B08_Attachment_01_CACO_227735_CD_FINAL_Drawings_0001.pdf
PDF 43 MB Posted
- Attached to
- CACO 227735 - Reconstruct Mill Creek Water Control Federal contract opportunity
- Solicitation number
- 140P2023R0112
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE
LOCATION
C
H
E
Q
U
E
S
S
E
T
N
E
C
K
R
D
H
E
R
R
I
G
I
V
E
R
WELLFLEET
HARBOR
SITE
LOCATION
G
R
I F
F
I
S
I
L
A
O
A
D
D
U
H
A
R
B
A
D
M
I L L
C
R
E E
K
O
L
E
Q
U
E
S
S
E
SHEET INDEX
SHEET SUB SHEET TITLE OF SHEET
1 GI-001 COVER SHEET
2 CN-001
GENERAL NOTES, LEGEND, AND INDEX PLAN
3-5 CS-101 - CS-103 EXISTING CONDITIONS PLAN NO. 1-3
6-8 CS-104 - CS-106 SITE PREPARATION PLAN NO. 1-3
9-11 CS-107 - CS-109 PROPOSED CONDITIONS PLAN NO. 1-3
12 ME-101
TIDAL CHANNEL DRAINAGE IMPROVEMENTS EXISTING
CONDITIONS PLAN
13 ME-102
TIDAL CHANNEL DRAINAGE IMPROVEMENTS PROPOSED
CONDITIONS PLAN
14-16 LP-101 - LP-103 RESTORATION PLAN NO. 1-3
17-19 CP-101 - CP-103 CONSTRUCTION SEQUENCE & WATER CONTROL PLAN NO. 1-3
20 CX-501 ACCESS DRIVE PROFILE
21-24 CX-502 - CX-505 ACCESS DRIVE SECTIONS SHEET NO. 1-4
25 CX-506
CONCRETE WATER CONTROL STRUCTURE WEST SIDE
PROFILE
26 CX-507
CONCRETE WATER CONTROL STRUCTURE EAST SIDE
PROFILE
27 CX-508 CONCRETE WATER CONTROL STRUCTURE SECTIONS
28 CX-509
TIDAL CHANNEL DRAINAGE IMPROVEMENTS SECTIONS
AND PROFILE
29-30 CD-501 - CD-502 CONSTRUCTION DETAILS
31 CD-503 EROSION AND SEDIMENTATION CONTROL DETAILS
32 EA-001 GATE POWER/CONTROL UTILITY SITE PLAN
33 EA-002 ELECTRICAL DETAILS
34 SA-001
WATER CONTROL STRUCTURE PLAN, ELEVATION AND
GENERAL NOTES
35 SA-002
WATER CONTROL STRUCTURE, ELEVATION, SECTIONS AND
DETAILS
36-37 SA-003 - SA-004 WATER CONTROL STRUCTURE DETAILS
38-40 SA-005 - SA-007 CATWALK DETAILS
MILL CREEK WATER CONTROL STRUCTURE AND DRAINAGE IMPROVEMENTS
C
S
C
S
C
MILL
CREEK
CHEQUESSETT
YACHT AND
COUNTRY CLUB
O
E
Q
U
E
S
S
E
T
T
H
E
R
R
I
N
G
R
I
V
E
R
DRIVE
H E
R R
I N
G
R I V
E R
EBB
FLOW
TIDAL
FLOW
WATER CONTROL
STRUCTURE
BENCHMARK
41.9330550°
-70.0571432°
N
E
A
C
C
E
S
S
CS-101,CS-104,
CS-107, & RC-101
C
S
C
S
C
S
C
M
E
M
CS-110
EXISTING LEGEND
1. PROJECT LOCATION AREA:
MILL CREEK AT OLD CHEQUESSETT NECK ROAD
ASSESSOR MAP NOs. 12 AND 19
PARCEL NOs. 19-6, 19-603, AND PORTION OF OLD CHEQUESSET NECK ROAD RIGHT-OF-WAY
WELLFLEET, MASSACHUSETTS
2. EXISTING SITE CONDITIONS INCLUDING SITE FEATURES, WETLAND FLAGGING, AND TOPOGRAPHICAL INFORMATION WITHIN THE IMMEDIATE PROJECT
AREA ARE BASED UPON LIDAR DATA AND ON-GROUND SURVEY PERFORMED BY BAXTER NYE ENGINEERING & SURVEYING ON MULTIPLE DATES BETWEEN
NOVEMBER 2015 THROUGH MAY 2016. APPROXIMATE LIMIT OF GROUND SURVEY IS SHOWN ON EXISTING CONDITIONS PLANS.
3. ALL SURVEY ELEVATIONS DEPICTED HEREON ARE IN ENGLISH UNITS (FEET) AND REFERENCED TO NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88), UNLESS OTHERWISE NOTED. THE COORDINATE SYSTEM UTILIZED IS NAD83, MASSACHUSETTS STATE PLANE, MAINLAND ZONE, UNITED STATES FOOT.
4. SURVEY BENCHMARKS:
· DISK IN CONCRETE BOUND EAST OF MILL CREEK NEAR THE PROPOSED OUTLET STRUCTURE - EL. 3.88FT.
· CONCRETE BOUND FOUND WEST OF MILL CREEK - EL. 21.71FT. THE BENCH MARK WAS ESTABLISHED BY LEICA RX 1250 TC GPS RTK.
5. PROPERTY BOUNDARIES SHOWN HEREIN WERE OBTAINED FROM MASSGIS PROPERTY LINE DATABASES, ARE NOT TO BE CONSTRUED AS AN ACCURATE
BOUNDARY SURVEY, AND ARE SUBJECT TO SUCH CHANGES AS AN ACCURATE BOUNDARY SURVEY MAY DISCLOSE.
6. FLOOD ZONE INFORMATION:
THE PROJECT IS LOCATED IN FLOOD ZONE AE-13 (BASE FLOOD ELEVATION = 13.0 FEET, NAVD88) AS REFLECTED IN FLOOD INSURANCE RATE MAP (FIRM)
NO.250010C241J FOR BARNSTABLE COUNTY DATED JULY 16, 2014.
