GIVEN BY OWNER 10 DAYS PRIOR TO ANTICIPATED INTERRUPTION OF SYSTEMS.
E. SUCH WORK MAY BE REQUIRED TO BE PERFORMED OUTSIDE OF NORMAL WORKING HOURS.
F. REFER TO FIRE WATCH NOTES FOR DISRUPTION OF FIRE SPRINKLER SYSTEMS IN OCCUPIED BUILDINGS
WHEN DISRUPTION EXCEEDS 4 HOURS.
27. SPRINKLERS INSTALLED WITHIN TELECOM ROOMS AND DATA CENTER ARE TO BE STANDARD RESPONSE TYPE AND
PROVIDED WITH PROTECTIVE CAGES.
28. REMOVE ALL PORTIONS OF THE BUILDING (CEILING TILES, WALLS, SPRINKLER HEADS, SPRINKLER HEAD ESCUTCHEON, ECT.) AS REQUIRED TO COMPLETE THE SCOPE INDICATED IN THE CONSTRUCTION DOCUMENTS (SEE ARCHITECTURAL, TECHNOLOGY, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS). REPLACE, REINSTALL, OR COORDINATE REINSTALLATION WITH OTHER TRADES FOR ALL ITEMS REMOVED TO ACCOMMODATE THE INSTALLATION/ REMOVALS OF ANY SPRINKLER PIPE, SPRINKLER HEAD, PLUMBING PIPE, FIXTURE, EQUIPMENT, OR OTHER TRADES WORK, USING WORKERS QUALIFIED IN THE APPROPRIATE TRADE. REPLACE CEILING TILES
DAMAGED WITH THIS WORK TO MATCH, REPAIR WALLS BACK TO THE ORIGINAL FINISH.
29. FIRE PROTECTION CONTRACTOR SHALL PROVIDE ONE OF THE FOLLOWING AFTER HOURS OF NORMAL WORK TIME:
A. EXISTING SPRINKLERS WITHIN WORK AREAS.
B. TEMPORARY SPRINKLER PROTECTION THROUGHOUT THE WORK AREA.
C. COMBINATION OF EXISTING SPRINKLER AND TEMPORARY SPRINKLER PROTECTION THROUGHOUT WORK
AREA.
D. A FIRE WATCH.
30. ANY UNUSED SPRINKLER PIPING WITHIN NEW/ REMODELED TELECOM AND DATA ROOMS SHALL BE REMOVED TO A
POINT OUTSIDE OF ROOM AND CAPPED.
31. ARCHITECTURAL, TECHNOLOGY PLUMBING, MECHANICAL, AND ELECTRICAL DEMOLITION AND NEW WORK PLANS/
DRAWINGS SHALL BE READ IN CONJUNCTION WITH THESE DRAWINGS.
FIRE PROTECTION SYMBOLS & ABBREVIATIONS
NOT ALL SYMBOLS ARE USED FOR THIS PROJECT
AIR VENT (AUTOMATIC)
DOUBLE CHECK VALVE ASSEMBLY
DRY PIPE VALVE
ELECTRONIC SUPERVISED INDICATING VALVE
FIRE DEPARTMENT VALVE (FDV)
FLOW SWITCH
PREACTION VALVE
PRESSURE RELIEF VALVE
SOLENOID VALVE
DRAIN LINE
DRY PIPE
FIRE MAIN (BULK)
SPRINKLER MAIN/BRANCH PIPING
DRIP CONNECTION
FIRE DEPARTMENT CONNECTION-FREE STANDING
FIRE DEPARTMENT CONNECTION-WALL MOUNT
FLUSH TYPE FIRE DEPARTMENT INLET CONNECTION
FIRE PUMP TEST HEADER-WALL MOUNT
FIRE PUMP TEST HEADER-FREE STANDING
EXSTING SPRINKLER HEAD
EXISTING SPRINKLER HEAD TO BE REMOVED
SPRINKLER HEAD (SEE SCHEDULE FOR TYPE)
SIDEWALL SPRINKLER HEAD (SEE SCHEDULE FOR TYPE)
D
EX
EX
DRY
F
SPR
ACCESS PANEL
AIR COMPRESSOR
AUTOMATIC SPRINKLERS
BACKFLOW PREVENTER
BRANCH TO CONNECTION
CAST IRON
DOUBLE CHECK VALVE ASSEMBLY
DRY PIPE VALVE
DRY STANDPIPE PIPING
DRY STANDPIPE VALVE
FIRE DPARTMENT CONNECTION
FIRE DEPARTMENT VALVE
FIRE EXTINGUISHER CABINET
FIRE HOSE CABINET
FIRE PUMP
FIRE PUMP CONTROLLER
FIRE PUMP TEST HEADER
JOCKEY PUMP
JOCKEY PUMP CONTROLLER
NO AUTOMATIC SPRINKLERS
NOT IN CONTRACT
POST INDICATOR VALVE
SUMP PUMP
TAMPER SWITCH
AP
AC
AS
BFP
BTC
CI
DCVA
DPV
DSP
DSV
FDC
FDV
FEC
FHC
FP
FPC
FPTH
JP
JPC
NAS
NIC
PIV
SP
TS
FIRE STOPPING NOTES
1. MATERIALS: USE ONLY FIRE STOP PRODUCTS THAT HAVE BEEN UL 1479,
ASTM E-814, OR UL 2079 TESTED FOR SPECIFIC FIRE RATE CONSTRUCTION
CONDITIONS CONFORMING TO CONSTRUCTION ASSEMBLY TYPE,
PENETRATING ITEM TYPE, ANNULAR SPACE REQUIREMENTS, AND FIRE
RATING INVOLVED FOR EACH SEPARATE INSTANCE.
2. FOR SINGLE PENETRATIONS: A READY-TO-USE LATEX BASED INTUMESCENT
SEALANT IS REQUIRED TO MAINTAIN THE FIRE RATING OF THE ASSEMBLY
PENETRATED. THE SEALANT MUST HAVE UL LISTING FOR BOTH SLEEVED
AND NON-SLEEVED APPLICATIONS.
3. FOR LARGE OPENINGS: CONTAINING MULTIPLE PENETRATIONS (2 OR MORE),
A READY-TO-USE FOAM INTUMESCENT BLOCK MATERIAL MUST BE ABLE TO
BE REMOVED AND REINSTALLED WITHOUT COMPROMISING FIRE
PROTECTION INTEGRITY. COMPLY WITH MANUFACTURER'S RECOMMENDED
PROCEDURES AND PRECAUTIONS. DO NOT USE DAMAGED OR EXPIRED
MATERIALS.
4. MANUFACTURERS: JOHNS MANVILLE INTERNATIONAL, 3M BRAND, CSD
SEALING SYSTEMS, HILTI, CIBA-GEIGY, HEAVY-DUTY/NEALSON. REFER TO
DIVISION 7 FOR FURTHER REQUIREMENTS.
FIRE PROTECTION DEMOLITION NOTES
1. ALL PIPING HANGERS AND SUPPORTS SHALL BE REMOVED ALONG WITH THE
PIPING.
2. PROTECT PIPING WHICH IS NOT TO BE REMOVED FROM DAMAGE, DIRT AND
DEBRIS.
3. ALL FIRE EQUIPMENT AND MATERIALS NOT CLAIMED BY THE OWNER SHALL BE
REMOVED FROM THE PREMISES AND PROPERLY DISPOSED OF BY THE
DEMOLITION CONTRACTOR.
4. THE CONTRACTOR SHALL PLUG OR CAP ALL PIPING OUTLETS NOT INTENDED
FOR REUSE.
5. CEILING REMOVAL, STORAGE, AND REPLACEMENT WILL BE MADE BY THE
CONTRACTOR AND IT IS THE RESPONSIBILITY OF THIS CONTRACTOR TO
REPAIR THE EXISTING SURFACES TO REMAIN WHERE THEIR WORK HAS BEEN
COMPLETED. REPAIR INCLUDES BUT SHALL NOT BE LIMITED TO, ANY EXISTING
WALL, CEILING, OR FLOOR THAT IS SCHEDULED TO REMAIN. REPAIR,
PAINTING, AND PATCHING SHALL BE COMPLETED BY AN APPROPRIATE
CONTRACTOR QUALIFIED FOR THIS TYPE OF WORK.
6. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION
OPERATIONS, THE CONTRACTOR WILL NOTIFY BUILDING OWNER OF THE
HAZARDOUS MATERIAL.
7. ARCHITECTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS SHALL BE
READ IN CONJUNCTION WITH THESE DRAWINGS.
