5-Exhibit C Specs Plans.pdf

PDF 33 MB Posted

Attached to
Northpoint/USPS Access Improvements
Solicitation number
2026-07
Issued by
Beaufort County, South Carolina

About this file

Site Development and Stormwater Management Plans for USPS Access Improvements

This document comprises comprehensive site development and stormwater pollution prevention plans prepared by Thomas & Hutton Engineering for the Town of Hilton Head Island for USPS access improvements at 213 William Hilton Parkway, Hilton Head Island, South Carolina. The project involves demolition and reconstruction of an existing asphalt parking lot, construction of a 12-foot wide asphalt pathway, drainage improvements, utility installations, and landscape enhancements across a 6.5-acre gross site area with 2.8 acres of disturbance. The work includes site staking and striping, ADA accessibility improvements, utility plan implementation (water, sewer, and storm drainage), paving and grading operations, traffic control measures, property acquisition of 1.82 acres, stormwater detention facilities, and landscape restoration featuring a 50-foot Type E buffer along Highway 278 with tree preservation and mitigation requirements. The plans were prepared on February 16, 2026, and incorporate detailed construction sequencing phased to maintain United States Postal Service operations throughout the project duration.

The stormwater pollution prevention plan establishes comprehensive erosion and sediment control measures including silt fencing, sediment basins, inlet protection devices, and stabilization procedures with specific maintenance protocols. Runoff coefficient before construction is 69 CN with 39 percent impervious area; post-construction runoff coefficient remains 69 CN with 40 percent impervious area. The site drains to an unnamed tributary to Jarvis Creek in FEMA Flood Zone X (unshaded). Construction activities must comply with South Carolina Department of Health and Environmental Control standards and require weekly inspections minimum, with stabilization of inactive areas mandated within 14 days of work cessation. Tree mitigation calculations indicate removal of 948 inches across three categories requiring replacement of 140 inches of caliper trees and 19 palm trees. The project includes detailed landscape plans, utility details, and long-term maintenance requirements to be assumed by the property owner upon project completion.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WILLIAM HILTON PKWY WILLIAM HILTON PKWY

CROSS

ISL

AND PKWY

G

UM

TREE RD

MARSH POINT

W

ILB

O

RN

R D

HILTON HEAD ISLAND

ELEMENTARY

SCHOOL

HILTON HEAD ISLAND

HIGH SCHOOL

OLD

W

ILD

HORSE

RD

W

ILD

H O

RS

E

RD

JARVIS CREEK

SPA

N

ISH W

ELLS RD

SITE

REVISION HISTORY

SUBMITTAL HISTORY

J-

4.

2/

/2

US

PS

A C

C

ES

S

IM

PR

O

V

EM

EN

TS

Know what'sbelow.

before you dig.Call

R

SITE DEVELOPMENT

FOR

USPS ACCESS IMPROVEMENTS

HILTON HEAD ISLAND

HILTON HEAD ISLAND, SOUTH CAROLINA

PREPARED FOR:

TOWN OF HILTON HEAD ISLAND

1 TOWN CENTER COURT

HILTON HEAD ISLAND, SOUTH CAROLINA 29928

FEBRUARY 16, 2026

TM# R510 007 000 0228 0000

J-28374.0013

VICINITY MAP

SCALE: 1" = 1000'

PREPARED BY:

50 Park of Commerce Way Savannah, GA 31405 p.912.234.5300 www.thomasandhutton.com

Sheet Number Sheet Title

C0 COVER SHEET

G0.1 GENERAL NOTES AND LEGENDS

G1.1 INDEX PLAN

V1.1 EXISTING CONDITIONS PLAN

CD1.1 SITE DEMOLITION PLAN

C1.1 STAKING AND STRIPING PLAN

C1.2 ADA AND SIGNAGE PLAN

C1.3 SITE DETAILS

C1.4 SITE DETAILS

C2.1 UTILITY PLAN

C2.2 UTLITY DETAILS

C2.3 UTLITY DETAILS

C2.4 UTLITY DETAILS

C3.1 PAVING AND GRADING PLAN

C3.2 PAVING AND GRADING PLAN

C3.3 PAVING AND GRADING DETAILS

C3.4 PAVING AND GRADING DETAILS

C4.1 TRAFFIC CONTROL PLAN

C5.1 RIGHT OF WAY AND EASEMENTS

C5.2 PROPERTY ACQUISITION EXHIBIT

EC0.1 STORMWATER POLLUTION PREVENTION NOTES

EC0.2 STORMWATER POLLUTION PREVENTION CHARTS AND LEGENDS

EC1.1 STORMWATER POLLUTION PREVENTION PLAN

EC2.1 STORMWATER POLLUTION PREVENTION DETAILS

EC2.2 STORMWATER POLLUTION PREVENTION DETAILS

L1.1 OVERALL CONCEPTUAL LANDSCAPE PLAN

L1.2 CONCEPTUAL LANDSCAPE PLAN

L1.3 CONCEPTUAL LANDSCAPE PLAN

L2.1 GENERAL NOTES AND DETAILS

EX.1 CONSTRUCTION SEQUENCE

PROPOSED SITE USE

GROSS SITE AREA

NET SITE AREAS (GROSS AREAS - TIDAL WETLANDS)

OVERLAY DISTRICT

ZONING LC

COD - ROW ARTERIAL

FEDERAL

6.50 AC

6.50 AC

ALLOWED TOTAL DENSITY

EXISTING BUILDING SQUARE FOOTAGE

PROPOSED BUILDING SQUARE FOOTAGE

39,000 GFA (6000 GFA PER NET ACRE)

15,519 SF

0.00 SF

PROPOSED BUILDING HEIGHT

MAXIMUM ALLOWED IMPERVIOUS AREA

CURRENT IMPERVIOUS AREA & PERCENTAGE

MAXIMUM BUILDING HEIGHT ALLOWED

TOTAL SQUARE FOOTAGE 15,519 SF

35.00 FT

0.00 FT

2.92 AC (45.0%)

2.44 AC (37.5%)

PROPOSED IMPERVIOUS AREA & PERCENTAGE 2.51 AC (38.6%)

SITE DATA TABLE

HORIZONTAL

DATUM

VERTICAL

SOUTH CAROLINA STATE PLANE GRID (NAD 83)

NAVD 88

LAND USE

AREA OF DISTURBANCE 2.80 AC

FLOOD ZONE X (UNSHADED)

BID SET - NOT FOR CONSTRUCTION

EXHIBIT C

RFP 2026-07

50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com

DRAINAGE LEGEND

SEWER LEGEND

OTHER UTILITIES LEGEND

WATER LEGEND

ABBREVIATIONS

SHEET NUMBERING DETAIL

SHEET\PAGE

NUMBER

PREFIX

PREFIX

C0 COVER SHEET

G0 GENERAL NOTES/ LEGENDS

G1 GENERAL INFORMATION PLAN

CD1 CIVIL DEMOLITION - PLAN/PROFILES/DETAILS

C1 SITE LAYOUT - PLAN/PROFILES/DETAILS

C2 WATER & SEWER - PLAN/PROFILES/DETAILS

C3 PAVING, GRADING, & DRAINAGE

C4 OTHER - PLAN/PROFILES/DETAILS

EC0 EROSION CONTROL - NOTES/LEGENDS

EC1 EROSION CONTROL PHASE 1 - PLAN

EC2 EROSION CONTROL PHASE 2 - PLAN

EC3 EROSION CONTROL PHASE 3 - PLAN

EC4 EROSION CONTROL DETAILS

L LANDSCAPE - PLAN/DETAILS

M MECHANICAL/HVAC

A ARCHITECTURAL

P PLUMBING

E ELECTRICAL

V SURVEY/MAPPING

PLAN/PROFILE/DETAILS

GENERAL NOTES

GENERAL PROJECT/SITE INFORMATION

UTILITY:

MARSH POINT

WILLIAM HILTON PARKWAY/ US 278

G

UM

TR

EE

R O

A

DNORTHPOINTE CIRCLE

N O

RTHPO

IN

TE C

IRC

LE

50 Park of Commerce Way www.thomasandhutton.com

N/F

UNITED STATES POSTAL SERVICE

N/F

1 GUMTREE LLC.

N/F

SOC MARSH POINT INC.

N/F

SOC MARSH POINT INC.

50' RIGHT-OF-WAY

150' CENTRAL ELECTRIC POWERLINE EASEMENT

50 Park of Commerce Way

N/F

1 GUMTREE LLC.

N/F

SOC MARSH POINT INC.

N/F

SOC MARSH POINT INC.

50' RIGHT-OF-WAY

150' CENTRAL ELECTRIC POWERLINE EASEMENT

50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300

TREE PROTECTION LEGEND

N/F

1 GUMTREE LLC.

N/F

SOC MARSH POINT INC.

N/F

SOC MARSH POINT INC.

50' RIGHT-OF-WAY

150' CENTRAL ELECTRIC POWERLINE EASEMENT

LINE TABLE

LINE TABLE

CURVE TABLE

CURVE TABLE

50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com

NOTES:

PAVEMENT LEGEND

N/F

1 GUMTREE LLC.

N/F

SOC MARSH POINT INC.

N/F

SOC MARSH POINT INC.

