568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part8.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26325B0018_1
About this file
These architectural documents are detailed structural engineering drawings for a Domiciliary Renovation project at the Hot Springs VA Medical Center, specifically for Building 8. The documents include multiple technical pages covering structural details such as double and single shoring post assemblies, truss elevation repairs, footing schedules, and a comprehensive demolition plan for the basement level. The drawings provide precise engineering specifications for renovation work, including removal of existing walls, doors, windows, mechanical elements, and infrastructure components, with detailed annotations for each demolition and construction element. The project appears to be part of a larger VA construction initiative for upgrading and modernizing facilities, with the drawings prepared by Stone Group Architects and Albertson Engineering, Inc., and dated for bid documents on 06/03/2025.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
GENERAL DEMOLITION NOTES
H. PROTECT ALL EXISTING UTILITIES UON.
I. WHERE APPLICABLE, ROOF PROTECTION IS TO BE PROVIDED FOR EXISTING ROOFS DURING ALL
PHASES OF CONSTRUCTION.
J. PATCH REMAINING EXISTING CONSTRUCTION AFFECTED BY DEMOLITION AS NEEDED.
K. PATCHING AND/OR INFILL TO MATCH EXISTING CONSTRUCTION & FINISHES UON.
L. EXISTING ITEMS TO REMAIN ARE SHOWN IN GRAY.
M. EXISTING ITEMS TO BE DEMOED ARE SHOWN WHITE WITH DASHED LINES.
N. INFILL OF FIRE PARTITION PENETRATIONS/OPENINGS SHALL MAINTAIN THE INTEGRITY OF THE
RATING.
O. CONTRACTOR TO COORDINATE RELOCATION AND/OR STORAGE OF SALVAGED ITEMS WITH THE
OWNER UON.
P. REFERENCE HAZARDOUS MATERIALS, MECHANICAL DEMOLITION, AND/OR PLUMBING DEMOLITION
SHEETS FOR INFORMATION REGARDING DEMOLITION OF HAZARDOUS MATERIALS.
Q. SEE STRUCTURAL DETAILS FOR INFORMATION REGARDING INFILL OF EXISTING STRUCTURAL FLOOR &
ROOF PENETRATIONS.
R. ALL CONSTRUCTION WASTE PRODUCED BY DEMOLITION TO BE PROPERTY OF CONTRACTOR UON.
S. PLUMBING ON BASEMENT LEVEL TO BE REMOVED TO BELOW THE FLOOR AND CAPPED. SEE
STRUCTURAL FOR CONCRETE PATCH DETAILS.
T. EXISTING INTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD AND PREPPED FOR
NEW STAIN FINISH. EXISTING EXTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD
AND PREPPED FOR NEW PAINT.
U. STRIP EXISTING STAINED WOOD WINDOWS, TRIM, AND SILLS. PREPARE FOR NEW STAIN FINISH.
EXISTING WOOD TRIM AND SILLS TO BE REMOVED AND SALVAGED AS NECESSARY FOR
REINSTALLATION
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE
DRAWINGS.
C. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.
D. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.
E. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.
F. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
G. DIMENSIONS ARE TO FACE OF FRAMING, CENTERLINE OF EQUIPMENT, CENTERLINE OF FIXTURE, OR
GRID UON. DIMENSIONS ARE TO FACE OF FINISH ON INTERIOR ELEVATIONS AND/OR WHERE THE
ABBREVIATION "CLR" IS USED UON.
A
B
C
D
10 13 14 D1
AD301
D5
AD301
B4
AD301
D3
AD301
4 5 6 7 8 9 11 12
2.05A
2.05A 2.05A
2.05A
2.05A
2.05A
2.05A
2.03
2.05A
2.05A
2.03
2.05A
2.05A
2.05A
2.05A
2.03
2.05A
2.05A
2.05A
2.05A
2.05A
2.03
2.05A2.05A 2.05A2.05A
2.03
2.03
2.05A
2.05A2.05A
2.05A
2.05A
2.09
2.09
2.09
2.09
2.09 2.09
2.09 2.09 2.09
2.09
2.09
2.09
2.05A