8. THE CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH PROJECT’S
PHASING SCHEDULE PRIOR TO ANY WORK
SEQUENCE OF OPERATIONS
THE CLEAN AGENT EXTINGUISHING FIRE EXTINGUISHING SYSTEM SHALL OPERATE
AS FOLLOWS:
1. ACTIVATION OF ANY SINGLE SMOKE DETECTOR SHALL:
A. ENERGIZE AN ALARM LED LAMP ON THE ACTIVATED DETECTOR AND
CLEAN AGENT CONTROL PANEL.
B. TRANSMIT AN ALARM SIGNAL TO THE BUILDING’S FIRE ALARM
SYSTEM.
2. ACTIVATION OF A SECOND SMOKE DETECTOR SHALL:
A. ENERGIZE AN ALARM LED LAMP ON THE ACTIVATOR DETECTOR.
B. ACTIVATE PRE-DISCHARGE BELL NOTIFICATION APPLIANCE AND
PREDISCHARGE STROBE NOTIFICATION APPLIANCE.
C. SHUT DOWN POWER TO ELECTRONIC EQUIPMENT WITHIN THE
PROTECTED SPACE, CLOSE DAMPERS, RELEASE DOOR HOLD OPEN
DEVICES, AND SHUT DOWN AIR HANDLING UNITS SERVING THE
PROTECTED SPACE.
D. INITIATE A PROGRAMMABLE 30-SECOND TIME DELAY (AGENT
RELEASE) SEQUENCE.
3. ACTIVATION OF A MANUAL ACTIVATION STATION SHALL:
A. ENERGIZE AN ALARM LED LAMP ON THE CLEAN AGENT CONTROL
PANEL.
B. ACTIVATE PRE-DISCHARGE BELL NOTIFICATION APPLIANCE AND PRE-
DISCHARGE STROBE NOTIFICATION APPLIANCE.
C. SHUT DOWN POWER TO ELECTRONIC EQUIPMENT WITHIN THE
PROTECTED SPACE, CLOSE DAMPERS, RELEASE DOOR HOLD OPEN
DEVICES, AND SHUT DOWN AIR HANDLING UNITS SERVING THE
PROTECTED SPACE.
D. TRANSMIT AN ALARM SIGNAL TO THE BUILDING’S FIRE ALARM
SYSTEM.
E. INITIATE A PROGRAMMABLE 20-SECOND TIME DELAY (AGENT
RELEASE) SEQUENCE.
4. ACTIVATION OF THE ABORT SWITCH SHALL:
A. CEASE THE TIME DELAY. ONCE THE ABORT SWITCH IS RELEASED,
THE TIME DELAY COUNTDOWN SHALL RESUME FROM WHERE IT
CEASED. THE TIME DELAY SHALL NOT RESET.
B. TRANSMIT A TROUBLE SIGNAL TO THE BUILDING’S FIRE ALARM
SYSTEM.
5. UPON COMPLETION OF THE TIME DELAY, THE SYSTEM SHALL:
A. DE-ENERGIZE THE PRE-DISCHARGE BELL AND PRE-DISCHARGE
STROBE NOTIFICATION APPLIANCE.
B. ACTIVATE A DISCHARGE STROBE NOTIFICATION APPLIANCE INSIDE
AND OUTSIDE OF THE PROTECTED AREA.
C. ENERGIZE VALVE ACTUATOR FOR AGENT CYLINDERS RELEASING
GASEOUS AGENT INTO THE PROTECTED AREA.
6. ACTIVATION OF THE LOW AGENT TANK PRESSURE SWITCH AND
MAINTENANCE LOCK-OUT SWITCH SHALL:
A. ENERGIZE A SUPERVISORY LED LAMP ON THE CLEAN AGENT
CONTROL PANEL.
B. TRANSMIT A SUPERVISORY ALARM SIGNAL TO THE BUILDING’S FIRE
ALARM SYSTEM.
7. PRESENCE OF ANY FAULT, BYPASS FUNCTION, OR REMOVAL OF THE
ELECTRIC VALVE ACTUATOR SHALL:
A. ENERGIZE A TROUBLE LED LAMP ON THE CLEAN AGENT CONTROL
PANEL.
B. TRANSMIT A TROUBLE SIGNAL TO THE BUILDING’S FIRE ALARM
SYSTEM.
8. ACTIVATION OF DUCT DETECTOR WITHIN A COMPUTER ROOM AIR
CONDITION UNIT SHALL ENERGIZE A SUPERVISORY SIGNAL LED LAMP ON
THE CLEAN AGENT CONTROL PANEL.
CLEAN AGENT INSTALLATION NOTES
1. NOVEC 1230 SYSTEMS SHALL BE INSTALLED AND TESTED IN ACCORDANCE
WITH NFPA 2001, CLEAN AGENT FIRE EXTINGUISHING SYSTEMS,
MANUFACTURER'S CURRENT PRINTED RECOMMENDATIONS, CODES, AND
STANDARDS ADOPTED BY THE LOCAL AUTHORITY HAVING JURISDICTION.
2. NOVEC 1230 SYSTEM INSTALLATION SHALL BE PERFORMED OR SUPERVISED
BY THOSE SKILLED IN CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
TECHNOLOGY.
3. ALL DEVICES, APPLIANCES, AND EQUIPMENT USED IN THE NOVEC 1230
EXTINGUISHING SYSTEM SHALL BE LISTED AND APPROVED BY UL AND FM
GLOBAL.
4. PIPING:
A. PIPING SHALL CONFORM WITH THE REQUIREMENTS SET FORTH IN
NFPA 2001, CLEAN AGENT FIRE EXTINGUISHING SYSTEMS.
B. PIPING SHALL BE BLACK STEEL PIPE CONFORMING TO ASTM-A-53 OR
A-106, SCHEDULE 40 OR 80, WITH AN INTERNAL WORKING PRESSURE
OF 620 PSIG.
C. ORDINARY CAST-IRON PIPE, STEEL PIPE CONFORMING TO ASTM
A-120 , OR NONMETALLIC PIPE SHALL NOT BE USED.
D. EACH PIPE SECTION SHALL BE REAMED, BLOWN CLEAR, AND
CLEANED INTERNALLY AFTER PREPARATION AND BEFORE
ASSEMBLY BY MEANS OF SWABBING UTILIZING A SUITABLE,
NONFLAMMABLE CLEANER SUCH AS TRICHLORETHANE, ETC.
E. THE PIPING NETWORK SHALL BE FREE OF PARTICULATE MATTER
AND OIL RESIDUE BEFORE INSTALLATION OF DISCHARGE NOZZLES.
F. STENCILED PIPE IDENTIFICATION SHALL NOT BE PAINTED OVER,
CONCEALED, OR REMOVED PRIOR TO APPROVAL OF THE LOCAL
AUTHORITY HAVING JURISDICTION.
G. PIPING NETWORK SHALL BE INSTALLED IN STRICT ACCORDANCE TO
SYSTEM PLANS AND PIPING ISOMETRICS PREPARED BY
CONTRACTOR. ANY PIPING CHANGES SHALL BE APPROVED BY ROSS
& BARUZZINI PRIOR TO FABRICATION OR INSTALLATION OF
MATERIALS.
5. FITTINGS
A. FITTINGS SHALL CONFORM WITH THE REQUIREMENTS SET FORTH IN
NFPA 2001, CLEAN AGENT FIRE EXTINGUISHING SYSTEMS.
B. MALLEABLE IRON FITTINGS SHALL BE 300 LB. CLASS CONFORMING
TO ASTM A-197.
C. 150 LB. CLASS, ORDINARY CAST IRON FITTINGS, AND HOLE-CUT
FITTINGS OR SIMILAR SHALL NOT BE USED. VICTAULIC TYPE FITTINGS
SHALL BE STYLE 75 OR 77.
D. UL LISTED VICTAULIC OR OTHER LISTED GROOVED PIPE FITTINGS
CAN BE USED.
E. PIPE JOINTS OTHER THAN THREADED, WELDED, BRAZED, FLARED,
COMPRESSION, OR FLANGED TYPE SHALL BE LISTED OR APPROVED.
ALL THREADS USED IN JOINTS AND FITTINGS SHALL CONFORM TO
ANSI B1.20.1
F. JOINT COMPOUND, PIPE TAPE, OR THREAD LUBRICANT SHALL BE
APPLIED ONLY TO THE MALE THREADS OF THE JOINT.
