The document provided is an addendum related to a state and local contract opportunity for the Midland Armory Construction project located in Midland, Michigan. The project involves the addition and renovation of the Midland Armory, which is overseen by the Department of Military and Veteran's Affairs for the State of Michigan. The addendum includes detailed specifications for the exterior wall, roof, and interior finishes, as well as various construction details and drawings. The bid attachments must be uploaded to the SIGMA VSS system, and any questions or issues should be directed to the provided contacts. The response deadline is 2:00 p.m. on an unspecified date.
The contract pricing terms, set-asides, incumbent information, funding sources, and other salient details are not provided in the addendum document. The addendum focuses solely on providing technical information and construction specifications for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
A 321
1A
A 321
1B
WOOD BLOCKING
ALUM EXTRUSION
4" (NOM) BRICK,
MATCH EXISTING
8" CMU
INSULATED ROOF
METAL DECK
3" INSULATION
13/4" AIR SPACE
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
A 321
2B
A 321
2C
A 321
2A
WOOD BLOCKING
TO REMAIN
EXISTING METAL
FASCIA TO REMAIN
±4" SALVAGED
UTILITY BRICK
4" CMU
STORE FRONT
EXISTING ROOF
TO REMAIN
EXISTING
STRUCTURAL
TO REMAIN
3" INSULATION
± 2 1/4" AIR SPACE
EXISTING STEEL
JOIST
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
A 321
2A
SIM
EXISTING WOOD
BLOCKING TO REMAIN
EXISTING METAL
FASCIA TO REMAIN
4" UTILITY BRICK,
MATCH EXISTING
4" CMU
EXISTING ROOF
TO REMAIN
EXISTING
STRUCTURAL TO
REMAIN
± 1 1/4" AIR SPACE
EXISTING STEEL
JOIST
NEW FLOST
SLAB, SEE
STRUCTURAL
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
A 321
4B
A 321
4A
A 321
2A
SIM
EXISTING WOOD
BLOCKING TO REMAIN
EXISTING METAL
FASCIA TO
REMAINFASCIA
4" CMU
INSULATED
PANEL GARAGE
DOOR
EXISTING
STRUCTURAL TO
REMAIN
3" INSULATION
± 2 1/4" AIR SPACE
±4" SALVAGED
UTILITY BRICK
NEW FLOST
SLAB, SEE
STRUCTURAL
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
A
A 321
5A
A 321
5B
E X
IS
T
IN
G B
R
IC
K /C
M U W
A
LL
T O
R E M
A
IN
/4
/4
±4" SALVAGED
BRICK
4" CMU
3" INSULATION
± 2 1/4" AIR SPACE
E X
IS
T
IN
G
B R
IC
K W
A
LL
T O
R E M
A
IN
E X
IS
T
B R
IC
K W
O
R E M
A
IN
A1
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
UPPER FLOOR
104' - 0" (X' - X")
A 321
6A
A 321
6B
E X
IS
T
IN
G B
R
IC
K /C
M U W
A
LL
T O
R E M
A
IN
N E W
I N F
IL
L W
A
LL
± 4" SALVAGED
UTILITY BRICK
4" CMU
3" INSULATION
± 2 1/4" AIR
SPACE N
E W
I N F
IL
L W
A
LL
E X
IS
T
IN
G B
R
IC
K /C
M U
W
LL
T O
R E M
A
IN
TOP MASONRY
117' - 4"
UPPER FLOOR
104' - 0" (X' - X")
A 321
7A
A 321
7B
A 321
1A
SIM
/8
/8
WOOD BLOCKING
METAL FASCIA
4" BRICK, MATCH
EXISTING
8" CMU
INSULATED ROOF
METAL DECK
3" INSULATION
1 3/4" AIR SPACE
8" CMU
CEILING, SEE
REFLECTED CEILING
PLAN
CAST STONE SILL
NEW WINDOW
0"
A1
A1
TOP MASONRY
117' - 4"
UPPER FLOOR
104' - 0" (X' - X")
WOOD BLOCKING
METAL FASCIA
BRICK, MATCH
EXISTING
8" CMU
INSULATED ROOF
METAL DECK
3" INSULATION
1" AIR SPACE
GYPSUM BOARD
CEILING, SEE
REFLECTED CEILING
A 321
1A
SIM
A 321
8B
A1
A1
TOP MASONRY
117' - 4"
4" (NOM) BRICK,
MATCH EXISTING
3" RIGID
INSULATION, SEAL
3" INSULATION
1 3/4" AIR SPACE
1' - 1 5/8"
ALUM GRAVEL
STOP PROFILE
AND HEIGHT TO
MATCH EXISTING
1/2" COVER BOARD
5" RIGID INSULATION
METAL DECK, SEE
STRUCTURAL
STEEL JOIST, SEE
STRUCTURAL
EPDM ROOF MEMBRANE
(2) TRT 2X4
STACKED. 24"
O.C. WITH INSUL
BETWEEN
/1
M T A C H E
X
IS
T
/4
EPDM ROOF MEMBRANE
PREBUCK
PARAPET CAP
1' - 7"
/2
3/4" TRT 1X4
STRIPS, 24" O.C.
SEALANT
MESH GROUT STOP
BOND BEAM
A1
LOWER FLOOR
100' - 0" (X' - X")
8" CMU
3" INSULATION
1 3/4" AIR SPACE
10 5/8"
CONCRETE
FOUNDATION
WALL FOOTING,
SEE STRUCTURAL
FLOOR SLAB
1' - 4"
3" RIGID
INSULATION
2" RIGID
INSULATION
CAVITY DRAINAGE
MESH
GROUT SOLID
WEEPS AT 24" O.C.
CONCRETE
APRON, SEE
CIVIL
4" BRICK, MATCH
EXISTING
MEMBRANE
FLASHING
BOND BREAKER
MATERIALA1
4" UTILITY BRICK,
MATCH EXISTING
8" CMU
1" AIR SPACE
LINTEL - REFER
TO STRUCTURAL
SEALANT ON
BOTH FACES
ALUMINUM
DOOR FRAME
CAVITY DRAINAGE
MESH
FLASHING
MEMBRANE
LOWER FLOOR
100' - 0" (X' - X")
THERMALLY BROKEN
ALUMINUM
STOREFRONT DOOR
WITH INSULATED GLASS
DOOR
THRESHOLD
EXISTING
CONCRETE
FOOTING
EXISTING
CONCRETE
FLOOR SLAB
1 3/4" 2" 4"ALUM. SNAP TRIM
AND CLIP
4 3/4"
NEW FROST
SLAB, SEE
STRUCTURAL
OVERHEAD DOOR
OVERHEAD
DOOR TRACK
PAINTED STEEL
TUBE LINTEL AND
PLATE - REFER
TO STRUCTURAL
4" UTILITY BRICK,
MATCH EXISTING
AIR SPACE
8" CMU
WEEPS AT 24"
O.C.
CAVITY DRAINAGE
MESH
LOWER FLOOR
100' - 0" (X' - X")
NEW FLOST
SLAB, SEE
STRUCTURAL
GARAGE
DOOR
EIXSTING
STRUCTURE
BOND BREAKER
MATERIAL
3" RIGID
INSULATION
2" RIGID
INSULATION
A
M
IN
EXISTING UTILITY
VENEER OVER CMU
WALL
5/8" GYPSUM OVER
3 5/8" METAL
STUDS, 16" O.C.
GYPSUM BOARD
CELING, SEE
REFLECTED CEILING
PLAN
A
LI
G N
4" CMU
3" INSULATION
±2 1/4" AIR SPACE
5/8"3 5/8"3 5/8"3"
2 1/4"
3 5/8"
MORTAR JOINT,
MATCH EXISTING
±4" SALVAGED
BRICKA1
LOWER FLOOR
100' - 0" (X' - X")
A
5/8" GYPSUM OVER
METAL STUDS, 16"
O.C., SEE FLOOR
PLAN
EXISTING
FLOOR SLAB
SEALANT
EXISTING UTILITY
VENEER OVER CMU
WALL TO REMAIN
A
LI
G N
4" CMU
3" INSULATION
±2 1/4" AIR SPACE
5/8"3 5/8"3 5/8"3" 2 1/4"
3 5/8"
MORTAR JOINT,
MATCH EXISTING
±4" SALVAGED
BRICK
INFILLE BRICK
VENEER WHERE
SILL IS REMOVED,
MATCH EXISTING
UTILITY BRICK FILL VOID WITH 4"
CMU
FILL WITH MORTAR
EXISTING CMU
WALL(s) TO REMAIN
A1
4" BRICK, MATCH
EXISTING
3" INSULATION
1 3/4 AIR SPACE
8" CMU
TILE CEILING, SEE
REFLECTED
CEILING PLAN
ALUMINUM
WINDOW FRAME
SEALANT BOTH
FACES
MATCH EXIST.
± 8 1/2"
3 5/8"1 3/4" 3" 7 5/8"
1' - 4"
A1
UPPER FLOOR
104' - 0" (X' - X")
4" UTILITY BRICK,
MATCH EXISTING
3" INSULATION
1 3/4" AIR SPACE
8" CMU
ALUMINMUM
WINDOW FRAME
SOLID SURFACE
WINDOW SILL.
SEE FINISH PLAN
ALUMINUM SILL
FLASHING
MEMBRANE
FLASHING.
EXTEND UNDER
WINDOW SUBSILL
CAVITY DRAINAGE
MESH
WEEPS AT 24" O.C.
CAST STONE SILL,
MATCH EXISTING
PROFILE
3 5/8" 1 3/4" 3" 7 5/8"
1' - 4"
± 4" SALVAGED
BRICK
4" CMU
3" INSULATION
± 2 1/4" AIR SPACE
EXISTING
UTILITY BRICK
A
LI
G N
5/8" GYPSUM OVER
3 5/8" METAL
STUDS, 16" O.C.