50' RIGHT-OF-WAY

150' CENTRAL ELECTRIC POWERLINE EASEMENT

L

L

L

C

L

L

C L

C

L

C

C L

L

C

50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300 www.thomasandhutton.com

LEGENDNOTES

ACCESSIBLE ROUTE

POINT OF ACCESS

LANDING

CURB RAMP

L

C

RAMP

HANDRAIL RAMP

R

H

REAR

SECTION

STOP

FRONT

YIELD

PEDESTRIAN SIGNAGE - STOP/YIELD 18"

NOTE

CROSSWALK STRIPING DETAIL

ELEVATION PLAN VIEW

DETECTABLE WARNING DETAIL

ACCESSIBLE PARKING SIGN DETAIL

VAN ACCESSIBLE

MAXIMUM FINE $500.00

TOW-AWAY ZONE

PERMIT PARKING ONLY

MAXIMUM FINE $500.00

TOW-AWAY ZONE

PERMIT PARKING ONLY

NOTE

CONCRETE WHEEL STOP DETAIL

B

B

A A

SECTION B-BSECTION A-A

STOP BAR DETAIL

NOTE

PARKING STALL DETAIL

NOTE

NOTE

PATH CROSSING DETAIL

ACCESSIBLE PARKING SPACE STRIPING DETAIL

SIGN POST DETAIL

NOTE

ROAD SIGN DETAILS

OCT. 2008

THOMAS & HUTTON

ENGINEERING CO.

50 Park of Commerce Way

N/F

1 GUMTREE LLC.

N/F

SOC MARSH POINT INC.

N/F

SOC MARSH POINT INC.

50' RIGHT-OF-WAY

150' CENTRAL ELECTRIC POWERLINE EASEMENT

C2.1

50 Park of Commerce Way

FIRE HYDRANT DETAIL

VALVE SECTION

SECTION

STORM MANHOLE

SECTION

PLAN

YARD INLET

SECTION

END OF LINE SCENARIO

SECTION

YARD INLET COVER

SUBGRADE DRAIN

50 Park of Commerce Way

NOTE: CONTRACTOR TO INSTALL 10 LF OF 4" SGD EACH SIDE OF INLET (MIN.)

NOTE: CONTRACTOR TO INSTALL 10 LF OF 4" SGD EACH SIDE OF INLET (MIN.)

C3.1

50 Park of Commerce Way

N/F

1 GUMTREE LLC.

N/F

SOC MARSH POINT INC.

50' RIGHT-OF-WAY

150' CENTRAL ELECTRIC POWERLINE EASEMENT

C3.2

50 Park of Commerce Way

PERVIOUS ASPHALT PAVEMENT SECTION

ASPHALT AND BASE PAVEMENT SECTION

ROAD GRADING AT PEDESTRIAN CROSSING

NOTE

TYPICAL SIDEWALK INTERSECTION

FEATHERING OF CURB & GUTTER

VALLEY GUTTER

PLAN VIEW

SECTION A-A

W/ PEDESTRIAN SIDEWALK

CURB RAMP "TYPE D"

50 Park of Commerce Way

A

A

B

SEE PLAN

SE

E

PL

A

N

CONCRETE FLUME

SECTION B-B

SECTION A-A

PLAN

WHITE TRIANGLE YIELD BAR

50 Park of Commerce Way

U.S. HIGHWAY 278 (WILLIAM HILTON PARKWAY)

G

UM

TR

EE

R O

A D

MARSH POINT DRIVE

MARSH POINT DRIVE

U.S. HIGHWAY 278 (WILLIAM HILTON PARKWAY)

U.S. HIGHWAY 278 (WILLIAM HILTON PARKWAY)

U.S. HIGHWAY 278 (WILLIAM HILTON PARKWAY)

CROSS ISLAND PARKWAY

CROSS ISLAND PARKWAY

G

UM

TR

EE

R O

A D

BUS DRIVE

RIGHT

AHEAD AHEAD

N O

RTHPO

IN

TE C

IRC

LE

U.S. HIGHWAY 278 (WILLIAM HILTON PARKWAY)

SPA

N

ISH W

ELLS RO

A D

W

IL

D

HO

RS

E

RO

A

D

U.S. HIGHWAY 278 (WILLIAM HILTON PARKWAY)

50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300

NOTES

WILLIAM HILTON PARKWAY/U.S. HIGHWAY 278

N O

RTHPO

IN

TE C

IRC

LE

MARSH POINT DRIVE

G

UM

TR

EE

R O

A D

UNITED STATES POSTAL SERVICE

R510 007 000 0228 0000

6.27 ACRES

213 WILLIAM HILTON PARKWAY

HILTON HEAD ISLAND, SC 29926

WILLIAM HILTON PARKWAY/U.S. HIGHWAY 278

N O

RTHPO

IN

TE C

IRC

LE

MARSH POINT DRIVE

G

UM

TR

EE

R O

A D

EXISTING PROPERTY LINE

PROPOSED PROPERTY LINE

PROPERTY TO BE ACQUIRED BY THE TOWN

OF HILTON HEAD ISLAND (1.82 ACRES)

CONSTRUCTION EASEMENT

PERMANENT STORMWATER EASEMENT

PERMANENT STORMWATER EASEMENT

50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300

NOTES:

WILLIAM HILTON PARKWAY/U.S. HIGHWAY 278

N O

RTHPO

IN

TE C

IRC

LE

MARSH POINT DRIVE

UNITED STATES POSTAL SERVICE

R510 007 000 0228 0000

6.27 ACRES TOTAL (4.45 ACRES TO REMAIN)

213 WILLIAM HILTON PARKWAY

HILTON HEAD ISLAND, SC 29926

EXISTING PROPERTY LINE

PROPOSED PROPERTY LINE

PROPERTY TO BE ACQUIRED BY THE TOWN

OF HILTON HEAD ISLAND (1.82 ACRES)

REVIEWED:

DRAWN:

JOB NO:

PREPARED BY:

PREPARED FOR:

SCALE:

SHEET:

DATE:

PROPERTY ACQUISITION EXHIBIT

USPS ACCESS IMPROVEMENTS

HILTON HEAD ISLAND, SOUTH CAROLINA

TOWN OF HILTON HEAD ISLAND

J-28374.0013

WNS

KMS

2/29/24

C5.2

50 Park of Commerce Way Savannah, GA 31405 • 912.234.5300

1" = 30'

STORMWATER POLLUTION PREVENTION PLAN

I. SITE DESCRIPTION

A. PROJECT DESCRIPTION

A.1. PROJECT AREA 6.5 ACRES

A.2. AREA DISTURBED 2.8 ACRES

A.3. PERCENT IMPERVIOUS AREA BEFORE CONSTRUCTION 39%

A.4. RUNOFF COEFFICIENT BEFORE CONSTRUCTION 69 CN

A.5. PERCENT IMPERVIOUS AREA AFTER CONSTRUCTION 40%

A.6. RUNOFF COEFFICIENT AFTER CONSTRUCTION 69 CN

B. DESCRIPTION OF CONSTRUCTION ACTIVITY

WORK CONSISTS OF DEMOLITION AND CONSTRUCTION OF EXISTING ASPHALT PARKING LOT,

DRAINAGE IMPROVEMENTS, AND 12' WIDE ASPHALT PATHWAY

C. RUNOFF DATA

C.1. SOIL CLASSIFICATIONS: (HSG) Rd (RIDGELAND B) Sk (SEABROOK A)

C.2. LAND USE(S): LIGHT COMMERCIAL (LC)

D. RECEIVING WATERS

D.1. CLOSEST RECEIVING WATERS: UNNAMED TRIBUTARY TO JARVIS CREEK

D.2. ULTIMATE RECEIVING WATERS: JARVIS CREEK

E. FLOOD

E.1. FEMA FLOOD ZONE(S): ZONE X (SHADED)

E.2. FEMA FLOOD INSURANCE MAP(S): 45013C0453G

II. CONTROL MEASURES

1. EROSION AND SEDIMENT CONTROLS

PRIOR TO START OF CONSTRUCTION, ALL EXTERIOR SILT FENCE WILL BE INSTALLED AS

SHOWN ON THE PLANS.

1.1. CLEARING

1.1.1. AS CLEARING IS COMPLETED, ADDITIONAL SILT FENCE WILL BE INSTALLED WHERE

NECESSARY, SUCH AS POINTS WHERE FLOWS BECOME CHANNELIZED, AND OTHER

POINTS WHERE EXCESSIVE RUNOFF VELOCITIES MAY OCCUR.

1.1.2. INSTALL CONSTRUCTION ENTRANCES / EXITS BEFORE BEGINNING CLEARING

1.1.3. CONSTRUCTION DELAYS IN ANY ONE AREA GREATER THAN 14 DAYS PRIOR TO START OF

ROUGH GRADING WILL MANDATE STABILIZATION PROCEDURES. ACCEPTABLE METHODS

OF STABILIZATION INCLUDE MULCHING AND TEMPORARY SEEDING.

1.1.4. MAINTAIN EXISTING VEGETATION WHENEVER POSSIBLE AND MINIMIZE THE AREA OF

DISTURBANCE. RETAIN AND PROTECT TREES TO ENHANCE FUTURE LANDSCAPING

EFFORTS AND REDUCE RAINDROP IMPACT.

