515-20-101 34 082-AE101 - Plans and Elevation.pdf
PDF 235 KB Posted
- Solicitation number
- 515-20-101
About this file
This solicitation is for project number 515-20-101 to renovate common areas in various buildings at the VA Medical Center in Battle Creek, Michigan. The contractor shall provide all labor, materials, equipment, supervision, documentation and other related services to improve conditions in several outpatient care buildings. Work includes replacing worn ceilings, flooring, wall coverings and doors in heavy traffic areas. New energy efficient doors and frames with integrated security hardware will be installed. Handrails and signage will also be improved. Buildings 2, 6, 8, 9, 10, 11, 12 and 82 are included. Additional safety vestibules will be added at buildings 5, 6, 13, 14 and 82. The contractor has 380 days to complete the work. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HZ
HZ
HZ
OFFICEANTEROOM
ELEC
OFFICE
CLOSET
CLOSET
019 019C
016G
016F
016E
HZ
HZ
HZ
OFFICEANTEROOM
ELEC
OFFICE
CLOSET
CLOSET
019 019C
016G
016F
016E
J
082.AE10104
VESTIBULE
082.AE101
CONCRETE FROST SLAB
3" 9' - 9"
AE300
AE300
EXISTING EXTERIOR
HATCH TO REMAIN
CONTROL JOINT
CONTROL JOINT
082.AE101
SIM O.H.
ALUMINUM BRAKE METAL
COLUMN WRAP TO MATCH
ALUMINUM FRAMED
STOREFRONT SYSTEM, TYP
82.B
82.A
82.1 82.2
082.AE101
EQ EQ EQ
82-000
82-001
SPLASHBLOCK;
TYP.
A2
082.AE10104
NEW STANDING SEAM
METAL ROOF
082.AE101
AE300
AE300
NEW GUTTER AND DOWNSPOUT
NEW GUTTER AND DOWNSPOUT
RIDGE VENT
82.B
82.A
82.1 82.2
1ST FLOOR
2ND FLOOR
3RD FLOOR
NEW FOUNDATION
AND FOOTING
ALUMINUM FRAMED
STOREFRONT SYSTEM w/
1" INSULATED GLAZING
8"
1'-0"
AE300
LINE OF FLASHING
BEYOND
(M
IN
NEW WALL MOUNTED
EXTERIOR LIGHT FIXTURE
BRAKE METAL FASCIA TRIM PANEL
82.B82.A
EQ EQ
PATCH AND REPAIR BRICK WHERE
EXISTING CANOPY WAS ATTACHED
AE300
NEW BRICK w/ PRECAST SILL
ALUMINUM FRAMED
STOREFRONT SYSTEM w/ 1"
INSULATED GLAZING
NEW STANDING
SEAM METAL ROOF
EXISTING FOUNDATION AND FOOTING
EJ
ALUMINUM BRAKE METAL
COLUMN WRAP TO MATCH
ALUMINUM FRAMED
STOREFRONT SYSTEM, TYP
NEW FOUNDATION AND FOOTING
- REFER TO STRUCT.
NEW GUTTER
& DOWN SPOUT
82.182.2
EQ EQ
FLOOR PLAN LEGEND
EXISTING WALL CONSTRUCTION
EXISTING DOOR
NEW DOOR
1-HOUR FIRE RATED PARTITION -
UL DES U419
2-HOUR FIRE RATED BARRIER -
UL DES U419
1-HOUR SMOKE BARRIER - NFPA 101 - 8.3
NEW DOOR AND NEW HARDWARE TO BE INSTALLED
INTO EXISTING FRAME.
NEW HARDWARE TO BE INSTALLED ON EXISTING DOOR.
NEW DOOR AND FRAME TO BE INSTALLED INTO EXISTING
OPENING.
INSTALL NEW DRINKING FOUNTAIN. MODIFY EXISTING
SANITARY, AND VENT PIPE AS REQUIRED, AND PROVIDE
NEW WATER SUPPLY LINES AND FINAL CONNECTION TO
NEW FIXTURE. COORDINATE w/ COR.
KEYNOTES
EQUIPMENT LEGEND
HR
CG-1
AE300
AE300
8' - 6"
VESTIBULE
NEW LIGHT FIXTURE W/
EMERGENCY BACKUP
- SEE ELEV
NEW DOWNLIGHTS IN CEILING.
PROVIDE EMERGENCY BACKUP
TO SELECT FIXTURES
5/8" GYP. BOARD
CEILING
82.B
82.A
82.1 82.2
REFLECTED CEILING PLAN LEGEND
AREAS TO BE SUSPENDED ACOUSTIC TILE
AREAS TO BE NEW PAINTED AND FINISHED
GYPSUM BOARD CEILING ON METAL STUD
FRAMING (FRAMING TO BE SUPPORTED ON
ENDS OR HUNG FROM STRUCTURE ABOVE
AS REQUIRED
NEW LED RECESSED LIGHT FIXTURE
REINSTALLED SUPPLY DIFFUSER
REINSTALLED EXHAUST/ RETURN AIR DIFFUSER
REINSTALLED CEILING MOUNTED EXIT SIGN
PENDANT LIGHT FIXTURE
REINSTALLED SPRINKLER
CEILING HEIGHT ABOVE FINISHED FLOOR8'-0"
GENERAL NOTES - CEILING PLAN
1. NEW CEILINGS TO MATCH EXISTING CEILING LOCATION.
2. IF CEILING GRID LAYOUT RESULTS IN TILES OF LESS THAN 3",
CONSULT WITH ARCHITECT FOR INSTRUCTIONS BEFORE
PROCEEDING.
