515-20-101 32 002-AD100 - Bldg 2 Ground Floor Demolition Plans.pdf

PDF 263 KB Posted

Attached to
36C25021B0052 - Project No. 515-20-101 - Renovate Common Areas, Various Buildings
Solicitation number
515-20-101
Issued by

About this file

This document package includes demolition plans and notes for renovations at a Veterans Affairs medical center, along with details of a related federal contract opportunity. The demolition plans outline work to fully remove finishes, casework, fixtures and other items from occupied patient areas to prepare surfaces for new construction. Notable removals include ceilings, flooring, wall coverings, doors, counters and plumbing fixtures. The contract opportunity involves furnishing all labor, materials and equipment to complete the renovations across several outpatient care buildings. Work will improve conditions in heavy traffic areas frequented by veterans through replacement of ceilings, flooring, wall coverings, doors and handrails. Wayfinding will also be enhanced with new signage. Safety will be increased with entrance vestibules added to five buildings. The contractor will have 380 days to complete the work. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

File Type Posted
36C25021B0052 0003.docx DOCX document
515-20-101 34 AE321 - Exterior Wall Sections.pdf PDF
515-20-101 32 002-AD102 - Bldg 2 2nd Flr Demolition Plans.pdf PDF
515-20-101 32 006-AD101 - Bldg 6 Roof Demolition Plans.pdf PDF
515-20-101 32 009-AD101 - Bldg 9 1st Flr Demolition Plans.pdf PDF
515-20-101 32 002-AD101 - Bldg 2 1st Flr Demolition Plans.pdf PDF
515-20-101 Addendum Answers.pdf PDF
515-20-101 32 013-AD101 - Bldg 13 Demolition Plans.pdf PDF
36C25021B0052 0002 Amendment.pdf PDF
RFI Answers for 2nd Group of Questions.pdf PDF
515-20-101 32 014-AD101 - Bldg 14 Demolition Plans.pdf PDF
515-20-101 34 AE600 - Door Sizes - Drawing.pdf PDF
515-20-101 34 082-AE101 - Plans and Elevation.pdf PDF
515-20-101 32 082-AD101 - Bldg 82 Demolition Plans.pdf PDF
515-20-101 32 008-AD101 - Bldg 8 2nd Flr Demolition Plans.pdf PDF
515-20-101 32 010-AD101 - Bldg 10 1st Flr Demolition Plans.pdf PDF
515-20-101 32 012-AD101 - Bldg 12 1st Flr Demolition Plans.pdf PDF
515-20-101 34 AE320 - Exterior Wall Sections.pdf PDF
515-20-101 32 011-AD101 - Bldg 11 1st Flr Demolition Plans.pdf PDF
515-20-101 32 005-AD101 - Bldg 5 Demolition Plans.pdf PDF
VA Signage Design Guide.pdf PDF
VA Signage Design Guide.pdf PDF
RFI Questions and Answers.pdf PDF
515-20-101 Pre-Bid Sign In Sheet.pdf PDF
36C25021B0052 0001 Amendment Update.pdf PDF
Specifications Project 515-20-101 Solicitation 36C25021B0052.pdf PDF
36C25021B0052.docx DOCX document
Drawing Solicitation 36C25021B0052.pdf PDF
RFI Form-Solicitation 36C25021B0052-Project 515-20-101.docx DOCX document
515-20-101 Wage Determination.pdf PDF
EMR Certification Form 2021-Solicitation 36C25021B0052-Project 515-20-101.docx DOCX document
515-20-101 Justification for Brand Name Only Component - KABA Cores.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STOR. FEMALE

OFFICE OFFICE SERVICE

RECORDS

OFFICE

OFFICE OFFICE

HSK

OFFICE

EXAM

STAFF LOUNGE/

I.T. OFFICE

MALE

WAITING ROOM

TRIAGE TRIAGE OFFICE

OFFICE

INFORMATION

RECEPTION

OFFICE

EXAM

EQUIP.

EXAM EXAM

RECORDS

OFFICE

MED

EXAM

OFFICE

HVAC

ELEV.