1.1.5. INSTALL ALL SEDIMENT CONTROL PRACTICES PRIOR TO ANY UP-SLOPE SOIL DISTURBING

ACTIVITIES.

1.1.6. PHASE CONSTRUCTION ACTIVITIES TO MINIMIZE THE AREAS DISTURBED AT ONE TIME.

THIS WILL ALSO ALLOW COMPLETED AREAS TO BE STABILIZED AND RE-VEGETATED

BEFORE DISTURBING ADJACENT SITES. THE NEED FOR TEMPORARY EROSION CONTROL

MEASURES MAY BE AVOIDED BY COMPLETING A PHASE AND INSTALLING PERMANENT

EROSION CONTROL MEASURES WHEN THE FINAL GRADE IS ATTAINED.

1.1.7. MAINTAIN AND PROTECT ALL NATURAL WATERWAYS. RETAIN AT LEAST A 35-FOOT

UNDISTURBED BUFFER OF NATURAL VEGETATION ALONG ALL WATERWAYS TO FILTER

OUT SEDIMENT AND OTHER POLLUTANTS. MAINTAIN A 45-FOOT UNDISTURBED BUFFER

AROUND SENSITIVE WATERS.

1.1.8. INSTALL SILT FENCE (OR BIO ROLLS/ROCK SOCK PRODUCTS) ON THE DOWN-SLOPE

PERIMETER OF ALL DISTURBED AREAS PRIOR TO ANY SOIL DISTURBING ACTIVITIES

(INCLUDING CLEARING AND GRUBBING). SILT FENCE CAN TREAT A MAXIMUM OF 100

SQUARE FEET PER LINEAL FOOT OF FENCE. INSTALL SILT FENCE IN SHORTER REACHES

ON THE CONTOUR WITH EACH END TURNED UP-SLOPE . SWALES AND SHORELAND

AREAS SHOULD ALSO BE PROTECTED WITH SILT FENCE, BIO ROLLS, OR ROCK SOCKS.

1.1.9. IN AREAS OF CONCENTRATED FLOW INSTALL STRAW BALE CHECKS, ROCK CHECK DAMS,

TRIANGULAR DIKES, BIO ROLL BLANKETS, OR ROCK SOCKS TO SLOW RUNOFF AND TRAP

SEDIMENT.

1.1.10. USE TEMPORARY SLOPE DRAINS OR ROCK CHUTES TO MOVE WATER DOWN STEEP

SLOPES.

1.1.11. CONSTRUCT SEDIMENT BASINS FOR DRAINAGE AREAS GREATER THAN 10 ACRES

1.2. ROUGH GRADING

1.2.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING ROUGH GRADING, DELAYS OF

GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.2.2. ALL AREAS NOT SUBJECT TO FURTHER CONSTRUCTION (DRAINAGE, SANITARY SEWER,

ROADS, WATER DISTRIBUTION SYSTEMS, OR STORM WATER FACILITIES) SHALL BE

GRASSED WITH A PERMANENT COVER.

1.2.3. COVER ANY STOCK PILED TOPSOIL WITH PLASTIC (OR OTHER IMPERVIOUS COVERING)

OR USE A TEMPORARY SEED MIX. USE STOCKPILED TOPSOIL AS EARTHEN BERMS TO

SERVE AS TEMPORARY SEDIMENT BASINS.

1.3. DRAINAGE

1.3.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING DRAINAGE INSTALLATION.

1.3.2. CONSTRUCTION DRAINAGE WILL BE ROUTED THROUGH LAKES, WHICH WILL ACT AS

SEDIMENT BASINS OR OTHER ACCEPTABLE SEDIMENT BASINS/TRAPS.

1.3.3. STORM DRAIN INLET PROTECTION AS SHOWN ON DETAIL SHEET SHALL BE INSTALLED ON

ALL CURB INLETS, STORM DRAIN MANHOLES, JUNCTION BOXES, AND GRATE INLETS.

1.3.4. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF THE NEXT CONSTRUCTION

SEQUENCE WILL MANDATE STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF

STABILIZATION INCLUDE MULCHING AND TEMPORARY SEEDING.

1.3.5. ALL STORM LINES NOT IN STREETS OR OTHER PAVED AREAS ARE TO BE MULCHED AND

SEEDED WITHIN 5 DAYS AFTER BACKFILL.

1.4. WASTE DISTRIBUTION SYSTEM INSTALLATION

1.4.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING INSTALLATION OF THE WATER

DISTRIBUTION SYSTEM.

1.4.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.5. WASTEWATER COLLECTION SYSTEM INSTALLATION

1.5.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING INSTALLATION OF THE

WASTEWATER SYSTEM.

1.5.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.6. CONSTRUCTION OF ROADS

1.6.1. ALL EXISTING CONTROLS WILL BE MAINTAINED DURING ROAD CONSTRUCTION.

1.6.2. DELAYS OF GREATER THAN 14 DAYS PRIOR TO START OF NEXT ACTIVITY WILL MANDATE

STABILIZATION PROCEDURES. ACCEPTABLE METHODS OF STABILIZATION INCLUDE

MULCHING AND TEMPORARY SEEDING.

1.7. GRASSING

1.7.1. ALL EXISTING CONTROLS WILL BE MAINTAINED UNTIL GRASSING IS ESTABLISHED

1.7.2. ANY AREAS THAT ERODE OR WHERE GRASS DOES NOT ESTABLISH ITSELF SHALL BE

RE-GRADED AND RE-GRASSED.

2. STORM WATER MANAGEMENT

RUNOFF FROM THIS PROJECT WILL DISCHARGE INTO A STORM WATER MANAGEMENT SYSTEM.

TREATMENT WILL OCCUR IN STORM WATER DETENTION PONDS.

3. OTHER CONTROLS

3.1. WASTE DISPOSAL

3.1.1. NO SOLID MATERIALS, INCLUDING BUILDING MATERIALS, SHALL BE DISCHARGED TO ANY

RECEIVING WATERS.

3.1.2. OFFSITE VEHICLE TRACKING OF SEDIMENTS AND THE GENERATION OF DUST SHALL BE

MINIMIZED.

3.1.3. THIS PLAN SHALL COMPLY WITH STATE AND/OR LOCAL WASTE DISPOSAL, SANITARY

SEWER OR SEPTIC SYSTEM REGULATIONS.

3.1.4. DUST CONTROL ON DISTURBED AREAS - CONTROLLING SURFACE AND AIR MOVEMENT OF

DUST ON CONSTRUCTION SITE AND HAUL ROUTES. THE PURPOSE OF THE MEASURE IS

TO REDUCE THE PRESENCE OF AIRBORNE SUBSTANCES, WHICH MAY BE HARMFUL OR

INJURIOUS TO HUMAN HEALTH, WELFARE OR SAFETY, OR TO ANIMALS OR PLANT LIFE.

III. MAINTENANCE

1. MAINTENANCE PROGRAM

1.1. THE SITE SUPERINTENDENT, OR HIS/HER REPRESENTATIVE, SHALL MAKE VISUAL

INSPECTIONS OF ALL MECHANICAL CONTROLS AND NEWLY STABILIZED AREAS (I.E. SEEDED

AND MULCHED AND/OR SODDED AREAS) ON A DAILY BASIS; ESPECIALLY AFTER HEAVY

RAINFALL EVENT TO INSURE THAT ALL CONTROLS ARE MAINTAINED AND PROPERLY

FUNCTIONING. ANY DAMAGED CONTROLS SHALL BE REPAIRED PRIOR TO THE END OF THE

WORK DAY INCLUDING RE-SEEDING AND MULCHING OR RE-SODDING IF NECESSARY.

1.2. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL

IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION

CONTROL, ADDITIONAL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE

IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. ALL DRAINAGE SWALES,

POCKETS, DEPRESSION, LOW LINES, AND OUTLET DITCHES SHALL DRAIN EFFECTIVELY AT

ALL TIMES. SETTLEMENT OR WASHING THAT MAY OCCUR SHALL BE REPAIRED BY THE

CONTRACTOR. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN

IT REACHES 1/3 THE HEIGHT OF THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS

NECESSARY TO MAINTAIN AN EFFECTIVE BARRIER. MAINTAIN THE CONSTRUCTION EXIT IN

A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. THIS MAY

REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE. IMMEDIATELY REMOVE ALL

OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TACKED ONTO PUBLIC ROADWAYS.

RESEED AND MULCH AREA WHERE SEEDING EMERGENCE IS POOR, OR WHERE EROSION

OCCURS. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. INSPECT ALL MULCHES

PERIODICALLY, AND AFTER RAINSTORMS TO CHECK FOR EROSION, DISLOCATION OR

FAILURE. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED AND REINSTALL

MULCH. FOLLOW THE CONSTRUCTION SEQUENCE THROUGHOUT THE PROJECT

DEVELOPMENT. WHEN CHANGES IN CONSTRUCTION ACTIVITIES ARE NEEDED, AMEND THE

SEQUENCE SCHEDULE IN ADVANCE TO MAINTAIN MANAGEMENT CONTROL. IF MAJOR

CHANGES ARE NECESSARY, SEND A COPY OF THE MODIFIED SCHEDULE TO THE ENGINEER,

SEDIMENT AND EROSION CONTROL MEASURES WILL REMAIN IN PLACE AND BE MAINTAINED

UNTIL THE DISTURBED AREAS ARE STABILIZED.