7. NO EXISTING STRUCTURES OR MOORINGS ARE PRESENT IN WATERS ADJACENT TO THE PROPOSED PROJECT AREA.
8. ENVIRONMENTAL INFORMATION:
· EXISTING TIDAL ELEVATIONS WERE OBTAINED FROM A REPORT ENTITLED "HERRING RIVER HYDRODYNAMIC MODELING, FINAL COMPREHENSIVE
REPORT," PREPARED BY THE WOODS HOLE GROUP, AND DATED JUNE 2012.
· ALL OR PORTIONS OF THE SITE ARE WITHIN AN A.C.E.C. (AREA OF CRITICAL ENVIRONMENTAL CONCERN).
· ALL OR PORTIONS OF THE SITE ARE WITHIN AN AREA OF ESTIMATED HABITAT OF RARE WILDLIFE PER MASS GIS OLIVER AUGUST 1, 2021 "ESTIMATED
HABITATS OF RARE WILDLIFE" FOR USE WITH THE MA WETLANDS PROTECTION ACT REGULATIONS (310 CMR 10).
· WETLAND RESOURCE AREAS LOCATED OUTSIDE OF THE LIMIT OF SURVEY ARE BASED ON NATIONAL WETLANDS INVENTORY SHAPEFILES OPTAINED
FROM MASSGIS OLIVER.
· COASTAL BANK WITHIN THE PROJECT AREA HAS BEEN DELINEATED BASED TOP OF COASTAL BANK LINES OBTAINED FROM ESS GROUP,INC.
· SITE DOES NOT CONTAIN A CERTIFIED VERNAL POOL PER MASS GIS OLIVER "CERTIFIED VERNAL POOLS."
· THE SITE IS WITHIN A PRIORITY HABITAT PER MASS GIS OLIVER AUGUST 1, 2021 "PRIORITY HABITATS OF RARE SPECIES" FOR SPECIES UNDER THE
MASSACHUSETTS ENDANGERED SPECIES ACT, REGULATIONS (321 CMR 10).
· THE SITE IS NOT WITHIN A GROUND WATER RECHARGE PROTECTION AREA.
· MILL CREEK IS CONSIDERED A TIER 2.5 (OUTSTANDING RESOURCE WATER) WATER.
SURVEY NOTES, MAP NOTES, AND EXISTING CONDITION REFERENCES
LIMIT OF TOPOGRAPHIC GROUND
SURVEY
PROPERTY BOUNDARY
CAPE COD NATIONAL SEASHORE
BOUNDARY AND AREA OF CRITICAL
ENVIRONMENTAL CONCERN
EDGE OF CHANNEL/BANK
HIGH TIDE LINE
APPROX. MEAN HIGH WATER
BOUNDARY
APPROX. MEAN LOW WATER
BOUNDARY
FEMA 100-YEAR FLOODPLAIN
BOUNDARY
WETLAND FLAG / COASTAL WETLAND
CONTOUR (LIDAR)
CONTOUR (GROUND SURVEY)
SPOT ELEVATION (GROUND SURVEY)
SPOT ELEVATION (LIDAR)
EDGE OF PAVEMENT
EDGE OF EXISTING GRAVEL DRIVE
OR PATH
TREE LINE
EDGE OF WATER
ESTIMATED HABITAT OF RARE
WILDLIFE
50 FT FILTER STRIP
100 FT BUFFER ZONE
200 FT RIVERFRONT AREA
CONCRETE BOUND FOUND
BORING LOCATION
EXISTING STONE ARMOR
GENERAL CONSTRUCTION AND COORDINATION NOTES
1. VERIFY THE LOCATIONS OF EXISTING STRUCTURES AND THE PROPOSED LAYOUT OF THE DIKE IN ITS RELATIONSHIP TO THE EXISTING SITE SURVEY. THE
CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER
OF ANY DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH THE WORK.
2. OBTAIN FIELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLY. RECHECK MEASUREMENTS BEFORE CONSTRUCTING EACH WORK ITEM.
WHERE PORTIONS OF THE WORK ARE INDICATED TO FIT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER CONSTRUCTION BY FIELD
MEASUREMENTS BEFORE FABRICATION. COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID DELAYING THE WORK.
3. ESTABLISH BENCHMARKS AND CONTROL POINTS IN ADDITION TO THOSE INDICATED TO SET LINES, GRADES, AND LEVELS AT EACH STAGE OF
CONSTRUCTION. LOCATE THE WORK AND COMPONENTS OF THE WORK ACCURATELY, IN CORRECT ALIGNMENT AND ELEVATION, AS INDICATED.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, SIGNS, CURBS, ETC., THAT MUST BE
CUT OR THAT ARE DAMAGED DURING CONSTRUCTION.
5. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLING MATERIALS AND PRODUCTS.
6. INSTALL PRODUCTS AT THE TIME AND UNDER CONDITIONS THAT WILL ENSURE THE BEST POSSIBLE RESULTS. MAINTAIN CONDITIONS REQUIRED FOR
PRODUCT PERFORMANCE UNTIL SUBSTANTIAL COMPLETION.
7. CONDUCT CONSTRUCTION OPERATIONS SO NO PART OF THE WORK IS SUBJECTED TO DAMAGING OPERATIONS OR LOADING IN EXCESS OF THAT
EXPECTED DURING NORMAL POST-CONSTRUCTION CONDITIONS.
8. ALIGNMENT OF EXISTING TIDAL CHANNEL BASELINE IS APPROXIMATE AND DEPICTED AS SHOWN HEREON BASED ON AVAILABLE MASSGIS AND NPS DATA.
ACTUAL CHANNEL ALIGNMENT AND EXTENTS SHALL BE FIELD VERIFIED, MAPPED AND THE LOCATIONS/LIMITS OF TEMPORARY AND PROPOSED WORK
AREAS ADJUSTED AS APPROPRIATE AND REVIEWED/APPROVED BY NPS PRIOR TO ANY PROJECT FIELD ACTIVITIES BETWEEN CHANNEL STA. 0+00 AND
10+25.
9. USE PRODUCTS, CLEANERS, AND INSTALLATION MATERIALS THAT ARE NOT CONSIDERED HAZARDOUS.
10. CONTRACTOR SHALL USE SOYBEAN BASED HYDRAULIC FLUID IN ALL HEAVY EQUIPMENT TO BE USED ON-SITE.
11. VEHICLE STORAGE AND FUELING SHALL BE PERFORMED AT LEAST 50' OUTSIDE THE CREEK CHANNEL AND ONLY IN THE DESIGNATED AREAS SUCH THAT
THERE WILL BE NO CONTAMINATION OF SOIL, GROUNDWATER OR SURFACE WATER FROM SPILLS OR LEAKS. CONTRACTOR SHALL CHECK EQUIPMENT
FOR LEAKS AT THE END OF EACH WORK DAY AND PROMPTLY FIX ANY LEAKS THAT SHOULD OCCUR.
