515-20-101 34 082-AE101 - Plans and Elevation.pdf

PDF 235 KB Posted

Attached to
36C25021B0052 - Project No. 515-20-101 - Renovate Common Areas, Various Buildings
Solicitation number
515-20-101
Issued by

About this file

This solicitation is for project number 515-20-101 to renovate common areas in various buildings at the VA Medical Center in Battle Creek, Michigan. The contractor shall provide all labor, materials, equipment, supervision, documentation and other related services to improve conditions in several outpatient care buildings. Work includes replacing worn ceilings, flooring, wall coverings and doors in heavy traffic areas. New energy efficient doors and frames with integrated security hardware will be installed. Handrails and signage will also be improved. Buildings 2, 6, 8, 9, 10, 11, 12 and 82 are included. Additional safety vestibules will be added at buildings 5, 6, 13, 14 and 82. The contractor has 380 days to complete the work. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

File Type Posted
36C25021B0052 0003.docx DOCX document
515-20-101 34 AE321 - Exterior Wall Sections.pdf PDF
515-20-101 32 002-AD102 - Bldg 2 2nd Flr Demolition Plans.pdf PDF
515-20-101 32 006-AD101 - Bldg 6 Roof Demolition Plans.pdf PDF
515-20-101 32 009-AD101 - Bldg 9 1st Flr Demolition Plans.pdf PDF
515-20-101 32 002-AD100 - Bldg 2 Ground Floor Demolition Plans.pdf PDF
515-20-101 32 002-AD101 - Bldg 2 1st Flr Demolition Plans.pdf PDF
515-20-101 Addendum Answers.pdf PDF
515-20-101 32 013-AD101 - Bldg 13 Demolition Plans.pdf PDF
36C25021B0052 0002 Amendment.pdf PDF
RFI Answers for 2nd Group of Questions.pdf PDF
515-20-101 32 014-AD101 - Bldg 14 Demolition Plans.pdf PDF
515-20-101 34 AE600 - Door Sizes - Drawing.pdf PDF
515-20-101 32 082-AD101 - Bldg 82 Demolition Plans.pdf PDF
515-20-101 32 008-AD101 - Bldg 8 2nd Flr Demolition Plans.pdf PDF
515-20-101 32 010-AD101 - Bldg 10 1st Flr Demolition Plans.pdf PDF
515-20-101 32 012-AD101 - Bldg 12 1st Flr Demolition Plans.pdf PDF
515-20-101 34 AE320 - Exterior Wall Sections.pdf PDF
515-20-101 32 011-AD101 - Bldg 11 1st Flr Demolition Plans.pdf PDF
515-20-101 32 005-AD101 - Bldg 5 Demolition Plans.pdf PDF
VA Signage Design Guide.pdf PDF
VA Signage Design Guide.pdf PDF
RFI Questions and Answers.pdf PDF
515-20-101 Pre-Bid Sign In Sheet.pdf PDF
36C25021B0052 0001 Amendment Update.pdf PDF
Specifications Project 515-20-101 Solicitation 36C25021B0052.pdf PDF
36C25021B0052.docx DOCX document
Drawing Solicitation 36C25021B0052.pdf PDF
RFI Form-Solicitation 36C25021B0052-Project 515-20-101.docx DOCX document
515-20-101 Wage Determination.pdf PDF
EMR Certification Form 2021-Solicitation 36C25021B0052-Project 515-20-101.docx DOCX document
515-20-101 Justification for Brand Name Only Component - KABA Cores.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HZ

HZ

HZ

OFFICEANTEROOM

ELEC

OFFICE

CLOSET

CLOSET

019 019C

016G

016F

016E

HZ

HZ

HZ

OFFICEANTEROOM

ELEC

OFFICE

CLOSET

CLOSET

019 019C

016G

016F

016E

J

082.AE10104

VESTIBULE

082.AE101

CONCRETE FROST SLAB

3" 9' - 9"

AE300

AE300

EXISTING EXTERIOR

HATCH TO REMAIN

CONTROL JOINT

CONTROL JOINT

082.AE101

SIM O.H.

ALUMINUM BRAKE METAL

COLUMN WRAP TO MATCH

ALUMINUM FRAMED

STOREFRONT SYSTEM, TYP

82.B

82.A

82.1 82.2

082.AE101

EQ EQ EQ

82-000

82-001

SPLASHBLOCK;

TYP.