PIPE

CASHIER FUNDS

ELEV.

ELEV.

HVAC

PROSTHETICS

TREATMENT

STOR. WAITING

TREATMENT

OFFICETELE

DRESSING

ROOM

SOILED UTILITY

RECOVERY

CARE

STAFF

LOUNGE

NURSES

STATION

ELEC

CLOSET

TOILET

TOILET

MEN'S

WOMEN'S

STAIR

STAIR

STAIR

TOILET

ELEC.

ELEV.

OFFICEOFFICE

LOCKER ROOM

FEMALE

MALE

OFFICEOFFICE

OFFICE

AGENT PATIENT

PATIENT

SECURITY

CUSTOMER

ROOM

IMMEDIATE

ADMISSIONS

W.C. STOR.

OFFICE

ELEC.

STAIR

STOR.

MACH.

STAIRHSK

CLOSET

STOR.

00640067

S3

0074 0074A

0007 0005

0076 0077

0111 0112 0113 0114

S4

C012

E3

C013

0108 0116

C011

0117 0118 0119

C01

0103A

0050E

E

0014E

0006E

0004 0003

S1

0016A 0016 0017

0018E

C010

C06

C08

C09

S2

0092A

0122A

S5

0078A

0048A

0017A

E1 E2

C03A

C014

INSERTION

POINT

4B 6B 7A5A

5A 6B 7B

6A 7B5A360 SF

CORRIDOR

328 SF

CORRIDOR

186 SF

SUB WAITING

1 11

9A

THIS DOOR TO BE

REMOVED AND INFILLED

UNDER A SEPARATE

CONTRACT PRIOR TO THE

START OF THIS PROJECT

4A

5C

5C

5C

5C

5C

9B

7A

4A

5A 7B

7A

4A

5A

7B

4A

4A

4A

4A

4A4A

7A

7A

4A

4A

GENERAL DEMOLITION NOTES

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED

TO WHAT IS SHOWN ON THE DEMOLITION PLANS. THE INTENT IS

TO REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO

FACILITATE NEW CONSTRUCTION.

2. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM

OCCUPIED AREAS WITH A ONE-HOUR FIRE RATED ASSEMBLY,

AND WITH SUITABLE DUST BARRIER. TEMPORARILY SEAL OFF ALL

RETURN & SUPPLY AIR DIFFUSERS IN CONSTRUCTION AREA.

PROVIDE RECIRCULATING HEPA FILTER IN CONSTRUCTION

AREA. ALL DEMOLISHED MATERIAL IS TO BE REMOVED FROM

SITE IN A COVERED CONTAINER. NEGATIVE AIR PRESSURE TO BE

MAINTAINED WITHIN CONSTRUCTION ZONE.

3. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS INCLUDING

ABOVE CEILINGS BEFORE BIDDING, IF CONDITIONS DO NOT

REFLECT WHAT IS NOTED IN THE CONTRACT DOCUMENTS, THE

CONTRACTOR IS TO SUBMIT AN RFI.

4. BEFORE ANY WORK ON FIRE ALARM SYSTEM IS TO BE DONE

CONTRACTOR MUST COORDINATE WITH VA COR AND VA FIRE

SERVICE. ALL SMOKE AND HEAT DETECTORS SHALL BE COVERED

AND SEALED AGAINST DUST ENTRY DURING WORK AND

UNCOVERED AFTER WORK IS CONCLUDED, EACH DAY.

5. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET

OF CONSTRUCTION DOCUMENTS. DO NOT REMOVE ANY ITEMS

WITHOUT VERIFYING AND COORDINATING WITH ALL

CONSTRUCTION DOCUMENTS AND SPECIFICATIONS. ANY

DISCREPANCIES TO BE BROUGHT TO ARCHITECTS ATTENTION

BEFORE WORK IS TO BE DONE.

6. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS.

LOCATION OF DUMPSTERS TO BE DETERMINED BY COR WITH

CONTRACTORS INPUT.

7. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL

DEMOLISHED MATERIALS. DO NOT ALLOW MATERIALS AND

DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO

ACCUMULATE ON THE JOBSITE. REMOVE DAILY AND DISPOSE

OF IN A LEGAL MANNER. NO ONSITE SALE OR BURNING OF

REMOVED ITEMS IS PERMITTED.

8. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS

TO ENSURE THE SAFETY OF THE PUBLIC AND/OR WORKMEN ON

THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON

ON, ABOUT OR ADJACENT TO THE PREMISES. THE CONTRACTOR

SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND

REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF

ACCIDENTS.

9. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT,

INSULATION, WATERPROOFING, EMERGENCY LIGHTING,

SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH

ARE TO REMAIN. CONTRACTOR TO PROVIDE TEMPORARY

LIGHTING IN THE INTERIM BETWEEN DEMOLITION AND NEW.

10. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A

MANNER THAT COULD CHANGE THEIR LOAD-CARRYING

CAPACITY OR LOAD-DEFLECTION RATIO.

11. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY

DEMOLITION, REWORK AS REQUIRED, PREPARE FOR NEW

CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING

SHALL BE TOOTHED-IN TO MATCH EXISTING COURSING PATTERN

WHERE EXPOSED.

12. REFER TO ASBESTOS SURVEY, AND IF ADDITIONAL HAZARDOUS

MATERIALS ARE ENCOUNTERED DURING DEMOLITION,

CONTRACTOR SHALL CONTACT COR FOR ABATEMENT.

13. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND

SURFACES CUT OR DAMAGED DURING DEMOLITION, BY

METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING

WARRANTIES.

14. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING

ARE PERFORMED.

15. INTERIOR WALLS TO BE REMOVED, SHALL BE REMOVED THE

ENTIRE HEIGHT OF THE WALL UNLESS REQUIRED OTHERWISE BY

NEW OPENINGS IN EXISTING WALLS TO REMAIN.

16. CONTRACTOR SHALL PATCH, REPAIR, AND INFILL ALL APPLIED

FIREPROOFING MATERIAL IN AREAS LEFT UNPROTECTED DUE TO

REMOVAL OF EXISTING ELEMENTS OR AREAS DAMAGED

DURING NEW WORK AND DEMOLITION. MATCH EXISTING

FIREPROOFING MATERIAL TYPE AND THICKNESS TO MAINTAIN

REQUIRED LEVEL OR PROTECTION.

A1

DEMOLITION KEY NOTES

REMOVE EXISTING DOOR & HARDWARE. EXISTING

FRAME TO REMAIN. PREPARE FRAME AS REQUIRED

TO RECEIVE NEW DOOR & HARDWARE. EXISTING

DOOR HARDWARE LOCKSETS, CORES, AND

KEYWAYS SHALL BE SALVAGED AND TURNED OVER

TO THE VA COR.

REMOVE EXISTING HARDWARE (DOOR TO REMAIN).

EXISTING DOOR HARDWARE LOCKSETS, CORES,

AND KEYWAYS SHALL BE SALVAGED AND TURNED

OVER TO THE VA COR.

REMOVE EXISTING WALL CAP; PARTIAL WALL TO

REMAIN

REMOVE EXISTING WALL-MOUNTED HANDRAILS

COMPLETE INCLUDING CONNECTORS, MOUNTING

BRACKETS, AND END TERMINATIONS. PATCH AND

REPAIR WALL. TURN BALANCE OVER TO COR UNLESS

DIRECTED OTHERWISE.

REMOVE EXISTING LOW WALL-MOUNTED BUMPER

GUARD COMPLETE. PATCH AND REPAIR WALL

SURFACE TO REMAIN.

REMOVE EXISTING WALL PROTECTION, WALL BASE,

AND ALL ITEMS ATTACHED TO THE WALLS (STORE

AND PROTECT FOR RE-INSTALLATION

ARTWORK/POSTERS). PATCH & REPAIR EXPOSED

SURFACES TO REMAIN AS REQUIRED FOR NEW

CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING WALL COVERING/WALL PAPER,

WALL BASE AND ALL ITEMS ATTACHED TO THE WALLS

(STORE AND PROTECT FOR RE-INSTALLATION

ARTWORK/POSTERS). PATCH & REPAIR EXPOSED

SURFACES TO REMAIN AS REQUIRED FOR NEW

CONSTRUCTION AND/OR NEW FINISHES. ALL

EXISTING ITEMS ATTACHED TO WALL, SHALL BE

STORED, AND WHERE DIRECTED BY COR

REINSTALLED.