GYPSUM CEILING
A1
UPPER FLOOR
104' - 0" (X' - X")
± 4" SALVAGED
UTILITY BRICK
4" CMU
3" INSULATION
± 2 1/4" AIR SPACE
EXISTING BRICK
VENEER BELOW
TO REMAIN
3 5/8" 2 1/4"
3" 3 5/8"
INFILLE BRICK
VENEER WHERE
SILL IS REMOVED,
MATCH EXISTING
UTILITY BRICK
FILL VOID
WITH 4" CMU
EXISTING
CONCRETE
SLAB
EXISTING
CMU WALL(s)
TO REMAIN
A
LI
G N
FILL WITH MORTAR
MORTAR JOINT,
MATCH EXISTING
TOP MASONRY
117' - 4"
4" BRICK, MATCH
EXISTING
8" CMU
1" AIR SPACE
EXISTING FASCIA
TO REMAIN
EXISTING WOOD
BLOCK(s) TO REMAIN
EXISTING ROOF
TO REMAIN
EXISTING STEEL
JOIST
EXITING BRICK
ANGLES, REMOVE
AND REINSTALL WITH
WALL CONSTRUCTION
EXISTING STEEL
ANGLE
BRICK TO REMAIN
A1
4" (NOM.) BRICK,
MATCH EXISTING
3" INSULATION
1" AIR SPACE
8" CMU
ALUMINUM
WINDOW
SEALANT ON
BOTH FACES
MORTAR JOINT
CAST STONE SILL, MATCH
DIMENSIONS TO EXISTING
M A T C
H E
X
IS
T
IN
G
/2
SILL FLASHING
UPPER FLOOR
104' - 0" (X' - X")
3" INSULATION
1 3/4" AIR SPACE
CAVITY DRAINAGE
MESH
GROUT SOLID
WEEPS AT 24" O.C.
4" UTILITY BRICK,
MATCH EXISTING
MEMBRANE
FLASHING
2" RIGID
INSULATION
CONCRETE
FOOTING, SEE
STRUCTURAL
BOND BREAKER
MATERIAL
3" RIGID
INSULATION
8" CMU
1 3/4" 3" 7 5/8"3 5/8"
1' - 4"
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
W A
L L
S E
C T
IO
N
S
-1
.0
A
J u n e
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.M
A A
/1
/2
/3
/2
1/2" = 1'-0"A 321
1 WALL SECTION
1/2" = 1'-0"A 321
2 WALL SECTION
1/2" = 1'-0"A 321
3 WALL SECTION
1/2" = 1'-0"A 321
4 WALL SECTION
1/2" = 1'-0"A 321
5 WALL SECTION
1/2" = 1'-0"A 321
6 WALL SECTION
1/2" = 1'-0"A 321
7 WALL SECTION
1/2" = 1'-0"A 321
8 WALL SECTION
1 1/2" = 1'-0"A 321
1A WALL DETAIL
1 1/2" = 1'-0"A 321
1B WALL DETAIL
1 1/2" = 1'-0"A 321
2B WALL DETAIL
1 1/2" = 1'-0"A 321
2C WALL DETAIL
1 1/2" = 1'-0"A 321
4A WALL DETAIL
1 1/2" = 1'-0"A 321
4B WALL DETAIL
1 1/2" = 1'-0"A 321
5A WALL DETAIL
1 1/2" = 1'-0"A 321
5B WALL DETAIL
1 1/2" = 1'-0"A 321
7A WALL DETAIL
1 1/2" = 1'-0"A 321
7B WALL DETAIL
1 1/2" = 1'-0"A 321
6A WALL DETAIL
1 1/2" = 1'-0"A 321
6B WALL DETAIL
1 1/2" = 1'-0"A 321
2A WALL DETAIL
1 1/2" = 1'-0"A 321
7C JAMB DETAIL
1 1/2" = 1'-0"A 321
8B WALL DETAIL
ISSUED FOR DATE
ADDENDUM 1 08-03-2023
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
A 322
1A
A 321
1A
SIM
A 322
1B
WOOD BLOCKING
METAL FASCIA
4" BRICK, MATCH
EXISTING
4" CMU
INSULATED ROOF
METAL DECK
STOREFRONT
4' - 6 3/8"
3" INSULATION
1" AIR SPACE
3 5/8" METAK STUD,
ADD BRACING AS
NEEDED
3 1/2" INSULATION
NEW FLOST
SLAB, SEE
STRUCTURAL
A1
A1
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
WOOD BLOCKING
METAL FASCIA
INSULATED ROOF
METAL DECK
DOOR
4' - 6 3/8"
A 322
1A
SIM
A 322
1B
SIM
A 321
1A
SIM
4" BRICK, MATCH
EXISTING
4" CMU
3" INSULATION
1" AIR SPACE
3 5/8" METAL STUD,
ADD BRACING AS
NEEDED
3 1/2" INSULATION
NEW FLOST
SLAB, SEE
STRUCTURAL
A1
A1
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
A 322
3A
A 322
3B
A 321
1A
SIM
WOOD BLOCKING
METAL FASCIA
4" BRICK, MATCH
EXISTING
8" CMU
INSULATED ROOF
METAL DECK
3" INSULATION
1" AIR SPACE
FROST
CONCRETE
SLAB, SEE
STRUCTURAL
A1
A1
4" UTILITY BRICK,
MATCH EXISTING
8" CMU
3" INSULATION
1" AIR SPACE
STEEL LINTEL,
SEE STRUCTURAL
MEMBRANE
FLASHING
3 5/8" 8"
ALIGN
WEEPS AT
24" O.C.
CAVITY
DRAINAGE MESH
EIFS FINISH OVER
GYPSUM BOARD
SHEATHING (EXTERIOR),
SEE REFLECTED CEILING
PLAN
4" BRICK, MATCH
EXISTING
8" CMU
3" INSULATION
1" AIR SPACE
STEEL LINTEL,
SEE STRUCTURAL
MEMBRANE
FLASHING
CAVITY
DRAINAGE MESH
WEEPS AT 24"
O.C.
SEALANT JOINTS,
BOTH FACES
MATCH EXIST.
A1
LOWER FLOOR
100' - 0" (X' - X")
THERMALLY BROKEN
ALUMINUM
STOREFRONT DOOR
WITH INSULATED GLASS
DOOR
THRESHOLD
CONCRETE
FLOOR SLAB, SEE
STRUCTURAL
ALUM. SNAP TRIM
AND CLIP
CONCRETE
FOUNDATION WALL,
SEE STRUCTURAL
BOND BREAKER
MATERIAL
FROST SLAB,
SEE STRUCTURAL 3" RIGID
INSULATION
2" RIGID
INSULATION
2X WOOD
BLOCKING
1X WOOD
BLOCKING
ALUMINUM
STOREFRONT DOOR
AND FRAMES
SEALANT JOINTS,
BOTH FACES
EIFS FINISH OVER
GYPSUM BOARD
SHEATHING
(EXTERIOR), SEE
REFLECTED CEILING
PLAN
GYPSUM
SHEATHING
BATT
INSULATION,
R-19
GYPSUM BOARD
CEILING, SEE
REFLECTED
CEILING PLAN
LOWER FLOOR
100' - 0" (X' - X")
TOP MASONRY
117' - 4"
T
A 322
4A
P O
R T
IO
N S O
F T
H E W
A
LL
B E C O
M E S N
E W
C M
U T
O R
E P
LA
C E E
X
IS
T
IN
G W
WOOD BLOCKING
INSULATED ROOF
METAL DECK
12" CMU
REMAINING SECTIONS OF
EXISTING CMU WALLS
SHARE SIMILAR DETAIL
REFER TO FLOOR PLAN
A 322
4B
TOP MASONRY PARAPET
120' - 0"
A1
TOP MASONRY
117' - 4"
T
12" (NOM)
CMU INFILL
1 1/2" RGID
INSULATION
RIGID
INSULATION
EPDM MEMBRANE.