6. PIPING SUPPORT
A. PIPING SHALL BE SUPPORTED BY A COMBINATION NETWORK
COMPRISED OF PIPE HANGERS AND RIGID PIPE SUPPORT RACKETS.
B. PIPE HANGERS SHALL BE USED TO SUPPORT THE "DEAD LOAD" OF
THE PIPING SYSTEM AND SHALL BE SPACED AT INTERVALS NOT
EXCEEDING 15 FEET.
C. RIGID PIPE SUPPORTS SHALL BE USED TO SUPPORT THE "LIVE LOAD”
OF THE PIPING SYSTEM DURING DISCHARGE. RIGID BRACING IS
REQUIRED AT EACH DIRECTIONAL CHANGE FITTING, TEE, AND
NOZZLE.
D. ALL DROPS TO 180 DEGREE NOZZLES REQUIRE BACK BRACING IN
THE OPPOSITE DIRECTION OF THE DISCHARGE.
E. EARTHQUAKE BRACING SHALL BE USED WHEN REQUIRED BY LOCAL
CODES. REFER TO ANSI B31.1, POWER PIPING CODE, FOR FURTHER
GUIDANCE ON SUPPORTING PIPING.
7. TESTING
A. THE COMPLETED SYSTEM SHALL BE REVIEWED AND TESTED BY
QUALIFIED FIELD ENGINEERING TECHNICIAN IN ACCORDANCE WITH
NFPA 2001 AND AS REQUIRED TO MEET THE APPROVAL OF THE
LOCAL AUTHORITY HAVING JURISDICTION.
B. PIPING NETWORK SHALL BE INSPECTED TO DETERMINE THAT IT IS IN
COMPLIANCE WITH THE DESIGN AND INSTALLATION DOCUMENTS.
C. MEANS OF PIPE REDUCTION AND ATTITUDES OF TEES SHALL BE
CHECKED FOR CONFORMANCE TO THE DESIGN.
D. PIPING JOINTS, DISCHARGE NOZZLES, AND PIPING SUPPORTS SHALL
BE SECURELY FASTENED TO PREVENT UNACCEPTABLE VERTICAL
OR LATERAL MOVEMENT DURING DISCHARGE.
E. DISCHARGE NOZZLES SHALL BE INSTALLED IN SUCH A MANNER THAT
PIPING CANNOT BECOME DETACHED DURING DISCHARGE.
F. ALL AGENT STORAGE CONTAINERS SHALL BE PROPERLY LOCATED
IN ACCORDANCE WITH AN APPROVED SET OF SYSTEM DRAWINGS.
G. ALL CONTAINERS AND MOUNTING BRACKETS SHALL BE FASTENED
SECURELY IN ACCORDANCE WITH THE MANUFACTURER'S
REQUIREMENTS.
H. THE PIPING NETWORK SHALL BE PNEUMATICALLY TESTED IN A
CLOSED CIRCUIT FOR A PERIOD OF 10 MINUTES AT 40 PSIG. AT THE
END OF 10 MINUTES, THE PRESSURE DROP SHALL NOT EXCEED 20
PERCENT OF THE TEST PRESSURE.
I. A FLOW TEST USING COMPRESSED AIR SHALL BE PERFORMED ON
THE PIPING NETWORK TO VERIFY THAT FLOW IS CONTINUOUS, AND
THAT THE PIPING AND NOZZLES ARE UNOBSTRUCTED.
J. PROTECTED ENCLOSURE SHALL BE EXAMINED AND DOOR FAN
TESTED TO LOCATE AND THEN EFFECTIVELY SEAL ANY SIGNIFICANT
AIR LEAKS THAT COULD RESULT IN A FAILURE OF THE ENCLOSURE
TO HOLD THE SPECIFIED AGENT CONCENTRATION LEVEL FOR THE
HOLDING PERIOD. SEALING OF THE ROOM SHALL BE BY OTHERS.
8. ALL PERSONNEL WHO WILL BE WORKING IN THE NOVEC 1230 PROTECTED
ENCLOSURE SHALL RECEIVE TRAINING REGARDING EXTINGUISHING SYSTEM
OPERATION AND AGENT SAFETY.
HAZARD GROUP AND DENSITY REQUIREMENTS
A. TELECOM ROOMS AND DATA ROOMS TO BE PROVIDED WITH A DENSITY OF 0.1
GPM/SQ.FT. OVER THE HYDRAULIC REMOTE 1500 SQ.FT. (LIGHT HAZARD) WITH A
HOSE STREAM ALLOWANCE OF 100 GPM.
B. STORAGE ROOMS TO BE PROVIDED WITH A DENSITY OF 0.20 GPM/SQ.FT. OVER
THE HYDRAULIC REMOTE 1,500 SQ. FT. (ORDINARY HAZARD GROUP 2) WITH A
HOSE STREAM ALLOWANCE OF 250 GPM.
C. CORRIDORS/ BREAKROOMS/ OFFICES/ AND OTHER ROOMS ALIKE SHALL BE
PROVIDED WITH A DENSITY OF 0.10 GPM/ SQ.FT. (LIGHT HAZARD) OVER THE
HYDRAULIC REMOTE 1500 SQ.FT. WITH A HOSE STREAM ALLOWANCE OF 100 GPM
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1 & 1A
FP-000
JDB
FIRE PROTECTION SYMBOLS AND
ABBREVIATIONS
AJH5/16/23
COMM
EQUIP RM
D007D
EMERGENCY
POWER
PA06B
NORMAL
POWER
PA06A
TR
D007D
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:WOOD
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCT
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT FF:CONCRETE
FF:CERAMIC TILE FF:VCT
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCT
FF:CONCRETE
FF:VCT
MECH RM
D-B038
EMERGENCY
GENERATOR
D003
TRANSFORMERS &
SWITCHGEAR
D003A
CORRIDOR
DH001
STAIR
PAS06
STAIR
PAS07
ELECTRICAL
D001
TD
D002
CORRIDOR
DH002
MECH RM
D004
EMS
D005
STOR
D005A
STORAGE
D006
ELEVATOR
S6
ELEVATOR
S7
C O
R R
ID
O
R D
H
PAINT
SHOP
D007C
CORRIDOR
DH003
SIGNAL
CLOSET
D008
STORAGE
PA08
PARKING
LEVEL A
PA01
CORRIDOR
DH004
CARPENTER
SHOP
D007
STORAGE
AREA
PA06
CHIEF
D007A
LOCKSMITH
D007B
CORRIDOR
DH005
CHIEF
ELECTRICIAN
B014B
M&O
FORMAN
B013
CORRIDOR
BH002
STAIR
PAS08
M E
C H
A N
IC
A
L B
F
UP
UP DN
UP
# SF
# SF
# SF
FP-400-1-1A.G
FP-400-1-1A.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
FP-100-1A.G
JDB
OVERALL GROUND FLOOR PLAN - AREA D & PA -
FIRE PROTECTION
AJH5/16/23
1/8" = 1'-0"
OVERALL GROUND FLOOR PLAN - AREA D & PA - FIRE PROTECTION
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
04 8 16268
SCALE: 1/8"=1'-0"
IT
CLOSET
A002C
SVC MGR
A072
DATA
CENTER
A073
ELECTRICAL
CORRIDOR
AH010
STERILE AND
NON-STERILE
STORAGE
A001A
CORRIDOR
AH001
DUMB
ELEVATOR
OFFICE
A019
ELEVATOR
LOBBY
A001
OFFICE ASST
CHIEF
A003 ELEV
AE004
ELEV
AE005
BREAK
RM
A021
ELEVATOR
LOBBY
A000
DISH
WASHING
A020
ELECTRIC
CLOSET
AU004
EMS
A023
CORRIDOR
AH004
DIETICIANS
OFFICE
A025
ASST
CHIEF
A027
DIETICIANS
OFFICE
A025A
SECY
A028
CORRIDOR
AH005
CONFERENCE M
A029
CORRIDOR
BH006
ELECTRICAL
AU003
ELECTRICAL
AU002
CORRIDOR
AH004
AU001
ELECTRIC
CLOSET
AU005
EMS
A004B
STORAGE
A004A
VCS
OFFICE
A004A
CHIEF
VCS
OFFICE
A004E
LOCKERS
FEMALE
A002A
LOUNGE
A002
ELEV
P3
ELEV
P2
ELEV
P1
TOILET &
SHOWERS
A002B
TELEPHONE
EQUIP RM
A022
TOILET
A024
EMS
A026
LOCKERS
A026B
OT
CLINIC
A044
A026A
TOILET &
SHOWERS
A046
TOILET
FEMALE
A045
C O
R R
ID
O
R A
H
CORRIDOR
AH007
OT
OFFICE
A043
OT
OFFICE
A043A
OFFICE
A070RECEIVING
A071
CORRIDOR
AH009
OFFICE
A069
PGM MGR
A068
SOFTWARE
APPL
SUPPORT
A067
APPLICATION
SUPPORT
A066
SYSTEMS
MGR
A065
NETWORKING
MGR
A064
PROG MGR
SYST &
NETWORKING
A063
ADP
WORKSHOP
A062
STAIRWELL
AS004
TELECOMM
SVCS
A061
TELECOMM
SVCS
A060
SUPPORT
A059
APPLICATION
SUPPORT
A058
