This document contains answers to questions regarding a federal solicitation for renovation work at various buildings at the Battle Creek Veterans Affairs Medical Center. The scope of work includes replacing ceilings, flooring, wall coverings and doors in heavy traffic areas, as well as adding new signage and safety improvements such as entrance vestibules. Fire suppression work is expected to be minimal and involve adjusting existing heads for new grilles. HVAC and plumbing information is provided in the architectural drawings, requiring reinstallation of air diffusers and minimal plumbing work. The hardware specification will use a 612 dull bronze finish. The contractor will have 380 days to complete the work.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project 515-20-101 – Renovate Common Areas, Various Buildings – Battle Creek VAMC
1. Can you define the scope of the required fire suppression work? We note answers to RFIs #51, #52 & #53 which would indicate that there is no fire suppression work although there is a Fire Suppression Specification, and we believe that some fire suppression head work might be experienced in the areas of the new Armstrong Woodworks Grilles on all three (3) floors of Building #2. Fire heads may need to be adjusted, but this is not expected.
2. The general plumbing and HVAC requirements are indicated on the various Architectural Drawings. Will there be Plumbing and HVAC Drawings issued showing the required new, relocated and existing requirements? Presently there is insufficient information indicating the mechanical trades requirements.
a. HVAC: There will be reinstalling of exhaust/return air diffuser and supply diffuser. They are called out in reflected ceiling plans.
b. Plumbing: There will be minimal plumbing, mainly replacing drinking fountains. The current drawings indicate the plumbing and HVAC work to be completed. No additional drawings will be provided.
3. There is some contradiction in the hardware specification in regards to the finish required. The hardware sets are written in 606 dull brass, the specification indicates 612 dull bronze. Please clarify the finish required. VA will use 612 dull bronze (US10).
File details come from the government source that posted it. Updated .