2.03
2.05A
2.05A
2.032.03
2.05A
2.05A
2.05A
2.05A
2.03 2.03
2.03
2.05A
2.05A
2.05A
2.05A
2.05A
2.05A
2.05A
2.05B 3.11
2.12B
2.23 2.23
2.05A
V F
Y
'-5
V F
Y
'-4
2.05B
2.13
2.13
V F
Y
8' -1
3/
8"
V F
Y
9' -7
/4
VFY
13'-4"
2.14B
2.15
2.15
2.15 2.15
2.15
2.05A
2.03
2.03
2.05
2.05
2.05
NIC
2.18
2.18
2.19
2.19A
STORAGE002
TOILET
TOILET
STORAGE
STORAGE
STORAGE
STORAGE
STORAGE
STORAGE
CORRIDOR
STORAGE
STORAGE
STORAGE
STORAGE
010A
MECHANICAL
2.17E2.17E
2.26
2.032.04C
2.08A
2.27
2.27
2.27
'-1
/8
7'-11 3/8"
VFY
4'-3 13/16"
'-1
/8
VFY
1'-8 13/16" VFY
7'-11 3/8"
VFY
1'-3 13/16"
2.05A
2" / 1'-0"
2.012.01
89'-2 1/2" 96'-10 1/2"
2.04D
2.04D
2.04D
2.27
2.27
2.05
DEMOLITION LEGEND
AREA NOT IN CONSTRUCTION BOUNDARIES
EXISTING COMPONENTS TO REMAIN
EXISTING COMPONENTS TO BE DEMOED
3/16" = 1'-0" D5
DEMOLITION PLAN - BASEMENT
VA FORM 08 - 6231
A
B
C
D
A
B
C
D
2 4 5 61
6"
6"
6"
6"
O N
E E
IG
H
T H
I N
C H
O
N E
F O
O T
1/
8"
'-0
O
N E
Q U
A R
T E
R I
N C
H
O N
E F
O O
T
1/ 4"
'-0
T H
R E
E E
IG
H
T H
S
IN
C H
O
N E
F O
O T
(3 /8
1' -0
O
N E
H A
LF
I
N C
H
O N
E F
O O
T
1/ 2"
'-0
T H
R E
E Q
U A
R T
E R
S
IN
C H
O
N E
F O
O T
3/
4"
'-0
O
N E
I N
C H
O
N E
F O
O T
1"
'-0
O N
E A
N D
O N
E H
A
LF
I N
C H
E S
O
N E
F O
O T
1/ 2"
'-0
T H
R E
E
IN
C H
E S
O
N E
F O
O T
3"
'-0
32 4 5 61
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
DESIGNER OF RECORD
A/E:
STAMPCONSULTANTS
STRUCTURAL:
ALBERTSON ENGINEERING, INC.
3202 W. MAIN ST., #C
RAPID CITY, SD 57702
605-343-9606
MEP:
WEST PLAINS ENGINEERING, INC.
1750 RAND ROAD
RAPID CITY, SD 57702
605-348-7455
STEPHEN KILBER MIKE SIGMAN (ELEC)
MICHAEL HEINRICH (MECH)
C :\U se rs
\K .K ue pe r\D oc um en ts \2
D om R en ov
B ui ld in g
_k yl ek 9D
U H
U .rv t 6/
2/
:0 1:
P
M
AD100
DEMOLITION PLAN - BASEMENT
STONE GROUP ARCHITECTS
600 EAST 7TH ST.
SIOUX FALLS, SD 57103
605-271-1144
TODD STONE
DOM RENOVATION FOR
SEMIPRIVATE ROOMS
HOT SPRINGS, SD
DOUG SPRINKLE
06/03/2025 JM/GB/TM TL/KK
SGA #211921
VA #568A4-21-208
BID DOCUMENTS
TRUE
NORTH
PLAN
NORTH
KEYNOTES
KEY VALUE KEYNOTE TEXT
2.01 EXISTING COLUMN TO REMAIN
2.03 REMOVE DOOR & FRAME IN ENTIRETY
2.04C REMOVE LOUVER
2.04D REMOVE WINDOW SILL & TRIM @ SALVAGE FOR REINSTALLATION. STRIP AND PREP FOR NEW
STAIN.
2.05 REMOVE WALL.
2.05A REMOVE PLASTER WALL IN ENTIRETY.
2.05B REMOVE PORTION OF MASONRY WALL FOR OPENING. SEE PLANS FOR LOCATION.
2.08A REMOVE HOUSE KEEPING PAD
2.09 REMOVE FENCING/CAGING MATERIAL IN ENTIRETY.
2.12B REMOVE EXISTING EXT. STAIR. MAY RETAIN AS NECESSARY FOR USE DURING
DEMOLITION/CONSTRUCTION. CONFIRM W/ COR.
2.13 REPAIR/LEVEL FLOOR AND PREP TO RECEIVE NEW FINISHES.
2.14B CUT & REMOVE EXISTING FLOOR AND EXCAVATE FOR NEW ELEVATOR, SEE STRUCTURAL
2.15 REMOVE PLUMBING FIXTURE. SEE MECHANICAL.
2.17E EXISTING MASONRY PIERS TO REMAIN IN PLACE
2.18 REMOVE COLUMN. SEE STRUCTURAL
2.19 REMOVE EXISTING FLOORING, CONCRETE SLAB TO REMAIN
2.19A EXISTING RAMP TO REMAIN
2.23 CUT & REMOVE TOP 3/4-INCH OF EXISTING FLOOR FOR NEW TILE SLOPE TO DRAIN.
2.26 REMOVE MECH ELEMENT, CONCRETE SLAB, CANOPY. SEE MECHANICAL.
2.27 REMOVE MECH ELEMENT. SEE MECHANICAL.
3.11 NEW CONCRETE SLAB ABOVE EXISTING RAMP. SEE STRUCTURAL.
ISSUE # DESCRIPTION DATE
1 BID DOCUMENTS 06/03/2025
| Sheets |
| AD100 - DEMOLITION PLAN - BASEMENT |
| AD101 - DEMOLITION PLAN - 1ST FLOOR |
| AD102 - DEMOLITION PLAN - 2ND FLOOR |
File details come from the government source that posted it. Updated .