1/2" COVER
BOARD
FASCIA TO MATCH
EXISTING ALUM
EXTRUSION (VIF)
EXISTING METAL FASCIA
TO BE REMOVED
EXISTING ROOF
TO REMAIN
EXISTING WOOD
BLOCKS TO REMAIN
CANT STRIP
TOP MASONRY PARAPET
120' - 0"
STRIP-IN NEW ROOFING
MEMBRANE
10 5/8"
A1
MORTAR NET
BOND BEAM
LOWER FLOOR
100' - 0" (X' - X")
T
NEW FLOOR
SLAB
NEW CMU
WALL, ALIGN
WITH EXISTING
EXISTING
CONCRETE
FLOOR SLAB
EXISTING
FOUNDATION
3" RIGID
INSULATION
2" RIGID
INSULATION
NEW FND - SEE
STRUCTURAL
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
W A
L L
S E
C T
IO
N
S
-1
.0
A
J u n e
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.M
A A
/1
/2
/3
/2
1/2" = 1'-0"A 322
1 WALL SECTION
1/2" = 1'-0"A 322
2 WALL SECTION
1/2" = 1'-0"A 322
3 WALL SECTION
1 1/2" = 1'-0"A 322
1A WALL DETAIL 1 1/2" = 1'-0"A 322
3A WALL DETAIL
1 1/2" = 1'-0"A 322
3B WALL DETAIL
1 1/2" = 1'-0"A 322
1B WALL DETAIL
1/2" = 1'-0"A 322
4 WALL SECTION
1 1/2" = 1'-0"A 322
4A WALL DETAIL
1 1/2" = 1'-0"A 322
4B WALL DETAIL
NEW 3-
HOUR CMU
NEW BRICK
VENEER
3" RIGID INSULATION
BOARD. SEAL ALL JOINTS
WITH SPRAY FOAM
/8
/4
/8
NEW CMU WALL
TO ALIGN W/
EXISTING
CONTROL JOINT
AIR GAP
1 3/8"
2" EXPANSION
JOINT
A1
/8
/4
/8
7 5/8"
CMU
BRICK VENEER
3" RIGID INSULATION
BOARD. SEAL ALL JOINTS
WITH SPRAY FOAM
AIR GAP
/8
/4
/8
7 5/8"
NEW VENEER
BRICK
CONCRETE VAULT
WALLS
CMU WALL
3" INSULATION
CONTROL JOINT
1 3/4" AIR GAP
/8
/4
/8
VAULT TO BE
PARGE COATED
/8
/4
/8
7 5/8"
/8
CMU
UTILITY BRICK
VENEER
3" RIGID INSULATION
BOARD. SEAL ALL JOINTS
WITH SPRAY FOAM
AIR GAP
T
CMU
EXISTING
CMU/ BRICK
WALL
BRICK VENEER
/8
/4
/8
3" RIGID INSULATION
BOARD. SEAL ALL
JOINTS WITH SPRAY
FOAM
5/8" GYPSUM
BOARD ON 2 1/2"
METAL STUDS
SEAL JOINT
EXPANSION JOINT
AIR GAP
D
CMU
EXISTING
CMU/ BRICK
WALL UTILITY BRICK
VENEER
3' - 4"
/8
3 5/8" 1 1/4"
3 5/8"
/8
2' - 7 1/4"
/8
/4 "3
/8
A
LI
N
EXISTING PORTION OF
WALL-MOUNTED
HANDRAIL TO REMAIN
CUT EXISTING
HANDRAIL TO MEET
WALL
EXISTING BRICK
VENEER TO REMAIN
AIR GAP
D
3' - 4"
CMU
UTILITY BRICK
VENEER
/2
3 5/8"
1 1/4"
3 5/8"
/8
/4
/8
EXISTING
CMU/ BRICK
WALL
EXISTING BRICK
VENEER TO REMAIN
A
LI
AIR GAP
CONTINUOUS SEALANT
WITH 3/8"x3"
COMPRESSIBLE BACKER
ROD
FACE BRICK - REFER TO
ELEVATIONS
NOTE:
• SASH BLOCK UNITS REQUIRED FULL
HEIGHT, BOTH SIDES OF JOINT, USING
WHOLE AND HALF BLOCK SASH UNITS
FOR A RUNNING BOND COURSING
APPEARANCE - USING SASH UNITS AT
ALTERNATE COURSES IS NOT
ACCEPTABLE AND JOINTS CONSTRUCTED
THIS WAY WILL BE REMOVED AND
REPLACED AT CONTRACTOR'S EXPENSE
• TRUSS TYPE HORIZONTAL MASONRY
WALL JOINT REINFORCING AT INTERIOR
MASONRY WALLS ONLY - LADDER TYPE
HORIZONTAL MASONRY WALL JOINT
REINFORCING (AS SHOWN) AT EXTERIOR
WALLS
• REFER TO FLOOR PLAN FOR WALL
THICKNESS AND UNIT TYPE
HORIZONTAL WALL REINFORCING
AT 16" O.C. WITH PINTLE-EYE
VENEER ATTACHMENT - DO NOT
EXTEND REINFORCING THROUGH
CONTROL JOINT
3" INSULATION
SEALANT WITH BACKER ROD BOTH
SIDES OF BLOCK
MASONRY CONTROL INSERT WITH SASH
UNIT BOTH SIDES (REFER TO NOTE ABOVE)
/8
/4
/8
A T
B
LO
C K
A T
B
LO
C K
1 3/4" AIR GAP
FACE BRICK
S E E P
LA
N
CONTINUOUS SEALANT WITH
3/8"x3" COMPRESSIBLE
BACKER ROD
CMU
T
5.9
NEW DOUBLE EGRESS HM
FRAME (120 MIN)
NEW FIRE CAULK BOTH
SIDES
NEW 3-HOUR CMU WALL
NEW 2" EXPANSION
JOINT
NEW CMU INFILL AT OLD
OHD (INNER WYTHE)
NEW CMU INFILLI AT OLD
OHD (OUTER WYTHE)
A1
T
12.2
NEW DOUBLE EGRESS HM FRAME
(120 MIN)
NEW FIRE CAULK BOTH SIDES
NEW 3 HOUR CMU WALL
NEW 2" EXPANSION JOINT
EX. CMU
EX. BRICK
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
P L A
N D
E T
A
IL
S
-1
.0
A
J u n e
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.M
A A
/1
/2
/3
/2
1 1/2" = 1'-0"A 351
1 PLAN DETAIL
1 1/2" = 1'-0"A 351
2 PLAN DETAIL
1 1/2" = 1'-0"A 351
3 PLAN DETAIL
1 1/2" = 1'-0"A 351
4 PLAN DETAIL
1 1/2" = 1'-0"A 351
5 PLAN DETAIL
1 1/2" = 1'-0"A 351
6 PLAN DETAIL
1 1/2" = 1'-0"A 351
7 PLAN DETAIL
1 1/2" = 1'-0"A 351
8 CONTROL JOINT @ EXTERIOR WALL
1 1/2" = 1'-0"A 351
10 CONTROL JOINT DETAIL AT CMU
ISSUED FOR DATE
ADDENDUM 1 AUGUST 3
1 1/2" = 1'-0"A 351
11 DOUBLE EGRESS DOOR JAMB
1 1/2" = 1'-0"A 351
12 DOUBLE EGRESS DOOR JAMB
NEW 3-
HOUR CMU
NEW BRICK
VENEER
3" RIGID INSULATION
BOARD. SEAL ALL JOINTS
WITH SPRAY FOAM
/8
/4
/8
NEW CMU WALL
TO ALIGN W/
EXISTING
CONTROL JOINT
AIR GAP
1 3/8"
2" EXPANSION
JOINT
A1
/8
/4
/8
7 5/8"
CMU
BRICK VENEER
3" RIGID INSULATION
BOARD. SEAL ALL JOINTS
WITH SPRAY FOAM
AIR GAP
/8
/4
/8
7 5/8"
NEW VENEER
BRICK
CONCRETE VAULT
WALLS
CMU WALL
3" INSULATION
CONTROL JOINT
1 3/4" AIR GAP
/8
/4
/8
VAULT TO BE
PARGE COATED
/8
/4
/8
7 5/8"
/8
CMU
UTILITY BRICK
VENEER
3" RIGID INSULATION
BOARD. SEAL ALL JOINTS
WITH SPRAY FOAM
AIR GAP
T
CMU
EXISTING
CMU/ BRICK
WALL
BRICK VENEER
/8
/4
/8
3" RIGID INSULATION
BOARD. SEAL ALL
JOINTS WITH SPRAY
FOAM
5/8" GYPSUM
BOARD ON 2 1/2"
METAL STUDS
SEAL JOINT
EXPANSION JOINT
AIR GAP
D
CMU
EXISTING
CMU/ BRICK
WALL UTILITY BRICK
VENEER
3' - 4"
/8
3 5/8" 1 1/4"
3 5/8"
/8
2' - 7 1/4"
/8
/4 "3
/8
A
LI
EXISTING PORTION OF
WALL-MOUNTED
HANDRAIL TO REMAIN
CUT EXISTING
HANDRAIL TO MEET
WALL
EXISTING BRICK
VENEER TO REMAIN
AIR GAP
D
3' - 4"
CMU
UTILITY BRICK
VENEER
/2
3 5/8"
1 1/4"
3 5/8"
/8
/4
/8
EXISTING
CMU/ BRICK
WALL
EXISTING BRICK
VENEER TO REMAIN
A
LI
AIR GAP
CONTINUOUS SEALANT
WITH 3/8"x3"
COMPRESSIBLE BACKER
ROD
FACE BRICK - REFER TO
ELEVATIONS
NOTE:
• SASH BLOCK UNITS REQUIRED FULL
HEIGHT, BOTH SIDES OF JOINT, USING
WHOLE AND HALF BLOCK SASH UNITS
FOR A RUNNING BOND COURSING
APPEARANCE - USING SASH UNITS AT
ALTERNATE COURSES IS NOT
ACCEPTABLE AND JOINTS CONSTRUCTED
THIS WAY WILL BE REMOVED AND
REPLACED AT CONTRACTOR'S EXPENSE
• TRUSS TYPE HORIZONTAL MASONRY
WALL JOINT REINFORCING AT INTERIOR
MASONRY WALLS ONLY - LADDER TYPE
HORIZONTAL MASONRY WALL JOINT
REINFORCING (AS SHOWN) AT EXTERIOR
WALLS
• REFER TO FLOOR PLAN FOR WALL
THICKNESS AND UNIT TYPE
HORIZONTAL WALL REINFORCING
AT 16" O.C. WITH PINTLE-EYE
VENEER ATTACHMENT - DO NOT
EXTEND REINFORCING THROUGH
CONTROL JOINT
3" INSULATION
SEALANT WITH BACKER ROD BOTH
SIDES OF BLOCK
MASONRY CONTROL INSERT WITH SASH
UNIT BOTH SIDES (REFER TO NOTE ABOVE)
/8
/4
/8
A T
B
LO
C K
A T
B
LO
C K
1 3/4" AIR GAP
FACE BRICK
S E E P
LA
N
CONTINUOUS SEALANT WITH
3/8"x3" COMPRESSIBLE
BACKER ROD
CMU
T
5.9
NEW DOUBLE EGRESS HM
FRAME (120 MIN)
NEW FIRE CAULK BOTH
SIDES
NEW 3-HOUR CMU WALL
NEW 2" EXPANSION
JOINT
NEW CMU INFILL AT OLD
OHD (INNER WYTHE)
NEW CMU INFILLI AT OLD
OHD (OUTER WYTHE)
A1
T
12.2
NEW DOUBLE EGRESS HM FRAME
(120 MIN)
NEW FIRE CAULK BOTH SIDES
NEW 3 HOUR CMU WALL
NEW 2" EXPANSION JOINT
EX. CMU
EX. BRICK
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
P L A
N D
E T
A
IL
S
-1
.0
A
J u n e
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.M
A A
/1
/2
/3
/2
1 1/2" = 1'-0"A 351
1 PLAN DETAIL
1 1/2" = 1'-0"A 351
2 PLAN DETAIL
1 1/2" = 1'-0"A 351
3 PLAN DETAIL
1 1/2" = 1'-0"A 351
4 PLAN DETAIL
1 1/2" = 1'-0"A 351
5 PLAN DETAIL
1 1/2" = 1'-0"A 351
6 PLAN DETAIL
1 1/2" = 1'-0"A 351
7 PLAN DETAIL
1 1/2" = 1'-0"A 351
8 CONTROL JOINT @ EXTERIOR WALL
1 1/2" = 1'-0"A 351
10 CONTROL JOINT DETAIL AT CMU
ISSUED FOR DATE
ADDENDUM 1 08-03-2023
1 1/2" = 1'-0"A 351
11 DOUBLE EGRESS DOOR JAMB
1 1/2" = 1'-0"A 351
12 DOUBLE EGRESS DOOR JAMB
UP
DN
FINISH PLAN KEY
VCT CPT
WALL FINISH
FLOOR BASE
FLOOR FINISH
COUNTER FINISH
CABINET FINISH (BASE AND UPPER)
INDICATES EXTENT OF ATYPICAL FINISH
INDICATES FLOOR MATERIAL TRANSITION
NOTE - REFER TO MATERIAL SELECTION SCHEDULE
REMARKS FOR FLOOR TRANSITION TYPE
REFER TO MATERIAL SELECTION
SCHEDULE FOR FINISH INFORMATION
PL-#
PL-#
P-#
RB-#
CPT-#
P-#
INDICATES MULTIPLE MATERIAL TYPES ON A SURFACE.
