50-80500-24-17123_50-80500-24--17123 Spreadsheet Plant Mix Bituminous Pavement D-2 Items - Updated 0325.xlsx.XLSX
XLSX spreadsheet 19 KB Posted
- Attached to
- PLANT MIX BITUMINOUS PAVEMENT D-2
- Solicitation number
- 50-80500-24-17123
- Issued by
- Catron County, Rowe CDP, New Mexico
About this file
This is an Excel spreadsheet for a New Mexico state contract opportunity for Plant Mix Bituminous Pavement D-2, covering bituminous pavement and related road construction services in the Roswell and Vaughn/Fort Sumner areas. The document provides a detailed bidding structure with 26 primary line items for hot mix asphalt, open graded friction course (OGFC), and associated delivery and hauling services. The contract allows for varying quantities of materials, with most line items having estimated quantities of 5,000 tons, and some items with quantity breaks at 5,000 tons. The contract includes options for materials to be delivered FOB at the vendor's plant or fully installed with paving equipment and labor.
Pricing will be unit-based, with bidders required to provide precise unit pricing for each line item without the ability to modify quantities, units of measure, or item descriptions. The contract appears designed to provide flexible purchasing options for highway departments, with separate pricing for different material types (SP-III and SP-IV mixes), quantity ranges, and geographic areas. Bidders are restricted from making substantive changes to the bid form and must provide any clarifications or brand identifications in the comments section. The contract seems structured to allow the highway department to purchase road construction materials and services on an as-needed basis with predictable pricing across different material types and delivery methods.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Items
| Bidder Instructions: (Replaces Agency Instructions, prior to ITB release. Be sure to check row height to ensure the entire instruction is displayed.) |
| Items - Bidders do not have the ability to add or delete Items. |
| Approx. Qty. - Quantities provides are estimates, only, and do not establish a definite quantity contract. Actual quantities purchased under a resulting agreement may vary. Bidders may not change the Approx. Qty. |
| UOM (Unit of Measure) - Bidders do not have the ability to change the UOM. Any variation from the UOM identified may be provided in the Comments. |
| Article and Description - Bidder cannot change Article and Description. Any clarification, explanation, brand name identification, etc. must be provided in the Comments. |
| Unit Price - Bidders must provide pricing that conforms with the identified Unit Price. |
| Comments - Bidders may only provide comments to explain or clarify an Item, identify a brand name, or provide information as specifically stated in the corresponding ITB document. Changes and additions to the Items, including variations in pricing for an Item, are not permitted. Any comments that do not conform to the requirements in the ITB or on this form will be disregarded, and will not be included in the resulting award, if Bidder is awarded. |
| Item | Approx. | ||||
| Qty. | UOM | Article and Description | Unit | ||
| Price | Comments | ||||
| 1 | 5,000 | TN - Ton | FOB: Hot Mix/Cold Lay Loaded in Highway Dept. Trucks Vendors plant. Roswell Area. | $ | |
| 2 | 5,000 | TN - Ton | FOB: Hot Mix SP-III(0-5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant. Roswell Area. | $ | |
| 3 | 5,000.01 | TN - Ton | FOB: Hot Mix SP-III (Over 5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant, Roswell Area. | $ | |
