These documents are Hazardous Abatement Plan drawings for the Department of Veterans Affairs Hot Springs facility Domiciliary Renovation project for Building 8, prepared by Stone Group Architects. The plans detail hazardous material removal across three floors (basement, first floor, and second floor) with multiple storage rooms, patient quarters, offices, and corridor spaces marked for abatement. The drawings include detailed demolition and hazardous material notes, a hazardous waste legend, and technical specifications for comprehensive renovation, with specific attention to asbestos removal, general demolition requirements, and existing interior surface preparation. The project involves fully sprinklered renovation of separate rooms, with precise architectural grid measurements and coordination requirements for the VA's Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
568A4-21-208 DOM Reno Rooms Bldg 8 QA 2.docx DOCX document
36C26325B0018 0003.docx DOCX document
36C26325B0018 0002.docx DOCX document
Johnson Controls Single Source Justification_Redacted.pdf PDF
2025.08.22_211921 Hot Springs Dom 8_Add-1.pdf PDF
568A4-21-208 DOM Reno Rooms Bldg 8 QA Final.docx DOCX document
Statement of Work - 568A4-21-208_Revised 8.22.25.pdf PDF
Building 8 Site Visit Sign-in.pdf PDF
36C26325B0018 0001.docx DOCX document
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part4.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part8.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part7.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part13.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part6.pdf PDF
Statement of Work - 568A4-21-208.pdf PDF
Wage Determination SD20250022 01.03.2025.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part11.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part5.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part1.pdf PDF
36C26325B0018.docx DOCX document
TMS 20939 VA Privacy Training.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part12.pdf PDF
Final Specs Combined 6-6-25.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part2.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part9.pdf PDF
Safety or Environmental Violations and EMR Information.pdf PDF
568A4-21-208 HOT SPRINGS VA DOMICILIARY RENO BLDG 9_Part10.pdf PDF
VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

10 13 14

2.91

2.91 2.91

2.91 2.91 2.91 2.91 2.91 2.91 2.91

2.91 2.91 2.91

2.91 2.91 2.91

2.912.912.912.91

2.92

4 5 6 7 8 9 11 12

2.962.96

2.96

2.96

2.95

2.92

2.92

2.912.91

2.91 2.91

2.96

STORAGE

TOILET

TOILET

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

STORAGE

CORRIDOR

STORAGE

STORAGE

STORAGE

STORAGE

010A

MECHANICAL

2.92

GENERAL HAZARDOUS MATERIAL NOTES

I. MATERIALS CONTAINING LESS THAN 1% ASBESTOS ARE NOT REQUIRED BY NESHPA OR AHERA;

HOWEVER THE OSHA PERSONAL EXPOSURE LIMITS (0.1 F/CC OF AIR AS AN EIGHT HOUR TIME

WEIGHTED AVERAGE OR 1.0 F/CC OF AIR OVER 30 MINUTES) FOR ASBESTOS APPLY WHEN MATERIALS

CONTAINING 1% ASBESTOS OR LESS ARE DISTURBED DURING RENOVATIONS OR DEMOLITIONS.

J. REFERENCE ASBESTOS SURVEY FOR A LIST OF MATERIALS THAT CONTAIN 1% ASBESTOS OR LESS

WHICH WILL ENABLE THE RENOVATION / DEMOLITION CONTRACTOR TO MAKE APPROPRIATE

DECISIONS CONCERNING COMPLIANCE ISSUES WITH APPLICABLE OSHA REGULATIONS.

K. REFERENCE MECHANICAL AND/OR PLUMBING DEMOLITION SHEETS FOR ADDITIONAL INFORMATION

REGARDING PIPES WRAPPED WITH ASBESTOS MATERIALS.

L. REFERENCE MECHANICAL AND/OR PLUMBING DEMOLITION SHEETS FOR IDENTIFIED & POSSIBLE

LOCATIONS OF PIPES WRAPPED WITH ASBESTOS MATERIALS.

M. REFERENCE ARCHITECTURAL DEMOLITION SHEETS FOR INFORMATION REGARDING DEMOLITION OF

NON HAZARDOUS MATERIALS.