REFER TO DETAIL OR ELEVATIONS.
INDICATES MATERIAL PATTERN. REFER TO DETAILS
MULTI
- P
GENERAL NOTES - INTERIORS
1. REFER TO ARCHITECTURAL FLOOR PLANS AND SPECIFICATION FOR ADDITIONAL
INFORMATION ON CONSTRUCTION MATERIALS.
2. REFER TO ARCHITECTURAL FLOOR PLANS FOR VISUAL DISPLAY BOARD LOCATIONS
AND QUANTITIES.
3. REFER TO ARCHITECTURAL FLOOR PLANS FOR LOCKER LOCATIONS, FINISHES AND
QUANTITIES.
4. REFER TO REFLECTED CEILING PLANS FOR CEILING FINISH AND HEIGHTS.
5. REFER TO ENLARGED STAIR PLANS AND SECTIONS FOR FINISH COLORS OF STRINGERS
AND GUARDRAILS.
6. REFER TO DOOR SCHEDULE FOR FINISH ON DOORS AND FRAMES.
7. REFER TO ENLARGED FINISH PLANS FOR TOILET ROOM FINISHES.
8. FINISH TAGS APPLY TO LIKE MATERIALS IN ENTIRE ROOM. I.E. CASEWORK TAG MAY
ONLY CALLOUT ONE RUN OF CASEWORK, BUT ALL CASEWORK IN ROOM RECEIVE THE
SAME FINISHES, UNLESS TAGGED DIFFERENTLY.
9. WALL MOUNTED DIFFUSERS, GRILLES, ACCESS PANELS, ELECTRICAL PANELS, ETC. ARE
TO BE PAINTED WITH AN OIL-BASED PAINT TO MATCH THE ADJACENT WALL FINISH.
10. CEILING ACCESS PANELS ARE TO BE PAINTED TO MATCH ADJACENT CEILING FINISH.
11. ALL EXPOSED COLUMNS TO BE PAINTED P-1.
12. ALL WALLS SHOULD BE PAINTED TO THE FLOOR IN ROOMS WHERE NO BASE IS
INDICATED
FLOORING DIRECTIONAL ARROW
CEMENT PARGING COAT ON CEILING AND EXPOSED
CONCRETE WALLS OF VAULT, PRIME AND PAINT
PRIME AND PAINT WALL SURFACE WHERE
INDICATED WITH DASHED LINES
A1
TRAINING
READINESS
ADMINISTRATION
SUPPLY
GENERAL
OFFICE
VESTIBULE
STORAGE
PLATOON
PLATOON
OFFICE
CORRIDOR
CONFERENCE
SUPPLY OFFICE
1 SARGENT
COMMANDER
CHAIR TABLE
STORAGE
WORKOUT
ROOM
NBC
TA 50 / OFFICE
PLATOON 1
PLATOON 2
PLATOON 3
COMM
CORRIDOR
TOILET
CLOSET
CLASSROOM
RECRUIT
SIPR
129MAIL
P-1
RB-1
SC-1
P-1
SC-1
SC-1
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-2
LVT-2 P-1
RB-1
CPTL-2
P-1
RB-1
VCT-1
P-1
RB-2
LVT-2
SCULLERY
HOT FOOD
PREP
COLD FOOD
PREP
MESS OFFICE
BREAK ROOM
CLOSET
WOMENS
TOILET
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-1
SF-1
P-1
RB-1
SC-1
P-1
RB-1
SC-1
P-1
RB-2
LVT-1
P-1
RB-1
SC-1
P-1
RB-1
CPTL-1
P-1
RB-1
SC-1
P-1
RB-1
ECPTL-1
P-1
RB-1
CPTL-2
P-1
RB-1
CPLT-3
VESTIBULE
REMOVE & REINSTALL
CARPET TILE AT NEW WALL
P-1
RB-2
LVT-1
P-1
RB-1
CPTL-1
P-1
RB-1
CPTL-1
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
P-1
RB-1
CPTL-2
MEN'S
RESTROOM
MENS TOILET
JAN
AV STORAGE
MEN'S
SHOWER
CLASSROOM
PLATOON 2
PLATOON 2
A 631
A 631
A 631
LAC
STORAGE
PES 200
UNIFORM
STORAGE
RECRUIT
VESTIBULE
E X
P T
PT EX EX PT
S C
V C
T
S C
C P T L
S C
C P T L
SSM-1
PL-1
SSM-1
PL-1
SSM-1
PL-1
A 631
SUPPLY OFFICE
FAMILY
LEARNING
LVT EX
C P T
LV
T
SC CPTL
SC ECPTL
SC ECPTL
WOMENS
TOILET
A 631
A 631
S C
C P T L
VESTIBULE
A 621
A 621
A 621
P-2
RBST-1
S C
R B S T
VCT EX
LV
T
S C
EX SF
EX SF
BOILER ROOM
SERVICE
OFFICE
SERVICE
PARTS / TOOLS
BUILDING
MAINTENANCE
PAINT SOFFIT & BULKHEAD WITH P - 1.
REFER TO A201
PAINT SOFFIT & BULKHEAD WITH P - 1.
REFER TO A201
PAINT SOFFIT & BULKHEAD WITH P - 1.
REFER TO A201
PAINT SOFFIT & BULKHEAD WITH P - 1.
REFER TO A201
P-1
RB-1
SC-1
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R F
IN
IS
H P
L A
N
-1
.0
A
J u n e
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.M
A A
/1
/2
/3
/2
MIDLAND ARMORY
KEY PLAN
E
A A
C
DB
SCALE: NO SCALE
EXISTING
NEW
BCD
F G
H
I
1/8" = 1'-0"
UPPER AND LOWER FLOOR FINISH PLAN
D G K L M P
E F H J N R SCBA T
EXIST.5"
EXIST.8" ST EXIST.6" ST
EX
IS
T.
S T
EXIST.4" SANEXIST.5" SAN
EX
IS
T.
3"
S
AN
EXIST.6" ST
E X
IS
T .6
S T
E X
IS
T .4
S A N
E X
IS
T .4
S A N
E X
IS
T .4
S A N
E X
IS
T .6
S T
EXIST.10" ST EXIST.8" ST
E X
IS
T .6
S T
EXIST.6" ST
E X
IS
T .6
S T
EXIST.4" ST
EXIST.4" SAN
EXIST.4" SAN
E X
IS
T .4
S A N
EXIST.4" SAN
EXIS
T.4
" S
AN
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig a n
-5
.3
.6
P H
O
E
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F O
U N
D A
T
IO
N P
L U
M B
IN
G
D E
M O
L
IT
IO
N
P L A
N
-1
.0
P D
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - DEMOLITION
1 ABANDON SANITARY PIPING BELOW FLOOR.
2 DEMO BURIED SANITARY AS INDICATED. COORDINATE DEMOLITION
WITH NEW WORK THIS AREA.
3 DEMO DOMESTIC CW, HW, & HWR PIPING AS INDICATED. COORDINATE
WITH NEW WORK.
4 DEMO VENT PIPING AS INDICATED. COORDINATE WITH NEW WORK.
5 DEMO FLOOR DRAIN OR CLEAN OUT. CAP & ABANDON SANITARY
BELOW FLOOR.
6 DEMO WATER CLOSET, PREP EXIST UTILITIES FOR CONNECTION TO
NEW. COORDINATE WITH NEW WORK.
7 DEMO URINAL, PREP EXIST UTILITIES FOR CONNECTION TO NEW.
COORDINATE WITH NEW WORK.
8 DEMO LAV OR SINK, PREP EXIST UTILITIES FOR CONNECTION TO NEW.
COORDINATE WITH NEW WORK.
9 DEMO LAV OR SINK AND ALL ASSOCIATED UTILITIES BACK TO MAINS &
CAP.
10 DEMO EWC, PREP EXIST UTILITIES FOR CONNECTION TO NEW.
COORDINATE WITH NEW WORK.
11 DEMO DOWNSPOUT NOZZLE AND PORTION OF STORM OVERFLOW
PIPING. COORDINATE WITH NEW WORK.