12. CONTRACTOR AGREES THAT IT ASSUMES SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION
OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED
TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CONTRACTING OFFICER AND GOVERNMENT
HARMLESS FROM ANY AND ALL LIABILITY, REAL AND ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT.
13. PRIOR TO CONSTRUCTION, ACCESS AND CONSTRUCTION EASEMENTS, LICENSE OR PERMIT MUST BE GRANTED BY PROPERTY OWNERS WHERE ACCESS
AND CONSTRUCTION (INCLUDING STORAGE/STAGING) WILL BE REQUIRED.
14. THE MASSDOT STANDARD SPECIFICATIONS FOR HIGHWAYS AND BRIDGES, 2023 (MARCH 31, 2023) ENGLISH EDITION, THE LATEST SUPPLEMENTAL
SPECIFICATIONS FOR HIGHWAYS AND BRIDGES, THE STANDARD SPECIAL PROVISIONS CONTAINED IN THE CONTRACT, AND THE 2014 CONSTRUCTION
STANDARD DETAILS AND THE CONSTRUCTION AND TRAFFIC STANDARD DETAILS DATED APRIL 2003 ARE MADE A PART HEREOF, AS IF ATTACHED HERETO
15. THE CONTRACTOR SHALL PERFORM PERIODIC SURVEYS OF AREAS CONTAINED BY TEMPORARY COFFERDAMS WILL BE PERFORMED, AT LEAST ONCE
EVERY TWO DAYS, TO IDENTIFY STRANDED OR TRAPPED AQUATIC OR AMPHIBIAN SPECIES AND RETURN SUCH SPECIES TO THE ADJACENT WETLANDS. A
SURVEY WILL BE COMPLETED AFTER ANY DRAWDOWN WITHIN THE COFFERDAMED AREA TO IDENTIFY STRANDED OR TRAPPED AQUATIC OR AMPHIBIAN
SPECIES AND RETURN SUCH SPECIES TO THE ADJACENT WETLANDS.
16. ALL WORK WITHIN THE CREEK, INCLUDING THE INSTALLATION OF THE TEMPORARY COFFERDAM SHALL BE IN ACCORDANCE WITH AUTHORIZED
SEASONAL PERIOD(S) REQUIRED UNDER MADEP AND/OR OTHER FEDERAL AGENCY PERMIT AUTHORIZATIONS.
17. THE CONTRACTOR SHALL NOT ENCROACH BEYOND THE LIMIT OF DISTURBANCE AT THE ENTRANCE DRIVE AS IT IS OWNED BY OTHERS AND NOT
FEDERAL LAND. THE CONTRACTOR SHALL CLEARLY MARK THE PARK BOUNDARY AND PROPERTY LINES OF OTHERS.
WORK AREA MAINTENANCE NOTES:
1. CLEAN PROJECT SITE AND WORK AREAS DAILY, INCLUDING COMMON AREAS. MAINTAIN PROJECT SITE FREE OF WASTE MATERIALS AND DEBRIS.
DISPOSE OF MATERIALS LAWFULLY OFF-SITE.
2. CLEAN AREAS WHERE WORK IS IN PROGRESS TO THE LEVEL OF CLEANLINESS NECESSARY FOR PROPER EXECUTION OF THE WORK.
A. REMOVE LIQUID SPILLS PROMPTLY.
B. APPLY WATER AS NEEDED TO CONTROL DUST.
3. BURYING OR BURNING WASTE MATERIALS ON-SITE WILL NOT BE PERMITTED. WASHING WASTE MATERIALS INTO WETLANDS AND WATERWAYS WILL NOT
BE PERMITTED.
4. DURING HANDLING AND INSTALLATION, CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS ALREADY IN PLACE. APPLY
PROTECTIVE COVERING WHERE REQUIRED TO ENSURE PROTECTION FROM DAMAGE OR DETERIORATION AT SUBSTANTIAL COMPLETION.
5. LIMITING EXPOSURES: SUPERVISE CONSTRUCTION OPERATIONS TO ASSURE THAT NO PART OF THE CONSTRUCTION, COMPLETED OR IN PROGRESS, IS
SUBJECT TO HARMFUL, DANGEROUS, DAMAGING, OR OTHERWISE DELETERIOUS EXPOSURE DURING THE CONSTRUCTION PERIOD.
CONTROL OF WATER AND PROTECTION OF WORK NOTES
1. THE WORK AND SITE SHALL BE PROTECTED AT ALL TIMES UNTIL FINAL ACCEPTANCE BY THE CONTRACTING OFFICER. CARE SHALL BE EXERCISED WHILE
OPERATING EQUIPMENT ON AND ADJACENT TO THE WORK AREA. THE CONTRACTOR SHALL BE RESPONSIBLE TO ASSURE THE UTILIZED EQUIPMENT DOES NOT
CAUSE DAMAGE TO CONSTRUCTED OR EXISTING FEATURES.
2. SURFACE WATER DEWATERING AND WATER CONTROL ACTIVITIES ARE REGULATED BY STATE LAW AND LOCAL ORDINANCE. ALL WORK SHALL COMPLY WITH THE
FOLLOWING CRITERIA AND OTHER PERMIT CONDITIONS TO AVOID OR MINIMIZE IMPACTS TO OFF-SITE AREAS.
3. ACCESS TO VARIOUS PORTIONS OF THE SITE SHALL BE UNDERTAKEN IN SUCH A MANNER THAT THE WORK AND SITE ARE PROTECTED AT ALL TIMES. ACCESS
WAYS SHALL BE CONSTRUCTED, MAINTAINED, AND PROTECTED WITH TEMPORARY COFFERDAM(S), WATER BYPASS CONVEYANCES AND EROSION AND SEDIMENT
CONTROLS TO PREVENT DAMAGE FROM EROSION DURING MAJOR STORM EVENTS.