APPLICATION
SUPPORT
A057
ELECTRICAL
A056
CONFERENCE
RM
A055
C O
R R
ID
O
R A
H
PGMMING
& INFO
A054
PGMMING
& INFO
A053
PGM
SPECIALISTS
A052
OFFICE
A051
RECEPTION
AREA
A050
TRACTION
A039
PROVIDER
A038
EXAM
A040
EXAM
A041
CORRIDOR
A030A
EXAM/
EMG
A037
WAITING
AREA A042
STAIRWELL
AS001
WAITING
AREA
A036
PHYSICAL
THERAPY
WORK
ROOM
RECEPTION
A030
THERAPY
A034A
THERAPY
A034
PHYSICAL
THERAPY
A035
STORAGE
A033
FP-401-1.G
FP-401-1.G
FP-400-1-1A.G
FP-400-1-1A.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
FP-101-1.G
JDB
OVERALL GROUND FLOOR PLAN - AREA A - FIRE
PROTECTION
AJH5/16/23
1/8" = 1'-0"
OVERALL GROUND FLOOR PLAN - AREA A - FIRE PROTECTION
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
0"
TR
B046A
FF:CONCRETE,VCT
FF:CERAMIC TILE
FF:CERAMIC TILE
FF:CONCRETE
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCTFF:VCT
FF:CARPET FF:CARPET
FF:CARPET
FF:CARPET
FF:VCT
FF:VCT
FF:VCT
FF:CERAMIC TILE
FF:VCT
FF:VCT
FF:CERAMIC TILE
FF:VCT
FF:VCT
FF:VCT
FF:VCT FF:VCT
FF:CARPET
FF:CARPET
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
EMERGENCY
GENERATOR
RM B037
C O
R R
ID
O
R B
H
FEMALE
TOILET
B040
MENS
TOILET
B041
EMS
B036C
LINEN B036D
CANTEEN
STORAGE
B036B
KITCHEN
ENVIRONMENTAL
MGMT SUPPLY
B045D
SURGICAL
PACK
B045C
STORAGE
B045B
CORRIDOR
BH006
SUPV
OFFICE
B045
BREAK
RM
B045A
PM&RS
CHIEF'S
OFFICE
A032A
SECY
OFFICE
A032B
RESIDENTS
OFFICE
A032C
HALL
A032
CONFERENCE
RM
A032D
CHARTING
A032E
IT
B046
HAS
B044
TOILET
B044A
EMS
B043
ELECTRIC
CLOSET
B043A
EMS
CHECK IN
B042B
EMS
OFFICE
B042A
HAS
B044B
HAS
B044C
SVC
RM
B039
SECY/
RECEPTIONIST
B-042
OFFICE ASST
CHIEF WORK
RM
B-042C
CORRIDOR
BH004
ELECTRICAL
DISTRIBUTION
RM
B037B
A/C
REFRIGERATION
EQUIP RM
B038
TRANSFORMER
RM
B037A
DN
DN
# SF
FP-401-1.G
FP-401-1.G
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
FP-102-1.G
JDB
OVERALL GROUND FLOOR PLAN - AREA B - FIRE
PROTECTION
AJH5/16/23
1/8" = 1'-0"
OVERALL GROUND FLOOR PLAN - AREA B - FIRE PROTECTION
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
C121
WAITING
C1-5D
WORK RM
D155
A-184
A-184C
C110
TREATMENT
CH100
D168
CAST RM
D158
MED
RECORD
D100
WORK
RM D126B
WAITING
CH105C
RECEPTION
D100A
PATIENT
RM
D102A
TOILET
D102B
MENS
TOILET
C109
WOMENS
TOILET
C110A
EMS
C106
EC
C107
TRAVEL
C108
FISCAL
C111
CORRIDOR
CH113
CORRIDOR
CH105
SURGERY
CLINIC
C112B
SURGERY
CLINIC
C112A
SURGERY
CLINIC
C112
E.R.
STAFF
C113B
HAS
C113A CANTEEN
DIRECTOR
OFFICE
C113
CORRIDOR
CH104
WAITING
CH104A
RESP
CARE
C114C
TOILET
C114A
BREAK
RM
C114B
PRE-OP
ASSESSMENT
D194
EC
D155
PUBLIC
TOILET
D156
C O
R R
ID
O
R D
PRE-OP
ASSESSMENT
D193
WORK RM
D191
SVC
OFFICE
D156A
SURG
CLINIC
CHECK IN
D157
EXAM
D154A OFFICE
D158
OFFICE
D160A BREAK/
READING
CH114
DRESSING/
RESTROOM
D193
OFFICE
D185
VASCULAR
LAB
D192
EC
D183A
TRIAGE
01 C121B
E V
ID
E
N C
E C
HEALTH
BENEFITS
CENTER
C104C
CUBICLE
C104V4
CUBICLE
C104V3
CUBICLE
C104V2
CUBICLE
C104V1
DECEDENT
AFFAIRS
C104U
OFFICE
C104T
SUPVY
MED
SUPPORT
ASST
C104S
C104V7 C104V6
C104V5 RECEPTION
C104A
PAT
TOILET
C104D
C104V18
COPY
C104V19C104V20
PATIENT
SUPPORT
PGM
SPECIALIST
C104R
CHIEF
AMBULATORY
CARE AND
PROCESSING
C104Q
CHIEF
HEALTH
INFO MGMT
C104P
C104V11 C104V12 C104V13
C104V19 C104V17
C104V14
C104V18 C104V16 C104V15
CUBICLE
WORK RM
C104H
BREAK RM
C104G
STAFF
TOILET
C104E
PIV
C107
HOLDING
C105
POLICE
C104 POLICE
C102
ARMORY
C103
ELEVATOR
P5
ELEVATOR
P4
POLICE
C110
LOBBY
CH101
ELEVATOR
P6
EXAM
C132B
EXAM
C132C
P A
S S
A G
E C
H B
EXAM/
ISO
C130J
EXAM
C130K TLT
C131
TLT
C128
PASSAGE
CH121
TRIAGE
02 C121A
P A
S S
A G
E C
H A
TLT
C121D
EKG/LAB
C121C
SUB-WAITING
CH121B
EXAM
D196
EXAM
D195
CORRIDOR
CH102
SPEC
COLLECT
C114
WAITING
CH120
EXIST
WELCOME
DESK
CH101C
VESTIBULE
C1-1A
WHEEL
CHAIR
STORAGE
CONFERENCE
RM
C104I
UM/UR UM/
UR MGR
OFFICE
C104J
CHIEF
OFFICE
C104K
ASST CHIEF
HEALTH ADMIN
C104M
ADMIN
ASST
C104N
HEALTH ADMIN
CHIEF OFFICE
C104O
STAFF
WORK
C130
RESUSCITATION 1/
ISO
C130F
ENTRANCE
CH139
VESTIBULE
CH130AEMS
C138OFFICE 3
C140
ER
OFFICE
C141
STAFF
TLT
C142
ER
NURSE
MGR
C143
EMPLOYEE
TRAINING RM
C144
STAIRWELL
CS109
PASSAGE
CH140
CLEAN
UTIL
C137
IT
C136
EXAM/
ISO
C130H
EXAM/
ISO
C130I
P A
S S
A G
E C
H A
EXAM
C132D
TLT/SHWR
C134
EC
CU100
SOILED
UTIL
C135
ELEVATOR
P7
STAFF /
WORK
RM C133
EXAM
C132A
PASSAGE
CH132
RESUSCITATION
2/
ISO
C130E
S T
O R
A G
E C
A
EXAM
C130D
IN-VITRO
COUNTING
HIGH/LOW
A-166
STORAGE
DECONTAM
C127EXAM
C130C
OFFICE
C130B
MENTAL
HEALTH RM
C130A
STAIR
CS104 PASSAGE
CH126
PHYS
WORK
C126C
ON
CALL
C126D
EXAM
C125G
CLEAN
UTILITY
CH125H
NOUR
PREP
C125J
MED
RM
C129
E
CYL
C125I
STAFF
WORK
C125
CART
STORAGE
C125K
SPECIMEN
C124
EMS
C123
PASSAGE
CH125
EXAM
C125F
PASSAGE
CH125B
SOILED
UTIL
C122
RAD
STORAGE
D183B
EMS D189
VASCULAR
LAB
D181
CORRIDOR
CH118
CORRIDOR
CH102A
PASSAGE
CH125A
EXAM
C125A
EXAM
C125B
EXAM
C125C
EXAM
C125D
STORAGE
C125E
A-184A A-184B
WAITING
D175
VASCULAR
LAB
D190
WAITING
CH105E
LINEN
RM
D173
B136
CHEST
X-RAY
B134A
EQUIPMENT
D137
CONTROL
RM
D180A
ANGIOGRAPHY
D180
CHEST
X-RAY
B134
OFFICE
B134B
TOILET
B134D
E L E
C B
C
TOILET
B137B
DRESSING
B137A
RADIOLOGY
WAITING
BH103
STORAGE
B147B
RECEPTION
B146B
RADIOLOGY
LOBBY
D175A
MECH
B133B
STAFF
TOILET
B133A
CORRIDOR
BH102
PHARMACY
WAITING
A-186
TOILET
C126A
CONTROL
D188A
FP-411-1-1A.3
FP-411-1-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
FP-111-1A.1
JDB
OVERALL FIRST FLOOR - AREA C - FIRE
PROTECTION
AJH5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
E
B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
1/8" = 1'-0"
OVERALL FIRST FLOOR PLAN - AREA C - FIRE PROTECTION
B125
B125
EXIST.