N. PROVIDE BARRIERS BETWEEN RENOVATION AREAS AND OCCUPIED AREAS AS REQUIRED.

O. REMOVE ALL MOUNTABLE OBJECTS WITHIN SCHEDULED ABATEMENT AREAS PRIOR TO

COMMENCEMENT OF ABATEMENT ACTIVITIES.

P. PRIOR TO CONDUCTING ABATEMENT ACTIVITIES, MECHANICAL CONTRACTOR TO REMOVE DIFFUSERS

AND CAP SUPPLY AND RETURN DUCTS. ABATEMENT CONTRACTOR TO SEAL ANY SEAMS IN HVAC

SYSTEM COMPONENTS THAT PASS THROUGH THE REGULATED AREA

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

C. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

D. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

E. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

F. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

G. DIMENSIONS ARE TO FACE OF FRAMING, CENTERLINE OF EQUIPMENT, CENTERLINE OF FIXTURE, OR

GRID UON. DIMENSIONS ARE TO FACE OF FINISH ON INTERIOR ELEVATIONS AND/OR WHERE THE

ABBREVIATION "CLR" IS USED UON.

HAZARDOUS WASTE LEGEND

EXISTING COMPONENT TO REMAINASBESTOS TILE/LINOLEUM

TO BE ABATED

GENERAL DEMOLITION NOTES

H. PROTECT ALL EXISTING UTILITIES UON.

I. WHERE APPLICABLE, ROOF PROTECTION IS TO BE PROVIDED FOR EXISTING ROOFS DURING ALL

PHASES OF CONSTRUCTION.

J. PATCH REMAINING EXISTING CONSTRUCTION AFFECTED BY DEMOLITION AS NEEDED.

K. PATCHING AND/OR INFILL TO MATCH EXISTING CONSTRUCTION & FINISHES UON.

L. EXISTING ITEMS TO REMAIN ARE SHOWN IN GRAY.

M. EXISTING ITEMS TO BE DEMOED ARE SHOWN WHITE WITH DASHED LINES.

N. INFILL OF FIRE PARTITION PENETRATIONS/OPENINGS SHALL MAINTAIN THE INTEGRITY OF THE

RATING.

O. CONTRACTOR TO COORDINATE RELOCATION AND/OR STORAGE OF SALVAGED ITEMS WITH THE

OWNER UON.

P. REFERENCE HAZARDOUS MATERIALS, MECHANICAL DEMOLITION, AND/OR PLUMBING DEMOLITION

SHEETS FOR INFORMATION REGARDING DEMOLITION OF HAZARDOUS MATERIALS.

Q. SEE STRUCTURAL DETAILS FOR INFORMATION REGARDING INFILL OF EXISTING STRUCTURAL FLOOR &

ROOF PENETRATIONS.

R. ALL CONSTRUCTION WASTE PRODUCED BY DEMOLITION TO BE PROPERTY OF CONTRACTOR UON.

S. PLUMBING ON BASEMENT LEVEL TO BE REMOVED TO BELOW THE FLOOR AND CAPPED. SEE

STRUCTURAL FOR CONCRETE PATCH DETAILS.

T. EXISTING INTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD AND PREPPED FOR

NEW STAIN FINISH. EXISTING EXTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD

AND PREPPED FOR NEW PAINT.

U. STRIP EXISTING STAINED WOOD WINDOWS, TRIM, AND SILLS. PREPARE FOR NEW STAIN FINISH.

EXISTING WOOD TRIM AND SILLS TO BE REMOVED AND SALVAGED AS NECESSARY FOR

REINSTALLATION

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

C. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

D. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

E. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

F. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

G. DIMENSIONS ARE TO FACE OF FRAMING, CENTERLINE OF EQUIPMENT, CENTERLINE OF FIXTURE, OR

GRID UON. DIMENSIONS ARE TO FACE OF FINISH ON INTERIOR ELEVATIONS AND/OR WHERE THE

ABBREVIATION "CLR" IS USED UON.