A2

082.AE10104

NEW STANDING SEAM

METAL ROOF

082.AE101

AE300

AE300

NEW GUTTER AND DOWNSPOUT

NEW GUTTER AND DOWNSPOUT

RIDGE VENT

82.B

82.A

82.1 82.2

1ST FLOOR

2ND FLOOR

3RD FLOOR

NEW FOUNDATION

AND FOOTING

ALUMINUM FRAMED

STOREFRONT SYSTEM w/

1" INSULATED GLAZING

8"

1'-0"

AE300

LINE OF FLASHING

BEYOND

(M

IN

NEW WALL MOUNTED

EXTERIOR LIGHT FIXTURE

BRAKE METAL FASCIA TRIM PANEL

82.B82.A

EQ EQ

PATCH AND REPAIR BRICK WHERE

EXISTING CANOPY WAS ATTACHED

AE300

NEW BRICK w/ PRECAST SILL

ALUMINUM FRAMED

STOREFRONT SYSTEM w/ 1"

INSULATED GLAZING

NEW STANDING

SEAM METAL ROOF

EXISTING FOUNDATION AND FOOTING

EJ

ALUMINUM BRAKE METAL

COLUMN WRAP TO MATCH

ALUMINUM FRAMED

STOREFRONT SYSTEM, TYP

NEW FOUNDATION AND FOOTING

- REFER TO STRUCT.

NEW GUTTER

& DOWN SPOUT

82.182.2

EQ EQ

FLOOR PLAN LEGEND

EXISTING WALL CONSTRUCTION

EXISTING DOOR

NEW DOOR

1-HOUR FIRE RATED PARTITION -

UL DES U419

2-HOUR FIRE RATED BARRIER -

UL DES U419

1-HOUR SMOKE BARRIER - NFPA 101 - 8.3

NEW DOOR AND NEW HARDWARE TO BE INSTALLED

INTO EXISTING FRAME.

NEW HARDWARE TO BE INSTALLED ON EXISTING DOOR.

NEW DOOR AND FRAME TO BE INSTALLED INTO EXISTING

OPENING.

INSTALL NEW DRINKING FOUNTAIN. MODIFY EXISTING

SANITARY, AND VENT PIPE AS REQUIRED, AND PROVIDE

NEW WATER SUPPLY LINES AND FINAL CONNECTION TO

NEW FIXTURE. COORDINATE w/ COR.

KEYNOTES

EQUIPMENT LEGEND

HR

CG-1

AE300

AE300

8' - 6"

VESTIBULE

NEW LIGHT FIXTURE W/

EMERGENCY BACKUP

- SEE ELEV

NEW DOWNLIGHTS IN CEILING.

PROVIDE EMERGENCY BACKUP

TO SELECT FIXTURES

5/8" GYP. BOARD

CEILING

82.B

82.A

82.1 82.2

REFLECTED CEILING PLAN LEGEND

AREAS TO BE SUSPENDED ACOUSTIC TILE

AREAS TO BE NEW PAINTED AND FINISHED

GYPSUM BOARD CEILING ON METAL STUD

FRAMING (FRAMING TO BE SUPPORTED ON

ENDS OR HUNG FROM STRUCTURE ABOVE

AS REQUIRED

NEW LED RECESSED LIGHT FIXTURE

REINSTALLED SUPPLY DIFFUSER

REINSTALLED EXHAUST/ RETURN AIR DIFFUSER

REINSTALLED CEILING MOUNTED EXIT SIGN

PENDANT LIGHT FIXTURE

REINSTALLED SPRINKLER

CEILING HEIGHT ABOVE FINISHED FLOOR8'-0"

GENERAL NOTES - CEILING PLAN

1. NEW CEILINGS TO MATCH EXISTING CEILING LOCATION.

2. IF CEILING GRID LAYOUT RESULTS IN TILES OF LESS THAN 3",

CONSULT WITH ARCHITECT FOR INSTRUCTIONS BEFORE

PROCEEDING.

3. REFER TO FINISH SCHEDULE FOR CEILING FINISHES.

4. EXISTING LED LIGHT FIXTURES, SPEAKERS, FIRE ALARMS

(SMOKE /CO DETECTORS /SENSORS /SPRINKLER HEADS

ETC.), MECHANICAL DIFFUSERS AND GRILLES, CAMERAS,

WIRELESS ACCESS POINT, SAFETY MIRRORS, COVER PLATES

ETC. TO BE STORED AND REINSTALLED IN NEW CEILING

FINISH.

RADIANT CEILING PANELS

EXISTING CEILING HEIGHT - NO CHANGEEXIST.