| 4 | 5,000 | TN - Ton | FOB: Hot Mix SP-IV (0-5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant. Roswell Area. | ||
| 5 | 5,000.01 | TN - Ton | FOB: Hot Mix SP-IV(Over 5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant, Roswell Area | ||
| 6 | 5,000 | TN - Ton | FOB: OGFC complete Loaded in Highway Dept. Trucks Vendors plant. Roswell Area. | $ | |
| 7 | 5,000 | MILE - Mile | Hauling of material: Per Ton Per Mile FOB Vendors plant to Roswell Area | $ | |
| 8 | 5,000 | TN - Ton | Delivery: OGFC complete in Place includes asphalt paver, roller and all required labor to finish in the Roswell area. | $ | |
| 9 | 5,000 | TN - Ton | Delivery: 0-5000 tons Hot Mix SP-III in Place includes asphalt paver, roller and all required labor to finish in the Roswell area. | $ | |
| 10 | 5,000.01 | TN - Ton | Delivery 5000+ tons Hot Mix SP_III in Place (includes asphalt paver, roller and all required labor to finish in the Roswell area. | $ | |
| 11 | 5,000 | TN - Ton | Delivery: 0-5000 tons Hot Mix SP-IV in Place includes asphalt paver, roller and all required labor to finish in the Roswell area. | ||
| 12 | TN - Ton | Delivery: 5000+ tons Hot Mix SP-IV in Place (includes asphalt paver, roller and all required labor to finish in the Roswell area. | |||
| 13 | 5,000 | MILE - Mile | Mobilization of paver and roller in the Roswell area. | $ | |
| 14 | 5,000 | TN - Ton | FOB: Hot Mix/Cold Lay, Loaded in Highway Dept. Trucks Vendors plant. Vaughn Area. | $ | |
| 15 | 5,000 | TN - Ton | FOB: Hot Mix SP-III(0-5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant. Vaughn and Fort Sumner Area. | $ | |
| 16 | 5,000.01 | TN - Ton | FOB: Hot Mix SP-III (Over 5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant. Vaughn and Fort Sumner Area | $ | |
| 17 | 5,000 | TN - Ton | FOB: Hot Mix SP-IV (0-5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant. Vaughn and Fort Sumner Area. | ||
| 18 | 5,000.01 | TN - Ton | FOB: Hot Mix SP-IV (Over 5,000 Tons) Loaded in Highway Dept. Trucks Vendors plant. Vaughn and Fort Sumner Area | ||
| 19 | 5,000 | TN - Ton | FOB: OGFC complete Loaded in Highway Dept. Trucks Vendors plant. Vaughn and Fort Sumner Area. | $ | |
| 20 | 5,000 | TN - Ton | Hauling of material Per Ton Per Mile Vendors plant. Vaughn and Fort Sumner Area. | $ | |
| 21 | 5,000 | TN - Ton | Delivery: OGFC complete in Place includes asphalt paver, roller and all required labor to finish in the Vaughn and Fort Sumner area. | $ | |
| 22 | 5,000 | TN - Ton | Delivery: 0-5,000 tons Hot Mix SP-III in Place includes asphalt paver, roller and all required labor to finish in the Vaughn and Fort Sumner area. | $ | |
| 23 | 5,000.01 | TN - Ton | Delivery: 5,000+ tons Hot Mix SP-III in Place includes asphalt paver, roller and all | ||
| required labor to finish in the Vaughn and Fort Sumner area | $ | ||||
| 24 | 5,000 | TN - Ton | Delivery: 0-5,000 tons Hot Mix SP-IV in Place includes asphalt paver, roller and all required labor to finish in the Vaughn and Fort Sumner area. | $ | |
| 25 | 5,000.01 | TN - Ton | Delivery: 5,000+ tons Hot Mix SP-IV in Place includes asphalt paver, roller and all required labor to finish in the Vaughn and Fort Sumner area. | ||
| 26 | 5,000 | MILE - Mile | Mobilization of paver and roller in the Vaughn area. | ||
| 27 | 1 | EA - Each | Contractor License No. | ______________________ |
Drop Down
| UnitOfMeasure |
| 10 - Group |
| 12 - Packet |
| 18 - 55 Gallon Drum |
| 23 - Gram per Cubic Centimeter |
| 4D - Curie |
| 4E - 20-Pack |
| 4F - 100-Pack |
| AA - Ball |
| AB - Bulk Pack |
| AC - Acre |
| AD - Bytes |
| AF - Centigram |
| AG - Angstrom |
| AM - Ampoule |
| AR - Suppository |
| AS - Assortment |