3/16" = 1'-0" D5

HAZARDOUS ABATEMENT PLAN -

BASEMENT

VA FORM 08 - 6231

A

B

C

D

A

B

C

D

2 4 5 61

6"

6"

6"

6"

O N

E E

IG

H

T H

I N

C H

O

N E

F O

O T

1/

8"

'-0

O

N E

Q U

A R

T E

R I

N C

H

O N

E F

O O

T

1/ 4"

'-0

T H

R E

E E

IG

H

T H

S

IN

C H

O

N E

F O

O T

(3 /8

1' -0

O

N E

H A

LF

I

N C

H

O N

E F

O O

T

1/ 2"

'-0

T H

R E

E Q

U A

R T

E R

S

IN

C H

O

N E

F O

O T

3/

4"

'-0

O

N E

I N

C H

O

N E

F O

O T

1"

'-0

O N

E A

N D

O N

E H

A

LF

I N

C H

E S

O

N E

F O

O T

1/ 2"

'-0

T H

R E

E

IN

C H

E S

O

N E

F O

O T

3"

'-0

32 4 5 61

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

DESIGNER OF RECORD

A/E:

STAMPCONSULTANTS

STRUCTURAL:

ALBERTSON ENGINEERING, INC.

3202 W. MAIN ST., #C

RAPID CITY, SD 57702

605-343-9606

MEP:

WEST PLAINS ENGINEERING, INC.

1750 RAND ROAD

RAPID CITY, SD 57702

605-348-7455

STEPHEN KILBER MIKE SIGMAN (ELEC)

MICHAEL HEINRICH (MECH)

C :\U se rs

\K .K ue pe r\D oc um en ts \2

D om R en ov

B ui ld in g

_k yl ek 9D

U H

U .rv t 6/

2/

:0 1:

P

M

HA100

HAZARDOUS ABATEMENT PLAN - BASEMENT

STONE GROUP ARCHITECTS

600 EAST 7TH ST.

SIOUX FALLS, SD 57103

605-271-1144

TODD STONE

DOM RENOVATION FOR

SEMIPRIVATE ROOMS

HOT SPRINGS, SD

DOUG SPRINKLE

06/03/2025 JM/GB/TM TL/KK

SGA #211921

VA #568A4-21-208

BID DOCUMENTS

TRUE

NORTH

PLAN

NORTH

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.91 ABATE LEAD PAINT ON WOOD WINDOW SASHES, SILLS, FRAMES & TRIM. INTERIOR AND

EXTERIOR.

2.92 ABATE LEAD PAINT ON WOOD DOOR AND TRIM.

2.95 ABATE ASBESTOS 12" WHITE/BLACK & 12" TAN FLOOR TILE.

2.96 ABATE ASBESTOS TAN LINOLEUM SHEET FLOORING. SEE HAZARDOUS ABATEMENT PLANS FOR

ABATEMENT OF ASBESTOS CONTAINING FLOOR MATERIAL.

ISSUE # DESCRIPTION DATE

B

C

D

10 13 14

2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91 2.91

2.91 2.91 2.91

2.91

2.912.912.91

2.912.912.912.912.912.912.912.912.912.912.912.91

2.91

2.91

2.92

2.92

2.92

4 5 6 7 8 9 11 12

2.942.942.942.942.942.942.942.942.94

2.94

2.94

2.94

2.94

2.94

2.91 2.91

2.91 2.91

2.92

2.92

2.94

DAYROOM 104

PATIENT

QUARTERS

1-BED

HAC

BATH 101

TOILET

TR

OFFICE

CORRIDOR

2.92

2.92

GENERAL HAZARDOUS MATERIAL NOTES

I. MATERIALS CONTAINING LESS THAN 1% ASBESTOS ARE NOT REQUIRED BY NESHPA OR AHERA;

HOWEVER THE OSHA PERSONAL EXPOSURE LIMITS (0.1 F/CC OF AIR AS AN EIGHT HOUR TIME

WEIGHTED AVERAGE OR 1.0 F/CC OF AIR OVER 30 MINUTES) FOR ASBESTOS APPLY WHEN MATERIALS

CONTAINING 1% ASBESTOS OR LESS ARE DISTURBED DURING RENOVATIONS OR DEMOLITIONS.

J. REFERENCE ASBESTOS SURVEY FOR A LIST OF MATERIALS THAT CONTAIN 1% ASBESTOS OR LESS

WHICH WILL ENABLE THE RENOVATION / DEMOLITION CONTRACTOR TO MAKE APPROPRIATE

DECISIONS CONCERNING COMPLIANCE ISSUES WITH APPLICABLE OSHA REGULATIONS.

