RFI Answers for 2nd Group of Questions.pdf

PDF 103 KB Posted

Attached to
36C25021B0052 - Project No. 515-20-101 - Renovate Common Areas, Various Buildings
Solicitation number
515-20-101
Issued by

About this file

This document contains answers to questions regarding a federal solicitation for renovation work at various buildings at the Battle Creek Veterans Affairs Medical Center. The scope of work includes replacing ceilings, flooring, wall coverings and doors in heavy traffic areas, as well as adding new signage and safety improvements such as entrance vestibules. Fire suppression work is expected to be minimal and involve adjusting existing heads for new grilles. HVAC and plumbing information is provided in the architectural drawings, requiring reinstallation of air diffusers and minimal plumbing work. The hardware specification will use a 612 dull bronze finish. The contractor will have 380 days to complete the work.

View the file

Other files

File Type Posted
36C25021B0052 0003.docx DOCX document
515-20-101 34 AE321 - Exterior Wall Sections.pdf PDF
515-20-101 32 002-AD102 - Bldg 2 2nd Flr Demolition Plans.pdf PDF
515-20-101 32 006-AD101 - Bldg 6 Roof Demolition Plans.pdf PDF
515-20-101 32 009-AD101 - Bldg 9 1st Flr Demolition Plans.pdf PDF
515-20-101 32 002-AD100 - Bldg 2 Ground Floor Demolition Plans.pdf PDF
515-20-101 32 002-AD101 - Bldg 2 1st Flr Demolition Plans.pdf PDF
515-20-101 Addendum Answers.pdf PDF
515-20-101 32 013-AD101 - Bldg 13 Demolition Plans.pdf PDF
36C25021B0052 0002 Amendment.pdf PDF
515-20-101 32 014-AD101 - Bldg 14 Demolition Plans.pdf PDF
515-20-101 34 AE600 - Door Sizes - Drawing.pdf PDF
515-20-101 34 082-AE101 - Plans and Elevation.pdf PDF
515-20-101 32 082-AD101 - Bldg 82 Demolition Plans.pdf PDF
515-20-101 32 008-AD101 - Bldg 8 2nd Flr Demolition Plans.pdf PDF
515-20-101 32 010-AD101 - Bldg 10 1st Flr Demolition Plans.pdf PDF
515-20-101 32 012-AD101 - Bldg 12 1st Flr Demolition Plans.pdf PDF
515-20-101 34 AE320 - Exterior Wall Sections.pdf PDF
515-20-101 32 011-AD101 - Bldg 11 1st Flr Demolition Plans.pdf PDF
515-20-101 32 005-AD101 - Bldg 5 Demolition Plans.pdf PDF
VA Signage Design Guide.pdf PDF
VA Signage Design Guide.pdf PDF
RFI Questions and Answers.pdf PDF
515-20-101 Pre-Bid Sign In Sheet.pdf PDF
36C25021B0052 0001 Amendment Update.pdf PDF
Specifications Project 515-20-101 Solicitation 36C25021B0052.pdf PDF
36C25021B0052.docx DOCX document
Drawing Solicitation 36C25021B0052.pdf PDF
RFI Form-Solicitation 36C25021B0052-Project 515-20-101.docx DOCX document
515-20-101 Wage Determination.pdf PDF
EMR Certification Form 2021-Solicitation 36C25021B0052-Project 515-20-101.docx DOCX document
515-20-101 Justification for Brand Name Only Component - KABA Cores.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 515-20-101 – Renovate Common Areas, Various Buildings – Battle Creek VAMC

1. Can you define the scope of the required fire suppression work? We note answers to RFIs #51, #52 & #53 which would indicate that there is no fire suppression work although there is a Fire Suppression Specification, and we believe that some fire suppression head work might be experienced in the areas of the new Armstrong Woodworks Grilles on all three (3) floors of Building #2. Fire heads may need to be adjusted, but this is not expected.

2. The general plumbing and HVAC requirements are indicated on the various Architectural Drawings. Will there be Plumbing and HVAC Drawings issued showing the required new, relocated and existing requirements? Presently there is insufficient information indicating the mechanical trades requirements.

a. HVAC: There will be reinstalling of exhaust/return air diffuser and supply diffuser. They are called out in reflected ceiling plans.

b. Plumbing: There will be minimal plumbing, mainly replacing drinking fountains. The current drawings indicate the plumbing and HVAC work to be completed. No additional drawings will be provided.

3. There is some contradiction in the hardware specification in regards to the finish required. The hardware sets are written in 606 dull brass, the specification indicates 612 dull bronze. Please clarify the finish required. VA will use 612 dull bronze (US10).

File details come from the government source that posted it. Updated .