12 EXIST. STORM PIPING TO BE REROUTED. DEMO AS INDICATED.
1/8" = 1'-0"
FOUNDATION PLUMBING DEMOLITION PLAN
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
ADDENDUM #1 08-02-2023
D G K L M P
E F H J N R SCBA T
3 3
BREAK ROOM
RECRUIT
CLOSET
WMNS TOILET
VESTIBULE
MENS TOILET
CLASSROOM
CHAIR TABLE
STORAGE
WORKOUT ROOM
BOILER ROOM
BUILDING
MAINTENANCE
CLASSROOM
RECRUIT
CORRIDOR
FAMILY
LAC
E X
IS
T .6
S T
E X
IS
T .3
C
W E X
IS
T .2
H W
E X
IS
T .3
/4 H W
R
EXIST.6" ST (OF)
E X
IS
T .6
S T
E X
IS
T .2
V
A1
A1
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R P
L U
M B
IN
G
D E
M O
L
IT
IO
N
P L A
N
-1
.0
P D
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - DEMOLITION
1 ABANDON SANITARY PIPING BELOW FLOOR.
2 DEMO BURIED SANITARY AS INDICATED. COORDINATE DEMOLITION
WITH NEW WORK THIS AREA.
3 DEMO DOMESTIC CW, HW, & HWR PIPING AS INDICATED. COORDINATE
WITH NEW WORK.
4 DEMO VENT PIPING AS INDICATED. COORDINATE WITH NEW WORK.
5 DEMO FLOOR DRAIN OR CLEAN OUT. CAP & ABANDON SANITARY
BELOW FLOOR.
6 DEMO WATER CLOSET, PREP EXIST UTILITIES FOR CONNECTION TO
NEW. COORDINATE WITH NEW WORK.
7 DEMO URINAL, PREP EXIST UTILITIES FOR CONNECTION TO NEW.
COORDINATE WITH NEW WORK.
8 DEMO LAV OR SINK, PREP EXIST UTILITIES FOR CONNECTION TO NEW.
COORDINATE WITH NEW WORK.
9 DEMO LAV OR SINK AND ALL ASSOCIATED UTILITIES BACK TO MAINS &
CAP.
10 DEMO EWC, PREP EXIST UTILITIES FOR CONNECTION TO NEW.
COORDINATE WITH NEW WORK.
11 DEMO DOWNSPOUT NOZZLE AND PORTION OF STORM OVERFLOW
PIPING. COORDINATE WITH NEW WORK.
12 EXIST. STORM PIPING TO BE REROUTED. DEMO AS INDICATED.
1/8" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION PLAN
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
D G K L M P
E F H J N R SCBA T
5 5
E X
IS
T .1
/2
H S
E X
IS
T .2
H S
E X
IS
T .2
H R
E X
IS
T .1
/2
H R
E X
IS
T .1
/2
H S
E X
IS
T .1
/2
H R
EXIST.2" HS
EXIST.2" HR
EXIST.1 1/4" HR
EXIST.1 1/4" HS
E X
IS
T .1
/4
H R
E X
IS
T .2
H S
EXIST.2" HS
EXIST.2" HS
EXIST.2" HR
EXIST.2" HR
EXIST.2" HS
EXIST.2" HR
EXIST.2" HR
EXIST.1 1/4" HS
EXIST.1 1/2" HR
EXIST.1 1/4" HS
EXIST.1 1/4" HR
EXIST.1 1/4" HS
EXIST.1 1/4" HR
EXIST.3/4" HR
EXIST.2" HS
EXIST.1 1/2" HR
EXIST.1 1/2" HS
E X
IS
T .1
/4
H R
E X
IS
T .2
H S
EXIST.1 1/2" HR
EXIST.1 1/2" HS
E X
IS
T .1
/2
H S
E X
IS
T .1
/2
H R
E X
IS
T .2
H S
E X
IS
T .1
H R
E X
IS
T .1
/2
H R
E X
IS
T .1
/2
H S
E X
IS
T
"x
S A
E X
IS
T
"x
S A
EXIST. 14"x10" SA
EXIST. 14"x10" SA
EXIST. 36"x36" RA
EXIST. 72"x18" RA
EXIST. 8"ø SA
EXIST. 10"ø RA
EXIST. 12"x10" EA
EXIST. 8"ø EA
EXIST. 72"x18" RA
EXIST. 8"ø SA
EXIST. 8"x10" SA
EXIST. 8"ø SA EXIST. 8"x10" SA
EXIST. 8"ø SA
EXIST. AHU
E X
IS
T
"x
O
A
EXIST. 30"x14" RA
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R M
E C
H A
N
IC
A L
D E
M O
L
IT
IO
N
P L A
N
-1
.0
M D
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - DEMOLITION
1 DEMO AIR HANDLING UNIT & ASSOCIATED DUCTWORK, PIPING,
SUPPORTS, AND CONTROLS. DEMO HS & HR PIPING BACK TO MAINS
AND CAP. COORDINATE DEMO WITH NEW WORK.
2 DEMO EXHAUST FAN AND ASSOCIATED DUCTWORK AND CONTROLS.
3 DEMO FINNED TUBE AND ASSOCIATED PIPING AND CONTROLS. DEMO
HS & HR PIPING BACK TO MAINS AND CAP.
4 DEMO DUCTWORK AS SHOWN. COORDINATE DEMO WITH NEW WORK.
5 DEMO GRILLE OR DIFFUSER AND ASSOCIATED DUCTWORK AS SHOWN.
COORDINATE DEMO WITH NEW WORK.
6 REMOVE ROOFTOP UNIT IN ITS ENTIRETY INCLUDING ALL ASSOCIATED
PIPING, WIRING, CONTROLS, ETC. ROOF CURB TO REMAIN INTACT FOR
REUSE.
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
1/8" = 1'-0"
FIRST FLOOR MECHANICAL DEMOLITION PLAN THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
D G K L M P
E F H J N R SCBA TD G K L M PE F H J N R SCBA T
15.2
12.2
8.6
ROOF ACCESS
RTU-4
(E.T.R.)
RTU-1
(E.T.R.)
RTU-3
(E.T.R.)
EF-3
(E.T.R.)
EF-2
(E.T.R.)
EF-5
(E.T.R.)
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
R O
O F
M E
C H
A N
IC
A
L D
E M
O L
IT
IO
N P
L A
N
-1
.0
M D
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - DEMOLITION
1 DEMO AIR HANDLING UNIT & ASSOCIATED DUCTWORK, PIPING,
SUPPORTS, AND CONTROLS. DEMO HS & HR PIPING BACK TO MAINS
AND CAP. COORDINATE DEMO WITH NEW WORK.
2 DEMO EXHAUST FAN AND ASSOCIATED DUCTWORK AND CONTROLS.
3 DEMO FINNED TUBE AND ASSOCIATED PIPING AND CONTROLS. DEMO
HS & HR PIPING BACK TO MAINS AND CAP.
4 DEMO DUCTWORK AS SHOWN. COORDINATE DEMO WITH NEW WORK.
5 DEMO GRILLE OR DIFFUSER AND ASSOCIATED DUCTWORK AS SHOWN.
COORDINATE DEMO WITH NEW WORK.
6 REMOVE ROOFTOP UNIT IN ITS ENTIRETY INCLUDING ALL ASSOCIATED
PIPING, WIRING, CONTROLS, ETC. ROOF CURB TO REMAIN INTACT FOR
REUSE.
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
1/8" = 1'-0"
ROOF MECHANICAL PLAN
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
D G K L M P
E F H J N R SCBA T
EXIST.6" ST
EXIST.4" SAN
EXIST.6" ST
EXIST.5" SAN
EXIST.8" ST
EX
IS
T.
S T
EXIST.6" ST
E X
IS
T .3
V
EXIST.10" ST
EXIST.4" SAN
EXIST.4" SAN
EXIST.8" ST
E X
IS
T .6
S T
E X
IS
T .4
S A N
E X
IS
T .4
S A N
E X
IS
T .4
S A N
EXIST.4" SAN
EXIST.4" SAN
E X
IS
T .4
S A N
E X
IS
T .6
S T
EXIST.6" ST
E X
IS
T .6
S T
EXIST.4" ST
EXIST.4" SAN
EXIST.3" SAN
EXIST.4" SAN
3" SAN
9 8
S A N
6" ST
FROM ABOVE
3" SAN
5" SAN
E X
IS
T .6
S T
EXIST.5" SAN
3" SAN
3" SAN
3" SAN
A1
G R E A S E
A1
6" ST
6" ST. UP
(26" B.F.F.)
A1
CO
SH
V UP
SK
F.D.
SH
V UP
3" SAN
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F O
U N
D A
T
IO
N P
L U
M B
IN
G
P L A
N
-1
.0
P
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - PLUMBING
1 CONNECT TO EXIST. SANITARY DRAIN.
2 6" ST, REFER TO CIVIL DRAWINGS FOR CONTINUATION.
3 CONNECT TO EXIST. ROOF OVERFLOW PIPING.
4 1 1/2" SAN UP TO LAV OR SINK.
5 3" ST & ST(OF) DN FROM ROOF DRAIN.
6 ST & ST(OF) PIPING DOWN, REFER TO P 000 FOR CONTINUATION OF
ST. PROVIDE CLEANOUT AT BASE OF ST STACK.
7 4" SAN UP TO CLEANOUT.
8 2" SAN UP TO MOP BASIN.
9 2" SAN UP TO SHOWER.
10 CONNECT TO EXIST. DOMESTIC WATER PIPING.
11 CONNECT FIXTURES TO EXIST. SAN. AND DOMESTIC WATER PIPING.
12 1 1/2" VENT UP.
13 1/2" HW & CW DOWN, 2" SAN UP, 1 1/2" WASTE UP.
14 ROUTE 1 1/2"V AND 1 1/2" PUMPED SAN AS INDICATED. REFER TO
SINK DRAIN PUMP DETAIL.
15 6" ST & ST(OF) DOWN FROM ROOF DRAIN.
16 CONNECT TO EXIST. ST. PIPING.
17 3" SAN UP TO FD.
18 PUMPED SAN ROUTED DOWN THROUGH BLOCK WALL. PROVIDE WALL
CLEANOUT AT BASE OF STACK. REFER TO FOUNDATION PLUMBING
PLAN FOR CONTINUATION.
19 3" SAN UP TO SLAB.