2. SILT FENCE

SILT FENCES WILL BE MONITORED DURING CONSTRUCTION. ANY SILT FENCE WHICH IS NOT

FUNCTIONING PROPERLY WILL BE PROMPTLY REPAIRED. CLEAN OUT THE SILT FENCE WHEN

IT REACHES 1/3 THE HEIGHT OF THE FENCE OR REPLACE WITH FUNCTIONAL SILT FENCE

WITHIN 24 HOURS. USE OF HOSES AND WATER TO FLUSH THE SEDIMENT INTO THE STORM

INLETS IS UNACCEPTABLE.

3. SEDIMENTATION BASINS

SEDIMENTATION BASINS WHICH ARE AT 50% USED CAPACITY OR APPROACHING SUCH

CAPACITY SHALL BE RE-EXCAVATED TO ORIGINAL DIMENSIONS AND THE SILT PROPERLY

DISPOSED OF.

4. SEDIMENT LOGS/ROLLS

SEDIMENT LOGS/ROLLS OR OTHER CONTROL MEASURES WHICH BEGIN TO DISINTEGRATE OR

FUNCTION INEFFECTIVELY SHALL BE PROMPTLY REPLACED.

5. VEGETATION COVER

ANY VEGETATION COVER SERVING TO STABILIZE DISTURBED SOILS WHICH IS ITSELF

DISTURBED SHALL IMMEDIATELY BE REPLACED.

6. CONSTRUCTION ENTRANCE

MAINTAIN ROCK CONSTRUCTION ENTRANCE AND CLEAN ADJACENT ROADS OF ANY MUD

TRACKED ONTO THEM.

IV. INSPECTIONS

1. QUALIFIED PERSONNEL WILL INSPECT DISTURBED AREAS OF THE CONSTRUCTION SITE, AREAS

USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION THAT HAVE NOT

BEEN FINALLY STABILIZED, STRUCTURAL CONTROL MEASURES, AND LOCATIONS WHERE

VEHICLES ENTER OR EXIT THE SITE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS. WHERE

SITES HAVE BEEN FINALLY STABILIZED SUCH INSPECTIONS SHALL BE CONDUCTED AT LEAST

ONCE EVERY MONTH DURING THE WARRANTY PERIOD.

2. DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO

PRECIPITATION SHALL BE INSPECTED FOR EVIDENCE OF, OR THE POTENTIAL FOR,

POLLUTANTS ENTERING THE DRAINAGE SYSTEM. EROSION AND SEDIMENT CONTROL

MEASURES IDENTIFIED IN THE PLAN SHALL BE OBSERVED TO ENSURE THAT THEY ARE

OPERATING CORRECTLY. WHERE DISCHARGE LOCATIONS OR POINTS ARE ACCESSIBLE, THEY

SHALL BE INSPECTED TO ASCERTAIN WHETHER EROSION CONTROL MEASURES ARE

EFFECTIVE IN PREVENTING SIGNIFICANT IMPACTS TO RECEIVING WATERS. LOCATIONS WHERE

VEHICLES ENTER OR EXIT THE SITE SHALL BE INSPECTED FOR EVIDENCE OF OFFSITE

SEDIMENT TRACKING.

3. A WRITTEN REPORT SUMMARIZING THE SCOPE OF THE INSPECTION, NAME(S) AND

QUALIFICATIONS OF PERSONNEL MAKING THE INSPECTION, THE DATE(S) OF THE INSPECTION, WEATHER INFORMATION FOR THE PERIOD SINCE THE LAST INSPECTION (OR SINCE

COMMENCEMENT OF CONSTRUCTION ACTIVITY) INCLUDING A BEST ESTIMATE OF THE

BEGINNING OF EACH STORM EVENT, DURATION OF EACH STORM EVENT, APPROXIMATE

AMOUNT OF RAINFALL FOR EACH STORM EVENT (IN INCHES) AND WHETHER ANY DISCHARGES

OCCURRED, LOCATION(S) OF DISCHARGES OF SEDIMENT OR OTHER POLLUTANTS FROM THE

SITE, LOCATION(S) OF BMP'S THAT NEED MAINTENANCE, LOCATION(S) OF BMP'S THAT FAILED

TO OPERATE AS DESIGNED OR PROVED INADEQUATE FOR A PARTICULAR LOCATION,

LOCATION(S) WHERE ADDITIONAL BMP'S ARE NEEDED THAT DID NOT EXIST AT THE TIME OF

INSPECTION AND ANY CORRECTIVE ACTION REQUIRED INCLUDING ANY CHANGES TO SWPPP

NECESSARY AND IMPLEMENTATION DATES.

4. THE REPORT SHALL BE MAINTAINED AT LEAST THREE YEARS FROM THE DATE THE SITE IS

FINALLY STABILIZED. THE REPORT MUST BE SIGNED AND SHALL CONTAIN A CERTIFICATION

THAT THE FACILITY IS IN COMPLIANCE WITH THE STORM WATER POLLUTION PREVENTION PLAN

AND THE NPDES PERMIT REFERENCED ABOVE. THE CONTRACTOR SHALL MAINTAIN THIS

REPORT. THE REPORT SHALL BE SUBMITTED TO THE ENGINEER AND OWNER.

V. LONG TERM MAINTENANCE OF DRAINAGE AND STORM WATER

MANAGEMENT SYSTEM

THE ROADS AND DRAINAGE SYSTEM WILL BE OWNED AND MAINTAINED BY THE PROPERTY

OWNER AFTER CONSTRUCTION IS COMPLETE.

VI. SC DHEC STANDARD NOTES

1. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO GRASSING / HYDROSEEDING. IT MAY

BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION.

TEMPORARY BERMS MAY BE NEEDED UNTIL THE SLOPE IS BROUGHT TO GRADE.

2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF

THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED,

BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER WORK HAS CEASED, EXCEPT AS

STATED BELOW:

2.1. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN

GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS

PRACTICABLE.

2.2. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED,

AND EARTH-DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY

STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.

3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE EVERY

CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP

HAS BEEN USED INAPPROPRIATELY, OR INCORRECTLY, THE PERMITTEE MUST ADDRESS THE

NECESSARY REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48

HOURS OF IDENTIFICATION.

4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL

SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED,

GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION.

FILL, COVER, AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF

WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE

ANY SEDIMENTS BEFORE BEING PUMPED INTO ANY WATERS OF THE STATE.

5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF

CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL

DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE

REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE

SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE

CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED.

6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO

THE PAVED ROADWAY FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE

CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT AS MAY BE REQUIRED.

7. RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE

AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL

FOLLOW THESE PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN

IN ACCORDANCE WITH S.C. REG. 72-300 AND SCR100000.

8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING

CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT

SEDIMENT LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS.

9. ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR

OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE

INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN NOT BE MAINTAINED BETWEEN THE

DISTURBED AREA AND ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE

LAST ROW OF SILT FENCE AND ALL WOS

10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT

POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND

CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE

PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES.

11. A COPY OF THE SWPPP, INSPECTION RECORDS AND RAINFALL DATA MUST BE RETAINED AT

THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL

BUSINESS HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO

THE DATE THAT FINAL STABILIZATION IS REACHED.

12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER)

WHERE LAND DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND

WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR DAYS.

13. MINIMIZE SOIL COMPACTION IN AREAS NOT UNDER PAVEMENTS AND /OR STRUCTURES AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.

14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL

WASH WATER AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT

BASIN OR ALTERNATIVE CONTROL THAT PROVIDES EQUAL OR BETTER TREATMENT PRIOR TO

DISCHARGE.

15. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND

EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS

(SEDIMENT BASIN, FILTER BAG, ETC.).

16. THE FOLLOWING DISCHARGES ARE PROHIBITED:

16.1. WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE

CONTROL;

16.2. WASTEWATER FROM WASHOUT AND CLEANOUT OF OF STUCCO, PAINT, FORM RELEASE

OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;

16.3. FUELS, OILS OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND

MAINTENANCE; AND

16.4. SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.

17. AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM

OF AT LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL

STABILIZATION IS REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.

18. IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY

WITH THE REQUIREMENTS OF PERMIT SCR100000 AND/OR SC'S WATER QUALITY STANDARDS,

IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER

PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE

SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE

IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.

19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN

APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES.

FOR NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE, THIS CONFERENCE MUST BE

HELD ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.

VII. EROSION, SEDIMENTATION & POLLUTION CONTROL NOTES

1. THE IMPLEMENTATION OF THESE EROSION SEDIMENT CONTROL (ESC) PLANS AND THE

CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS

THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND

APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED.

2. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL

CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO INSURE THAT SEDIMENT

AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR

VIOLATE APPLICABLE WATER STANDARDS.

3. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR

ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES

SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT

SEDIMENT AND SEDIMENT LADEN WATER DO NOT LEAVE THE SITE.

4. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE CONTRACTOR AND MAINTAINED AS

NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.

5. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF

ONCE A MONTH OR WITHIN THE 24 HOURS FOLLOWING A MAJOR STORM EVENT.

6. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN

A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO

PAVING AND PRIOR TO FINAL INSPECTION. THE CLEANING OPERATION SHALL NOT FLUSH

SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM.

7. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF

CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL

MEASURES MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE

DURATION OF THE PROJECT.

8. BEFORE COMMENCING ANY LAND DISTURBING ACTIVITY, THE EXISTING STORM WATER INLET(S)

THAT RECEIVING RUNOFF FROM THE PROPOSED WORK AREA SHALL BE PROTECTED. THE

TEMPORARY INLET PROTECTION MUST REMAIN IN PLACE UNTIL THE CONSTRUCTION ACTIVITY

IS COMPLETED, THE STREET HAS BEEN SWEPT AND ANY EXPOSED SOILS ARE STABILIZED. THE

CONTRACTOR IS ALSO RESPONSIBLE FOR REMOVING ANY TEMPORARY INLET PROTECTION

INSTALLED; AFTER ALL DISTURBED AREAS ARE STABILIZED. TEMPORARY PROTECTION OF THE

INLETS MAY BE ACCOMPLISHED BY ONE OR MORE OF THE FOLLOWING:

8.1. USE OF GRAVEL BAGS TO FILTER THE SEDIMENT FROM ANY RUNOFF. TO MAKE A GRAVEL

BAG, USE A BAG MADE OF GEOTEXTILE FABRIC (NOT BURLAP) AND FILL WITH EITHER 3/4

INCH ROCK OR 1/4 INCH PEA GRAVEL.

8.2. USE OF SEDIMENT LOGS TO FILTER THE SEDIMENT FROM ANY RUNOFF (AVAILABLE

THROUGH LOCAL EROSION CONTROL SUPPLIERS).

8.3. USE OF ABOVE OR UNDER-GRATE FILTER BAGS OR DEVICES TO FILTER THE SEDIMENT

FROM ANY RUNOFF (AVAILABLE THROUGH EROSION CONTROL SUPPLIERS).

9. WATER MAY NOT BE DISCHARGED IN A MANNER THAT CAUSES EROSION, SEDIMENTATION, OR

FLOODING ON THE SITE, ON DOWNSTREAM PROPERTIES, IN THE RECEIVING CHANNELS, OR IN

ANY STORM WATER INLET. WHEN SITE DEWATERING, WATER PUMPED FROM THE SITE,

INCLUDING TRENCHES, SHALL BE TREATED BY ONE OF THE FOLLOWING:

9.1. TEMPORARY SEDIMENTATION BASINS

9.2. SEDIMENT FILTERING BAGS

10. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL EXISTING UTILITIES.

EXISTING UTILITIES ARE ALL UTILITIES THAT EXIST ON THE PROJECT IN AN ORIGINAL,

RELOCATED OR NEWLY INSTALLED POSITION. THE CONTRACTOR SHALL BE HELD RESPONSIBLE

FOR THE COST OF REPAIRS TO DAMAGED UNDERGROUND OR OVERHEAD FACILITIES, EVEN IF

THE UTILITY IS NOT SHOWN ON THE SITE DEVELOPMENT PLANS. THE CONTRACTOR SHALL

CONTACT THE LOCAL UTILITIES PROTECTION CENTER TO COORDINATE THE MARKING OF

EXISTING UTILITY LINES A MINIMUM OF 96 HOURS PRIOR TO COMMENCEMENT OF ANY WORK.

11. THE CONTRACTOR SHALL FLUSH ALL INLETS AND PIPE AT THE COMPLETION OF CONSTRUCTION TO REMOVE SILT AND DEBRIS. THE CLEANING AND FLUSHING OF INLETS AND PIPE (EXISTING

AND PROPOSED) SHALL BE CONSIDERED PART OF THE COST FOR THE PROJECT.

12. EGRESS FROM THE SITE SHALL BE CONTROLLED SUCH THAT VEHICLES LEAVING THE SITE

MUST TRAVERSE CONSTRUCTION EXITS TO REMOVE MUD FROM TIRES.

13. SCHEDULE CONSTRUCTION ACTIVITIES TO MINIMIZE THE EXPOSED AREA AND DURATION OF

EXPOSURE. IN SCHEDULING, TAKE INTO ACCOUNT THE SEASON AND THE WEATHER FORECAST.

14. EROSION CONTROL MEASURES ARE THE MINIMUM REQUIRED. THE CONTRACTOR SHALL

PROVIDE ADDITIONAL CONTROL MEASURES AS DICTATED BY ACTUAL FIELD CONDITIONS AT

THE TIME OF CONSTRUCTION IN ORDER TO PREVENT EROSION AND CONTROL SEDIMENT.

EROSION AND SEDIMENT CONTROL MEASURES WILL REMAIN IN PLACE AND BE MAINTAINED

UNTIL THE ENTIRE PROJECT IS TERMINATED OR SUSPENDED FOR AND INDEFINITE LENGTH OF

TIME, ALL DISTURBED AREAS SHALL BE PLANTED WITH PERMANENT VEGETATION.

15. THE DATA, TOGETHER WITH ALL OTHER INFORMATION SHOWN ON THESE PLANS, OR IN ANY

WAY INDICATED THEREBY, WHETHER BY DRAWINGS OR NOTES, OR IN ANY OTHER MANNER, IS

BASED UPON FIELD INVESTIGATIONS AND IS BELIEVED TO BE INDICATIVE OF ACTUAL

CONDITIONS. HOWEVER, THE SAME IS SHOWN AS INFORMATION ONLY, IS NOT GUARANTEED

AND DOES NOT BIND THOMAS & HUTTON, OR THE OWNER IN ANY WAY.

16. CONTRACTOR SHALL MAINTAIN SITE ON A DAILY BASIS TO PROVIDE FOR POSITIVE DRAINAGE.

CONTRACTOR, AT HIS COST, SHALL GRADE SITE AND PROVIDE NECESSARY TEMPORARY

DRAINAGE SWALES TO INSURE STORM WATER DOES NOT POND ON SITE.

17. SITE DRAINAGE SHALL BE ESTABLISHED TO PREVENT ANY PONDED WATER CONDITIONS WITHIN

THE CONSTRUCTION AREA AND TO FACILITATE STORM WATER DISCHARGE.

18. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE INSTALLATION OF

EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO, OR CONCURRENT

WITH, LAND DISTURBING ACTIVITIES.

19. LIME RATES AND ANALYSIS:

19.1. AGRICULTURAL LIME SHALL BE APPLIED AT THE RATE SHOWN IN THE SEEDING SECTION

UNLESS SOIL TESTS INDICATE OTHERWISE. GRADED AREAS REQUIRE LIME APPLICATION. IF

LIME IS APPLIED WITHIN SIX MONTHS OF PLANTING PERMANENT PERENNIAL VEGETATION,

ADDITIONAL LIME IS NOT REQUIRED. AGRICULTURAL LIME APPLICATION SHALL BE WITHIN

THE SPECIFICATIONS OF THE SOUTH CAROLINA DEPARTMENT OF AGRICULTURE.

20. MULCHING:

MULCHING IS REQUIRED FOR ALL PERMANENT VEGETATION APPLICATIONS. MULCH APPLIED TO

SEEDED AREAS SHALL ACHIEVE 75% SOIL COVER. SELECT THE MULCHING MATERIAL FROM THE

FOLLOWING AND APPLY AS INDICATED:

20.1. DRY STRAW OR DRY HAY OF GOOD QUALITY AND FREE OF WEED SEEDS CAN BE USED.

DRY STRAW SHALL BE APPLIED AT THE RATE OF TWO TONS PER ACRE. DRY HAY SHALL BE

APPLIED AT THE RATE OF 2 1/2 TONS PER ACRE.

20.2. WOOD CELLULOSE MULCH OR WOOD PULP FIBER SHALL BE USED WITH HYDRAULIC

SEEDING. IT SHALL BE APPLIED AT A RATE OF 500 POUNDS PER ACRE. DRY STRAW OR DRY

HAY SHALL BE APPLIED (AT THE RATE INDICATED ABOVE) AFTER HYDRAULIC SEEDING.

20.3. ONE THOUSAND POUNDS OF WOOD CELLULOSE OR WOOD PULP FIBER, WHICH INCLUDES A

TACKIFIER, SHALL BE USED WITH HYDRAULIC SEEDING ON SLOPES 3/4:1 OR STEEPER.

20.4. PINE STRAW OR PINE BARK SHALL BE APPLIED AT A THICKNESS OF 3 INCHES FOR BEDDING

PURPOSES. OTHER SUITABLE MATERIALS IN SUFFICIENT QUANTITY MAY BE USED WHERE

ORNAMENTALS OR OTHER GROUND COVERS ARE PLANTED. THIS IS NOT APPROPRIATE

FOR SEEDED AREAS.

20.5. WHEN USING TEMPORARY EROSION CONTROL BLANKETS OR BLACK SOD, MULCH IS NOT

REQUIRED.

20.6. ON SLOPES GREATER THAN 10 FEET IN LENGTH AND 4:1 OR STEEPER, USE THE FOLLOWING

EROSION CONTROL BLANKETS THAT HAVE BEEN PROPERLY ANCHORED TO THE SLOPE

ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS:

· 2:1 SLOPES OR STEEPER: - STRAW/COCONUT BLANKET OR HIGH VELOCITY WOOD

BLANKET

· 3:1 SLOPES OR STEEPER: - WOOD OR STRAW BLANKET WITH NET ON BOTH SIDES

· 4:1 SLOPES OR FLATTER: - WOOD OR STRAW MULCH BLANKET WITH NET ON ONE SIDE

VIII. HOUSEKEEPING

THESE PERFORMANCE STANDARDS APPLY TO ALL SITES.