4. PLACEMENT AND COMPACTION OF FILL MATERIALS SHALL BE COMPLETED IN SUCH A MANNER THAT THE WORK IS PROTECTED FROM DAMAGE AT ALL TIMES.
5. BACKFILL OPERATIONS SHALL PROCEED TO RAISE THE GROUND SURFACE UNIFORMLY AND SHAPED TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES. CONSTRUCT
AND MAINTAIN ON THE SITE, ALL DITCHES AND CHANNELS NECESSARY TO KEEP THE SITE IN A DRY AND WORKABLE CONDITION. WHERE WATER IS FLOWING OR
OTHERWISE INFILTRATING INTO AN EXCAVATION, PROVIDE FOR PUMPING AND OTHER DRAINAGE FACILITIES, INCLUDING EROSION AND SEDIMENT CONTROLS, TO
DIVERT WATER FROM SUCH EXCAVATION.
6. TEMPORARY COFFERDAM AND WATER BYPASS CONVEYANCE SYSTEMS AND MEASURES TO DISCHARGE CHANNEL FLOW THROUGH THE SITE SHALL BE INSTALLED, OPERATED, MAINTAINED AND REMOVED IN SUCH MANNERS TO PROTECT THE WORK AND EXISTING FEATURES FROM DAMAGE AT ALL TIMES UNTIL FINAL
ACCEPTANCE BY THE CONTRACTING OFFICER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL DESIGN AND MAINTENANCE OF ALL TEMPORARY
COFFERDAM AND WATER BY-PASS CONVEYANCE SYSTEMS.
7. DO NOT ALLOW WATER TO ACCUMULATE IN EXCAVATIONS. REMOVE WATER TO PREVENT SOFTENING OF AREAS OF EXPOSED SUBGRADE, UNDERCUTTING OF
FOOTINGS AND SOIL CHANGES DETRIMENTAL TO STABILITY OF SUBGRADES, FOUNDATIONS AND STRUCTURES.
8. THE TEMPORARY WATER CONTROL SYSTEM (INCLUDING COFFERDAMMING AND BY-PASS STRUCTURES) MUST BE MAINTAINED TO ALLOW A DRY WORKING
CONDITION (NO SEDIMENT PLUME) IN THE WATERCOURSE. PROVIDE AND MAINTAIN PUMPS, WELL POINTS, SUMPS, SUCTION AND DISCHARGE LINES, AND OTHER
DEWATERING SYSTEM COMPONENTS NECESSARY TO CONVEY WATER AWAY FROM EXCAVATIONS. UTILIZE COFFERDAMS, TEMPORARY PIPE CULVERTS WITH
OTHER EROSION AND SEDIMENT CONTROLS AS NECESSARY TO MINIMIZE THE POTENTIAL FOR EROSION IN WORK AREAS. SOIL DISTURBANCE WITHIN THE
WATERCOURSE MUST TEMPORARILY CEASE IN THE EVENT OF ANY ABNORMALLY HIGH STORMWATER RUNOFF OR TIDAL SURCHARGE EVENT IF A DRY WORKING
CONDITION CANNOT BE MAINTAINED (NO SEDIMENT PLUME) BY USE OF WATER PUMPS OR OTHER MEANS.
9. PUMP DISCHARGES FROM LOCALIZED TRENCH/FOOTING EXCAVATIONS SHALL BE MANAGED SUCH THAT THESE DO NOT CAUSE EROSION OF SOILS. FOR EXAMPLE, PUMP INTAKES SHALL BE FLOATED TO MINIMIZE SEDIMENTATION. ADDITIONALLY, PUMPED WATER SHALL BE DISCHARGED INTO CONSTRUCTED DEWATERING
AREAS (AS REFLECTED HEREIN), CONSISTING OF FILTER BAGS SURROUNDED BY A TIGHT ENCLOSURE OF CRUSHED STONE AND PORTABLE CONCRETE BARRIERS, IN ORDER TO PROPERLY FILTER TURBID WATER PRIOR TO ITS RETURN TO THE WATERCOURSE. STONE ARMOR PROTECTION SHALL BE INSTALLED AS REQUIRED
AT THE DISCHARGE OF THE DEWATERING AREA TO AVOID SCOUR OR SUSPENSION OF SOIL AT THE DISCHARGE. WATER SHALL NOT BE DISCHARGED ONTO FILL
OR BACKFILL AREAS OR FOUNDATIONS. WATER SHALL ONLY BE ALLOWED TO DISCHARGE DIRECTLY INTO THE WATERCOURSE AFTER EMERGING CLEAR WITHOUT
ANY SUSPENDED SEDIMENT OR SILT.
10. PROTECT CONSTRUCTED WORK ON THE SITE DURING FLOOD CONDITIONS IN ACCORDANCE WITH THE PROJECT'S FINAL APPROVED FLOOD CONTINGENCY PLAN
PREPARED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO CONSTRUCTION.
11. CONSTRUCT TEMPORARY COFFERDAM(S) AND WATER DIVERSION STRUCTURE(S) OF MATERIALS THAT CAN BE COMPLETELY REMOVED FROM THE CREEK UPON
COMPLETION OF CONSTRUCTION. ALL TEMPORARY COFFERDAM AND WATER BYPASS/CONVEYANCE STRUCTURES AND PRODUCTS SHALL BE COMPLETELY
REMOVED FROM THE SITE. REMOVAL OF THE TEMPORARY COFFERDAM(S) SHALL BE CONDUCTED IN A CONTROLLED MANNER.
SALT MARSH
LAND UNDER OCEAN
BORDERING VEGETATED
WETLAND
EROSION AND SEDIMENT CONTROL NOTES
1. PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES, INSTALL ALL EROSION AND SEDIMENT CONTROL DEVICES AS SHOWN ON THE PLAN OR AS
REQUIRED BY SITE CONDITIONS. ALL EROSION AND SEDIMENT CONTROL DEVICES WILL BE MAINTAINED THROUGHOUT CONSTRUCTION.
2. ALL STOCKPILES OF SOIL/SEDIMENT, WHETHER WITHIN THE PROJECT SITE OR AT OFF-SITE STAGING AREAS, SHALL BE COVERED BY SECURED 6-MIL POLY
(PLASTIC) SHEETING WHEN NOT ACTIVELY IN USE. WHERE MULTIPLE SHEETS ARE REQUIRED TO COVER A STOCKPILE, SHEETS SHALL BE OVERLAPPED A MINIMUM
OF 3-FEET AND OVERLAP SEAMS SECURED BY SANDBAGS OR OTHER MEANS ACCEPTABLE TO THE CONTRACTING OFFICER.