1/8" = 1'-0"
FOUNDATION PLUMBING PLAN
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
D G K L M P
E F H J N R SCBA T
S T O
F
S T
S T
E X
IS
T .3
C
W E X
IS
T .2
H W
E X
IS
T .3
/4 H W
R
EXIST.2 1/2" CW
EXIST.3/4" HW
EXIST.3/4" HWR
E X
IS
T .3
/4 H W
R E X
IS
T .2
H W
E X
IS
T .3
C
W
E X
IS
T .3
/4 H W
R E X
IS
T .2
H W
E X
IS
T .3
C
W
2" CW
1 1/4" HW
EXIST.6" ST (OF)
EWC-1
B.F.
LAV-1
B.F.
LAV-1
B.F.
WC-1
WC-1
WC-2
BF
SK-1
LAV-1
B.F.
3/4" CW
3/4" HW
1/2" HWR
5 6
3" ST
6" ST
6" ST (OF)
P 301
PES 200 UNIFORM
STORAGE
VAULT
SUPPLY OFFICE
CORRIDOR
VESTIBULE
VESTIBULE
READINESS
TRAINING
GENERAL OFFICE
ADMINISTRATION
SUPPLY
PLATOON
PLATOON
OFFICE
STORAGE
OFFICE
CONFERENCE
LEARNING
CMDR
1 SGT
OFFICE
TA 50 / OFFICE
PLATOON 1
PLATOON 2
PLATOON 3
COMM
NBC
SUPPLY ROOM
130 SIPR
BREAK ROOM
RECRUIT
CLOSET
WMNS TOILET
VESTIBULE
MENS TOILET
MEN'S RESTROOM
MEN'S LOCKER
MEN'S SHOWER
JAN
AV STORAGE
CLASSROOM
CHAIR TABLE
STORAGE
WORKOUT ROOM
BOILER ROOM
WOMEN'S SHOWERS
BUILDING
MAINTENANCE
CLASSROOM
RECRUIT
CORRIDOR
FAMILY
LAC
CORRIDOR
CORRIDOR
3" FCO
P 301
1/2" HWR
6" ST (OF)
3" ST (OF)
6" ST
E X
IS
T .6
S T
(18" A.F.F.)
6" DS-1
S T O
F
S T O
F
(18" A.F.F.)
6" DS-1
CBV: 0.5 GPM
3" VTR
/2 S A N
6" ST (OF)
A1
A1
A1
A1
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R P
L U
M B
IN
G
P L A
N
-1
.0
P
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - PLUMBING
1 CONNECT TO EXIST. SANITARY DRAIN.
2 6" ST, REFER TO CIVIL DRAWINGS FOR CONTINUATION.
3 CONNECT TO EXIST. ROOF OVERFLOW PIPING.
4 1 1/2" SAN UP TO LAV OR SINK.
5 3" ST & ST(OF) DN FROM ROOF DRAIN.
6 ST & ST(OF) PIPING DOWN, REFER TO P 000 FOR CONTINUATION OF
ST. PROVIDE CLEANOUT AT BASE OF ST STACK.
7 4" SAN UP TO CLEANOUT.
8 2" SAN UP TO MOP BASIN.
9 2" SAN UP TO SHOWER.
10 CONNECT TO EXIST. DOMESTIC WATER PIPING.
11 CONNECT FIXTURES TO EXIST. SAN. AND DOMESTIC WATER PIPING.
12 1 1/2" VENT UP.
13 1/2" HW & CW DOWN, 2" SAN UP, 1 1/2" WASTE UP.
14 ROUTE 1 1/2"V AND 1 1/2" PUMPED SAN AS INDICATED. REFER TO
SINK DRAIN PUMP DETAIL.
15 6" ST & ST(OF) DOWN FROM ROOF DRAIN.
16 CONNECT TO EXIST. ST. PIPING.
17 3" SAN UP TO FD.
18 PUMPED SAN ROUTED DOWN THROUGH BLOCK WALL. PROVIDE WALL
CLEANOUT AT BASE OF STACK. REFER TO FOUNDATION PLUMBING
PLAN FOR CONTINUATION.
19 3" SAN UP TO SLAB.
1/8" = 1'-0"
FIRST FLOOR PLUMBING PLAN
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
D G
E FCBA
MENS TOILET
MEN'S RESTROOM
MEN'S LOCKER
MEN'S SHOWER
JAN
AV STORAGE
SH-1
(TYP. OF 6)
WC-1
WC-1
UR-1
UR-1
UR-1
LAV-1
(TYP. OF 4)
UR-1
UR-1
WC-1
(TYP. OF 2)
MB-1
1/2" HWR
/4
H W
/4 C
W
1 1/4" HW
1 1/4" CW
3/4" HW
3/4" CW
1 1/4" CW
1 1/4" CW
1 1/4" HW
1 1/4" CW
LAV-1 (TYP. OF 3)
B.F.
1" CW
2" V
WC-1
B.F.
SH-1
(TYP. OF 6)
FD-1
FCO
2" V
V
2" V
1 1/2" V
CBV: 0.5 GPM
1 1/2" V
1 1/2" V
1 1/2" V
1 1/2" V
3/4" HW
3/4" CW
1 1/2" HW
2 1/2" CW
2" V
A1
1 1/2" V DN.
D
ECBA D ECBA
SH-1
SH-1
SH-1
SH-1
SH-1
SH-1
SH-1
1/2" HWR
1 1/4" HW
1 1/2" CW
/4
H W
/4
C
W
/4 C
W
LAV-1
B.F.
LAV-1
B.F.
WC-1 WC-1
V
/2 V
WOMEN'S SHOWERS
BUILDING
MAINTENANCE
E X
IS
T .6
S T
EXIST. VTR
2" V
E X
IS
T .2
V
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
E N
L A
R G
E D
P L
U M
B
IN
G P
L A
N S
-1
.0
P
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
1/4" = 1'-0"P 301
1 FIRST FLOOR PLUMBING PLAN - MENS SHOWERS
KEYED NOTES - ENLARGED PLUMBING
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
1 CONNECT TO EXIST.
2 MODIFY PIPING IN ORDER TO CONNECT TO EXIST. UTILITIES.
3 SUPPLY MANIFOLD WITH PEX PIPING TO INDIVIDUAL SHOWER
ASSEMBLIES.
4 3/4" HW & CW DOWN, 3" SAN DOWN, 1 1/2" VENT UP.
5 1" CW DOWN, 2" SAN UP, 1 1/2" VENT UP.
6 3/4" CW DOWN, 4" SAN DOWN, 2" VENT UP.
7 CONNECT TO EXIST 4" VTR.
8 NEW ST PIPING DOWN TIGHT TO WALL.
9 1/2" CW & HW DOWN, 2" SAN DOWN, 1 1/2" VENT UP.
1/4" = 1'-0"P 301
2 FIRST FLOOR PLUMBING PLAN - WOMENS SHOWERS
WASTE
VENT
FINISHED WALL
HWR PIPE WITH INSULATION
EXTENDING FROM LAST HW
CONNECTION (WHERE
APPLICABLE)
HW PIPE WITH INSULATION
ROUTED IN WALL OR CHASE
CW PIPE WITH
INSULATION ROUTED IN
WALL OR CHASE
SANITARY WYE FITTING
LAVATORY
½" CW & HW BRANCH PIPING
THRU WALL TO LAVATORY
ASSE 1070
MIXING VALVE
FIXTURE STOP
5"
MIN.
FINISHED FLOOR
OFFSET TRAP
ON B.F. UNITS
SEE ARCH DRAWINGS
FOR CASEWORK
DOMESTIC WATER
NATURAL GAS
COMPRESSED AIR
MEDICAL GASES
VACUUM
STEAM / CONDENSATE
BRANCH CONNECTION OFF TOP BRANCH CONNECTION OFF BOTTOM
APPLIES TO THE FOLLOWING SYSTEMS: APPLIES TO THE FOLLOWING SYSTEMS:
NOTE: BOTTOM AS INDICATED OR SIDE
CONNECTION IS ACCEPTABLE.
CONNECTION TO THE TOP OF THE MAINS
IS NOT ACCEPTABLE.
HEATING HOT WATER
CHILLED WATER
GEOTHERMAL
FINISHED WALL SURFACE
STANDARD WEIGHT STEEL
PIPE SLEEVE OF SIZE TO
PASS PIPE AND INSULATION
FINISHED ESCUTCHEON PLATE
FLUSH AGAINST WALL AND
OF SIZE TO COMPLETELY
COVER OPENING
CONCEALED PIPING
PIPE AND INSULATION TO BE
CENTERED IN SLEEVE - DO NOT
SUPPORT PIPE FROM SLEEVE
TERMINATE SLEEVE FLUSH WITH
FINISHED WALL SURFACES
SEAL AND CAULK ALL SLEEVES,
THRU FIRE WALL WITH FIRE
STOPPING SEALANTS
PIPING EXPOSED TO VIEW
SEAL BOTH SIDES WITH
ACOUSTICAL SEALANT
WALL
PIPE
INSULATION WHERE
SPECIFIED
1/2" MIN SPACE. PACK WITH
FIBROUS MATERIAL ALL AROUND GALVANIZED STEEL PIPE
SLEEVE FLUSH WITH WALL
IN
S U
LA
T E D
P
IP
E
NOTE
U N
IN
S U
LA
T E D
P
IP
E
1. WHERE PIPING IS EXPOSED TO VIEW PROVIDE WITH ESCUTCHEON.
2. FOR RATED WALLS REFER TO FIRE STOP SPECIFICATIONS.
FINISHED SLAB
NO-HUB COUPLING (TYP.)