1. PETROLEUM PRODUCTS: INCLUDING OIL, GASOLINE, LUBRICANTS AND ASPHALTIC

SUBSTANCES.

1.1. HAVE EQUIPMENT TO CONTAIN AND CLEAN UP PETROLEUM SPILLS IN FUEL STORAGE

AREAS OR ON MAINTENANCE AND FUELING VEHICLES

1.2. STORE IN COVERED AREAS PROTECTED WITH DIKES

2. SPILLS: PREVENTION AND RESPONSE.

2.1. STORE AND HANDLE MATERIALS TO PREVENT SPILLS

2.2. TIGHTLY SEALED CONTAINERS, NEAT AND SECURE STACKING, ETC.

2.3. REDUCE STORM WATER CONTACT IF SPILL OCCURS

2.3.1. CLEANUP PROCEDURES SHOULD BE CLEARLY POSTED.

2.3.2. CLEANUP MATERIALS SHOULD BE READILY AVAILABLE

2.3.3. STOP THE SOURCE

2.3.4. CONTAIN THE SPILL

3. NON-STORM WATER DISCHARGES

THE FOLLOWING NON-STORMWATER DISCHARGES MUST BE PROTECTED FROM CAUSING

POLLUTION OR EROSION:

3.1. DISCHARGES FROM FIRE-FIGHTING ACTIVITIES

3.2. FIRE HYDRANT FLUSHINGS

3.3. WATERS USED TO WASH VEHICLES WHERE DETERGENTS ARE NOT USED

3.4. WATER USED TO CONTROL DUST

3.5. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS

3.6. ROUTINE EXTERNAL BUILDING WASH DOWN THAT DOES NOT USE DETERGENTS

3.7. PAVEMENT WASH WATERS WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS

HAVE NOT OCCURRED (UNLESS ALL SPILLED MATERIAL HAS BEEN REMOVED) AND WHERE

DETERGENTS ARE NOT USED

3.8. UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE

3.9. UNCONTAMINATED GROUND WATER OR SPRING WATER

3.10. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH

PROCESS MATERIALS SUCH AS SOLVENTS

3.11. UNCONTAMINATED EXCAVATION DEWATERING

3.12. LANDSCAPE IRRIGATION

3.13. DECHLORINATED SWIMMING POOL DISCHARGES.

4. CONSTRUCTION WASTES: DEMOLITION RUBBLE, PACKAGING MATERIALS, SCRAP BUILDING

SUPPLIES, ETC.

4.1. SELECT A DESIGNATED WASTE COLLECTION AREA

4.2. PROVIDE LIDS FOR WASTE CONTAINERS

4.3. WHEN POSSIBLE LOCATE CONTAINERS IN COVERED AREA

4.4. MAINTAIN CONSISTENT REMOVAL SCHEDULE FOR WASTE

5. PESTICIDES: REDUCE THE AMOUNT OF PESTICIDES AVAILABLE FOR CONTACT WITH STORM

WATER.

5.1. STORE IN A DRY COVERED AREA

5.2. INSTALL CURBS OR DIKES AROUND STORAGE AREA TO PROTECT AGAINST SPILLS

5.3. STRICTLY FOLLOW RECOMMENDED APPLICATION RATES

6. FERTILIZERS AND DETERGENTS: REDUCE THE AMOUNT OF FERTILIZERS AND DETERGENTS

AVAILABLE FOR CONTACT WITH STORM WATER.

6.1. LIMIT APPLICATION OF FERTILIZERS TO THE MINIMUM NEEDED

6.2. APPLY MORE FREQUENTLY BUT AT LOWER APPLICATION RATES

6.3. LIMIT USE OF DETERGENTS ON-SITE

6.4. DO NOT DISCHARGE WASH WATER INTO STORM WATER SYSTEM

6.5. MAINTAIN STRUCTURAL AND VEGETATIVE BMP'S

6.6. APPLY ACCORDING TO SOIL TEST RECOMMENDATIONS PRIOR TO SEEDING.

IX. GRASSING NOTES

1. SOD:

ALL SOD SHALL BE NURSERY GROWN AS CLASSIFIED IN THE ASPS GSS. MACHINE CUT SOD AT A

UNIFORM THICKENS OF 3/4" WITHIN A TOLERANCE OF 1/4", EXCLUDING TOP GROWTH AND

THATCH. EACH INDIVIDUAL SOD PIECE SHALL BE STRONG ENOUGH TO SUPPORT ITS OWN

WEIGHT WHEN LIFTED BY THE ENDS. BROKEN PODS, IRREGULARLY SHAPED PIECES, AND TORN

OR UNEVEN ENDS WILL BE REJECTED. WOOD PEGS AND / OR WIRE STAPLES SHALL REPLACE

SOD WITH AN EQUAL SOD COMPOSITION AS THAT WHICH IS EXISTING. IF NO SOD TYPE EXIST.

THEN THE FOLLOWING SOD COMPOSITION SHALL BE USED.

2. SODDING SCHEDULE:

LAY SOD FROM MAY 1 TO SEPTEMBER 15 FOR SPRING PLANTING AND FROM SEPTEMBER 15 TO

NOVEMBER 1 FOR FALL PLANTING.

3. SEED:

ALL SEED SHALL CONFORM TO ALL STATE LAWS AND TO ALL REQUIREMENTS AND

REGULATIONS OF THE SOUTH CAROLINA DEPARTMENT OF AGRICULTURE. THE SEVERAL

VARIETIES OF SEED SHALL BE INDIVIDUALLY PACKAGED OR BAGGED, AND TAGGED TO SHOW

NAME OF SEED, NET WEIGHT, ORIGIN, GERMINATION, LOT NUMBER, AND OTHER INFORMATION

REQUIRED BY THE DEPARTMENT OF AGRICULTURE.

3.1. PENNISETUM GLAUCIUM (BROWNTOP MILLET): TESTING 98 PERCENT PURITY AND 85

PERCENT GERMINATION.

3.2. BERMUDA COMMON: TESTING 98 PERCENT PURITY AND 85 PERCENT GERMINATION.

3.3. DOMESTIC ITALIAN RYE: TESTING 98 PERCENT PURITY AND 90 PERCENT GERMINATION.

4. MISCELLANEOUS:

4.1. PERMANENT SEEDING SHALL COVER ALL DISTURBED AREA NOT TO BE COVERED BY

LANDSCAPE PLANTING BEDS, STRUCTURE, OR PAVEMENT.

4.2. SEED ALL DISTURBED AREAS WITHIN SEVEN DAYS OF FINAL GRADING AND TEMPORARY

SEED/MULCH ALL AREAS THAT WILL BE LEFT INACTIVE FOR MORE THAN FOURTEEN (14)

DAYS.

4.3. ALL PERMANENT GRASS PLANTINGS SHALL BE MULCHED

4.4. CENTIPEDE SOD CAN BE USED AS PERMANENT COVER ANYTIME EXCEPT JUNE THRU OCTOBER

4.5. IF GRASSING OCCURS DURING A MONTH REQUIRING TEMPORARY COVER, THE CONTRACTOR

SHALL APPLY PERMANENT COVER (IN ADDITION TO THE TEMPORARY COVER) AT THE

APPROPRIATE TIME AT NO NO ADDITIONAL COST. THE CONTRACTOR MUST ACHIEVE A STRAND

OF PERMANENT GRASS WITH AT LEAST 95% COVER. BARE SPOTS CAN NOT BE MORE THAN 1

INCH SQUARE IN ANY 10 SF.

X. PERMANENT STABILIZATION

NEWLY SEEDED OR SODDED AREAS MUST BE PROTECTED FROM VEHICLE TRAFFIC,EXCESSIVE

PEDESTRIAN TRAFFIC, AND CONCENTRATED RUNOFF UNTIL THE VEGETATION IS WELL

ESTABLISHED. IF NECESSARY, AREAS MUST BE RE-WORKED AND RE-STABILIZED IF GERMINATION IS SPARSE, PLANT COVERAGE IS SPOTTY ,OR TOPSOIL EROSION IS EVIDENT. ONE OR MORE OF THE

FOLLOWING MAY APPLY TO THE SITE.

4.1. SEEDED AREAS

FOR SEEDED AREAS, PERMANENT STABILIZATION MEANS A 90% COVER OF THE DISTURBED

AREA WITH MATURE, HEALTHY PLANTS WITH NO EVIDENCE OF WASHING OR RILLING OF

THE TOPSOIL.

4.2. SODDED AREAS

FOR SODDED AREAS, PERMANENT STABILIZATION MEANS THE COMPLETE BINDING OF THE

SOD ROOTS INTO THE APPROVED MULCH MATERIAL.

4.3. PERMANENT MULCH

FOR MULCHED AREAS, PERMANENT MULCHING MEANS TOTAL COVERAGE OF THE

EXPOSED AREA WITH AN APPROVED MULCH MATERIAL.