3. REFER TO FINISH SCHEDULE FOR CEILING FINISHES.
4. EXISTING LED LIGHT FIXTURES, SPEAKERS, FIRE ALARMS
(SMOKE /CO DETECTORS /SENSORS /SPRINKLER HEADS
ETC.), MECHANICAL DIFFUSERS AND GRILLES, CAMERAS,
WIRELESS ACCESS POINT, SAFETY MIRRORS, COVER PLATES
ETC. TO BE STORED AND REINSTALLED IN NEW CEILING
FINISH.
RADIANT CEILING PANELS
EXISTING CEILING HEIGHT - NO CHANGEEXIST.
CEILING HEIGHT ABOVE FINISHED FLOOR -
MATCH EXISTING; FIELD VERIFY
VERIFY
OR
REINSTALLED SMOKE DETECTOR
REINSTALLED EMERGENCY WALL PACK
REINSTALLED MOTION SENSOR
REINSTALLED SECURITY CAMERA
REINSTALLED SPEAKER
REINSTALLED WIRELESS ACCESS POINT
REINSTALLED GENERAL SENSOR
REINSTALLED QUARTER, HALF, & FULL
DOME SAFETY MIRROR
REINSTALLED SINGLE & DOUBLE MOUNTED
RECEPTACLE
RECESSED LIGHT FIXTURE
S
REINSTALLED LINEAR DIFFUSER
REINSTALLED EXISTING
RECESSED LIGHT FIXTURE
OR
EX EX
AREAS TO BE NEW BASIS OF DESIGN:
ARMSTRONG WOODWORKS GRILLE w/
LINEAR FLEECE AND CONTINUOUS EDGE TRIM
AT PERIMETER. PROVIDE XL SUSPENSION
SYSTEM AS REQUIRED
NEW 2" RECESSED LINEAR LED LIGHT FIXTURE;
BASIS OF DESIGN FINELITE PER ELECTRICAL
EXISTING GYP BOARD CEILING TO REMAIN,
AND BE PAINTED
ROOF PLAN LEGEND
INDICATES ROOF PITCH
RUBBER ROOF WALKWAY TRAFFIC PAD -
ADHERE PAD TO ROOF MEMBRANE
TAPERED INSULATION
GENERAL NOTES - ROOF PLAN
1. SEE MECHANICAL DRAWINGS FOR LOCATIONS OF PLUMBING
VENTS, FLASH AS SPECIFIED.
2. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR
ADDITIONAL OPENINGS, IF ANY, IN ROOF(S).
3. TYPICAL ROOF IS (FULLY ADHERED OR MECHANICALLY
FASTENED) SINGLE-PLY MEMBRANE ROOFING ON RIGID
INSULATION ON METAL DECK OR CONCRETE DECK. (PROVIDE
TAPERED INSULATION TO CREATE SLOPES TO DRAINS)
4. TAPERED INSULATION LAYOUTS ARE SCHEMATIC ONLY. FINAL
LAYOUT FOR THE PROPOSED AREA SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
5. MINIMUM 1/4" PER FOOT SLOPE AT ALL NEW LOW SLOPE
ROOF AREAS.
6. MINIMUM 1/8" PER FOOT SLOPE AT ALL EXISTING RE-ROOF
LOW SLOPE ROOF AREAS.
ICE AND WATER SHIELD
82.A
82.1
3"
1" 4" 1/2"
SEALANT
TREATED
WOOD BLOCKING
HSS COLUMN - REFER TO STRUCT.
ALUM. BREAK METAL - MATCH STOREFRONT
SYSTEM
BACKER ROD & SEALANT
ALUMINUM FRAMED STOREFRONT SYSTEM
W/1" INSULATED GLASS
SOLID SURFACE MATERIAL SILL
BELOW
CAST STONE SILL BELOW
EXISTING WALL
SEALANT
EXTERIOR PAINT
ALL EXTERIOR FINISHED CONSTRUCTION TO BE PRIMED AND
PAINTED. PAINT TO BE WHITE TO MATCH ELSEWHERE ON THE
VAMC BATTLE CREEK CAMPUS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DWG. ___ OF 74
7GAE PROJECT NO.: 219122
Sprinkler:
600 E. Michigan Avenue, Suite B
Kalamazoo, MI 49007
P: 269.927.0144 www.7GenAE.com
2850 Eisenhower Ave, Suite 310
Alexandria, VA 22314
P: 202.617.8485 www.alliance.us.com
FOR CONSTRUCTION
100% BID DOCUMENTS
PLANS & ELEVATION VAMC BC RENOVATE
COMMON AREAS, VARIOUS
BUILDINGS
5500 ARMSTRONG ROAD
BATTLE CREEK, MI 49037
515-20-101
PROJECT DIRECTOR
04 - 01 - 2021 JB JS
100% BID
DOCUMENTS
082.AE101
FULLY SPRINKLED
SCALE: 1/8" = 1'-0"082.AE101
BUILDING 82: FIRST FLOOR PLAN01
SCALE: 1/8" = 1'-0"082.AE101
BUILDING 82: ROOF PLAN03
SCALE: 1/8" = 1'-0"082.AE101
BUILDING 82: VESTIBULE EAST ELEVATION04
SCALE: 1/8" = 1'-0"082.AE101
BUILDING 82: VESTIBULE NORTH ELEVATION05
PLAN NORTH
SCALE: 1/8" = 1'-0"082.AE101
BUILDING 82: VESTIBULE CEILING PLAN02
SCALE: 1 1/2" = 1'-0"082.AE101
PLAN DETAIL06
Revisions: Date:
ADDENDUM #1 7/19/2021
| Sheets |
| 082.AE101 - PLANS & ELEVATION |
File details come from the government source that posted it. Updated .