3. DISTURBANCE OF SOIL SURFACES IS REGULATED BY STATE LAW AND LOCAL ORDINANCE. ALL WORK SHALL COMPLY WITH THE FOLLOWING CRITERIA AND OTHER
PERMIT CONDITIONS TO PREVENT OR MINIMIZE SOIL EROSION AND SEDIMENTATION TO OFF-SITE AREAS.
4. THE CONTRACTOR SHALL COMPLY WITH THE LATEST EDITION OF THE "MASSACHUSETTS EROSION AND SEDIMENT CONTROL GUIDELINES FOR URBAN AND
SUBURBAN AREAS" IN CONSTRUCTING THE EROSION AND SEDIMENT CONTROLS INDICATED ON THE PLANS. ALL EROSION AND SEDIMENT CONTROL MEASURES OR
WORKS AND REHABILITATION MEASURES MUST CONFORM TO OR EXCEED THE SPECIFICATIONS OR STANDARDS SET OUT IN THIS HANDBOOK.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE TIMELY INSTALLATION, INSPECTION, MAINTENANCE, AND/OR REPLACEMENT OF ALL TEMPORARY EROSION AND
SEDIMENT CONTROL DEVICES SHOWN ON THESE PLANS TO ENSURE PROPER OPERATION THROUGHOUT THE LIFE OF THE PROJECT. THE CONTRACTOR IS
RESPONSIBLE FOR MAINTENANCE OF PERMANENT MEASURES UNTIL CONSTRUCTION OF THE PROJECT IS COMPLETED OR UNTIL IT IS ACCEPTED BY THE
CONTRACTING OFFICER. REMOVE EROSION AND SEDIMENT CONTROLS AFTER STABLE VEGETATIVE GROWTH IS ESTABLISHED.
6. THE CONTRACTOR SHALL INSPECT EROSION AND SEDIMENT CONTROL DEVICES AT THE END OF EACH WORKING DAY, AFTER EACH STORM EVENT, AND AT LEAST
DAILY DURING PROLONGED RAINFALL. CLEAN OUT ACCUMULATED SEDIMENT BEHIND CONTROLS. REPAIR OR REPLACE PROMPTLY. REMOVE ACCUMULATED
SEDIMENT FROM BEHIND PERIMETER CONTROLS WHEN ONE-HALF OF THE ORIGINAL HEIGHT OF THE CONTROLS BECOME FILLED WITH SEDIMENT. DISPOSE OF
REMOVED SEDIMENT IN ON-SITE FILL AREAS OR LAWFULLY OFF-SITE.
7. TREES AND OTHER EXISTING VEGETATION NOT WITHIN THE LIMITS OF DISTURBANCE SHALL BE PROTECTED FROM DAMAGE. VEGETATED AREAS AND/OR TREES
DAMAGED THAT ARE NOT PLANNED FOR REMOVAL SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER.
8. TEMPORARY VEGETATIVE COVER SHALL BE ESTABLISHED FOR ANY DISTURBED AREAS THAT HAVE NOT YET REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED, UNLESS THE ACTIVITY IS TO RESUME
WITHIN TWENTY-ONE (21) DAYS.
9. PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED TO ALL DISTURBED AREAS THAT HAVE REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT
MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS PERMANENTLY CEASED. PERMANENT VEGETATIVE COVER SEED
MIXTURES AND APPLICATION RATES SHALL BE IN ACCORDANCE WITH THE REVEGETATION PLANS. TREES, SHRUBS, PLUG PLANTINGS, AND POTTED PLANTINGS
SHALL BE IN ACCORDANCE WITH THE REVEGETATION PLANS AND SHALL BE INSTALLED BASED ON SEASONAL AVAILABILITY AND VIABILITY, AS RECOMMENDED BY
THE NURSERY PROVIDING PLANT STOCK. ALL PLANTINGS AND SEED SHALL BE COVERED BY A ONE-YEAR WARRANTY PERIOD; RESEEDING/RE-PLANTING SHALL BE
COMPLETED TO ENSURE STABLE VEGETATIVE COVER IS ESTABLISHED OVER ALL DISTURBED AREA.
10. IF PERMANENT SEEDING CANNOT BE COMPLETED IMMEDIATELY OR WITHIN THE RECOMMENDED SEEDING DATES, TEMPORARY BIODEGRADABLE EROSION
CONTROL BLANKETING (CONTAINING NO PLASTIC COMPONENTS) OR WEED-FREE STRAW MULCH SHALL BE SPREAD/INSTALLED OVER ALL DISTURBED AREAS TO
PROTECT THE SITE UNTIL ARRIVAL OF THE NEXT RECOMMENDED SEEDING PERIOD. STRAW MULCHING /BLANKETING SHOULD BE PERFORMED AS SOON AS
POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED UNLESS THE ACTIVITY IS TO
RESUME WITHIN TWENTY-ONE (21) DAYS.
11. TEMPORARY EROSION CONTROL BLANKETING MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAINSTORMS, TO CHECK FOR RILL EROSION. WHERE
EROSION IS OBSERVED, ADDITIONAL STRAW MULCH MUST BE APPLIED OR BLANKETING REPAIRED OR REPLACED. INSPECTIONS SHALL TAKE PLACE UNTIL
VEGETATION IS THOROUGHLY ESTABLISHED.
12. GOOD HOUSEKEEPING: THE PROJECT SITE SHALL PROVIDE FOR THE MINIMIZATION OF EXPOSURE OF CONSTRUCTION DEBRIS (INCLUDING, BUT NOT LIMITED TO, WIRING, CANS, SOLVENTS, ETC.) TO PRECIPITATION BY MEANS OF DISPOSAL AND/OR PROPER SHELTER OR COVER. CONSTRUCTION WASTE MUST BE PROPERLY
DISPOSED OF IN ORDER TO AVOID EXPOSURE TO PRECIPITATION AT THE END OF EACH WORKING DAY.