K. REFERENCE MECHANICAL AND/OR PLUMBING DEMOLITION SHEETS FOR ADDITIONAL INFORMATION

REGARDING PIPES WRAPPED WITH ASBESTOS MATERIALS.

L. REFERENCE MECHANICAL AND/OR PLUMBING DEMOLITION SHEETS FOR IDENTIFIED & POSSIBLE

LOCATIONS OF PIPES WRAPPED WITH ASBESTOS MATERIALS.

M. REFERENCE ARCHITECTURAL DEMOLITION SHEETS FOR INFORMATION REGARDING DEMOLITION OF

NON HAZARDOUS MATERIALS.

N. PROVIDE BARRIERS BETWEEN RENOVATION AREAS AND OCCUPIED AREAS AS REQUIRED.

O. REMOVE ALL MOUNTABLE OBJECTS WITHIN SCHEDULED ABATEMENT AREAS PRIOR TO

COMMENCEMENT OF ABATEMENT ACTIVITIES.

P. PRIOR TO CONDUCTING ABATEMENT ACTIVITIES, MECHANICAL CONTRACTOR TO REMOVE DIFFUSERS

AND CAP SUPPLY AND RETURN DUCTS. ABATEMENT CONTRACTOR TO SEAL ANY SEAMS IN HVAC

SYSTEM COMPONENTS THAT PASS THROUGH THE REGULATED AREA

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

C. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

D. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

E. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

F. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

G. DIMENSIONS ARE TO FACE OF FRAMING, CENTERLINE OF EQUIPMENT, CENTERLINE OF FIXTURE, OR

GRID UON. DIMENSIONS ARE TO FACE OF FINISH ON INTERIOR ELEVATIONS AND/OR WHERE THE

ABBREVIATION "CLR" IS USED UON.

HAZARDOUS WASTE LEGEND

EXISTING COMPONENT TO REMAINASBESTOS TILE/LINOLEUM

TO BE ABATED

GENERAL DEMOLITION NOTES

H. PROTECT ALL EXISTING UTILITIES UON.

I. WHERE APPLICABLE, ROOF PROTECTION IS TO BE PROVIDED FOR EXISTING ROOFS DURING ALL

PHASES OF CONSTRUCTION.

J. PATCH REMAINING EXISTING CONSTRUCTION AFFECTED BY DEMOLITION AS NEEDED.

K. PATCHING AND/OR INFILL TO MATCH EXISTING CONSTRUCTION & FINISHES UON.

L. EXISTING ITEMS TO REMAIN ARE SHOWN IN GRAY.

M. EXISTING ITEMS TO BE DEMOED ARE SHOWN WHITE WITH DASHED LINES.

N. INFILL OF FIRE PARTITION PENETRATIONS/OPENINGS SHALL MAINTAIN THE INTEGRITY OF THE

RATING.

O. CONTRACTOR TO COORDINATE RELOCATION AND/OR STORAGE OF SALVAGED ITEMS WITH THE

OWNER UON.

P. REFERENCE HAZARDOUS MATERIALS, MECHANICAL DEMOLITION, AND/OR PLUMBING DEMOLITION

SHEETS FOR INFORMATION REGARDING DEMOLITION OF HAZARDOUS MATERIALS.

Q. SEE STRUCTURAL DETAILS FOR INFORMATION REGARDING INFILL OF EXISTING STRUCTURAL FLOOR &

ROOF PENETRATIONS.

R. ALL CONSTRUCTION WASTE PRODUCED BY DEMOLITION TO BE PROPERTY OF CONTRACTOR UON.

S. PLUMBING ON BASEMENT LEVEL TO BE REMOVED TO BELOW THE FLOOR AND CAPPED. SEE

STRUCTURAL FOR CONCRETE PATCH DETAILS.

T. EXISTING INTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD AND PREPPED FOR

NEW STAIN FINISH. EXISTING EXTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD

AND PREPPED FOR NEW PAINT.