4.4. RIPRAP

FOR AREAS STABILIZED WITH RIPRAP, PERMANENT STABILIZATION MEANS THAT SLOPES

STABILIZED WITH RIPRAP HAVE AN APPROPRIATE BACKING OF AN APPROVED GEOTEXTILE

TO PREVENT SOIL MOVEMENT FROM BEHIND THE RIPRAP.

4.5. DITCHES, CHANNELS, AND SWALES

FOR OPEN CHANNELS, PERMANENT STABILIZATION MEANS THE CHANNEL IS STABILIZED

WITH MATURE VEGETATION AT LEAST THREE INCHES IN HEIGHT, WITH WELL-GRADED

RIPRAP LINING, OR WITH ANOTHER NON-EROSIVE LINING CAPABLE OF WITHSTANDING THE

ANTICIPATED FLOW VELOCITIES AND FLOW DEPTHS WITHOUT RELIANCE ON CHECK DAMS

TO SLOW FLOW. THERE MUST BE NO EVIDENCE OF SLUMPING OF THE LINING,

UNDERCUTTING OF THE BANKS, OR DOWN CUTTING OF THE CHANNEL.

XI. FERTILIZER REQUIREMENTS

1. TEMPORARY SEEDING FERTILIZER

APPLY A MINIMUM OF 500 LBS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (11.5 POUNDS

PER 1000 SQUARE FEET) OR EQUIVALENT DURING TEMPORARY SEEDING OF GRASSES UNLESS

A SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF

USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE

CONDITIONS ALLOW. LIME IS NOT REQUIRED FOR TEMPORARY SEEDING UNLESS A SOIL TEST

SHOWS THAT THE SOIL PH IS BELOW 5.0. IT IS DESIRABLE TO APPLY LIME DURING THE

TEMPORARY SEEDING OPERATION TO BENEFIT THE LONG-TERM PERMANENT SEEDING. APPLY

A MINIMUM OF 1.5 TONS OF LIME / ACRE (70LBS. / 1000 SQ. FT.).

2. PERMANENT SEEDING FERTILIZER

APPLY A MINIMUM OF 1000 LBS PER ACRE OF A COMPLETE 10-10-10 FERTILIZER (23 POUNDS

PER 1000 SQUARE FEET) OR EQUIVALENT DURING PERMANENT SEEDING OF GRADES UNLESS A

SOIL TEST INDICATES A DIFFERENT REQUIREMENT. INCORPORATE FERTILIZER AND LIME (IF

USED) INTO THE TOP 4-6 INCHES OF THE SOIL BY DISKING OR OTHER MEANS WHERE

CONDITIONS ALLOW. DO NOT MIX THE LIME AND THE FERTILIZER PRIOR TO THE FIELD

APPLICATION. UNLESS A SPECIFIC SOIL TEST INDICATES OTHERWISE, APPLY 1 & 1/2 TONS OF

GROUND COARSE TEXTURED AGRICULTURAL LIMESTONE PER ACRE (70 LBS. / 1000 SQ.FT.).

XII. SWPP PREPARER CERTIFICATION

I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000.

50 Park of Commerce Way

LIST OF ACRONYMS FOR SEDIMENT AND EROSION CONTROL

AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

AMD ACRYLAMIDE POLYMER

BFM BONDED FIBER MATRIX

BMP(S) BEST MANAGEMENT PRACTICE(S)

CFS CUBIC FEET PER SECOND

CMP CORRUGATED METAL PIPE

DHEC DEPARTMENT OF HEATH AND ENVIRONMENTAL CONTROL

ECB EROSION CONTROL BLANKET

EPA UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

EPSC EROSION PREVENTION AND SEDIMENTATION CONTROL

FDA UNITED STATES FOOD AND DRUG ADMINISTRATION

FGM FLEXIBLE GROWTH MATRIX

HDPE HIGH DENSITY POLYETHYLENE

MS4 MUNICIPAL SEPARATE STORM SEWER SYSTEM

MSDS MATERIAL SAFETY DATA SHEETS

NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

PAM POLYACRYLAMIDE OR POLYMER

RCP REINFORCED CONCRETE PIPE

SCS SOIL CONSERVATION SERVICE

SWPPP STORMWATER POLLUTION PREVENTION PROGRAM

TRM TURF REINFORCEMENT MAT

VFS VEGETATED FILTER STRIP

TEMPORARY SEEDING - COASTAL

SPECIES LBS/AC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

SANDY, DROUGHTY SITES

BROWNTOP MILLET 40

RYE, GRAIN 56

RYEGRASS 50

WELL DRAINED, CLAYEY/LOAMEY SITES

BROWNTOP MILLET 40

JAPANESE MILLET 40

RYE, GRAIN 56

OATS 75

RYEGRASS 50

PERMANENT SEEDING - COASTAL

SPECIES LBS/AC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

SANDY, DROUGHTY SITES

BROWNTOP MILLET 10

BAHIAGRASS 40

BROWNTOP MILLET 10

BAHIAGRASS 30

BROWNTOP MILLET 10

ATLANTIC COASTAL 15

PANICGRASS PLS

BROWNTOP MILLET 10

SWITCHGRASS 8

(ALAMO) PLS

LITTLE BLUESTEM 4

BROWNTOP MILLET 10

WEEPING LOVEGRASS 8

WELL DRAINED, CLAYEY/LOAMEY SITES

BROWNTOP MILLET 10

BAHIAGRASS 40

RYE, GRAIN 10

BAHIAGRASS 40

CLOVER, CRIMSON (ANNUAL) 5

BROWNTOP MILLET 10

BAHIAGRASS 30

BROWNTOP MILLET 10

BERMUDA, COMMON 10

BROWNTOP MILLET 10

BERMUDA, COMMON 12

BROWNTOP MILLET 10

BAHIAGRASS 20

BERMUDA, COMMON 6

BROWNTOP MILLET 10

SWITCHGRASS 8

LITTLE BLUESTEM PLS

INDIANGRASS 3

CONSTRUCTION SEQUENCE

CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION

1 OBTAIN COPIES OF ALL PLAN APPROVALS AND

OTHER APPLICABLE PERMITS.

CONTRACTOR TO HAVE ONSITE AT ALL TIMES DURING

CONSTRUCTION.

2 FLAG THE WORK LIMITS AND BARRICADE TREES AND

MARK BUFFER AREAS FOR PROTECTION.

HAVE LOCAL REGULATORY AGENCY INSPECT TREE

BARRICADES.

3 HOLD PRE CONSTRUCTION CONFERENCE AT LEAST

ONE WEEK PRIOR TO STARTING CONSTRUCTION.

REVIEW TREE PROTECTION (BARRICADE) WITH OWNER AND

LOCAL REGULATORY AGENCY. TAKE PICTURES OF ALL

PROTECTED TREES AND LOCATIONS WHERE SITE WORK TIES

INTO EXISTING TO DOCUMENT PREDEVELOPMENT

PROCEDURES.

4 INSTALL CONSTRUCTION ACCESS AND LAY DOWN

AREAS

STABILIZE BARE AREAS IMMEDIATELY AND INSTALL

CONSTRUCTION EXITS / ENTRANCES.

5 CONSTRUCT SEDIMENT TRAPS AND BARRIERS -

BASIN TRAPS, SEDIMENT FENCES, AND OUTLET

PROTECTION.

INSTALL PRINCIPAL BASINS AFTER CONSTRUCTION SITE IS

ACCESSED. INSTALL ADDITIONAL TRAPS AND BARRIERS AS

NEEDED DURING GRADING.

6 ESTABLISH RUNOFF CONTROL - DIVERSIONS,

PERIMETER DIKES, WATER BARS, AND OUTLET

PROTECTION.

INSTALL KEY PRACTICES AFTER PRINCIPAL SEDIMENT TRAPS

AND BEFORE LAND GRADING. INSTALL ADDITIONAL

RUNOFF-CONTROL MEASURES DURING GRADING.

7 LAND CLEARING AND GRADING-SITE PREPARATION

CUTTING, FILLING AND GRADING, SEDIMENTATION

TRAPS, BARRIERS, DIVERSIONS, DRAINS, SURFACE

ROUGHENING.

BEGIN MAJOR CLEARING AND GRADING AFTER PRINCIPAL

SEDIMENT AND KEY RUNOFF-CONTROL MEASURES ARE

INSTALLED. CLEAR BORROW AND DISPOSAL AREAS ONLY AS

NEEDED. INSTALL ADDITIONAL CONTROL MEASURES AS

GRADING PROGRESSES. MARK TREES AND BUFFER AREAS

FOR PRESERVATION.

8 RUNOFF CONVEYANCE SYSTEM- INSTALL STORM

DRAINS, STABILIZE BANKS, CHANNELS, INSTALL

INLET AND OUTLET PROTECTION, SLOPE DRAINS.

WHERE NECESSARY, STABILIZE BANKS AS EARLY AS

POSSIBLE. INSTALL PRINCIPAL RUNOFF CONVEYANCE SYSTEM

WITH RUNOFF- CONTROL MEASURES. INSTALL REMAINDER OF

SYSTEM AFTER GRADING.

9 INSTALL WASTEWATER COLLECTION, WATER

DISTRIBUTION, AND STORM DRAINAGE SYSTEMS

APPLY TEMPORARY OR PERMANENT STABILIZATION

MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE

WORK IS DELAYED OR COMPLETE.