DRESS. RM.
B150A
S V
A-185
A-150A
A-184C
A-152
TECHNOLOGIST
EXAM
C125G
CLEAN
UTILITY
CH125H
NOUR
PREP
C125J
E
CYL
C125I
STAFF
WORK
C125
PASSAGE
CH125
EXAM
C125F
PASSAGE
CH125B
EXAM
C125A
EXAM
C125B
EXAM
C125C
EXAM
C125D
STORAGE
C125E
A-184A A-184B
WAITING
D175
OFFICE- CHIEF
VASCULAR
LAB TECH D171
STAIRWELL
DS108
CORRIDOR
DH116
CORRIDOR
DH116A
LINEN
RM
D173
MECH.
SHAFT
B136
STORAGE
B135
CHEST
X-RAY
B134A
EQUIPMENT
D137
CONTROL
RM
D180A
CHEST
X-RAY
B134
OFFICE
B134B
TOILET
B134D
E L E
C B
C
RADIOGRAPHIC
AND
FLUOROSCOPIC
B139
C O
R R
ID
O
R B
H
CONFERENCE
B138
CORRIDOR
TOILET
E101
DRESSING
B139A
TOILET
B139B
BU106
ELEC
B140A
X-RAY
B137
TOILET
B137B
DRESSING
B137A
RADIOLOGY
WAITING
BH103
STORAGE
B147B
RADIO/
FLOUR
B140
CORRIDOR
BH104
VACANT
B141
CONTROL
RM B140A
RADIOLOGY
SVC SUPPLY
RM
B148
FILM
PROCESSING
AREA B147
OUTPATIENT
READING RM
B147A
INPATIENT
HOLDING
BAY 3
B146E
RADIOGRAPHIC
B143
RADIOGRAPHIC
AND
FLUOROSCOPIC
B142
CORRIDOR
BH105
CT SCAN
B152
CONTROL
RM
B152A
SCANNER
RM
B153
UPS
RM
DOSE
B122A
DOSE
B122B
HOT LAB
B122C
TOILET
B122D
HALL
WAY
B122A
CORRIDOR
BH108
CLINICAL
REVIEW
COS SVC
OFFICE
B129F
UTILIZATION
MGMT
B129E
CLINICAL
CHEMIST
B103
SUPV
LAB
B104
ELEC
INPATIENT
HOLDING
BAY 3
B146D
INPATIENT
HOLDING
BAY 3
B146C
INPATIENT
OBSEVATION
B146B
RECEPTION
B146B
RADIOLOGY
LOBBY
D175A
CORRIDOR
BH106
RADIOLOGY
STORAGE
B146F
X-RAY
DIAGNOSTIC
B144 RM
DRESSING
RM B146H
DRESSING
RM
B14JG
DRESSING
RM ALCOVE
B146G
FEMALE
TOILET
B127
MALE
TOILET
B126
M E
C H
B
CORRIDOR
BH107
STAIR
BS103
PATIENT
FLOW
COMMAND
CTR
B129C
PGM
MGR
B129D
CLINICAL
HOUSE
SUPV
B129C
LAB MGR/
CHIEF MED
TECH
B105
BLOOD
BANK
MED
DIRECTOR
B106TRANSFER
OFFICE
B129B
BREAK
RM
B129A
OFFICE
B101K LINE
ITEM
MGR
OFFICE
B107
STORAGE
STORAGE
B101J
OFFICE
B101I
CORRIDOR
SUPV
B101D
E L E
C B
U
E L E
C B
U
WAITING
A-150
CORRIDOR
BH101
FILE
RM
A-151A
A-151
BONE
DENSITY
A-159
VACANT
B131
OFFICE
B132A
VIEWING
RM B132
LOUNGE
B133
KITCHEN
B133A
MECH
B133B
STAFF
TOILET
B133A
CORRIDOR
BH102
PHARMACY
WAITING
A-186
C O
R R
ID
O
R A
H
SUPPLY
A-160
BREAK
RM
A-156
READING
RM A-158
EXAM
A-157
MENS
RESTROOM
A-155
WOMENS
RESTROOM
STORAGE
A-152B
HOT
LAB
A-152A
HOT
LAB
A-152B
PROVIDER
WORK RM
B101L
Restroom
B101EEMS
CLOSET
B104
ELECTRIC
CLOSET
BU101
Restroom B101F
STORAGE
B101C
BREAK
RM
B101G
STORAGE
B101H
SURGICAL
PATHOLOGY
B107A
BREAK
RM
B108CONFERENCE
RM
B101A
S T
O R
A G
E B
B
SOILED SUPPLY
CLINICAL
MICROBIOLOGIST
B121
DN UP
EL
KA
Y
PS
LV
R1
7L
O
E L
K A
Y
P S
L V
R
L
O
E L
K A
Y
P S
L V
R
L
O
# SF# SF
FP-411-1-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
FP-112-1.1
JDB
OVERALL FIRST FLOOR PLAN - AREA B - FIRE
PROTECTION
AJH5/16/23
1/8" = 1'-0"
OVERALL FIRST FLOOR PLAN - AREA B - PLUMBING
PLAN
NORTH
TRUE
NORTH
KEY PLAN
PA
D
B
A
A. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
A104
A-184
A-153
AS107
S T
O R
A G
E C
A
EXAM
C130D
IN-VITRO
COUNTING
HIGH/LOW
A-166
STORAGE
DECONTAM
C127EXAM
C130C
OFFICE
C130B
MENTAL
HEALTH RM
C130A
STAIR
CS104 PASSAGE
CH126
PHYS
WORK
C126C
ON
CALL
C126D
EXAM
C125G
CH125HC125I WOMENS
RESTROOM
A-154
SOILED
A146
SUPPLY
A147
STAIR
AS102
AS108 AS106
CORRIDOR AH102
PHARMACY
OFFICE
A-189
OFFICE
NURSE
MGR
A177
PATIENT
ADVOCATE
A102
INPT
PHARMACY
A103
CORRIDOR
A-191
VAULT
A-180
CONFERENCE
RM
A174
TECHNICIAN
OFFICE
A-179
C O
R R
ID
O
R A
-1
PRE-PACK
A-177a
ANTEROOM
A-190
IV
STORAGE
A-190a
CORRIDOR
AH103
MGR
CMOP
A-178
ACOS
AMB
CARE
A-190C
SUPPORT
UNIT ADMIN
A-190b
ADMIN
ASSIST
A-188
INVESTIGATION
DRUGS SVC
PGME MGR
A164
MED
MGMT
SPECIALIST
A-163
FORMULARY
MGR
A-165
PHARMACY
OPERATION
MGR
A-166
CLINICAL
PHARMACIST
A-167
JANITOR
A-167A
CORRIDOR
A-162
WOMEN
A-176
MEN
A-175
ASSOCIATE
CHIEF OF
PHARMACY
OFFICE
A-171
CRITICAL
CARE
PHARMACY
SPECIALIST
OFFICE
A-170
PHARMACY
ADAPC
A-169
CHIEF
A-168
CHIEF OF
STAFF
A120
FEMALE
TOILET
HEALTH
SYSTEM
SPECIALIST
A119
MALE
TOILET
A107
S T
O R
A G
E A
CORRIDOR
AH110
STAFF
TOILET
A105A
DAV
SVC
OFFICE
A105
VFW
SVC
A101
LOBBY
A100
OFFICE
A105B
CORRIDOR
AH101
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
ELEV
LOBBY
ELEVATOR
S4
ELEVATOR
S5
COPIER/
FAX RM
A145
ELEC
AU104
ELEC
AU-105
BMS
CLOSET
A178
STOCK
RM
A149
EMS
A148
SVC ELEV
LOBBY
1B-1
CORRIDOR
AH101
TOILET
C126A
PHARMACY
STORAGE
A190A
BREAK
RM
A-173
RESIDENTS
A-172
ELEC
A0104
FP-411-1-1A.3
FP-411-1-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
FP-113-1.1
JDB
OVERALL FIRST FLOOR PLAN - AREA A - FIRE
PROTECTION
AJH5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
E
B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
1/8" = 1'-0"
OVERALL FIRST FLOOR PLAN - AREA A - FIRE PROTECTION