13. STORAGE AND DISPOSAL: MATERIALS WHICH COULD BE A POTENTIAL SOURCE OF STORMWATER POLLUTION SUCH AS GASOLINE, DIESEL FUEL, HYDRAULIC OIL, ETC., WILL BE STORED AT THE END OF EACH DAY IN A LOCKED STORAGE TRAILER OR COVERED LOCATION AND TAKEN OFF-SITE AND PROPERLY DISPOSED OF.
ALL TYPES OF WASTE GENERATED AT THIS SITE WILL BE DISPOSED OF IN A MANNER CONSISTENT WITH STATE LAW AND/OR REGULATIONS.
14. SPILL/LEAK PROTECTION AND RESPONSE: FUEL VEHICLES AND EQUIPMENT AWAY FROM THE WETLAND AND DRAINAGE SYSTEM AND PREVENT CONTAMINATION
OF SOIL, GROUNDWATER OR SURFACE WATER FROM SPILLS OR LEAKS.. DEPLOY BOOMS AND OTHER CONTAINMENT/CLEANUP MEASURES IN THE EVENT OF A
SPILL OR LEAK. NOTIFY LOCAL FIRE DEPT. AND DEP IMMEDIATELY OF ANY SPILLS.
15. DEWATERING CONSTRUCTION: DEWATERING SHALL BE IN ACCORDANCE WITH THE "MASSACHUSETTS EROSION AND SEDIMENT CONTROL GUIDELINES FOR URBAN
AND SUBURBAN AREAS" AND THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) CONSTRUCTION GENERAL PERMIT.
16. TRACKING AND DUST CONTROL: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CLEAN ADJACENT ROADS WHERE CONSTRUCTION VEHICLES HAVE TRACKED
SEDIMENT FROM THE PROJECT, CONTROL DUST, AND TAKE ALL NECESSARY MEASURES TO ENSURE THAT THE SITE AND ALL ADJACENT ROADS BE MAINTAINED IN
A MUD- AND DUST-FREE CONDITION AT ALL TIMES THROUGHOUT THE LIFE OF THE CONTRACT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO
THE SURROUNDING ROADWAYS MUST BE REMOVED IMMEDIATELY. DUST CONTROL MAY INCLUDE APPLICATION OF CONTROLLED AMOUNTS OF WATER ONTO
AFFECTED AREAS OR OTHER CONTROL MEASURES, EXCLUDING CALCIUM CHLORIDE, APPROVED BY THE ENGINEER.
ABBREVIATIONS
GENERAL
ACB ARTICULATED CONCRETE BLOCK
MATTING
APPROX. APPROXIMATE
BL BASELINE
BM BENCHMARK
BO BY OTHERS
BOS BOTTOM OF SLOPE
CC CEMENT CONCRETE
CEM CEMENT
CL CENTERLINE
CONC CONCRETE
CONST CONSTRUCTION
INDEX PLAN
EXISTING UTILITY NOTES
1. THE CONTRACTOR SHALL CONTACT DIG SAFE (811) AND UTILITY COMPANIES TO LOCATE ALL EXISTING UTILITIES, AT LEAST 3 BUSINESS DAYS PRIOR TO THE
START OF CONSTRUCTION. THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT RESULT FROM THE
CONTRACTOR'S FAILURE TO LOCATE EXISTING UNDERGROUND INFRASTRUCTURE AND UTILITIES EXACTLY. IF FIELD CONDITIONS DIFFERS FROM PLAN
INFORMATION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY FOR POSSIBLE REDESIGN.
2. BEFORE BEGINNING SITE WORK, THE CONTRACTOR SHALL INVESTIGATE AND VERIFY THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES AND OTHER
CONSTRUCTION AFFECTING THE WORK. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AND LOCATE ANY EXISTING UTILITIES SUFFICIENTLY
AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS IF NECESSARY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING, AT ITS OWN EXPENSE, ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION.
3. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS, AS DETERMINED BY THE CONTRACTING OFFICER HAVE BEEN CORRECTED.
VEGETATED ARTICULATED
CONCRETE BLOCK
MATTING (ACB)
VEGETATED STONE ARMOR
DIA DIAMETER
ELEV (or EL.) ELEVATION
EXIST (or EX) EXISTING
INV INVERT
LT LEFT
MAX MAXIMUM
MSE MECHANICALLY STABILIZED EARTH
NO. NUMBER
PROJ PROJECT
PROP PROPOSED
R&D REMOVE AND DISPOSE
REM REMOVE
GRAVEL ACCESS DRIVE
RETAIN RETAIN
RET WALL RETAINING WALL
RT RIGHT
STA STATION
TEMP TEMPORARY
TOS TOP OF SLOPE
TYP TYPICAL
UP UTILITY POLE
VAR VARIES
VERT VERTICAL
LIMIT OF DISTURBANCE
LIMIT OF DISTURBANCE, LIMIT OF
CLEARING AND BIODEGRADABLE
WATTLE
PROPOSED CONTOUR
TEMPORARY COFFERDAM
TIDAL CHANNEL DREDGING
BIODEGRADABLE WATTLE
PRECAST MODULAR BLOCK
RETAINING WALL
STEEL-BACKED TIMBER GUARDRAIL
SHEETING PILE
PROPOSED LEGEND
EXCAVATE REMNANT
EARTHEN DIKE
RESTORATION TYPE 1
RESTORATION TYPE 2
RESTORATION TYPE 3
CONSTRUCTION ENTRANCE
STAGING AREA
RESTORATION TYPE 4
COASTAL BANK
SEDIMENT-FILLED STONE ARMOR
F i l e
P a t h
J D
W G
P
A
C i v i l P l a n
A
G
E N d w g y o u t
C
N o t t e d
W e d
M a y
U s e r s i r o n s
INVASIVE SPECIES CONTROL
1. INVASIVE SPECIES REFERRED TO BELOW SHALL INCLUDE, BUT NOT BE LIMITED TO PHRAGMITES AUSTRALIS, WHICH IS KNOWN TO BE PRESENT IN
PORTIONS OF THE PROJECT SITE.