10 SURFACE STABILIZATION-TEMPORARY AND

PERMANENT SEEDING, MULCHING, SODDING, RIP

RAP.

APPLY TEMPORARY OR PERMANENT STABILIZATION

MEASURES IMMEDIATELY ON ALL DISTURBED AREAS WHERE

WORK IS DELAYED OR COMPLETE.

11 BUILDING CONSTRUCTION- BUILDINGS UTILITIES,

ROADS, ETC.

INSTALL NECESSARY EROSION AND SEDIMENTATION CONTROL

PRACTICES AS WORK TAKES PLACE.

12 LANDSCAPING AND FINAL STABILIZATION -

TOPSOILING, TREES AND SHRUBS, PERMANENT

SEEDING, MULCHING, SODDING, RIP RAP.

LAST CONSTRUCTION PHASE--STABILIZE ALL OPEN AREAS,

INCLUDING BORROW AND SPOIL AREAS. REMOVE AND

STABILIZE ALL TEMPORARY CONTROL MEASURES.

EROSION CONTROL LEGEND EROSION CONTROL LEGEND EROSION CONTROL LEGEND

50 Park of Commerce Way

N/F

1 GUMTREE LLC.

N/F

SOC MARSH POINT INC.

N/F

SOC MARSH POINT INC.

50' RIGHT-OF-WAY

150' CENTRAL ELECTRIC POWERLINE EASEMENT

Rd-B

Sk-A

Rd-B

Sk-A 50 Park of Commerce Way

Savannah, GA 31405 • 912.234.5300

TREE PROTECTION LEGEND

1.0' MIN.1.0' MIN.

CURB INLET

CURB INLET FILTER

CURB INLET FILTER

DIRECTION OF FLOW

GUTTER

PIPE

MATERIALS:

ONLY USE SURFACE COURSE INLET FILTERS THAT HAVE A MINIMUM HEIGHT OR DIAMETER OF 9-INCHES AND HAVE A MINIMUM LENGTH THAT IS 2-FEET LONGER THAN THE LENGTH OF THE CURB OPENING. SURFACE COURSE INLET FILTERS ARE NOT DESIGNED TO COMPLETELY BLOCK THE INLET OPENING.

SURFACE COURSE INLET FILTERS ARE CONSTRUCTED WITH A SYNTHETIC MATERIAL THAT WILL ALLOW STORM WATER TO FREELY FLOW THROUGH WHILE TRAPPING SEDIMENT AND DEBRIS. THE GEOTEXTILE IS NON-BIODEGRADABLE AND RESISTANT TO DEGRADATION BY ULTRAVIOLET EXPOSURE AND RESISTANT TO CONTAMINANTS COMMONLY ENCOUNTERED IN STORM WATER. STRAW, STRAW FIBER, STRAW BALES, PINE NEEDLES AND LEAF MULCH ARE NOT

PERMISSIBLE FILTER MATERIALS.

SURFACE COURSE INLET FILTERS HAVE AGGREGATE COMPARTMENTS FOR STONE, SAND OR OTHER WEIGHTED MATERIALS OR MECHANISMS TO HOLD THE

UNIT IN PLACE.

USE FILTER FABRIC THAT IS CAPABLE OF REDUCING EFFLUENT SEDIMENT CONCENTRATIONS BY NO LESS THAN 80% UNDER TYPICAL SEDIMENT

MIGRATION CONDITIONS.

APPLICABLE TYPE E INLET FILTERS MAY BE SELECTED FROM THE SCDOT APPROVED PRODUCTS LIST.

INSTALLATION:

SURFACE COURSE INLET FILTERS ARE APPLICABLE FOR ROAD CATCH BASIN AFTER THE ROAD SURFACE COURSE IS PLACED. PLACE SURFACE COURSE

INLET FILTERS WHERE SEDIMENT MAY SPILL OVER SIDEWALKS AND CURBS.

INSTALL SURFACE COURSE INLET FILTERS IN FRONT OF CURB INLET OPENINGS. THE FILTER SHALL HAVE A MINIMUM HEIGHT OR DIAMETER OF 9-INCHES AND HAVE A MINIMUM LENGTH THAT IS 2-FEET LONGER THAN THE LENGTH OF THE CURB OPENING. THIS WILL ALLOW SUFFICIENT LENGTH TO COVER THE INLET WITH AT LEAST 1-FOOT OF CLEARANCE BEYOND THE INLET ON BOTH ENDS.

DO NOT COMPLETELY BLOCK THE INLET OPENING WITH SURFACE COURSE INLET FILTERS. INSTALL SURFACE COURSE INLET FILTERS IN A MANNER TO

ALLOW OVERFLOWS TO ENTER THE CATCH BASIN.

FILL THE AGGREGATE COMPARTMENT TO A LEVEL (AT LEAST 1/2 FULL) THAT WILL KEEP THE SURFACE COURSE INLET FILTER IN PLACE AND CREATE A

SEAL BETWEEN THE SURFACE COURSE INLET FILTER AND THE ROAD SURFACE.

INSPECTION AND MAINTENANCE:

PONDING IS LIKELY IF SEDIMENT IS NOT REMOVED REGULARLY, THEREFORE ROUTINE MAINTENANCE MUST BE PROVIDED.

INSPECT SURFACE COURSE CURB INLET FILTERS ON A REGULAR BASIS AND IMMEDIATELY AFTER MAJOR RAIN EVENTS.

CLEAN THE SURFACE COURSE CURB INLET FILTER IF A VISUAL INSPECTION SHOWS SILT AND DEBRIS BUILD UP AROUND THE FILTER.

SURFACE COURSE CURB INLET FILTERS (TYPE E)

TOP VIEW

DUST CONTROL

DUST CONTROL

MAXIMUM SPACING = 6 FT.

FILTER FABRIC

BACKFILL TRENCH WITH

COMPACTED EARTH

COMPACTED

EARTH

COMPACTED

EARTH

FILTER FABRIC FILTER FABRIC

RUNOFF

RUNOFF RUNOFF

BURY FABRICUSE EITHER FLAT-BOTTOM

OR V-BOTTOM TRENCH

SHOWN BELOW

FLAT-BOTTOM TRENCH DETAIL V-SHAPED TRENCH DETAIL

SILT FENCE INSTALLATION

FILTER

FABRIC

FILTER FABRIC

1.25 LB./LINEAR FT. STEEL POSTS

HEAVY DUTY PLASTIC TIE

FOR STEEL POSTS

WHEN AND WHERE TO USE IT:

SILT FENCE IS APPLICABLE IN AREAS:

WHERE THE MAXIMUM SHEET OR OVERLAND FLOW PATH LENGTH TO THE FENCE IS 100-FEET.

WHERE THE MAXIMUM SLOPE STEEPNESS (NORMAL [PERPENDICULAR] TO FENCE LINE) IS 2H:1V.

THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS.

DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT AS A VELOCITY CONTROL BMP.

MATERIALS:

STEEL POSTS

USE 48-INCH LONG STEEL POSTS THAT MEET THE FOLLOWING MINIMUM PHYSICAL REQUIREMENTS:

COMPOSED OF HIGH STRENGTH STEEL WITH MINIMUM YIELD STRENGTH OF 50,000 PSI.

HAVE A STANDARD "T" SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND NOMINAL "T" LENGTH OF 1.48-INCHES.

WEIGH 1.25 POUNDS PER FOOT (± 8%).

HAVE A SOIL STABILIZATION PLATE WITH A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES ATTACHED TO THE STEEL POSTS.

PAINTED WITH A WATER BASED BAKED ENAMEL PAINT.

USE STEEL POSTS WITH A MINIMUM LENGTH OF 4-FEET, WEIGHING 1.25 POUNDS PER LINEAR FOOT (± 8%) WITH PROJECTIONS TO AID IN FASTENING THE FABRIC. EXCEPT WHEN HEAVY CLAY SOILS ARE PRESENT ON SITE, STEEL POSTS WILL HAVE A METAL SOIL STABILIZATION PLATE WELDED NEAR THE BOTTOM SUCH THAT WHEN THE POST IS DRIVEN TO THE PROPER DEPTH, THE PLATE WILL BE

BELOW THE GROUND LEVEL FOR ADDED STABILITY.

THE SOIL PLATES SHOULD HAVE THE FOLLOWING CHARACTERISTICS:

BE COMPOSED OF MINIMUM 15 GAUGE STEEL.

HAVE A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES.

GEOTEXTILE FILTER FABRIC:

FILTER FABRIC IS:

COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS COMPOSED OF AT LEAST 85% BY WEIGHT OF POLYOLEFINS, POLYESTERS, OR POLYAMIDES.

FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER.

FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES AFTER INSTALLATION.

FREE OF DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING PROPERTIES.

CUT TO A MINIMUM WIDTH OF 36 INCHES.

USE ONLY FABRIC APPEARING ON SCDOT APPROVAL SHEET #34 MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE

SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.

INSTALLATION:

EXCAVATE A TRENCH APPROXIMATELY 6-INCHES WIDE AND 6-INCHES DEEP WHEN PLACING FABRIC BY HAND. PLACE 12-INCHES OF GEOTEXTILE FABRIC INTO THE 6-INCH DEEP TRENCH, EXTENDING THE REMAINING 6-INCHES TOWARDS THE UPSLOPE SIDE OF THE TRENCH.