CEILING HEIGHT ABOVE FINISHED FLOOR -

MATCH EXISTING; FIELD VERIFY

VERIFY

OR

REINSTALLED SMOKE DETECTOR

REINSTALLED EMERGENCY WALL PACK

REINSTALLED MOTION SENSOR

REINSTALLED SECURITY CAMERA

REINSTALLED SPEAKER

REINSTALLED WIRELESS ACCESS POINT

REINSTALLED GENERAL SENSOR

REINSTALLED QUARTER, HALF, & FULL

DOME SAFETY MIRROR

REINSTALLED SINGLE & DOUBLE MOUNTED

RECEPTACLE

RECESSED LIGHT FIXTURE

S

REINSTALLED LINEAR DIFFUSER

REINSTALLED EXISTING

RECESSED LIGHT FIXTURE

OR

EX EX

AREAS TO BE NEW BASIS OF DESIGN:

ARMSTRONG WOODWORKS GRILLE w/

LINEAR FLEECE AND CONTINUOUS EDGE TRIM

AT PERIMETER. PROVIDE XL SUSPENSION

SYSTEM AS REQUIRED

NEW 2" RECESSED LINEAR LED LIGHT FIXTURE;

BASIS OF DESIGN FINELITE PER ELECTRICAL

EXISTING GYP BOARD CEILING TO REMAIN,

AND BE PAINTED

ROOF PLAN LEGEND

INDICATES ROOF PITCH

RUBBER ROOF WALKWAY TRAFFIC PAD -

ADHERE PAD TO ROOF MEMBRANE

TAPERED INSULATION

GENERAL NOTES - ROOF PLAN

1. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF PLUMBING

VENTS, FLASH AS SPECIFIED.

2. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR

ADDITIONAL OPENINGS, IF ANY, IN ROOF(S).

3. TYPICAL ROOF IS (FULLY ADHERED OR MECHANICALLY

FASTENED) SINGLE-PLY MEMBRANE ROOFING ON RIGID

INSULATION ON METAL DECK OR CONCRETE DECK. (PROVIDE

TAPERED INSULATION TO CREATE SLOPES TO DRAINS)

4. TAPERED INSULATION LAYOUTS ARE SCHEMATIC ONLY. FINAL

LAYOUT FOR THE PROPOSED AREA SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

5. MINIMUM 1/4" PER FOOT SLOPE AT ALL NEW LOW SLOPE

ROOF AREAS.

6. MINIMUM 1/8" PER FOOT SLOPE AT ALL EXISTING RE-ROOF

LOW SLOPE ROOF AREAS.

ICE AND WATER SHIELD

82.A

82.1

3"

1" 4" 1/2"

SEALANT

TREATED

WOOD BLOCKING

HSS COLUMN - REFER TO STRUCT.

ALUM. BREAK METAL - MATCH STOREFRONT

SYSTEM

BACKER ROD & SEALANT

ALUMINUM FRAMED STOREFRONT SYSTEM

W/1" INSULATED GLASS

SOLID SURFACE MATERIAL SILL

BELOW

CAST STONE SILL BELOW

EXISTING WALL

SEALANT

EXTERIOR PAINT

ALL EXTERIOR FINISHED CONSTRUCTION TO BE PRIMED AND

PAINTED. PAINT TO BE WHITE TO MATCH ELSEWHERE ON THE

VAMC BATTLE CREEK CAMPUS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 74

7GAE PROJECT NO.: 219122

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

FOR CONSTRUCTION

100% BID DOCUMENTS

PLANS & ELEVATION VAMC BC RENOVATE

COMMON AREAS, VARIOUS

BUILDINGS

5500 ARMSTRONG ROAD

BATTLE CREEK, MI 49037

515-20-101

PROJECT DIRECTOR

04 - 01 - 2021 JB JS

100% BID

DOCUMENTS

082.AE101

FULLY SPRINKLED

SCALE: 1/8" = 1'-0"082.AE101

BUILDING 82: FIRST FLOOR PLAN01

SCALE: 1/8" = 1'-0"082.AE101

BUILDING 82: ROOF PLAN03

SCALE: 1/8" = 1'-0"082.AE101

BUILDING 82: VESTIBULE EAST ELEVATION04

SCALE: 1/8" = 1'-0"082.AE101

BUILDING 82: VESTIBULE NORTH ELEVATION05

PLAN NORTH

SCALE: 1/8" = 1'-0"082.AE101

BUILDING 82: VESTIBULE CEILING PLAN02

SCALE: 1 1/2" = 1'-0"082.AE101

PLAN DETAIL06

Revisions: Date:

ADDENDUM #1 7/19/2021

Sheets
082.AE101 - PLANS & ELEVATION