FIRESTOP TO FLOOR RATING
ROUND STAINLESS
STEEL ACCESS
COVER PLATE (RE:
SPECIFICATIONS
FOR TYPE)
CLEANOUT PLUG (RE:
SPECIFICATIONS FOR
TYPE)
SANITARY DRAIN
(RE: PLAN FOR PIPE
SIZE & LOCATION)
FULL SIZE TEST TEE MAX
4" (RE: PLAN FOR PIPE
SIZE & LOCATION)
WALL (RE: ARCH. DWGS. FOR
SIZE AND TYPE)
CARPET CLIP
UNFINISHED OR
CARPETED FLOOR
FINISHED SLAB
NICKEL BRONZE TOP
SET SCREW
FINISHED FLOOR
FINISHED SLAB
CAST IRON CLEANOUT
BODY WITH PUSH-ON
GASKET
ADJUSTABLE TOP
HOUSING
GASKETED CONNECTION
PVC CLEANOUT PIPE
BRONZE CLEANOUT
PLUG WITH GASKETED
SEAL
Ti
HOT WATER
SUPPLY
HOT WATER
RETURN
BALANCING VALVECHECK VALVE
TEMPERATURE GAUGE
ISOLATION VALVE
FLOOR
VENT
WALL
FIXTURE OUTLET
CABINET
SINK
DRAIN PUMP BASED ON "LIBERTY" MODEL 406 SELF CONTAINED,
1-1/2" INLET, 1-1/2" DISCHARGE, 20 GPM AT 15 FT. W.G., 1/3 HP,
3450 RPM, 115V, 5.2A, 9 FT. POWER CORD ADN PLUG. INTEGRAL
CHECK VALVES ON INLET AND DISCHARGE.
SHUT OFF VALVE
UNION
P-TRAP
WASTE
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
P L U
M B
IN
G
S C
H E
D U
L E
S A
N D
D E
T A
IL
S
-1
.0
P
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
SCALE: NONE
TYPICAL LAVATORY DETAIL
SCALE: NONE
BRANCH TAKE-OFF PIPING DETAIL
SCALE: NONE
PIPING SLEEVE DETAIL - INTERIOR WALL
SCALE: NONE
PENETRATION NOT RATED DETAIL
SCALE: NONE
WALL CLEANOUT DETAIL
SCALE: NONE
FLOOR CLEANOUT DETAIL
SCALE: NONE
BALANCING VALVE ASSEMBLY DETAIL
ISSUED FOR DATE
ADDENDUM #1 08-02-2023
SCALE: NONE
SINK DRAIN PUMP DETAIL
A1
D G K L M P
E F H J N R SCBA T
TRAINING
READINESS
ADMINISTRATION
SUPPLY
GENERAL
OFFICE
STORAGE
PLATOON
PLATOON
OFFICE
CONFERENCE
COMMANDER
LEARNING
1 SARGENT
CORRIDOR
TA 50 / OFFICE
SUPPLY OFFICE
PLATOON 1
PLATOON 2
PLATOON 3
COMM
SUPPLY ROOM
NBC
WORKOUT
ROOM
CHAIR TABLE
STORAGE
LAC
FAMILY
SIPR
BREAK ROOM
RECRUIT
RECRUIT
WOMENS
TOILET
CORRIDOR
PES 200
UNIFORM
STORAGE
STORAGE
VESTIBULE
MENS TOILET
MEN'S LOCKER
MEN'S
RESTROOM
JAN
AV STORAGE
CLASSROOM
CLASSROOM
WOMEN'S
SHOWERS
WOMENS
TOILET
TOILET
SCULLERY
HOT FOOD
PREP
BOILER ROOM
SERVICE
OFFICE
COLD FOOD
PREP
MESS OFFICE
SERVICE
PARTS / TOOLS
SA-6
300 CFM
TYP. OF 4
RA-1
1200 CFM
RA-3
200 CFM
"ø
8"ø
SA-7
125 CFM
SA-7
125 CFM
SA-7
125 CFM
SA-7
125 CFM
SA-6
200 CFM
TYP. OF 2
SA-8
125 CFM
SA-7
150 CFM
8"ø
SA-7
125 CFM
SA-7
125 CFM
SA-6
200 CFM
TYP. OF 2
SA-6
300 CFM
TYP. OF 2
SS-210
RA-1
125 CFM
RA-1
150 CFM
RA-1
125 CFM
RA-1
125 CFM
SA-7
150 CFM
RA-1
150 CFM
RA-1
125 CFM
RA-1
125 CFM
RA-1
600 CFM
RA-1
125 CFM
SA-7
50 CFM
RA-1
400 CFM
EA-1
100 CFM
"ø
EA-1
400 CFM
SA-2
300 CFM
10"ø
SA-11 @45°
125 CFM
SA-10 @45°
500 CFM
TYP. OF 4
SA-6
275 CFM
SA-6
250 CFM
RA-1
275 CFM
14"ø
22"x20"
"x
10"ø10"ø
10"ø10"ø
RA-4
2000 CFM
14"ø
SA-10 @45°
500 CFM
TYP. OF 4
16"ø
8"x10"
1 2
1 2
10"ø
10"ø
"ø
6"x6"
SA-8
50 CFM
"x
16"x12"
14"ø
12"ø
SA-2
200 CFM
TYP. OF 2
"ø
8"ø
"ø
"ø
EA-1
500 CFM
TYP. OF 2
SA-3
100 CFM
EA-1
125 CFM
SA-2
125 CFM
SA-1
500 CFM
TYP. OF 2
SA-9
200 CFM
EA-2
75 CFM
RA-1
50 CFM
10"ø
RA-1
250 CFM
16"x12"
12"ø
"x
10"x10"
10"ø
"ø
"ø
"ø
"ø
10"ø
10"ø
8"ø
10"ø
"x
12"ø
14"x14"
8"ø
10"ø
10"ø
10"x8"
"x
"x
" 10"x6"
24"x24"
"x
12"x12"
EA-1
300 CFM
RA-5
1400 CFM
20"x12"
16"ø
SA-12 @45°
375 CFM
TYP. OF 4
"ø
"ø
"x
14"ø
32"x14"
14"x10"
24"x12"
18"x12"
14"x12"
6"x12"
RA-2
500 CFM
TYP. OF 4
"ø
SA-2
150 CFM
TYP. OF 4
RA-1
600 CFM
SA-7
270 CFM
SA-7
135 CFM
SA-7
80 CFM
SA-7
160 CFM
RA-1
270 CFM
RA-X
135 CFM
CH-2
18"x18"6"x6"
AHU (E.T.R.)
CH-1
16"x16"
10"ø
RHC-1
RHC-5
RHC-2
32"x24"
"ø
RHC-3
RHC-4
RHC-2E
24"x24"
20"x14"
24"x24"
24"x24"
RHC-6
A1
VAULT
A1
10"x8"
8"ø
10"ø
"ø
RA-1
400 CFM
A1
A1
12"x6"A1
A1
A1
A1
A1
A1
A1
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R S
H E
E T
M E
T A
L P
L A
N
-1
.0
M
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - MECHANICAL
1 SUPPLY AIR DOWN FROM ROOF, REFER TO SHEET M150 FOR
CONTINUATION.
2 RETURN AIR UP TO ROOF, REFER TO SHEET M150 FOR CONTINUATION.
3 EXHAUST AIR UP TO ROOF, REFER TO SHEET M150 FOR
CONTINUATION.
4 ROUTE DUCTWORK THROUGH JOIST WEBBING.
5 DROP DUCT DOWN INTO LOWER CEILING.
6 RAISE DUCT UP INTO HIGHER CEILING.
7 ROUTE DUCTWORK ABOVE CEILING AND UNDER JOISTS.
8 CONNECT TO EXIST. DUCTWORK.
1/8" = 1'-0"
FIRST FLOOR SHEET METAL PLAN
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
D G K L M P
E F H J N R SCBA T
ACCU-210
HRU-1
RTU-4
RTU-1
RTU-5
RTU-3
RTU-2E
RTU-2
RTU-4
(E.T.R.)
RTU-1
(E.T.R.)
RTU-3
(E.T.R.)
EF-3
(E.T.R.)
EF-2
(E.T.R.)
EF-5
(E.T.R.)
ROOF ACCESS
3" VTR
3" VTR
EXIST. VTR
A1
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
R O
O F
M E
C H
A N
IC
A
L P
L A
N
-1
.0
M
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - MECHANICAL
1 SUPPLY AIR DOWN FROM ROOF, REFER TO SHEET M150 FOR
CONTINUATION.
2 RETURN AIR UP TO ROOF, REFER TO SHEET M150 FOR CONTINUATION.
3 EXHAUST AIR UP TO ROOF, REFER TO SHEET M150 FOR
CONTINUATION.