| AV - Capsule |
| AW - Powder-Filled Vials |
| AY - Assembly |
| BA - Bale |
| BB - Base Box |
| BC - Bucket |
| BD - Bundle |
| BE - Beam |
| BF - Board Feet |
| BG - Bag |
| BH - Brush |
| BI - Bar |
| BJ - Band |
| BK - Book |
| BL - Block |
| BM - Bolt |
| BN - Bulk |
| BO - Bottle |
| BR - Barrel |
| BS - Basket |
| BT - Belt |
| BU - Bushel |
| BX - Box |
| C3 - Centiliter |
| C8 - Cubic Decimeter |
| CAS - Cassette |
| CC - Cubic Centimeter |
| CE - Centigrade/Celsius |
| CF - Cubic Foot |
| CG - Card |
| CH - Container |
| CI - Cubic Inches |
| CJ - Cone |
| CM - Centimeter |
| CN - Can |
| CP - Crate |
| CQ - Cartridge |
| CR - Cubic Meter |
| CS - Case |
| CT - Carton |
| CU - Cup |
| CW - Hundred Weight |
| CX - Coil |
| CY - Cubic Yard |
| CYL - Cylinder |
| CZ - Combo |
| D3 - Square Decimeter |
| D5 - Kilogram per Square Centimeter |
| DAY - Day |
| DB - Dry Pounds |
| DC - Disk (Disc) |
| DE - Deal |
| DF - Dram |
| DG - Decigram |
| DI - Dispenser |
| DJ - Decagram |
| DL - Deciliter |
| DM - Decimeter |
| DP - Dozen Pair |
| DR - Drum |
| DS - Display |
| DZ - Dozen |
| EA - Each |
| EM - Inches, Decimal-Minimum |
| EV - Envelope |
| F4 - Minim |
| FG - Transdermal Patch |
| FL - Flake Ton |
| FO - Fluid Ounce |
| FT - Foot |
| G - Gram |
| G5 - Gill (Imperial) |
| GAL - Gallon |
| GH - Half Gallon |
| GS - Gross |
| GT - Gross Ton |
| GX - Grain |
| HA - Hank |
| HD - Half Dozen |
| HR - Hour |
| HT - Half Hour |
| HU - Hundred |
| IH - Inhaler |
| IN - Inch |
| JA - Job |
| JG - Joule per Gram |
| JO - Joint |
| JR - Jar |
| JU - Jug |
| KA - Cake |
| KB - Kilocharacters |
| KC - Kilograms per Cubic Meter |
| KD - Kilograms Decimal |
| KE - Keg |
| KG - Kilogram |
| KL - KiloLiter |
| KM - KiloMeter |
| KT - Kit |
| KU - Task |
| L - Liter |
| LB - Pound |
| LF - Linear Foot |
| LG - Long Ton |
| LN - Length |
| LO - Lot |
| LS - Lump Sum |
| M - Meter |
| M3 - Mat |
| MCI - Millicurie |
| MG - Milligram |
| MI - Metric |
| MICROCI - Microcurie |
| MICROG - Microgram |
| MICROL - Microliter |
| MILE - Mile |
| MIN - Minute |
| ML - Milliliter |
| MM - Millimeter |
| MON - Months |
| MP - Metric Ton |
| MS - Square Millimeter |
| NL - Load |
| NT - Trailer |
| NTE - Not to Exceed |
| OP - Two Pack |
| OZ - Ounce |
| P1 - Percent |
| P3 - Three Pack |
| P4 - Four Pack |
| P5 - 5 Pack |
| P6 - 6 Pack |
| P7 - Seven Pack |
| P8 - Eight Pack |
| P9 - Nine Pack |
| PA - Pail |
| PC - Piece |
| PD - Pad |
| PK - Pack |
| PL - Pallet |
| PO - Pounds per Inch of Length |
| PP - Plate |
| PR - Pair |
| PT - Pint |
| PV - Half Pint |
| PY - Peck Dry U.S. |
| QR - Quire |
| QT - Quart |
| QTR - Quarter |
| RA - Rack |
| RD - Rod |
| RE - Reel |
| RG - Ring |
| RL - Roll |
| RM - Ream |
| RO - Round |
| SB - Square Mile |
| SC - Square Centimeter |
| SEC - Second |
| SET - Set |
| SF - Square Feet |
| SH - Sheet |
| SI - Square Inch |
| SJ - Sack |
| SL - Sleeve |
| SM - Square Meter |
| SO - Spool |
| SP - Shelf Package |
| SR - Strip |
| STN - Short Ton |
| SV - Skid |
| SVC - Service |
| SW - Skein |
| SY - Square Yard |
| SZ - Syringe |
| TB - Tube |
| TC - Truckload |
| TH - Thousand |
| TK - Tank |
| TN - Ton |
| TO - Troy Ounce |
| TP - Ten Pack |
| TY - Tray |
| U2 - Tablet |
| UL - Unitless |
| UM - Million Units |
| UN - Unit |
| UP - Troche |
| UQ - Wafer |
| USD - US Dollar |
| UU - Lozenge |
| UX - Dram (Minim) |
| V2 - Pouch |
| VI - Vial |
| WK - Week |
| WP - Pennyweight |
| WR - Wrap |
| Y2 - Tablespoon |
| Y3 - Teaspoon |
| Y4 - Tub |
| YD - Yard |
| YR - Year |
| ZC - Semiannual |
| ZP - Page |
File details come from the government source that posted it. Updated .