CHECK OUT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:CERAMIC TILE
CARD CATALOGR
E
F E
R E
N C
E
STAGE
D201
S T
O R
A G
E
V E
S T
IB
U
L E
D H
CONTROL
RM
C205
PREPARATION/
WORK AREA
C206
LIBRARY
C209
EC
CU208
CORRIDOR
CH206
STORAGE
C210
LIBRARY
RECEPTION
C211D
MENS
TOILET
D200
TELEMEDICINE
DISTANCE
LEARNING A
C204
VISUAL
INFO
OFFICE
C207
S T
O R
A G
E C
H
OFFICE
C211B
CONFERENCE
C211A
CORRIDOR
CH204
OFFICE
C288
EXAM
RM
C289
EXAM
RM
C290
EXAM
RM
C293
EXAM
RM
C294
TECH
WORK
AREA
C297
WOMENS
TOILET
C213
MENS
TOILET
C212
SCREENING
C271
SCREENING
C272
OPTICAL
SCREENING
C273
CORRIDOR
CH203
INFO
C201
LOBBY
CH201
VIST
COORD
C287
VISIT
DOC
OFFICE
C286
EXAM
RM
C291
EXAM
RM
C292
EXAM
RM
C295
EXAM
RM
C296
RECEPTION
C270A
RECEPTION
WORKSPACE
C270B
C O
R R
ID
O
R
CLINIC
DIRECTOR
C274
VISUAL
FIELD
C276
SPECIAL
TESTING
C277
YAG
LASER
C280
ARGON
LASER
C281
SOILED
SPD
C285A
CLEAN
SPD
C285
CASE
MGR
C284
WORK AREA /
KITCHENETTE
C283
CLIN DIR
OFFICE
C282
PROCEDURE
RM
C279
PHOTO
RM
C278
OPTICAL
SHOP
C275
WAITING RM
C270
STAIRWELL
CS209
EC
CU200
ELEVATOR
(FUTURE)
CE208
ELEVATOR
P7
ELEVATOR
P6
OFFICE
CHIEF
C223D
WORK
AREA/STORAGE
C223E
C223FTOILET
C223C
RECORDS
C225
SUPER
OFFICE
C226A
WAITING
EMS
C224
RECEPTION
C223
STAFF
DEVELOP.
SPECIALIST
OFFICE
C203E
STAFF DEV
SPECIALIST
OFFICE
C203A
PATIENT
SAFETY
FELLOWS
OFFICE
C203B
C O
R R
ID
O
R C
H
SIM CTR
TRAINING
RM
C203C
LIBRARY
C203
MULTI
PURPOSE
C203D
CLERICAL
REC
D209
WAITING
DH224A
CORRIDOR
DH224
AUDIOLOGY
CO-ORDR
D225
D210 DH233
ORAL
SURGY
C235
ORAL
SURGY
C238
RECOVERY
C239
LOCKER
RM
C241
TOILET
CORRIDOR
CH218
OPERATORY
C261
DENTAL
LAB
C260
PROSTHETICS
LAB
C259
SOLID
C258
OPERATORY
C256
OPERATORY
C254
DENTISTS
OFFICE
C252
C O
R R
ID
O
R C
H
EC
C257
GENERAL
C255
GENERAL
C253SUPPLY
C248
GENERAL
C245
TREATMENT
OPERATORY
C243
C O
R R
ID
O
R C
H
OFFICE
C242
X-RAY
C244
X-RAY
C246
TOILET
C227
STOR
C228
CHIEF
OFFICE
C233
INSTRUMENT
STORAGE
C240
C O
R R
ID
O
R C
H
OFFICE
RM
C234
STORAGE
C236
STORAGE
C237
C O
R R
ID
O
R C
H
CONFERENCE
RM
C232
EMS
C231
CORRIDOR
CH214
DATA
ENTRY
C251
HYGIENE
OPERATOR
C250
HYGIENE
OPERATOR
C249
EXAM
OPERATOR
C247
WAITING
C229B
STOR
C229A
SECY/
CLERICAL
C229
OFFICE
C230
CORRIDOR
CH212
C O
R R
ID
O
R C
H
STAIRWELL
CS204
STORAGE
CH2-12A
SEMI-PRIVATE
RM
A257
TOILET
A256A
TOILET
A257A
SHOWER
A269
CCU1
A258
STORAGE
C223B
UP
DN
UP
DN
UP
FP-421-1-1A.2
FP-421-1-1A.2
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
FP-121-1A.2
JDB
OVERALL SECOND FLOOR PLAN - AREA C - FIRE
PROTECTION
AJH5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
1/8" = 1'-0"
OVERALL SECOND FLOOR PLAN - AREA C - FIRE PROTECTION
10'-0" A243
PNEUMATIC TUBE
FF:VCTFF:VCT
FF:VCT
FF:CONCRETE
FF:VCT FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CERAMIC TILE
S
S D
W
D
W
C H
STAIRWELL
CS204
CORRIDOR
BH212
MECH
RM
A273 SOCIAL
WORKER
B247
TOILET
B249
TOILET
B248
SEMI-PRIVATE
RM
A257
TOILET
A256A
TOILET
A257A
SHOWER
A269
SEMI-PRIVATE
RM
A256
CONFERENCE
RM
A255
STOR
A255
VISITOR
WAITING
A254
TOILET
A255A
ECHO
LAB
A249
ECHO
LAB
A250
C O
R R
ID
O
R A
H A
STORAGE
A248B
CONTROL
RM
A248A
PHONO
CARDIOLOGY
A248 EC
AU205
CORRIDOR
AH211
ELEC
AU206
ELEC
AU207
ELEC
AU208
CCU1
A258
CCU2
A259
CCU3
A260
C O
R R
ID
O
R A
H
NURSES
WORK
RM
A268
NURSE
STATION
A267
NOURISHMENT
CENTER
A267C
EMS
A270
STAIRWELL
AS202
BREAK
A267D
CLEAN
UTILITY
A267A
TOILET
A271B
HEART
STATION
SUPV
OFFICE
A272
NURSE
LOUNGE
A271
NURSE
COORD
OFC
A274
EMS
A252
TOILET
A251
C O
R R
ID
O
R A
H
STRESS
LAB
A266
IT
CLOSET
A265
CORRIDOR
AH209
CCU6
A264
CCU5
A263
CCU4
A262
CARDIAC
PROCEDURE
RM
A261
HEART
STATION
A245
HEART
STATION
WORK RM
A244
CONSULT
A241
JANITOR
A240
TOILET
A239
CLEAN
STOR
A238
PREPARATION/
HOLDING
A237
CORRIDOR
AH206
PACEMAKER
A247
CARDIO
CASE
MGR
OFFICE
A276A
C O
R R
ID
O
R A
H
CARDIO
OFFICE
A276
EKG
COMPUTER
A247A
EEO
ADMIN
OFFICE
A277
CORRIDOR
AH207
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
CATH
LAB
OFFICE
A242
EQUIP
RM
A235B
CATH
LAB 1
A235
CATH
STORAGE
A235A
STAFF
OFFICE
A231A
BREAK
RM
A231
CONTROL
A234
STAFF
CORRIDOR
A232
SOILED
LINEN
A229
CLEAN
HOLDING
A230
CATH
STORAGE
A233A
EQUIP
RM
A233B
CATH
LAB 2
A233
LOBBY
AH200
ELEVATOR
S5
ELEVATOR
S4
SVC
LOBBY
A201
EQUIP
STOR
A202
WAITING
A205
PHARMACY
A204
STAFF
TOILET
A206A
ELECTRIC
CLOSET
A205A
STAFF
LOCKER
A206
STOR
A203
ELECTRIC
CLOSET
BU201
CLINIC B
WAITING
B238
MECH
RM
B234
CORRIDOR
AH204
LAB
A207
EC
AU204
TOILET
A207A
ROOM
A209
CORRIDOR
AH202
ELEC
AU201
ELEC
AU202
ELEC
AU203
GROUP
CLINIC RM
A210
CORRIDOR
C212
CONSULT
B235
WARFARIN
CLINIC
B234
WC
STORAGE
A211A
PATIENT
TOILET
A213