4 ROUTE DUCTWORK THROUGH JOIST WEBBING.
5 DROP DUCT DOWN INTO LOWER CEILING.
6 RAISE DUCT UP INTO HIGHER CEILING.
7 ROUTE DUCTWORK ABOVE CEILING AND UNDER JOISTS.
8 CONNECT TO EXIST. DUCTWORK.
1/8" = 1'-0"
ROOF MECHANICAL PLAN
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
TS
TS
T S
TS
T S
T S
T S
T S
T S
T S
T S
TS
TS
D G K L PE F H J N R SCBA TD G K L M PE F H J N R SCBA T
U
15.2
12.2
8.6
5.9
FR-1
FR-3
FR-4
FR-5
FR-2
FR-6
E X
IS
T .1
/2
H S
E X
IS
T .1
/2
H R
1 1/4"
1 1/4"
1 1/2" HR
1 1/4" HS
1 1/4" HR
2 1/2" HS
2 1/2" HR
/4 H R
/4 H S P-1
21 GPM
P-2
14 GPM
P-3
8 GPM
P-6
8 GPM
P-4
PES 200 UNIFORM
STORAGE
VAULT
SUPPLY OFFICE
CORRIDOR
VESTIBULE
VESTIBULE
READINESS
TRAINING
229 GENERAL OFFICE
ADMINISTRATION
SUPPLY
PLATOON
PLATOON
OFFICE
STORAGE
OFFICE
CONFERENCE
LEARNING
CMDR
1 SGT
OFFICE
TA 50 / OFFICE
PLATOON 1
PLATOON 2
PLATOON 3
COMM
NBC
SUPPLY ROOM
SIPR
BREAK ROOM
RECRUIT
CLOSET
WMNS TOILET
VESTIBULE
MENS TOILET
MEN'S RESTROOM
MEN'S LOCKER
MEN'S SHOWER
JAN
AV STORAGE
CLASSROOM
CHAIR TABLE
STORAGE
WORKOUT ROOM
BOILER ROOM
WOMEN'S SHOWERS
BUILDING
MAINTENANCE
CLASSROOM
RECRUIT
CORRIDOR
FAMILY
LAC
CORRIDOR
SS-210
3/4" HS
3/4" HR
1 1/4" HR
1" HR
/2 H S
/2 H R
CORRIDOR
CH-1
CH-2
P-5
8 GPM
1 1/4" HR
H S
1" HS
3/4" HR
1" HS
3/4" HS
3/4" HR
/4
H R
/4
H S
P-7
58 GPM
RTU-1
RTU-2
RTU-2E
RTU-3
RTU-4
HRU-1
RTU-5
RHC-1
21 GPM
RHC-5
8 GPM
RHC-2
RHC-3
8 GPM
RHC-4
8 GPM
EXIST.2" HR
EXIST.2" HS
RHC-2E
P-2E
11 GPM
1 1/2" HR
1 1/2" HS
H S
H R
/2 H S
1 1/4" HS
/2 H R
RHC-6
8 GPM
A1
A1
A1
A1
A1
A1
3/4" HR
A1
3/4" HS
3/4" HR
3/4" HS
3/4" HS
3/4" HR
A1
3/4" HS
A1
3/4" HS A1
1 1/4" HS
1 1/2" HS
1 1/4" HS
1 1/4" HR
A1
A1
A1EXIST.2" HR
EXIST.2" HR
EXIST.2" HS
EXIST.2" HR
EXIST.2" HS
A1
EXIST.1 1/4" HS
EXIST.1 1/4" HR
A1
E X
IS
T .2
H S
E X
IS
T .1
H R
EXIST.1 1/4" HR
EXIST.1 1/2" HS
E X
IS
T .1
/4
H R
E X
IS
T .2
H S
EXIST.1 1/2" HS
EXIST.1 1/2" HS
EXIST.1 1/2" HR
A1
A1
A1
EXIST.1 1/2" HS
EXIST.1 1/2" HR
F
IL
E N
U M
B E
R
S T
A T
E I
N D
E X
N U
M B
E R
S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T
A N
D B
U D
G E
T S
T A
T E
O F
M
IC
H
IG
A N
A D
A M
P
L A
C H
R
A
D
IR
E C
T O
R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
E a s t
K a la m a z o o A v e n u e
S u it e
K a la m a z o o
M ic h ig
-5
.3
.6
P H
O
.3
.6
F A
X
T O
W E
R P
IN
K
S T
E R
.C O
M
A L L R
IG
H
T S
R E
S E
R V
E D
E a s t
F u lt o n S tr e e t, S u it e
G ra n d R a p id s
M ic h ig a n
.4
.9
P H
O
.4
.5
F A
X
S H
E E
T T
IT
L
E
S H
E E
T N
U M
B E
R
O W
N E
R P
R O
J E
C T
T
IT
L E
D A
T E
F
IR
S T
F L
O O
R H
V A
C P
IP
IN
G P
L A
N
-1
.0
M
J U
N E
M
ID
L A
N D
A R
M O
R Y
A D
D
IT
IO
N
A N
D R
E N
O V
A T
IO
N
A
IR
P
O R
T R
O A
D
M
ID
L A
N D
M
I
D E
P A
R T
M E
N T
O F
M
IL
IT
A
R Y
A N
D V
E T
E R
A N
'S A
F F
A
IR
S
/2
.C
A K
/1
/2
KEYED NOTES - HVAC PIPING
1 UNUSED
2 CONNECT TO EXIST. 1 1/2" HEATING WATER SUPPLY AND RETURN
PIPING.
3 CONNECT TO EXIST. 3" HEATING WATER SUPPLY AND RETURN PIPING.
4 REFRIGERANT PIPING UP THROUGH ROOF TO CONDENSING UNIT ON
ROOF.
5 LOCATE ALL NEW TEMPERATURE CONTROL PANEL(S) ON BACK WALL OF
STORAGE ROOM
1/8" = 1'-0"
FIRST FLOOR HVAC PIPING PLAN
MIDLAND ARMORY
KEY PLAN
SCALE: NO SCALE
EXISTING
NEW
THIS DRAWING SHEET IS INTENDED TO BE PLOTTED IN
COLOR. IF THIS TEXT APPEARS IN BLACK AND WHITE,
IT IS PLOTTED INCORRECTLY. DISCARD AND OBTAIN
AN ACCURATE DRAWING
ISSUED FOR DATE
OUTSIDE
AIR
SUPPLY RETURN
FILTER
COIL
CONTROLS AND
COMPRESSOR
ACCESS
5_
3_
4INSIDE BASE
RAIL
OUTSIDE BASE
RAIL
1_
501/2
ECONOMIZER
LIFTING LUG
(4 CORNERS)
3_
3_
SUPPLY
R E T U R N
5_
3_
C O
IL
F
IL
T E
R S
3_
EXHAUST
AIR
3_
7_
8 3
36 SUPPLY
R E T U R N
4 5
C O
IL
F
IL
T E
R S
7 3
EXHAUST
AIR
38781712
FILTER
COIL
LIFTING
LUG(4
CORNERS)
3_
4INSIDE BASE
RAIL
OUTSIDE BASE
RAIL
OUTSIDE
AIR
SUPPLY RETURN
CONTROLS AND
COMPRESSOR
ACCESS
1_
7_
3_
ECON
INSIDEBASE
RAILS
BLOWER
ACCESS
COIL
ACCESS
SUPPLY
BLOWER
SUPPLY COIL FILTER
FILTER
ACCESS
EXHAUST
AIR
OUTSIDE
AIR
AIR
FLOW
RETURN
40 5
82 1
O U T S
ID
E
A
IR
H O O D
SUPPLY
RETURN
C O
IL35
7 1
8 1
22388814
OUTSIDE
AIR
INSIDEBASE
RAILS
BLOWER
ACCESS
COMPRESSOR
ACCESS
COIL
ACCESS
FILTER
ACCESS
SUPPLY RETURN
BLOWER
SUPPLY COIL
FILTER
AIR
FLOW
ECON
EXHAUST
AIR
3_
5_
1_
SUPPLY
RETURN
C O
IL
O U T S
ID
E
A
IR
H O O D
1414 2412 3014 1312
SEE
DETAIL"B"
SEE
DETAIL"C"
SEE
DETAIL"A"
EXHAUST
AIR
SUPPLY
EXHAUST
AIR
O U T S
ID
E
A
IR
H O O D
RETURN
C O
IL
1234 2478 27 13
BLOWER
ACCESS HEATWHEEL
ACCESS
BLOWER
SUPPLY
COIL
COIL
ACCESS
FILTER ECON
HEATWHEEL
ACCESS
FILTER
ACCESS
OUTSIDE
AIR
AIR
FLOW
RETURNSUPPLY
HEATWHEEL
HEATWHEEL
FILTER
OUTSIDE
AIR
SUPPLY RETURN
FILTER
COIL
CONTROLS AND
COMPRESSOR
ACCESS
5_
3_
4INSIDE BASE
RAIL
OUTSIDE BASE
RAIL
1_
501/2
ECONOMIZER
LIFTING LUG
(4 CORNERS)
3_
3_
SUPPLY
R E T U R N
5_
3_
C O
IL
F
IL
T E
R S
3_
EXHAUST
AIR
3_
7_
OUTSIDE
AIR
SUPPLY RETURN
FILTER
COIL
CONTROLS AND
COMPRESSOR
ACCESS
5_
3_
4INSIDE BASE
RAIL
OUTSIDE BASE
RAIL
1_
501/2
ECONOMIZER
LIFTING LUG
(4 CORNERS)
3_
3_
SUPPLY
R E T U R N
5_
3_
C O
IL
F
IL
T E
R S
3_
EXHAUST
AIR
3_
7_
AREA SERVED: CLASSROOM
TYPE: PACKAGED OUTDOOR ROOFTOP UNIT, 1,400 CFM, HOT WATER HEATING, DX COOLING, DOWNWARD DISCHARGE
MANUFACTURER: BASED ON AAON "RN" SERIES
OUTSIDE AIR: 420 CFM OA
WEIGHT: 911 LB
LOCATION: ROOFTOP
UNIT MOUNTING: 14" ROOF CURB
UNIT DISCHARGE ACOUSTICS (Hz/db): 63/85, 125/83, 250/86, 500/82, 1000/75, 2000/72, 4000/70, 8000/64
ROOFTOP AIR HANDLING UNIT (RTU-4)
PLAN - TOP VIEW
ELEVATION - SIDE VIEW
FILTER SECTION: 2" PLEATED MERV-13 FILTERS
DX COOLING SECTION: 50.8 TMBH, 37.8 SMBH, 79°F EDB, 66°F EWB, 55°F LDB, 54°F LWB, R-410A
REFRIGERANT.
HEATING SECTION: (REFER TO DUCT-MOUNTED HEATING COIL SCHEDULE)
SUPPLY FAN: 1 FAN @ 2 HP, 1.01 BHP Ea., 1,400 CFM @ 1.25" ESP, 2.31" TSP, 1,821 RPM, 208/3/60, PREMIUM EFFICIENCY FOR USE WITH VFD, VFD PROVIDED BY TEMERPATURE CONTROLS CONTRACTOR.
RETURN/EXHAUST SECTION: 1 FAN @ 1 HP, 0.25 BHP, 1,400 CFM @ 0.25" ESP, 0.42" TSP, 1,330 RPM, 208-230/3/60, PREMIUM EFFICIENCY FOR USE WITH VFD, VFD PROVIDED BY TEMERPATURE CONTROLS
CONTRACTOR.
ELECTRICAL: SINGLE…