This addendum addresses a federal contract opportunity for renovations at the VA Medical Center in Battle Creek, Michigan. The contractor shall replace worn ceilings, flooring, walls and doors in several outpatient care buildings, improving conditions for Veterans. Specifically, the contractor shall install new ceilings, flooring, wall coverings and energy efficient doors with integrated security features in Buildings 2, 6, 8, 9, 10, 11, 12. Entrance vestibules shall be added to Buildings 5, 6, 13, 14 and 82 to eliminate safety concerns from falling ice. The contractor has 380 days to complete the work. The addendum provides clarification on salvaging items, splashblocks, foundation notes, weeps and door types for the project.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project 515-20-101 Page 1 of 2
ALLIANCE | 7GAE JV
Addendum 01 Project: VA Battle Creek Medical Center Project No: 515-20-101
Renovate Common Areas, Various Buildings
Date: July 19, 2021
Notice
This addendum is issued by the Architect to all known individuals, firms or corporations who have obtained or received bidding documents and contract documents for the above-listed project. This addendum is hereby made a portion of bidding documents or contract documents, as appropriate. It is issued for the purpose of amplifying, clarifying or correcting originally issued bid documents. Bidders are required to acknowledge receipt of this addendum in the appropriate space on bid form.
Item AD1-A1 – Salvaged Items and General Notes
Demolition plan detail note 4A was revised such that the wall mounted handrail connectors, brackets, and end terminations are to be demoed and NOT salvaged.
Demolition plan detail notes 5A and 5B are clarified such that artwork and posters are to be salvaged, stored, and reinstalled.
Demolition plan general notes, note #9 it was added that the contractor is responsible for temporary lighting in the event that demolition of existing lighting and subsequent replacement with new lighting cannot be provided before that days work hours are complete.
Item AD1-A2 – Splashblock
Building 82 downspouts are revised to terminate on grade with a splashblock. No underground storm is present, and none is desired for this entry addition storm to tie into.
Item AD1-A3 – New Construction Notes
Building 5 wall section 3 foundation note has been revised to read as ‘new construction’.
VA Project 515-20-101 Page 2 of 2
ALLIANCE | 7GAE JV
Item AD1-A4 – Weeps
Building 14 base column cast stone sections have been noted to provide weeps in lieu of continuous sealant and backer rod at the base.
Item AD1-A5 – Door Types
Doors 14-03 and 82-000 types were revised. 14-03 is to be door type ‘C’, and 82-000 is to be door type ‘D’.
END OF ADDENDUM No. 1