B09_AM_004_Revised_Construction_Price_Schedule_20230719_0004.pdf
PDF 65 KB Posted
- Attached to
- CACO 227735 - Reconstruct Mill Creek Water Control Federal contract opportunity
- Solicitation number
- 140P2023R0112
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule Template National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:
PARK - PMIS: 227735
(Project Management Information System)
Developed Area: Cape Cod National Seashore in Wellfleet, Massachusetts
Project Title: Mill Creek Water Control Structure and Drainage Improvements
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line
Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Mobilization 1 LS
2 General Requirements 1 LS
3 Demobilization 1 LS
4 Site Clearing and Demolition 1 LS
5 Remnant Dike Excavation 1 LS
Temporary Access and Erosion and Sedimentation
Controls
1 LS
7 Control of Water 1 LS
8 Precast Modular Concrete Block Retaining Wall 1 LS
9 Permanent Gravel Access Drive 1 LS
10 Articulating Concrete Block Matting Access Drive 1 LS
11 Steel Sheet Pile Wall 1 LS
12 Steel Sheeting Concrete Cap 1 LS
13 Cantilevered Steel Walkway 1 LS
14 Earthwork 1 LS
15 Steel-Backed Timber Guardrail 1 LS
16 Water Control Structure 1 LS
Soil-Filled Stone Armor Slope and Overtopping
Protection
1 LS
Sediment-Filled Stone Armor Channel Scour
Protection
1 LS
19 Trailer-Mounted Generator 1 LS
20 Water Control Gates and Power/Control System 1 LS
Water Control Gate System Testing and
Commissioning
1 LS
22 Site Restoration 1 LS
23 Unsuitable Soil Structural Excavation 475 CY
24 Crushed Stone for Structure Foundation 70 CY
25 Tidal Channel Dredging - Off-Site Disposal 100 CY
26 Tidal Channel Dredging - Benefical Reuse 800 CY
27 Steel H-Piles 535 LF
28 Additional Subgrade Reinforcement Stone 10 TON
TOTAL BASE PRICE (Contract Line Item Number 1 through 28) --------------------------------------------------------------------------------- $0.00
Contract Option Item 1 - Pavement Micromilling and Overlay
250 SY $0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item 1) ----------------------------------------------------------- $0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 29) -------------------------- $0.00
All measurement and payment information is included in Division 01 Specifications Section 01 22 19 Payment Items.
REVISED 7/19/23
File details come from the government source that posted it. Updated .