REMOVE EXISTING CORNER GUARDS.

REMOVE EXISTING WOOD VENEER PANEL AND

BACKUP GYP BOARD. REFER TO DEMOLITION

SECTION.

REMOVE EXISTING WOOD VENEER PANEL; EXISTING

BACKUP MATERIAL TO REMAIN.

REMOVE EXISTING WINDOW SILL AND ASSOCIATED

WOOD TRIM; PATCH AND REPAIR WALL SURFACE TO

REMAIN.

REMOVE EXISTING CARPET FLOORING INCLUDING

ADHESIVES, NAILING STRIPS, TRANSITION STRIPS,

AND SETTING MATERIALS DOWN TO EXISTING

SUBSTRATE. GRIND CONCRETE FLOORS AS

REQUIRED TO PROVIDE A SMOOTH AND UNIFORM

SURFACE FOR NEW FINISHES.

REMOVE EXISTING VINYL COMPOSITION TILE/

LUXURY VINYL TILE FLOORING INCLUDING

ADHESIVES, TRANSITION STRIPS, AND SETTING

MATERIALS DOWN TO EXISTING SUBSTRATE. GRIND

CONCRETE FLOORS AS REQUIRED TO PROVIDE A

SMOOTH AND UNIFORM SURFACE FOR NEW

FINISHES.

REMOVE EXISTING TILE FLOORING INCLUDING

TRANSITION STRIPS, AND TILE MORTAR BED DOWN

TO EXISTING SUBSTRATE. GRIND CONCRETE FLOOR

AS REQUIRED TO PROVIDE A SMOOTH AND

UNIFORM SURFACE FOR NEW FINISHES. PROVIDE

FLOOR LEVELER AS REQUIRED.

REMOVE EXISTING ACOUSTICAL CEILING TILE AND

GRID SYSTEM COMPLETE INCLUDING ASSOCIATED

HANGERS, METAL TEE GRID, AND EDGE ANGLES.

EXISTING CEILING MOUNTED LIGHT FIXTURES

(UNLESS NOTED IN CONJUNCTION W/ 7B),

SPEAKERS, CAMERAS, FIRE ALARMS, MECHANICAL

DEVICES, SMOKE DETECTORS, SENSORS, WIRELESS

ACCESS POINT, EXIT SIGNAGE, SAFETY MIRRORS,

ETC. TO BE TEMPORARILY SUPPORTED FOR

REINSTALLATION IN NEW CEILING FINISH; REFER TO

REFLECTED CEILING PLANS FOR EXISTING AND

REINSTALLED LOCATIONS. [NOTE: ITEMS SHALL NOT

BE TEMPORARILY OR PERMANENTLY SUSPENDED

FROM FIRE SUPPRESSION LINES]

REMOVE EXISTING LIGHT FIXTURES COMPLETE AND

RETURN TO COR. EXISTING CIRCUITING (EXTEND AS

REQUIRED)AND CONTROLS TO REMAIN FOR REUSE

WITH NEW LIGHTING. REFER TO NEW WORK

REFLECTED CEILING PLANS FOR EXISTING LIGHTS TO

BE REMOVED AND EXISTING LIGHTS TO REMAIN. ALL

REMAINING CEILING MOUNTED ITEMS TO BE

REINSTALLED AS CALLED OUT IN 7A.

REMOVE EXISTING DRYWALL CEILING AND SUPPORT

SYSTEM. PATCH & REPAIR EXPOSED SURFACES TO

REMAIN AS REQUIRED FOR NEW CONSTRUCTION

AND/OR NEW FINISHES.

REMOVE EXISTING CASEWORK UPPER AND LOWER.