2. TO PREVENT THE ACCIDENTAL INTRODUCTION OF INVASIVE PLANTS DURING CONSTRUCTION OR MAINTENANCE ACTIVITIES, CLEAN ALL HEAVY EQUIPMENT
INVOLVED IN EARTHWORK OR CONSTRUCTION TO REMOVE PLANTS, SEEDS AND PROPAGULES THAT MAY BE ATTACHED TO EQUIPMENT PRIOR TO
DELIVERY TO THE SITE. EQUIPMENT WILL BE INSPECTED BY THE CONTRACTING OFFICER FOR SOURCES OF INVASIVE PLANTS OR INSECTS AND IF ANY ARE
FOUND, EQUIPMENT WILL NOT BE ALLOWED ON THE SITE UNTIL CLEANED AND ACCEPTED BY THE CONTRACTING OFFICER. THE CONTRACTOR SHALL
PROVIDE AT LEAST FIVE (5) DAYS ADVANCE NOTICE TO THE CONTRACTING OFFICER PRIOR TO DELIVERY OF ANY/ALL HEAVY EQUIPMENT TO ALLOW FOR
SCHEDULING OF INSPECTIONS.
3. IF HEAVY EQUIPMENT IS USED ON A PORTION OF THE PROJECT SITE WHERE INVASIVE SPECIES ARE KNOWN TO EXIST, CONDUCT THIS PORTION OF THE
WORK LAST, IF FEASIBLE, OR CLEAN THE EQUIPMENT PRIOR TO USE ON ANY OTHER PORTION OF THE SITE THAT IS KNOWN TO BE FREE OF INVASIVE
PLANTS.
4. CLEANING SHALL CONSIST OF PRESSURE WASHING OR USING PHYSICAL MEANS AND HAND TOOLS, SUCH AS BRUSHES, BROOMS, RAKES OR SHOVELS, ON
ALL WHEEL, TRACK AND BUCKET/BLADE COMPONENTS TO ADEQUATELY REMOVE ALL VISIBLE DIRT AND PLANT DEBRIS. IF WATER IS USED, CONTAIN AND
FILTER THE WATER/SLURRY TO RESTRICT INTRODUCTION OF INVASIVE PLANTS, SEEDS, AND PROPAGULES INTO THE PROJECT OR OFF SITE THROUGH
FUTURE SURPLUS MATERIAL DISPOSAL.
5. CLEANING EQUIPMENT NEAR THE INFESTED AREA WITHOUT A CLEANING STATION IS ACCEPTABLE IF SPACE ON PROJECT SITE IS LIMITED FOR USE OF
CLEANING STATIONS, PROVIDED THE MATERIAL WASHED OFF EQUIPMENT DOES NOT ENTER A WATERBODY. ESTABLISH LOCATIONS FOR EQUIPMENT
CLEANING STATIONS WITHIN THE PROJECT SITE THAT WILL BE BURIED IN LATER STAGES, IF POSSIBLE.
TEMPORARY CRANE MATS
TIDE TABLE FOR MILL CREEK AND HERRING RIVER AT
CHEQUESSETT NECK ROAD DIKE (ELEVATION, FT, NAVD88)
NOTE:
BASELINE OF PROPOSED ACCESS ROAD AND DIKE SHOWN TO
PROVIDE PROJECT LOCATION/ORIENTATION REFERENCE ONLY.
F i t h
J D
W G
P
A
C i v i l P l a n
A
E
X C d y o u t
C
S o t t e d
W e d
M a y e r r m e y e r
PROVIDE PROJECT LOCATION/ORIENTATION REFERENCE ONLY.
F i t h
J D
W G
P
A
C i v i l P l a n
A
E
X C d y o u t
C
S o t t e d
W e d
M a y e r r m e y e
PROVIDE PROJECT LOCATION/ORIENTATION REFERENCE ONLY.
F i t h
J D
W G
P
A
C i v i l P l a n
A
E
X C d y o u t
C
S o t t e d
W e d
M a y e r r m e y e
F i t h
J D
W G
P
A
C i v i l P l a n
A
E
R O d y o u t
C
S o t t e d
W e d
M a y e r r m e y e t h
J D
W G
P
A
C i v i l P l a n
A
E
R O d y o u t
C
S o t t e d
W e d
M a y e r r m e y e t h
J D
W G
P
A
C i v i l P l a n
A
E
R O d y o u t
C
S o t t e d
W e d
M a y e r r m e y e t h
J D
W G
P
A
C i v i l P l a n
A
S
T P d y o u t
C
S o t t e d
W e d
M a y e r r m e y e t h
J D
W G
P
A
C i v i l P l a n
A
S
T P d y o u t
C
S o t t e d
W e d
M a y e r s i r o n t h
J D
W G
P
A
C i v i l P l a n
A
S
T P d y o u t
C
S o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
E
X C d y o u t
M
E o t t e d
W e d
M a y e r s i r o n s
NOTE:
ALIGNMENT OF EXISTING TIDAL CHANNEL BASELINE IS
APPROXIMATE AND DEPICTED AS SHOWN HEREON
BASED ON AVAILABLE MASSGIS AND NPS DATA. ACTUAL
CHANNEL ALIGNMENT AND EXTENTS SHALL BE FIELD
VERIFIED, MAPPED AND THE LOCATIONS/LIMITS OF
TEMPORARY AND PROPOSED WORK AREAS ADJUSTED
AS APPROPRIATE AND REVIEWED/APPROVED BY NPS
PRIOR TO ANY PROJECT FIELD ACTIVITIES BETWEEN
CHANNEL STA. 0+00 AND 10+25.
1. ALIGNMENT OF EXISTING TIDAL CHANNEL BASELINE
IS APPROXIMATE AND DEPICTED AS SHOWN
HEREON BASED ON AVAILABLE MASSGIS AND NPS
DATA. ACTUAL CHANNEL ALIGNMENT AND EXTENTS
SHALL BE FIELD VERIFIED, MAPPED AND THE
LOCATIONS/LIMITS OF TEMPORARY AND
PROPOSED WORK AREAS ADJUSTED AS
APPROPRIATE AND REVIEWED/APPROVED BY NPS
PRIOR TO ANY PROJECT FIELD ACTIVITIES
BETWEEN CHANNEL STA. 0+00 AND 10+25.