U. STRIP EXISTING STAINED WOOD WINDOWS, TRIM, AND SILLS. PREPARE FOR NEW STAIN FINISH.

EXISTING WOOD TRIM AND SILLS TO BE REMOVED AND SALVAGED AS NECESSARY FOR

REINSTALLATION

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

C. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

D. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

E. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

F. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

G. DIMENSIONS ARE TO FACE OF FRAMING, CENTERLINE OF EQUIPMENT, CENTERLINE OF FIXTURE, OR

GRID UON. DIMENSIONS ARE TO FACE OF FINISH ON INTERIOR ELEVATIONS AND/OR WHERE THE

ABBREVIATION "CLR" IS USED UON.

VA FORM 08 - 6231

A

B

C

D

A

B

C

D

2 4 5 61

6"

6"

6"

6"

O N

E E

IG

H

T H

I N

C H

O

N E

F O

O T

1/

8"

'-0

O

N E

Q U

A R

T E

R I

N C

H

O N

E F

O O

T

1/ 4"

'-0

T H

R E

E E

IG

H

T H

S

IN

C H

O

N E

F O

O T

(3 /8

1' -0

O

N E

H A

LF

I

N C

H

O N

E F

O O

T

1/ 2"

'-0

T H

R E

E Q

U A

R T

E R

S

IN

C H

O

N E

F O

O T

3/

4"

'-0

O

N E

I N

C H

O

N E

F O

O T

1"

'-0

O N

E A

N D

O N

E H

A

LF

I N

C H

E S

O

N E

F O

O T

1/ 2"

'-0

T H

R E

E

IN

C H

E S

O

N E

F O

O T

3"

'-0

32 4 5 61

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

DESIGNER OF RECORD

A/E:

STAMPCONSULTANTS

STRUCTURAL:

ALBERTSON ENGINEERING, INC.

3202 W. MAIN ST., #C

RAPID CITY, SD 57702

605-343-9606

MEP:

WEST PLAINS ENGINEERING, INC.

1750 RAND ROAD

RAPID CITY, SD 57702

605-348-7455

STEPHEN KILBER MIKE SIGMAN (ELEC)

MICHAEL HEINRICH (MECH)

C :\U se rs

\K .K ue pe r\D oc um en ts \2

D om R en ov

B ui ld in g

_k yl ek 9D

U H

U .rv t 6/

2/

:0 1:

P

M

HA101

HAZARDOUS ABATEMENT PLAN - 1ST FLOOR

STONE GROUP ARCHITECTS

600 EAST 7TH ST.

SIOUX FALLS, SD 57103

605-271-1144

TODD STONE

DOM RENOVATION FOR

SEMIPRIVATE ROOMS

HOT SPRINGS, SD

DOUG SPRINKLE

06/03/2025 JM/GB/TM TL/KK

SGA #211921

VA #568A4-21-208

BID DOCUMENTS

TRUE

NORTH

PLAN

NORTH

3/16" = 1'-0" D5

HAZARDOUS ABATEMENT PLAN -

FIRST FLOOR

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.91 ABATE LEAD PAINT ON WOOD WINDOW SASHES, SILLS, FRAMES & TRIM. INTERIOR AND

EXTERIOR.

2.92 ABATE LEAD PAINT ON WOOD DOOR AND TRIM.

2.94 ABATE LEAD PAINT ON WOOD PORCH FLOORS, SUPPORTS, RAILINGS & TRIM. INTERIOR AND

EXTERIOR.

UP

B

C

D

10 13 14

2.91

2.91 2.91

2.91 2.91 2.91 2.91

2.92

2.91 2.91 2.91 2.91

2.91 2.91 2.91

2.91

2.912.912.91

2.912.912.912.912.912.912.912.912.912.912.912.91

2.92

4 5 6 7 8 9 11 12

2.94

2.94

2.942.942.942.942.942.942.942.94

2.94

2.94

2.94

2.94

2.94

OFFICE 211

PATIENT

QUARTERS

TOILET

BATH

202A

CHASE

HAC

OFFICE

OFFICE 209

OFFICE

CORRIDOR

STAIR

2.92

2.92

2.92

GENERAL HAZARDOUS MATERIAL NOTES

I. MATERIALS CONTAINING LESS THAN 1% ASBESTOS ARE NOT REQUIRED BY NESHPA OR AHERA;

HOWEVER THE OSHA PERSONAL EXPOSURE LIMITS (0.1 F/CC OF AIR AS AN EIGHT HOUR TIME

WEIGHTED AVERAGE OR 1.0 F/CC OF AIR OVER 30 MINUTES) FOR ASBESTOS APPLY WHEN MATERIALS

CONTAINING 1% ASBESTOS OR LESS ARE DISTURBED DURING RENOVATIONS OR DEMOLITIONS.