SALVAGE EQUIPMENT & TURN OVER TO COR

UNLESS DIRECTED OTHERWISE. PATCH AND REPAIR

EXPOSED SURFACES TO REMAIN AS REQUIRED TO

RECEIVE NEW CONSTRUCTION AND FINISHES.

REMOVE EXISTING COUNTERTOP INCLUDING BACK/

SIDESPLASH AND ALL ASSOCIATED SUPPORT

BRACKETS AND FRAMING. SALVAGE EQUIPMENT &

TURN OVER TO COR UNLESS DIRECTED OTHERWISE.

PATCH AND REPAIR EXPOSED SURFACES TO REMAIN

AS REQUIRED TO RECEIVE NEW CONSTRUCTION

AND FINISHES.

REMOVE EXISTING PLUMBING FIXTURE COMPLETE.

EXISTING SANITARY, WATER, AND VENT PIPING TO

REMAIN; PATCH AND REPAIR WALL AS REQUIRED.

REMOVE EXISTING STAIRS SYSTEM (TREADS, RISERS,

HANDRAILS, SUPPORTS, GUARD RAILS, ETC.) REFER

TO STRUCTURAL DRAWINGS FOR INFILL OF FLOOR

OPENING.

REMOVE EXISTING STAIR GRIP TAPE INCLUDING ALL

ADHESIVES DOWN TO EXISTING SUBSTRATE. SAND

EXISTING WOOD TREADS AND LANDINGS AND

PROVIDE FLOOR LEVEL AS REQUIRED TO PROVIDE A

SMOOTH AND UNIFORM SURFACE FOR NEW

FINISHES. DEMO EXISTING WALL MOUNTED

HANDRAIL AND SUPPORT.

REMOVE EXISTING WOODEN ROOF SHEATHING

AND STEEL PLATE ICICLE PROTECTION; REMOVE ALL

EXISTING FRAMING EXCLUDING SUPPORT

COLUMNS.

REMOVE EXISTING ROOF & STRUCTURE INCLUDING

WALL MOUNT BRACKETS AND FLASHING. PATCH

AND REPAIR EXISTING BRICK AND MORTAR TO

REMAIN

REMOVE EXISTING SYSTEM FURNITURE AND DESK

STORE AND PROTECT FOR RE-INSTALLATION,

COORDINATE WITH COR.

REMOVE EXISTING TERRAZZO FLOORING AND

INTEGRAL WALL BASE. PATCH AND REPAIR FLOOR.

PROVIDE FLOOR LEVELER AS REQUIRED.

4A

5A

6A

7A

9A

4B

6B

5B

5C

5D

5F

EXISTING FULLY FINISHED SPACE THAT ALL WALL FINISHES,

CEILINGS, FLOORING, CASEWORK, PLUMBING FIXTURES,

CEILING MOUNTED LIGHT FIXTURES ARE TO BE REMOVED.

EXISTING WALL CONSTRUCTION AND COLUMNS ARE TO

REMAIN, UNLESS NOTED OTHERWISE. PREPARE ALL SURFACES

FOR NEW CONSTRUCTION. PROVIDE SKIM COAT ON ALL WALL

SURFACES TO A LEVEL 5 FINISH.

EXISTING INTERIOR SPACE NOT INCLUDED IN SCOPE

OF THIS PROJECT

9B

REMOVE EXISTING CONCRETE STEPS INCLUDING

FOUNDATIONS/FOOTINGS AND EXISTING HANDRAILS AND

BRACKETS; PATCH AND REPAIR EXISTING BRICK TO REMAIN,

REMOVE EXISTING WALL TILE AND BACKING; PATCH AND

REPAIR WALL IN PREPARATION FOR NEW FINISHES.

SAWCUT AND REMOVE EXISTING CONCRETE UP TO EXISTING

CONTROL JOINT IN PREPARATION FOR NEW WORK.

REMOVE EXISTING WALL PARTITION (INCLUDING GLASS

SIDELIGHTS) FULL HEIGHT; PATCH AND REPAIR ADJOINING

FLOOR, WALL AND CEILING SURFACES TO REMAIN.