EMS
A212
CLINIC C
WAITING
A211
EXAMINATION
A215
EXAMINATION
A216
EXAMINATION
A217
PHYSICIAN
WORK RM
A222
PATIENT CARE STAFF
WORKROOM
A227
C O
R R
ID
O
R A
H
STRETCHER
STORAGE
STAFF
TOILET
A228
FILE
A214A
RECEPTION/
BUSINESS
A214
STAIRWELL
AS201
CLEAN
UTILITY
A226
C O
R R
ID
O
R A
H
CONSULT
A225
CORRIDOR
AH206A
READING/
VIEWING
A236
BREAK
RM
A224
PROCEDURE
A223
PATIENT
TOILET
A223A
SOILED
HOLDING
A223B
EXAMINATION/
TREATMENT
A221
EXAMINATION
A220
EXAMINATION
A219
EXAMINATION
A218
SOILED
UTILITY
A267B
LOCKER
A271A
CLEAN
UTILITY
A202
DN
FP-421-1-1A.2
FP-421-1-1A.2
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
FP-123-1.2
JDB
OVERALL SECOND FLOOR PLAN - AREA A - FIRE
PROTECTION
AJH5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
1/8" = 1'-0"
OVERALL SECOND FLOOR PLAN - AREA A - FIRE PROTECTION
C333
C333
ROOF OF SECOND FLOOR
C O
R R
ID
O
R D
H
0 CHEMICAL
STORAGE
D321 GENERAL
LAB
D322
CORRIDOR
CH312
CHEMISTRY
LAB
C318
GENERAL
LAB
D323A
GENERAL
LAB
D301B
GENERAL
LAB
D303
CHEMISTRY
LAB
D302
D304
CHEMISTRY
LAB
D300
MECHANICAL
SHAFT
CU301
CHEMISTRY
LAB
C319
EC
CU320
GENERAL
LAB
C317
GENERAL
LAB
C315
EC
CU316
GENERAL
LAB
D301A
GENERAL
LAB
D323B
CHEMISTRY
LAB
C314
CHEMISTRY
LAB
C312
CHEMISTRY
LAB
C310
C O
R R
ID
O
R C
H
WOMENS
STAFF
TOILET
C313
GENERAL
LAB
C311B
GENERAL
LAB
C311A
RESERCH
C304
GENERAL
LAB
C323B
GENERAL
LAB
C323A
MENS
STAFF
TOILET
C321
CORRIDOR
CH308
CHEMISTRY
LAB
C322
DARK
RM
C324
WALK-IN
REFR
C325
CORRIDOR
CH305
INSTRUMENTS
C326
CHEMISTRY
LAB
C327
OFFICE
C309
OFFICE
C304B
OFFICE
C304C
ELEVATOR
P6
LAB
C332
ELEVATOR
P7
LOBBY
CH301
TOILET
C304DOFFICE
C304A
OFFICE
C308
LOBBY
CH303
CMPR
PROGMR
C307
OFC
INVESTGR
C306
OFC
INVESTGR
C305
OFC
INVESTGR
C303
OFC
INVESTGR
C302
OFC
INVESTGR
C301
EC
CU300
STAIR
CS309
CORRIDOR
CH306
STAFF
LOUNGE
C331
WASTE
STORAGE
C330A
EQUIP AND
GENERAL
STORAGE
C330A
BIO-MED
ENG
C330
MECH RM
CM328
MECHANICAL
SHAFT
CU302
ELEVATOR
(FUTURE)
CE308
DN
FP-431-1-1A.3
FP-431-1-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
FP-131-1A.3
JDB
OVERALL THIRD FLOOR PLAN - AREA C - FIRE
PROTECTION
AJH5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
1/8" = 1'-0"
OVERALL THIRD FLOOR PLAN - AREA C - FIRE PROTECTION
L S
L S
LS
LS
L S
A345
TR
A345
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
LOCKER
A338A
B323
BU301
NUEROLOGY
ADMIN OFFICE
A303
C O
R R
ID
O
R A
H
1 MECH
SHAFT
A304A
CLEAN
A304
SLEEP
DISORDER
RECEPTION
A306
C O
R R
ID
O
R A
H
HOSPICE CARE
OFFICE
A307
SOILED
A305
NEUROLOGY
ADMIN OFFICE
A302C
LOBBY
A301
HAS
A308
EC
AU304
EMS
A309
PATIENT RM
A364
PATIENT
TOILET
A364A
PATIENT
TOILET
A365A
PATIENT RM
A365
PATIENT RM
A367
WAITING RM
A369
MED R
VIEW RM
B302
ELEVATOR
S5
ELEVATOR
S4EC
AU305
EMS
A372
PATIENT
A369A
PATIENT
TOILET
A367ALINEN
SUPPLY
A366
CORRIDOR
AH309
AS302
AU308 AU307 AU306
CLEAN
SUPPLY
A368
BEREAVEMENT
ROOM
A371
PHYSICIANS
OFFICE
A373
NEUROLOGY
TEAM OFFICE
A350
C O
R R
ID
O
R A
H
7NURSE
STATION
A352
MED RM
A353
NURSE
MANAGER
A355
A355A
SOILED
UTILITY
A358
STAFF
WORK RM
A358A
C O
R R
ID
O
R A
H
PATIENT
TOILET
A-363A
PATIENT RM
A-363
PATIENT
TOILET
A-362A
PATIENT
RM A362
TOILET
A357
CORRIDOR
AH306
NOURISHMENT
A359
PATIENT
RM A361
PATIENT
TOILET
A361A
PATIENT
TOILET
A360A
NURSES
LOUNGE
A360
PATIENT
RM A356
PATIENT
TOILET
A356A
A354A
SOCIAL
WORK
A354 TOILET
A351A
STAFF
NURSING
A351
TOILET
A349A
CORRIDOR
AH306
OFFICE
SOC. WORK
A349
OFFICE
APU
A347
OFFICE
APU
A346
TOILET
A346A
1 BED
RM
A343
1 BED
RM
A342
1 BED
RM
A340
STORAGE
A344
DOCTOR
A341
DOCTOR
A310
ELEVATOR
AE301
ELEVATOR
AE302
ELEVATOR
AE303
LOBBY
A300
SECURITY
RM
A338 2 BED
RM
A337
2 BED
RM
A336
4 BED
RM
A332
TOILET
A328A
1 BED
RM
A329
1 BED
RM
A328
4 BED
RM
A327
TOILET
A329A
STORAGE
A330
TOILET
A332A
TOILET
A334
TOILET
A336A
TOILET
A327A
WORK RM
A326
4 BED
RM
A324
TOILET
A324A
TOILET
A326A
C O
R R
ID
O
R A
H
SMALL
EQUIP RM
A325A
PATIENT
SHOWER
A325SPD
A331
EXAM
A333
DOCTOR
A335
CORRIDOR
AH306
SECY
A339
PANTRY
A313
SURGY
TEAM RM
A311
C O
R R
ID
O
R A
H
4 NURSES
STATION
A314
MED RM
A317 STAIR
AS301
ELEC
AU301
ELEC
AU302
ELEC
AU303
TOILET
A315A CORRIDOR
AH303
TOILET
A318A
EMS
A319
TOILET
A320
TOILET
A321A
TOILET
A323A
4 BED
RM
A323
1 BED
RM
A322
TOILET
A322A
1 BED
RM
A321
4 BED
RM
A318
2 BED
RM
A316
2 BED
RM
A315
WAITING
AREA
A312
CORRIDOR
AH309
TOILET
A342A
FP-431-1-1A.3
FP-431-1-1A.3
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
FP-133-1.3
JDB
OVERALL THIRD FLOOR PLAN - AREA A FIRE
PROTECTION
AJH5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
1/8" = 1'-0"
OVERALL THIRD FLOOR PLAN - AREA A - FIRE PROTECTION
CU411
CU411
EXIST.