J. REFERENCE ASBESTOS SURVEY FOR A LIST OF MATERIALS THAT CONTAIN 1% ASBESTOS OR LESS

WHICH WILL ENABLE THE RENOVATION / DEMOLITION CONTRACTOR TO MAKE APPROPRIATE

DECISIONS CONCERNING COMPLIANCE ISSUES WITH APPLICABLE OSHA REGULATIONS.

K. REFERENCE MECHANICAL AND/OR PLUMBING DEMOLITION SHEETS FOR ADDITIONAL INFORMATION

REGARDING PIPES WRAPPED WITH ASBESTOS MATERIALS.

L. REFERENCE MECHANICAL AND/OR PLUMBING DEMOLITION SHEETS FOR IDENTIFIED & POSSIBLE

LOCATIONS OF PIPES WRAPPED WITH ASBESTOS MATERIALS.

M. REFERENCE ARCHITECTURAL DEMOLITION SHEETS FOR INFORMATION REGARDING DEMOLITION OF

NON HAZARDOUS MATERIALS.

N. PROVIDE BARRIERS BETWEEN RENOVATION AREAS AND OCCUPIED AREAS AS REQUIRED.

O. REMOVE ALL MOUNTABLE OBJECTS WITHIN SCHEDULED ABATEMENT AREAS PRIOR TO

COMMENCEMENT OF ABATEMENT ACTIVITIES.

P. PRIOR TO CONDUCTING ABATEMENT ACTIVITIES, MECHANICAL CONTRACTOR TO REMOVE DIFFUSERS

AND CAP SUPPLY AND RETURN DUCTS. ABATEMENT CONTRACTOR TO SEAL ANY SEAMS IN HVAC

SYSTEM COMPONENTS THAT PASS THROUGH THE REGULATED AREA

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

C. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

D. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

E. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

F. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

G. DIMENSIONS ARE TO FACE OF FRAMING, CENTERLINE OF EQUIPMENT, CENTERLINE OF FIXTURE, OR

GRID UON. DIMENSIONS ARE TO FACE OF FINISH ON INTERIOR ELEVATIONS AND/OR WHERE THE

ABBREVIATION "CLR" IS USED UON.

HAZARDOUS WASTE LEGEND

EXISTING COMPONENT TO REMAINASBESTOS TILE/LINOLEUM

TO BE ABATED

GENERAL DEMOLITION NOTES

H. PROTECT ALL EXISTING UTILITIES UON.

I. WHERE APPLICABLE, ROOF PROTECTION IS TO BE PROVIDED FOR EXISTING ROOFS DURING ALL

PHASES OF CONSTRUCTION.

J. PATCH REMAINING EXISTING CONSTRUCTION AFFECTED BY DEMOLITION AS NEEDED.

K. PATCHING AND/OR INFILL TO MATCH EXISTING CONSTRUCTION & FINISHES UON.

L. EXISTING ITEMS TO REMAIN ARE SHOWN IN GRAY.

M. EXISTING ITEMS TO BE DEMOED ARE SHOWN WHITE WITH DASHED LINES.

N. INFILL OF FIRE PARTITION PENETRATIONS/OPENINGS SHALL MAINTAIN THE INTEGRITY OF THE

RATING.

O. CONTRACTOR TO COORDINATE RELOCATION AND/OR STORAGE OF SALVAGED ITEMS WITH THE

OWNER UON.

P. REFERENCE HAZARDOUS MATERIALS, MECHANICAL DEMOLITION, AND/OR PLUMBING DEMOLITION

SHEETS FOR INFORMATION REGARDING DEMOLITION OF HAZARDOUS MATERIALS.

Q. SEE STRUCTURAL DETAILS FOR INFORMATION REGARDING INFILL OF EXISTING STRUCTURAL FLOOR &

ROOF PENETRATIONS.

R. ALL CONSTRUCTION WASTE PRODUCED BY DEMOLITION TO BE PROPERTY OF CONTRACTOR UON.

S. PLUMBING ON BASEMENT LEVEL TO BE REMOVED TO BELOW THE FLOOR AND CAPPED. SEE

STRUCTURAL FOR CONCRETE PATCH DETAILS.

T. EXISTING INTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD AND PREPPED FOR

NEW STAIN FINISH. EXISTING EXTERIOR PAINTED WOOD SURFACES TO BE STRIPPED TO BARE WOOD

AND PREPPED FOR NEW PAINT.

U. STRIP EXISTING STAINED WOOD WINDOWS, TRIM, AND SILLS. PREPARE FOR NEW STAIN FINISH.

EXISTING WOOD TRIM AND SILLS TO BE REMOVED AND SALVAGED AS NECESSARY FOR

REINSTALLATION

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

C. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

D. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

E. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

F. SEE STRUCTURAL, MECHANICAL, ELECTRICAL, & PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

G. DIMENSIONS ARE TO FACE OF FRAMING, CENTERLINE OF EQUIPMENT, CENTERLINE OF FIXTURE, OR

GRID UON. DIMENSIONS ARE TO FACE OF FINISH ON INTERIOR ELEVATIONS AND/OR WHERE THE

ABBREVIATION "CLR" IS USED UON.

VA FORM 08 - 6231

A

B

C

D

A

B

C

D

2 4 5 61

6"

6"

6"

6"

O N

E E

IG

H

T H

I N

C H

O

N E

F O

O T

1/

8"

'-0

O

N E

Q U

A R

T E

R I

N C

H

O N

E F

O O

T

1/ 4"

'-0

T H

R E

E E

IG

H

T H

S

IN

C H

O

N E

F O

O T

(3 /8

1' -0

O

N E

H A

LF

I

N C

H

O N

E F

O O

T

1/ 2"

'-0

T H

R E

E Q

U A

R T

E R

S

IN

C H

O

N E

F O

O T

3/

4"

'-0

O

N E

I N

C H

O

N E

F O

O T

1"

'-0

O N

E A

N D

O N

E H

A

LF

I N

C H

E S

O

N E

F O

O T

1/ 2"

'-0

T H

R E

E

IN

C H

E S

O

N E

F O

O T

3"

'-0

32 4 5 61

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

DESIGNER OF RECORD

A/E:

STAMPCONSULTANTS

STRUCTURAL:

ALBERTSON ENGINEERING, INC.

3202 W. MAIN ST., #C

RAPID CITY, SD 57702

605-343-9606

MEP:

WEST PLAINS ENGINEERING, INC.

1750 RAND ROAD

RAPID CITY, SD 57702

605-348-7455

STEPHEN KILBER MIKE SIGMAN (ELEC)

MICHAEL HEINRICH (MECH)

C :\U se rs

\K .K ue pe r\D oc um en ts \2

D om R en ov

B ui ld in g

_k yl ek 9D

U H

U .rv t 6/

2/

:0 1:

P

M

HA102

HAZARDOUS ABATEMENT PLAN - 2ND FLOOR

STONE GROUP ARCHITECTS

600 EAST 7TH ST.

SIOUX FALLS, SD 57103

605-271-1144

TODD STONE

DOM RENOVATION FOR

SEMIPRIVATE ROOMS

HOT SPRINGS, SD

DOUG SPRINKLE

06/03/2025 JM/GB/TM TL/KK

SGA #211921

VA #568A4-21-208

BID DOCUMENTS

TRUE

NORTH

PLAN

NORTH

3/16" = 1'-0" D5

HAZARDOUS ABATEMENT PLAN -

SECOND FLOOR

KEYNOTES

KEY VALUE KEYNOTE TEXT

2.91 ABATE LEAD PAINT ON WOOD WINDOW SASHES, SILLS, FRAMES & TRIM. INTERIOR AND

EXTERIOR.

2.92 ABATE LEAD PAINT ON WOOD DOOR AND TRIM.

2.94 ABATE LEAD PAINT ON WOOD PORCH FLOORS, SUPPORTS, RAILINGS & TRIM. INTERIOR AND

EXTERIOR.

Sheets
HA100 - HAZARDOUS ABATEMENT PLAN - BASEMENT
HA101 - HAZARDOUS ABATEMENT PLAN - 1ST FLOOR
HA102 - HAZARDOUS ABATEMENT PLAN - 2ND FLOOR