REMOVE EXISTING EXTERIOR STOREFRONT SYSTEM INCLUDING

DOOR. PATCH AND REPAIR ADJACENT WALL CONSTRUCTION

TO REMAIN.

REMOVE EXISTING FLOOR EXPANSION JOINT; EXISTING WALL

EXPANSION TO REMAIN.

REMOVE EXISTING FIRE EXTINGUISHER AND BRACKET SALVAGE

AND TURN OVER TO THE VA COR.

REMOVE EXISTING KIOSKS AND STORE FOR REINSTALLATION.

TURN BALANCE OVER TO COR.

REMOVE EXISTING DOOR, DOOR FRAME & HARDWARE.

PREPARE OPENING AS REQUIRED TO RECEIVE NEW DOOR &

HARDWARE. EXISTING DOOR HARDWARE LOCKSETS, CORES,

AND KEYWAYS SHALL BE SALVAGED AND TURNED OVER TO THE

VA COR.

5E

7B

6C

HAZARDOUS DEMO KEY NOTES

H1 ABATE AND REMOVE EXISTING DOOR LEAF WITH

ASBESTOS. EXISTING FRAME TO REMAIN.PREPARE

FRAME AS REQUIRED TO RECEIVE NEW DOOR &

HARDWARE.

ABATE AND REMOVE EXISTING ASBESTOS FLOOR TILE

AND ASBESTOS MASTIC. REMOVE EXISTING

ASBESTOS ADHESIVES, TRANSITION STRIPS. GRIND

EXISTING FLOOR SUBSTRATE TO A SMOOTH AND

UNIFORM SURFACE FOR NEW FINISHES. PATCH AND

REPAIR AS REQUIRED.

ABATE AND REMOVE EXISTING ASBESTOS FLOOR TILE

AND ASBESTOS BEDDING COMPOUND. REMOVE

EXISTING TRANSITION STRIPS, AND GRIND EXISTING

CONCRETE SUBSTRATE TO A SMOOTH AND

UNIFORM SURFACE FOR NEW FINISHES.

ABATE AND REMOVE EXISTING WALL TILE AND

ASBESTOS BEDDING COMPOUND. PATCH AND

REPAIR EXISTING/ADJACENT WALL TO REMAIN IN

PREPERATION FOR NEW WORK.

H2

H3

H4

A1

A1

A1

BUILDING 2 ADDITIONAL

DEMOLITION NOTES

17. INFECTION CONTROL PERMIT WILL BE REQUIRED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

DWG. ___ OF 74

7GAE PROJECT NO.: 219122

Sprinkler:

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

FOR CONSTRUCTION

100% BID DOCUMENTS

GROUND FLOOR

DEMOLITION PLAN

VAMC BC RENOVATE

COMMON AREAS, VARIOUS

BUILDINGS

5500 ARMSTRONG ROAD

BATTLE CREEK, MI 49037

515-20-101

PROJECT DIRECTOR

04 - 01 - 2021 JB JS

100% BID

DOCUMENTS

002.AD100

PARTIALLY

SPRINKLED

SCALE: 1/8" = 1'-0"002.AD100

BUILDING 2: GROUND FLOOR DEMOLITION PLAN01

PLAN NORTH

Revisions: Date:

Sheets
002.AD100 - GROUND FLOOR DEMOLITION PLAN
002.AD101 - FIRST FLOOR DEMOLITION PLAN
002.AD102 - SECOND FLOOR DEMOLITION PLAN
005.AD101 - DEMOLITION PLAN & ELEVATION
006.AD101 - DEMOLITION PLANS & ELEVATION
008.AD101 - DEMOLITION FLOOR PLANS
009.AD101 - DEMOLITION FLOOR PLANS
010.AD101 - DEMOLITION FLOOR PLANS
011.AD101 - DEMOLITION FLOOR PLAN
012.AD101 - DEMOLITION FLOOR PLANS
013.AD101 - DEMOLITION PLANS & ELEVATION
014.AD101 - DEMOLITION PLAN & ELEVATION
082.AD101 - DEMOLITION PLANS & ELEVATION

File details come from the government source that posted it. Updated .