TELECOM
CU411
ROOF OF SECOND FLOOR
ANIMAL
D415
C O
R R
ID
O
R D
H
SCRUB
D414
WORKRM
D415A
FREEZE
D432A
STO &
FEED
D433
OPERATING RM
D412A
ANIMAL
D413
CORRIDOR
DH414
M
TOILET
D411
F
TOILET
D410
PRE-OP
D412
POST-OP
D434
CAGE WASH
D437
PRO LAB
D408
E C
D U
LOUNGE
D407
STOR
A406
ANIMAL
D406
STOR
RM
D405
CORRIDOR
DH412
ANIMAL
D435
AIR
LOCK
CH410
CLEAN
STORAGE
D436
ANIMAL RM
D404
C O
R R
ID
O
R C
H
LAB
C409A
LAB
C409B
CORRIDOR
CH408
ANIMAL RM
D402
HAC
C407
STOR
D400
TOILET
C406
AIR
LOCK
CH405
ROOF
ACCESS
CORRIDOR
C4-6
BREAK
RM
D401
C O
R R
ID
O
R C
H
OFFICE
D403
CLERKS
C405
WORK RM
C404
C O
R R
ID
O
R C
H
CORRIDOR
CH403
CONFERENCE
C402 LOBBY
CH401
ELEVATOR
CE406
ELEVATOR
CE407
LAB
C410
ASSOC
COS
C403A
SEC
C403
ASSIST
ASSOC
TO COS
C403B
REPRO/COPY
C401
CORRIDOR
CH402
EC
CU400
STAIRWELL
CS409
ELEVATOR
(FUTURE)
CE408
MECH SHAFT
CU401
CM408
DN
FP-441-1-1A.4
FP-441-1-1A.4
Project Number
Building Number
Drawing Number
DrawnCheckedIssue Date
Location
Project TitlePhaseDrawing Title
Approved: Project Director
ARCHITECT OF RECORDCONSULTANT
Revisions: Date:
U.S. Department of Veterans Affairs
Construction and Facilities Management
8718 Botts Lane Phone: (210) 816-4784
San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com
FULLY SPRINKLERED
569A4-22-700100% CONSTRUCTION
DOCUMENTS
LEXINGTON-COOPER EHRM
INFRASTRUCTURE DESIGN
1101 VETERANS DRIVE
LEXINGTON, KY 40502
21 3 4 5 6 7 8 9 10
21 3 4 5 6 7 8 9 10
B
A
C
D
E
F
B
A
C
D
E
F
St. Louis
6 South Old Orchard St. Louis, MO 63119 t: +1 800.404.7677 e: hello@introba.com www.introba.com
1A
FP-141-1A.4
JDB
OVERALL FOURTH FLOOR PLAN - AREA C - FIRE
PROTECTION
AJH5/16/23
PLAN
NORTH
TRUE
NORTH
KEY PLAN
C
B
A
D
1. AREA PLAN SHOWN FOR REFERENCE ONLY. SEE
ENLARGED PLANS FOR DEMOLITION AND NEW WORK.
GENERAL SHEET NOTES
1/8" = 1'-0"
OVERALL FOURTH FLOOR PLAN - AREA C - FIRE PROTECTION
X
2FLT
2FLT
X
2FLT
2FLT
TELE/DATA
CLOSET
A450
PSYCHOLOGY
TECHNICIAN
A490
TELE/DATA
CLOSET
A450
PSYCHOLOGY
TECHNICIAN
A490
WASHERDRYER
A408
C O
R R
ID
O
R
DR.
OFFICE
A405
3 BED RM
A474
SHOWER
A474A
1 BED RM
A475
TOILET/
SHOWER
A475A
TOILET
A474B
SHOWER
A473A
3 BED RM
A473
STAIR
1 BED RM
A476 RECREATION
A478
STORAGE
A478A
STORAGE
A478B
NUTRITION
A404
STAFF
WORKRM
A482
OFFICE
PSYCHOLOGIST
A486
OFFICE
PSYCHOLOGIST
A487
OFFICE
A488
FEMALE
TOILET
A403
EC
AU405
PSYCHOLOGY
TESTING/
WAITING
A485
EXAMINATION
A484
CORRIDOR
AH411
HAC
A477
TOILET/
SHOWER
A476A
STORAGE
A472
ELEC
AU406
ELEC
AU408
ELEC
AU407
MEDICATIONS
A458A
PSYCHOLOGY
TESTING
A491
3 BED RM
A470
TOILET
A473B
TOILET
A470B
C O
R R
ID
O
R A
H
HYDROTHERAPY
TUB RM
A471
LAUNDRY
A466
STAFF
BREAK RM
A464
RECREATION
THERAPIST
OFFICE
A461
COMMUNICATION
CENTER/ NURSE
STATION
A458
C O
R R
ID
O
R A
H
DAYRM
A456
OFFICE
A452
OFFICE OPS
MGR
A452A
NURSE MGT
OFFICE
A454
CORRIDOR
AH408
TOILET
A457B
SHOWER
A457A
1 BED RM
OR
SECLUSION
A457
THERAPEUTIC
SECLUSION
A4551 BED RM
OR
SECLUSION
A459
SHOWER
A459A
SHOWER
A462A
STAFF
TOILET
A460
STORAGE
A463A
TOILET
A462B
LINENS
A465
TUB &
TOILET
A467A
1 BED RM
OR
SECLUSION
A462
1 BED RM
OR
SECLUSION
A463
1 BED RM
OR
SECLUSION
A467
GROUP RM
A468
3 BED RM
A469
HIMS
OFFICE
A451
RES & MED
STUDENTS
A448 RES & MED
STUDENTS
A445
SECY
A442
OFFICE
CHIEF
A443
CHAPEL
A440
OFFICE/
CHAPLAINS
A439
OFFICE/
WAITING
A435
SOCIAL
WORKER
A446
SOCIAL
WORKER
A447
KITCHENETTE/
COFFEE
A449
STAFF
TOILET
A449A
CORRIDOR
AH407
HALL
A489
ELEVATOR
AE403
ELEVATOR
AE402
ELEVATOR
AE401
OFFICE
PHYSICIAN
A436 CHAPEL
OFFICE
A438
ENDO
WAITING RM
A412
C O
R R
ID
O
R A
H
LOBBY
A400
ELEVATOR
AE405
ELEVATOR
AE404
C O
R R
ID
O
R A
H
1 LOBBY A401
TRASH
CHUTE
DUMP
WAITER
A406A
SOILED
A407
CLEAN
A406
C O
R R
ID
O
R A
H
MED TEAM
ADMIN
OFFICE
A409
OFFICE
PHYSICIAN
A410
SCOPEWASH &
STORAGE
A413
EC
AU404
PROCEDURE RM
A415
PROCEDURE RM
A414
SUPPLY
A411B
TOILET
A411C
SCOPEWASH
A417
TOILET &
SHOWER
A418
FILM
PROC
A419
RECOVERY
A411
WC
STORAGE
A411A
CORRIDOR
AH403
ELEC
AU401
ELEC
AU402
ELEC
AU403
STAIR
AS401
FLUOROSCOPY
A420
GASTROENTEROLOGY
FELLOW OFFICE
A422A
PHYSICIANS
OFFICE
A422BSTAFF
LOUNGE
A421 SECY
A422
ENDOSCOPY
A422E
GI
SERVICES
A422C
PHYSICIANS
OFFICE
A422DTOILET
A423AC
O
R R
ID
O
R
PATIENT
WAITING
A423
REST
RM
A424
TOILET
A425A
STOR
SLEEP
RM
A425B
SLEEP
RM
A425C
MEDICINE
SVC ON
CALL RM
A425D
MEDICINE
SVC ON
CALL RM
A425E
MEDICINE
SVC ON
CALL RM
A425F
MOD ON
CALL RM
A425G
ADMIN
OFFICE
A429B
BUSINESS
MGR
OFFICE
A429A
CHIEF
OFFICE
A432
HAC
A430
SECRETARIE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .