This document is a comprehensive state and local contract opportunity file for the State of Michigan Department of Military and Veterans Affairs (DMVA), involving the renovation of the Kingsford Armory located at 401 South Carpenter Ave., Kingsford, Michigan. The project, identified as File No. 511/22033.JBB, encompasses interior renovations and interior build-out of the existing armory building, including all structural, mechanical, electrical, and plumbing work. The bid is scheduled to be submitted electronically through the SIGMA VSS website by 2:00 p.m. ET on August 20, 2025, with a mandatory pre-bid conference on August 6, 2025, at 10:00 ET. The contract duration is 365 days from the Notice to Proceed, with substantial completion required by July 25, 2025.

The project has a base bid with an allowance amount of $115,000, and bidders are required to submit a 5% bid security. The State of Michigan will evaluate bids using a best value construction bidder evaluation, with a preference for Qualified Disabled Veterans (QDV). A 10% preference will be applied to QDV bids, and bidders must provide documentation including a DD 214, Veterans Administration rating decision letter, and proof of 51% ownership. The project is funded by the State of Michigan and will be procured through the Department of Technology, Management and Budget (DTMB) State Facilities Administration. Contractors must comply with prevailing wage requirements, state project registration, and various state and federal regulations including nondiscrimination, right-to-know, and environmental protection standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MICHSPECTM DTMB 00210 –

2(R 03/25)

This is a Cover Sheet to the State’s Owner and Contractor Standard Construction Contract, known as the MICHSPEC Division 0

Specifications. The MICHSPEC Division 0 Specifications have been developed from the FORMSPEC Michigan Model, 1997 Edition. Although the State’s 2008 Version of the Division 0 Specifications are written as simply as practical, it is nonetheless advisable to consult with companion Guide to Specifiers when preparing specifications for a specific project. These Division 0 Specifications were developed by incorporating provisions and requirements furnished by the State into the FORMSPEC Michigan Model. These Division 0 Specifications have undergone detailed technical reviews by Department of Technology, Management and Budget, State Facilities Administration representatives and detailed legal reviews by the Department of the Attorney General for the State of Michigan. Specifiers are encouraged to consult with a Division 0 specifications specialist or an attorney knowledgeable in public contracts when preparing specifications for a specific project.

STATE OF MICHIGAN

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

MICHSPEC 2008 VERSION, OWNER AND CONTRACTOR

STANDARD CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

MICHSPEC No. 97.0820 − 00020 THROUGH 97.0820 − 00440

RELEASED ON NOVEMBER 1, 1997.

Developed from

Contract Forms and Conditions of the Contract

FORMSPEC Michigan Model and suggested for use with

Bidding Requirements

511/22033.JBB

Department of Military and Veterans Affairs

Renovate Kingsford Armory Kingsford, Michigan

July 25, 2025

1997 Edition/R 03/25 Version

STATE OF MICHIGAN (DMVA) TABLE OF CONTENTS

MICHSPEC DTMB 00010 − 1 (R 03/25)

SECTION 00010 TABLE OF CONTENTS

SECTION/PAGE NO.

SUBJECT INDEX

SECTION 00020 GLOSSARY ............................................................................................................................................. 00020 - 1

SECTION 00030 ADVERTISEMENT .................................................................................................................................. 00030 - 1

SECTION 00100 INSTRUCTIONS TO BIDDERS ............................................................................................................... 00100 - 1

ARTICLE 1 BIDDING DOCUMENT INTERPRETATIONS .................................................................................................. 00100 - 1

ARTICLE 2 QUALIFICATIONS OF BIDDERS ..................................................................................................................... 00100 - 1

ARTICLE 3 BIDDING DOCUMENTS; SITE CONDITIONS; SAFETY REQUIREMENTS; LAWS ....................................... 00100 - 2

ARTICLE 4 INTERPRETATIONS; ADDENDA .................................................................................................................... 00100 - 3

ARTICLE 5 BID SECURITY ................................................................................................................................................ 00100 - 3

ARTICLE 6 CONTRACT TIME; LIQUIDATED DAMAGES .................................................................................................. 00100 - 4

ARTICLE 7 MATERIALS AND EQUIPMENT ...................................................................................................................... 00100 - 4

ARTICLE 8 SUBCONTRACTORS ...................................................................................................................................... 00100 - 5

ARTICLE 9 BID FORM AND BID FORM ATTACHMENTS ................................................................................................. 00100 - 5

ARTICLE 10 PREPARATION AND SUBMISSION OF BIDS.................................................................................................. 00100 - 6

ARTICLE 11 BID WITHDRAWAL; BID MODIFICATION ........................................................................................................ 00100 - 6

ARTICLE 12 BID OPENING; OBJECTION TO THE AWARD ................................................................................................ 00100 - 7

ARTICLE 13 BIDS TO REMAIN OPEN .................................................................................................................................. 00100 - 7

ARTICLE 14 AWARD OF THE CONTRACT .......................................................................................................................... 00100 - 7

ARTICLE 15 EXECUTION OF THE AGREEMENT ................................................................................................................ 00100 - 9

ARTICLE 16 MOBILIZATION PAY ITEM ............................................................................................................................. 00100 -10 ARTICLE 17 SOIL EROSION AND SEDIMENTATION CONTROL–FINE FOR NON-COMPLIANCE .................................. 00100 -10 ATTACHMENT A TO SECTION 00100: BIDDER'S CHECK LIST........................................................................................ 00110 - 1

SECTION 00120 SUPPLEMENTARY INSTRUCTIONS ..................................................................................................... 00120 - 1

SECTION 00210 INFORMATION FOR BIDDERS .............................................................................................................. 00210 - 1

SECTION 00300 BID SUMMARY ...................................................................................................................... 00300 - SUMMARY

SECTION 00300 BID FORM ............................................................................................................................................... 00300 - 1

ARTICLE 1 THIS BID IS SUBMITTED TO THE STATE OF MICHIGAN ("THE OWNER"). ................................................. 00300 - 1

ARTICLE 2 THE BIDDER'S REPRESENTATIONS ............................................................................................................... 00300 - 1

ARTICLE 3 TIME OF COMPLETION ..................................................................................................................................... 00300 - 2

ARTICLE 4 ATTACHMENTS INCLUDED WITH THIS BID .................................................................................................... 00300 - 2

ARTICLE 5 DEFINED TERMS ............................................................................................................................................... 00300 - 2

ARTICLE 6 BID SCHEDULE .................................................................................................................................................. 00300 - 3

ARTICLE 7 SCHEDULE OF CHANGE ORDER PRICES ...................................................................................................... 00300 - 5

ARTICLE 8 BID SUBMITTED ON ......................................................................................................................................... 00300 - 6

SECTION 00310 BID BOND ............................................................................................................................................... 00310 - 1

SECTION 00320 NONCOLLUSION AFFIDAVIT ............................................................................................................... 00320 – 1

SECTION 00330 ASBESTOS ABATEMENT ATTESTATION........................................................................................... 00330 – 1

SECTION 00410 BID BREAKDOWN ................................................................................................................................. 00410 - 1

SECTION 00420 QUESTIONNAIRE ................................................................................................................................... 00420 - 1

ARTICLE 1 ORGANIZATION ............................................................................................................................................... 00420 - 1

ARTICLE 2 SPECIALTY CONTRACTOR LICENSES .......................................................................................................... 00420 - 1

ARTICLE 3 EXPERIENCE ................................................................................................................................................... 00420 - 1

ARTICLE 4 ADDITIONAL QUALIFICATIONS ...................................................................................................................... 00420 - 2

ARTICLE 5 REFERENCES .................................................................................................................................................. 00420 - 2 REFERENCES ATTACHMENT ......................................................................................................................... 00420 - 3

SECTION 00430 LIST OF SUBCONTRACTORS ............................................................................................................... 00430 - 1

SECTION 00440 SCHEDULE OF MATERIALS AND EQUIPMENT .................................................................................. 00440 - 1

ARTICLE 1 BID MATERIALS AND EQUIPMENT −LISTED (NAMED OR SPECIFIED) ITEMS ........................................... 00440 - 1

ARTICLE 2 BID MATERIALS AND EQUIPMENT − OPEN SPECIFICATIONS .................................................................... 00440 - 3

SECTION 00500 AGREEMENT .......................................................................................................................................... 00500 - 1

ARTICLE 1 THE CONTRACT; THE PROJECT; THE WORK .............................................................................................. 00500 - 1

ARTICLE 2 CONTRACT DOCUMENTS .............................................................................................................................. 00500 - 1

ARTICLE 3 CONTRACT PRICE ........................................................................................................................................... 00500 - 2

MICHSPEC DTMB 00010 − 2 (R 03/25)

ARTICLE 4 CONTRACT TIME; LIQUIDATED DAMAGES ................................................................................................... 00500 - 2

ARTICLE 5 PAYMENTS TO CONTRACTOR ...................................................................................................................... 00500 - 3

ARTICLE 6 THE PROFESSIONAL SERVICES CONTRACTOR ......................................................................................... 00500 - 3

ARTICLE 7 CONTRACTOR'S REPRESENTATIONS .......................................................................................................... 00500 - 3

ARTICLE 8 MISCELLANEOUS ............................................................................................................................................ 00500 - 3

ARTICLE 9 NOTICE AND SERVICE .................................................................................................................................... 00500 - 4

SECTION 00520 ATTACHMENT “A” TO AGREEMENT ................................................................................................... 00520 - 1

SECTION 00610 PERFORMANCE BOND ........................................................................................................................ 00610 - 1

SECTION 00620 PAYMENT BOND ................................................................................................................................... 00620 - 1

SECTION 00700 GENERAL CONDITIONS ........................................................................................................................ 00700 - 1

ARTICLE 1 INTERPRETATIONS ........................................................................................................................................... 00700 - 1

1.1 Section 00020 Glossary:............................................................................................................................................... 00700 - 1

1.2 Intent of the Contract Documents: ................................................................................................................................ 00700 - 1

1.3 Priority of the Contract Documents: .............................................................................................................................. 00700 - 2

1.4 Interpretation of Indemnification Provisions: ................................................................................................................. 00700 - 2

1.5 Additional Interpretations: ............................................................................................................................................. 00700 - 2

1.6 Ownership and Use of the Contract Documents: .......................................................................................................... 00700 - 3

1.7 Copies of the Contract Documents: ............................................................................................................................... 00700 - 3

ARTICLE 2 THE OWNER−GENERAL PROVISIONS .......................................................................................................... 00700 - 3

2.1 Availability of Lands, Areas, Properties and Facilities: ................................................................................................. 00700 - 3

2.2 Reference Points; Base Lines and Benchmarks: .......................................................................................................... 00700 - 3

2.3 Stop Work Order: .......................................................................................................................................................... 00700 - 3

2.4 Limitations on the Owner’s Responsibilities: ................................................................................................................ 00700 - 4

2.5 Additional General Provisions: ...................................................................................................................................... 00700 - 4

2.6 Partnering Charter: ....................................................................................................................................................... 00700 - 4

ARTICLE 3 THE PROFESSIONAL − GENERAL PROVISIONS .......................................................................................... 00700 - 4

3.1 Owner’s Representative: ............................................................................................................................................. 00700 - 4

3.2 Clarifications and Interpretations: ................................................................................................................................. 00700 - 4

3.3 Minor Variations and No-Cost Changes; Minor Delays:................................................................................................ 00700 - 5

3.4 Determinations by the Professional: ........................................................................................................................... 00700 - 5

3.5 Limitations on the Professional’s Responsibilities: ....................................................................................................... 00700 - 5

ARTICLE 4 CONTROL OF WORK − GENERAL PROVISIONS ........................................................................................... 00700 - 5

4.1 Review of the Contract Documents: ............................................................................................................................. 00700 - 5

4.2 Management, Supervision, and Personnel: .................................................................................................................. 00700 - 5

4.3 Materials and Equipment: ............................................................................................................................................. 00700 - 6

4.4 Concerning Control of Work: ........................................................................................................................................ 00700 - 6

4.5 Patent Fees and Royalties: ........................................................................................................................................... 00700 - 7

4.6 Use of Premises: .......................................................................................................................................................... 00700 - 7

4.7 Record Documents: ...................................................................................................................................................... 00700 - 7

4.8 Emergencies: ................................................................................................................................................................ 00700 - 8

4.9 Indemnification: ............................................................................................................................................................ 00700 - 8

ARTICLE 5 SUBCONTRACTORS AND SUPPLIERS .......................................................................................................... 00700 - 8

5.1 Employment of Subcontractors: .................................................................................................................................... 00700 - 8

5.2 "Or Equal" and Substitute Materials and Equipment:.................................................................................................... 00700 - 9

5.3 The Contractor’s Continuing Responsibilities: ............................................................................................................ 00700 - 9

ARTICLE 6 SUBMITTALS .................................................................................................................................................... 00700 - 9

6.1 Shop Drawing, Sample and Other Technical Submittals: ............................................................................................. 00700 - 9

6.2 Review and Return of Technical Submittals: .............................................................................................................. 00700 - 10

6.3 Progress Schedule Submittals: ................................................................................................................................... 00700 - 10

6.4 Review and Return of Progress Schedule Submittals: ............................................................................................... 00700 - 10

6.5 Additional Provisions Concerning Submittals: ............................................................................................................ 00700 - 10

ARTICLE 7 LEGAL REQUIREMENTS; INSURANCE ........................................................................................................ 00700 - 11

7.1 Laws; Permits (Which Include Approvals and Licenses): ........................................................................................... 00700 - 11

7.2 Sales and Use Tax and Other Similar Taxes: ............................................................................................................. 00700 - 12

7.3 Safety and Protection: ................................................................................................................................................ 00700 - 12

7.4 Bonds and Insurance - General Requirements: .......................................................................................................... 00700 - 12

7.5 The Contractor’s Liability Insurance:......................................................................................................................... 00700 - 12

7.6 Pollution Liability Insurance: ....................................................................................................................................... 00700 - 13

7.7 Property Insurance (Builder's All Risk Insurance): ...................................................................................................... 00700 - 13

MICHSPEC DTMB 00010 − 3 (R 03/25)

7.8 Waiver of Rights: ........................................................................................................................................................ 00700 - 13

7.9 Receipt and Application of Proceeds: ......................................................................................................................... 00700 - 13

7.10 Unfair Labor Practice: ................................................................................................................................................. 00700 - 13

7.11 Michigan Right-To-Know Law: .................................................................................................................................... 00700 - 13

7.12 Nondiscrimination: ...................................................................................................................................................... 00700 - 14

7.13 Michigan Residency for Employees: .......................................................................................................................... 00700 – 14

7.14 Prevailing Wages: ...................................................................................................................................................... 00700 – 14

7.15 Asbestos Abatement:................................................................................................................................................. 00700 – 14

ARTICLE 8 PROSECUTION; SUBSTANTIAL COMPLETION ........................................................................................... 00700 - 15

8.1 Starting the Work: ....................................................................................................................................................... 00700 - 15

8.2 Revision 0 (Rev. 0) Schedule and Cost Submittals: ................................................................................................... 00700 - 15

8.3 Compliance with Contract Time Requirements: .......................................................................................................... 00700 - 15

8.4 Substantial Completion: .............................................................................................................................................. 00700 - 15

8.5 Partial Use: ................................................................................................................................................................. 00700 - 16

8.6 Division of Responsibilities: ........................................................................................................................................ 00700 - 16

8.7 Suspension of Work: .................................................................................................................................................. 00700 - 16

8.8 Sharing of Total Float on Non-Critical Paths: .............................................................................................................. 00700 - 16

ARTICLE 9 WARRANTY; TESTS, INSPECTIONS, AND

APPROVALS; CORRECTION OF WORK ....................................................................................................... 00700 - 17

9.1 Warranty: ................................................................................................................................................................... 00700 - 17

9.2 Tests, Inspections and Approvals: ............................................................................................................................. 00700 - 17

9.3 Uncovering Work: ...................................................................................................................................................... 00700 - 17

9.4 Correction of Work: .................................................................................................................................................... 00700 - 17

9.5 Special Correction Period Requirements: .................................................................................................................. 00700 - 18

9.6 Special Maintenance Requirements: ......................................................................................................................... 00700 - 18

ARTICLE 10 CHANGES ..................................................................................................................................................... 00700 - 19

10.1 Changes in the Work: ................................................................................................................................................ 00700 - 19

10.2 Differing Subsurface or Physical Site Conditions: ...................................................................................................... 00700 - 19

10.3 Responsibilities for Underground Utilities: ................................................................................................................. 00700 - 20

10.4 Hazardous Material Conditions: ................................................................................................................................. 00700 - 20

10.5 Incidents with Archaeological Features: .................................................................................................................... 00700 - 20

10.6 Unit Price Work: ......................................................................................................................................................... 00700 - 21

10.7 Cash Allowances; Provisionary Allowances: ............................................................................................................. 00700 - 21

10.8 Change Orders; Change Authorizations: ................................................................................................................... 00700 - 21

ARTICLE 11 CHANGES IN CONTRACT PRICE; CHANGES IN

CONTRACT TIME ......................................................................................................................................... 00700 - 22

11.1 General Provisions: ................................................................................................................................................... 00700 - 22

11.2 Changes in Contract Time: ........................................................................................................................................ 00700 - 22

11.3 Methods for Making Adjustments in Contract Price: .................................................................................................. 00700 - 22

11.4 Labor, Subcontract and Material/Equipment Costs: .................................................................................................. 00700 - 23

11.5 Construction Equipment Costs: ................................................................................................................................. 00700 - 23

11.6 Rented or Leased Construction Equipment: .............................................................................................................. 00700 - 23

11.7 Owned Construction Equipment: ............................................................................................................................... 00700 - 24

11.8 General Conditions Costs: ......................................................................................................................................... 00700 - 24

11.9 Limitations on Allowable Costs: ................................................................................................................................. 00700 - 24

11.10 Costs Covered by the Fee for the Work Involved (and not Allowable as Cost of the Work Involved): ........................ 00700 - 24

11.11 Limits on the Fee for the Work Involved: .................................................................................................................... 00700 - 25

11.12 Fee for Unabsorbed Home Office Overhead: ............................................................................................................. 00700 - 25

11.13 Changes in Contract Time for Early Completion: ........................................................................................................ 00700 - 25

11.14 Access to Records: ..................................................................................................................................................... 00700 - 26

11.15 Price Reduction for Defective Cost and Pricing Data: ................................................................................................ 00700 - 26

ARTICLE 12 PROGRESS PAYMENTS; FINAL PAYMENT ............................................................................................... 00700 - 26

12.1. Schedule of Values: ................................................................................................................................................... 00700 - 26

12.2 Requests for Payment: .............................................................................................................................................. 00700 - 27

12.3 Review of Request for Payment; Intent of Review: .................................................................................................... 00700 - 27

12.4 Refusal to Make or to Recommend Payment: .......................................................................................................... 00700 - 27.

12.5 Final Request for Payment: ....................................................................................................................................... 00700 - 27

12.6 Final Payment and Acceptance: ................................................................................................................................ 00700 - 28

12.7 Contractor’s Continuing Obligation: ......................................................................................................................... 00700 - 28

12.8 Waiver of Claims: ...................................................................................................................................................... 00700 - 28

ARTICLE 13 OTHER WORK .............................................................................................................................................. 00700 - 28

MICHSPEC DTMB 00010 − 4 (R 03/25)

13.1 Related Work at Site: ................................................................................................................................................. 00700 - 28

13.2 Coordination Requirements: ...................................................................................................................................... 00700 - 29

13.3 Claims Between the Contractor and Other Parties: ................................................................................................. 00700 - 29

ARTICLE 14 TERMINATION .............................................................................................................................................. 00700 - 29

14.1 Notice Requiring Assurance of Due Performance: .................................................................................................... 00700 - 29

14.2 Contractor Default and Termination for Cause: ........................................................................................................ 00700 - 30

14.3 Surety Default: ........................................................................................................................................................... 00700 - 31

14.4 Termination for Convenience of the Owner: .............................................................................................................. 00700 - 31

14.5 The Contractor May Suspend Work: ....................................................................................................................... 00700 – 31

ARTICLE 15 DISPUTES .................................................................................................................................................... 00700 - 31

15.1 Claims Under This Article: ......................................................................................................................................... 00700 - 31

15.2 Requirement for Certification of Contractor Claims: ................................................................................................. 00700 - 32

15.3 Recommendations or Decisions from the Professional:........................................................................................... 00700 - 32

15.4 Determinations by the Director-DCD: ....................................................................................................................... 00700 - 32

15.5 Supplements to AAA Arbitration: ............................................................................................................................... 00700 - 33

15.6 Interest on a Judgment; Payment of Judgment: ........................................................................................................ 00700 - 33

15.7 Venue; Flow-Through Provision: ............................................................................................................................... 00700 - 33

SECTION 00800 SUPPLEMENTARY CONDITIONS ....................................................................................................... 00800 - 1

SECTION 01310 PROGRESS SCHEDULE ...................................................................................................................... 01310 - 1

SECTION 011000 – SUMMARY…………………………………………………………………………………………………….. 011000 - 1

SECTION 012000 – PRICE AND PAYMENT PROCEDURES……………………………………………………………………012000 - 1

SECTION 013000 – ADMINISTRATIVE REQUIREMENTS……………………………………………………………………… 013000 - 1

SECTION 013300 – SUBMITTAL PROCEDURES…………………………………………………………………………………013300 - 1

SECTION 014000 – QUALITY REQUIREMENTS…………………………………………………………………………………. 014000 - 1

SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS……………………………………………………………...015000 - 1

SECTION 016000 – PRODUCT REQUIREMENTS…………………………………………………………………………………016000 - 1

SECTION 017000 – EXECUTION AND CLOSEOUT REQUIREMENTS………………………………………………………...017000 - 1

SECTION 017419 – CONSTRUCTION WASTE MANAGEMENT……………………………………………………………….. 017419 - 1

SECTION 024119 – SELECTIVE BUILDING DEMOLITION………………………………………………………………………024119 – 1

SECTION 022220 – HAZARDOUS MATERIALS ABATEMENT…………………………………………………………………022220 – 1

SECTION 031000 – CONCRETE FORMING & ACCESSORIES…………………………………………………………………031000 - 1

SECTION 032000 – CONCRETE REINFORCING………………………………………………………………………………….032000 - 1

SECTION 033000 – CAST-IN-PLACE CONCRETE………………………………………………………………………………..033000 - 1

SECTION 035000 – CONCRETE FINISHING……………………………………………………………………………………….035000 - 1

SECTION 039000 – CONCRETE CURING…………………………………………………………………………………………. 039000 - 1

SECTION 035400 – CAST UNDERLAYMENT………………………………………………………………………………………035400 - 1

SECTION 040513 – MASONRY MORTARING………………………………………………………………………………………040513 -1

SECTION 040516 – MASONRY GROUTING………………………………………………………………………………………...040516 -1

SECTION 042000 – UNIT MASONRY………………………………………………………………………………………………. 042000 -1

MICHSPEC DTMB 00010 − 5 (R 03/25)

SECTION 052100 – STEEL JOIST FRAMING……………………………………………………………………………………….052100 -1

SECTION 053123 – STEEL ROOF DECKING……………………………………………………………………………………….053123 -1

SECTION 054000 – COLD FORMED METAL FRAMING…………………………………………………………………………..054000 -1

SECTION 055000 – METAL FABRICATIONS……………………………………………………………………………………….055000 -1

SECTION 061053 – MISCELLANEOUS ROUGH CARPENTRY…………………………………………………………………..061053 -1

SECTION 062000 – FINISH CARPENTRY……………………………………………………………………………………………062000-1

SECTION 070150 – MAINTENANCE OF MEMBRANE ROOF…………………………………………………………………….070150 -1

SECTION 072113 – BOARD INSULATION…………………………………………………………………………………………..072113 -1

SECTION 075303 – ELASTOMERIC MEMBRANE ROOFING – FULLY ADHERED…………………………………………..075303 -1

SECTION 076200 – SHEET METAL FLASHING AND TRIM………………………………………………………………………076200 -1

SECTION 077200 – ROOF ACCESSORIES………………………………………………………………………………………….077200 -1

SECTION 078400 – FIRESTOPPING………………………………………………………………………………………………….078400 -1

SECTION 079000 – JOINT PROTECTION…………………………………………………………………………………………...079000 -1

SECTION 081213 – STANDARD HOLLOW METAL FRAMES…………………………………………………………………...081213 -1

SECTION 081313 – STANDARD HOLLOW METAL DOORS..…………………………………………………………………...081313 -1

SECTION 083323 – OVERHEAD COILING DOORS………………………………………………………………………………..083323 -1

SECTION 087100 – DOOR HARDWARE…..………………………………………………………………………………………...087100 -1

SECTION 088000 – GLAZING…………….…………………………………………………………………………………………...088000 -1

SECTION 088716 – SAFETY AND SECURITY FILM..……………………………………………………………………………...088716 -1

SECTION 092116 – GYPSUM BOARD ASSEMBLIES……..……………………………………………………………………...092116 -1

SECTION 093000 – TILING…………………….……………………………………………………………………………………...093000 -1

SECTION 095113 – ACOUSTICAL PANEL CEILINGS….………………………………………………………………………...095113 -1

SECTION 096500 – RESILIENT FLOORING………………………………………………………………………………………...096500 -1

SECTION 096566 – RESILIENT ATHLETIC FLOORING..………………………………………………………………………...096566 -1

SECTION 096813 – TILE CARPETING………….…………………………………………………………………………………...096813 -1

SECTION 099000 – PAINTING AND COATING..…………………………………………………………………………………...099000 -1

SECTION 099726 – CEMENTITIOUS COATINGS (PARGING)…………………………………………………………………...099726 -1

SECTION 101100 – VISUAL DISPLAY………………………………………………………………………..……………………...101100 -1

SECTION 101400 – SIGNAGE………………………………………………………………………………………………………....101400 -1

SECTION 102113 – PLASTIC TOILET AND SHOWER COMPARTMENTS…………………………………..………………...102113 -1

SECTION 102213 – WIRE MESH PARTITIONS……………………………………………………………………………………..102213 -1

SECTION 102800 – TOILET, BATH, AND LAUNDRY ACCESSORIES…..……………………………………………………...102800 -1

SECTION 104400 – FIRE PROTECTION SPECIALTIES…………...……………………………………………………………....104400-1

SECTION 105113 – METAL LOCKERS………………….…………………………………………………………………………...105113 -1

SECTION 114000 – FOOD SERVICE EQUIPMENT………………………………………………………………………………...114000 -1

SECTION 123530 – RESIDENTIAL CASEWORK…………………………………………………………………………………...123530 -1

SECTION 123661 – SOLID SURFACING FABRICATIONS……………...……………………………………………...………...123661 -1

SECTION 122413 – ROLLER SHADES……………………………………………………………………………………………....122413 -1

SECTION 220516 – EXPANSION FITTINGS AND LOOPS FOR PLUMBING PIPING………………………………………...220516 -1

SECTION 220529 – HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT…………………………...220529 -1

SECTION 220553 – IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT….………………………………………220553 -1

SECTION 220700 – PLUMBING INSULATION……………………………………………………………………………………...220700 -1

SECTION 221100 – FACILITY WATER DISTRIBUTION…………………………………………………………………………...221100 -1

MICHSPEC DTMB 00010 − 6 (R 03/25)

SECTION 221300 – FACILITY SANITARY SEWERAGE…...……………………………………………………………………...221300 -1

SECTION 221400 – FACILITY STORM DRAINAGE…………...…………………………………………………………………...221400 -1

SECTION 224000 – PLUMBING FIXTURES…………………………………………………….…………………………………...224000 -1

SECTION 230529 – HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT……………………….………….230529 -1

SECTION 230548 – VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT……………………..230548 -1

SECTION 230553 – IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT………………………………………………...230553 -1

SECTION 230593 – TESTING, ADJUSTING, AND BALANCING FOR HVAC……………………………………………….....230593 -1

SECTION 230700 – HVAC INSULATION…..………………………………………………………………………………………...230700 -1

SECTION 230900 – INSTRUMENTATION AND CONTROL FOR HVAC………………………………………………………...230900 -1

SECTION 230923 – ACC DELTA DIRECT DIGITAL CONTROL SYSTEM FOR HVAC…………………………………….....230923 -1

SECTION 231123 – FACILITY NATURAL GAS PIPING…………………………………………………………………………...231123 -1

SECTION 232213 – STEAM AND CONDENSATE HEATING PIPING…………………………………………………………...232213 -1

SECTION 232216 – STEAM AND CONDENSATE PIPING SPECIALTIES……………………………………………………...232216 -1

SECTION 233100 – HVAC DUCTS AND CASINGS………………………………………………………………………………...233100 -1

SECTION 233300 – AIR-DUCT ACCESSORIES….………………………………………………………………………………...233300 -1

SECTION 233700 – AIR OUTLETS AND INLETS…………..……………………………………………………………………...233700 -1

SECTION 237200 – AIR TO AIR ENERGY RECOVERY EQUIPMENT……..…………………………………………………...237200 -1

SECTION 238103 – PACKAGED ROOFTOP AIR CONDITIONING UNITS – SMALL CAPACITY………………………...…238103 -1

SECTION 238126 – SPLIT SYSTEM AIR CONDITIONERS – (MINI-SPLIT)……..……………………………………………...238126 -1

SECTION 260500 – GENERAL ELECTRICAL REQUIREMENTS………………………………………………………………...260500 -1

SECTION 260502 – MINOR ELECTRICAL DEMOLITION………………………………………………………………………....260502 -1

SECTION 260503 – EQUIPMENT WIRING CONNECTIONS……………………………………………………………………....260503 -1

SECTION 260519 – LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES…….………………………...260519 -1

SECTION 260526 – GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS…………………………………………...260526 -1

SECTION 260529 – HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS…..………………………………………...260529 -1

SECTION 260533 – RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS………….……………………………………...260533 -1

SECTION 260553 – IDENTIFICATION FOR ELECTRICAL SYSTEMS………...………………………………………………...260553 -1

SECTION 260923 – LIGHTING CONTROL DEVICES……………………………………………………………………………...260923 -1

SECTION 262416 – PANELBOARDS………………………………………………………………………………………………...262416 -1

SECTION 262726 – WIRING DEVICES………….…………………………………………………………………………………...262726 -1

SECTION 262813 – FUSES…………………………..………………………………………………………………………………...262813 -1

SECTION 262819 – ENCLOSED SWITCHES………..……………………………………………………………………………...262819 -1

SECTION 262823 – ENCLOSED CIRCUIT BREAKERS…………………………………………………………………………...262823 -1

SECTION 262913 – ENCLOSED CONTROLLERS…….…………………………………………………………………………...262913 -1

SECTION 262916 – ENCLOSED CONTACTORS…………………………………………………………………………………...262916 -1

SECTION 265100 – INTERIOR LIGHTING…………………………………………………………………………………………...265100 -1

SECTION 265200 – EMERGENCY LIGHTING….…………………………………………………………………………………...265200 -1

SECTION 265600 – EXTERIOR LIGHTING…………..……………………………………………………………………………...265600 -1

SECTION 270500 – DATA COMMUNICATION SYSTEM………..………………………………………………………………...270500 -1

SECTION 271343 – TELECOMMUNICATIONS CABLING AND EQUIPMENT……….………………………………………...271343 -1

SECTION 283111 – FIRE DETECTION AND ALARM SYSTEM………...………………………………………………………...283111 -1

Appendix I – Special Working Conditions Appendix II – Special Project Procedures Appendix III – Prevailing Wage Rate Schedules & Federal Provisions Addendum Appendix IV - Reserved

MICHSPEC DTMB 00010 − 7 (R 03/25)

DRAWINGS - BOUND SEPARATELY (REFERENCE SHEET INDEX ON G001 FOR FULL LIST)

TITLE SHEETS THRU

GENERAL G001 TO G004

STRUCTURAL S001 TO S502

ARCHITECTURAL A001 TO A605

MECHANICAL AND PLUMBING MP001 TO M602

ELECTRICAL E001 TO E703

SECTION 00020 GLOSSARY

1.1 Defined Terms:

1.1.1. The following terms or relative pronouns used in Division 0 of the Specifications have these intent and meanings:

Activity− An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

Addenda− Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications, and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who submitted a Bid, for the purpose of rebidding the Work without readvertising, is referred to as a post-Bid Addendum.

Agreement− The written agreement between the Owner and Contractor covering the Work to be furnished and performed.

Alternate− Refers to Work specified in the Bidding Documents for which the Bidder shall bid a Bid Price in the space provided in the Schedule of Alternates in Section 00300 Bid Form.

Apparent Low Bidder:- Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Base Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Base Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation and with the veteran’s pre ference is the lowest Bidder is considered the Apparent Low Bidder.

Archaeological Feature− Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts, or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan.

As-Planned Schedule− The Contractor’s Revision 0 Progress Schedule returned to the Contractor as "Resubmittal Not Required," with or without comments or objections noted.

Authorized Technical Data− Information and data contained in a report of exploration and tests of subsurface conditions that are expressly designated in paragraph 2.0 of Section 00210 Information for Bidders. Also, any physical data (dimension, location, conditions, etc.) contained in those drawings of physical conditions of existing surface and subsurface facilities identified in paragraph

3.0 of Section 00210 Information for Bidders.

Bar Chart Schedule− Activity schedule, in a bar chart format, that accounts for the entire Work at a level of detail commensurate with the Progress Schedule requirements of the Contract Documents.

STATE OF MICHIGAN MODEL

Developed from FORMSPEC Michigan Model.

Bid− Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.

The term Bid includes a Rebid.

STATE OF MICHIGAN (DMVA) GLOSSARY

MICHSPEC DTMB 00020 - 2 (R 03/25)

Bidder− The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding Documents− The proposed Contract Documents as advertised, and all Addenda issued before Bid opening, and after Bid opening, if the Work is rebid without readvertising.

Bid Price− The Bidder's price for a lump sum item of Work, or the product of the Bidder's unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid Security− A security serving as a guarantee that the Bidder will conform to all conditions requisite for its return or as liquidated damages in the event of failure or refusal to conform.

Bidding Requirements− The Advertisement, Instructions to Bidders (including Attachment A), Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and Qualification Submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

*AD Board− The Administrative Board of the State of Michigan.

Bonds− Section 00310 Bid Bond, Section 00610 Performance Bond and Section 00620 Payment Bond are security furnished by the Contractor, as required by the Contract Documents.

Business Day− Any Day except Saturdays, Sundays and holidays observed by the Owner.

Bulletin− A standard DTMB or other PSC form used by the PSC & Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar Day− Every day shown on the calendar, Saturdays, Sundays, and holidays included.

Cash Allowance− An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents.

Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change Authorization− A written order issued and signed by the Professional, which directs changes in the Work that require no adjustment in Contract Price or Contract Time, or which allows for variations in the quantities of Unit Price Work.

Change Order− A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Construction Mechanic− A skilled or unskilled mechanic, laborer, worker, helper, assistant, or apprentice working on a state project but shall not include executive, administrative, professional, office, or custodial employees

Contact Person− Individual in the employ of the Professional or the Owner who is designated as the sole point of contact for prospective Bidders for requests or inquiries concerning the Work and/or the Bidding Documents.

Contract− Refer to the definition in paragraph 1.1 of Section 00500 Agreement. The term “Contract” encompasses the legal obligations of the Owner and Contractor, as defined by the Contract Documents.

Contract Award− The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.

Contract Documents− Those documents itemized or designated in paragraphs 2.2 through 2.4 of Section 00500 Agreement.

Contract Float− Calendar Days between the Contractor's anticipated date for early completion of the Work, or of a…