F i t h
J D
W G
P
A
C i v i l P l a n
A
S
T P d y o u t
M
E o t t e d
T h u
J u e r d n e w h a t h
J D
W G
P
A
C i v i l P l a n
A
L
N D d y o u t
L
P o t t e d
T h u
J u e r d n e w h a l l
BOTANICAL NAME COMMON NAME INDICATOR
ELYMUS CANADENSIS CANADA WILD RYE FACU+
FESTUCA RUBRA RED FESCUE FACU
PANICUM AMARUM ATLANTIC COASTAL PANIC GRASS FACU-
ANDROPOGON GERARDI BIG BLUESTEM FAC
SORGHASTRUM NUTANS INDIAN GRASS UPL
PANICUM VIRGATUM SWITCH GRASS FAC
JUNCUS TENUIS PATH RUSH FAC
t h
J D
W G
P
A
C i v i l P l a n
A
L
N D d y o u t
L
P o t t e d
T h u
J u e r d n e w h a l l
BOTANICAL NAME COMMON NAME INDICATOR
ELYMUS CANADENSIS CANADA WILD RYE FACU+
FESTUCA RUBRA RED FESCUE FACU
PANICUM AMARUM ATLANTIC COASTAL PANIC GRASS FACU-
ANDROPOGON GERARDI BIG BLUESTEM FAC
SORGHASTRUM NUTANS INDIAN GRASS UPL
t h
J D
W G
P
A
C i v i l P l a n
A
L
N D d y o u t
L
P o t t e d
T h u
J u e r d n e w h a l l
BOTANICAL NAME COMMON NAME INDICATOR
ELYMUS CANADENSIS CANADA WILD RYE FACU+
FESTUCA RUBRA RED FESCUE FACU
PANICUM AMARUM ATLANTIC COASTAL PANIC GRASS FACU-
ANDROPOGON GERARDI BIG BLUESTEM FAC
SORGHASTRUM NUTANS INDIAN GRASS UPL
t h
J D
W G
P
A
C i v i l P l a n
A
P
H A d y o u t
C
P o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
P
H A d y o u t
C
P o t t e d
W e d
M a y e r s i r o
NON-TIDAL
BORDERING
VEGETATED
WETLAND
TIDAL FLATS
SALT MARSH
LAND UNDER
WATER
F i t h
J D
W G
P
A
C i v i l P l a n
A
P
H A d y o u t
C
P o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
X o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
D o t t e d
W e d
M a y e r s i r o n s
SECTION VIEW
RETAINED SOIL
NOTES:
TYPICAL WATTLE INSTALLATION GUIDE
ENTRENCHMENT
F i t h
J D
W G
P
A
C i v i l P l a n
A
D
E T d y o u t
C
D o t t e d
W e d
M a y e r s i r o n s
PLAN
SECTION A
t h
J D
W G
P
A
M
E P
E l e c t r i c a l
A
U
T L d y o u t
E
A o t t e d
W e d
M a y e r s i r o t h
J D
W G
P
A
M
E P
E l e c t r i c a l
A
U
T L d y o u t
E
A o t t e d
W e d
M a y e r s i r o
F i t h p r i v a t e
D
F S
C a d
P r o j D
W G
P
A
S t r u c t u r a l P l a n
A
S
T R d y o u t
S
A o t t e d
T u e
M a y e r j t a t t h p r i v a t e
D
F S
C a d
P r o j D
W G
P
A
S t r u c t u r a l P l a n
A
S
T R d y o u t
S
A o t t e d
T u e
M a y e r j t a t t h p r i v a t e
D
F S
C a d
P r o j D
W G
P
A
S t r u c t u r a l P l a n
A
S
T R d y o u t
S
A o t t e d
T u e
M a y e r j t a t t h p r i v a t e
D
F S
C a d
P r o j D
W G
P
A
S t r u c t u r a l P l a n
A
S
T R d y o u t
S
A o t t e d
T u e
M a y e r j t a t t h p r i v a t e
D
F S
C a d
P r o j D
W G
P
A
S t r u c t u r a l P l a n
A
S
T R d y o u t
S
A o t t e d
T u e
M a y e r j t a t t h p r i v a t e
D
F S
C a d
P r o j D
W G
P
A
S t r u c t u r a l P l a n
A
S
T R d y o u t
S
A o t t e d
T u e
M a y e r j t a t t h p r i v a t e
D
F S
C a d
P r o j D
W G
P
A
S t r u c t u r a l P l a n
A
S
T R d y o u t
S
A o t t e d
T u e
M a y e r j t a t
| Sheets and Views |
| 1 20120636A27_COV01 - GI-001 |
| 2 20120636A27_GEN01 - CN-001 |
| 3 20120636A27_EXC01 - CS-101 |
| 4 20120636A27_EXC01 - CS-102 |
| 5 20120636A27_EXC01 - CS-103 |
| 6 20120636A27_ERO01 - CS-104 |
| 7 20120636A27_ERO01 - CS-105 |
| 8 20120636A27_ERO01 - CS-106 |
| 9 20120636A27_STP01 - CS-107 |
| 10 20120636A27_STP01 - CS-108 |
| 11 20120636A27_STP01 - CS-109 |
| 12 20120636A27_EXC02 - ME-101 |
| 13 20120636A27_STP02 - ME-102 |
| 14 20120636A27_LND01 - LP-101 |
| 15 20120636A27_LND01 - LP-102 |
| 16 20120636A27_LND01 - LP-103 |
| 17 20120636A27_PHA01 - CP-101 |
| 18 20120636A27_PHA01 - CP-102 |
| 19 20120636A27_PHA01 - CP-103 |
| 20 20120636A27_DET01 - CX-501 |
| 21 20120636A27_DET01 - CX-502 |
| 22 20120636A27_DET01 - CX-503 |
| 23 20120636A27_DET01 - CX-504 |
| 24 20120636A27_DET01 - CX-505 |
| 25 20120636A27_DET01 - CX-506 |
| 26 20120636A27_DET01 - CX-507 |
| 27 20120636A27_DET01 - CX-508 |
| 28 20120636A27_DET04 - CX-509 |
| 29 20120636A27_DET03 - CD-501 |
| 30 20120636A27_DET03 - CD-502 |
| 31 20120636A27_DET03 - CD-503 |
| 32 20120636A27_UTL01 - EA-001 |
| 33 20120636A27_UTL01 - EA-002 |
| 34 20120636A27_STR03 - SA-001 |
| 35 20120636A27_STR03 - SA-002 |
| 36 20120636A27_STR04 - SA-003 |
| 37 20120636A27_STR04 - SA-004 |
| 38 20120636A27_STR04 - SA-005 |
| 39 20120636A27_STR04 - SA-006 |
| 40 20120636A27_STR04 - SA-007 |
File details come from the government source that posted it. Updated .